Loading...
HomeMy WebLinkAbout2024-08-05; Traffic Safety and Mobility Commission; ; 2024 Resurfacing Project, Capital Improvement Project No. 6001-24OL Striping Plans for Arterial StreetsMeeting Date: Aug. 5, 2024 To: Traffic Safety & Mobility Commission Staff Contact: Eric Zielke, Senior Engineer Eric.Zielke@carlsbadca.gov, 442-339-2230 Hossein Ajideh, Engineering Manager Hossein.Ajideh@carlsbadca.gov, 442-339-2756 Subject: 2024 Resurfacing Project, Capital Improvement Project No. 6001-24OL Striping Plans for Arterial Streets Recommended Action Support staff’s recommendation to the City Council to approve the striping plans for the 2024 Resurfacing Project on the as a part of the Pavement Management Program. Background The City of Carlsbad has an ongoing Pavement Management Program, Capital Improvement Program No. 6001, that resurfaces and restripes Carlsbad roads to keep streets in top condition, free of distress and potholes, which lengthens the road’s useful life and saves money in the long run. While the resurfacing work is being designed, city staff also evaluates the existing roadways striping and if needed modifies striping to provide additional traffic safety benefits and address unsafe speeds, which is the number one cause of injury collisions in Carlsbad. The final list of streets to be included in this bid document is not completed at this time, however, staff is proposing to include arterial road segments with improved striping design to better address the needs of the roadway. Addressing Unsafe Speeds Speeding has become a bigger problem nationwide in recent years. In Carlsbad, speeding is the number one contributing factor in injury collisions. Reducing vehicle speed by even five mph can make a difference in the severity and survivability of collisions. Research shows that reducing speed limits alone is ineffective in reducing speeding, and slowing down vehicles requires actual changes to the road. Travel Lane Widths Restriping roadways provides an opportunity to adjust existing travel lanes to more appropriate widths. This adjustment can lead to several benefits, including improved safety, better traffic flow, and enhanced infrastructure for other modes of transportation, such as wider bike lanes and buffers. These changes also support the goals of the Sustainable Mobility Plan and the TRAFFIC SAFETY & MOBILITY COMMISSION Aug. 5, 2024 Item #1 Page 1 of 17 Staff Report Safer Streets Together plan. Below are key points highlighting the advantages and considerations of optimizing travel lane widths: • Changing lanes to more appropriate widths encourages drivers to pay more attention and slow down • The extra space can then be used to enhance existing bike lanes and safety buffers between sidewalks, bike lanes and car lanes, where appropriate • There are national industry guidelines for lane widths, and all our street designs meet those guidelines • The lane width is based on several factors, including traffic volume, speed, type of street and location • Designing appropriate vehicle lane widths also results in lower long-term maintenance costs for the city’s pavement infrastructure and creates improved flow of traffic with less delay at traffic signals and improved opportunities for cars turning right Road Segments with Proposed Revised Striping As shown in Exhibit 1 and Exhibit 2, the following arterial segments that will be resurfaced and restriped with enhanced bicycle lanes