Loading...
HomeMy WebLinkAboutDWG 545-7A; CDP 2022-0067; LABOUNTY RESIDENCE - 3950; 01-046/24/2024 GRADING NOTES (IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE CARLSBAD MUNICIPAL CODE.) 1. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING GRADING SHOWN ON THIS SET OF PLANS. 2. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. THE ENGINEER IN RESPONSIBLE CHARGE SHALL REVISE THESE PLANS WHEN NON-CONFORMANCE IS DISCOVERED. 3. CITY APPROVAL OF PLANS DOES NOT RELIEVE THE DEVELOPER OR ENGINEER-OF- WORK FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. ALL PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR APPROVAL. 4. A RIGHT-OF-WAY PERMIT FROM THE CITY ENGINEER WILL BE REQUIRED FOR ANY WORK IN THE PUBLIC RIGHT OF WAY. PRIOR TO PERMIT ISSUANCE, A CERT/FICA TE OF INSURANCE AS WELL AS ADDITIONAL INSURED ENDORSEMENT MUST BE FILED NAMING THE CITY OF CARLSBAD AS AN ADDITIONAL INSURED ON THE PERMITTEE'S POLICY IN THE MINIMUM AMOUNT OF $1,000,000.00 FOR EACH OCCURRANCE OF LIABILITY. THE INSURANCE COMPANY WRITING THE POLICY MUST HAVE A RATING OF "A-" OR BETTER AND A SIZE CATEGORY OF CLASS VII OR BETTER AS ESTABLISHED BY "BESTS" KEY RA TING GUIDE. 5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE CITY AND OTHER APPROPRIATE AGENCIES. 6. REVISION OF THESE PLANS MAY BE REQUIRED IF THE PROPOSED IMPROVEMENTS ARE NOT CONSTRUCTED PRIOR TO THE DEADLINE DA TE OF THE IMPROVEMENT AGREEMENT. 7. APPROVAL OF THESE PLANS BY THE CITY ENGINEER DOES NOT AUTHORIZE ANY WORK OR GRADING TO BE PERFORMED UNTIL THE PROPERTY OWNER'S PERMISSION HAS BEEN OBTAINED AND A VALID GRADING PERMIT HAS BEEN ISSUED. 8. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND THE TITLE SHEET. 9. ORIGINAL ORA WINGS SHALL BECOME THE PROPERTY OF THE CITY UPON BEING SIGNED BY THE CITY ENGINEER. 10. THE ORIGINAL DRAWING SHALL BE REVISED TO REFLECT AS-BUILT CONDITIONS BY THE ENGINEER-OF-WORK PRIOR TO FINAL ACCEPTANCE OF THE WORK BY THE CITY. 11. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. 12. WHERE TRENCHES ARE WITHIN CITY EASEMENTS, A SOILS REPORT COMPRISED OF: (A) SUMMARY SHEET, (B) LABORATORY WORK SHEETS AND (C) COMPACTION CURVES, SHALL BE SUBMITTED BY A PROFESSIONAL ENGINEER OF THE STA TE OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. THE SOILS REPORT WILL BE SUBMITTED TO THE CITY ENGINEERING INSPECTOR WITHIN TWO WORKING DAYS OF THE COMPLETION OF FIELD TESTS. 13. A SOILS COMPACTION REPORT AND COMPLIANCE VER/FICA TION REGARDING ADHERENCE TO RECOMMENDA T/ONS OUTLINED IN THE SOILS REPORT IS REQUIRED PRIOR TO THE ISSUANCE OF A BUILDING PERMIT. ALL CONTROLLED GRADING SHALL BE DONE UNDER THE DIRECTION OF A PROFESSIONAL ENGINEER OF THE STA TE OF CALIFORNIA PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. ALL FILL OR FUTURE FILL AREAS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CITY OF CARLSBAD STANDARD SPECIF/CATIONS AND THE RECOMMENDATIONS IN THE PRELIMINARY SOILS INVEST/GA TION REPORT DA TED APRIL 21, 2023. DAILY FIELD COMPACTION REPORTS WILL BE SUBMITTED TO THE PROJECT INSPECTOR. 14. A PRECONSTRUCTION MEETING SHALL BE HELD PRIOR TO THE BEGINNING OF WORK AND SHALL BE ATTENDED BY ALL REPRESENTATIVES RESPONSIBLE FOR CONSTRUCTION, INSPECTION, SUPERVISION, TESTING AND ALL OTHER ASPECTS OF THE WURK. IRE CON/RAC/OR w/LL BE CVN/ACIE.D BY IRE PROJECI INSPECIOR 10 COORDINATE A DA TE AND TIME FOR THE PRECONSTRUCTION MEETING. APPROVED ORA WINGS MUST BE AVAILABLE PRIOR TO SCHEDULING. THE GRADING PERMIT WILL BE PROVIDED BY THE PROJECT INSPECTOR AT THE MEETING. 15. ALL INSPECTION REQUESTS OTHER THAN FOR PRECONSTRUCTION MEETING WILL BE MADE BY CALLING THE ENGINEERING 24-HOUR INSPECTION REQUEST LINE AT (760) 438-3891. INSPECTION REQUEST MUST BE RECEIVED PRIOR TO 2:00 P.M. ON THE WORKING DAY BEFORE THE INSPECTION IS NEEDED. INSPECTIONS WILL BE MADE THE NEXT WORK DAY UNLESS YOU REQUEST OTHERWISE. REQUESTS MADE AFTER 2: 00 P.M. WILL BE SCHEDULED FOR TWO FULL WORK DAYS LATER. 16. THE OWNER AND/OR APPLICANT THROUGH THE DEVELOPER AND/OR CONTRACTOR SHALL DESIGN. CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING. AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 17. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE DESIGN OF SHORING, BRACING SLOPING OR OTHER PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8 CALIFORNIA ADMINlsTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION. 18. NO BLASTING SHALL BE PERFORMED UNTIL A VALID BLASTING PERMIT HAS BEEN OBTAINED FROM THE CITY OF CARLSBAD. SUBMIT APPL/CATION FOR BLASTING PERMIT WELL IN ADVANCE OF THE SCHEDULING OF BLASTING OPERATIONS. 19. IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK AREA DURING CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIATELY, AND THE PERMITTEE WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART UNTIL THE PERMITTEE HAS RECEIVED WRITTEN AUTHORITY FROM THE CITY ENGINEER TO DO SO. 20. ALL OPERATIONS CONDUCTED ON THE SITE OR ADJACENT THERETO, INCLUDING WARMING UP, REPAIR, ARRIVAL. DEPARTURE OR OPERATION OF TRUCKS, EARTHMOVING EQUIPMENT, CONSTRUCTION EQUIPMENT AND ANY OTHER ASSOC/A TED GRADING EQUIPMENT SHALL BE LIMITED TO THE PERIOD BETWEEN 7: 00 A.M. AND 6:00 P.M. EACH DAY, MONDAY THRU FRIDAY AND NO EARTHMOVING OR GRADING OPERATIONS SHALL BE CONDUCTED ON WEEKENDS OR HOLIDAYS. (A LIST OF CITY HOLIDAYS IS AVAILABLE AT THE ENGINEER/NG DEPARTMENT COUNTER.) 21. ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY INSPECTOR FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 22. IMPORT MATERIAL SHALL BE OBTAINED FROM, AND WASTE MATERIAL SHALL BE DEPOSITED AT, A SITE APPROVED BY THE CITY ENGINEER. