Subject: 2024 Resurfacing Project, Capital Improvement Project No. 6001-24OL
Striping Plans for Arterial Streets
Recommended Action
Support staff’s recommendation to the City Council to approve the striping plans for the 2024
Resurfacing Project on the as a part of the Pavement Management Program.
Background
The City of Carlsbad has an ongoing Pavement Management Program, Capital Improvement
Program No. 6001, that resurfaces and restripes Carlsbad roads to keep streets in top condition,
free of distress and potholes, which lengthens the road’s useful life and saves money in the long
run. While the resurfacing work is being designed, city staff also evaluates the existing
roadways striping and if needed modifies striping to provide additional traffic safety benefits
and address unsafe speeds, which is the number one cause of injury collisions in Carlsbad. The
final list of streets to be included in this bid document is not completed at this time, however,
staff is proposing to include arterial road segments with improved striping design to better
address the needs of the roadway.
Addressing Unsafe Speeds
Speeding has become a bigger problem nationwide in recent years. In Carlsbad, speeding is the
number one contributing factor in injury collisions. Reducing vehicle speed by even five mph
can make a difference in the severity and survivability of collisions. Research shows that
reducing speed limits alone is ineffective in reducing speeding, and slowing down vehicles
requires actual changes to the road.
Travel Lane Widths
Restriping roadways provides an opportunity to adjust existing travel lanes to more appropriate
widths. This adjustment can lead to several benefits, including improved safety, better traffic
flow, and enhanced infrastructure for other modes of transportation, such as wider bike lanes
and buffers. These changes also support the goals of the Sustainable Mobility Plan and the
TRAFFIC SAFETY & MOBILITY
COMMISSION
Aug. 5, 2024 Item #1 Page 1 of 17
Staff Report
Safer Streets Together plan. Below are key points highlighting the advantages and
considerations of optimizing travel lane widths:
• Changing lanes to more appropriate widths encourages drivers to pay more
attention and slow down
• The extra space can then be used to enhance existing bike lanes and safety
buffers between sidewalks, bike lanes and car lanes, where appropriate
• There are national industry guidelines for lane widths, and all our street designs
meet those guidelines
• The lane width is based on several factors, including traffic volume, speed, type
of street and location
• Designing appropriate vehicle lane widths also results in lower long-term
maintenance costs for the city’s pavement infrastructure and creates improved
flow of traffic with less delay at traffic signals and improved opportunities for
cars turning right
Road Segments with Proposed Revised Striping
As shown in Exhibit 1 and Exhibit 2, the following arterial segments that will be resurfaced and
restriped with enhanced bicycle lanes as described above:
Street Segments:
• El Camino Real between Interstate 5 and Marron Road
• Eastbound lanes of Palomar Airport Road between Paseo Del Norte and El
Camino Real
• El Camino Real between Levante Street and Encinitas City Limits
Next Steps
Following the Traffic Safety & Mobility Commission’s review, staff will finalize the project
construction plans and specifications. Later this fall 2024, staff will present a report to the
Traffic Safety and Mobility Commission and City Council recommending approval of the project
plans and specifications and authorization for the City Clerk to advertise for construction bids.
After the bidding process is complete, staff will return to the City Council with a
recommendation to award a construction contract to the lowest responsive and responsible
bidder. The construction is targeted to begin in Spring 2025 and complete by Summer 2025.
Public Notification
This item was noticed in keeping with the Ralph M. Brown Act and it was available for public
viewing and review at least 72 hours before the scheduled meeting date.
Exhibits
1. Location Map for the 2024 Resurfacing Project
2. Striping Plans
Aug. 5, 2024 Item #1 Page 2 of 17
OLIVENHAIN RD
E
L
CO
C
H
E
S
DE LOS
AC
E
R
V
O
BARCE LONA
IO
D
R
CALLE TIMITEO
PALOM A RAIRPO RT RD
L A COSTAAV
P O I N S E T T I A L N
M
E
L
R
O
S
E
D
R
C
A
R
L
S
B
A
D
B
L
C A R LS B A D V IL LAGEDR
R A N CHOSANTAFERD
AVIARAPY
C
O
L
L
E
G
E
BL
ALGA RD
CANNONRD
XA
N
A
W
Y
MICA RD
PAL
A
C
PA
S
E
O
D
E
L
N
O
R
T
E
RE
A
L
LA G
O
L
O
N
D
R
I
N
A
S
T
AVENIDACIRUELA
LEVANTE ST
GALI
C
I
A
W
Y
CALLE
E
L
F
U
E
R
T
E
S
T
EL
F
U
E
R
T
E
S
T
CAD
E
N
C
I
A
S
T
TAM
A
R
A
C
K
A
V
BATIQUITOS DR
FARADAY AV
H
A
R
D
I
N
G
S
T
CALLE
TH
E
C
R
O
S
S
I
N
G
S
D
R
CAMINO
SEGOVIA WY
BRESSI R
A
N
C
H
W
Y
EL C
A
M
I
N
O
COLIBRI LN
C
A
M
I
N
O
R
E
A
L
P
A
S
E
O
D
E
L
N
O
R
T
E
RANC
H
O
S
A
N
T
A
F
E
R
D
LOCATION MAP
PROJECT NAME PROJECTNUMBER6001-24OL
EXHIBIT12024 Resurfacing Project
Created By: Andy Chang 8/1/2024 Z:\Eric_Zielke\Pavement\CIP6001_Webapp\LocationMap_Overlay2024_TempRevision_08-01-24.mxd
$!Å NOT TOSCALE
Exhibit 1
Legend
2024 Resurfacing Project
Aug. 5, 2024 Item #1 Page 3 of 17
-1· I
-
~ I
\
\
/ J I
"
•;,
..
• '
)
1""
•
,
~
-
-
I I I -1
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
VICINITY MAP
SIGNING AND STRIPING NOTES
2024 OVERLAY PROJECT
CITY OF CARLSBAD
CARLSBAD, CALIFORNIA
CONTRACT NO. XXXX-XXXX
FOR
SHEET INDEX
WORK TO BE DONE
PROJECT LOCATION
CITY COUNCIL
DETAIL A - BIKE LANE SYMBOL
AND ARROW MARKING
SIGN LEGEND
“”“”“”
“”
“”
DETAIL F - BIKE SHARROW
WITH GREEN PAINT
01
DETAIL B - CONTINENTAL
CROSSWALK MARKINGS
DETAIL C-GREEN BIKE LANE SKIP
DETAIL E-GREEN BIKE LANE SKIP AT CURB
DETAIL D-GREEN BIKE LANE SKIP WITH 6" LINE
GENERAL NOTES
DETAIL G - STRIPING AT INTESECTIONS
DETAIL H - SPEED CUSHION MARKINGS
DETAIL I - SPEED CUSHION MARKINGS
DETAIL J - PARKING SPACE MARKING
DETAIL K - PARKING SPACE MARKING
END
Exhibit 2
Aug. 5, 2024 Item #1 Page 4 of 17
THE SIGNING AND STRIPING WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF
CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER.
1 . CARLSBAD MUNICIPAL CODE
2. CITY OF CARLSBAD ENGINEERING STANDARDS
3. THIS SET OF PLANS
4. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN
BOOK).
5. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY
THE CITY OF CARLSBAD STANDARDS.
6. THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
MUTCD).
7. CALTRANS STANDARD PLANS.
8. CALTRANS STANDARD SPECIFICATIONS.
SHEET NO
1
DESCRIPTION
TITLE SHEET
OVERLAY BOUNDARY 2-6
7-16 SIGNING & STRIPING PLANS
(CA
THIS PROJECT IS LOCATED ON VARIOUS RESIDENTIAL STREETS AND CORRIDORS
THROUGHOUT THE CITY OF CARLSBAD
1. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL SIGNING AND
STRIPING.
