HomeMy WebLinkAboutCDP 2022-0067; LABOUNTY RESIDENCE - 3950; REVISED REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION; 2024-07-01
REVISED REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION
LaBounty Residences
3940 and 3950 Garfield Street
Carlsbad, California
JOB NO. 23-14188
01 July 2024
Prepared for:
Judith and Paul LaBounty
01 July 2024
Judith and Paul LaBounty Job No. 23-14188
3950 Garfield Street
Carlsbad, CA 92011
Subject: Revised Report of Preliminary Geotechnical Investigation
LaBounty Residences
3940 and 3950 Garfield Street
Carlsbad, California
Dear Mr. and Mrs. LaBounty:
In accordance with our proposal and work agreement dated January 17, 2023,
Geotechnical Exploration, Inc. has performed a preliminary geotechnical
investigation for the subject projects in San Marcos, California. The field work was
performed on March 13, 2023.
If the conclusions and recommendations presented in this report are incorporated
into the design and construction, it is our opinion that the sites are suitable for the
proposed new residences and associated improvements from a geotechnical
perspective.
This opportunity to be of service is sincerely appreciated. Should you have any
questions concerning the following report, please do not hesitate to contact us.
Reference to our Job No. 23-14188 will expedite a response to your inquiries.
Respectfully submitted,
GEOTECHNICAL EXPLORATION, INC.
_______________________________ ______________________________
Wm. D. Hespeler, G.E. 396 Jay K. Heiser
Senior Geotechnical Engineer Senior Project Geologist
TABLE OF CONTENTS
I. PROJECT SUMMARY 1
II. SCOPE OF WORK 2
III. SITE DESCRIPTION 2
IV. FIELD INVESTIGATION 3
V. LABORATORY TESTS AND SOIL INFORMATION 3
VI. SITE-SPECIFIC SOIL & GEOLOGIC DESCRIPTION 5
A. Stratigraphy 5
B. Structure 6
VII. GEOLOGIC HAZARDS 6
VIII. GROUNDWATER 7
IX. CONCLUSIONS AND RECOMMENDATIONS 8
A. Site Preparation and Earthwork 9
B. Foundation Recommendations 13
C. Concrete Slab On-grade Criteria 16
D. General Recommendations 20
X. GRADING NOTES 22
XI. LIMITATIONS 22
FIGURES
I. Vicinity Map
II. Plot Plan and Site-Specific Geologic Map
IIIa-d. Exploratory Test Pit Logs
IV. Geologic Map Excerpt and Legend
APPENDICES
A. Unified Soil Classification System
B. Soluble Sulfate and Chloride Test Results
REVISED REPORT OF PRELIMINARY GEOTECHNICAL INVESTIGATION
LaBounty Residences
3940 and 3950 Garfield Street
Carlsbad, California
JOB NO. 23-14188
The following report presents the findings and recommendations of Geotechnical
Exploration, Inc. for the subject project.
I. PROJECT SUMMARY
It is our understanding that the residences on the two adjacent lots (APN Nos. 206-
012-05-00 and 206-012-06-00) will be removed and each lot will be developed to
receive a new three-story, single-family residence with attached two-car garage and
associated improvements. The new structures are to be constructed of standard-
type building materials and foundation loads are expected to be typical for this type
of relatively light construction. Flooring is to be concrete slab on-grade. When final
architectural and engineering plans have been prepared, they should be made
available for our review. Additional or modified recommendations would be provided
at that time if warranted.
Please be aware that the importance of thorough observation and testing during
construction should be recognized by the client and the contractor(s) to provide
appropriate documentation for any necessary as-graded reports. Recommendations
for observation and testing are provided under Conclusions and Recommendations
No. 7, “Observations and Testing.”
Based on our current understanding of the proposed construction, it is our opinion
that construction of the proposed new residences would not destabilize neighboring
properties or induce the settlement of adjacent structures if designed and constructed
in accordance with our recommendations.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 2
II. SCOPE OF WORK
The scope of work performed for this investigation included a site reconnaissance and
subsurface exploration program under the direction of our geologist with the
placement, logging and sampling of three exploratory test pits across the lots utilizing
hand tools, review of available published literature pertaining to the site geology,
laboratory testing of sampled soils, geotechnical engineering analysis of the field and
laboratory data, and the preparation of this report. The data obtained and the
analyses performed were for the purpose of providing design and construction criteria
for the project earthwork, seismic design, building foundations, slab on-grade floors,
and associated improvements.
III. SITE DESCRIPTION
The subject lots are known as Assessor’s Parcel Nos. 206-012-05-00 and 206-012-
06-00. Refer to Figure No. I, the Vicinity Map, for the site location. The rectangular-
shaped lots are each 6,000 square feet in size. Each lot is currently occupied by an
existing residential structure that will be demolished.
The lots are bordered on the west by Garfield Street at about the same elevation,
and on the north, east and south by existing residences at about the same elevation.
Vegetation across the site consists of ornamental landscaping with some shrubs and
a few mature trees.
The elevation of the lots is approximately 69 feet above Mean Sea Level (MSL) on
the west property line adjacent to Garfield Street, and both lots slope gently down to
about 64 feet above MSL at the rear of each lot.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 3
IV. FIELD INVESTIGATION
The field investigation consisted of a surface reconnaissance and a subsurface
exploration program utilizing hand tools to investigate and sample the subsurface
soils. Four exploratory test pits (two on each lot) were advanced on the lots on March
13, 2023. The exploratory test pits were advanced to depths of 5 to 7 feet to obtain
representative soil samples and to define the soil profile in the project area. The
materials encountered in the exploratory test pits were continuously logged in the
field by our geologist and described in accordance with the Unified Soil Classification
System (refer to Appendix A). The approximate locations of the exploratory test pits
are shown on the attached Plot Plan and Site-Specific Geologic Map, Figure No. II.
A relatively undisturbed sample obtained by driving a lined sample barrel and a bulk
sample were collected from the exploratory test pits to aid in classification and for
appropriate laboratory testing. The samples were returned to our laboratory for
evaluation and testing. Exploratory test pit logs were prepared on the basis of our
observations and laboratory test results and are attached as Figure Nos. IIIa-d.
The exploratory test pit logs and related information depict subsurface conditions
only at the specific locations shown on the plot plan and on the particular date
designated on the logs. Subsurface conditions at other locations may differ from
conditions occurring at these locations. Also, the passage of time may result in
changes in the subsurface conditions due to environmental changes.
V. LABORATORY TESTS AND SOIL INFORMATION
Laboratory tests were performed on retrieved soil samples in order to evaluate their
physical and mechanical properties. The test results are presented on the test pit
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 4
logs, Figure No. IIIa-d, at the appropriate sample depths. The following tests were
conducted on representative soil samples:
1. Moisture Content (ASTM D2216-19)
2. Laboratory Compaction Characteristics (ASTM D1557-12[2021])
3. Determination of Percentage of Particles Smaller than No. 200 Sieve
(ASTM D1140-17)
4. Density Measurements (ASTM D2937-17e2)
5. Water Soluble Sulfate (California Test 417)
6. Water Soluble Chloride (California Test 422)
Moisture content and density measurements were performed by ASTM methods
D2216-19 and D2937-17e2, respectively, to establish the in-situ moisture and
density of samples retrieved from the exploratory test pits.