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTES OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 23. BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE GRADED. NO TREES ARE TO BE REMOVED UNLESS SPECIF/CALLY NOTED ON THE PLAN. 24. ALL AREAS SHALL BE GRADED TO DRAIN. GRADING RESULTING IN THE PONDING OF WATER IS NOT PERMITTED. ALL EARTHEN SWALES AND DITCHES SHALL HA VE A MINIMUM ONE PERCENT SLOPE. 25. THESE PLANS ARE SUBJECT TO A SIGNED AND APPROVED SWPPP AND/OR SET OF EROSION CONTROL PLANS. EROSION CONTROL SHALL BE AS SHOWN AND AS APPROVED BY THE CITY ENGINEER OR AS DIRECTED BY THE PROJECT INSPECTOR. 26. ALL SLOPES SHALL BE TRIMMED TO A FINISH GRADE TO PRODUCE A UNIFORM SURFACE AND CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAT AND ORDERLY CONDITION. ALL STONES, ROOTS OR OTHER DEBRIS SHALL BE REMOVED AND DISPOSED OF AT A SITE APPROVED OF BY THE CITY ENGINEER. 27. ALL SLOPES SHALL BE /RR/GA TED, STABILIZED, PLANTED AND/OR HYDROSEEDED WITHIN TEN (10) DAYS OF THE TIME WHEN EACH SLOPE IS BROUGHT TO GRADE AS SHOWN ON THE APPROVED GRADING PLANS. D:\DRAWING F'ILES\llllE SHEETS\GRADING TlllE SHEET.DWG REVISED:01/05/16 28. LANDSCAPING SHALL BE ACCOMPLISHED ON ALL SLOPES AND PADS AS REQUIRED BY THE CITY OF CARLSBAD LANDSCAPE MANUAL, THE LANDSCAPING PLANS FOR THIS PROJECT, DRAWING NO. NIA , AND/OR AS DIRECTED BY THE CITY ENGINEER OR PLANNING DIRECTOR. 29. THE OWNER/APPLICANT SHALL INSURE THAT ALL CONTRACTORS SHALL COORDINATE THE WORK OF THESE GRADING PLANS WITH THAT SHOWN ON BOTH THE LANDSCAPE AND /RR/GA TION PLANS AND THE IMPROVEMENT PLANS AS REQUIRED FOR THIS WORK IN ACCORDANCE WITH THE LANDSCAPE MANUAL TIME REQUIREMENTS. 30. WHERE AN EXISTING PIPE LINE IS TO BE ABANDONED AS A RESULT OF THE GRADING OPERATION. IT SHALL BE REMOVED WITHIN TWENTY FEET OF BUILDING OR STREET AREAS AND REPLACED WITH PROPERLY COMPACTED SOILS. IN OTHER AREAS THE PIPE WILL BE PLUGGED WITH CONCRETE OR REMOVED AS APPROVED BY THE CITY ENGINEER. 31. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR /S REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. 32. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES ( ABOVE GROUND AND UNDER GROUND ) WITHIN THE PROJECT SITE SUFFICIENTLY AHEAD OF GRADING TO PERMIT THE REVISION OF THE GRADING PLANS IF IT IS FOUND THAT THE ACTUAL LOCA T/ONS ARE IN CONFLICT WITH THE PROPOSED WORK. 33. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTATIVE. UNDERGROUND SERVICE ALERT (800)422-4133 SDG&E (800)411-7343 AT&T (800)892-0123 TIME WARNER CABLE (760)438-7741 COX COMMUNICATIONS (619)262-1122 CITY OF CARLSBAD(STREETS & STORM DRAIN) ~760)434-2980 'CITY OF CARLSBAD(SEWER. WATER & RECLAIMED WATER) 760)438-2722 *SAN DIEGUITO WATER DISTRICT 760)633-2650 *LEUCADIA WASTEWATER DISTRICT (760)753-0155 *VALLECITOS WATER DISTRICT (760)744-0460 *OLIVENHAIN WATER DISTRICT (760)753-6466 'BUENA SANITATION DISTRICT (760)726-1340 x1330 * AS APPROPRIATE 34. PERMIT COMPLIANCE REQUIREMENTS: A. FOR CONTROLLED GRADING -THE APPLICANT HIRES A CIVIL ENGINEER, SOILS ENGINEER. AND/OR GEOLOGIST TO GIVE TECHNICAL ADVICE, OBSERVE AND CONTROL THE WORK IN PROGRESS {15.16.120 A.BJ CARLSBAD MUNICIPAL CODE. B. PRIOR TO FINAL APPROVAL OF A GRADING PERMIT -THE FOLLOWING REPORTS MUST BE SUBMITTED TO THE CITY ENGINEER VIA THE PROJECT INSPECTOR {15.16.120 A. 10} CARLSBAD MUNICIPAL CODE: (1) FINAL REPORT BY SUPERVISING GRADING ENGINEER STA TING ALL GRADING IS COMPLETE. ALL EROSION CONTROL, SLOPE PLANTING AND /RR/GA TION ARE INSTALLED IN CONFORMANCE WITH CITY CODE AND THE APPROVED PLANS ( OBTAIN SAMPLE OF COMPLIANCE LETTER FROM CITY ENGINEERING DEPARTMENT). (2) AS-BUJL T GRADING PLAN. (3) REPORT FROM THE SOILS ENGINEER, WHICH INCLUDES RECOMMENDED SOIL BEARING CAPACITIES. A STATEMENT AS TO THE EXPANSIVE QUALITY OF THE SOIL. AND SUMMARIES OF FIELD AND LABORATORY TESTS AND PLOTTED TEST POINTS THE REPORT SHALL ALSO INCLUDE A STATEMENT BY THE SOILS ENGINEER THAT THE GRADING WAS DONE IN ACCORDANCE WITH THE REQUIREMENTS AND RECOMMENDATIONS OUTLINED IN THE PRELIMINARY SOILS REPORT AND ANY SUPPLEMENTS THERETO. (4) REPORT WITH AS-BUILT GEOLOGIC PLAN, IF REQUIRED BY THE CITY. 35. UNLESS A GRADING PERMIT FOR THIS PROJECT IS ISSUED WITHIN ONE (1) YEAR AFTER THE CITY ENGINEER'S APPROVAL, THESE PLANS MAY BE REQUIRED TO BE RESUBMITTED FOR PLANCHECK. PLANCHECK FEES WILL BE REQUIRED FOR ANY SUCH RECHECK. 35. IN ACCORDANCE WITH THE CITY STORM WATER STANDARDS. ALL STORM DRAIN INLETS CONSTRUCTED BY THIS PLAN SHALL INCLUDE "STENCILS" BE ADDED TO PROHIBIT WASTEWATER DISCHARGE DOWNSTREAM. STENCILS SHALL BE ADDED TO THE SATISFACTION OF THE CITY ENGINEER. "DECLARATION OF RESPONSIBLE CHARGE" I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HAVE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT ORA WINGS AND SPECIF/CATIONS BY THE CITY OF CARLSBAD DOES NOT RELIEVE ME, AS ENGINEER OF WORK. OF MY RESPONSIBILITIES FOR PROJECT DESIGN. EROSION CONTROL NOTES 1. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT ___ J_UD_I_TH_LA_B_O_UN_T_Y __ .AT ( 442) 287-3372 (PHONE NUMBER) 2. EQUIPMENT AND WORKERS FOR EMERGENCY WORK SHALL BE MADE AVAILABLE AT ALL TIMES DURING THE RAINY SEASON. ALL NECESSARY MATERIALS SHALL BE STOCKPILED ON SITE AT CONVENIENT LOCATIONS TO FACILITATE RAPID CONSTRUCTION OF TEMPORARY DEVICES WHEN RAIN IS EMINENT. 