Loading...
HomeMy WebLinkAboutSDP 2018-0004; ROMERIA POINTE APARTMENTS; GEOPIER STRUCTURAL CALCULATIONS; 2024-07-18THESE PLANS/DOCUMENTS HAVE BEENREVIEWED FOR COMPLIANCE WITH THEAPPLICABLE CALIFORNIA BUILDING STANDARDSCODES AS ADOPTED BY THE STATE OFCALIFORNIA AND AMENDED BY THEJURISDICTION. PLAN REVIEW ACCEPTANCE OFDOCUMENTS DOES NOT AUTHORIZECONSTRUCTION TO PROCEED IN VIOLATION OFANY FEDERAL, STATE, NOR LOCAL REGULATION.BY: _________________ DATE: ________________ True North Compliance Services, Inc. THIS SET OF THE PLANS AND SPECIFICATIONSMUST BE KEPT ON THE JOB SITE AT ALL TIMESAND IT IS UNLAWFUL TO MAKE ANY CHANGESOR ALTERATIONS WITHOUT PERMISSION FROMTHE CITY. OCCUPANCY OF STRUCTURE(S) ISNOT PERMITTED UNTIL FINAL APPROVAL ISGRANTED BY ALL APPLICABLE DEPARTMENTS. Scott Weisse 07/23/24 WCi 11 CiEOPIER~ July 18, 2024 Alliance Diversified Enterprises, Inc. Attn: Judd Hatzky 665 Opper Street Escondido, Ca 92029 Western Ground Improvement, Inc. 209 Avenida Del Mar Suite 2018 San Clemente, California 92672 Tel: (714) 336-3702 www.westerngroundimprovement.com Re: Design Submittal for a Geopiet® Foundation System -Delta 1 Romeria Pointe Apartments Carlsbad, California GFC Project No.: GDC-835 Dear Mr. Hatzky, Western Ground Improvement, Inc. has completed the Geopier® foundation design for the above project. The following documents are included herein: • Geopier Design Drawing Sheet 18 of 20: Geopier Notes & Details • Geopier Design Drawing Sheet 19 of 20: Geopier Location Plan -Building A • Geopier Design Drawing Sheet 20 of 20: Geopier Location Plan -Building B We are pleased to have provided you with our design services. If you have any questions, please contact this office. Sincerely, Western Ground lmprov Aar Bis Regional GEOPIER DESIGN NOTES: 1. 2. 3. 4. 5. 6. GEOPIER FOUNDATION SUPPORT IS AS DESIGNED BY WESTERN GROUND IMPROVEMENT, INC., SAN CLEMENTE, CALIFORNIA (DESIGNER). THESE DESIGN DRAWINGS ARE PREPARED BY THE DESIGNER FOR USE IN GEOPIER CONSTRUCTION. THE GEOPIER SYSTEM SHALL BE INSTALLED BY APPROVED INSTALLERS LICENSED BY GEOPIER FOUNDATION COMPANY. UNAUTHORIZED USE OF THESE DRAWINGS IS PROHIBITED. THE GEOPIER FOUNDATION DESIGN IS BASED ON THE GEOTECHNICAL INFORMATION PROVIDED IN THE SUBSURFACE EXPLORATION BY GEOSOILS, INC. IN THE REPORTS DATED 11/21/17, 08/17121 & 05/18/22. GEOPIER FOUNDATION COMPANY HAS RELIED ON THIS INFORMATION AND WE HAVE NO REASON TO SUSPECT ANY OF THE INFORMATION IN THE REPORT IS IN ERROR. GEOPIER FOUNDATION COMPANY IS NOT RESPONSIBLE FOR ERRORS OR OMISSIONS IN THE REPORT THAT MAY AFFECT THE PARAMETER VALUES IN OUR DESIGN. IF THE SUBSURFACE OR SITE CONDITIONS DIFFER FROM THOSE UTILIZED IN THE DESIGN THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY. \ /--. -.. -.. &_ THE ALLOWABLE BEARING PRESSURE FOR FOUNDATIONS SUPPORTED BY GEOPIER ELEMENTS ts 6,000 PSF FOR THIS PROJECT PLUS l INCREASE FOR TRANSIENT LOADS. .. _ ! THE GEOPIER LAYOUT IS DESIGNED TO PROVIDE SETTLEMENT CONTROL BASED ON SERVICE LOADS PROVIDED BY KURT FISCHER STRUCTURAL ENGINEERING. IN THE EVENT THE STRUCTURAL LOADS VARY, THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY. FOOTING ELEVATIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL BE REPORTED IN WRITING TO THE INSTALLER'S QC REPRESENTATIVE PRIOR TO INSTALLING GEOPIER ELEMENTS. GEOPIER LAYOUT NOTES: 1. GEOPIER ELEMENT LAYOUT IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. GEOPIER ELEMENTS SHALL BE INSTALLED IN THE FIELD WITHIN 6 INCHES OF LOCATIONS SHOWN ON THESE PLANS. 2. GEOPIER ELEMENTS ARE LOCATED RELATIVE TO THE INTERSECTION OF REFERENCE GRID LINES OR AT THE CENTERLINE OF STRIP FOOTINGS, UNLESS DIMENSIONED OTHERWISE. 3. THE "GEOPIER LOCATION PLAN" PROVIDES GEOPIER ELEMENT NUMBER, LOCATION, AND LAYOUT ONLY. FOOTING LOCATIONS, SIZES, AND ORIENTATION SHOWN ON THESE PLANS ARE FOR INFORMATION ONLY. PLEASE REFER TO THE STRUCTURAL PLANS FOR SPECIFIC FOUNDATION DIMENSIONS AND LOCATIONS. THE DESIGNER ACCEPTS NO RESPONSIBILITY FOR THE LOCATION OF FOOTINGS SHOWN ON THESE PLANS. THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY IF INFORMATION ON THESE PLANS CONFLICTS WITH STRUCTURAL OR ARCHITECTURAL DRAWINGS. UTIL TIES/OBSTRUCTION NOTES: 1. UTILITY LOCATIONS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE DESIGNER SHALL BE NOTIFIED OF ANY CONFLICTS WITH GEOPIER LOCATIONS SHOWN ON THE PLANS. NEW TEMPORARY UTILITY EXCAVATIONS SHALL BE LIMITED TO THE ZONE DEPICTED ON DETAIL 2 OF THIS SHEET. IF EXCAVATIONS ARE PLANNED WITHIN THE GEOPIER "NO DIG" ZONE, THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY TO DISCUSS EXCAVATION OPTIONS. 2. IF OBSTRUCTIONS ARE ENCOUNTERED DURING GEOPIER INSTALLATION THAT CANNOT BE REMOVED WITH CONVENTIONAL GEOPIER INSTALLATION EQUIPMENT, THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING THE OBSTRUCTIONS. IF THE GENERAL CONTRACTOR DOES NOT DO SO IN A TIMELY MANNER THAT DOES NOT INTERRUPT GEOPIER PRODUCTION, THE INSTALLER MAY REMOVE OBSTRUCTION(S) AND SHALL BE REIMBURSED FOR COSTS INCURRED, INCLUDING LABOR, EQUIPMENT, AND MATERIALS. IN THE EVENT OBSTRUCTIONS ARE ENCOUNTERED BELOW THE DESIGNED BOTTOM OF FOOTING ELEVATION THE OBSTRUCTION SHALL BE REMOVED AS OUTLINED ABOVE. THE RESULTING EXCAVATION SHALL THEN BE BACKFILLED AND COMPACTED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS FOR STRUCTURAL FILL. THE AREA SHALL BE TESTED BY THE OWNER'S TESTING AGENCY AND THE COMPACTION TEST RESULTS SHALL BE SUBMITTED TO THE INSTALLER AND THE DESIGNER. CONSTRUCTION NOTES FOR SLABS SUPPORTED BY GEOPIER ELEMENTS: 1. ALL EXCAVATION FOR FOUNDATIONS AND SLABS SUPPORTED BY GEOPIER ELEMENTS SHALL BE PREPARED IN THE FOLLOWING MANNER BY THE GENERAL CONTRACTOR: 2. THE TOP OF THE EXCAVATED SOIL AND GEOPIER ELEMENTS SHALL BE MECHANICALLY COMPACTED. COMPACTION SHALL BE PERFORMED OVER THE ENTIRE FOUNDATION/SLAB SUBGRADE TO COMPACT ANY LOOSE SURFACE SOIL AND LOOSE SURFACE GEOPIER AGGREGATE. 3. WATER SHALL NOT BE ALLOWED TO ACCUMULATE ON THE SUBGRADE PRIOR TO CONCRETE PLACEMENT OR ALLOWED TO ACCUMULATE OVER THE POURED SLAB. 4. EXCAVATION AND SURFACE COMPACTION OF ALL SUBGRADES SHALL BE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 5. THE TESTING AGENCY SHALL INSPECT THE SUBGRADE AND APPROVE IT IN WRITING ON THE SAME DAY THAT THE CONCRETE IS PLACED. THE APPROVAL SHALL STATE THAT THE SUBGRADE, INCLUDING MATRIX SOILS AND GEOPIER ELEMENTS HAVE BEEN KEPT FREE OF WATER ACCUMULATION AND HAVE BEEN REASONABLY COMPACTED. 6. IN THE EVENT THAT SUBGRADE PREPARATIONS, AS DESCRIBED ABOVE, ARE NOT PERFORMED OR DOCUMENTED IN ACCORDANCE WITH THIS SECTION, ANY WRITTEN OR IMPLIED WARRANTY WITH RESPECT TO GEOPIER FOUNDATION PERFORMANCE CAN BE CONSIDERED VOID. 2'-10"~-~~2'-10" 2'-10"~~~~2'-10" GEOPIER TESTING NOTES: 1. A QUALIFIED, FULL-TIME QUALITY CONTROL (QC) REPRESENTATIVE PROVIDED BY THE GEOPIER INSTALLER (INSTALLER) SHALL BE RESPONSIBLE FOR DOCUMENTING INSTALLATION OF THE GEOPIER ELEMENTS IN ACCORDANCE WITH THE DESIGN AND SHALL REPORT ALL GEOPIER FOUNDATION CONSTRUCTION ACTIVITIES TO THE DESIGNER. IF AUTHORIZED BY THE OWNER, THE QC REPRESENTATIVE SHALL COORDINATE QC ACTIVITIES WITH THE TESTING AGENCY HIRED BY THE OWNER. UNDER NO CIRCUMSTANCES SHALL THE TESTING AGENCY DIRECT GEOPIER INSTALLATION PROCEDURES. 2. GEOPIER ELEMENT DESIGN SHALL BE CONFIRMED BY A MODULUS TEST PERFORMED AT THE SITE. PLEASE REFER TO THE DESIGN SUBMITTAL FOR TEST LOCATION AND SPECIFICATIONS. 3. GEOPIER ELEMENTS SHALL BE BASED ON THE FOLLOWING CRITERIA UNLESS OTHERWISE APPROVED IN WRITING BY THE DESIGNER: A. INSTALLATION DEPTHS SHALL BE WITHIN 3 INCHES OR DEEPER THAN THE DEPTHS SHOWN ON THE PLANS .. B. GEOPIER ELEMENT DISPLACEMENT MEASURED DURING BOTTOM STABILIZATION TESTS (BST) SHALL BE WITHIN 150% OF THE BST VALUE ACHIEVED IN THE MODULUS TEST PIER. BSTS SHALL BE PERFORMED IN AT LEAST 10% OF THE DAY'S PRODUCTION PIERS. C. GEOPIER ELEMENT AGGREGATE RELATIVE DENSITY SHALL BE RECORDED PERIODICALLY THROUGHOUT THE DAY. THE AVERAGE BLOW COUNTS OBTAINED UTILIZING A DYNAMIC CONE PENETROMETER (DCP) IN ACCORDANCE WITH ASTM STP-399, SHALL BE GREATER THAN 15 BLOWS FOR 1. 75 INCHES OF PENETRATION (BPI). NO MORE THAN 10% OF DCP TESTS CONDUCTED ON EACH DAY SHALL BE BELOW 15 BPI. NOTE: USE OF DCP TESTS ARE NOT APPROPRIATE FOR OPEN GRADED AGGREGATE SUCH AS #57 STONE OR SAND. D. GEOPIER ELEMENT AGGREGATE SHALL BE APPROVED BY THE DESIGNER AND SHALL BE THE SAME AS USED IN A SUCCESSFUL MODULUS TEST, UNLESS OTHERWISE APPROVED IN WRITING BY THE DESIGNER. E. THE AGGREGATE SHALL BE TAMPED IN A MANNER CONSISTENT WITH THE MODULUS TEST PIER BUT FOR NO LESS THAN 10 SECONDS PER LIFT. F. IF CAVE-INS OCCUR ON TOP OF A LIFT OF AGGREGATE SUCH THAT THE VOLUME OF CAVED SOIL IS GREATER THAN APPROXIMATELY 10% OF THE VOLUME OF THE AGGREGATE IN THE LIFT, THEN THE AGGREGATE SHALL BE CONSIDERED CONTAMINATED, AND SHALL BE REMOVED AND REPLACED WITH UNCONTAMINATED AGGREGATE. 4. GEOPIER ELEMENTS NOT MEETING DESIGN REQUIREMENTS SHALL BE REINSTALLED UNLESS OTHERWISE APPROVED IN WRITING BY THE DESIGNER. FILL PLACEMENT NOTES: 1. ALL NEW FILL SHALL BE PLACED AND COMPACTED AS RECOMMENDED BY THE GEOTECHNICAL ENGINEER AND/OR IN THE PROJECT SPECIFICATIONS. 2. COMPACTION TEST RESULTS SHALL BE FORWARDED TO THE GEOPIER DESIGNER. EXPANSIVE SOIL NOTES: 1. EXPANSIVE SOILS ARE NOT MITIGATED BY GEOPIER ELEMENTS. THE GEOTECHNICAL ENGINEER'S RECOMMENDATIONS FOR MITIGATION OF EXPANSIVE SOIL NEEDS TO BE FOLLOWED INCLUDING PROPER GRADING AND DRAINAGE. 13'-0" 6'-6" W-BEAM -JACK . -PEDESTAL :::J LIMITS OF EXCAVATION :r:[u I--' (!) ::::> Z Cl WW -' :r: I-(.) LL en <( 0::: :r: w rn c_ c_ 0 ~ lli 0::: 0 w l- e_ 0::: ow W LL (!) ~ ~ FOUNDATION OR SLAB-ON-GRADE SUPPORTED BY GEOPIER RAP 24" DIAMETER GEOPIER ELEMENT (U.N.O.) ..