Laboratory compaction values (ASTM D1557-12r21) establish the optimum moisture
content and the laboratory maximum dry density of the tested soils. The relationship
between the moisture and density of remolded soil samples helps to establish the
relative compaction of the existing fill and soil compaction conditions to be anticipated
during any future grading operation. The test results are presented on the logs at
the appropriate sample depths.
The particle size smaller than a No. 200 sieve analysis (ASTM D1140-17) aids in
classifying the tested soils in accordance with the Unified Soil Classification System
(attached as Appendix A) and provides qualitative information related to engineering
characteristics such as expansion potential, permeability, and shear strength.
Water soluble sulfate and chloride tests were performed on samples recovered from
the test pits by Clarkson Laboratory and Supply. The test results are attached as
Appendix B and indicate an exposure class of S0 for sulfates.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 5
VI. SITE-SPECIFIC SOIL & GEOLOGIC DESCRIPTION
Our review of the “Geologic Map of the Oceanside 30’x60’ Quadrangle, California” by
Kennedy and Tan, 2007, indicates that the site is mapped as Old Paralic Deposits
(Qop6-7). An excerpt of the geologic map is included as Figure No. IV, Geologic Map
and Legend. The formational materials are overlain with approximately 3 feet of
artificial fill. For more information, see Figure No. II, the Plot Plan with Site-Specific
Geology and Figure Nos. IIIa-d, the exploratory test pit logs.
A. Stratigraphy
Artificial Fill Soils (Qaf): Fill soils consisting of fine to medium grained, loose to
medium dense, damp, dark brown silty sand (SM per USCS) were encountered in
exploratory test pits HP1 through HP3 to a depth of 3 feet, and to a depth of 2 feet
in exploratory test pit HP4. In our opinion, the fill soils are not well compacted and
are not suitable in their current condition for support of loads from the proposed
residences and associated improvements. The fill soils are considered to have a low
expansion potential and are suitable for use as new fill material on the site provided
any encountered organics, trash and oversize materials are removed during grading
operations and the soils are adequately moisture conditioned. Refer to Figure Nos.
IIIa-d for details.
Old Paralic Deposits (Qop6-7): Old Paralic Deposit Formational materials were
encountered below the fill soils in all the exploratory test pits to the depths explored
of 5 to 7 feet. The observed formational materials consisted of 1 foot of loose to
medium dense, fine to medium grained, damp, red-brown silty sands (SM per USCS),
which were underlain by medium dense, fine to medium grained, damp, light gray-
brown silty to poorly graded sand (SM-SP per USCS). In our opinion, the formational
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 6
materials are suitable in their current condition for support of loads from the proposed
structures and associated improvements. Refer to Figure Nos. IIIa-d for details.
B. Structure
No geologic structure was observed during our field investigation.
VII. GEOLOGIC HAZARDS
No significant geologic hazards are known to exist on the subject site that would
prohibit the proposed construction. The site, like most of southern California, is
located in a seismically active area and regional faulting is present in San Diego
County. The following local and regional fault zones are mapped in southern
California in general proximity to the site:
Newport-Inglewood Fault: Mapped approximately 5 miles northwest of the site,
estimated to be capable of producing a M6.0 to M7.4 earthquake (Grant Ludwig
and Shearer, 2004).
Rose Canyon Fault Zone: Mapped approximately 5 miles southwest of the site,
considered capable of a M6.9 earthquake (Singleton, et al., 2019).
Coronado Bank Fault: Mapped approximately 21 miles southwest of the site,
estimated to be to be capable of a M7.6 earthquake.
Elsinore Fault: Mapped approximately 25 miles northeast of the site, estimated
to be capable of a M6.0 to M7.0 earthquake (Rockwell, et al. 1985) and M7.5
(Greensfelder, 1974).
San Jacinto Fault: Mapped approximately 47 miles northeast of the site,
estimated to have a 31 percent probability of a M6.7 or greater earthquake
within the next 30 years (Working Group on California Earthquake Probabilities,
2008).
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 7
Reference to the Geologic Map and Legend, Figure No. IV (Kennedy and Tan, 2007)
indicates that no faults are shown to cross the site. Furthermore, the California
Geological Survey has not produced an “Earthquake Zones of Required Investigation”
regulatory map for this area, indicating that there is no known active faulting in this
area. In our explicit opinion, neither an active fault nor a potentially active fault
underlies the site. Ground shaking from earthquakes on active southern California
faults and active faults in northwestern Mexico is considered the greatest geologic
hazard at the site. Further geologic hazards considered in our analysis were ground
rupture, landslides, soil liquefaction, tsunamis, seiches, storm surges and flooding.
Based on the results of our study, the potential for these hazards to occur are very
low and the site is considered low risk.
The potential for strong ground shaking from earthquakes on active southern
California faults and active faults in northwestern Mexico should be anticipated at the
site. Design of building structures in accordance with the current building codes
would reduce the potential for injury or loss of human life. Buildings constructed in
accordance with current building codes may suffer significant damage but should not
undergo total collapse.
VIII. GROUNDWATER
Groundwater was not encountered during the field investigation and we do not
anticipate significant groundwater problems to develop in the future if the property
is developed as proposed and proper drainage is implemented and maintained.
It should be kept in mind that grading operations can change surface drainage
patterns and/or reduce permeabilities due to the densification of compacted soils.
Such changes of surface and subsurface hydrologic conditions, plus irrigation of
landscaping or significant increases in rainfall, may result in the appearance of
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 8
surface or near-surface water at locations where none existed previously. The
appearance of such water is expected to be localized and cosmetic in nature, if good
positive drainage is implemented, as recommended in this report, during and at the
completion of construction.
It must be understood that unless discovered during initial site exploration or
encountered during site grading operations, it is extremely difficult to predict if or
where perched or true groundwater conditions may appear in the future. When site
formational soils are fine-grained and of low permeability, water problems may not
become apparent for extended periods of time.
Water conditions, where suspected or encountered during grading operations, should
be evaluated and remedied by the project civil and geotechnical consultants. The
project developer and property owner, however, must realize that post-construction
appearances of groundwater may have to be dealt with on a site-specific basis.
IX. CONCLUSIONS AND RECOMMENDATIONS
From a geotechnical engineering standpoint, it is our opinion that the lots are suitable
for the proposed residences and associated improvements provided the conclusions
and recommendations presented in this report are incorporated into their design and
construction.