3. FOR PROJECTS COVERED BY STA TE SWPPP /Wl)ID, IN ACCORDANCE WITH THE CONSTRUCTION ORDER ISSUED BY THE CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD. THE CONTRACTOR'S QUALIFIED SWPPP PRACTITIONER (QSP) SHALL UPDATE AND MAINTAIN THE WATER POLLUTION CONTROL (WPC) PLAN TO ADDRESS UPDATED SITE CONDITIONS OF THE PROJECT. THE UPDATED WPC PLAN AND UPDATED SWPPP SHALL BE KEPT AT THE PROJECT SITE AND MADE A VAJLABLE TO THE CITY INSPECTOR. ADDITIONAL CONSTRUCTION BMP'S BEYOND THE ORIGINAL APPROVED SWPPP SHALL BE PROVIDED TO ADDRESS SITE CONDITIONS NOT ANTIC/PA TED. THE QSP SHALL REPORT BMP DEFICIENCIES TO THE CITY INSPECTOR. THE QSP SHALL OBTAIN APPROVAL FROM THE CONTRACTOR'S QUALIFIED SWPPP DEVELOPER AND THE CITY INSPECTOR REGARDING ANY SIGNIFICANT CHANGES TO BMP DEPLOYMENT. 4. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 5. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER AND/OR CITY INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. 6. THE CONTRACTOR SHALL BE RESPONSIBLE AND SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A HAZARDOUS CONDITION. 7. ALL EROSION CONTROL MEASURES PROVIDED PER THE APPROVED SWPPP AND/OR EROSION CONTROL PLAN SHALL BE INCORPORATED HEREON. 8. GRADED AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 9. ALL REMOVABLE PROTECTIVE DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 10. ALL GRAVEL BAGS SHALL BE BURLAP TYPE WITH 3/4 INCH MINIMUM AGGREGRA TE. 11. SHOULD GERMINATION OF HYDROSEEDED SLOPES FAIL TO PROVIDE EFFECTIVE COVERAGE OF GRADED SLOPES (90% COVERAGE) PRIOR TO NOVEMBER 15, THE SLOPES SHALL BE STABILIZED BY PUNCH STRAW INSTALLED IN ACCORDANCE WITH SECTION 35.023 OF THE EROSION AND SEDIMENT CONTROL HANDBOOK OF THE DEPARTMENT OF CONSERVATION, STA TE OF CALIFORNIA. EROSION CONTROL H 'fDROSEEDING. PLAN TING AND /RR/GA TION ALL PERMANENT AND TEMPORARY EROSION CONTROL PLANTING AND /RR/GA TION SHALL BE INSTALLED AND MAINTAINED AS REQUIRED IN SECTION 212 OF THE STANDARD SPECIF/CATIONS AND THE FOLLOWING: A. HYDROSEEDING SHALL BE APPLIED TO: 1. ALL SLOPES THAT ARE GRADED 6: 1 (HORIZONTAL TO VERTICAL) OR STEEPER WHEN THEY ARE: a. THREE FEET OR MORE IN HEIGHT AND ADJACENT TO A PUBLIC WALL OR STREET. b. ALL SLOPES 4 FEET OR MORE IN HEIGHT. 2. AREAS GRADED FLATTER THAN 6: 1 WHEN ANY OF THE FOLLOWING CONDITIONS EXIST: a. NOT SCHEDULED FOR IMPROVEMENTS(CONSTRUCTION OR GENERAL LANDSCAPING) WITHIN 60 DAYS OF ROUGH GRADING. b. IDENTIFIED BY THE PARKS AND RECREA T/ON DIRECTOR AS HIGHLY VISIBLE TO THE PUBLIC. c. HA VE ANY SPECIAL CONDITION IDENTIFIED BY THE CITY ENGINEER THAT WARRANTS IMMEDIATE TREATMENT. B. HYDROSEEDED AREAS SHALL BE /RR/GA TED IN ACCORDANCE WITH THE FOLLOWING CRITERIA: 1. ALL SLOPES THAT ARE GRADED 6: 1 OR STEEPER AND THAT ARE: a. THREE TO EIGHT FEET IN HEIGHT SHALL BE /RR/GA TED BY HAND WATERING FROM QUICK COUPLERS/HOSE BIBS OR A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. b. GREATER THAN 8 FEET IN HEIGHT SHALL BE WATERED BY A CONVENTIONAL SYSTEM OF LOW PRECIPITATION SPRINKLER HEADS PROVIDING 100% COVERAGE. 2. AREAS SLOPED LESS THAN 6: 1 SHALL BE IRRIGATED AS APPROVED BY THE CITY ENGINEER, PRIOR TO HYDROSEEDING. THE DEVELOPER SHALL SUBMIT A PROPOSED SCHEME TO PROVIDE /RR/GA TION TO THE CITY ENGINEER. THE PROPOSAL SHALL BE SPECIFIC REGARDING THE NUMBERS, TYPES AND COSTS OF THE ELEMENTS OF THE THE PROPOSED SYSTEM. 3. /RR/GA TION SHALL MAINTAIN THE MOISTURE LEVEL OF THE SOIL AT THE OPTIMUM LEVEL FOR THE GROWTH OF THE HYDROSEEDED GROWTH. C. HYDROSEEDING MIX SHALL CONSIST OF ALL OF THE FOLLOWING: 1. SEED MIX SHALL CONSIST OF NO LESS THAN: a. 5 LBS. PER ACRE COASTAL DEERWEED b. 4 LBS. PER ACRE FASCICLED TARWEED c. 3 LBS. PER ACRE CALIFORNIA ENGEL/A d. 7 LBS. PER ACRE CALIFORNIA BUCK'M-IEA T e. 4 LBS. PER ACRE LONG-STEM GOLDEN-YARROW f. 4 LBS. PER ACRE CALIFORNIA POPPY g. 2 LBS. PER ACRE COASTAL GOLDENBUSH h. 3 LBS. PER ACRE STINGING LUPINE VICINITY MAP CITY OF OCEANSIDE HIGHWAY, '7a r'1 NOT TO SCALE WORK TO BE DONE THE GRADING WORK SHALL CONSIST OF THE CONSTRUCTION OF ALL CUTS AND FILLS, REMEDIAL GRADING. DRAINAGE FACILITIES. EROSION CONTROL FACILITIES. AND PLANTING OF PERMANENT LANDSCAPING AND PREPARATION OF AS-BUILT GRADING PLANS, AS-BUILT GEOLOGIC MAPS AND REPORTS, ALL AS SHOWN OR REQUIRED ON THIS SET OF PLANS AND THE CITY STANDARDS, SPECIF/CATIONS, REQUIREMENTS, RESOLUTIONS AND ORDINANCES CITED ON THESE PLANS. THE GRADING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. 1. CARLSBAD MUNICIPAL CODE I SITE CITY OF VISTA 2. CITY OF CARLSBAD ENGINEERING STANDARDS p ~ ~ Lr--...1"=--,-4 L..>,,.. CITY OF ENCINITAS ~~ L-~ INDEX OF SHEETS SHEET 1 .................... TITLE SHEET SHEET 2 .................... GRADING & DRAINAGE PLAN SHEET 3 .................... CITY TIER 2 SWPPP TITLE SHEET SHEET 4 .................... EROSION CONTROL & BMP PLAN LEGAL DESCRIPTION LOT 6 OF THE PALISADES IN THE CITY OF CARLSBAD. COUNTY OF SAN DIEGO, STATE OF CALIFORNIA, ACCORDING TO THE MAP THEREOF 1 7 4 7, FILED IN THE OFFICE OF THE COUNTY RECORDER, COUNTY OF SAN DIEGO, NOVEMBER 1922 OF O.R. APN: 206-012-06 PROJECT ADDRESS 3950 GARFIELD STREET CARLSBAD, CA 92008 DEVELOPER NAME: LB BEACH PROPERTIES, LLC. ADDRESS: 1314 GULL COURT CARLSBAD CA 92011 PHONE NO.: ( 442) 287-3372 REFERENCE DRAWINGS MAP 1747 DWG. NO. 188-6 DWG. NO. 188-6A EARTHWORK QUANTITIES CUT: 2 CY FILL: --~6~7-~C~Y_ IMPORT: -~65~~C~Y- EXPORT: N/A CY REMEDIAL: 735 CY BENCH MARK DESCRIPTION: LOCATION: RECORDED: ELEVATION: 2.5" DISK STAMPED CLSB-141 SE CORNER OF VAULT ADJ. TO NE COR. NB COAST HWY 101 BRIDGE OVER AGUA HEDIONDA LAGOON. FEBRUARY 8, 2002 AS FILE NO. 2002-0112862 OF O.R. PER ROS 17271 ELEVATION: 26.518' DATUM: NGVD29 3. THIS SET OF PLANS 4. RESOLUTION N0.