2. ALL SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL CONFORM TO THE
CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST
VERSION), THE CALTRANS STANDARD PLANS AND SPECIFICATIONS (LATEST
VERSION), THESE PLANS AND THE SPECIAL PROVISIONS.
3. ALL SIGNING AND STRIPING IS SUBJECT TO THE APPROVAL OF THE
TRANSPORTATION DIRECTOR OR THEIR REPRESENTATIVE, PRIOR TO
INSTALLATION.
4. ANY DEVIATION FROM THESE SIGNING AND STRIPING PLANS SHALL BE
APPROVED BY THE TRANSPORTATION DIRECTOR OR THEIR REPRESENTATIVE
PRIOR TO ANY CHANGE IN THE FIELD.
5. ALL STRIPING SHALL BE REFLECTIVE PER CALTRANS SPECIFICATIONS.
STRIPING SHALL BE REPAINTED TWO WEEKS AFTER INITIAL PAINTING.
6. ALL PERMANENT SIGNAGE SHALL BE REFLECTIVE PER ASTM DESIGNATION
D4956 AND SHALL USE TYPE IV PRISMATIC REFLECTIVE SHEETING (HIGH
INTENSITY PRISMATIC OR EQUAL) UNLESS OTHERWISE SPECIFIED. R1-1
STOP , R1-2 YIELD , R2-1 SPEED LIMIT AND STREET NAME SIGNS SHALL
USE TYPE IX PRISMATIC CUBE-CORNER REFLECTIVE SHEETING (DIAMOND
GRADE VIP DR EQUAL).
7. PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL STREET
STRIPING AND MARKINGS WITHIN A 500' PERIMETER OF THE CONSTRUCTION
PROJECT WILL BE RESTORED TO A LIKE NEW CONDITION, IN A MANNER
MEETING THE APPROVAL OF THE CITY INSPECTOR.
8. EXACT LOCATION OF STRIPING AND STOP LIMIT LINES SHALL BE APPROVED
BY THE TRANSPORTATION DIRECTOR OR THEIR REPRESENTATIVE PRIOR TO
INSTALLATION.
9. CONTRACTOR SHALL REMOVE ALL CONFLICTING PAINTED LINES, MARKINGS AND
PAVEMENT LEGENDS BY GRINDING. DEBRIS SHALL BE PROMPTLY REMOVED BY
THE CONTRACTOR.
10. ALL PAVEMENT LEGENDS SHALL BE THE LATEST VERSION OF THE CALTRANS
STENCILS.
11. LIMIT LINES AND CROSSWALKS SHALL BE FIELD LOCATED. CROSSWALKS SHALL
BE HIGH VISIBILITY CONTINENTAL STYLE AND SHALL HAVE 10' INSIDE
DIMENSION UNLESS OTHERWISE SPECIFIED. CONTINENTAL CROSSWALK
MARKINGS SHALL BE PARALLEL TO THE DIRECTION OF VEHICULAR TRAVEL.
12. ALL CROSSWALKS, LIMIT LINES, STOP BARS, PAVEMENT ARROWS AND
PAVEMENT LEGENDS SHALL BE THERMOPLASTIC UNLESS OTHERWISE SPECIFIED.
PREFORMED THERMOPLASTIC ARROWS AND LEGENDS SHALL NOT BE ACCEPTABLE.
13. ALL BIKE LANE LEGENDS SHALL BE HELMETED BICYCLIST SYMBOL AND ARROW
PER CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FIGURE
9C-3 AND PAINTED, UNLESS OTHERWISE SPECIFIED.
14. SIZE OF SIGNS SHALL BE BASED UPON THE RECOMMENDED SIGN SIZES FOUND
IN THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES UNLESS
OTHERWISE SPECIFIED.
15. SIGN POSTS SHALL BE SQUARE PERFORATED STEEL TUBING WITH BREAKAWAY
BASE PER SAN DIEGO REGIONAL STANDARD DRAWING M-45.
16. WHEN A SIGN IS ATTACHED TO A POLE, IT SHALL BE MOUNTED USING A
STANDARD CITY OF CARLSBAD APPROVED MOUNTING BRACKET WITH STRAPS.
17. EXISTING SIGNS REMOVED BY THE CONTRACTOR SHALL BE DELIVERED BY THE
CONTRACTOR TO THE CITY OF CARLSBAD PUBLIC WORKS YARD AT 405 OAK
AVENUE.
18. ALL SIGNS SHOWN ON THESE PLANS SHALL BE NEW SIGNS PROVIDED AND
INSTALLED BY THE CONTRACTOR EXCEPT THOSE SIGNS SPECIFICALLY SHOWN
AS EXISTING TO BE RELOCATED OR TO REMAIN.
19. FIRE HYDRANT PAVEMENT MARKERS SHALL CONFORM TO THE CALIFORNIA MUTCD
AND SAN DIEGO REGIONAL STANDARD DRAWING M-19.
20.ALL NEW AND RELOCATED SIGNS SHALL BE CLEARLY VISIBLE, NOT BLOCKED
BY ANY OBSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO TRIM OR REMOVE
ANY VEGETATION BLOCKING THE NEW AND RELOCATED SIGNS.
Michael Baker
INTERNATIONAL
1. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES IN THE
2.
3.
4.
ROADWAY AND RAISE TO FINISHED GRADE PER SPECIFICATION SECTION
302-5.8. THE CONTRACTOR MUST LOCATE, SURVEY, AND RECORD
LOCATIONS OF ALL APPURTENANCES IN THE ROADWAY INCLUDING, BUT
NOT LIMITED TO, MANHOLES, ACCESS HOLES, VALVE BOXES,
BLOWOFFS, AIR RELEASES, SEWER CLEANOUTS, AND SURVEY MONUMENT
BOXES.
THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND
FACILITIES SHOWN ON THE CONSTRUCTION PLANS WERE OBTAINED BY A
SEARCH OF AVAILABLE RECORDS. ATTENTION IS CALLED TO THE
POSSIBLE EXISTENCE OF OTHER UTILITY FACILITIES OR STRUCTURES
NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE
PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY
MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY
OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN.
THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING
FACILITIES (ABOVE GROUND AND UNDERGROUND) WITHIN THE PROJECT
SITE SUFFICIENTLY AHEAD OF WORK.
THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE
BELOW) AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING
NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A
COMPANY REPRESENTATIVE.
UNDERGROUND SERVICE ALTER
SDG&E
AT&T
TIME WARNER CABLE
COX COMMUNICATIONS
CITY OF CARLSBAD(STREETS & STORM DRAIN)
*CITY OF CARLSBAD(SEWER,WATER &
RECLAIMED WATER)
811
( 800 )411-7343
(800)892-0123
(760)438-7741
(619)262-1122
(760)434-2980
(760)438-2722
(760)633-2650
(760)753-0155
(760)744-0460
(760)753-6466
*SAN DIEGUITO WATER DISTRICT
*LEUCADIA WASTEWATER DISTRICT
*VALLECITOS WATER DISTRICT
*OLIVENHAIN WATER DISTRICT
*BUENA SANITATION DISTRICT (760)726-1340X1330
z -:::;;
" a
*AS APPROPRIATE
NOT TO SCALE
OPTIONAL LEFT _,, A
TURN ARROW USE ~ 7 1 \..:,,_
(PER PLAN) / /
72" 72"
NOT TO SCALE
24" WHITE OR YELLOW----
THERMOPLASTIC
.
st
GUTTER
72"
12" LIMIT LINE I
NOT TO SCALE
4' 8' 4' 8' 4'
GREEN PAINT
(TYP)
6" WHITE SKIP
(TYP)
NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD
FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN
(34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F
TYPE I & II.