--TYP. COMPACTED LIFT .. --BOTTOM BULB , 1 :~TY=P=IC=A=L~G_EO_P_IE_R_®_E_L_EM_E_N_T _____ _ NOTTO SCALE FOUNDATION SUPPORTED BY GEOPIER RAP 1' MIN. 1' MIN. SHOP DRAWING/ SUBMITTAL REVIEW !!I' APPROVED O APPROVE WITH CHANGES NOTED □ REVISE AND RESUBMIT □ REJECTED ___ _ SUBMITTAL WAS REVIEWED FOR DESIGN CONFORMITY AND GENERAL CONFORMANCE TO CONTRACT DOCUMENTS ONLY. THE CONTRACTOR IS RESPONSIBLE FOR CONFIRMING AND CORRELATING DIMENSIONS AT JOBSITE FOR TOLERANCE, CLEARANCE, QUANTITIES. FABRICATION PROCESSES AND TECHNIQUES OF CONSTRUCTION, COORDINATION OF HIS WORK WITH OTHER TRADES AND FULLCOMPLIANCEWITH CONTRACT DOCUMENTS. By:John Allen Date: 07/18/2024 Streamline Construction Company San Diego, CA92124 LIMITS OF EXCAVATION LIMITS OF EXCAVATION 1 1 6'MIN. -6'MIN. - ·-GEOPIER ELEMENT (TYP.) (_-2 ·-• ADJACENT TEMPORARY UTILITY EXCAVATION LIMITS NOTTO SCALE DESIGN TOP OF GEOPIER ELEMENT 'MIN. ----+----1-LIMIT OF ADJACENT EXCAVATION ADJACENT TEMPORARY UTILITY EXCAVATION NOTES: 1. ADJACENT TEMPORARY UTILITY EXCAVATIONS MUST BE OUTSIDE THIS ZONE AND IN ACCORDANCE WITH PROJECT GEOTECHNICAL ENGINEER RECOMMENDATIONS. IF THIS IS NOT THE CASE, THE DESIGNER SHALL BE NOTIFIED IMMEDIATELY. 2. THIS DETAIL DOES NOT APPLY TO MASS EXCAVATION OR SITE GRADING. 3. THE PROJECT GEOTECHNICAL ENGINEER'S RECOMMENDATIONS SHALL BE FOLLOWED FOR TEMPORARY OR PERMANANT SLOPES. • ••• ·-._LIMITS OF EXCAVATION Iii NO EXCEPTIONS TAKEN □ FURNISH AS CORRECTED □ REJECTED □ REVISE AND RESUBMIT This review is only for general conformance with the design concept for the project and general compliance with the information given in the Contract Documents. Corrections and comments made on the shop drawings during this review do not relieve the contractor from compliance with the requirements of the plans and specifications. Contractor is responsible for: dimensions to be confirmed and correlated at the job site; information that pertains solely to the fabrication processes or to the means, methods, techniques, sequences, and procedures of construction; coordination of the work and all trades; and for performing all work in a safe and satisfactory manner. ~~~ 2'-6" 2'-6"/ CAP NOVA Services, Inc. II ~ Date: 7/18/2024 1 11111111 ,Q 0 3'-8" 3'-8" F11 2' t 2' F9 0 3'-8"~3'-8"- 2' ' 2' F9 2'-10" f 2'-10" { 0 F11 , 2' 2' 0 FB FOOTING DETAILS 5 -----------------NOTTOSCALE "Geopier® and Rammed Aggregate Pier®" are registered trademarks of Geopier Foundation Company. This drawing contains information proprietary to The Geopier Foundation Company and its licensees. The infonnalion contained herein is not to be transmitted to any other organization unless specifically authorized in writing by Geopier Foundation Company. Geopier® is the property of Geopier Foundation Company and is protected under U.S. Patent No. 6,425,713; 6,688,815; 6,988,855, 5,249,892; 7,226,246; 6,354,766; 7,004,684; 6,354,768; 7,326,004 and other patents pending. 2'-10" 2'-10" F10 2' ' 2' FB 0 0 ~ 2'-3" 2'-3" F10 0 NOTE: HELICAL ANCHORS MAY BE USED IN LIEU OF UPLIFT GEOPIER ELEMENTS. \~LOAD "'--~_,, TEST GEOPIER ELEMENT (COMPRESSION) ,-ANCHOR GEOPIER ELEMENT (UPLIFT) GEOPIER ELEMENT BACKFILL TO BE PLACED AND ··-COMPACTED IN ACCORDANCE WITH THE NOTES BELOW NOTES: By: Gillian Carzzarella Dean, PE, GE N Q VA A. IF ADJACENT EXCAVATION ENCROACHES WITHIN THE RAP CONFINEMENT ZONE INDICATED ABOVE, NOTIFY DESIGNER PRIOR TO PLACING AND COMPACTING BACKFILL B. BACKFILL SHALL BE APPROVED BY THE DESIGNER AND CONSIST OF: • WELL-GRADED CRUSHED GRAVEL • PLACED IN MAXIMUM 6-INCH THICK LIFTS • COMPACTED TO 95% OF ASTM D-1557 OR 100% OF ASTM D-698 C. ALTERNATIVE BACKFILL MATERIALS MAY BE USED WITH WRITTEN APPROVAL OF THE DESIGNER " ,. ~ i (4-\ < GEOPIER MODULUS TEST SETUP ' . _/ , NOT TO SCALE (-3,\ REQUIREMENTS FOR REMEDIATION OF INFRINGEMENT ON EXCAVATION LIMITS \ _ j NOT TO SCALE "DECLARATION OF RESPONSIBLE CHARGE (SHEETS 18-20)" I r/c.i-c'.f=_6',,' ~_::t::_:_;!___,6,,'-,:r_ I ,'-!.A I I .A,1',-:1 i 17':=_ t__l\JG1,'\l~ch) :'_),I-,-1/c::,>: I-:')r) ,I i-/lS i--J,L_J(\N::<:: ,'' ,i 1---i'.A I ,"7'.A'-/C C/EF<:iSE!J _r:::cs.c::;/\,'SiBL.E C.1----1/'-~:C.,E C\c-/,Li~ ~)CS1(.,·1\' c;;::-Ti-IC F'.RG..icc·;, Si---iEEIS ,'\,'o<::·. ·; :3 --:-heo1._,·::~"F--! )'.~1 C/\1/ r, i\_:; 1-:;r:::-1,\1,c-1~ 11\J '.:;rc;,ic:,'\' r, ;.~,:,,:, c.:r :dr e 1 _ _;:~_1/\.1rss /\\1r,1 ,°F·crc-'.:;s,rJ1\'S ,::c;,~,11-, ,:,,1\'.1J Ti iA-;--:1 /1-,~,,:;i,r::,'\1 1:s ~_:,_-:;;\,:Si::1,'1\'T v·.,1,11,11 ;~.,'.../,'?.1{,'t,;T STJ:J-.1'1-:;,::_r:1--::s t---t-------------------+-----1---+-------I GHAlllNG J'LAN::i r'CJH: / 1)/'}~::t::_r(S' .1A/\/i_,; ,' i-{_L._ ,' 1,'-!i=_ C1-J:=..C1< :.__11--,1---'K',:)-Jt._C I u~_L,_1,"i,1,l,'\1G.':: ,f-'.,1--_i;J ·~: I -'1::_::_;1,'--1C,6, 1 ,i\)1\'i:· c::rr ,' ~'I::_ '/'., ROMERIA POINTE APARTMENTS :Jr CAr?1_:~-;~·,2,r_; 0:)c__~J i'-.i'Ci ;-._;1::_:___,'1::_\/=_ 1,/IC, ,l~--' l::_/\'(i,•,\1=-t_,'----'. c,l /1,/'._:,r.'1,;" c,:-1\;,'l ,'--.,'t_Si' :_:,_,-·.,''~;_;13,'1_,'1i't_S F""::;? r·~:C1.)f'.=,1 c:-~s,i::;.r-,1. .-., ., T- !_,;.f--', 1 i::_: V/,'Sl,'1?,I\.J C,'?()1,,: 1\' '~ '," .. //,ril{(:;\/,'1\i/1-,'\I/, 1,\1C. 209 A\/~1\ii:J.!!. SL1_ 1\:!.,LJ.1'?, S 1).1/L 201 G 4 ,~d-cc--7c----------------l------l-----l--------l LilGll, __ IW·C l•;IMIA-~LI, It:_ ijjSL _:<-ilc 9/ f': A~ 534-lA ~-' --Uh,' L: i 11 i I I "Geopier® and Rammed Aggregate Pier®" are registered trademarks of Gsopier Foundation Company. This drawing contains information proprietary to The Geopier Foundation Company and its licensees. The infonnalion contained herein is not to be transmitted to any other organization unless specifically authorized in writing by Geopier Foundation Company. Geopier® is the property of Geopier Foundation Company and is protected under U.S. Patent No. 6,425,713; 6,688,815; 6,988,855, 5,249,892; 7,226,246; 6,354,766; 7,004,684; 6,354,768; 7,326,004 and other patents pending. 1 1 i i i i i ----GEOPLER® LOCATION PLAN -BUILDING A I 1 .. • 1/~"-~1'-~"-tn_ GEOPIER LOCATION PLAN NOTES: 1. FOOTING CONCRETE SHALL BE PLACED DIRECTLY ON TOP OF EXPOSED GEOPIER ELEMENTS. 2. ALL EXISTING AND PROPOSED UTILITIES WITHIN AND ADJACENT TO THE PROPOSED BUILDING FOOTPRINT SHALL BE FIELD VERIFIED BY THE GENERAL CONTRACTOR AND COORDINATED WITH THE GEOPIER INSTALLER BEFORE GEOPIER ELEMENT INSTALLATION SHALL PROCEED. 3. THESE DRAWINGS ARE FOR GEOPIER LOCATION ONLY, AND ARE BASED ON THE STRUCTURAL DRAWINGS PROVIDED BY KURT FISCHER STRUCTURAL ENGINEERING ON SHEET S-110 DATED 05/05/22. REFER TO THE STRUCTURAL DRAWINGS FOR FOOTING LAYOUT AND ORIENTATION. 4. GEOPIER ELEMENTS SHALL BE LOCATED IN THE FIELD AS SHOWN, DIMENSIONED FROM CONTROL POINTS ESTABLISHED FROM STRUCTURAL AND/OR ARCHITECTURAL PLANS, 5. CONTROL JOINTS FOR FLOOR SLAB SHALL COINCIDE WITH AND INTERSECT AT GEOPIER LOCATIONS. LEGEND i 0 0 TYP. 24" GEOPIER ELEMENT i TYP. GEOPIER ELEMENT NUMBER i -------e ------0 -------e Project Name: Romeria Point Apartments Project Location: Carl sbad, Ca GEOPIER ® SCHEDULE Project Number: GDC-835 Building A A A A A A A A A A A A A A A A A A A A A A A A NOTES: &2 Geopier® Number(s) 1 -18 19 -28 29 -30 31 -33 34 -40 41 42 -43 44 -45 46 -47 48 -50 51 -53 54 -58 59 -64 65 66 67 -70 71 -73 74 75 -77 78 -81 82 -85 86 -88 89 -91 92 -94 Type I Mark SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB SLAB F11 GB-2 GB-2 24" MAT FB GB-2 F9 F11 F10 F9 F9 F9 Width . (fl) 11 0 2.5 2.5 80 2.5 90 11.0 10.0 9.0 9.0 9.0 Length, (fl) 11 0 80 90 11. 0 10.0 9.0 9.0 9.0 Thickness, (in) 6 6 6 6 6 6 6 6 6 6 6 6 36 24 24 24 36 24 36 36 36 36 36 36 Anticipated Geopier® Shaft Length, (ft) (1 ) 28 23 28 23 18 28 23 18 13 23 18 13 25 22 22 22 25 26 25 20 15 15 10 10 Pad Elevation, (ft) (2) 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84 70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 84.70 Top of Geopier® Elevation, (fl) 84.70 84.70 8470 84.70 84.70 84.70 84.70 8470 84.70 8470 84.70 84.70 8200 79.00 79.00 79.00 8200 83.00 8200 82 .00 82.00 82 .00 82 .00 82.00 (1) Geopier elements shalf completely penetrate fill and extend approximately 5' into formationaf material (2) Elevations shall be confirmed prior to Geopier element installation. GEOPIER® SCHEDULE -BUILDING A crE ' TA_ ~:,-c IIIITl:/1 Approximate Bedrock Elevation (fl) 60 65 60 65 70 60 65 70 75 65 70 75 60 60 60 60 60 60 60 65 70 70 75 75 '" C:/F. ___ _ GHAlllNG J'LAN::i r'CJH: ROMERIA POINTE APARTMENTS /41 '1\i,s 2 ·; C-.3C·::::1-I 2 &-21 C-.3()C-'.1 .3 C~Gr11C..1',:· l...C)CA";,'0,\1 1-,'.L,ii./\1 -!3,'_.1/1_;.),,'\IC A UA 534-lA er ~ Ir l l I l l J l ,I I 0------- ---l - -L..C..=.=---------------....;...:...:..----------------------:..=..=..i:---------------------------i=--------------------------i-=-=-=----------------------~---------------------::....=.=.=i----------------------------1-------------------1.J...._ -+--- - - - - - ---+ - - - - - - ---@ I ! i I I I I I I I i ! I I : : I I I I I I I : : I ~":::::::::::::::t:::::::::::::::::::::::I :::::::::::::::::::::::1 :::::::::::::::::::::::t:::::::::::::::::::::::r::::::::::::::::::::::: I :::::::::::::::::::::::: l:::::::::::::::::::"J I "Geopier® and Rammed Aggregate Pier®" are registered trademarks of Geopier Foundation Company. This drawing contains information proprietary to The Geopier Foundation Company and its licensees. The infonnalion contained herein is not to be transmitted to any other organization unless specifically authorized in writing by Geopier Foundation Company. Geopier® is the property of Geopier Foundation Company and is protected under U.S. Patent No. 6,425,713; 6,688,815; 6,988,855, 5,249,892; 7,226,246; 6,354,766; 7,004,684; 6,354,768; 7,326,004 and other patents pending. I @) I I 0 1 1 ~~f~~lE: LOCATION PLAN-BUILDING B GEOPIER LOCATION PLAN NOTES: 1. FOOTING CONCRETE SHALL BE PLACED DIRECTLY ON TOP OF EXPOSED GEOPIER ELEMENTS. 