~7~5~01~ __ DATED 11/16/2023 5. THE STANDARD SPECIF/CATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK). 6. SOILS REPORT AND RECOMMENDATIONS BY GEO TECHNICAL EXPLORATION, INC. DATED 4/21123 AND UPDATE DATED _____ _ 7. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS. 8. CALIFORNIA COASTAL COMMISSION DEVELOPMENT PERMIT CONDITIONS DATED 11/16/2023 9. ENVIRONMENTAL APPROVAL DOCUMENTS DATED ~N=/.~A _____ _ 10. STORM WATER POLLUTION PREVENTION PLAN, TIER 2. PREPARED BY COFFEY ENGINEERING SEE SHEETS 3 & 4 OF THIS PLAN 11. STORf1 ,WATER QUALITY MANAGEMENT PLAN PREPARED BY N/A DATED ~N~/.~A __ _ 12. CALIFORNIA STORM WATER QUALITY ASSOC/A TION BMP CONSTRUCT/ON HANDBOOK AND CAL TRANS CONSTRUCTION SITE BMP MANUAL. DESCRIPTION PROPERTY LINE DIRECTION OF FLOW (E) SPOT ELEVATION (P) SPOT ELEVATION (FG=FINISH GROUND; FS=FINISH SURPACf:) (E) CONTOUR (P) CONTOUR DEEPENED FOOTING FOUNDATION WALL (SEPARATE PERMIT) ROOF DOWN SPOUT LEGEND DWG.NO. SITE RETAINING WALL SDRSD C-04 1" WATER SERVICE CMWD W-5 & BACKFLOW (PER DWG 545-7) CONCRETE PAVEMENT SYMBOL _.;.N,..45:1_5;±5 ... "W..__ X 100.00 ---90------90--- ~ I :, .. • ~ ··• ·, I QUANTITY 175 SF 1 EA SPLASH PAD ROCK LINED SWALE SOIL MEDIA SDRSD GS-5.06 (TYPE 1) DETAIL "A'-SHEET 2 SECTION G -SHEET 2 --- 1,020 SF 47 SF 83 LF 2 CY ABBREVIATIONS AC BLK BRK BW It. C; CONG ELEV Ii.; FL FG ASPHALTIC CONCRETE BLOCK BRICK GRADE AT BOTTOM OF WALL CENTER LINE CONCRETE ELEVATION FLOW LINE FINISH GROUND (DIRT) FS FINISH SURFACE (e.g. CONCRETE) H HIGH JRCV IRRIGATION CONTROL VALVE L.P. LOW PRESSURE PVMT PAVEMENT TEL TELEPHONE TF TOP OF RETAINING WALL FOOTING TFP TOP OF FENCE POST FOUNDATION TW TOP OF WALL ELEVATION TYP TYPICAL ALL STANDARD DRAWINGS ARE SAN DIEGO REGIONAL STANDARD DRAWINGS (SDRSD) UNLESS NOTED OTHERWISE: • CITY OF CARLSBAD STANDARD ** CARLSBAD MUNICIPAL WATER DISTRICT STANDARD ORA WING ••• SDRSD AS MODIFIED BY CITY OF CARLSBAD POST-CONSTRUCTION BMP TABLE FIRM: COFFEY FNGINFFRING INC i. 2 LBS. PER ACRE CATERPILLAR PHACELIA j. 4 LBS. PER ACRE NEEDLE GRASS ABANDONMENT NOTES STORMWA TER REQUIREMENTS THAT APPLY: EXEMPT FROM TRASH CAPTURE? EXEMPT FROM H YOROMOOIFICA T/QN? ADDRESS: 9666 BUS/NESSPARK AVE., SUITE 210 CITY, STA TE: SAN DIEGO CA 92131 TELEPHONE: f858l 831 0111 ~ / B~------~,,f',~'LC2.../'-/,~/,1/.4'\-'/ __ _ DATE: ____ _ DANIEL VALDEZ, PE ' (1/ R.C.E. N0.:_-'-'76"-'0'-'-7.,_4 ___________ _ REGISTRATION EXP/RATION DA TE: ________ _ SOILS ENGINEER'S CERTIFICATE /, WILLIAM HESPELER , A REGISTERED GEO TECHNICAL ENGINEER OF THE STA TE OF CALIFORNIA, PR/NC/PALLY DOING BUSINESS IN THE FIELD OF APPLIED SOILS MECHANICS. HEREBY CERTIFY THAT A SAMPLING AND STUDY OF THE SOIL CONDITIONS PREVALENT WITHIN THIS SITE WAS MADE BY ME OR UNDER MY DIRECTION BETWEEN THE DA TES OF MARCH 13 202.3 ANO APRIi 21 202.3 COPIES OF THE SOILS REPORT COMPILED FROM THIS STUDY, WITH MY RECOMMENDATIONS. HAS BEEN SUBMITTED TO THE OFFICE OF THE CITY ENGINEER.~':'=""....._ ,.,,Z.,,,. /J, _/ '<,l)~ROFl:ss,a SIGNED: .rp ,ff ~h~ "'¼~ ID Hes ::It< -~~~*~-,..,_p-'-.,,.,.-<-=-+------ ,.._ f.._':' '° ~ G.E. NO.: -~39=6~----------"' ~· f i ;; "' GE 396 "' z DA TE: uJ Exp. J/31/26 ;;o ~ r<-,,A "' LICENSE EXP/RATION DA TE: * G'e, ~)-:* ~ or1:c1-11<~~ -1rt:orcAL'f:'J OWNER'S CERTIFICATE 3/31/26 I ( WE ) HEREBY CERTIFY THAT A REGISTERED SOILS ENGINEER OR GEOLOGIST HAS BEEN OR WILL BE RETAINED TO SUPERVISE OVER-ALL GRADING ACTIVITY AND ADVISE ON THE COMPACTION AND STABILITY OF THIS SITE. IF THIS PROJECT/DEVELOPMENT IS SUBJECT TO A STATE-REGULATED SWPPP, I ALSO AGREE A QUALIFIED SWPPP PR NER (QSP) HAS BEEN OR WILL BE TO SUPERVI I TA TION F THE SWPPP IN ACCORDANCE WITH THE • 2. k. 2 LBS. PER ACRE WESTERN VERVAJN o. p. ALL SEED MATERIALS SHALL BE TRANSPORTED TO THE JOBS/TE IN UNOPENED CONTAINERS WITH THE CALIFORNIA DEPARTMENT OF FOOD AND AGR/CUL TURE CERT/FICA TION TAG ATTACHED TO, OR PRINTED ON SAID CONTAINERS. NON-PHYTO-TOXIC WETTING AGENTS MAY BE ADDED TO THE HYDROSEED SLURRY AT THE DISCRETION OF THE CONTRACTOR. TYPE 1 MULCH APPLIED AT THE RA TE OF NO LESS THAN 2000 lbs PER ACRE. TYPE 6 MULCH (STRAW) MAY BE SUBSTITUTED. ALL OR PART, FOR HYDRAULICALLY APPLIED FIBER MATERIAL. WHEN STRAW IS USED IT MUST BE ANCHORED TO THE SLOPE BY MEGHAN/CALLY PUNCHING NO LESS THAN 50% OF THE STRAW IN TO THE SOIL. 3. FERTILIZER CONSISTING OF AMMONIUM PHOSPHATE SULFA TE, 16-20-0, WITH 15% SULPHUR APPLIED AT THE RA TE OF 500 lbs. PER ACRE. D. AREAS TO BE HYDROSEEDED SHALL BE PREPARED PRIOR TO HYDROSEEDING BY: 1. ROUGHENING THE SURFACE TO BE PLANTED BY ANY OR A COMB/NATION OF: a. TRACK WALKING SLOPES STEEPER THAN 6: 1 b. HARROWING AREAS 6: 1 OR FLATTER THAT ARE SUFFICIENTLY FRIABLE. c. RIPPING AREAS THAT WILL NOT BREAK UP USING ITEMS a OR b ABOVE. 2. CONDITIONING THE SOILS SO THAT IT IS SUITABLE FOR PLANTING BY: a. ADJUSTING THE SURFACE SOIL MOISTURE TO PROVIDE A DAMP BUT NOT SA TURA TEO SEED BED. b. THE ADDITION OF SOIL AMENDMENTS, PH ADJUSTMENT, LEACHING COVERING SALINE SOILS TO PROVIDED VIABLE CONDITIONS FOR GROWTH. E. HYDROSEEDED AREAS SHALL BE MAINTAINED TO PROVIDE A VIGOROUS GROWTH UNTIL THE THE PROJECT IS PERMANENTLY LANDSCAPED OR. FOR AREAS WHERE HYDROSEEDING IS THE THE PERMANENT LANDSCAPING, UNTIL THE PROJECT IS COMPLETED AND ALL BONDS RELEASED. SOURCE OF TOPOGRAPHY CALIFO ~JSTRU N DER , D MU /PAL PERMIT, LA TEST VERSI ~-I Ir ... ~ , l , ___ '( ...