CITY OF
CARLSBAD
KEITH BLACKBURN -MAYOR
PRIYA BHAT-PATEL -MAYOR PRO TEM
MELANIE BURKHOLDER -COUNCIL MEMBER
TERESA ACOSTA -COUNCIL MEMBER
CAROLYN LUNA -COUNCIL MEMBER
SCOTT CHADWICK
CITY MANAGER
PAZ GOMEZ
DEPUTY CITY MANAGER
NOT TO SCALE
I 4' I 8' I 4' I 8' I
I
4' I
~ --!lll■~------------~~!1111■6■.■W■H■I ■TE----~
"" SOLID (TYP)
-~---""-GREEN PA~6" WHITE 111S■KI■P-■
(TYP) (TYP)
NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD
FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN
(34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F
TYPE I & II.
NOT TO SCALE
4' 8' 4' 8' 4'
-~
ll\_6"WHITE
z <(
_J
[L ~GREEN PAINT SKIP (TYP) a:: (TYP) w [L
\
\_ LIP OF GUTTER
STRIPING NOTE: GREEN PAINT SHALL STOP AT LIP OF GUTTER.
NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD
FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN
(34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F TYPE
I & II.
NOT TO SCALE
" <D
12'
.,__--i--GREEN PAINT
(TYP)
SHARED ROADWAY
BICYCLE MARKING
PER CALTRANS
STD PLAN A24C.
NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD
FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN
(34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F
TYPE I & II.
/ DETAIJ DETAIL 2
FACE OF
CURB
50' PER PLAN
NOT TO SCALE
VAR 40' TO 60'
/DETAIL 22
50'
FACE OF
CURB
s.2s· VAR a.so· ~
TO 18.50' " N
7' 0LO VAR 8.50' 5.
" TO 18.50'
FACE OF\ CURB
BIKE LANE OR RIGHT
EDGE LINE STRIPING
4" WHITE STRIPE
N
NOT TO SCALE
VAR 23' TO 30'
1" DEEP GRIND
7' ;,, VAR 7.25'
,-.. TO 21.25'
N
NOT TO SCALE
(SEE PLANS)
FACE OF
CURB
D IRE CT I ON OF
TRAVEL
4" WHITE STRIPE
r::::::=EXISTING FACE OF CURB
4"
CITY OF OCEANSIDE
HIGHWAY 78
PACIFIC
OCEAN
" -
BEGIN RIGHT TURN LANE
~ YIELD TO BIKES
R4-4
36"X30"
W4-2R
36"X36"
l\JRNING ,..
1,{HIC\.£S
'(/ro
R10-15(MOD)
30"X30"
1 '
I -
~
WHITE STRIPE
0
V\_
CITY OF ENCINITAS
Giff LAN TURNS RIGHr
AHEAD
W73A(CA)
36"X36"
W9-1R
36"X36"
W74(CA)
36"X36"
c5l€J BIKE LANE
W81(CA)
12"X8"
NOT TO SCALE
DIRECTION OF
TRAVEL
2'
I
22'
NOT TO SCALE
CITY OF VISTA
(
RIGHT LANE
MUST
TURN RIGHT
R3-7
36"X36"
W81 B(CA)
8"X5"
~c
)
4" WHITE STRIPE
"AS BU I LT"
P.E. __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
f"sHml CITY OF CARLSBAD I SHEETS I
t----+----+----------------+----,r---+----+----1 L__j ENGINEERING DEPARTMENT
l----+----+----------------+----11----+--+----I
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
IMPROVEMENT PLANS FOR:
ROW TITLE SHEET
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
>--0-TH_E_R_A~P-PR_O_VA-L-+--C-IT_Y_A~PP_R_OV_A_L ... CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~
<(
F z
<(
::;;:
<( en
[L
0 a::
F <(
_J
~ 0
0
I -a
I
O>
LO ,-..
O> ro
/ >-<(
_J a:: w > 0
st N a
? n. en z
<(
~
0
0
<(
;;;!, en w u > a:: w en
"' z
f--LI.. <( a::
0
0
<( u ~ :::,
<Cl
O> LO ,-..
O> ro
/ <(
f--
<(
0 n. ;:::-
0
0 a::
7 -en LI. -<(
u _J a::
<( u / m :::, :r: -<(
~ z <( ;;;-
/
35
35
35
30
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
08
EL CAMINO REAL
LEGEND:
Aug. 5, 2024 Item #1 Page 5 of 17
I 55 6.5'X29'
a. '---11---r--i I ~
--
u. u. 0
m z
'9 -
I
-t0.----.-o.----v .----.------..... ..---.----........, .._,, .._,, .._,, .._,, ...._,,
I
Michael Baker
INTERNATIONAL
EL CAMINO REAL
548' 9
114' 38
120' SHIFT TAPER
--
50' FROM
ECR
-
----
®
APPROX.50'
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 9.
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
------
@ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22.
@ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
@ INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40.
--
@]) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 5' SPACING.
--
@) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET
1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 35' SPACING.
@) INSTALL SHARED ROADWAY BICYCLE MARKING WITH GREEN PAINT PER DETAIL "F" ON SHEET 1.
@ PAINT MEDIAN NOSE YELLOW.
@ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
(@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS.
@) INSTALL SPEED PAVEMENT LEGEND ( "25" UNLESS OTHERWISE NOTED) (THERMOPLASTIC) .
81NSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL TYPE VI ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@) INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
@ INSTALL WHITE YIELD LINE PER CALTRANS STD PLAN A24G.
EL CAMINO REAL
►
►
( 12' )
12'
<]
--R/C
D
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
4020 0 40 80 120 I ~--1 __ 1 I
SCALE: 1 "=40 '
~ ~
IVL
485' 9
486' 9
----------
~~~~;1 ~}:f ,!!'!!'!~~9~_;5~•x~2~0:o' 55 IVL
-~ 58' WITHIN LIMITS OF RP
MILL AND OVERLAY
- - - --
:J
SCALE 1 "'40 '
52
8'
-';-
\~ 11 '
11 '
11 ' CD
w 10· w
10' (/)
I
w z .....
\• ~
~ :::i:
106' 38
\
JiCL:._____
"AS BU I LT"
P.E. __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
[s"Hml CITY OF CARLSBAD I SHEETS I
1---+------t------------------t---i---------t------r------i L__j ENGINEERING DEPARTMENT
1---+---+----------------t---t------t----t------J
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
,_O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_O_VA_L_, CHKD BY: ---)()()()(-)()()()( . xxx-x ---------------
<{
~ z
<{
:;;
<{
(f)
0.. 0
0:::
~
<{
_J
"' ,?;
0
0
0..
I co
0
I
O> "' r--
0> co
/ >-<{
_J
0::: w > 0
...-N
0
?
0.. (f)
z
<{
~
0
0
<{
;;;!,
(f) w u > 0::: w
(f)
"' z
f--c_
<{
0:::
0
0
<{ u ~ :::,
.,:I
O> "' r--
0> co
/ <{ f--
<{
0
0.. ;:::-
0
0
0:::
7 -(f) c_ -<{
u _J
0:::
<{ u / m :::, :r: -<{
~ z <{ ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
09
EL CAMINO REAL
LEGEND:
Aug. 5, 2024 Item #1 Page 6 of 17
200' TO BCR
'X77'
00 I
0
I-w w I en
w 12.5' w en
w z ......
_J
I ()
I-< ~I
\
Michael Baker
INTERNATIONAL
@ APPROX . 1 00 '
--
I
I
I
I
I
WITHIN LIMITS OF MILL AND OVERLAY
(11.5')
( 11 ' )
( 11 ')
zoo' TO BCR @ APPROX. 100'
38 194'
:?:117' /®TY
~ ,z~ €3
-----t>-
1
--
100' 39
50' FROM ECR
@
APPROX.50'
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@) INSTALL CHANNELIZING LI NE PER CA MUTCD, DET 38.
@) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
@ INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40.
--t>--
@) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON
SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
@ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 35' SPACING.
@ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING.
@ PAINT MEDIAN NOSE YELLOW.
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT
MARKERS.
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
<]
--R/C
D
7 7 7
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
'\. ( 12')
I I I ~f 7. 5. !~~-I I I I I I "-
-c11·i_ I I J J
(11') --( 12' ) -
(11.5') l! ~
( 11 ' ) ~ -= -~ -4-( 11 ' ) ~ ~ (3') -~ \8') 3--
-~ (3')(8') 2 2
~ 2 2 ~ -~ ( 11 ' )
~ ii ( 11 ' )
~ ~ ~ ( 11 ' )
( 18')
( 11 ')
( 11 ' )
(11')-
:;i... i3') (8')
I I I If I
------
-~ ----
lo ..... --..g
I-w w I en
w w en
w z ......
_J :::c
a,.. -
()
I-< ,~
"AS BU I LT"
P.E, __ _ EXP, ___ _ DATE
REVIEWED BY:
INSPECTOR DATE MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
[s"Hml CITY OF CARLSBAD I SHEETS I
~=====;====t================================t====j~====t=====1====j L__j ENGINEERING DEPARTMENT
l---l---+-----------------1------l-----l----l------1 IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
40 20 0 40 80 120 l~~~--1 _ __J1----11
SCALE: 1 "=40 '
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: ---11 PROJECT NO. I DRAWING NO.
f---O_TH_E_R_A..1.PP_R_OV_A_L-+--C-IT-Y _A.i.PP-'-R--'-OV--'-A=-L--,1 CHKD BY: . -~--XXXX __ -XXXX ____ ,_ L _x_x_x_-_x__,
<{
~ z
<{
:;;
<{
(f)
0.. 0
0:::
~
<{
_J
"' ,?;
0
0
0.. I m
0 I m "' r--m ro
/ >-<{
_J
0::: w > 0
...-N
0
?
0.. (f)
z
<{
~
0
0
<{
;;;!,
(f) w u > 0::: w
(f)
"' z
f--c_
<{
0:::
0
0
<{ u ~ :::,
.,:I
m "' r--m ro
/ <{ f--
<{
0
0.. ;:::-
0
0
0:::
7 -(f)
LI. -<{
u _J
0:::
<{ u / m :::, :r: -<{
~ z <{ ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
10
EL CAMINO REAL
LEGEND:
Aug. 5, 2024 Item #1 Page 7 of 17
ml EL CAMINO REAL
0
1-w l========~-~~~=====================(3. l,03_') W (11')
I (11')
(/)~ 1 ( 11 ' )
(/)
wzl I (11')
( 11 ' )
:J (11') o l======================::::;3--::==_~=======<3• \5•) 1-
:i I
@
APPROX. 50' 50' FROM ECR
I EL CAMINO REAL
> (3' )1~~===~~~================~'=4~ wt= (B') -~
0 (11')
' 8'
11 '
11 ' ID -
<C (11')
-~(/)1 (11') -11·~
WITHIN LIMITS OF MILL AND OVERLAY RP ____ ,, -----------------T-~~=~~~~~~:::::::::110~·¾
----------I I -l--?-------,--~11~' _-2.__-F--i W (11') -<]-----~-~-~ (11') ---
_J -<]1----1---~ -
(8.) -( 12') -( 12' ) ---( 12' ) --( 10')
10' --(12')
-~-\-f'>
I (11') ~ ~( 3' )i( 8:::;:, -:;::.) =====~===='="¥=~ /)'_i= _= _=_ =_;:j.L == -f;_!,-. ~!'!:. ="./-=~=~
= -.-l,Y> (12') -(8') __ _ xw .
<C -
~
I
Michael Baker
INTERNATIONAL
'-l---.a..&.J../'.1...1 .......... .....,~~!!,,!,,,._ ........ /c===~--
' ~,,.,\\\\\\\ -~~·
IVL 54'
(@ APPROX.100' 215' TOP BCR
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22.
@ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
@ INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A.
16'
16
\ ~·
~~ 0
@) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON
SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING.
@ PAINT MEDIAN NOSE YELLOW.
@ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
(@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT
MARKERS.
SINSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INST ALL CONT I NENT AL CROSSWALK ( WH !TE ) , SEE DETAIL "B" ON SHEET 1 .
►
►
( 12')
12·
<l
--R/C -
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
40 20 0 40 80 120 1-~f----1 __ 1--1
SCALE: 1 "=40 '
I
I
"AS BU I LT"
P.E. __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
fsHml CITY OF CARLSBAD I SHEETS I 1----+---+----------------t----ii-----t----t----, L__j ENGINEERING DEPARTMENT
1----+--+--------------+----t--t-----t-----i
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
,_O_TH_E_R_A__,P-PR-0-VA_L_.__C_IT_Y_A~PP_R_O_VA_L_, CHKD BY: ---L ___ XXXX __ -_XXXX ___ ~., _x_x_x_-_x_
.. -... N 0 ~ LO
.::;:_ ,..._
<(
i!: z <( ::;:
<(
(f)
a. 0
D:'. i!:
<(
...J
(') ,::
0
0 a.
I
0
I
O>
LO ,..._
O> ro
/ >-<(
...J D:'. w > 0 ... N
0
? a. (f) z
<(
~
0
0
<(
;;;!,
(f) w u > D:'. w
(f)
(') z
f-l,_
<(
D:'.
0
0
<( u ~ :::,
<(I
O> LO ,..._
O> ro
/ <(
f---
<(
0 a. ;:::-
0
0 D:'.
7 -(f) c_ -<(
u ...J
D:'.
<( u / m :::, :r: -<(
~ z <(
;;].
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
LEGEND:
12
PALOMAR AIRPORT RD
Aug. 5, 2024 Item #1 Page 8 of 17
as
I
BB
73
39' 68
IVR
~ 52
0 z
-I w C
0 w en ~ -0
---------------10'
------•--==========d:-~73
' !
,I
-
I
YIII
-0
11
I 26169'
9 166'
• --'t. ------------~ -
-"' 0
~
~ (l.. ~
®
PALOMAR AIRPORT RD
~
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 9.
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL LEFT EDGE LINE RPMS PER CA MUTCD, DET 26.
@) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
@ INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40.
@) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION 8) AND DETAIL "A" ON
SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "c" ON SHEET 1.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@ PAINT MEDIAN NOSE YELLOW.
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@rNTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INST ALL 12" THERMOPLAST I C WH !TE LI MIT LI NE .
@:'.) REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS.
@ INST ALL CONT I NENT AL CROSSWALK ( WH I TE ) , SEE DETAIL "8" ON SHEET 1 .
----I") : -: -J g
; -; ----~ ~ --
~ ----~=---·--------------------------------------=~~:--,~
~=========;;;;;;;;;::::::~==============~~~::::::::::::::::::=.------------...-7iii--1rrr-=--=---==----==------.-------~--------~ (/) --------®"= '
11111111111111111
I ~ ~ I
I
I
I I
I
I
I
Michael Baker
INTERNATIONAL
TYP 63 52
►
►
( 12' )
12'
<l
--R/C -
6.5'-11 ·x200· 60
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
z ,____. @I TYP 63
0 .. II ' -w _J < u en
"AS BU I LT"
40 20 0 40 80 120 P.E. __ _ EXP. ___ _ DATE
I ~f----1 __ 1----;1 REVIEWED BY:
SCALE: 1 "=40 '
INSPECTOR DATE
[s"Hml CITY OF CARLSBAD I SHEETS I
t----+----+----------------+-----,r----+----+-----1 L__j ENGINEERING DEPARTMENT
l----+----+----------------+----11----+--+----I
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
.,_O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L .... CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~.• _x_x_x_-_x~
2
<(
r0
0 .. -... N 0 ~ LO
"-r---
<(
i!: z <(
2
<(
(f)
0. 0
D:'. i!:
<(
...J
(') ,::
0
0
0.