as described above: Street Segments: • El Camino Real between Interstate 5 and Marron Road • Eastbound lanes of Palomar Airport Road between Paseo Del Norte and El Camino Real • El Camino Real between Levante Street and Encinitas City Limits Next Steps Following the Traffic Safety & Mobility Commission’s review, staff will finalize the project construction plans and specifications. Later this fall 2024, staff will present a report to the Traffic Safety and Mobility Commission and City Council recommending approval of the project plans and specifications and authorization for the City Clerk to advertise for construction bids. After the bidding process is complete, staff will return to the City Council with a recommendation to award a construction contract to the lowest responsive and responsible bidder. The construction is targeted to begin in Spring 2025 and complete by Summer 2025. Public Notification This item was noticed in keeping with the Ralph M. Brown Act and it was available for public viewing and review at least 72 hours before the scheduled meeting date. Exhibits 1. Location Map for the 2024 Resurfacing Project 2. Striping Plans Aug. 5, 2024 Item #1 Page 2 of 17 OLIVENHAIN RD E L CO C H E S DE LOS AC E R V O BARCE LONA IO D R CALLE TIMITEO PALOM A RAIRPO RT RD L A COSTAAV P O I N S E T T I A L N M E L R O S E D R C A R L S B A D B L C A R LS B A D V IL LAGEDR R A N CHOSANTAFERD AVIARAPY C O L L E G E BL ALGA RD CANNONRD XA N A W Y MICA RD PAL A C PA S E O D E L N O R T E RE A L LA G O L O N D R I N A S T AVENIDACIRUELA LEVANTE ST GALI C I A W Y CALLE E L F U E R T E S T EL F U E R T E S T CAD E N C I A S T TAM A R A C K A V BATIQUITOS DR FARADAY AV H A R D I N G S T CALLE TH E C R O S S I N G S D R CAMINO SEGOVIA WY BRESSI R A N C H W Y EL C A M I N O COLIBRI LN C A M I N O R E A L P A S E O D E L N O R T E RANC H O S A N T A F E R D LOCATION MAP PROJECT NAME PROJECTNUMBER6001-24OL EXHIBIT12024 Resurfacing Project Created By: Andy Chang 8/1/2024 Z:\Eric_Zielke\Pavement\CIP6001_Webapp\LocationMap_Overlay2024_TempRevision_08-01-24.mxd $!Å NOT TOSCALE Exhibit 1 Legend 2024 Resurfacing Project Aug. 5, 2024 Item #1 Page 3 of 17 -1· I - ~ I \ \ / J I " •;, .. • ' ) 1"" • , ~ - - I I I -1 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT VICINITY MAP SIGNING AND STRIPING NOTES 2024 OVERLAY PROJECT CITY OF CARLSBAD CARLSBAD, CALIFORNIA CONTRACT NO. XXXX-XXXX FOR SHEET INDEX WORK TO BE DONE PROJECT LOCATION CITY COUNCIL DETAIL A - BIKE LANE SYMBOL AND ARROW MARKING SIGN LEGEND “”“”“” “” “” DETAIL F - BIKE SHARROW WITH GREEN PAINT 01 DETAIL B - CONTINENTAL CROSSWALK MARKINGS DETAIL C-GREEN BIKE LANE SKIP DETAIL E-GREEN BIKE LANE SKIP AT CURB DETAIL D-GREEN BIKE LANE SKIP WITH 6" LINE GENERAL NOTES DETAIL G - STRIPING AT INTESECTIONS DETAIL H - SPEED CUSHION MARKINGS DETAIL I - SPEED CUSHION MARKINGS DETAIL J - PARKING SPACE MARKING DETAIL K - PARKING SPACE MARKING END Exhibit 2 Aug. 5, 2024 Item #1 Page 4 of 17 THE SIGNING AND STRIPING WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE FOLLOWING DOCUMENTS, CURRENT AT THE TIME OF CONSTRUCTION, AS DIRECTED BY THE CITY ENGINEER. 1 . CARLSBAD MUNICIPAL CODE 2. CITY OF CARLSBAD ENGINEERING STANDARDS 3. THIS SET OF PLANS 4. THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREEN BOOK). 5. THE SAN DIEGO REGIONAL STANDARD DRAWINGS AND AS MAY BE MODIFIED BY THE CITY OF CARLSBAD STANDARDS. 6. THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES MUTCD). 