-:-:-==-:-:-='l r I ! C) I 'Z. PA LABOUNTY, MEM -PROPERTIES, ' , TE TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY HAND SHOT METHODS FROM INFORMATION GATHERED ON 8/30/2021, BY COFFEY ENGINEERING. INC. PROJECT LOCATION THIS PROJECT JS LOCATED WITHIN ASSESSORS PARCEL NUMBER(S) 206-012-05 & 06 THE CALIFORNIA COORDINATE INDEX OF THIS PROJECT JS: N 358 E 1665 PART/ALL r COMPLETED PROJECTS SEEKING TO INDEFINITELY STOP WORK AND CLOSE THE GRADING PERMIT MUST IMPLEMENT APPROPRIATE ACCESS RESTRICT/ON AND EROSION AND SEDIMENT CONTROL MEASURES TO THE SATISFACTION OF THE CITY, INCLUDING BUT NOT LIMITED TO THE FOLLOWING: 1) PERMANENTLY STABILIZE ALL SLOPES (>5%) -70% COVER WITH WELL-ESTABLISHED, SUSTAINABLE, NON-WEED VEGETATION (SEE CITY LANDSCAPE MANUAL FOR GUIDELINES) JS CONSIDERED ADEQUATE. 2) PERMANENTLY STABILIZE FLAT AREAS (S:.5%) -70% COVER WITH WELL-ESTABLISHED, SUSTAINABLE, NON-WEED VEGETATION (SEE CITY LANDSCAPE MANUAL FOR GUIDELINES) OR 2 INCHES (MINIMUM) OF PERMEABLE COVER (E.G .. GRAVEL) IS CONSIDERED ADEQUATE. 3) RESTRICT ACCESS TO SITE -CDORDINA TE WITH CITY STAFF TO DETERMINE APPROPRIATE FENCING TYPE. 4) S/GNAGE ALONG FRONTAGE ROAD(S) POSTING THAT DUMPING. LITTERING. AND TRESPASS/NG ARE PROHIBITED. 5) TRESPASS ENFORCEMENT AUTHORJZA TION LETTER MUST BE SENT FROM THE OWNER TO THE CITY OF CARLSBAD POLICE DEPARTMENT. 6) NOTARIZE AND RECORD AGAINST THE PROPERTY AN AGREEMENT STA TING THAT OWNER IS RESPONSIBLE FDR MAINTAINING FENCING AND S/GNAGE. ADHERING TO THE FIRE PREVENTION ORD/NATION, KEEPING THE SITE FREE FROM LITTER ACCUMULATION AND VEGETATION GROWTH, AND REMOVING ANY ILLEGALLY DUMPED MATERIALS AT THE SITE UNTIL THE PROPERTY JS DEVELOPED IN THE FUTURE. CX'.J STANDARD STORM WATER REQUIREMENTS □ PRIORITY PROJECT REQUIREMENTS TYPE DESCRIPTION OWNERSHIP TOTAL LOT AREA =_,..0.,.,13"'8'--'A"'C"'R""ES.,_ ___ _ TOTAL DISTURBED AREA = 0.152 ACRES (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY TRENCHES, BACKFILL CUTS AND SLOPE KEYWA YS) TOTAL REPLACED IMPERVIOUS AREA = 4.967 SF CX'.J YES □ NO MAINTENANCE AGREEMENT "AS CX'.J YES □ NO SHEET NO. MAINTENANCE FREQUENCY BUIL T 11 RCE __ _ EXP, ___ _ DATE REVIE'v/ED BY: TOTAL PROPOSED IMPERVIOUS AREA -4 430 SF ( 537 SF) INSPECTOR DA TE >---+-----+-----------+----f-----+---+----' I SHElET I CITY OF CARLS BAD I SH4EETS I ENGINEERING DEPARTMENT ~=::::'...'.::===========:'._'.====: t----e----+------------------+----+----+---+-----t GRADING PLANS FOR: /1\ DATE INITIAL DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL LABOUNTY RESIDENCE 3950 GARFIELD STREET GR2023-0040 TITLE SHEET APPROVED: JASON S. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE DWN BY: ..._py-"---PROJECT NO. DRAWING NO. CHKD BY: __ _ RVWD BY: CDP2022-0067 545-7A MBI Docusign Envelope ID: 95C42BC4-EE81-427A-8538-86C00EBF0DA1 7/30/2024 0, I co vt: • co Vl EX GRAVEL EX. AC ow APRON I DRIVEWAY I ..---.'---------\---'----;:;--7r EX. MOW -----------------------------------------------4 . ~ CURB TW=66.66 TW=67.25 ~~ ~(Ji TRW=66.32 TRW=66.92 <.:'~ 6 1 BRW=66.32 BRW=64.97 ~ """''-"\,'---!!--~~~ l:====i--------l--=---,__+--1 7. 5' ULTIMATE € _ ______,1-------t 3: TO CURB FACE :r: I rJo. s:: CURB PER SDRSD G-2 .q q <l :r: A 2% -0~ ·-Y OH- OVERHEAD ELECTRICAL SERVING PROPERTY TO BE UNDERGROUNDED P.C.C. MOW CURB LAWN O~--,2'.lr f-4 -- "" I 3: I REFER TO DWG NO. 545-7 FOR OFFS/TE PUBLIC IMPROVEMENTS I 3: EX. EDGE OF PVMT CURB PER SDRSD G-2-t---t---,-,,..._j • • l w w --+-W 3: • ,1 ---------ofl'-N£JSCAPE .-:, AREA -56.e PLANTER _P.C.C. MOW CURB I 5 0 5 10 ~ ------ SCALE: 1"=5' ISC-AI L ISO-Kl < ,1 0 0 0 0 0 0 Q Q Q ~~ 0 0 0 0 0 I ISO-Kl LANDSCAPE AREA DURING GRADING. TEST DATA, RESULTS AND RECOMMENDATIONS WILL BE PROVIDED TO THE CITY FOR REVIEW AND APPROVAL PRIOR TO APN: 206-012-06 PROPOSED RESIDENCE FF 67.07' 15 I FOOT/ RINT OF )I EX. t USE (TO_/ I BE R, MOVED) I 4.0' I I I 5.5_2.z:QO '.'.W 120. I I I I I I I I I I I I I I I I I I I I I I 0 I I I I I I ol I S 0 0 ~ E FOOTPRINT OF tl EX. HOUSE (TO BE REMOVED) --- 0 ,1 A I I I I I I ---ii:--11-r EX. VINYL FENCE ON CMU WALL. I I LAWN I II ~": I I I II I : II----10. O' -sc+-+----F}-ff+.,11 ~-------I RYSB DETACHED ADU (TO 8£ PROCESSED UNDER SEPARATE CDP) FF 62.52' I 4.0' ADU.,,:+-+-~~ RYSB ' 10,5' (P) 6' WOOD EX. VINYL FENCE 1---FENCE ON 1r----""'"~.ll--''--J=t1l-lll g CMU WALL I g I ,!.w la .,:, I 8 6' [ ;,; .,,. "' 1' WIDE SPLASH BLOCK 1-ff'tt ---~-PER COUNTY OF SD [ GREENSTREETS STD. NO. I l I l l GS-5.06 TYPE 1 r-- I I I I ~--~ ~====t'---~----'-,...,-, -, -_ t,..-_t+--.---,_ -_ ....,._~.e.. 4 4 I .-.. -. T---- Ll .-:1 5.0 1 0 0 0 0 0 0 6' SYSB ~a o oo-e,O :J ■ ;ru 00 uo ROCKLINED SWALE PER _; ___J,,_ 10.0· ISO-Kl P.C.C. MOW CURB I I I I PUBLIC IMPROVEMENT NOTE EX. CMU FENCE/WALL <o <o \ _____ i-,.;=, ___________ _ _l __ -DETA~ ~·--l - - SPLASH BLOCK PER COUNTY OF SD GREEN STREETS STD. NO. GS-5.06 TYPE 1 Oroa=0.18 CFS -7 V,oa=1.89 FPS I I IMPROVEMENTS WITHIN PUBLIC RIGHT-OF-WAY TO BE CONSTRUCTED PER PUBLIC IMPROVEMENT PLANS. NOTE, ALL REFERENCES TO PUBIC IMPROVEMENT PLANS DO NOT IMPLY APPROVAL THEREOF. THESE PLANS AR£ SUBJECT TO CHANG£. SITE DESIGN (LID} BMPs SOURCE CONTROL BMPS DESCRIPTION IMPERVIOUS AREA DISPERSION SUSTAINABLE LANDSCAPING SYMBOL I SO-Bl I SD-Kl DESCRIPTION PROTECT TRASH STORAGE AREAS EASEMENTS SYMBOL I SC-A I THIS SURVEY WAS PREPARED WITH THE BENEFIT OF A PRELIMINARY TITLE REPORT FROM FIRST AMERICAN TITLE COMPANY, ORDER NO. DIV-6930240, DATED 11/23/22. SAID REPORTS INDICATE THE FOLLOWING EASEMENTS FOR THE SUBJECT PROPERTY: (3) THE RECITAL ON MAP 1787 WHICH AGREES TO ALLOW THE CROSSARMS OF POLES OR SIMILAR STRUCTURES PLACED ALONG THE RIGHT OF WAY OF HIGHWAYS LESS THAN SIXTY (60) FEET IN WIDTH TO HANG OVER THE ABUTTING LAND. (4) AN EASEMENT FOR RIGHTS OF WAY FOR TELEPHONE AND/OR ELECTRIC POLES AND LINES, AND FOR SEWER, WATER AND/OR GAS MAINS AND PIPE LINES, IN UNDER, OVER AND ACROSS SAID PROPERTY. TOGETHER WITH THE RIGHT TO ENTER ON SAID PROPERTY FOR PURPOSES OF CONSTRUCT/ON, RECONSTRUCT/ON, REPAIRING AND/OR ALTERING ANY OF THE SAME AND INCIDENTAL PURPOSES IN THE DOCUMENT RECORDED DECEMBER 24, 1937 AS BOOK 729, PAGE 313 OF OFFICIAL RECORDS. (THE LOCATION OF THE EASEMENT CANNOT BE DETERMINED FROM RECORD INFORMATION.) NOTE: DISINTEGRATED GRANITE (D.G.) PER TABLE 200-2. 