I N
I
O>
LO r---
0> ro
/ >-<(
...J D:'. w > 0 ... N
0
?
0. (f) z
<(
~
0
0
<(
;;;!,
(f) w u > D:'. w
(f)
(') z
f---LI. <(
D:'.
0
0
<( u ~ :::,
<(I
O> LO r---
0> ro
/ <(
f---
<(
0
0. ;:::-
0
0 D:'.
7 -(f) LI. -<(
u ...J
D:'.
<( u / m :::, :r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
13
LEGEND:
PALOMAR AIRPORT RD
Aug. 5, 2024 Item #1 Page 9 of 17
-
I
--------------------
-----I -
52
Michael Baker
INTERNATIONAL
.,......._ .,......._ .,......._ .,......._
52 571 ' 12
135' SHIFT TAPER
26B' 38
WITHIN LIMITS OF RP
MILL AND OVERLAY
26' 29
52
" " " "' " --"' ~ I~ II
PALOMAR AIRPORT RD -----
TYP 53
----
-------
1276' 39
52
WITHIN LIMITS OF MILL AND OVERLAY RP
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29.
@ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@)
@)
INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION 8)
AND DETAIL "A" ON SHEET 1. SPACE MARK I NGS APPROX I MA TEL Y 300 ' FROM EACH OTHER . @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN.
@ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING.
@ PAINT MEDIAN NOSE YELLOW.
@) INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC),
@ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING
RAISED PAVEMENT MARKERS.
@) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
SINSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "8" ON SHEET 1.
►
►
( 12')
12'
<l
--R/C -
---------------:it-
11
~ ~ ~
"
0 0 N
~ ~ ~
52
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
11 '
3'
B'
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
\
-------------•=--a --• -• -• • ----------\
0 1f '
I~
1; _w
I -1;
(/)
I
w z .....
_J
I ,.,. (.)
I-
<(
52 I~
"AS BU I LT"
P.E. EXP. 40 20 0 40 80 120 DATE
I ~ I I I REVIEWED BY:
SCALE: 1"=40'
INSPECTOR DATE
fsHml CITY OF CARLSBAD I SHEETS I
1----1----+-----------------1------1---+--+------I L__j ENGINEERING DEPARTMENT
1---1---+----------------l-------l---+---+------I
1----l-----+-----------------1------1---+--+------1 IMPROVEMENT PLANS FOR:
l-----l-----+-----------------1------1---+--+------1 ~R=O=W=======S=IG::::N::::IN:::::G::::::=&::::S:::T:::::R:::::IP::::IN=G=P=L=A=NS========:
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
....._D_ATE_~IN_ITI_A_L_,__DA_T_E~_IN_ITI_A_L_, I RVWD BY: ---11 PROJECT NO. I DRAWING NO.
OTHER APPROVAL CITY APPROVAL CHKD BY: ....._ __ XXXX __ -XXXX ____ ,.L _x_x_x_-_x__,
.. -
" N 0 ~ LO
.::;:_
r----
<(
i!: z <(
::;:
<(
(f)
o_
0
D:'. i!:
<(
...J
(') ,::
0
0 o_
I "' I
O>
LO r----
0> ro
/ >-<(
...J D:'. w > 0
" N
0
? o_
(f) z
<(
~
0
0
<(
;;;!,
(f) w u > D:'. w
(f)
(') z
f---c_
<(
D:'.
0
0
<( u ~ :::,
<(I
O> LO r----
0> ro
/ <(
f---
<(
0 o_ ;:::-
0
0 D:'.
7 -(f) c_ -<( u ...J
D:'.
<( u / m :::, :r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
LEGEND:
PALOMAR AIRPORT RD
14
Aug. 5, 2024 Item #1 Page 10 of 17
ll
a:::
C
en
(!)
7'X50 z -25 1. I en . . -en . o I . co 0 r--0 0 Cl co i -----I .
X 0 0 CIC a.. a.. w < ® :::c I-
MATCHLINE -MIDDLE RIGHT
--
217' 38
~' ------t!) ------~ --------------w ---\\ ----
'cl --(fl -\ --~
r'. 87' 39 ,,i.O i ,~2,0' ,\l.t--t-lS
Michael Baker
INTERNATIONAL
c:, )t -
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22.
@) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
@INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A.
@ PAINT MEDIAN NOSE YELLOW.
@) INST ALL "AHEAD" PAVEMENT LEGEND ( THERMOPLAST IC) ,
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
@ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL
"A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
® REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED
PAVEMENT MARKERS.
@) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
-
--
(8.)
( 12')
( 12') ----(12')
MATCHLINE SEE ABOVE LEFT
--.:-r:-~l ,__
ffl 253' 38
z -~ ~ i a:::
1-0 C
I I I I I I 1: I I I
-jg] xw _ l--Ll-!bl---
-?s-@ ----. . ----------1---1-------
• 11111 LL 9'
'
I " ':-:--::-!-~ .-..-O -ro
111-=--=--=-11
w
(!) w
...I C a~
52
--( 12')
( 12')
( 12')
( 11' )
-
@ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "C" ON SHEET 1.
@ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING .
PALOMAR AIRPORi RD
---II --!II
II
" -------
801' 12
TYP 53
WITHIN LIMITS OF RP
MILL AND OVERLAY
a.aAD A\RPORi RD pA\.0IW"I'
0
I I I I I I I I I I I I I I I I I I
-----10·
10'
------
.5'-6.5'X90'
-
73
--
WITHIN LIMITS OF RP
MILL AND OVERLAY
~ EXISTING SIGN (ONE POST)
~ NEW SIGN
(12') EXISTING WIDTH
12'
<]
--R/C -
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
1 ®7
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
------------------------
52
-------
------
52
"AS BU I LT"
40 20 0 40 80 120 P.E. __ _ EXP. ___ _
~I ~~f----1 __ 1----;1 REVIEWED BY:
SCALE: 1 "=40 '
INSPECTOR
I
'~ .....
I-w w ::r: -, (/)
m
I
w z .....
~ I-
<( ,~
DATE
DATE
t----+---+--------------+----+---+----+----t LJ CITEllN~!NG ~~~~~N~AD I SHEETS I
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
.,_O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L .... CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~
2
<(
LO
0
... N 0 ~ LO
"-r--
<(
i!: z <(
2
<(
(f)
a.. 0
CIC i!:
<(
...J
(') ,::
0
0 o_
I ... -I
O>
LO r--
0> co
/ >-< ...J
CIC w > 0 ... N
0
? o_
(f) z
<(
~
0
0
<(
;;;!,
(f) w u > CIC w
(f)
(') z
f---c_
<(
CIC
0
0
<( u ~ :::,
<I
O> LO r--
0> co
/ <(
f---
<(
0 o_ ;:::-
0
0
CIC
7 -(f) c_ -<( u ...J
CIC
<( u / m :::, :r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
1515
LEGEND:
PALOMAR AIRPORT RD
Aug. 5, 2024 Item #1 Page 11 of 17
\
PALOMAR AIRPORT RD
I
vJ
~IE~~~~=~~=~~=~~~~~~~~~~~=~~=~~~~~~~~=~~=~~~~~~~~~~~=~~=~~~~~~~~~~~=~~~~~~~~~~~=~~=~~=~~~~~~~~~~~~~~~5 3:
I 0
~1=~-------------------------------------------------------------------------------------------
fi1
I t;t ~~--=-------==--i~--=--------==-----=--=------==-----=-~=------=:-----=--------::=-----=--=--------==-----=---=-------==-----=--=------=:-----_----: I -!2! _J '-
Ql===========::::::i
I-
TYP 53 ~,
WITHIN LIMITS OF MILL ANO OVERLAY RP
------
------------------------------------------------------
--------------------
-------
CONSTRUCTION NOTES
@INSTALL 4" LANE LINE PER CA MUTCO, DET 12.
@INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
--
52
--
WITHIN LIMITS OF RP
MILL ANO OVERLAY
@INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B)
"A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
AND DETAIL
---~
~
I
PALOMAR AIRPORT RO
-------------------
52
"AS BU I LT"
40 20 D 40 80 120 P.E. EXP.
I ~ I I I REVIEWED BY:
SCALE: 1"=40"
INSPECTOR
,-
DATE
DATE
@) INSTALL 12" THERMOPLASTIC WHITE 45-0EGREE HATCHING AT 55' SPACING.
@REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED
PAVEMENT MARKERS.
EXISTING SIGN (ONE POST)
NEW SIGN
fSHEEll CITY OF CARLSBAD I SHEETS I
1----+----+----------------+-----11-----+--+-----1 L__j ENGINEERING DEPARTMENT
l----+----+----------------+-----11-----+--+-----I @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
<l
--R/C
EXISTING WIDTH
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
Michael Baker -LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, DR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
CllY ENGINEER RCE 49070 EXP.9/30/24 DATE
INTERNATIONAL DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL IRVWD BY: ---11
t-O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L-t CHKD BY:
PROJECT NO.
xxxx-xxxx
I DRAWING NO. xxx-x
2
<(
<O
0 .. -... N 0 ~ LO
.::;:_ ,-.._
<(
i!: z <( ::;:
<(
(f)
o_
0
D:'. i!:
<(
...J
(') ,::
0
0 o_
I
LO
I
O>
LO r---
0> ro
/ >-<(
...J D:'. w > 0 ... N 0
? o_
(f) z
<(
~
0
0
<(
0 / (f) w 0
> D:'. w
(f)
(')
z
f--LL <(
D:'.
0
0
<(
0 0 f--:::,
<(I
O> LO r---
0> ro
/ ~ <(
0 ~ 0 0 D:'. :r: / -(f)
LL
4: 0 ...J D:'. <(
53-m :::, :r: -<(
0 f--z
<(
(f)
/ ---------------------------------------------------------------------------------------------------------------------------------------✓
LEGEND:
Aug. 5, 2024 Item #1 Page 12 of 17
,_
!:J :e -------t1l -------PALOMAR AIRPORT RD
I
w -
------
J.;;:.1::-_-..;;;::~
~ --
I 52
Michael Baker
INTERNATIONAL
-
5
TYP 53
TYP 53
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92006
Phone: (760) 476-9193
MBAKERINTL.COM
1806' 39
----------
-10' -------
~
/ ~ 9.5'X200' 55
1994' 12
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
52
@ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND
DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
@ PAINT MEDIAN NOSE YELLOW.
@) INST ALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC) ,
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
(@) REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED
PAVEMENT MARKERS.
56' LL
-
73
73 ---
=---
593' 12
~ EXISTING SIGN (ONE POST)
~ NEW SIGN
( 12' ) EXISTING WIDTH
12' PROPOSED WIDTH
<] MATCH EXISTING STRIPING/END PROPOSED STRIPING
--R/C PROPOSED RED CURB -LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS. DATE INITIAL
ENGINEER OF WORK
-------------------------
40 20 0 40 80
I ~ I I
SCALE: 1"=40'
DATE INITIAL
REVISION DESCRIPTION OTHER APPROVAL
\
--------------------------------------------------------------------\
"AS BUil T"
P.E. EXP. DATE 120
I REVIEWED BY:
INSPECTOR DATE
[jrJ CITY OF CARLSBAD ~ 6 ENGINEERING DEPARTMENT 6
IMPROVEMENT PLANS FOR:
2024 OVERLAY PROJECT
PALOMAR AIRPORT RD
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
11
I DRAWING NO. IRVWD BY: PROJECT NO. DATE INITIAL
CHKD BY: xxxx-xxxx CITY APPROVAL xxx-x
.. --a-N D
~ Lf)
,::::__
r----
<(
~ z <( ::e <(
V)
o_
0
(l:'.
~
<(
...J
~
0
0 o_
I
<D
I a, Lf) r----a,
OJ < <(
...J
(l:'. w > 0
-a-N
0 N / ~ o_
V) z
<(
~
0
0
<(
~ V) w u > (l:'. w
V)
'-' z
f-"-<(
(l:'.
0
0
<( u ~ :::,
<(I
a, Lf) r----a,
OJ
/ <(
f---<(
0 o_ ;:::-
0
0
(l:'.
7 -V)
"--<(
u ...J
(l:'.
<( u / a:, :::, :r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
17
LEGEND:
PALOMAR AIRPORT RD
Aug. 5, 2024 Item #1 Page 13 of 17
sl ~ --------
!J!l ---------------------------------------
--------
-
I
--
I
Michael Baker
INTERNATIONAL
------------------------------------------
WITHIN LIMITS OF MILL AND OVERLAY RP
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
---
IVL
@) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION 8) AND DETAIL "A"
ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
@ PAINT MEDIAN NOSE YELLOW.
@_) INST ALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC ) ,
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
(@) REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT
MARKERS.
@) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "8" ON SHEET 1.
PALOMAR AIRPORT RD
9.5'X200' 55
<]
--R/C -
...-_..I ro -
---
- -- -
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
-
IVL 54'
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
_. _.
_. 73 -::.-:10·, --~---_.
--
---------------------------------------------
-----------
------------------------
-----------
-----
40 20 0 40 80 120 I ~f-----1 __ 1-----il
SCALE: 1 "=40 '
\
,./
\
"AS BU I LT"
P.E. __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
f"sHml CITY OF CARLSBAD I SHEETS I
t----+----+----------------+--------,r---+----+--------1 L__j ENGINEERING DEPARTMENT
1----+-----+----------------+-------ll----+--+------I
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
._O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L__. CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~
2
<(
CX)
0
... N 0 ~ LO
"'-r----
<(
i!: z <( ::;:
<(
(f)
o_
0
D:'. i!:
<(
...J
(') ,::
0
0 o_
I r----
1
O>
LO r----
0> CX)
/ >-<(
...J D:'. w > 0 ... N
0
? o_
(f) z
<(
~
0
0
<(
;;;!,
(f) w u > D:'. w
(f)
(') z
f---c_
<(
D:'.
0
0
<( u ~ :::,
<(I
O> LO r----
0> CX)
/ <(
f---
<(
0 o_ ;:::-
0
0 D:'.
7 -(f) c_ -<(
u ...J
D:'.
<(
u / m :::,
:r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
18
LEGEND:
PALOMAR AIRPORT RD
Aug. 5, 2024 Item #1 Page 14 of 17
I
I ,------
Michael Baker
INTERNATIONAL
.....
1-w w I ;1
en
I
w z .....
_J
I u 1-
~I
10·
~ .
l()
~
~ . "' ~
----------------10· --=c:._,---
I I I I I I I I
~ ~ ~ . . .
N "' l() -~
~ ~ ~ .,
73
PALOMAR AIRPORT RD
TYP 53
WITHIN LIMITS OF MILL AND OVERLAY RP
PALOMAR AIRPORT RD
TYP 53
WITHIN LIMITS OF MILL AND OVERLAY RP
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22.
@ INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29.
@ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
@ INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A.
@ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND
DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "C" ON SHEET 1.
@ PAINT MEDIAN NOSE YELLOW.
@) INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC), @ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED
PAVEMENT MARKERS.
@) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
@INSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
<]
--R/C -
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
AH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
----------------
----------------
------------------------19 --_m -------,~ --I --~ -..... -
52 -:t -~ 9.5'X111' 55 ~
I
Im
I~
I 1; en
I
w z .....
_J
I u I-
<(
52 ,~
"AS BU I LT"
40 20 0 40 80 120 P.E. __ _ EXP. ___ _ DATE
I ~f----1 __ 1----;1 REVIEWED BY:
SCALE: 1 "=40 '
INSPECTOR DATE
[s"Hml CITY OF CARLSBAD I SHEETS I
t----+----+----------------+------,r---+----+------1 L__j ENGINEERING DEPARTMENT
l----+----+----------------+------11----+--+-----I
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
._O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L_. CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~
2
<(
0,
0 .. -... N 0 ~ l()
"'-,-.._
<(
i!: z <(
2
<(
(f)
o_
0
D:'. i!:
<(
...J
(') ,::
0
0 o_
I co
I
0, l() r---0, co
/ >-<(
...J D:'. w > 0 ... N
0
? o_
(f) z
<(
~
0
0
<(
;;;!,
(f) w u > D:'. w
(f)
(') z
f---c_
<(
D:'.
0
0
<( u ~ :::,
<(I
0, l() r---
0, co
/ <(
f---
<(
0 o_ ;:::-
0
0 D:'.
7 -(f) c_ -<(
u ...J
D:'.
<( u / m :::, :r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
19
LEGEND:
PALOMAR AIRPORT RD
Aug. 5, 2024 Item #1 Page 15 of 17
.....
\ -~~ ------------------CQ ----------:.(, -----
\.I.\\ -----la\
I -
i, ----i -
t.J
~ ~ -IVR
Michael Baker
INTERNATIONAL
9.5'-11·x120· 60
-
--
---
--
PALOMAR AIRPORT RD
--
11 '
11 '
11' ======:=====:=z::::i•3'·b=.====-=r=,=-.;:=======tf=-======~~~:z::::::===::/ .::: 8.
12'
WITHIN LIMITS OF MILL AND OVERLAY
PALOMAR AIRPORT RD
-
8.5'-10.5'X204' 60
WITHIN LIMITS OF P
MILL AND OVERLAY
---
----10 -----~I ::
lillllllllll-
1
\
\ \ \
\ \ \
\ \
\ \
\ \
\ \
\ \
\ \
\ \
\
\
\ \ \
I
(8')
( 12') -( 12 ') -(12')-------I
( 10 ') ----------------------9. 5' X120' 60
I
\
-t.
\ -t. \ -t. \ \ -t. -t.
\ \
\ \
\ \
\ \
\ \
\ \
\ \
CONSTRUCTION NOTES
@ INSTALL 4" LANE LINE PER CA MUTCD, DET 12.
@ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39.
\ I
\ I \ \ "AS BU I LT"
~INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A.
® INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B)
AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING.
@ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "C" ON SHEET 1.
@ PAINT MEDIAN NOSE YELLOW.
@) INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC),
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING
RAISED PAVEMENT MARKERS.
@) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
<]
--R/C -
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
I I
40 20 0 40 80 120 P.E. __ _ EXP. ___ _ DATE
I ~f----1 __ 1----;1 REVIEWED BY:
SCALE: 1 "=40 '
INSPECTOR DATE
[s"Hml CITY OF CARLSBAD I SHEETS I
1------1---+----------------+-----+---+-----tr-----1 L__j ENGINEERING DEPARTMENT
l------l---+----------------+-----+--+-----11-----1
t------t---+----------------+-----+---+-----tr-----1 IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
.,_O_TH_E_R_A~PP-RO-V-AL--+-C-IT_Y_A~P-PR-0-VA_L---, CHKD BY: ---~ __ XXXX __ -_XXXX ___ ~., _x_x_x_-_x~
... N 0 ~ LO
"'-r----
<(
i!: z <(
::;:
<(
(f)
o_
0
D:'. i!:
<(
...J
(') ,::
0
0 o_
I
0) -I
0)
LO r----
0) ro
/ >-<(
...J D:'. w > 0 ... N
0
? o_
(f) z
<(
~
0
0
<(
;;;!,
(f) w u > D:'. w
(f)
(') z .... c_
<(
D:'.
0
0
<( u ~ :::,
<(I
0) LO r----
0) ro
/ <( ....
<(
0 o_ ;:::-
0
0 D:'.
7 -(f) c_ -<(
u ...J
D:'.
<( u / m :::, :r: -<(
~ z <( ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
PASEO DEL NORTE
LEGEND:
20
Aug. 5, 2024 Item #1 Page 16 of 17
16'
------0 "' '--
Michael Baker
INTERNATIONAL
_,--,,RP !THIN LIMITS OF
MILL AND OVERLAY
7' -·· -""~
1035' 39
APPROX· 160 ' ~-----1.t'IJ'
J----------1.70 10 SPACES AT 21
CONSTRUCTION NOTES
@ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22.
@ INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29.
@) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
@) INST ALL BI KE LANE LI NE PER CA MUTCD, DET 39 .
@INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A.
-►----
-- - --
@ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON
SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER.
@) INSTALL GREEN BIKE LANE SKIP PER DETAIL "D" ON SHEET 1.
@) INST ALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING.
@) INSTALL PARKING SPACE MARKING AT SPACING PER PLAN PER DETAIL "J" ON SHEET 1.
@INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
@ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
(® REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT
MARKERS.
@ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
40 20 0 40 80 120 l~~f-----1 __ 1-----;1
SCALE: 1 "=40 '
PASEO DEL NORTE
<]
--R/C -
EXISTING SIGN (ONE POST)
NEW SIGN
EXISTING WIDTH
PROPOSED WIDTH
MATCH EXISTING STRIPING/END PROPOSED STRIPING
PROPOSED RED CURB
LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN
LIMITS, INCLUDING RAISED PAVEMENT MARKERS.
I I
"AS BU I LT"
P.E. __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
t----+---+--------------+---+---+---+----t LJ CITEllN~!NG ~~~~~N~AD I SHEETS I
1------1---+----------------+-----+--+-----1f-----1 IMPROVEMENT PLANS FOR:
ROW SIGNING & STRIPING PLANS
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
.,_O_TH_E_R_A~PP-RO-V-AL--+-C-IT_Y_A~P-PR-O-VA-L--1 CHKD BY: ---~ __ XXXX __ -_XXXX ___ ~., _x_x_x_-_x~
v N
0 ~ Lf)
'--,....
<{
~ z
<{
:;;
<{
(f)
0.. 0
0:::
~
<{
_J
"' ,?;
0
0
0..
I 0
N
I
O> Lf) ,....
O> ro
/ >-<{
_J
0::: w > 0
v N
0 ?
0.. (f) z
<{
~
0
0
<{
;;;!,
(f) w u > 0::: w
(f)
"' z .... LI.. <{
0:::
0
0
<{ u ~ :::,
.,:I
O> Lf) ,....
O> ro
/ <{ ....
<{
0
0.. ;:::-
0
0
0:::
7 -(f)
LI.. -<{
u _J
0:::
<{ u / m :::, :r: -<{
~ z <{ ;;;-
/
5050 Avenida Encinas
Suite 260
Carlsbad, CA 92008
Phone: (760) 476-9193
MBAKERINTL.COM
26
2024 OVERLAY PROJECT
25
PASEO DEL NORTE
##
##############
LEGEND:
Aug. 5, 2024 Item #1 Page 17 of 17
59'
--------IVL
--------
-
---------
-----------------------------------
\ 12 1055' 12 1050'
-~ -------18'
-10'
8' VAR 0'-3' -
\
~(!) I
: ,-.;;;;;;;;;-..-~4.5'X60'
0 CD
<(
w t--------L-r---:::1-+-
~ l--' _______ ..L____:~-~, ~-----
w z .....