7. CALTRANS STANDARD PLANS. 8. CALTRANS STANDARD SPECIFICATIONS. SHEET NO 1 DESCRIPTION TITLE SHEET OVERLAY BOUNDARY 2-6 7-16 SIGNING & STRIPING PLANS (CA THIS PROJECT IS LOCATED ON VARIOUS RESIDENTIAL STREETS AND CORRIDORS THROUGHOUT THE CITY OF CARLSBAD 1. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ALL SIGNING AND STRIPING. 2. ALL SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL CONFORM TO THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST VERSION), THE CALTRANS STANDARD PLANS AND SPECIFICATIONS (LATEST VERSION), THESE PLANS AND THE SPECIAL PROVISIONS. 3. ALL SIGNING AND STRIPING IS SUBJECT TO THE APPROVAL OF THE TRANSPORTATION DIRECTOR OR THEIR REPRESENTATIVE, PRIOR TO INSTALLATION. 4. ANY DEVIATION FROM THESE SIGNING AND STRIPING PLANS SHALL BE APPROVED BY THE TRANSPORTATION DIRECTOR OR THEIR REPRESENTATIVE PRIOR TO ANY CHANGE IN THE FIELD. 5. ALL STRIPING SHALL BE REFLECTIVE PER CALTRANS SPECIFICATIONS. STRIPING SHALL BE REPAINTED TWO WEEKS AFTER INITIAL PAINTING. 6. ALL PERMANENT SIGNAGE SHALL BE REFLECTIVE PER ASTM DESIGNATION D4956 AND SHALL USE TYPE IV PRISMATIC REFLECTIVE SHEETING (HIGH INTENSITY PRISMATIC OR EQUAL) UNLESS OTHERWISE SPECIFIED. R1-1 STOP , R1-2 YIELD , R2-1 SPEED LIMIT AND STREET NAME SIGNS SHALL USE TYPE IX PRISMATIC CUBE-CORNER REFLECTIVE SHEETING (DIAMOND GRADE VIP DR EQUAL). 7. PRIOR TO FINAL ACCEPTANCE OF STREET IMPROVEMENTS, ALL STREET STRIPING AND MARKINGS WITHIN A 500' PERIMETER OF THE CONSTRUCTION PROJECT WILL BE RESTORED TO A LIKE NEW CONDITION, IN A MANNER MEETING THE APPROVAL OF THE CITY INSPECTOR. 8. EXACT LOCATION OF STRIPING AND STOP LIMIT LINES SHALL BE APPROVED BY THE TRANSPORTATION DIRECTOR OR THEIR REPRESENTATIVE PRIOR TO INSTALLATION. 9. CONTRACTOR SHALL REMOVE ALL CONFLICTING PAINTED LINES, MARKINGS AND PAVEMENT LEGENDS BY GRINDING. DEBRIS SHALL BE PROMPTLY REMOVED BY THE CONTRACTOR. 10. ALL PAVEMENT LEGENDS SHALL BE THE LATEST VERSION OF THE CALTRANS STENCILS. 11. LIMIT LINES AND CROSSWALKS SHALL BE FIELD LOCATED. CROSSWALKS SHALL BE HIGH VISIBILITY CONTINENTAL STYLE AND SHALL HAVE 10' INSIDE DIMENSION UNLESS OTHERWISE SPECIFIED. CONTINENTAL CROSSWALK MARKINGS SHALL BE PARALLEL TO THE DIRECTION OF VEHICULAR TRAVEL. 12. ALL CROSSWALKS, LIMIT LINES, STOP BARS, PAVEMENT ARROWS AND PAVEMENT LEGENDS SHALL BE THERMOPLASTIC UNLESS OTHERWISE SPECIFIED. PREFORMED THERMOPLASTIC ARROWS AND LEGENDS SHALL NOT BE ACCEPTABLE. 13. ALL BIKE LANE LEGENDS SHALL BE HELMETED BICYCLIST SYMBOL AND ARROW PER CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES FIGURE 9C-3 AND PAINTED, UNLESS OTHERWISE SPECIFIED. 14. SIZE OF SIGNS SHALL BE BASED UPON THE RECOMMENDED SIGN SIZES FOUND IN THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES UNLESS OTHERWISE SPECIFIED. 15. SIGN POSTS SHALL BE SQUARE PERFORATED STEEL TUBING WITH BREAKAWAY BASE PER SAN DIEGO REGIONAL STANDARD DRAWING M-45. 16. WHEN A SIGN IS ATTACHED TO A POLE, IT SHALL BE MOUNTED USING A STANDARD CITY OF CARLSBAD APPROVED MOUNTING BRACKET WITH STRAPS. 17. EXISTING SIGNS REMOVED BY THE CONTRACTOR SHALL BE DELIVERED BY THE CONTRACTOR TO THE CITY OF CARLSBAD PUBLIC WORKS YARD AT 405 OAK AVENUE. 18. ALL SIGNS SHOWN ON THESE PLANS SHALL BE NEW SIGNS PROVIDED AND INSTALLED BY THE CONTRACTOR EXCEPT THOSE SIGNS SPECIFICALLY SHOWN AS EXISTING TO BE RELOCATED OR TO REMAIN. 19. FIRE HYDRANT PAVEMENT MARKERS SHALL CONFORM TO THE CALIFORNIA MUTCD AND SAN DIEGO REGIONAL STANDARD DRAWING M-19. 