7.2(A) OF TH£ STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION 1 ' CONCRETE WALKWAY (@ 2%) SWALE 3" MIN. 1"-2" 0IA. ANGULAR=rn m 1 11 m 111 1111l11, rn 5.8"(TYP.) 9 EA. STEPS #3 NOSE __ , BAR -TYP. 14" • LANDSCAPE ROCK - ' 1=11 =i I 1-1 I _II 1=11 ,-, • 2" THICK (COBBLE IS • ,_,., O.G. FILTER BLANKET ,,__+-1-/4 T&B NOT ACCEPTABLE) (SEE NOTE AT LEFT) DETAIL A' - UIN. 12• DIB. INTO UNDIS7UR8ED SOIL 1 2 • DETAIL 'B' - ROCKLINED SWALE CONCRETE STAIRS NOT TO SCALE D:\DRAWING FlLES\llllE SHEElS\GRADING TlllE SHEET.DWG REVISED:01/05/16 ,- 6' WOOD FENCE ON 70 -1------tl----------------------------',.JJJJjil~UflUS_GO.IJI.C _______ +-70 68 66 64 62 60 58 56 54 52 FINISH GROUND~ 5%~""-2% FOOTING (REPLACES EX. 6'\ VINYL FENCE) \ DETACHED ADU FOUNDATION (SEPARATE CDP) FF=62.52' t FG=61.30' 0.5' 68 66 64 62 ----~-£-X.--------==----=------==-------£-G-+--l =tr-,----;-60 HOUSE GROUND 18" SOIL MEDIA IN FOUNDATION PLANTER AREA* • SOIL MEDIA TO BE PER APPENDIX F.J OF THE CITY OF CARLSBAD BMP DESIGN MANUAL CONSISTING OF 70% TO 85% BY VOLUME WASHED SAND AND 15% TO JO% BY VOLUME COMPOST OR ALTERNATNE ORGANIC AMENDMENT. SEE APPENDIX F.J OF THE BMP DESIGN MANUAL FOR i ~ 58 56 54 SPECIFIC GRADAllONS AND COMPOSITIONS OF SAND AND COMPOST. _/" "--EG 52 EX. CMU WALL 50-+-----------------..-------------------r--------+-50 0+00 0+48 SECTION 'G' SCALE: 1 "=5' RAILING 72 68 66 64 62 SECTION A' SCALE: 1 "=5' 10 -1-------l/~1----------------------------------------+-------lf'--EX. 6' 68 66 64 62 FF=67.07' HOUSE FOUNDATION , _____ _ HOUSE FOUNDATION I r MAX CMU (pl PCC WALL / •I I WALKWAY ,, , ~ I: : 1.9' EX. \ 11 f DIFFERENTIAL \ ·iv- Ex._i./- 56 SECTION 'B' SCALE: 1 "=5' 68 66 6' WOOD FENCE ON CONTINUOUS CONG. FOOTING (REPLACES EX. 6' VINYL FENCE~ DETACHED ADU FOUNDATION 1----61.J;.,-++ l __ -1 (SEPARATE COP) 1, SPLASH FF=62.52'54 BLOCK PER SAFETY RAILING PER GS-5.06 CALTRANS STD. 811-47 (v.3/14/23) 62 HOUSE FOUNDATION FF=67.07' FG 2% s; 60 -1--+-~t:-- 1 ', 58 56 18" SOIL MEDIA IN Pl.ANT[R AREA (Sff SEC. G FOR MIX) f I I 11 I 70 68 66 64 54 52 EX. CMU_/-I WALL 0. 64 60 58 56 54 EG 52 I 6/11/2"/ 70 -1------1----+-70 68 BLOG. FOUNDATION PER ARCHITECTURAL PLANS FG 2% 66 64 66 64 62 t--...._ ........ ~ ...... ~62 60 -f---'-EG 0+00 HOUSE FOUNDAT/0 60 0+10 SECTION 'E' SCALE: 1 "=5' 50-+---------1-50 ~----------------~ 0+00 0+10 11 AS BUILT" SECTION 'C' SECTION 'D' SCALE: 1 "=5' SCALE: 1 "=5' RCE __ _ EXP. ___ _ DATE REVIE\./ED BY: INSPECTOR DATE 70 t----t----+------------------+----+----+---+-----t I S2ET I CITY OF CARLSBAD I SH4ETS I 68 ENGINEERING DEPARTMENT GRADING PLANS FOR: 66 LABOUNTY RESIDENCE 64 3950 GARFIELD STREET GR2023-0040 GRADING & DRAINAGE PLAN 62 APPROVED: JASON S. GELDERT 60-+------------------~----------------~--------,,"GROUND------~--+-60 1----1----+-,,------------------1---+--+---t-----t o+oo ROCK LINED 0+63 ~~~~~-~ ~-------~~---~ ENGINEERING MANAGER RCE 63912 EXPIRES 9/30/24 DATE SW,"LE PER DWN BY: ~PY.,___ PROJECT NO DRAWING NO " DATE INITIAL DATE INITIAL DATE INITIAL -• • DETAIL 'A' CHKD BY: ---CDP2022 0067 545 7A ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: --SECTION 'F' SCALE: 1 "=5' MBI Docusign Envelope ID: 95C42BC4-EE81-427A-8538-86C00EBF0DA1 7/30/2024 STORM WATER POLLUTION PREVENTION NOTES GENERAL SITE MANAGEMENT REQUIREMENTS THE FOLLOWING GENERAL SITE MANAGEMENT REQUIREMENTS SHALL BE ADHERED TO THROUGHOUT THE DURATION OF THE CONSTRUCTION WORK {YEAR ROUND). I. IN CASE EMERGENCY WORK IS REQUIRED, CONTACT.· PAUL LABOUNTY FROM: OWNER AT {TEL.NO.} 619 849 3878 2. DEVICES SHOWN ON CITY APPROVED PLANS SHALL NOT BE MOVED OR MODIFIED WITHOUT THE APPROVAL OF THE ENGINEERING INSPECTOR. J. THE CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER AFTER EACH RUN-OFF PRODUCING RAINFALL. 4. THE CONTRACTOR SHALL INSTALL ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEER DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFORSEEN CIRCUMSTANCES WHICH MAY ARISE. 5. THE CONTRACTOR SHALL BE RESPONSIBLE ANO SHALL TAKE NECESSARY PRECAUTIONS TO PREVENT PUBLIC TRESPASS ONTO AREAS WHERE IMPOUNDED WATERS CREA TE A HAZARDOUS CONDITION. 6. GRADING AREAS AROUND THE PROJECT PERIMETER MUST DRAIN AWAY FROM THE FACE OF SLOPE AT THE CONCLUSION OF EACH WORKING DAY. 7. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE AT THE ENO OF EACH WORKING DAY WHEN FIVE (5) DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PERCENT (40%}. SILT ANO OTHER DEBRIS SHALL BE REMOVED AFTER EACH RAINFALL. 8. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM AGGREGATE. NON-BIODEGRADABLE BAGS SHALL BE REMOVED PRIOR TO THE CLOSE OF THE GRADING PERMIT. BIODEGRADABLE BAGS MAY REMAIN. 9. ALL EXPOSED DISTURBED AREAS MUST HA VE EROSION PROTECTION BMPs PROPERLY INSTALLED. THIS INCLUDES ALL BUILDING PADS, UNFINISHED ROADS, ANO SLOPES. 10. ADEQUATE PERIMETER PROTECTION BMPs MUST BE INSTALLED ANO MAINTAINED ANO WILL BE UPGRADED, IF NECESSARY, TO PROVIDE SUFFICIENT PROTECTION FROM RUNOFF DURING RAIN EVENTS. II. AOEQUA TE SEDIMENT CONTROL BMPs MUST BE INSTALLED ANO MAINTAINED. 