_J :::c 0
ii
I
1-
ffi -..... a::
w > 0
50'
TRANSITION
---,ti)>-
CD 1----------....;,,,,1__
APPROXIMATE CITY OF CARLSBAD R/W
(8')
( 12' )
( 12' )
----( 12')
RP WITHIN LIMITS OF
MILL AND OVERLAY
( 11 ' ) --( 12')
--
(11.5')
(11.57-
1023' 12
38 245'
--
-
1027' 12
IVL
WITHIN LIMITS OF RP
MILL AND OVERLAY
63 TYP 39 910' EL CAMINO REAL
WITHIN Ll:S OF ✓
MILL AND OVERLAY ~
-
825' 39
12 1132'
121128'
EL CAMINO REAL
------
------
--
-----
52
-~ ------
--
-
EL CAMINO REAL ___________ ~------i _.::.=--------i _39_7_79_· -/-39 453'
VAR 0'-3'
23'
TYP 63
WITHIN LIMITS OF RP
MILL AND OVERLAY
VAR 11 '-21'
8, VAR 0'-3'
SG
SCALE 1"=40' -=---........ i 21t c::_____
lj / I ~ ~
,,,,,,,,,,,,,
C ir
2' j
2' ~ -_,
.J' 10'
10'
------
------
----------
~ ~t;::::::::== ---
--
39'
xw
--
--
7'X50
12
12
7'X50
--
--
~
~ -~~ ---\~
.c( --'i -..... -:e
\~
\
I
-f:--i~
.::::, ,.,,, 9'
...... .......
. 0
• __,,_ 40 1 I 55 4.5'X140
• ..___ 12 140' / --,~~----.... -n---~
--_,_.__ ~:.~· ,A~ k
,,,,. ,,, $---
,1 0-fg-1--z:-~-~:11, ~~--:~7;>-... ~---; '.
D,--• \V"~~;~J 39' 8 ' ,
2
<(
<O -.. -v N
0 ~ Lf)
'--r--
<(
~ z
<(
2
<(
(f)
0.. 0
0::
~
<(
_J
"' ,?;
0
0
0..
I Lf)
N
I
O> Lf) r--
0> ro a;~ ' ~ _,u 1
,'.::: ~1-/· . ' 135 ...._,, ~ 0 o .. CONSTRUCTION NOTES / >-
w z .....
_J :::c 0
I-
<(
~
@
@
@
@)
CD
@
@)
@
(@
@) e
@
_,_,-,....._ I
INST ALL 4" LANE LI NE PER CA MUTCD , DET 12 . • '--~ / ..._,
INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. TY /;0;t
INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29. J;:;.
INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38.
INSTALL BIKE LANE LINE PER CA MUTCD, DET 39 .
INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A.
INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40.
INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE
9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS
APPROXIMATELY 300' FROM EACH OTHER.
INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1.
,~
EXISTING SIGN (ONE POST)
NEW SIGN
(12') EXISTING WIDTH
12' PROPOSED WIDTH
INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. <] MATCH EXISTING STRIPING/END PROPOSED STRIPING
PAINT MEDIAN NOSE YELLOW. --R/C PROPOSED RED CURB
"" _J
0:: w > 0
v N
0
?
0.. (f) z
<(
~
0
0
<(
;;;!,
(f) w u > 0:: w
(f)
INST ALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC) ,
INSTALL TYPE I ARROW PER CALTRANS STD PLAN A24A. D "' LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING z
INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A.
INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE.
REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY
GRINDING. INCLUDING RAISED PAVEMENT MARKERS.
INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC),
INSTALL TYPE Vil ARROW (RIGHT) PER CALTRANS STD PLAN A24A.
INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1.
TRAFFIC STRIPING, MARKING, OR ARROW WITHIN t;:
LIMITS, INCLUDING RAISED PAVEMENT MARKERS. ~
"AS BU I LT"
P.E. __ _ EXP. ___ _ DATE
REVIEWED BY:
INSPECTOR DATE
0
0
<( u ~ :::,
<(I
O> Lf) r--
0> ro
/ <( >--<(
0
0.. ;:::-~1-
~, 50'
TRANSITION
CONTRACTOR IS REQUIRED TD DBTAI ~
5
;:L~N~E~C~ES~S~AR~Y::;c;c;c;c;c;c;c;c;c;c;c;;;c;c;c;cE~L~C~AM~~lijN~0~jR~EAl~~=======:.__~~~~~~-~~-~-~~:-~-;0_~_~~=~__,
PERMITS FROM THE CITY OF ENCINITAS FOR
CONSTRUCTION IMPROVEMENTS IN THE JURISDICTION
0 [s"Hml CITY OF CARLSBAD I SHEETS I
l-----t--+----------------1----+--+----t----.l L_j ENGINEERING DEPARTMENT
l-----l--+----------------1----+--+----1----I
1-----+--+----------------1----+--+---+----.I IMPROVEMENT PLANS FOR:
0
0 0::
7 -(f)
LL -,,,,,,,,,,,
n"--J
Michael Baker
SCALE 1 "=40 • ...................... .--:--.: c::_____ 40 20 0 40 80 120 l~___J~--1 _ ___J1----11
INTERNATIONAL SCALE: 1 "=40 '
l-----+--+----------------1----+--+----1----.I ~R=O=W======S=IG=N=IN:::::G::::::::&::::::::ST=R=IP:::::IN::':::G===:P:=LA::::N:':::S:::=====~
APPROVED:THOMAS FRANK
CITY ENGINEER RCE 49070 EXP.9/30/24 DATE
DA TE INITIAL
ENGINEER OF WORK REVISION DESCRIPTION
DA TE INITIAL DATE INITIAL
OTHER APPROVAL CITY APPROVAL I RVWD BY: 11 PROJECT NO. I DRAWING NO.
CHKD BY: ---~ __ XXXX __ -_XXXX ___ _,_, ~X_X_X_-_X____,
<(
u _J
0::
<( u / m :::, :r: -<(
~ z <( ;;;-
/
Traffic Safety & Mobility Commission Memorandum
Aug. 5, 2024
To: Members of the Traffic Safety & Mobility Commission
From: Hossein Ajideh, Engineering Manager
Via Paz Gomez, Deputy City Manager, Public Works
Re: Additional Material Related to Staff Report Item #1 – 2024 Resurfacing Project, Capital
Improvement Project No. 6001-24
This memorandum is to correct information provided in the staff report for agenda Item #1. The
following revisions have been made for the record:
•On page two of the Staff Report for agenda item #1, 2024 Resurfacing Project, Capital
Improvement Project No. 6001-24, the bullet on page 2 of 17 explaining the first location of
street segments is corrected from Interstate 5 to State Route, SR-78, as follows:
o El Camino Real between SR-78 and Marron Road
•Also, in the Striping Plans provided as Exhibit 2, on page 5 of 17, the I-5 NB Off Ramp and I-5 NB
On Ramp has been corrected to read as follows:
o SR-78 EB Off Ramp and SR-78 EB On Ramp.
cc: Scott Chadwick, City Manager
Geoff Patnoe, Assistant City Manager
Cindie McMahon, City Attorney
Faviola Medina, City Clerk Services Director
Gina Herrera, Assistant City Attorney
Tom Frank, Transportation Director/ City Engineer
Eric Zielke, Senior Engineer
{'city of
Carlsbad