20.ALL NEW AND RELOCATED SIGNS SHALL BE CLEARLY VISIBLE, NOT BLOCKED BY ANY OBSTRUCTION. THE CONTRACTOR IS RESPONSIBLE TO TRIM OR REMOVE ANY VEGETATION BLOCKING THE NEW AND RELOCATED SIGNS. Michael Baker INTERNATIONAL 1. CONTRACTOR SHALL PROTECT ALL EXISTING UTILITIES IN THE 2. 3. 4. ROADWAY AND RAISE TO FINISHED GRADE PER SPECIFICATION SECTION 302-5.8. THE CONTRACTOR MUST LOCATE, SURVEY, AND RECORD LOCATIONS OF ALL APPURTENANCES IN THE ROADWAY INCLUDING, BUT NOT LIMITED TO, MANHOLES, ACCESS HOLES, VALVE BOXES, BLOWOFFS, AIR RELEASES, SEWER CLEANOUTS, AND SURVEY MONUMENT BOXES. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES (ABOVE GROUND AND UNDERGROUND) WITHIN THE PROJECT SITE SUFFICIENTLY AHEAD OF WORK. THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW) AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING GRADING NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTATIVE. UNDERGROUND SERVICE ALTER SDG&E AT&T TIME WARNER CABLE COX COMMUNICATIONS CITY OF CARLSBAD(STREETS & STORM DRAIN) *CITY OF CARLSBAD(SEWER,WATER & RECLAIMED WATER) 811 ( 800 )411-7343 (800)892-0123 (760)438-7741 (619)262-1122 (760)434-2980 (760)438-2722 (760)633-2650 (760)753-0155 (760)744-0460 (760)753-6466 *SAN DIEGUITO WATER DISTRICT *LEUCADIA WASTEWATER DISTRICT *VALLECITOS WATER DISTRICT *OLIVENHAIN WATER DISTRICT *BUENA SANITATION DISTRICT (760)726-1340X1330 z -:::;; " a *AS APPROPRIATE NOT TO SCALE OPTIONAL LEFT _,, A TURN ARROW USE ~ 7 1 \..:,,_ (PER PLAN) / / 72" 72" NOT TO SCALE 24" WHITE OR YELLOW---- THERMOPLASTIC . st GUTTER 72" 12" LIMIT LINE I NOT TO SCALE 4' 8' 4' 8' 4' GREEN PAINT (TYP) 6" WHITE SKIP (TYP) NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN (34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F TYPE I & II. CITY OF CARLSBAD KEITH BLACKBURN -MAYOR PRIYA BHAT-PATEL -MAYOR PRO TEM MELANIE BURKHOLDER -COUNCIL MEMBER TERESA ACOSTA -COUNCIL MEMBER CAROLYN LUNA -COUNCIL MEMBER SCOTT CHADWICK CITY MANAGER PAZ GOMEZ DEPUTY CITY MANAGER NOT TO SCALE I 4' I 8' I 4' I 8' I I 4' I ~ --!lll■~------------~~!1111■6■.■W■H■I ■TE----~ "" SOLID (TYP) -~---""-GREEN PA~6" WHITE 111S■KI■P-■ (TYP) (TYP) NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN (34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F TYPE I & II. NOT TO SCALE 4' 8' 4' 8' 4' -~ ll\_6"WHITE z <( _J [L ~GREEN PAINT SKIP (TYP) a:: (TYP) w [L \ \_ LIP OF GUTTER STRIPING NOTE: GREEN PAINT SHALL STOP AT LIP OF GUTTER. NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN (34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F TYPE I & II. NOT TO SCALE " <D 12' .,__--i--GREEN PAINT (TYP) SHARED ROADWAY BICYCLE MARKING PER CALTRANS STD PLAN A24C. NOTE: GREEN TRAFFIC PAINT SHALL BE ENNIS-FLINT 985216 GREEN STANDARD FAST DRY WATERBORNE 1952F1/2 TRAFFIC PAINT, PRODUCT COLOR GREEN (34115) OR APPROVED EQUAL. PAINT TO MEET FEDERAL SPEC TT-P-1952F TYPE I & II. / DETAIJ DETAIL 2 FACE OF CURB 50' PER PLAN NOT TO SCALE VAR 40' TO 60' /DETAIL 22 50' FACE OF CURB s.2s· VAR a.so· ~ TO 18.50' " N 7' 0LO VAR 8.50' 5. " TO 18.50' FACE OF\ CURB BIKE LANE OR RIGHT EDGE LINE STRIPING 4" WHITE STRIPE N NOT TO SCALE VAR 23' TO 30' 1" DEEP GRIND 7' ;,, VAR 7.25' ,-.. TO 21.25' N NOT TO SCALE (SEE PLANS) FACE OF CURB D IRE CT I ON OF TRAVEL 4" WHITE STRIPE r::::::=EXISTING FACE OF CURB 4" CITY OF OCEANSIDE HIGHWAY 78 PACIFIC OCEAN " - BEGIN RIGHT TURN LANE ~ YIELD TO BIKES R4-4 36"X30" W4-2R 36"X36" l\JRNING ,.. 