186 K Tse, ~ KSF - I I 0 2. ALL EXISTING AND PROPOSED UTILITIES WITHIN AND ADJACENT TO THE PROPOSED BUILDING FOOTPRINT SHALL BE FIELD VERIFIED BY THE GENERAL CONTRACTOR AND COORDINATED WITH THE GEOPIER INSTALLER BEFORE GEOPIER ELEMENT INSTALLATION SHALL PROCEED. 3. THESE DRAWINGS ARE FOR GEOPIER LOCATION ONLY, AND ARE BASED ON THE STRUCTURAL DRAWINGS PROVIDED BY KURT FISCHER STRUCTURAL ENGINEERING ON SHEET S-122 DATED 05105122. REFER TO THE STRUCTURAL DRAWINGS FOR FOOTING LAYOUT AND ORIENTATION. 4. GEOPIER ELEMENTS SHALL BE LOCATED IN THE FIELD AS SHOWN, DIMENSIONED FROM CONTROL POINTS ESTABLISHED FROM STRUCTURAL AND/OR ARCHITECTURAL PLANS. 5. CONTROL JOINTS FOR FLOOR SLAB SHALL COINCIDE WITH AND INTERSECT AT GEOPIER LOCATIONS. LEGEND 295 I[ .. ~ 48 ~ 4 KSI I I I I 0 1133}------{ I ,-----7 I I !@□®! I@ t@ @t I L ____ __BI 9'-4" 10' I I 141HJ----'f I I I ~ 0 0 TYP. 24" GEOPIER ELEMENT TYP. GEOPIER ELEMENT NUMBER r )( ,, I~-,. I I I I I I I I I I I ~ Project Name: Romeria Point Apartments Project Location: Carlsbad, Ca GEOPIER ® SCHEDULE ; Project Number: Building B B B B B B B B B B B B B B B B Geopier® Number(s) 95 -122 123 124 -133 134 135-139 140 -141 142 -153 154 -1 56 157-158 159 -160 161 -162 163 -164 165 -166 167-168 169 -170 171 -174 GDC.835 Type/ Mark SLAB SLAB SLAB SLAB SLAB SLAB SLAB F10 F9 F9 F8 F9 F8 F8 CF-6 F10 Widll1, (fl) 10.0 90 9.0 80 9.0 8.0 8.0 6.0 10 0 Length, (fl) 10.0 90 9.0 80 9.0 8.0 8.0 10 0 Thickness, (in) 6 6 6 6 6 6 6 36 36 36 36 36 36 36 24 36 Anticipated Geopier® Shaft Length, (fl) ( 1) 4 6 4 6 4 9 4 2 2 2 2 2 2 2 -2 2 Pad Elevation, (fl) (2) 65.90 65.90 65.90 65.90 65.90 65.90 65 90 65.90 65 90 65.90 65 90 65.90 65.90 65.90 65.90 65 90 Top of Geopier® Elevation, (ft) 65.90 65.90 65.90 65.90 65.90 65.90 65 90 63.50 63 50 63.50 63 50 63.50 63.50 63.50 60.50 63 50 NOTES: (1) Geopier elements sha!f completely penetrate fill and extend approximately 5' into formationaf material. (2) Elevations shall be conrmned pnor to Geop1er element lnstaffatlon. &.2 GEOPIER® SCHEDULE -BUILDING B crE ' TA_ 1111 Tl:\I -,- Approximate Bedrock Eleva.tion (ft) 65 63 65 63 65 60 65 65 65 65 65 65 65 65 65 65 : ' ', i GHAlllNG J'LAN::i r'CJH: C:iF. ____ _ ROMERIA POINTE APARTMENTS /41 '1\i,s 2 ·; C-.3C·::::1-I 2 &-21 C-.3()C-'.1 J .:.;t_:,,ui'=._,~' ~o~:,A--:-1Ci'\' ....:·:_A,\1 -8,'_,,/i..D1 1\J,:~: =:: UA 534-lA WCi 11 CiEOPIER~ July 18, 2024 Alliance Diversified Enterprises, Inc. Attn: Judd Hatzky 665 Opper Street Escondido, Ca 92029 Western Ground Improvement, Inc. 209 Avenida Del Mar Suite 2018 San Clemente, California 92672 Tel: (714) 336-3702 www.westerngroundimprovement.com Re: Calculation Package for a Geopier® Foundation System -Delta 1 Romeria Pointe Apartments Carlsbad, California GFC Project No.: GDC-835 Dear Mr. Hatzky, Western Ground Improvement, Inc. has completed the Geopier® foundation design for the above project. The design is based on geotechnical information provided by GeoSoils, Inc. in the reports dated 11/21/17, 08/17/21 & 05/18/22. Structural design loads are as provided by Kurt Fischer Structural ENgineering. The following documents are included herein: • Structural Plan Sheet S-110 and S-122, (Includes loading information) • Geopier calculations We are pleased to have provided you with our design services. If you have any questions, please contact this office. t. 0 .c ..... ~ ::e:: a. ,.,, N ,.,, ,.,, II) N N CS) N ...... Ill ...... Ill er ' I I I I I I I I I I I I +BIOFILTERPLANTERPER 1 1 1 1 1 CIVIL, SEE SH-2,1 FOR 0-::---1-----1-1------1--------1---_ PLANUR WALL D£TAlLS __ F i - - -' -! j ____ ----}---! ,. ! PO ' ------------,., ~-~----- 1 , I f i~t-t-'.------------------- -i :,~ -· -· -· ~ I :, W:~1:;R°;.~CH. SEE r II i ET LS FOR ATTACltlENT---,--~ I· I I --~~-=-=~ ------J__ ~ I @~-,----- 1 I • i i i i t-t------i ________ r ___ i _____ _ I I I I I I I I I I i i i i i @BLDG A FOUNDATION PLAN S-110 3/16. • 1'-8" -----CONTINUOUS CONCRETE FOUNDATION SCHEDULE ' s 10 I SIZE I I ~ ~~ MARK I WIDTH I LENGTH I DEPTH I REINFORCEMENT CF-6 6'·8" ""'· 2'-1" (6)·#5 MRS TOP AND BOT, r------------------ ;!ld-+,--i-bc-t-,-,-~-------€) I ( r-~ r-j:--f4 6" CONC SLAB OtJ GRADE W/ #5@12• O.C. EA WAY 0-+--+-'~~ -----------e .:, I 7 S-015 T~ i S ,-•-, S I I =----'. / --+-f----------____,.;\ ~ ' --I I ~ I I ' ' ' I I I ' ' ' e 09 e s 10 STEEL STAIRS BEYOND~ 1 ,1,-l" ___ ,.1 I"---~ ,...,,,"' ' ,- ~ - - -.J ..,,,." SLABONGRADEPERPLAN I"-_., .,,..," 10° THICK CONC WALL W/ #5 @ 12" O.C. EA WAY EA FACE-----~ GRADE BEN! PER PLAN :,_,,,/ ~ ii ;~e~~~TE:E:L:~~~lp:~R I' I PLANTER WALL DETAILS I I ,,....,_ ~+~~~zt:::s~===t=:~~~~=-~~ ==;=l ----t-le) NDTES lr' 1,- ' I 1,-- 1( 1'-- 1 _______ L_ I -------_---1.,_ _____ 1 I I ' ' I ---,""c:;--1--,.,--c:; -----,.. -cc:, -1-----,..c! . .., '----BIOFILTER PLANTER PER CIVIL. SEE SH-2.1 FOR PLA~TER WALL DETAILS FOUNDATION NOTES: I. FOR GENERAL tlJTES AND TYPICAL DETAILS SEE SHEETS s-exx SERIES. GENERAL NDTES & TYPICAL DETAILS APPLY TO ALL PARTS OF THE WORK EXCEPT WHERE SPECIFICALLY DETAILED DR U,N,D, 2. VEIUFY ALL DIMENSICNS, ELEVATIONS, SLAB EDGES, SLAB DEPRESSIONS, SUB OPENIN&S, CURBS, FOOTING, PENETRATIONS, WALL OPENINGS, MECHANICAL PAD & EQUIPIIIENT WEIGHTS WITH ARCHITECTURAL, "ECHANICAL, PLUMBING, ELECTRICAL & CIVIL ORAWIN65, 3. FOR GRID LINE DLIIENSIONS, SEE ARCHITECnJRAL Df!AWINGS. 4. PRIOR TO REQUESTING A BUILDING DEPARTMENT FOffiDATI<III INSPECTIOM, THE SOILS ENGINEER/GEOTEQINICAL CONSULTANT SHALL INSPECT ANO APPROVE THE FCNJWATION EXCAVATION PRIOR TO PLACING FOUNDATION REINFORCEMENT. 5. TOP OF GRADE BEN! SHALL BE AT -1'-0" BELfl,I TOP OF SLAB. TVP. U.N.O. 6. MINIMIJ,\ LENGTH OF ADDITICNAL REINFORCEJI\ENT TO BE 18' -0" UNO ON PLAN, ADOITIOtJAL BARS SfOrlN OIi PLAN INDICATE THE CENTERLINE FOR BARS TO BE PLACED. BARS ARE TO BE DISTRIBUTED EQUALLY EA SIDE SPACED AT 12" o.c. 8. SHALLOW FOUNDATIOMS ARE DESIGNED ASSUMING SOIL REMEDIATION HAS BEEN PROVIDED BY VIBROPIERS AMI MINIMUM BEARING CAPACITY FOR THE FOUN>ATIONS EQUALS A JUNINIJl,I OF 4 KSF IMl ON PLAN, /IIAX:Til'IJII SETTLEMENT OF SHALLOW FOIJ\IDATIONS SHALL t«JT EXCEED 1/4' OVER 2BFT. 9. BOTTOM OF ALL FOUMDATmlS INCLUDING PILES SHALL BE CLEANED OF ALL LOOSE SOILS PRIOR TO THE PLACEMENT OF REINFORCING STEEL AND CONCRETE. 10, IF GR~D WATER IS ENCOUNTERED DURING DRILLING, TI-IE EXCESS WATER SHALL BE PIJi'PEO FROfll THE EXCAVATIONS DURING CONCRETE PLACEMENT ANO CONCRETE BE DELIVERED BY TREMIE. CONCRETE SHALL t.UT BE ALLOWED TO FREE FALL JIIORE THAN S FEET, INCREASE CONCRETE STRENGTH BY 1008 PSI i.lERE TllIS CONDITION OCCURS. CONCRETE WALL REINFORCEMENT SHEAR WALL TYPICAL VERTICAL TYPICAL IIJRIZONTAL I I --¾ I I I I I -t® I ----+-@ I SCHEDULE BOUY>ARY ELEMENT REINFORCEMENT MARK TI-IICKNESS (in,) REINFORCEMENT REINFORCEMENT BOUNDARY REQUIRE/'IENT I BOUNDARY LENGTH (B.L.)I VERTICAL REINF, (s.w.T.) (T.V.R,) (T.H.R.) (B,V.R,) 0 ,. #5@ 12" O,C, CENTERED #5 8 12" O,C. CENTERED NOT REQUIRED 0 10' #5 I! 12" O.C. EA FACE #5@ 12" o.c, EA FACE NOT REQUIRED 0 10' #"5 @ 9" O,C, EA FACE #5 @ 12" o.c, EA FACE NOT REQUIRED 0 10' #6 (!l 6" O.C. INT FACE, #6 Iii 12• O,C, EXT FACE #5 I! 12" o.c, EA FACE NOT REQUIRED <> KEY NOTES LEGEND AND SYMBOLS: [ ___ J @TI INDICATES COOCRETE COLU'fll PER SCHEDULE. SEE 5-015 INDICATES COLU'.N ABOVE INDICATES GRADE BEAi'! TYPE SEE SCHEOOLE ON 5-012 INDICATES CONTINUOUS CONC FTG PER SCHED INDICATES COOCRETE SHEARWALL REINF, MARK SEE 12/5-813 INDICATES CONCRETE WALL ABOVE t=====t INDICATES CONCRETE WALL BELOW INDICATES SLAB STEP, VERIFY SLAB ELEVATIONS AND STEP HEIGHT 'Ill ARCH, / INDICATES PILE TYPE PER SCHED ~ 1/S-812 ,,-~-~-' z ( ) INDICATES JIIIN Efl:BEDfllENT DEPTll. ·--~-~--· (X (' NO. OF BARS SIZE OF BARS \. TOP OR BOTTOM ADD BAR s----s INDICATES STEPPED FOOTINGS. GC TO COORDINATE EXACT QTY & LOCATI<WS. INDICATES TOTAL DEAD LOAD (KIPS) INDICATES LIVE LOAD (KIPS) INDICATES EQ LOAD (KIPS) INDICATES MIN ALLOWABLE SOIL BEARING CAPACITY REQUIRED SPREAD CONCRETE FOOTING SCHEDULE MARK SIZE DEPTH REINFORCEMENT NOTES F7 7'-0"SQ ,.. (G)-#6 BARS BOT EA WAY /IIIN BEARING PER PLAN Fl 8'-B"SQ ,.. (1)-#6 BARS BOT EA WAY /IIIN BEARING PER PLAN " 9'-0"SQ ,.. (9)-#6 BARS BOT EA WAY /IIIN BEARING PER PLAN "' 18'-e-SQ ,.. (18)-116 BARS BOT EA WAY /IIIN BEARING PER PLAN F1I 11'-0"SQ ,.. 11 -#G BARS BOT EA WAY /IIIN BEARING PER PLAN ~IE REINF. (B.T.R.) N CS) ,.,, w I-"' VI -.t -.t E g-.... J 0 u ...I ... .;, a, \0 co .... E C: :i ,.,, ~ 0 ... .... co u u, ::, en .... ..... I-~ ""-"' z <C C: <i!J w u ... t. > u, ... 0 w .... .c " z u -"' u -.t ,_, ,_, i u, "' u u.. -..-< " z u.. .... .... w 0 -"' a: ILi .J [!I :I ,( z u a: ii1 UJ :::J ILi c;: I-ILi u z I-:::J a: a: [!I :::J I-z ~ en ILi ~ ~=:'.'.::'.=:'.:::'.:=:'.:::'.:='.:::'.:=1 !! PROJECT NAME s ROMERIA POINT i APARTMENTS 7527 ROMERIA ST, CARLSBAD, CA 920D9 0 ~ • • ~ ~============~~ SHEET TITLE BLDG A FOUNDATION PLAN ! g ~ e z ~ ~ • >-A-R-CH_IT_E_CT-----<~ C I--------<~ ~;~~~CT NUMBER ~ ~====~! SHEET NUMBER ... S-110 t. 0 .c ..... ~ ::e:: a. N IS) ~ II) N N IS) N ...... Ill ...... Ill 1 5-122 f f f ' ' f f i i i i i i i J I J I J J J -----~1-------------------_,,--------~ _,,--t -----------______ ,,---.:!:: <:l>. q_• I ' _____ ___j_ ' I ' I ' I ' I ' I r--------,_- I ' --~-----' I ' I --_, -., I 1----- ( ; -, ____ ,, - - -i - IGB-1 I ' --------+-' ! I ' I ' ~-r ---------1 ---, I----------,---- I ' -~------ ' I ' I ' ~ ,...,,--; -:.:-.