The primary feature of concern at the site is the presence of poorly compacted
existing fill soils. In order to preclude the possibility of the new residences and
associated improvements being subject to excessive total and differential
settlements, we recommend that all existing fill soils be removed and recompacted.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 9
Earthwork and foundation recommendations are presented in the following
paragraphs. It should be noted that the recommendations for allowable footing
bearing pressures, passive soil resistance and coefficient of friction presented below
are based on presumptive values for Class 4 soils in the 2022 CBC. The opinions,
conclusions, and recommendations presented in this report are contingent upon
Geotechnical Exploration, Inc. being retained to review the final plans and
specifications as they are developed and to observe the site earthwork and
installation of foundations. Accordingly, we recommend that the following paragraph
be included on the grading and foundation plans for the projects:
If the geotechnical consultant of record is changed for the project, the
work shall be stopped until the replacement has agreed in writing to
accept the responsibility within their area of technical competence for
approval upon completion of the work. It shall be the responsibility of
the permittee to notify the governing agency in writing of such change
prior to the commencement or recommencement of grading and/or
foundation installation work
A. Site Preparation and Earthwork
1. Clearing and Stripping: The subject lots should be cleared of all obstructions,
including the existing structures and associated improvements to be
demolished, any utility lines to be abandoned and any miscellaneous debris
that may be present at the time of construction. After clearing, the ground
surface should be stripped of surface vegetation as well as associated root
systems. Holes resulting from the removal of buried obstructions that extend
below the proposed finished site grades should be cleared and backfilled with
suitable material compacted to the requirements given under
Recommendation No. 4, "Compaction.” The cleared and stripped materials
should be properly disposed of off-site.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 10
2. Treatment of Existing Fill: In order to provide suitable foundation support for
the proposed new residences and associated improvements, we recommend
that all existing fill soils on the lots that remain after the necessary site
excavations have been made be removed and recompacted. The areal extent
and depth required to remove the existing fill soils should be determined by
our representatives during the excavation work based on their examination of
the soils being exposed. The anticipated depth of removal is on the order of 3
feet below existing grade. Any unsuitable materials (such as oversize rubble
and/or organic matter) should be selectively removed as directed by our
representative and disposed of off-site. After removal of existing fill, the
exposed natural subgrade materials should be scarified to a depth of 6 inches,
moisture conditioned to at least 2 percent above the laboratory optimum and
compacted to a minimum degree of compaction of 90 percent.
3. Materials for Fill: All on-site soils with an organic content of less than 3 percent
by volume are suitable for reuse as fill material. Fill material should not,
however, contain rocks or lumps over 3 inches in greatest dimension and not
more than 15 percent larger than ¼-inch. In addition to the preceding size
requirements, any required imported fill soil should be a granular soil with an
Expansion Index of 50 or less per ASTM D4829-19 and be approved by our
representative prior to importation to the site.
4. Compaction: All structural fill and backfill should be compacted to a minimum
degree of compaction of 90 percent at a moisture content at least 2 percent
above the optimum moisture content based upon ASTM D1557-12r21. All fill
material should be spread and compacted in uniform horizontal lifts not
exceeding 8 inches in uncompacted thickness. Before compaction begins, the
fill should be brought to a moisture content that will permit proper compaction
by either: (1) aerating and drying the fill if it is too wet; or (2) watering the fill
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 11
if it is too dry. Each lift should be thoroughly mixed before compaction to
ensure a uniform distribution of moisture.
5. Trench Backfill: All pipeline trenches should be backfilled with compacted fill.
Backfill material should be placed in lift thicknesses appropriate to the type of
compaction equipment utilized and compacted to a minimum degree of
compaction of 90 percent by mechanical means.
Our experience has shown that even shallow, narrow trenches, such as for
irrigation and electrical lines, which are not properly compacted, can result in
problems, particularly with respect to shallow groundwater accumulation and
migration.
6. Drainage: Positive surface gradients should be provided adjacent to the
structures, and roof gutters and downspouts should be installed to direct water
away from foundations and slabs toward suitable discharge facilities. Ponding
of surface water should not be allowed, especially adjacent to the structures,
driveways and flatwork.
7. Observations and Testing: As stated in CBC 2022, Section 1705.6 Soils:
“Special inspections and tests of existing site soil conditions, fill placement and
load-bearing requirements shall be performed in accordance with this section
and Table 1705.6 (see below). The approved geotechnical report and the
construction documents prepared by the registered design professionals shall
be used to determine compliance. During fill placement, the special inspector
shall verify that proper materials and procedures are used in accordance with
the provisions of the approved geotechnical report.” A summary of Table
1705.6 “REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS” is presented
below:
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 12
a) Verify materials below shallow foundations are adequate to achieve the
design bearing capacity;
b) Verify excavations are extended to proper depth and have reached proper
material;
c) Perform classification and testing of compacted fill materials;
d) Verify use of proper materials, densities and fill thicknesses during
placement and compaction of compacted fill prior to placement of
compacted fill, inspect subgrade and verify that site has been prepared
properly.
Section 1705.6 “Soils” statement and Table 1705.6 indicates that it is
mandatory that a representative of this firm (responsible engineering firm)
perform observations and fill compaction testing during grading and backfilling
operations to verify that the operations are consistent with the
recommendations presented in this report. All grading excavations resulting
from the removal of soils should be observed and evaluated by a
representative of our firm before they are backfilled.
Quality control grading observation and field density testing for the purpose of
documenting that adequate compaction has been achieved and acceptable
soils have been utilized to properly support a project applies not only to fill
soils supporting primary structures (unless supported by deep foundations or
caissons) but all site improvements such as stairways, patios, pools and pool
decking, retaining walls, etc. Observation and testing of utility line trench
backfill also reduces the potential for localized settlement of all of the above
including all improvements outside of the footprint of primary structures.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 13
Often after primary building pad grading and swimming pool excavation, it is
not uncommon for the geotechnical engineer of record to not be notified of
grading performed outside the footprint of the project primary structures. As
a result, settlement damage of site improvements such as patios, pool and
pool decks, exterior landscape walls and walks, and structure access stairways
can occur. It is therefore strongly recommended that the project general
contractor, grading contractor, and others tasked with completing the project,
be advised and acknowledge the importance of adequate and comprehensive
observation and testing of soils intended to support the project they are
working on. The project geotechnical engineer of record must be contacted
and requested to provide these services.
The geotechnical engineer of record, in this case Geotechnical Exploration,
Inc., cannot be held responsible for the costs and time delays associated with
the lack of contact and requests for testing services by the client, general
contractor, grading contractor or any of the project design team responsible
for requesting the required geotechnical services. Requests for services are to
be made through our office telephone number (858) 549-7222 and the
telephone number of the GEI personnel assigned to the project.
B. Foundation Recommendations
8. Footings: We recommend that the proposed residences be supported on
conventional, individual-spread and/or continuous footing foundations bearing
on undisturbed formational materials and/or properly compacted structural fill
soils prepared as recommended above in Recommendations Nos. 2, 3 and 4.
All footings should be founded at least 18 inches below the lowest adjacent
finished grade.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 14
At the recommended depths, footings may be designed for allowable bearing
pressures of 2,000 pounds per square foot (psf) for combined dead and live
loads and 2,600 psf for all loads, including wind or seismic. The footings
should, however, have a minimum width of 12 inches.
9. General Criteria for All Footings: Footings located adjacent to the tops of
slopes should be extended sufficiently deep so as to provide at least 10 feet of
horizontal cover between the slope face and outside edge of the footing at the
footing bearing level. Footings located adjacent to utility trenches should have
their bearing surfaces situated below an imaginary 1.5 to 1.0 plane projected
upward from the bottom edge of the adjacent utility trench.
All continuous footings should contain top and bottom reinforcement to provide
structural continuity and to permit spanning of local irregularities. We
recommend that a minimum of two No. 5 top and two No. 5 bottom reinforcing
bars be provided in the footings. A minimum clearance of 3 inches should be
maintained between steel reinforcement and the bottom or sides of the footing.