12. AOEQUA TE BMPs TO CONTROL OFFS/TE SEDIMENT TRACKING MUST BE INSTALLED ANO MAINTAINED. 13. A MINIMUM OF 125% OF THE MATERIAL NEEDED TOO INSTALL STANDBY BMPs TO PROTECT THE EXPOSED AREAS FROM EROSION ANO PREVENT SEDIMENT DISCHARGES, MUST BE STORED ONSITE. AREAS ALREADY PROTECTED FROM EROSION USING PHYSICAL STAB/LIZA TION OR ESTABLISHED VEGETATION STAB/LIZA TION BMPs ARE NOT CONSIDERED TO BE "EXPOSED" FOR PURPOSES OF THIS REQUIREMENT. 14. THE OWNER/DEVELOPER/CONTRACTOR MUST FOLLOW "WEATHER TRIGGERED" ACTION PLAN ANO BE ABLE TO DEPLOY STANDBY BMPs TO PROTECT THE EXPOSED PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT {A PREDICTED STORM EVENT IS DEFINED AS A 40% CHANCE OF RAIN WITHIN A 5-0A Y NATIONAL WEATHER SERVICE FORECAST). ON REQUEST. THE OWNER/DEVELOPER/CONTRACTOR MUST PROVIDE PROOF OF THIS CAPABILITY. 15. DEPLOYMENT OF PHYSICAL OR VEGETATION EROSION CONTROL BMPs MUST COMMENCE AS SOON AS SLOPES ARE COMPLETED. THE OWNER/DEVELOPER/CONTRACTOR MAY NOT RELY ON THE ABILITY TO DEPLOY STANDBY BMP MATERIALS TO PREVENT EROSION OF SLOPES THAT HA VE BEEN COMPLETED. 16. THE AREA THAT CAN BE CLEARED, GRADED, ANO LEFT EXPOSED AT ONE TIME IS LIMITED TO THE AMOUNT OF ACREAGE THAT THE CONTRACTOR CAN ADEQUATELY PROTECT PRIOR TO A PREDICTED RAIN EVENT. FOR LARGER SITES, GRADING SHOULD BE PHASED. IT MAY BE NECESSARY TO DEPLOY EROSION ANO SEDIMENT CONTROL BMPs IN AREAS THAT ARE NOT COMPLETED, BUT ARE NOT ACTIVELY BEING WORKED BEFORE ADDITIONAL GRADING IS ALLOWED TO PROCEED, AT THE DISCRETION OF THE CITY INSPECTOR. 17. ALL DISTURBED AREAS THAT ARE NOT COMPLETED ANO/OR NOT BEING ACTIVELY GRADED MUST BE FULLY PROTECTED FROM EROSION IF LEFT FOR 14 OR MORE DA Y5. THE ABILITY TO INSTALL BMP MATERIALS IN A PROMPT MANNER IS lJill SUFFICIENT. BMPs NEED TO BE INSTALLED IN THESE AREAS. 18. BMPs MUST BE STOCKPILED AT VARIOUS LOCATION THROUGHOUT THE PROJECT SITE THROUGHOUT THE YEAR. WHENEVER THERE IS A 40% CHANCE OR GREATER OF A RAIN WITHIN A THREE {J) DAY FORECAST. THE INSPECTOR WILL VERIFY THAT BMPs ARE AOEQUA TEL Y STOCKPILED. BMPs MUST BE STOCKPILED ANO READY FOR DEPLOYMENT WHEN THERE IS 50% CHANCE OF RAIN WITHIN A 48 HOUR FORECAST. FAILURE TO COMPLY WITH THIS REQUIREMENT COULD RESULT IN THE ISSUANCE OF A STOP WORK NOTICE OR OTHER ENFORCEMENT ACTION. 19. ALL TREATMENT ANO EROSION CONTROL BMPs MUST BE INSPECTED WEEKLY ANO PRIOR TO A FORECASTEO RAIN EVENT OF GREATER THAN 50%, ANO AFTER A RAIN EVENT. IN ADDITION, TREATMENT CONTROL BMPs MUST BE SERVICED AS NEEDED THROUGHOUT THE YEAR. 20. IF SELECTED BMP FAILS DURING A RAIN EVENT. IT MUST BE REPAIRED OR IMPROVED OR REPLACED WITH AN ACCEPTABLE AL TERNA TE AS SOON AS IT IS SAFE TO 00 50. THE FAILURE OF A BMP IND/CA TES IT WAS NOT AOEQUA TE FOR THE CIRCUMSTANCES IN WHICH IT WAS USED. REPAIRS ANO REPLACEMENT MUST THEREFORE PUT A MORE ROBUST BMP MEASURE IN PLACE. 21. ALL CONSTRUCTION EMPLOYEES MUST BE TRAINED ON THE IMPORTANCE OF STORM WATER POLLUTION PREVENTION ANO BMP MAINTENANCE. WEATHER TRIGGERED ACTION PLAN THE: DEVELOPE:R SHALL DEPLOY STANDBY BEST MANAGEMENT PRACTICE: ME:ASURE:5 TO COMPLE:TEL Y PROTECT THE E:XPOSEO PORTIONS OF THE SITE WITHIN 48 HOURS OF A PREDICTED STORM EVENT { A PREDICTED STORM EVENT IS DEFINED AS A FORECASTED, 40% CHANCE: OF RAIN BY THE NATIONAL WEATHER SERVICE:), IN ADDITION TO BMPs IMPLEMENTED YEAR-ROUND INCLUDING PERIMETER CONTROL, WINO EROSION CONTROL, TRACKING, NON-STORM WATER CONTROL, WASTE MANAGEMENT. ANO MATERIALS POLLUTION CONTROL. THE NATIONAL WEATHER SERVICE FORECAST SHALL BE MONITORED AND USED BY THE DEVELOPER ON A DAILY BASIS. IF PRECIPITATION IS PREDICTED (40% CHANCE OF RAIN), THEN THE NE:CESSARY WATER POLLUTION CONTROL PRACTICES SHALL BE DEPLOYED WITHIN 48 HOURS ANO PRIOR TO THE ONSE:T OF THE PRECIP/TA TION. THE DEPLOYMENT OF THE BMPS SHALL INCLUDE BUT NOT BE LIMITED TO GRAVEL BAGS ANO SILT FENCES. A MINIMUM OF 125% OF THE MATERIAL NEEDED TO INSTALL STANDBY BE:ST MANAGEMENT PRACTICES MEASURES TO PROTECT THE EXPOSED AREAS FORM EROSION AND PREVENT SEDIMENT DISCHARGES MUST BE: STORED ON-SITE. AREAS THAT HAVE ALREADY BEE:N PROTECTED FROM EROSION USING PHYSICAL STAB/LIZA TION OR E:STABLISHEO VEGE:TA TION STAB/LIZA TION BMPS AS OE:TERMINEO BY THE CITY OF CARLSBAD ARE NOT CONSIDERED TO BE "EXPOSED" FOR THE PURPOSES OF "WEATHER TRIGGERED ACTION PLAN~ AN AOEQUA TE SOURCE OF EQUIPMENT AND WORKERS SHALL BE AVAILABLE FOR DEPLOYME:NT OF "WEATHER TRIGGERED BMPS~ D:\DRAWING F'ILES\lllLE SHEElS\GRADING TllLE SHEET.DWG REVISED:01/05/16 TIER 2 CITY STORM WATER POLLUTION PREVENTION PLAN (TIER 2 SWPPP) BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials BMPs Control BMPs Management BMPs Pollution Control BMPs C: --~ C: .Q -.Q C: "l;J -., "l;J iii --0, 0 "l;J C: "' C: 0 0 C: ~ ·E E C: E C: .Q -0 .s .s .Q -9-0 0 0 ~ -., ., -:::;; "l;J "' 0, .§ ~ -.s ~ ::, c 0, -.... 0 §~ .s .s "' "' "' §! c;f 0 C: "' o-0, 2-., § "' c§ G !!1 .Q £_ Best Management Practice* ., 0, <'1l .s a:, ii} t: a; ., C: C: 0, "' ., "' ~ 0 .s (.)~ -·.; ., 0 --.s ~ -S ~ "' "l;J "' £ "l;J "' :::;; C: ., C: C: (BMP) Description ➔ -2~ "l;J "' "VJ ., i 0, ., 0, a:, 0 C: C: C: c:, ::, !!1 -., "' ., -., ., ~ Q,) ~ 0 -0 Ji.£ .._ 0 -g~ "l;J "' 0 "' C: C: 0 0, ., ~~ " E §! 0, "' iii c:, a:, 0, Q~ c.., ., 0.2 ., ., -:::;; c:, 0, C: _E 0 ·"' "' ., 0 i....·~ ~ -~-~ "'6" -~ "' .._ -.g ., b-£ "' " ~ Eal ~ ~ 0,---0, .lt-a.. e 0, 0 ., :S-~ ~ "U !!1 ., ::, cg --== ~ .£ e -g te .._ 0, "l;J ., .._ --"l;J ., -"l;J 0 oO "' -~ -g. ., " ::, ..