=.:-~ --t-- I ' -----+--' ! I ' I ' I ( __ ) 1 -------- 1 ' ~------' I ' I ' I ' I--' I ( _ _) -----,-- 1 ' ------1---, I ' I ' I ' ~r-- ---------1 A JTilj -----,-(9:lill 1----------r--- - I I -----0 I I : i I ----B i ___ T _;0 -----B ,/' ;/ / / / BLDG B FOUNDATION PLAN 3/16" = 1'-0' ~ 9 S 10 /, / / i ): '/ /1 ' -----------~~==cJ- 1 ' I ' () I ' I ' ' -----+---~~----~--------~~ I I ' ' I I ' ' 6" CONC *AB QI GRADE W/ O ! #Sf12" or EA WAY I FOUNDATION NOTES: 1, FOR GENERAL NOTES Atll TYPICAL DETAILS SEE SHEETS s-exx SERIES, GENERAL NOTES l TYi>ICAL DETAILS APPLY TO ALL PARTS OF THE WORK EXCEPT 2, VERIFY ALL DI/1\ENSIONS, ELEVATIONS, SLAB EDGES, SLAB DEPRESSIONS, SLAB OPENIJll55, CURBS, FOOTIJll5, PENETRATIONS, WALL OPENINGS, MECHANICAL PAD l EQUIPMENT WEIGHTS Willi ARCHITECTURAL, MECHANICAL, PLUMBING, ELECTRICAL 8. CIVIL DIWUNGS, 3. FOR GRID LINE DIMENSION.S, SEE ARCHITECnJRAL DRAWINGS. 4, PRIOR TO REQUESTING A BUILOIN6 DEPARTl'IENT FOUNDATION INSPECTION, TllE SOILS ENGINEER/GEOTECHNICAL CONSULTANT SHALL INSPECT AND APPROVE TllE FOUNlATION EXCAVATION PRIOR TO PL.ACING FOONDATION REINFORCEMENT, S, TOP OF GRADE BEAM SHALL BE AT -1•-0• BEL!ll TOP OF SLAB, TYP, U,N,O, 6. fllINIIUI LENGTH OF ADDITICIIAL REINFORCEMENT TO BE 10'-0" INl ON ?LAN. 7. ADDITIONAL BARS SHOWN ~ PLAN INDICA.TE THE CENTERLINE FOR BARS TO BE PLACED. BARS ARE TO BE DISTRIBUTED EQUALLY EA SIDE SPACED AT 12" o.c. 8, SHALLDII FOUNDATIONS ARE DESIGNED ASSIJIIING SOIL REMEDIATION HAS BEEN PROVIDED BY YIIIROPIERS Al'll fllINifllll.N BEARING CAPACITY FOR TllE FOUflllATIONS EQUALS A /IIINiflllJII OF 4 KSF LftO ON PLAN. JIIAXIJI\WI\ SETnEMENT OF SHALLOW FOlllDATIONS SHALL NOT !XCEED 1/4" OYER 20FT. 9, !IOTTOM OF ALL FOLN>ATI~S INCLUDIMG PILES SHALL BE CLEANED OF ALL LOOSE SOILS PRIOR TO THE PLACE/IIENT OF REINFORCIN6 STEEL AND cot.CRETE. 10, IF GROUND KATER IS ENCOUNTERED DURING DRILLING, THE EXCESS HATER SHALL BE PU/1\PED FROl'I THE EXCAVATIONS DURING CONCRETE PLACEl'\ENT AND CONCRETE BE DELIVERED BY TREJIIIE. CCNCR.ETE SHALL NOT BE ALLaiED TO FREE FALL MORE TiiAN 5 FEET, INCREASE CONCRETE STRENGTii BY 1000 PSI WHERE THIS CONDITION OCCURS, SHEAR WALL MARK THICKt.ESS(in,) (S,W,T,) 0 8" 0 10" 0 10" 0 10" <> KEY NOTES DESIGN BUILD STAIR STRINGER IIIAX, SIIPS VERTICAL REACTION ALLCJrlll.BLE AT STRINGER ' I ' I ' ' I l I ' ~ CONNECTIONS. KFSE ASSIJIIES HSSSX4x1/4, #6 {I 9" O.C. IXIIEL FOR THE WALL. -------------0 -------------0 I I I I I I I I I I I I I I ~.,,,,, ,. ~ i MARK F7 F8 " F10 F11 I MARK I CF-6 LEGEND AND SYMBOLS: @:!] INDICATES COOCRETE COLUW PER SCHEDULE. SEES-815 INDICATES COLI.N ABOVE INDICATES COOCRETE FOl.tlDATI(l,I BELON INDICATES GRADE BEA/II TYPE SEE SCHEDULE ON 5-912 INDICATES COOTINUOUS CONC FTG PER SCHED INDICATES COOCRETE SHEARW,',,LL REINF, MARK SEE U/S-813 INDICATl:S CONCRETE WALL ABOVE t=====t INDICATES COOCRETE WALL BELOW INDICATES SLAB STEP, VERIFY SLAB ELEVATIONS AND STEP HEIGHT W/ ARCH, / INDICATES PILE TYPE PER SCHED ~~ 1/5-912 ✓~ (~-~-'\ ~ INDICATES MIN EJIIBEDMENT DEPTli. \_-~-~-/ (X (' NO, OF BARS SIZE OF BARS \_ TOP OR BOTTOfll ADD BAR s----s INDICATES STEPPED FOOTINGS. GC TO COORDINATE EXACT QTY & LOCATIONS, INDICATES TOTAL DEAD LOAD (KIPS) INDICATES LIVE LOAD (KIPS) INDICATES EQ LOAD (KIPS) INDICATES MIN ALLOWABLE SOIL BEARING CAPACITY REQUIRED SPREAD CONCRETE FOOTING SCHEDULE SIZE DEPT!t REINFORCEMENT NOTES 7'-0" SQ 36" (6)-iti BARS BOT EA WAY fl'IIN BEARING PER PLAN 8'-0" SQ 36" (8)-116 BARS BOT EA WAY MIN BEARING PER PLAN !l'-0" SQ 36" (!1)-16 BARS BOT EA WAY fl'IIN BEARING PER PLAN 10'-e" SQ 36" {10)-#6 BARS BOT EA WAY fl'IIN BEARING PER PLAN 11'-0" SQ 36" (11)-#6 BARS BOT EA WAY fl'IIN BEARING PER PLAN CONTINUOUS CONCRETE FOUNDATION SCHEDULE SIZE I I WIDT!t I LENGTH I DEPTH I REINFORCEMENT 6'-0" COOT, 2'-0" (6)-115 BARS TOP AND BOT, CONCRETE WALL REINFORCEMENT SCHEDULE TYPICAL VERTICAL TYPICAL HORIZONTAL BCNJNDARV ELE/IIENT REINFORCEMENT NOTES REINFORCEMENT REINFORCE/1\ENT BOOtllARY REQUIREMENT I BOUNDARY LENGTH (B.L,)I VERTICAL REINF. Im REINF. (B.T.R.) (T,V,R,) (T,H,R,) {B.V.R.) lfS@ 12" O,C, CENTERED #5@ 12" O.C. CENTERED NOT REQUIRED #5@ 12" O,C, EA FACE #5@ 12" O,C, EA FACE NOT REQUIRED #5 @ 9" O,C, EA FACE #5@ 12" O,C, EA FACE r«>T REQUIRED #6@ 6" O,C, INT FACE, #5@ 12" O,C, EA FACE NOT REQUIRED #6@ 12" O,C, EXT FACE N CS) ,.,, w I-"' VI ..i-..i-E g-.... J 0 u ...I .... .;, a, \0 co .... E C: :i ,.,, ~ 0 ... .... co u u, ::, en .... ..... I-~ .,.,..,. z <C C: <i!J w u ... t. > u, ... 0 w .... .c .... z u -"' u ..i-..., ..., i u, "' u u.. .... .... z u.. .... .... w 0 -"' a: Ill .J [!I :I ,( z u a: ii1 UJ :::J Ill c;: I-Ill u z I-:::J a: a: [!I :::J I-z ~ en ILi ~ ~=:'.'.::'.=:'.:::'.:=:'.:::'.:='.:::'.:=1 !! PROJECT NAME s ROMERIA POINT i APARTMENTS 7S27 ROMERIA ST, CARLSBAD, CA 92009 0 ~ • • ~ ~============~~ SHEET TITLE BLDG B FOUNDATION PLAN ! g ~ e z ~ ~ • >-A-R-CH_IT_E_CT ___ _____,~ C I---------<~ ~;~~~CT NUMBER ~ ~====~! SHEET NUMBER ... S-122 GEOPIER® Foundation Company Project Name/Location: Project No.: Engineer: Date: f) INPUT PARAMETER VALUES· Parameter Allowable and-bearing (kips) E or c, for LZ sublyr 1 E or c, for LZ sublyr 2 E or c, for LZ sublyr 3 E or c, for LZ sublyr 4 E or c, for LZ sublyr 5 Cale. settlement to X*B Romeria Point Apartments, Carlsbad, CA GDC-835 AMB 7/18/2024 TOP OF PIER STRESS S mb Val. Parameter d 24 Sustained column load (kips) dgw 50 Required footing width (fl) g 120 Selected footing width (fl) f 28 Sustained bearing pressure (ksf) max 2500 Selected No. RAP elems Qcall 120 Area replacement ratio qall 4 Stiffness ratio kg 325 Stress at too of GP lksfl km 41 Load at too of GP lkios l Uooar zone settlement Cinl LOWER ZONE SETTLEMENTS Svmb Val. Parameter Qab 18.8 Dplh to bottm of LZ from fig (fl) E1 lc,1 0.01 Upper zone thickness (ft) E2 I C.2 0.01 Lower zone thickness (ft) E3 I c,, 0.01 Thickness of LZ sublayer 1 (ft) E, I c.. 0.01 Thickness of LZ sublayer 2 (fl) Eo I C.s 0.01 Thickness of LZ sublayer 3 (ft) X 2 Thickness of LZ sublayer 4 (ft) Thickness of LZ sublayer 5 (fl) Total LZ thickness ok? E or c, for LZ sublyr 1 E or c, for LZ sublyr 2 E or c, for LZ sublyr 3 E or c, for LZ sublyr 4 E or c, for LZ sublyr 5 Initial stress for sublyr 1 (ksf) Initial stress for sublyr 2 (ksf) Initial stress for sublyr 3 (ksf) Initial stress for sublyr 4 (ksf) Initial stress for sublyr 5 (ksf) Ftg stress on sublyr 1 (ksf) Ftg stress on sublyr 2 (ksf) Ftg stress on sublyr 3 (ksf) Ftg stress on sublyr 4 (ksf) Fta stress on sublvr 5 (ksfl Salt. of LZ sublayer 1 (in) Sell. of LZ sublayer 2 (in) Salt. of LZ sublayer 3 (in) Sell. of LZ sublayer 4 (in) Salt. of LZ sublayer 5 (in) Total lower zone sett. (in) Total UZ + LZ settlement linl Svmb p Br B q N Ra Rs 00 Qa suz Svmb X*B Hwe Ho H., H., H., H .. H .. E1 lc,1 E2 I C.2 E3 I c,, E• IC.• Eo I C.s P'01 P'o2 P'o3 P'o4 P'o5 t.P1 t.P2 t.P3 t.P4 t.P5 So1 s., So, s., s., s. s Building A DL(KIPS)= LL(KIPS)= EQIKIPSl= Eauation sqrt(p/qall) p/(B*B) N*Ag/(B*B) kg/km o*Rs/1Rs*Ra-Ra+1 l aa*Aa O!l/KQ Eauation X*B Hs+d H2b-Hlz E (ksf)orc, E (ksf)orc, E (ksf)orc, E (ksf)orc, E (ksf)orc, q*I q*I q*I q*I a*I ce1 *Hlz1"Iog((Po1 +DP1 )/Po1) ce2"Hlz:Tlog((Pc2+DP2)/Po2) ce3*Hlz3"1og((Po3+DP3)/Po3) ce4*Hlz4*1og((Po4+DP4)/Po4) ce5*Hlz5"1og((Po5+DP5)/Po5) S1z.1+S1z2+S1z3+S1z4+S1z5 Square-design A F11 225 80 50 305 8.73 11 2.52 6 0.156 7.9 9.61 30.2 0.21 F11 22 29.0 -7 NoLZ 0.01 0.01 0.01 0.01 0.01 3.840 3.840 3.840 3.840 3.840 0.16 0.16 0.16 0.16 0.16 0.00 0.00 0.00 0.00 0.00 0.0 <1/2 F9 F9 195 60 30 255 7.98 9 3.15 3 0.116 7.9 13.82 43.4 0.30 18 29.0 -11 NoLZ 0.01 0.01 0.01 0.01 0.01 3.840 3.840 3.840 3.840 3.840 0.14 0.14 0.14 0.14 0.14 0.00 0.00 0.00 0.00 0.00 0.0 <112 F11 250 75 40 325 9.01 11 2.69 4 0.104 7.9 12.38 38.9 0.26 F11 22 24.0 -2 NoLZ 0.01 0.01 0.01 0.01 0.01 3.240 3.240 3.240 3.240 3.240 0.25 0.25 0.25 0.25 0.25 0.00 0.00 0.00 0.00 0.00 0.0 <1/2 CiEOPIER® SQUARE FOOTINGS Version 3.0.6 August 2013 191 185 185 210 65 55 55 65 30 40 40 40 F10 F9 F9 F9 F8 256 240 240 275 256 8.00 7.75 7.75 8.29 8.00 10 9 9 9 8 2.56 2.96 2.96 3.40 4.00 4 3 3 3 3 0.126 0.116 0.116 0.116 0.147 7.9 7.9 7.9 7.9 7.9 10.85 13.01 13.01 14.90 15.70 34.1 40.9 40.9 46.8 49.3 0.23 0.28 0.28 0.32 0.34 F10 F9 F9 F9 F8 20 18 18 18 16 22.0 19.0 14.0 14.0 29.0 -2 -1 4 4 -13 4.0 4.0 NoLZ NoLZ ok ok NoLZ 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 3.000 2.640 2.280 2.280 3.840 3.000 2.640 2.520 2.520 3.840 3.000 2.640 2.520 2.520 3.840 3.000 2.640 2.520 2.520 3.840 3.000 2.640 2.520 2.520 3.840 0.23 0.29 0.40 0.45 0.14 0.23 0.29 0.32 0.37 0.14 0.23 0.29 0.32 0.37 0.14 0.23 0.29 0.32 0.37 0.14 0.23 0.29 0.32 0.37 0.14 0.00 0.00 0.03 0.04 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.0 0.0 0.0 0.0 0.0 <112 <1/2 <112 <1/2 <1/2 GEOPIER® Foundation Company Project Name/Location: Project No.: Engineer: Date: INPUT PARAMETER VALUES· I Parameter I Constructed RAP diameter (in) Depth to groundwater (fl) Total unit weight of soil (pcf) Soil fricl. angle (degr) Max. hor. oressure (osO RAP cell cap. (kips) Allowable bearing press. (ksf) RAP stiffn. modulus (pci) Soil stiffness modulus (ocil Romeria Point Apartments, Carlsbad, CA GDC-835 AMB 7/18/2024 Building A -Max Bearing TOP OF PIER STRESS • SQUARE FOOTINGS S:tmb I Val. I Parameter Svmb Eauation d 24 Sustained column load (kips) p dgw 50 Required footing width (fl) Br sqrt(p/qall) g 120 Selected footing width (fl) B f 28 Sustained bearing pressure (ksf) q p/(B*B) omax 2500 Est. No. RAP elems per Qcell Nr p/Qcell Selected No. RAP elems N Qcell 120 ~a replacement ratio Ra N*Ag/(B*B) qall 4 Stiffness ratio Rs kg/km kg 325 Stress at too of GP lksfl aa a*Rs/1Rs*Ra-Ra+1 l km 41 Load at too of GP Ckios l Qa aa*Aa Square-design (A BEARING) CiEOPIER® SQUARE FOOTINGS Version 3.0.6 August 2013 F11 F9 F11 F10 F9 F9 F9 726 405 605 550 405 405 405 13.47 10.06 12.30 11.73 10.06 10.06 10.06 11 9 11 10 9 9 9 6.00 5.00 5.00 5.50 5.00 5.00 5.00 6.1 3.4 5.0 4.6 3.4 3.4 3.4 6 3 4 4 3 3 3 0.156 0.116 0.104 0.126 0.116 0.116 0.116 7.9 