In order for us to offer an opinion as to whether the footings are founded on
soils of sufficient load bearing capacity, it is essential that our representative
inspect the footing excavations prior to the placement of reinforcing steel or
concrete.
NOTE: The project Civil/Structural Engineer should review all reinforcing
schedules. The reinforcing minimums recommended herein are not to be
construed as structural designs, but merely as minimum reinforcement to
reduce the potential for cracking and separations
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 15
10. Seismic Design Criteria: Site-specific seismic design criteria for the proposed
residences are presented in the following table in accordance with Section 1613
of the 2022 CBC, which incorporates by reference ASCE 7-16 for seismic
design. We have determined the mapped spectral acceleration values for the
site, based on a latitude of 33.14786 degrees and longitude of -117.34325
degrees, utilizing a tool provided by the USGS, which provides a solution for
ASCE 7-16 (Section 1613 of the 2022 CBC) utilizing digitized files for the
Spectral Acceleration maps. Based on our past experience with similar
conditions, we have assigned a Site Soil Classification of C.
TABLE I
Mapped Spectral Acceleration Values and Design Parameters
Ss S1 Fa Fv Sms Sm1 Sds Sd1
1.097g 0.396g 1.2 1.5 1.317g 0.593g 0.878g 0.396g
11. Lateral Loads: Lateral load resistance for the structures supported on footing
foundations may be developed in friction between the foundation bottoms and
the supporting subgrade. An allowable friction coefficient of 0.25 is considered
applicable. An additional allowable passive resistance equal to an equivalent
fluid weight of 150 pcf acting against the foundations may be used in design
provided the footings are poured neat against the adjacent properly compacted
fill materials and/or undisturbed formational materials. These lateral
resistance values assume a level surface in front of the footing for a minimum
distance of three times the embedment depth of the footing and any shear
keys.
12. Settlement: Settlement under building loads is expected to be within tolerable
limits for the proposed structures. For footings designed in accordance with
the recommendations presented in the preceding paragraphs, we anticipate
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 16
that total settlements should not exceed 1 inch and that post-construction
differential settlements should be less than 1/240.
C. Concrete Slab On-grade Criteria
13. Minimum Floor Slab and Garage Slab Thickness and Reinforcement: Based on
our experience, we have found that, for various reasons, floor slabs
occasionally crack, causing brittle surfaces such as ceramic tiles to become
damaged. Therefore, we recommend that all slabs on-grade contain at least
a minimum amount of reinforcing steel to reduce the separation of cracks,
should they occur. Actual floor slab thickness and reinforcement
recommendations should be provided by the project Structural Engineer.
13.1 Interior floor slabs (and garage slabs and driveways subject only to
automobile traffic) should be a minimum of 5 inches in thickness and be
reinforced with No. 4 bars on 18-inch centers, both ways, placed at mid-
height in the slab. Concrete for any garage slabs and driveways should
conform to Section 201 of The Standard Specifications for Public Works
Construction, 2024 Edition, for Class 560-C-3250. Slab subgrade soil
should be verified by a Geotechnical Exploration, Inc. representative
to have the proper moisture content within 48 hours prior to placement
of the vapor barrier and pouring of concrete.
13.2 Following placement of any concrete floor slabs, sufficient drying time
must be allowed prior to placement of floor coverings. Premature
placement of floor coverings may result in degradation of adhesive
materials and loosening of the finish floor materials.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 17
We note that shrinkage cracking can result in reflective cracking in brittle
flooring surfaces such as stone and tiles. It is imperative that if movement
intolerant flooring materials are to be utilized, the flooring contractor and/or
architect should provide specifications for the use of high-quality isolation
membrane products installed between slab and floor materials.
14. Slab Moisture Protection and Vapor Barrier Membrane: Although it is not the
responsibility of geotechnical engineering firms to provide moisture protection
recommendations, as a service to our clients we provide the following
discussion and suggested minimum protection criteria. Actual recommenda-
tions should be provided by the architect and waterproofing consultants.
Soil moisture vapor can result in damage to moisture-sensitive floors, some
floor sealers, or sensitive equipment in direct contact with the floor, in addition
to mold and staining on slabs, walls and carpets. The common practice in
Southern California is to place vapor retarders made of PVC, or of polyethylene.
PVC retarders are made in thickness ranging from 10- to 60-mil. Polyethylene
retarders, called visqueen, range from 5- to 10-mil in thickness. These
products are no longer considered adequate for moisture protection and can
actually deteriorate over time.
Specialty vapor retarding products possess higher tensile strength and are
more specifically designed for and intended to retard moisture transmission
into and through concrete slabs. The use of such products is highly
recommended for reduction of floor slab moisture emission.
The following American Society for Testing and Materials (ASTM) and American
Concrete Institute (ACI) sections address the issue of moisture transmission
into and through concrete slabs: ASTM E154/E154M-08a(2019) Standard Test
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 18
Methods for Water Vapor Retarders Used in Contact with Earth Under Concrete
Slabs, on Walls, or as Ground Cover; ASTM E96-00e1 Standard Test Methods
for Water Vapor Transmission of Materials; ASTM E1643-18a Standard Practice
for Selection, Design, Installation and Inspection of Water Vapor Retarders
Used in Contact with Earth or Granular Fill Under Concrete Slabs; and ACI
302.2R-06 Guide for Concrete Slabs that Receive Moisture-Sensitive Flooring
Materials.
14.1 Based on the above, we recommend that the vapor barrier consist of a
minimum 15-mil extruded polyolefin plastic (no recycled content or
woven materials permitted). Permeance as tested before and after
mandatory conditioning (ASTM E1745 Section 7.1 and sub-paragraphs
7.1.1-7.1.5) should be less than 0.01 US perms (grains/square
foot/hour/inch of mercury Hg) and comply with the ASTM E1745 Class
A requirements. Installation of vapor barriers should be in accordance
with ASTM E1643. The basis of design is StegoWrap vapor barrier 15-
mil. Reef Industries Vapor Guard membrane has also been shown to
achieve a permeance of less than 0.01 perm. We recommend that the
recommended vapor barrier be placed directly on properly prepared
subgrade soils and the floor slabs be poured directly on the vapor
barrier; no sand or gravel layers are used.
14.2 Common to all acceptable products, vapor retarder/barrier joints must
be lapped at least 6 inches. Seam joints and permanent utility
penetrations should be sealed with the manufacturer’s recommended
tape or mastic. Edges of the vapor retarder should be extended to
terminate at a location in accordance with ASTM E1643-18a or to an
alternate location that is acceptable to the project’s structural engineer.
All terminated edges of the vapor retarder should be sealed to the
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 19
building foundation (grade beam, wall, or slab) using the manufacturer’s
recommended accessory for sealing the vapor retarder to pre-existing
or freshly placed concrete. In actual practice, stakes are often driven
through the retarder material, equipment is dragged or rolled across the
retarder, overlapping or jointing is not properly implemented, etc. All
these construction deficiencies reduce the retarder’s effectiveness. In
no case should retarder/barrier products be punctured or gaps be
allowed to form prior to or during concrete placement. Vapor barrier-
safe screeding and forming systems should be used that will not leave
puncture holes in the vapor barrier, such as Beast Foot (by Stego
Industries) or equivalent.