__ -g .._ -g 0 -g 0 ::::;~ CJ,)-~ 0 0 .._ 0 -., 0 .._ 0 Jj ~ rt ~]. --c: ., -o -0 :.:::: § "' C: ct~ ., ~ ~a V) Jl 6 ~ G (/) g -0, -o iit 0 ~u ~vi i -b}-8 ~~ :t: "' vj VJ .s VJ<>: a...o a.. VJ ell :::;; CASQA Designation ➔ <'< .... r--.. CQ -"1 r--.. 0 <'< -"1 r--.. CQ -<'< "1 .... U) <o er, --.... "' <o co --I I I I I I I I I I I I I I I I J, J, I J, I I I I I I c.., [;J c.., c.., [;J c.., bj bj bj bj bj bj bj bj I,: I,: VJ i i i i i i Construction Activity UJ UJ UJ UJ '2: '2: '2: '2: X Gradina/Soil Disturbance X X X X X X X X X X X X X X Trenchinn /Excavation X Stockpilinq X X X X X X X X X X X X X X Dril/inn IBorina Concrete/Asphalt Sawcutting X Concrete Flatwork X X X X X X X X X X X X X X Paving Conduit/Pipe Installation Stucco/Mortar Work X Waste Disoosal X X X X X X X X X X X X X X X Staainn ILav Down Area X X X X X X X X X X X X X X Eauiament Maintenance and Fuelina X Hazardous Substance Use/Storaae X X X X X X X X X X X X X X Dewaterina X Site Access Across Dirt X X X X X X )( X X X X X X X Other (/;st): Instructions: 1. Check the box to the left of all applicable construction activity (first column} expected to occur during construction. 2. Located alon.9 the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column. Choose one 3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project. OWNER'S CERTIFICATION: NAME OF PREPARER: ~DAN~I-U~VA~LO-EZ~------- QUALIFICATION OF PREPARER· RCE 76074, QSD 21156 ADDRESS: COFFEY ENGINEERING, INC. 9666 BUSINESSPARK AVENUE. SUITE 210 SAN DIEGO, CA 92131 PHONE NO.: (858) 831-0111 ., -"' o-,. iii ., E -" ~ 0, oO 8~ CQ I i X X X X X X X SITE VICINITY MAP CITY OF OCEANSIDE HIGHWAY 78 CITY OF VISTA PACIFIC OCEAN CITY OF ENCINITAS SITE ADDRESS: 3950 GARFIELD STREET CARLSBAD, CA 92008 APN: 206-012-06 AREA OF DISTURBANCE AREA OF DISTURBANCE 6,600 S.F. (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFF-SITE WORK INCLUDING PUBLIC IMPROVEMENTS ANO TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFI~ SOIL/GRAVEL PILE~ UTILITY TRENCHES. BACKFILL CUTS AND SLOPE KEYWA YS) CONSTRUCTION THREAT: CONSTRUCTION THREAT TO STORM WATER QUALITY {CHECK BOX): IXI HIGH □ MEDIUM OWNER/APPLICANT: NAME.· PAUL LABOUNTY -lB BEACH PROPERTIES, LLC. ADDRESS: 1314 GULL CT. CARLSBAD, CA 92011 TELEPHONE NO.: 619 849 3878 EMERGENCY CONTACT: NAME.· PAUL LABOUNTY -lB BEACH PROPERTIES, LLC. ADDRESS: 1314 GULL CT. CARLSBAD, CA 92011 TELEPHONE NO.: 619 849 3878 I SH3ET I CITY OF CARLSBAD ENGINEERING DEPARTMENT GRADING PLANS FOR: LABOUNTY RESIDENCE 3950 GARFIELD STREET GR2023-0040 SWPPP TIER 2 TITLE SHEET I SH4ETS I APPROVED: JASON S. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9 /30 /24 DATE 42:{?~ 76074 6/30/2026 6/17 /24 >----+---+£-----------------+----+---+----+----I ~o=w=N~BY~,-~=□v=--=--=--=-~ ~--P-R-0-JE_C_T-NO-_-~ -□-R_A_W-IN_G_N_O~. DATE DATE INITIAL DATE INITIAL DATE INITIAL CRHVWKDD BBYY:: ---CDP2022-0067 545-7A R.C.E./CERT. NO. UC. EXP. DA TE ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL MBI Docusign Envelope ID: 95C42BC4-EE81-427A-8538-86C00EBF0DA1 7/30/2024 I • • • • • ALLOW 2'-5' AT TOE OF SLOPEl FOR SEDIMENT TO ACCUMULATE FILTER FABRIC 2'-5' HAY BALE 6"-8" STAKE BACKFILL 4"-6" FILTER FABRIC STAKE SEDIMENT INSTALLATION 11 Ill 11 111 111 BACK FILL -=111 Ii'II TRENGTHENING II IITT= KEY IN FILTER FABRIC A STAKE MINIMUM OF 6' BELOW THE GROUND SURFACE AND 6 • ACROSS, THEN BACKFILL WITH DIRT OR GRAVEL STAKE ITT ITT ill=IIl=gj I I II I I I II =II i'll1 II= II = ANCHORING BACK FILL DETAIL ' SILT FENCE INSTALLATION NO SCALE D:\DRAWING FILES\llllE SHEElS\GRADING TlllE SHEET.DWG REVISED:01/05/16 50' MIN .,J;.r":: ~ I PROFILE PAVE"D SURFACE EXISTTNG GROUND REMAINING l 20 'MIN. T PLAN PAVE"D SURFACE REMAINING PROVIDE APPROPRIATE TRANSITION I GRAVEL STONE SHALL BE 1-.3 INCHES I 8£1WEEN STABILIZED CONSTR. • ENTRANCE AND PAVED SURFACE DETAIL '.5' STABILIZED CONSTRUCT/ON ENTRANCE {PVT} NO SCALE BIFFY DETAIL 'T' TWO LEVELS OF SAND OR GRAVEL BAGS -ON£ BELOW VISQUEEN, ONE ABOVE (TO CONTAIN SPILLAGE) SANITARY TO/LIN (BIFFYJ PROTECTION NO SCALE BMP PLAN GRAVEL BAGS OVERLAP ENDS--- RUNOFF GAP BETWEE, CTS AS SP DETAIL 'V GRADE GRAVEL BAGS BARRIER NO SCALE GRAVEL BAGS OVERLAP ONTO CURB OR SIDE ~ ------- RUNOFF M GAP BETWEEN BAGS ACTS AS SPILLWAY DETAIL 'W' CURB OR SIDE OF TRAVELWAY FT MIN. THREE LAYERS OF GRAVEL BAGS WITH ENDS OVERLAPPED GRAVEL BAGS ON TRAVELWAYS NO SCALE DESCRIPTION PROPERTY LINE SILT FENCE STABILIZED CONSTRUCTION ENTRANCE GRAVEL BAG BERM/BARRIER STOCKPILE MANAGEMENT SANITARY WASTE (PORTABLE TOILET) MATERIALS DELIVERY AND STORAGE AREA TEMPORARY TRASH/SOLID WASTE STREET SWEEPING LEGEND STD DWG* SE-1; OCT. 'R' TC-1; DET. 's' SE-6; DET. ·v;w· WM-3 WM-9; DET. 'T' WM-1 WM-5 SE-7 SYMBOL N45'45'45"W -------~ WM-1 WM-5 (NO SYMBOL) *STANDARD DRAWINGS (SE-5, WM-5, ETC.) CAN BE FOUND AT THE CALIFORNIA STORMWATER QUALITY ASSOCIATION (CASQA) WEBSITE: https://www.casqa.org/resources/bmp-handbooks/construction 5 0 ' -• --5 10 15 ,----, ____ ' SCALE: 1 "=5' DATE INITIAL QUANTITY 90 L.F. 200 S.F. 80 EA. 1 EA. 1 EA. 1 EA. 1 EA. 1 EA. ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL I S4ET I r " I 11'1 I I -I 11 AS BUILT" RCE __ _ EXP. ___ _ REVIEl,IED BY: INSPECTOR CITY OF CARLSBAD ENGINEERING DEPARTMENT GRADING PLANS FOR: LABOUNTY RESIDENCE 3950 GARFIELD STREET DATE DATE I SH4ETS I GR2023-0040 EROSION CONTROL & BMP PLAN APPROVED: JASON S. GELDERT ENGINEERING MANAGER RCE 63912 EXPIRES 9 /30 /24 DATE OWN BY: ~□~V __ PROJECT NO. DRAWING NO. CHKD BY: __ _ RVWD BY: CDP2022-0067 545-7A MBI Docusign Envelope ID: 95C42BC4-EE81-427A-8538-86C00EBF0DA1 7/30/2024