7.9 7.9 7.9 7.9 7.9 7.9 22.88 21.95 23.05 23.31 21.95 21.95 21.95 71.9 68.9 72.4 73.2 68.9 68.9 68.9 GEOPIER® Foundation Company Project Name/Location: Project No.: Engineer: Date: f) INPUT PARAMETER VALUES· Parameter Allowable and-bearing (kips) E or c, for LZ sublyr 1 E or c, for LZ sublyr 2 E or c, for LZ sublyr 3 E or c, for LZ sublyr 4 E or c, for LZ sublyr 5 Cale. settlement to X*B Romeria Point Apartments, Carlsbad, CA GDC-835 AMB 7/18/2024 TOP OF PIER STRESS S mb Val. Parameter d 24 Sustained column load (kips) dgw 50 Required footing width (fl) g 120 Selected footing width (fl) f 28 Sustained bearing pressure (ksf) max 2500 Selected No. RAP elems Qcall 120 Area replacement ratio qall 4 Stiffness ratio kg 325 Stress at too of GP lksfl km 41 Load at too of GP lkios l Uooar zone settlement Cinl LOWER ZONE SETTLEMENTS Svmb Val. Parameter Qab 18.8 Dplh to bottm of LZ from fig (fl) E1 lc,1 0.01 Upper zone thickness (ft) E2 I C.2 0.01 Lower zone thickness (ft) E3 I c,, 0.01 Thickness of LZ sublayer 1 (ft) E, I c.. 0.01 Thickness of LZ sublayer 2 (fl) Eo I C.s 0.01 Thickness of LZ sublayer 3 (ft) X 2 Thickness of LZ sublayer 4 (ft) Thickness of LZ sublayer 5 (fl) Total LZ thickness ok? E or c, for LZ sublyr 1 E or c, for LZ sublyr 2 E or c, for LZ sublyr 3 E or c, for LZ sublyr 4 E or c, for LZ sublyr 5 Initial stress for sublyr 1 (ksf) Initial stress for sublyr 2 (ksf) Initial stress for sublyr 3 (ksf) Initial stress for sublyr 4 (ksf) Initial stress for sublyr 5 (ksf) Ftg stress on sublyr 1 (ksf) Ftg stress on sublyr 2 (ksf) Ftg stress on sublyr 3 (ksf) Ftg stress on sublyr 4 (ksf) Fta stress on sublvr 5 (ksfl Salt. of LZ sublayer 1 (in) Sell. of LZ sublayer 2 (in) Salt. of LZ sublayer 3 (in) Sell. of LZ sublayer 4 (in) Salt. of LZ sublayer 5 (in) Total lower zone sett. (in) Total UZ + LZ settlement linl Svmb p Br B q N Ra Rs 00 Qa suz Svmb X*B Hwe Ho H., H., H., H .. H .. E1 lc,1 E2 I C.2 E3 I c,, E• IC.• Eo I C.s P'01 P'o2 P'o3 P'o4 P'o5 t.P1 t.P2 t.P3 t.P4 t.P5 So1 s., So, s., s., s. s Building B DL(KIPS)= LL(KIPS)= EQIKIPSl= Eauation sqrt(p/qall) p/(B*B) N*Ag/(B*B) kg/km o*Rs/1Rs*Ra-Ra+1 l aa*Aa O!l/KQ Eauation X*B Hs+d H2b-Hlz E (ksf)orc, E (ksf)orc, E (ksf)orc, E (ksf)orc, E (ksf)orc, q*I q*I q*I q*I a*I ce1 *Hlz1"Iog((Po1 +DP1 )/Po1) ce2"Hlz:Tlog((Pc2+DP2)/Po2) ce3*Hlz3"1og((Po3+DP3)/Po3) ce4*Hlz4*1og((Po4+DP4)/Po4) ce5*Hlz5"1og((Po5+DP5)/Po5) S1z.1+S1z2+S1z3+S1z4+S1z5 Square-design B F10 210 65 35 275 8.29 10 2.75 2 0.063 7.9 15.19 47.7 0.32 F10 20 8.0 12 4.0 5.0 3.0 ok 0.01 0.01 0.01 0.01 0.01 1.560 2.100 2.580 2.760 2.760 0.92 0.52 0.34 0.30 0.30 0.10 0.06 0.02 0.00 0.00 0.2 0.5 F9 F9 180 55 25 235 25.00 9 2.90 2 0.078 7.9 14.96 47.0 0.32 18 8.0 10 4.0 5.0 1.0 ok 0.01 0.01 0.01 0.01 0.01 1.560 2.100 2.460 2.520 2.520 0.84 0.46 0.33 0.31 0.31 0.09 0.05 0.01 0.00 0.00 0.1 <112 F9 175 55 25 230 7.58 9 2.84 2 0.078 7.9 14.64 46.0 0.31 F9 18 8.0 10 4.0 5.0 1.0 ok 0.01 0.01 0.01 0.01 0.01 1.560 2.100 2.460 2.520 2.520 0.82 0.45 0.32 0.31 0.31 0.09 0.05 0.01 0.00 0.00 0.1 <112 CiEOPIER® SQUARE FOOTINGS Version 3.0.6 August 2013 180 210 180 155 55 65 55 45 30 30 20 20 F8 F9 F8 F8 235 275 235 200 7.66 8.29 7.66 7.07 8 9 8 8 3.67 3.40 3.67 3.13 2 2 2 2 0.098 0.078 0.098 0.098 7.9 7.9 7.9 7.9 17.32 17.51 17.32 14.74 54.4 55.0 54.4 46.3 0.37 0.37 0.37 0.32 F8 F9 F8 F8 16 18 16 16 8.0 8.0 8.0 8.0 8 10 8 8 4.0 4.0 4.0 4.0 4.0 5.0 4.0 4.0 1.0 ok ok ok ok 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 1.560 1.560 1.560 1.560 2.040 2.100 2.040 2.040 2.280 2.460 2.280 2.280 2.280 2.520 2.280 2.280 2.280 2.520 2.280 2.280 0.88 0.98 0.88 0.75 0.50 0.54 0.50 0.43 0.40 0.39 0.40 0.34 0.40 0.37 0.40 0.34 0.40 0.37 0.40 0.34 0.09 0.10 0.09 0.08 0.05 0.06 0.05 0.04 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.1 0.2 0.1 0.1 <112 0.5 <112 <1/2 F10 295 90 40 385 9.81 10 3.85 4 0.126 7.9 16.32 51.3 0.35 F10 20 8.0 12 4.0 5.0 3.0 ok 0.01 0.01 0.01 0.01 0.01 1.560 2.100 2.580 2.760 2.760 1.29 0.73 0.48 0.42 0.42 0.13 0.08 0.03 0.00 0.00 0.2 0.5 GEOPIER® Foundation Company Project Name/Location: Project No.: Engineer: Date: Romeria Point Apartments, Carlsbad, CA GDC-835 AMB 7/18/2024 Building B -Max Bearing INPUT PARAMETER VALUES· TOP OF PIER STRESS -SQUARE FOOTINGS Parameter Svmb Val. arameter Svmb Eauation Constructed RAP diameter (in) d 24 sustained column load (kips) p Depth to groundwater (fl) dgw 50 ~equired foaling width (fl) Br sqrl(p/qall) Total unit weight of soil (pcf) g 120 ,elected footing width (fl) B Soil frict. angle (degr) f 28 ,ustained bearing pressure (ksf) q p/(B*B) Max. hor. oressure (osfl omax 250n =st. No. RAP elems per Qcell Nr p/Qcell ,elected No. RAP elems N RAP cell cap. (kips) Qcell 120 \rea replacement ratio Ra N*Ag/(B*B) ~lowable bearing press. (ksf) qall 4 ,tiffness ratio Rs kg/km RAP stiffn. modulus (pci) kg 32 tress at too of GP lksfl aa a*Rsl(Rs*Ra-Ra+ 11 Soil stiffness modulus (ocil km 4 oad at too of GP (kiosl Qa aa*Aa Square-design (B BEARING) CiEOPIER® SQUARE FOOTINGS Version 3.0.6 August 2013 400 324 324 256 324 256 256 256 400 10.00 9.00 9.00 8.00 9.00 8.00 8.00 8.00 10.00 10 9 9 8 9 8 8 8 10 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 3.3 2.7 2.7 2.1 2.7 2.1 2.1 2.1 3.3 2 2 2 2 2 2 2 2 4 0.063 0.078 0.078 0.098 0.078 0.098 0.098 0.098 0.126 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 7.9 22.09 20.63 20.63 18.87 20.63 18.87 18.87 18.87 16.95 69.4 64.8 64.8 59.3 64.8 59.3 59.3 59.3 53.3 GEOPIER® Foundation Company Project Name/Location: Project No.: Romeria Point Apartments, Carlsbad, CA GDC-835 Engineer: AMB Date: 7/18/2024 INPUT PARAMETER VALUES· TOP OF PIER STRESS· RECTANGULAR FOOTINGS !Parameter I S}'.mb I Val. I Parameter Svmb Eauation Constructed RAP diameter (in) d 24 Sustained column load (kips) p Depth lo groundwater (fl) dgw 50 Selected fooling width (fl) B Total unit weight of soil (pcf) g 120 Required fooling length (fl) Lr Soil frict. angle (degr) f 28 Selected footing length (fl) L Max. hor. oressure In.oil omax 2500 Sustained bearing pressure (ksf) q p/(B*L) Est. No. RAP elems per Qcell Nr p/Qcell RAP cell cap. (kips) Qcell 120 Selected No. RAP elems N Allowable bearing press. (ksf) qall 4 Area replacement ratio Ra N*Ag/(B*L) RAP stiffn. modulus (pci) kg 325 Stiffness ratio Rs kg/km Soil stiffness modulus (ocil km 41 Stress at top of GP (ksf) qg q*Rs/(Rs*Ra-Ra+1) Load at too of GP lkios l Qa aa*Aa INPUT PARAMETER VALUES· LOWER ZONE SETTLEMENTS I Parameter I S:tmb I Val. I Parameter Svmb Eauation Allowable end-bearing (kips) Qeb 18.8 Dplh to bollm of LZ from fig (fl) X"B X"Beq E or c. for L.Z sublyr 1 E1 /c,1 0.01 Upper zone thickness (fl) H.,, Hs+d E or c, for L.Z sublyr 2 E2 / C,2 0.01 Lawer zone thickness (fl) H• H2b-Hlz E or c. for L.Z sublyr 3 E, / C., 0.01 Thickness of L.Z sublayer 1 (fl) H•1 E or c, for L.Z sublyr 4 E., / c,, 0.01 Thickness of L.Z sublayer 2 (fl) H., E or c. for L.Z sublyr 5 Es/ C.s 0.01 Thickness of L.Z sublayer 3 (fl) H., Cale. settlement to X"B X 2 Thickness of L.Z sublayer 4 (fl) H .. Thickness of L.Z sublayer 5 (fl) H .. Total thickness ok? E or c. for L.Z sublyr 1 E1 /c,1 E (ksf)orc, E or c, for L.Z sublyr 2 E2 / C,2 E (ksf)orc, E or c. for L.Z sublyr 3 E, / C., E (ksf)orc, E or c, for L.Z sublyr 4 E• / c,, E (ksf)orc, E or c. for L.Z sublyr 5 Es/ C.s E (ksf)orc, Initial stress for sublyr 1 (ksf) P'01 Initial stress for sublyr 2 (ksf) P'o2 Initial stress for sublyr 3 (ksf) P'o3 Initial stress for sublyr 4 (ksf) P'o4 Initial stress for sublyr 5 (ksf) P'o5 Fig stress on sublyr 1 (ksf) 8P1 q*I Fig stress on sublyr 2 (ksf) 8P2 q*I Fig stress on sublyr 3 (ksf) 8P3 q*I Fig stress on sublyr 4 (ksf) 8P4 q*I Fla stress on sublvr 5 (ksfl 8P5 a*I Sell. of L.Z sublayer 1 (in) s., ce1 *Hlz1*Iog((Po1 +DP1 )/Po1) Sett. of L.Z sublayer 2 (in) So, ce2"'Hlz2"1og((Po2+DP2)/Po2) Sell. of L.Z sublayer 3 (in) s., ce3*Hlz3*Iog((Po3+DP3)/Po3) Sett. of L.Z sublayer 4 (in) s •• ce4*Hlz4"1og((Po4+DP4)/Po4) Sell. of L.Z sublayer 5 (in) s .. ce5*Hlz5*1og((Po5+DP5)/Po5) Total lawer zone sett. (in) s. S1z.1+S1z2+S1z3+S1z.4+S1z5 Total UZ + L.Z settlement linl s Reel CiEOPIER® RECTANGULAR FOOTINGS Version 3.0.6 August 2013 Bide B Bide A CF-6 24"Mat 252 504 6.00 10.50 10.50 12.00 10.50 12.00 4.00 4.00 2.1 4.2 2 4 0.100 0.100 7.9 7.9 18.75 18.75 58.9 58.9 CF-6 24"Mat 15.9 22.4 9.0 24.0 6.9 -1.6 7 ok NoLZ 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 1.734 3.600 2.148 3.600 2.148 3.600 2.148 3.600 2.148 3.600 0.67 0.38 0.43 0.38 0.43 0.38 0.43 0.38 0.43 0.38 0.12 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.1 a.a 0.5 <1/2 GEOPIER® Foundation Company Project Name/Location: Project No.: Romeria Point Apartments, Carlsbad, CA GDC-835 Engineer: AMB Date: 7/18/2024 INPUT PARAMETER VALUES· TOP OF PIER STRESS· CONTINUOUS FOOTINGS !Parameter I S}'.mb I Val. I Parameter Svmb Eauation Constructed RAP diameter (in) d 24 Sustained wall load (kif) p Depth lo groundwater (fl) dgw 50 Est. Geopier spacing per Qcell (fl) sreq Qcell/p Total unit weight of soil (pcf) g 120 Selected Geopier spacing (fl) s Soil frict. angle (degr) f 28 Required footing width (fl) Breq p/qall Max. hor. oressure In.oil omax 2500 Selected footing width (fl) B Sustained bearing pressure (ksf) q p/B RAP cell cap. (kips) Qcell 120 Area replacement ratio Ra Ag/(B*s) Allowable bearing press. (ksf) qall 4 Stiffness ratio Rs kg/km RAP stiffn. modulus (pci) kg 325 Stress at lop of GP (ksf) qg q*Rs/(Rs*Ra-Ra+1) Soil stiffness modulus (ocil km 41 Load at too of GP lkios l Qa aa*Aa Upper zone settlement linl suz nntKn INPUT PARAMETER VALUES· LOWER ZONE SETTLEMENTS I Parameter I S:tmb I Val. I Parameter Svmb Eauation Allowable end-bearing (kips) Qeb 18.8 Dplh to bottm of LZ from fig (fl) X"B X"B E or