14.3 Vapor retarders/barriers do not provide full waterproofing for structures
constructed below free water surfaces. They are intended to help reduce
or prevent vapor transmission and/or capillary migration through the
soil and through the concrete slabs. Waterproofing systems must be
designed and properly constructed if full waterproofing is desired. The
owner and project designers should be consulted to determine the
specific level of protection required.
14.4 Following placement of concrete floor slabs, sufficient drying time must
be allowed prior to placement of any floor coverings. Premature
placement of floor coverings may result in degradation of adhesive
materials and loosening of the finish floor materials.
15. Exterior Slab Thickness and Reinforcement: Exterior slab reinforcement and
control joints should be designed by the project Structural Engineer. As a
minimum for protection of on-site improvements, we recommend that all
exterior pedestrian concrete slabs be at least 4 inches thick and founded on
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 20
properly compacted and tested fill, with No. 3 bars at 18-inch centers, both
ways, at the center of the slab, and contain adequate isolation and control
joints. The performance of on-site improvements can be greatly affected by
soil base preparation and the quality of construction. It is therefore important
that all improvements are properly designed and constructed for the existing
soil conditions. The improvements should not be built on loose soils or fills
placed without our observation and testing.
For exterior slabs with the minimum shrinkage reinforcement, control joints
should be placed at spaces no farther than 15 feet apart or the width of the
slab, whichever is less, and also at re-entrant corners. Control joints in
exterior slabs should be sealed with elastomeric joint sealant. The sealant
should be inspected every 6 months and be properly maintained.
D. General Recommendations
16. Infiltration Feasibility: The subject lots are underlain by 3 to 4 feet of fill soils
over dense formational sandstone. We anticipate that the adjacent existing
residential lots as well as Garfield Street are underlain by similar materials. In
our opinion, the formational sandstone materials would have poor infiltration
characteristics and any attempted infiltration would quite likely lead to a
spreading perched groundwater condition and hydroconsolidation of fill soils
under the proposed construction and adjacent residences. In addition, the
perched groundwater condition would lead to flooding of utility trenches.
Accordingly, it is our opinion that the lots are not suitable for infiltration and
we recommend that all biofiltration basins be lined with an impermeable liner.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 21
17. Project Start Up Notification: In order to minimize any work delays during site
development, this firm should be contacted 24 hours prior to any need for
observation of footing excavations or field density testing of compacted fill
soils. If possible, placement of formwork and steel reinforcement in footing
excavations should not occur prior to observing the excavations; in the event
that our observations reveal the need for deepening or re-designing foundation
structures at any locations, any formwork or steel reinforcement in the affected
footing excavation areas would have to be removed prior to correction of the
observed problem (i.e., deepening the footing excavation, recompacting soil
in the bottom of the excavation, etc.).
18. Construction Best Management Practices (BMPs): Sufficient BMPs must be
installed to prevent silt, mud, or other construction debris from being tracked
into the adjacent street(s) or stormwater conveyance systems due to
construction vehicles or any other construction activity. The contractor is
responsible for cleaning any such debris that may be in the street at the end
of each work day or after a storm event that causes a breach in the installed
construction BMPs.
All stockpiles of uncompacted soil and/or building materials that are left
unprotected for a period greater than 7 days are to be provided with erosion
and sediment controls. Such soil must be protected each day when the
probability of rain is 40% or higher. A concrete washout should be provided
on all projects that propose the construction of any concrete improvements
that are to be poured in place. All erosion/sediment control devices should be
maintained and in working order at all times. All slopes that are created or
disturbed by construction activity must be protected against erosion and
sediment transport at all times. The storage of all construction materials and
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 22
equipment must be protected against any potential release of pollutants into
the environment.
X. GRADING NOTES
Geotechnical Exploration, Inc. recommends that we be retained to verify the
actual soil conditions revealed during site grading work and footing excavations to be
as anticipated in this "Report of Preliminary Geotechnical Investigation" for the
project. In addition, the compaction of any fill soils placed during site grading work
must be observed and tested by the soil engineer. It is the responsibility of the
grading contractor to comply with the requirements on the grading plans and the
local grading ordinance. All trench backfill should be properly compacted.
Geotechnical Exploration, Inc. will assume no liability for damage occurring due
to improperly or uncompacted backfill placed without our observation and testing.
XI. LIMITATIONS
Our conclusions and recommendations have been based on available data obtained
from our field investigation and laboratory analysis, as well as our experience with
similar soils and formational materials located in this area of San Diego County. Of
necessity, we must assume a certain degree of continuity between exploratory
excavations. It is, therefore, necessary that all observations, conclusions, and
recommendations be verified at the time grading operations begin or when footing
excavations are placed. In the event discrepancies are noted, additional
recommendations may be issued, if required.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 23
The firm of Geotechnical Exploration, Inc. shall not be held responsible for
changes to the physical condition of the property, such as addition of fill soils or
changing drainage patterns, which occur subsequent to issuance of this report and
the changes are made without our observations, testing, and approval.
The work performed and recommendations presented herein are the result of an
investigation and analysis that meet the contemporary standard of care in our
profession within the County of San Diego. No warranty is provided.
This report should be considered valid for a period of two (2) years, and is subject to
review by our firm following that time. If significant modifications are made to the
building plans, especially with respect to the height and location of any proposed
structures, this report must be presented to us for immediate review and possible
revision.
It must be understood that it is not within the scope of our services to provide quality
control oversight for surface or subsurface drainage construction or retaining wall
sealing and base of wall drain construction. It is the responsibility of the contractor
to verify and provide proper surface drainage at the site, wall sealing, geofabric
installation, protection board (if needed), drain depth below interior floor or yard
surface, pipe percent slope to the outlet, etc.
This firm does not practice or consult in the field of safety engineering. We do not
direct the contractor's operations, and we cannot be responsible for the safety of
personnel other than our own on the site; the safety of others is the responsibility of
the contractor. The contractor should notify the owner if any of the recommended
actions presented herein are considered to be unsafe.
LaBounty Residences Job No. 23-14188
Carlsbad, California Page 24
It is the responsibility of the owner and/or developer to ensure that the
recommendations summarized in this report are carried out in the field operations
and that our recommendations for design of this project are incorporated in the
structural plans. We should be retained to review the project plans once they are
available, to verify that our recommendations are adequately incorporated in them.
Once again, should any questions arise concerning this report, please feel free to
contact the undersigned. Reference to our Job No. 23-14188 will expedite a reply
to your inquiries.
Respectfully submitted,
GEOTECHNICAL EXPLORATION, INC.
_______________________________ ______________________________
Wm. D. Hespeler, G.E. 396 Jay K. Heiser
Senior Geotechnical Engineer Senior Project Geologist
REFERENCES
JOB NO. 23-14188
June 2024
2007 Working Group on California Earthquake Probabilities, 2008, The Uniform California Earthquake Rupture Forecast, Version 2 (UCERF 2), U.S Geological Survey Open-file Report 2007-1437 and
California Geological Survey Special Report 203.