c. for L.Z sublyr 1 E1 /c,1 0.01 Upper zone thickness (fl) H.,, Hs+d E or c, for L.Z sublyr 2 E2 / C,2 0.01 Lawer zone thickness (fl) H• H2b-Hlz E or c. for L.Z sublyr 3 E, / C., 0.01 Thickness of L.Z sublayer 1 (fl) H•1 E or c, for L.Z sublyr 4 E., / c,, 0.01 Thickness of L.Z sublayer 2 (fl) H., E or c. for L.Z sublyr 5 Es/ C.s 0.01 Thickness of L.Z sublayer 3 (fl) H., Cale. settlement to X"B X 5 Thickness of L.Z sublayer 4 (fl) H .. Thickness of L.Z sublayer 5 (fl) H .. Total thickness ok? E or c. for L.Z sublyr 1 E1 /c,1 E (ksf)orc, E ar c, for L.Z sublyr 2 E2 / C,2 E (ksf)arc, E or c. for L.Z sublyr 3 E, / C., E (ksf)orc, E ar c, for L.Z sublyr 4 E• / c,, E (ksf)arc, E or c. for L.Z sublyr 5 Es/ C.s E (ksf)orc, Initial stress for sublyr 1 (ksf) P'01 Initial stress for sublyr 2 (ksf) P'o2 Initial stress for sublyr 3 (ksf) P'o3 Initial stress for sublyr 4 (ksf) P'o4 Initial stress for sublyr 5 (ksf) P'o5 Fig stress an sublyr 1 (ksf) 8P1 q*I Fig stress on sublyr 2 (ksf) 8P2 q*I Fig stress an sublyr 3 (ksf) 8P3 q*I Fig stress on sublyr 4 (ksf) 8P4 q*I Ftq stress an sublvr 5 (ksfl 8P5 q*I Sell. of L.Z sublayer 1 (in) s., ce1*Hlz1*Iog((Po1 +DP1 )/Po1) Sett. al L.Z sublayer 2 (in) So, ce2"Hlz2"1og((Po2+DP2)/Po2) Sell. of L.Z sublayer 3 (in) s., ce3"Hlz3•1og((Po3+DP3)/Po3) Sett. al L.Z sublayer 4 (in) s •• ce4"Hlz4•1og((Po4+DP4)/Po4) Sell. of L.Z sublayer 5 (in) s .. ce5*Hlz5*Iog((Po5+DP5)/Po5) Total lawer zone sett. (in) s. S1z.1+S1z2+S1z3+S1z.4+S1z5 Total UZ + L.Z settlement linl s Strip GEOPIER® CONTINUOUS FOOTINGS Version 3.0.6 August 2013 Bide A GB-2 10 12.00 23 2.50 2.5 4.00 0.055 7.9 23.00 72.3 0.49 GB-2 12.5 24.0 -11.5 NoLZ 0.01 0.01 0.01 0.01 0.01 3.600 3.600 3.600 3.600 3.600 0.24 0.24 0.24 0.24 0.24 0.00 0.00 0.00 0.00 0.00 a.a <1/2 WCi 11 CiEOPIER~ July 18, 2024 Alliance Diversified Enterprises, Inc. Attn: Judd Hatzky 665 Opper Street Escondido, Ca 92029 Western Ground Improvement, Inc. 209 Avenida Del Mar Suite 2018 San Clemente, California 92672 Tel: (714) 336-3702 www.westerngroundimprovement.com Re: Quality Control Package for a Geopier® Foundation System -Delta 1 Romeria Pointe Apartments Carlsbad, California GFC Project No.: GDC-835 Dear Mr. Hatzky, Western Ground Improvement, Inc. has completed the Geopier® foundation design for the above project. The following documents are included herein: • Geopier Quality Control Package We are pleased to have provided you with our design services. If you have any questions, please contact this office. Sincerely, Western Ground lmpr Aron B Regional WCi 11 CiEOPIER~ QUALITY CONTROL PACKAGE FOR GEOPIER FOUNDATIONS (Copy to be provided to Owner's QA Representative) Project: Project Number: Geopier Designer: Mobile: E-Mail: Geotechnical Engineer: Contact: Phone: Structural Engineer: Phone: Referenced Drawings: Date of Drawings: Romeria Pointe Apartments Carlsbad, California GDC-835 Aaron Bishop, P.E. 714.336.3702 aaron@westerngroundimprovement.com GeoSoils, Inc. John P. Franklin, CEG 760.438.3155 Kurt Fischer Structural Engineering 818.874.1445 S-110 and S-122 05/05/22 Anticipated Geotechnical Conditions: The subsurface conditions generally consist of up to 24 feet of sandy clay and silty sand fill over Tertiary Santiago Formation consisting of stiff to hard clay and sandstone. Groundwater was not encountered. Gradina: Piers are to be installed after grading. New fill should be placed and compacted as recommended by the project geotechnical engineer. Please include a two-week hold period between fill placement and footing/slab construction for areas requiring greater than 5 feet of grade raise fill. Special Site Considerations: We are only responsible for settlement control of foundations supported by Geopier elements and are not responsible for differential and total settlements induced below non-pier-supported exterior wall footings. The RAP solution does not mitigate expansive soils. Guidance provided by the Geotechnical Engineer should be followed as it pertains to mitigating expansive soils. RAPs have not been designed to reinforce slope stability. Slope stability should be evaluated by others. ATTACHMENTS -GEOPIER SCHEDULE GEOPIER MODULUS TEST SCHEDULE GEOTECHNICAL INFORMATION Geopier Foundation Company® CiEOPIER ® Project Name: Romeria Point Apartments Project Location: Carlsbad, Ca GEOPIER® SCHEDULE Project Number: GDC-835 Ant1cIpatea Geopier® Pad Top of Shaft Length, Elevation, Geopier® Approximate Geopier® Width, Length, Thickness, (ft) (ft) Elevation, Bedrock Building Number(s) Type I Mark (ft) (ft) (in) (1) (2) (ft) Elevation (ft) A 1 -18 SLAB - -6 28 84.70 84.70 60 A 19 -28 SLAB - -6 23 84.70 84.70 65 A 29-30 SLAB - -6 28 84.70 84.70 60 A 31 -33 SLAB - -6 23 84.70 84.70 65 A 34-40 SLAB - -6 18 84.70 84.70 70 A 41 SLAB - -6 28 84.70 84.70 60 A 42-43 SLAB - -6 23 84.70 84.70 65 A 44-45 SLAB - -6 18 84.70 84.70 70 A 46-47 SLAB - -6 13 84.70 84.70 75 A 48-50 SLAB - -6 23 84.70 84.70 65 A 51 -53 SLAB - -6 18 84.70 84.70 70 A 54-58 SLAB - -6 13 84.70 84.70 75 A 59-64 F11 11.0 11 .0 36 25 84.70 82.00 60 A 65 GB-2 2.5 -24 22 84.70 79.00 60 A 66 GB-2 2.5 -24 22 84.70 79.00 60 A 67-70 24" MAT - -24 22 84.70 79.00 60 A 71 -73 F8 8.0 8.0 36 25 84.70 82.00 60 A 74 GB-2 2.5 -24 26 84.70 83.00 60 A 75-77 F9 9.0 9.0 36 25 84.70 82.00 60 A 78 -81 F11 11 .0 11 .0 36 20 84.70 82.00 65 A 82-85 F10 10.0 10.0 36 15 84.70 82.00 70 A 86-88 F9 9.0 9.0 36 15 84.70 82.00 70 A 89 -91 F9 9.0 9.0 36 10 84.70 82.00 75 A 92-94 F9 9.0 9.0 36 10 84.70 82.00 75 B 95-122 SLAB - -6 4 65.90 65.90 65 B 123 SLAB --6 6 65.90 65.90 63 B 124 -133 SLAB - -6 4 65.90 65.90 65 B 134 SLAB --6 6 65.90 65.90 63 B 135 -139 SLAB - -6 4 65.90 65.90 65 B 140-141 SLAB - -6 9 65.90 65.90 60 B 142 -153 SLAB --6 4 65.90 65.90 65 B 154 -156 F10 10.0 10.0 36 2 65.90 63.50 65 B 157 -158 F9 9.0 9.0 36 2 65.90 63.50 65 B 159 -160 F9 9.0 9.0 36 2 65.90 63.50 65 B 161 -162 F8 8.0 8.0 36 2 65.90 63.50 65 B 163 -164 F9 9.0 9.0 36 2 65.90 63.50 65 B 165 -166 F8 8.0 8.0 36 2 65.90 63.50 65 B 167 -168 F8 8.0 8.0 36 2 65.90 63.50 65 B 169-170 CF-6 6.0 -24 -2 65.90 60.50 65 B 171 -174 F10 10.0 10.0 36 2 65.90 63.50 65 NOTES: ( 1) Geo pier elements shall completely penetrate fill and extend approximately 5' into formational material. (2) Elevations shall be confirmed prior to Geopier element installation. page 1 of 1 Geopier Foundation Company® CiEOPIER ® Project Name: Romeria Point Apartments Project Location: Carlsbad, Ca Geopier® Modulus Test Schedule Project Number: GDC-835 Geopier Design Stress: 17 ,510 psf ----,,-,,....----;,-----Geo pier Element Design Diameter: 24 in. Modulus Test Location: near Geopier #6 ---..... .,;.----Test Geopier Element Shaft Length: 28 ft --...---------Concrete Cap Diameter: 24-26 in. ___ ...,. ___ _ Concrete Cap Thickness: 2 ft --.......... -.......... ----Geopier Design Load: __ 5.,.5.., . .,.01 ___ k_ip,,.s ___ _ Geopier Design Modulus: 325 pci --------Tot a I Geopier Element Depth: ___ 3_0_ft __ _ Ram Load, Percent of Minimum Maximum Load No. (kips) Design Stress Duration Duration Remarks 2.75 5.0% NIA NIA seatinci load 1 9.17 16.7% 15 min 60 min 2 18.33 33.3% 15 min 60 min 3 27.50 50.0% 15 min 60 min 4 36.67 66.7% 15 min 60 min 5 45.84 83.3% 15 min 60 min 6 55.01 100.0% 15 min 60 min 7 64.16 116.6% 60 min 240 min 8 73.34 133.3% 15 min 60 min 9 82.51 150.0% 15 min 60 min 10 55.01 100.0% NIA NIA rebound, unload 11 36.31 66.0% NIA NIA rebound, unload 12 18.15 33.0% NIA NIA rebound, unload 13 2.75 5.0% NIA NIA rebound, unload Notes: 1 -The Geopier element to be used in the modulus load testing should be installed in a manner similar to production, at least 4 days prior to testing, so that pore-pressures have adequate time to dissipate. 2 -The modulus load test shall be performed to a stress not less than 150% of the design maximum top-of-pier stress indicated in the Geopier Design Calculations. 3 -The modulus load test Geopier element shall be installed to a depth of 30 feet below the ground surface with a 2-foot thick unreinforced concrete (minimum 2,500 psi) leveling pad. The modulus load test Geopier shall penetrate the fill. 4 - A telltale shall be installed in the bottom one-third of the tested Geopier element. Telltale deflections shall be monitored concurrent with top of Geopier deflections during the modulus load test. 5 -The modulus load test setup shall be as shown on Geopier Construction Drawing GP0.1. Helical anchors should be installed in accordance with manufacturers specifications. 6 - A representative of the owner's geotechnical consultant should be present to witness the load test. GEOTECHNICAL INFORMATION The attached boring logs have been prepared by others and are included solely for reference purposes. The boring logs should be used for information only and are not intended to represent geotechnical recommendations for this project. The project geotechnical report should be reviewed in its entirety for more information. 0 20 10 Feet Sc-ale: 1"=10' PROPERTY LINE FENCE PER LANDSCAPE PLANS TEMPORARY SHORING SEE SHEET SH-1.0 BMP-1 B' 325 SF BIOF ... :ATION PLANTER " FX FUC. TRFF •. ' I I /w ' \ ., ,\ \ \ Afc \ \ ~ ·O ' ' . ~ .'ORTIO's OF EXIST BROW )ITCH TO REMAIN • EX. PEPPER TREES, T'O REivUIN Buildi .l;l g A ROOF DRAIN OUTLET TO BMP (TYP) I B-2 .,. !TD=16' I • . I . I ~ .. I :'I r' . ' I ' . . I ' lr--'~l'-\A-.-1 2 i I. i, , f$ i ' 1('.>· / , . -T / .i : /1 I I 'o ,' I ,' . cl . ' -,. ~-; 'c···"-~ y •. 371 ~r'-,P ', 4 " A '6 i) I • .Fo ~5 ' , I ' . I I . I . ,..,..t/ I "'· "" "-L c,~ ; I ~~-. -- '' 0 / --'J' : i:: • 7 )q ' :s . f l~ -' r1 I '7 - .•• Afu Afc sa ,I == -_ GROUP OFT _ EXc'fREE -~REMAIN =';'I ;;,Q~R-F~M;';';A~"'<= ---~~,.,,,~~::; ____ _,.c--~ ,;L-i' "~--~ ,, -:,,_ -_;,/ ·- ~t B-1 .. -·· •. ." TD=1612 ' ••• ..