Berger, V. and Schug, D.L., 1991, Probabilistic Evaluation of Seismic Hazard in the San Diego-Tijuana
Metropolitan Region, Environmental Perils, San Diego Region, Geological Society of America by the San
Diego Association of Geologists, October 20, 1991, p. 89-99.
Demere, T.A. 1997, Geology of San Diego County, California, San Diego Natural History Museum,
http://archive.sdnhm.org/research/paleontology/sdgeol.html, accessed July 30, 2020.
Grant Ludwig, L.B. and Shearer, P.M., 2004, Activity of the Offshore Newport-Inglewood Rose Canyon
Fault Zone, Coastal Southern California, from Relocated Microseismicity, Bulletin of the Seismological
Society of America, 94(2), 747-752.
Greene, H.G., Bailey, K.A., Clarke, S.H., Ziony, J.I. and Kennedy, M.P., 1979, Implications of fault
patterns of the inner California continental borderland between San Pedro and San Diego, in Abbott, P.L., and Elliot, W.J., eds., Earthquakes and other perils, San Diego region: San Diego Association of
Geologists, Geological Society of America field trip, November, 1979, p. 21–28.
Hart, E.W. and Bryant, W.A., 1997, Fault-Rupture Hazard Zones in California, California Division of Mines
and Geology, Special Publication 42.
Hart, E.W., Smith, D.P. and Saul, R.B., 1979, Summary Report: Fault Evaluation Program, 1978 Area
(Peninsular Ranges-Salton Trough Region), California Division of Mines and Geology, Open-file Report
79-10 SF, 10.
Jennings, C.W., and Bryant, W.A., 2010, Fault Activity Map of California, California Geological Survey
Geologic Data Map No. 6
Kennedy, M.P. and Tan, S.S., 2007, Geologic Map 30’x60’ Oceanside Quadrangle, California, California
Geological Survey, Department of Conservation.
Legg, M., and Agnew, D., 1979, The 1862 Earthquake in San Diego, in Earthquakes and Other Perils:
San Diego Region (Abbott, P.L., Elliott, W.J., eds.), San Diego Association of Geologists, San Diego, CA
139-141.
Rockwell, T.K., 2010, The Rose Canyon Fault Zone in San Diego, Proceedings of the Fifth International
Conference on Recent Advances in Geotechnical Earthquake Engineering and Soil Dynamics. Paper No.
7.06C.
Rockwell, T.K., Dawson, T.E., Young Ben-Horin, J. and Seitz, G., 2014, A 21-Event, 4,000-Year History
of Surface Ruptures in the Anza Seismic Gap, San Jacinto Fault, and Implications for Long-term
Earthquake Production on a Major Plate Boundary Fault, Pure and Applied Geophysics, v. 172, 1143–
1165 (2015).
Rockwell, T.K., Millman, D.E., McElwain, R.S. and Lamar, D.L., 1985, Study of Seismic Activity by
Trenching Along the Glen Ivy North Fault, Elsinore Fault Zone, Southern California: Lamar-Merifield Technical Report 85-1, U.S.G.S. Contract 14-08-0001-21376, 19 p.
REFERENCES/Page 2
Ross, Z.E., Hauksson E. and Ben-Zion Y., 2017, Abundant Off-fault Seismicity and Orthogonal Structures
in the San Jacinto Fault Zone, Science Advances, 2017; 3(3): e1601946.
Singleton, D.M., Rockwell, T.K., Murbach, D., Murbach, M., Maloney, J., Freeman, T., Levy, Y., 2019,
Late-Holocene Rupture History of the Rose Canyon Fault in Old Town, San Diego: Implications of
Cascading Earthquakes on the Newport-Inglewood-Rose Canyon Fault System, Bulletin of the
Seismological Society of America 109, p. 855-874.
Southern California Earthquake Data Center (SCEDC), 2022, Earthquake Information, Fault Name Index, Division of Geological and Planetary Sciences, California Institute of Technology.
Toppozada, T.R. and Parke, D.L., 1982, Areas Damaged by California Earthquakes, 1900-1949,
California Division of Mines and Geology, Open-file Report. 82-17.
VICINITY MAP
LaBounty Residences
3940 and 3950 Garfield
Carlsbad, CA.
Figure No. I
Job No. 23-14188
SITESITE
Thomas Bros Guide San Diego County pg 1106-D5
Ex
i
s
t
i
n
g
S
t
r
u
c
t
u
r
e
HP
-
4
Ap
p
r
o
x
i
m
a
t
e
L
o
c
a
t
i
o
n
of
E
x
p
l
o
r
a
t
o
r
y
H
a
n
d
p
i
t
HP
-
1
HP
-
3
HP
-
2
HP
-
4
Qa
f
Qo
p
6-
7
Qa
f
Qo
p
6-
7
Ar
t
i
f
i
c
i
a
l
F
i
l
l
G
E
O
L
O
G
I
C
U
N
I
T
S
Ol
d
P
a
r
a
l
i
c
D
e
p
o
s
i
t
s
,
U
n
i
t
s
6
&
7
Qa
f
Qo
p
6-
7
Qa
f
Qo
p
6-
7
Qa
f
Qo
p
6-
7
PL
O
T
P
L
A
N
A
N
D
SI
T
E
S
P
E
C
I
F
I
C
GE
O
L
O
G
I
C
M
A
P
La
B
o
u
n
t
y
R
e
s
i
d
e
n
c
e
s
39
4
0
&
3
9
5
0
G
a
r
f
i
e
l
d
S
t
r
e
e
t
Ca
r
l
s
b
a
d
,
C
A
.
Fi
g
u
r
e
N
o
.
I
I
Jo
b
N
o
.
2
3
-
1
4
1
8
8
L
E
G
E
N
D
23
-
1
4
1
8
8
-
P
.
a
i
RE
F
E
R
E
N
C
E
:
T
h
i
s
P
l
o
t
P
l
a
n
w
a
s
p
r
e
p
a
r
e
d
f
r
o
m
a
n
e
x
i
s
t
i
n
g
TO
P
O
G
R
A
P
H
I
C
S
U
R
V
E
Y
b
y
C
O
F
F
E
Y
E
N
G
I
N
E
E
R
I
N
G
,
I
N
C
.
da
t
e
d
9
/
1
4
/
2
1
a
n
d
f
r
o
m
o
n
-
s
i
t
e
f
i
e
l
d
r
e
c
o
n
n
a
i
s
s
a
n
c
e
pe
r
f
o
r
m
e
d
b
y
G
E
I
.
NO
T
E
:
T
h
i
s
P
l
o
t
P
l
a
n
i
s
n
o
t
t
o
b
e
u
s
e
d
f
o
r
l
e
g
a
l
pu
r
p
o
s
e
s
.
L
o
c
a
t
i
o
n
s
a
n
d
d
i
m
e
n
s
i
o
n
s
a
r
e
a
p
p
r
o
x
i
m
a
t
e
.
Ac
t
u
a
l
p
r
o
p
e
r
t
y
d
i
m
e
n
s
i
o
n
s
a
n
d
l
o
c
a
t
i
o
n
s
o
f
u
t
i
l
i
t
i
e
s
ma
y
b
e
o
b
t
a
i
n
e
d
f
r
o
m
t
h
e
A
p
p
r
o
v
e
d
B
u
i
l
d
i
n
g
P
l
a
n
s
or
t
h
e
“
A
s
-
B
u
i
l
t
”
G
r
a
d
i
n
g
P
l
a
n
s
.