• ,/ •• .i ~U' 3 OUTLET \ ./ • 66.80 TG. •• ,/ 58.65 INV f;~ .• Afc Tsa 6 g r . s . I . I . I . I I I SEE SHEET FOR 6 SEWEf & STOR'vl DRAIN PLANS j . 6p I I ' I ' \ ' ' ' ' I I ' \ "' \ ' ' I I ' I \ ' I "-!<-·, (,.,.,~ <$! \ '\ ' •• \ · ' \ 560 SI' [l!Ol'JL TRA TTON PLANTER • • -; 0 FG BASIN A f C :EE DE~ AIL SHEET 3 ) \\\ EX SEWERMH \ tV! '<'$ ' \, ' ' ' ,,,, \ v ,, .... ' ' ' ' to tQ ,,,, \ Qs Afu Afc Tsa r ?-./ - CPT-5 ' -•-' B-2 s TD=41f' B-2 • TD=17' TP-2 4 I C C' 1---11 GS/ LEGEND QUA TERNARY (RECENT) SLUMP DEPOSITS AR11FICIAL FILL -UNDOCUMENTED AR11FICIAL FILL -COMPAC1ED PLACED UNDER PURVIEW OF BEi (1970) 1ER11ARY SAN11AGO FORMA 110N, CIRCLED WHERE BURIED APPROX/MA 1E LOCA 110N OF GEOLOGIC CONTACT, QUERIED WHERE UNCERTAIN APPROX/MA 1E LOCA 110N OF CONE PENETRA 110N JEST SOUNDING W/1H TOTAL DEP1H IN FEET (GS/. 2006a) APPROX/MA 1E LOCA 110N OF EXPLORATORY BORING ltl1H TOTAL DEP1H IN FEET (GS/, 2004) APPROX/MA 1E LOCA 110N OF EXPLORATORY BORING ltl1H TOT AL DEP1H IN FEET (ECSCEI, 2001) APPROX/MA 1E LOCA 110N OF EXPLORATORY TEST PIT ltl1H TOT AL DEP1H IN FEET (ECSCEI, 2001) LOCA 110N OF GEOLOGIC CROSS SEC110N APPROX/MA 1E LOCA 110N OF FA/LURE SCARP APPROX/MA 1E ELEVA 110N OF BURIED GEOLOGIC CONTACT BETWEEN Afc & Tsa IN FEET (NGVD29) APPROX/MA 1E ELEVA 110N CONTOUR OF BURIED GEOLOGIC CONTACT BETWEEN Afc & Tsa IN FEET (NGVD29) / ifr: ;, ' I , -,¼ ' i-4..D . ' '• ROOF RAIN OUTLET -;-- ~ 150' STOPPTKG SIGHT DISTANCE LIKE PER CALTRANS HIGHWAY DESIGN 'v!A"JUAL (25MPH) I t I . I I I I I T • ' """ 1 ,. . I _4_1!;; --::-- " ' ~---·--~~-----~~- 11::, . .I -.:;_:: ... > I ,I . -c,,::j" ., I , : , -'i;f3'f ,· ; ' '/fr"" .~ -' 6 ' -1--;•a..._;o-ill":'· ' _,.,,\)fo ; ,...,:::.;,-_ ------ 4 I ·, - . ______ , __ .__..._ ' -r -----=-·--c::-_:::-..::.---,.,.-::::'-:-=' ------ ---L I I EX TREE TO llE REM0JVED -· -- ·"o/ "'j~ ~ -~ ~!--~?.-C":: _~ ~ --- tJ EX CU GUITHR& S!Ul'.Wj\.LK Ex 1.5'' SERVICE W/1" METER - (IRRIG ) ~ SEE STREET IMPROVE~1ENT PLANS FOR OH-SITE IMPROVl'.Ml'.NTS <l~ __________ _f •• .__ -.. ·-•. I --f\i ~~::c:a}• r_!&. 1 ·., [X~~-I . EX. 8" SEWER PER DWG 169-4 EX, 8'' WATERPERDWG 169-4 I '; ' ' • 1-J •• I I ' I ~ Afc ~- Tsa . I j I . I 8 B_EREMO'(ED• (TYP) ' _. ·· '0.R. • iivy . < 39 sr llTOl'TLTRATION PLANTER . 64 I FG BASl"l (SEE DETAIL SHEET 4) 150' STOPPING SJGJ-!1-0JSTANCl'. L!Nl'. PER CAL TRANS HIGHWAY DESIGN MAKUAL (25MPH) f------1----e-<' 1 ~' -------------------1-----l-----1 nA"TF INITIAi 11\IITl .61 I\ o" Cr~_)\ 1 Gll43FL • I • :------ L 0 \ \ RCE ___ _ REVIEWED BY: \ \\ 20 \\ . \\\\ \\ "AS BUILT" EXP. ____ _ 10' 30 DATE UPDATED GEOTECHNICAL MAP Plate 1 w.o. 7297-A5-SC DATE: 05/22 SCALE: 1" = 10' APPENDIX B LOGS OF SUBSURFACE EXPLORATIONS B.1 -ECSCEI, 2001 B.2 -GSI, 2004 B.3 -GSI, 2006a GeoSoils, Inc. APPENDIX B LOGS OF SUBSURFACE EXPLORATIONS B.1 -ECSCEI, 2001 GeoSoils, Inc. LEGACY DEVELOPMENT, LLC PROJECT NO. 0l-1147Hl I R s BORING NO.I N E 0 M L I p 0 A s L L I T 0 EQUIPMENT: GAS-POWERED AUGER A s I I C C T V D L L E u E E A SAMPLING METHOD: R p s s C= CHUNK SAMPLE D E C T A s B= BULK SAMPLE, R 0 H M I y C M p F U= UNDISTIJRBED DRIVE 0 p I L I D N A N E C E T C A N E T f T T s N I E y I I T 0 E p 0 SOIL DESCRIPTION T N T E N y % % 0 SC TAN. DA.VIP TO MOIST, SOFT TO MEDIUM STIFF SANDY Cl.A Y (Qaf) - I DARK BROWN, MOIST, LOOSE TO MEDIUM DENSE, Cl.A YEY SAND -2 -SC TAN, MOIST, SOFT TO MEDIUM STIFF SANDY Cl.A Y J . 4 -s - 6 .. - 7 - 8 .. - 9 - IO ·-CL SANTIAGO FORMATION (Tsa) -DARK GRAYISH BROWN. MOIST, MEDIUM STIFF Cl.A Y II B --12 BROWN, MOIST. MEDIUM STIFF SANDY CLAY . IJ - 14 - 15 - 16 SC-TAN MOIST. DENSE, SA."IDSTONE -SM 17 BOTTOM OF EXPLORATORY HOLE - 18 PLATE NO. 2 l I DATE LOGGED: APRlL 12, 2001 LOGGED BY: M. DUNCAN 9 W .0. 4460-A-SC Plate B.1-1 LEGACY DEVELOPMENT. UC PROJECT NO. 0l-l 147HJ I R I s BORING NO. 2 N E 0 M L I p 0 A s L L I T 0 ' EQUIPMENT: GAS~POWERED AUGER A s I I C C T V D L L SAMPLING METIIOD: E u E E A R p s s C= CHUNK SAMPLE D E C T A s B= BULK SAMPLE, R 0 H M l y C M p F U= UNDISTURBED DRIVE 0 p I L I D N A N E C E T C A N E T F T T s N I E y . I I T 0 E p 0 SOIL DESCRIPTION T N T E N y % % 0 --T A.'I. MOIST, SOFT TO MEDIUM STIFF SANDY CLAY (Qal) -B I . 2 --- 3 -BROWN. MOIST, SOFT TO MEDIUM STIFF SANDY Cl.AV 4 . SC TAN. MOIST TO WET. LOOSE TO MEDIUM DENSE, SILTY. CLAYEY SAND s - 6 . 7 CL GRAYISH BROWN. MOIST. SOFT TO MEDIUM STIFF SANDY Cl.A Y 8 . 9 - 10 CL SANTIAGO FORMATION (Tsa) -DARK BROWN. MOIST, MEDIUM STIFF SANDY CLAY 11 - 12 GRAYISH BROWN.MOIST. MEDIUM STIFF, SANDY CLAY - 13 14 - IS B SC-TAN MOIST, DENSE. SANDSTONE -SM 16 -BOTTOM OF EXPLORATORY HOLE - 17 - 18 I PLATEN0.3 I I DA TE LOGGED: APRIL 12, 200 I LOGGED BY: M. DUNCAN 10 W.0. 4460-A-SC Plate B.1-2 LEGACY DEVELOPMENT, LLC PROJECT NO. 0l-l 147HJ I K s TRENCH NO. I N E 0 M L I p 0 A s L EQUIPMENT: CASE 580 E BACKHOE L I T 0 A s I I C C T V D l L SAMPLING METHOD: E u E E A R p s s U= UNDISTURBED DRIVE D E C T A s C= CHUNK SAMPLE R 0 H M I y C M p F B= BULK SAMPLE 0 p I L I D N A N E C E T C A N E T F T T s N I E y l I T 0 E p 0 T N T E N SOIL DESCRIPTION V % 'Yo 0 SC TAN, DAMP TO MOIST, SOFT TO MEDIUM STIFF SANDY CL<\ Y WITH GRAVEL: (Qaf) . I DARJC BROWN. MOIST LOOSE TO MEDRJM DENSE, CLAYEY SAND . 2 C 105.8 18.7 . SC TAN, MOIST, SOFT TO MEDIL"M SrIFF SANDY ClA Y ) C 103.4 20.2 . BROWN, MOIST. SOFT TO MEDIUM STIFF, SANDY CLAY 4 -GRAYISH BROWN. MOIST, LOOSI::, SILTY.CLAYEY SAND 5 - 6 C 105.0 18.0 - 7 -g - 9 BLUEISH BROWN, MOIST, LOOSE 10 MEDIUM DENSE.CLAYEY SAND - 10 CL SANTIAGO FORMATION (Tsa) -DARK GRAYISH BROWN, MOIST, MEDIUM STIFF CLAY: BOTTOM OF EXPLORATORY TRENCH II - 12 - IJ - 14 - 1S I I - PLATEN0.4 I I DATE LOGGED: MAY 2, 2001 LOGGEDBY:M.DUNCAN 11 W.O. 4460-A-SC Plate B.1-3 Wd'::W :':J LEGACY DEVELOPMENT, LLC PROJECT NO.01-1147HJ I R s TRENCHNO.2 N E 0 M L I p 0 A s L EQUIPMENT: CASE 580 E BACKHOE L I T 0 A. s I I C C T V D L L SAMPLING METHOD: E u E E A. R p s s U= UNDISTIJRBED DRlVE D E C T A s C= CHUNK SAMPLE R 0 H M I y C M p F B= BULK SAMPLE 0 p I L I D N A N E C E T C A N E T F T T s N I E y l I T 0 E p 0 T N T E N SOIL DESCRIPTION y % ¾ 0 SC TAN, DAMP 10 MOIST, SOFT 10 MEDIUM STIFF SANDY Ct.A Y (Qaf) - I -2 - 3 -BROWN, MOIST. SOFT TO MEDIUM STIFF SANDY CLAY 4 -TAN, MOIST TO WET, LOOSE TO MEDIUM DENSE. SIL lY, CL\ YEY SAND s C JI0.J 17.2 . TAN BROWN. WET, SOFT TO MEDIUM STIFF SANDY Cl.A Y: LA YER OF OVERSIZED ROCK 6 . 7 Ll<JHT TAN, MOIST, LOOSE TO MEDIUM DENSE. SILTY SAND . 8 . 9 - 10 CL SANTIGO FORMATION (Tsa) . DARK GRAYISH BROWN. MOIST. MEDIUM STIFF CLAY: BOTTOM OF EXPLORATORY TRENCH II - 12 . 13 - 14 . IS PLATE NO. 5 J I DATE LOGGED: MAY2. 2001 LOGGEDBY:M.DUNCAN 12 W.O. 4460-A-SC Plate B.1-4 APPENDIX B LOGS OF SUBSURFACE EXPLORATIONS B.2 -GSI, 2004 GeoSoils, Inc. UNIFIED SOIL CLASSIFICATION SYSTEM CONSISTENCY OR RELATIVE DENSITY Major Divisions Group Typical Names CRITERIA Symbols GW Well-graded gravels and gravel- sand mixtures, little or no fines Standard Penetration Test ~ C: .!!l ltl Q) Q) .!!1 ~ ..,_ C "U) Poorly graded gravels and Penetration ~ oos:t (_) ~ a>·-(!) GP gravel-sand mixtures, little or no Resistance N Relative 111~Uci "iii "iii o ltlz fines (blows/fl) Density >E.::: 0 f! 0 lJl § 0 C\I (!) * iii "O Silty gravels gravel-sand-silt 0-4 Very loose Ill • 1i5 ..c GM = 0 0 0 a> mixtures oz ID O -~ ~ :!: en c: "O 0 ~ ~;: 4 -10 Loose ~ "O GC Clayey gravels, gravel-sand-clay -~ -~ mixtures 10 -30 Medium (!) It! ch a5 Well-graded sands and gravelly Ill ~ 30-50 Dense ~* SW rao C: Ill sands, little or no fines 8 'g .... Q) 0 C: 6, al "C Q) C: > 50 Very dense * O·--al al ·-Ill u en Poorly graded sands and :5 Ill g g-.i: SP ~ -g C .J:: 0 gravelly sands, little or no fines 0 It!~ Q) z ::!: Cl)+-'~cn SM Silty sands, sand-silt mixtures Q) It! Q) ~ 0 Ill ~..C: Ill 0 o Ill E ~ C :t:::: ~ Clayey sands, sand-clay &1l :: ii: SC mixtures Inorganic silts, very fine sands, Standard Penetration Test ML rock flour, silty or clayey fine sands (/l ~ ~~ ~ Unconfined u _§ .!!1 Inorganic clays of low to Penetration Compressive Q) -g :g 0 medium plasticity, gravelly clays, "iii CL Resistance N Strength 0 al 6-cil! sandy clays, silty clays, lean 0 (blows/fl} Consistenc:t'. (tons/ft") Ill C\I :¥l :::d5 clays ~ . en en ~ Organic silts and organic silty <2 Very Soft <0.25 "O Ill Q) Q) OL clays of low plasticity C: Ill -~ gj 2-4 Soft 0.25-.050 (!) C. cb ~ Inorganic silts, micaceous or 4-8 Medium 0.50-1.00 C: 0 MH diatomaceous fine sands or silts, ii: E (/l cil! 0 ~,,,,g elastic silts u ~ la 8-15 Stiff 1.00-2.00 * Inorganic clays of high plasticity, 0 -g :2 ;:i CH ID al ::::, ~ fat clays 15-30 Very Stiff 2.00-4.00 ~g; --Q) en ~ >30 Hard >4.00 Cl Organic clays of medium to high OH plasticity Highly Organic Soils PT Peat, mucic, and other highly organic soils 3" 3/4" #4 #10 #40 #200 U.S. Standard Sieve Unified Soil Gravel Sand Silt or Clay Classification Cobbles I I I coarse fine coarse medium fine MOISTURE CONDITIONS MATERIAL QUANTITY OTHER SYMBOLS Dry Absence of moisture: dusty, dry to the touch trace 0-5% C Core Sample Slightly Moist Below optimum moisture content for compaction few 5-10 % s SPTSample Moist Near optimum moisture content little 10 -25 % B Bulk Sample Very Moist Above optimum moisture content some 25-45% -Groundwater Wet Visible free water; below water table Qp Pocket Penetrometer BASIC LOG FORMAT: Group name, Group symbol, (grain size), color, moisture, consistency or relative density. Additional comments: odor, presence of roots, mica, gypsum, coarse grained particles, etc. EXAMPLE: Sand (SP), fine to medium grained, brown, moist, loose, trace silt, little fine gravel, few cobbles up to 4" in size, some hair roots and rootlets. File:Mgr: c;\SoilClassif.wpd PLATE B.2-1 GeoSoils, Inc. PROJECT: KARNAK Romeria Points, Carlsbad Sample -~'fi" s !E en o = a. J, -0 c~ t "' ::, ~ --QI ;: (.) .0 Q) ::i -g .e 0 en [ ?:-0 ID =>2 iii :::, Cl) 0 CL 5 SM 101.1 10 113.1 CL l ~ 2 C/) 'i5 ::;;; 19.4 15.3 C 0 ~ ::::, 1v CJ) 81.0 87.9 BORING LOG BORING B-1 DATE EXCAVATED w.o. __ 4_4_6_o_-A_-s_c __ SHEET_ OF__1_ 8-12-04 SAMPLE METHOD: ._,... .. .r . ":-,Y""' ..;..:..