Ju
ly
20
2
4
GARFIELD STREET
N
GR
A
P
H
I
C
S
C
A
L
E
1”
=
2
0
’
(
a
p
p
r
o
x
i
m
a
t
e
)
10
0
10
20
40
30
SE
Q
U
O
I
A
AV
E
N
U
E
SILTY SAND , fine- to medium-grained, withsome roots. Loose to medium dense. Damp. Dark
brown.
FILL (Qaf)
SILTY SAND , fine- to medium-grained. Loose
to medium dense. Damp. Red-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
SILTY-POORLY GRADED SAND , fine- tomedium-grained; poorly cemented. Medium
dense. Damp. Light gray-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
Bottom @ 5'
SM
SM
SM-SP
DE
P
T
H
(
f
e
e
t
)
FIGURE NUMBER
23-14188
GROUNDWATER/ SEEPAGE DEPTH
FIELD DESCRIPTION
AND
CLASSIFICATION
3-13-23
1
2
3
4
5
6
JOB NUMBER
SA
M
P
L
E
HP-1
DATE LOGGED
Not Encountered
DIMENSION & TYPE OF EXCAVATION
SA
M
P
L
E
O
.
D
.
(I
N
C
H
E
S
)
La Bounty Residences
SY
M
B
O
L
BL
O
W
CO
U
N
T
S
/
F
T
.
REVIEWED BY
JKH± 70' Mean Sea Level
IIIa
1
SITE LOCATION
JOB NAME
3940 and 3950 Garfield Street, Carlsbad, CA
PERCHED WATER TABLE
BULK BAG SAMPLE
IN-PLACE SAMPLE
MODIFIED CALIFORNIA SAMPLE
NUCLEAR FIELD DENSITY TEST
STANDARD PENETRATION TEST
WDH
LOGGED BYSURFACE ELEVATION
3' X 3' X 5' Test Pit
DESCRIPTION AND REMARKS
(Grain size, Density, Moisture, Color)
Hand Tools
EQUIPMENT
LOG No.
EX
P
L
O
R
A
T
I
O
N
L
O
G
1
4
1
8
8
L
A
B
O
U
N
T
Y
.
G
P
J
G
E
O
_
E
X
P
L
.
G
D
T
4
/
1
0
/
2
3
(%
)
IN
-
P
L
A
C
E
MO
I
S
T
U
R
E
(
%
)
MA
X
I
M
U
M
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
EX
P
A
N
.
+
CO
N
S
O
L
.
-
DE
N
S
I
T
Y
(%
o
f
M
.
D
.
D
.
)
OP
T
I
M
U
M
MO
I
S
T
U
R
E
(
%
)
IN
-
P
L
A
C
E
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
U.
S
.
C
.
S
.
SILTY SAND , fine- to medium-grained, withsome roots. Loose to medium dense. Damp. Dark
brown.
FILL (Qaf)
SILTY SAND , fine- to medium-grained. Loose
to medium dense. Damp. Red-brown.
OLD PARALIC DEPOSITS (Qop 6-7)-- 15% passing #200 sieve.
SILTY-POORLY GRADED SAND , fine- tomedium-grained; poorly cemented. Medium
dense. Damp. Light gray-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
Bottom @ 7'
103.2
120.97.5
SM
SM
SM-
SP
7.7
DE
P
T
H
(
f
e
e
t
)
FIGURE NUMBER
23-14188
GROUNDWATER/ SEEPAGE DEPTH
FIELD DESCRIPTION
AND
CLASSIFICATION
3-13-23
1
2
3
4
5
6
7
8
JOB NUMBER
SA
M
P
L
E
HP-2
DATE LOGGED
Not Encountered
DIMENSION & TYPE OF EXCAVATION
SA
M
P
L
E
O
.
D
.
(I
N
C
H
E
S
)
La Bounty Residences
SY
M
B
O
L
BL
O
W
CO
U
N
T
S
/
F
T
.
REVIEWED BY
JKH± 65' Mean Sea Level
IIIb
1
SITE LOCATION
JOB NAME
3940 and 3950 Garfield Street, Carlsbad, CA
PERCHED WATER TABLE
BULK BAG SAMPLE
IN-PLACE SAMPLE
MODIFIED CALIFORNIA SAMPLE
NUCLEAR FIELD DENSITY TEST
STANDARD PENETRATION TEST
WDH
LOGGED BYSURFACE ELEVATION
3' X 3' X 7' Test Pit
DESCRIPTION AND REMARKS
(Grain size, Density, Moisture, Color)
Hand Tools
EQUIPMENT
LOG No.
EX
P
L
O
R
A
T
I
O
N
L
O
G
1
4
1
8
8
L
A
B
O
U
N
T
Y
.
G
P
J
G
E
O
_
E
X
P
L
.
G
D
T
4
/
1
0
/
2
3
(%
)
IN
-
P
L
A
C
E
MO
I
S
T
U
R
E
(
%
)
MA
X
I
M
U
M
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
EX
P
A
N
.
+
CO
N
S
O
L
.
-
DE
N
S
I
T
Y
(%
o
f
M
.
D
.
D
.
)
OP
T
I
M
U
M
MO
I
S
T
U
R
E
(
%
)
IN
-
P
L
A
C
E
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
U.
S
.
C
.
S
.
SILTY SAND , fine- to medium-grained, withsome roots. Loose to medium dense. Damp. Dark
brown.
FILL (Qaf)
Hand auger from 3'- 7'.
SILTY SAND , fine- to medium-grained. Looseto medium dense. Damp. Red-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
SILTY-POORLY GRADED SAND , fine- to
medium-grained; poorly cemented. Medium
dense. Damp. Light gray-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
Bottom @ 7'
SM
SM
SM-
SP
DE
P
T
H
(
f
e
e
t
)
FIGURE NUMBER
23-14188
GROUNDWATER/ SEEPAGE DEPTH
FIELD DESCRIPTION
AND
CLASSIFICATION
3-13-23
1
2
3
4
5
6
7
8
JOB NUMBER
SA
M
P
L
E
HP-3
DATE LOGGED
Not Encountered
DIMENSION & TYPE OF EXCAVATION
SA
M
P
L
E
O
.
D
.
(I
N
C
H
E
S
)
La Bounty Residences
SY
M
B
O
L
BL
O
W
CO
U
N
T
S
/
F
T
.
REVIEWED BY
JKH± 65' Mean Sea Level
IIIc
1
SITE LOCATION
JOB NAME
3940 and 3950 Garfield Street, Carlsbad, CA
PERCHED WATER TABLE
BULK BAG SAMPLE
IN-PLACE SAMPLE
MODIFIED CALIFORNIA SAMPLE
NUCLEAR FIELD DENSITY TEST
STANDARD PENETRATION TEST
WDH
LOGGED BYSURFACE ELEVATION
3' X 3' X 7' Test Pit
DESCRIPTION AND REMARKS
(Grain size, Density, Moisture, Color)
Hand Tools, Hand Auger
EQUIPMENT
LOG No.
EX
P
L
O
R
A
T
I
O
N
L
O
G
1
4
1
8
8
L
A
B
O
U
N
T
Y
.
G
P
J
G
E
O
_
E
X
P
L
.
G
D
T
4
/
1
0
/
2
3
(%
)
IN
-
P
L
A
C
E
MO
I
S
T
U
R
E
(
%
)
MA
X
I
M
U
M
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
EX
P
A
N
.
+
CO
N
S
O
L
.
-
DE
N
S
I
T
Y
(%
o
f
M
.
D
.
D
.
)
OP
T
I
M
U
M
MO
I
S
T
U
R
E
(
%
)
IN
-
P
L
A
C
E
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
U.
S
.
C
.
S
.
SILTY SAND , fine- to medium-grained, withsome roots. Loose to medium dense. Damp. Dark
brown.
FILL (Qaf)
SILTY SAND , fine- to medium-grained. Loose
to medium dense. Damp. Red-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
Hand auger from 3'- 7'.
SILTY-POORLY GRADED SAND , fine- to
medium-grained; poorly cemented. Medium
dense. Damp. Light gray-brown.
OLD PARALIC DEPOSITS (Qop 6-7)
Bottom @ 7'
SM
SM
SM-
SP
DE
P
T
H
(
f
e
e
t
)
FIGURE NUMBER
23-14188
GROUNDWATER/ SEEPAGE DEPTH
FIELD DESCRIPTION
AND
CLASSIFICATION
3-13-23
1
2
3
4
5
6
7
8
JOB NUMBER
SA
M
P
L
E
HP-4
DATE LOGGED
Not Encountered
DIMENSION & TYPE OF EXCAVATION
SA
M
P
L
E
O
.
D
.
(I
N
C
H
E
S
)
La Bounty Residences
SY
M
B
O
L
BL
O
W
CO
U
N
T
S
/
F
T
.
REVIEWED BY
JKH± 65' Mean Sea Level
IIId
1
SITE LOCATION
JOB NAME
3940 and 3950 Garfield Street, Carlsbad, CA
PERCHED WATER TABLE
BULK BAG SAMPLE
IN-PLACE SAMPLE
MODIFIED CALIFORNIA SAMPLE
NUCLEAR FIELD DENSITY TEST
STANDARD PENETRATION TEST
WDH
LOGGED BYSURFACE ELEVATION
3' X 3' X 7' Test Pit
DESCRIPTION AND REMARKS
(Grain size, Density, Moisture, Color)
Hand Tools, Hand Auger
EQUIPMENT
LOG No.
EX
P
L
O
R
A
T
I
O
N
L
O
G
1
4
1
8
8
L
A
B
O
U
N
T
Y
.
G
P
J
G
E
O
_
E
X
P
L
.
G
D
T
4
/
1
0
/
2
3
(%
)
IN
-
P
L
A
C
E
MO
I
S
T
U
R
E
(
%
)
MA
X
I
M
U
M
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
EX
P
A
N
.
+
CO
N
S
O
L
.
-
DE
N
S
I
T
Y
(%
o
f
M
.
D
.
D
.
)
OP
T
I
M
U
M
MO
I
S
T
U
R
E
(
%
)
IN
-
P
L
A
C
E
D
R
Y
DE
N
S
I
T
Y
(
p
c
f
)
U.
S
.
C
.
S
.
La
B
o
u
n
t
y
R
e
s
i
d
e
n
c
e
s
39
4
0
&
3
9
5
0
G
a
r
f
i
e
l
d
S
t
r
e
e
t
Ca
r
l
s
b
a
d
,
C
A
.
SI
T
E
Fi
g
u
r
e
N
o
.
I
V
Jo
b
N
o
.
2
3
-
1
4
1
8
8
Ap
r
i
l
2
0
2
3
LA
B
O
U
N
T
Y
-
O
C
-
g
e
o
.
a
i
PA
C
I
F
I
C
OC
E
A
N
EX
C
E
R
P
T
F
R
O
M
Qo
p
Qu
a
r
t
e
n
a
r
y
O
l
d
P
a
r
a
l
i
c
D
e
p
o
s
i
t
s
(
u
n
i
t
6
-
7
)
6-
7
APPENDIX A
UNIFIED SOIL CLASSIFICATION SYSTEM (U.S.C.S.)
SOIL DESCRIPTION
Coarse-grained (More than half of material is larger than a No. 200 sieve)
GRAVELS, CLEAN GRAVELS GW Well-graded gravels, gravel and sand mixtures, little
(More than half of coarse fraction or no fines.
is larger than No. 4 sieve size, but
smaller than 3”) GP Poorly graded gravels, gravel and sand mixtures, little
or no fines.
GRAVELS WITH FINES GC Clay gravels, poorly graded gravel-sand-silt mixtures
SANDS, CLEAN SANDS SW Well-graded sand, gravelly sands, little or no fines
(More than half of coarse fraction
is smaller than a No. 4 sieve) SP Poorly graded sands, gravelly sands, little or no fines.
SANDS WITH FINES SM Silty sands, poorly graded sand and silty mixtures.
SC Clayey sands, poorly graded sand and clay mixtures.
Fine-grained (More than half of material is smaller than a No. 200 sieve)
SILTS AND CLAYS
Liquid Limit Less than 50 ML Inorganic silts and very fine sands, rock flour, sandy silt
and clayey-silt sand mixtures with a slight plasticity
CL Inorganic clays of low to medium plasticity, gravelly
clays, silty clays, lean clays.
OL Organic silts and organic silty clays of low plasticity.
Liquid Limit Greater than 50 MH Inorganic silts, micaceous or diatomaceous fine sandy
or silty soils, elastic silts.
CH Inorganic clays of high plasticity, fat clays.
OH Organic clays of medium to high plasticity.
HIGHLY ORGANIC SOILS PT Peat and other highly organic soils
APPENDIX B
Soluble Sulfate and Chloride
Test Results
L A B O R A T O R Y R E P O R T
Telephone (619) 425-1993 Fax 425-7917 Established 1928
C L A R K S O N L A B O R A T O R Y A N D S U P P L Y I N C.
350 Trousdale Dr. Chula Vista, Ca. 91910 www.clarksonlab.com
A N A L Y T I C A L A N D C O N S U L T I N G C H E M I S T S
Date: March 24, 2023
Purchase Order Number: 23-14188
Sales Order Number: 59070
Account Number: GEOE
To:
*-------------------------------------------------*
Geotechnical Exploration Inc.
7420 Trade Street
San Diego, CA 92121
Attention: Jay Heiser
Laboratory Number: SO9499 Customers Phone: 858-560-0428
Fax: 858-549-1604
Sample Designation:
*-------------------------------------------------*
One soil sample received on 03/17/23 at 1:15pm,
taken from La Bounty 23-14-188 marked as follows:
ANALYSIS: Water Soluble Sulfate (SO4) California Test 417
(Turbidity Method)
Water Soluble Chloride (Cl) California Test 422
(Titration Method)
Sample SO4% Cl%
-------------------------
#1 HP-2@3'0.003 0.004
_________________
Rosa Bernal
RMB/arr