· . . '-<"""'.· .:-.-:-· ·...;.-:,.· . . ......--.· y":'·_ -~- ,"'-(".· Standard Penetration Test :;J.. Groundwater Undisturbed, Ring Sample Description of Material ARTIFICIAL FILL: @ O' SANDY CLAY, gray brown, dry, soft; porous, non-uniform. @ 1' SANDY CLAY, olive gray to brown to dark brown, damp to moist, medium stiff; oversize rock (12") encountered@ 2', non-uniform. @ 5' SIL TY SAND, yellow brown to gray brown, moist, medium dense; non-uniform. @ 10' SANDY CLAY, yellow brown to gray brown, moist, stiff; non-uniform. TERTIARY SANTIAGO FORMATION: @ 11 ½' SANDY CLAYSTONE, dark gray brown to brown, moist, medium stiff to stiff. 15-l---llrr,.,-l----!--,...,,+-----+---l--....,,...---f"L.uc+---c::--~.,......,,.....,...,..,=-:,....,..-,:-:-:--:-:-:=-==-=------:-:,---,-----;--,---=-:---, Push 4 cusc 113.9 11.0 99.7 @ 15' SANDY CLAYSTONE, medium brown, moist, very stiff to 20 25 5-8" CLAYEY SAND, yellow brown to gray to dark gray brown to orange, moist, dense; abundant angular pebble-to cobble-size clasts. Practical Refusal Due to Oversize Rock @ 16½' No Groundwater/Caving Encountered Backfilled 8-12-2004 Romeria Points, Carlsbad GeoSoils, Inc. PLATE B.2-2 GeoSoils, Inc. PROJECT: KARNAK Romeria Points, Carlsbad Sample g ~'5' !E Cf) 0 ~ c.. .~-g c~ £ "' ::> -"' ~ () .0 a. -c.a Cl) t ~ Q) :5 c ... 0 ID ::> .3 in ::> CJ) 0 CL 5 10 104.1 15 111.9 C: 0 ~ .2 C1l Cf) 20.8 93.7 14.2 79.0 BORING LOG BORING B-2 DA TE EXCAVATED SAMPLE METHOD: Standard Penetration Test '5l Groundwater Undisturbed, Ring Sample Description of Material ARTIFICIAL FILL: WO. 446 0-A-SC SHEET_ OF2_ 8-12-04 @ O' SANDY CLAY, brown, dry, soft; porous, occasional pebble- to cobble-size clasts (subrounded to subangular), non-uniform. @ 2' SANDY CLAY, brown, moist, medium stiff; occasional subangular cobble-to boulder-size clasts, non-uniform. @ 5' SANDY CLAY, brown to dark brown, moist to wet, medium stiff; occasional to abundant subangular cobble-to boulder-size clasts, non-uniform. @ 10' SANDY CLAY, yellow brown to gray, moist, soft to medium stiff; occasional subrounded cobble-size clasts, non-uniform. @ 15' SILTY SAND, yellow brown, moist, medium dense to SANDY CLAY, gray to brown, moist, stiff; non-uniform. 20-+---l777>+=:----c--=+---=-+--:--:--=--::--+-=--c:-+--::--:::-::----b-777:f----::::----=-=:-:-=:---:---:-c:=-:--::-:--:c77'---:--:------:-~--::-::=------:-=-------l Push 6 CL 110.9 17.8 96.0 @ 20' SANDY CLAY, olive gray, moist, stiff, non-uniform. /1 CL 25+--~=+--·--:2=--+.:cc--:-u-;;:s;--;:c;1---:;171-=-1.74--t--;;18;-;.3.t-.1,_;oo"."O::, SM TERTIARY SANTIAGO FORMATION (REPROCESSED): @24' SANDY CLAYSTONE, dark gray brown to brown, moist, medium stiff or anic odor subhorizontal contact. @ 25' SANDY CLAYSTONE, orange to gray, moist, stiff. @ 29' SIL TY SANDSTONE w/GRAVEL, brown, moist to wet, Romeria Points, Carlsbad GeoSoils, Inc. PLATE B.2-3 GeoSoils, Inc. PROJECT: KARNAK Romeria Points, Carlsbad Sample I ~13 g !1::! en o ;t:: C. J,"O c~ .c en :::, a. ...: ·-., 3: u.o "O.o en E Q) :5 c:-0 ~ a ID :::,.3 ffi -::,£ 0 CL - - SW SM 35-+---17"7"7",71----t-------+--- -~ 8 CL 101.9 - - ~ 0 ~ .3 ,n ·5 ~ 18.1 C 0 ~ i en 76.9 BORING LOG BORING B-2 DATE EXCAVATED W.O. 4460-A-SC SHEET _3_ OF --3.__ 8-12-04 SAMPLE METHOD: Standard Penetration Test '5l-Groundwater Undisturbed, Ring Sample Description of Material :0, \ dense. .. .. . . . . ...;....· J- @ 30' SANDY CLAYSTONE w/GRAVEL, brown, moist to wet, dense; abundant rounded cobble-size clasts. @ 33' Grades to SANDSTONE w/GRAVEL, brown, damp, dense: abundant Debbie-to cobble-size clasts . @ 34' SIL TY SANDSTONE w/CLAY, gray to orange, moist, dense· weak subhorizontal beddinq calic.l:e. @ 35' CLAYEY SANDSTONE, gray, moist, very de·nse; occasional subangular cobble-size clasts, weak subhorizontal bedding. I r f 4o_-1--+..~'777"f----1=2-+--,9.11~1---...,..11:-c:6'"""".2,----,1--:-:13::-c_5:c-t-c:8:-::5.--:-1--¥-~~-.-?-'·1----=@::--:-40-::c':-::S=-=1-=-LTY=-:---=s=-=A:--:-N-:-::D::--:S=-=T:;:'.O~N-;::E:-,-g-ra-y--;-b-ro-w-n,-d7a_m_p_,_v_e_ry_d--;-e-n_s_e __ ---1 - 45- - 50- - 55- - - Romeria Points, Carlsbad Total Depth= 41½' No Groundwater/Caving Encountered Backfilled 8-12-2004 GeoSoils, Inc. PLATE B.2-4 APPENDIX B LOGS OF SUBSURFACE EXPLORATIONS B.3 -GSI, 2006a GeoSoils, Inc. GeoSoils Inc ~uh;11 Location Romeria Point Operator ML-JH Filename SDF(458}.c~t CONEPENETJlOMmRTlSTING&DIKlCJ.n/StlCIIOUI' Job Number 4460-A3-SC Cone Number DSG0409 GPS Hole Number CPT-01 Date and Time 10/4/2006 1 :46:04 PM Maximum Depth 33.96ft Water Table Depth 32.00 ft 0:::: CPTDATA 0 I ~ I-...J UJ a.. 6 I a.. UJ .-TIP FRICTION Fs/Qt SPTN UJ ~ 0 !S (/) co 0 TSF 400 0 TSF 12 0 % 12 0 350 0 12 0 ~ ..----= ---------- pa-( < ~ ( f 7 ~ ~ 5 -1 i> ..___ -L c -~---=-10 ,---t==-..____ -,.,--t= ( ~ ~ ( ________,.-> 15 ~ <' ~ \ > .£.) ~ - 20 ( / ~ :i e----~ s: ~ .. ~ -i < -:;=- 25 ~ -----. --==ec_ = :::== -""' S.__~ • i ~ "-::-,. -~ 30 1--===---. ~ ~ .;,;=- < --, ': :::=--~ --=--_., 35 I-----' 40 45 50 ■ 1 -sensitive fine grained ■4-silty clay to clay ■ 7 -silty sand to sandy silt ■ 10-gravelly sand to sand ■ 2-organic material ■ 5 -clayey silt to silty clay 8-sand to silty sand ■ 11 -very stiff fine grained (*) ■ 3-clay ■ 6 -sandy silt to clayey silt ■ 9-sand ■ 12-sand to clayey sand (*) Plate B.3-1 Depth Increment *Soil behavior type and SPT based on data from UBC-1983 GeoSoils Inc ~uh;11 Location Romeria Point Operator ML-JH Filename SDF(460}.c~t CONEPENETJlOMmRTlSTING&DIKlCJ.n/StlCIIOUI' Job Number 4460-A3-SC Cone Number DSG0409 GPS Hole Number CPT-02 Date and Time 10/4/2006 2:44:31 PM Maximum Depth 37.24ft Water Table Depth 32.00 ft 0:::: CPTDATA 0 I ~ I-...J UJ a.. 6 I a.. UJ .-TIP FRICTION Fs/Qt SPTN UJ ~ 0 !S (/) co 0 TSF 400 0 TSF 12 0 % 12 0 350 0 12 0 p ~to,-~ -..... r 1 -_,,-,, r 5 s= c / =;;f_ ~ --~--10 T j ""> 5 = r r-~ = r - 15 ? l ~ < ~ l ,,.- 20 _? } ~ > ~- ~ 25 \ 30 t I=-L ---- _f t = ~ ~ ~ I=-s -= ~ ----,____,__ t:::=----z.___ -> t--------35 --=::::: --~ = 40 45 50 ■ 1 -sensitive fine grained ■4-silty clay to clay ■ 7 -silty sand to sandy silt ■ 10-gravelly sand to sand ■ 2-organic material ■ 5 -clayey silt to silty clay 8-sand to silty sand ■ 11 -very stiff fine grained (*) ■ 3-clay ■ 6 -sandy silt to clayey silt ■ 9-sand ■ 12-sand to clayey sand (*) Plate B.3-2 Depth Increment *Soil behavior type and SPT based on data from UBC-1983 GeoSoils Inc ~uh;11 Location Romeria Point Operator ML-JH Filename SDF(463}.c~t CONEPENETJlOMmRTlSTING&DIKlCJ.n/StlCIIOUI' Job Number 4460-A3-SC Cone Number DSG0409 GPS Hole Number CPT-03B Date and Time 10/4/2006 3:51 :43 PM Maximum Depth 35.60 ft Water Table Depth 32.00 ft 0:::: CPTDATA 0 I ~ I-...J UJ a.. 6 I a.. UJ .-TIP FRICTION Fs/Qt SPTN UJ ~ 0 !S (/) co 0 TSF 400 0 TSF 12 0 % 12 0 350 0 12 0 v -~ ( 11111 l_ ~ :=:, ~ 5 D = "';> ? -z • □ ~p ~ ~ ~ 10 •• ~ (__ > ~ ~ <:: -----~ 15 < ---=i = ( ~ -,:_;; =- ~ ,, ~ > 20 ~ r i==-z:: -! ) 7 25 ,J z \_:, <---7 _f 30 ( ( t • <:::: 3 > D ~ --=-= <,' ____,--35 ~ ~ --~ ~ 40 45 50 ■ 1 -sensitive fine grained ■4-silty clay to clay ■ 7 -silty sand to sandy silt ■ 10-gravelly sand to sand ■ 2-organic material ■ 5 -clayey silt to silty clay 8-sand to silty sand ■ 11 -very stiff fine grained (*) ■ 3-clay ■ 6 -sandy silt to clayey silt ■ 9-sand ■ 12-sand to clayey sand (*) Plate B.3-3 Depth Increment *Soil behavior type and SPT based on data from UBC-1983 GeoSoils Inc ~uHl11 CONEPENETJlOMmRTlSTING&DIKlCJ.n/StlCIIOUI' Location Romeria Point Operator Job Number 4460-A3-SC Cone Number ML-JH DSG0409 Hole Number CPT-04 Date and Time 10/4/2006 4:51 :05 PM Water Table Dept_h ____________ 3_2_.0_0_ft _____________ _ I CPTDATA I-a.. w--TIP FRICTION 0 !S 0 TSF 400 0 TSF 12 0 Fs/Qt % 0 ~ c; 5 ~ 10 ~ - 15 } 20 t 25 ~ ~ 30 ~ p 35 L,--- c'.'.: c---p- 40 ~ 45 R ? -~ 50 ■ 1 -sensitive fine grained ■ 2-organic material ■ 3-clay ---> ~ > ---= --=-==-L ; 0--- l__ c s~ ,-- l <;:, l ') = ( -----, ~ ■ 4 -silty clay to clay ■ 5 -clayey silt to silty clay ■ 6 -sandy silt to clayey silt ---- ■ 7 -silty sand to sandy silt 8 -sand to silty sand ■ 9-sand 12 ~ Filename GPS SDF(464).cpt Maximum Depth 51.34 ft SPTN 0 ? _) ~ 'S '- 1 1 \ ~ ~ ==..._ C r---=---rs;=. < F=--z_ i-------._ < f-' [> C ,----, ? "'" -sec: ■ 10 -gravelly sand to sand ■ 11 -very stiff fine grained (*) ■ 12 -sand to clayey sand (*) ••• ••• ·-Ii 12 II~ Plate B.3-4 Depth Increment *Soil behavior type and SPT based on data from UBC-1983 GeoSoils Inc ~uh;11 Location Romeria Point Operator ML-JH Filename SDF(459}.c~t CONEPENETJlOMmRTlSTING&DIKlCJ.n/StlCIIOUI' Job Number 4460-A3-SC Cone Number DSG0409 GPS Hole Number CPT-05 Date and Time 10/4/2006 2:22:15 PM Maximum Depth 16.40 ft Water Table Depth 32.00 ft 0:::: CPTDATA 0 I ~ I-...J UJ a.. 6 I a.. UJ .-TIP FRICTION Fs/Qt SPTN UJ ~ 0 !S (/) co 0 TSF 400 0 TSF 12 0 % 12 0 350 0 12 0 J? 5 --------- t7 --- _=:::=, 2 I . 't;== ._. ~ 5 ~ -"'---, / -t:= _:;::=---= -D l [_ < ~ __,. = ~ 10 I~~ ~ -:) v=---•...J I! ~ ~ -~ cc___ =-.c 15 ~ = .--::=- 20 25 30 35 40 45 50 ■ 1 -sensitive fine grained ■4-silty clay to clay ■ 7 -silty sand to sandy silt ■ 10-gravelly sand to sand ■ 2-organic material ■ 5 -clayey silt to silty clay 8-sand to silty sand ■ 11 -very stiff fine grained (*) ■ 3-clay ■ 6 -sandy silt to clayey silt ■ 9-sand ■ 12-sand to clayey sand (*) Plate B.3-5 Depth Increment *Soil behavior type and SPT based on data from UBC-1983