1,{HIC\.£S '(/ro R10-15(MOD) 30"X30" 1 ' I - ~ WHITE STRIPE 0 V\_ CITY OF ENCINITAS Giff LAN TURNS RIGHr AHEAD W73A(CA) 36"X36" W9-1R 36"X36" W74(CA) 36"X36" c5l€J BIKE LANE W81(CA) 12"X8" NOT TO SCALE DIRECTION OF TRAVEL 2' I 22' NOT TO SCALE CITY OF VISTA ( RIGHT LANE MUST TURN RIGHT R3-7 36"X36" W81 B(CA) 8"X5" ~c ) 4" WHITE STRIPE "AS BU I LT" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE f"sHml CITY OF CARLSBAD I SHEETS I t----+----+----------------+----,r---+----+----1 L__j ENGINEERING DEPARTMENT l----+----+----------------+----11----+--+----I DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION IMPROVEMENT PLANS FOR: ROW TITLE SHEET APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. >--0-TH_E_R_A~P-PR_O_VA-L-+--C-IT_Y_A~PP_R_OV_A_L ... CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~ <( F z <( ::;;: <( en [L 0 a:: F <( _J ~ 0 0 I -a I O> LO ,-.. O> ro / >-<( _J a:: w > 0 st N a ? n. en z <( ~ 0 0 <( ;;;!, en w u > a:: w en "' z f--LI.. <( a:: 0 0 <( u ~ :::, <Cl O> LO ,-.. O> ro / <( f-- <( 0 n. ;:::- 0 0 a:: 7 -en LI. -<( u _J a:: <( u / m :::, :r: -<( ~ z <( ;;;- / 35 35 35 30 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 08 EL CAMINO REAL LEGEND: Aug. 5, 2024 Item #1 Page 5 of 17 I 55 6.5'X29' a. '---11---r--i I ~ -- u. u. 0 m z '9 - I -t0.----.-o.----v .----.------..... ..---.----........, .._,, .._,, .._,, .._,, ...._,, I Michael Baker INTERNATIONAL EL CAMINO REAL 548' 9 114' 38 120' SHIFT TAPER -- 50' FROM ECR - ---- ® APPROX.50' CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 9. @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. ------ @ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. @ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. @ INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40. -- @]) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 5' SPACING. -- @) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 35' SPACING. @) INSTALL SHARED ROADWAY BICYCLE MARKING WITH GREEN PAINT PER DETAIL "F" ON SHEET 1. @ PAINT MEDIAN NOSE YELLOW. @ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. (@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @) INSTALL SPEED PAVEMENT LEGEND ( "25" UNLESS OTHERWISE NOTED) (THERMOPLASTIC) . 81NSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL TYPE VI ARROW (LEFT) PER CALTRANS STD PLAN A24A. @) INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. @ INSTALL WHITE YIELD LINE PER CALTRANS STD PLAN A24G. EL CAMINO REAL ► ► ( 12' ) 12' <] --R/C D EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. 4020 0 40 80 120 I ~--1 __ 1 I SCALE: 1 "=40 ' ~ ~ IVL 485' 9 486' 9 ---------- ~~~~;1 ~}:f ,!!'!!'!~~9~_;5~•x~2~0:o' 55 IVL -~ 58' WITHIN LIMITS OF RP MILL AND OVERLAY - - - -- :J SCALE 1 "'40 ' 52 8' -';- \~ 11 ' 11 ' 11 ' CD w 10· w 10' (/) I w z ..... \• ~ ~ :::i: 106' 38 \ JiCL:._____ "AS BU I LT" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE [s"Hml CITY OF CARLSBAD I SHEETS I 1---+------t------------------t---i---------t------r------i L__j ENGINEERING DEPARTMENT 1---+---+----------------t---t------t----t------J IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. ,_O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_O_VA_L_, CHKD BY: ---)()()()(-)()()()( . xxx-x --------------- <{ ~ z <{ :;; <{ (f) 0.. 0 0::: ~ <{ _J "' ,?; 0 0 0.. I co 0 I O> "' r-- 0> co / >-<{ _J 0::: w > 0 ...-N 0 ? 0.. (f) z <{ ~ 0 0 <{ ;;;!, (f) w u > 0::: w (f) "' z f--c_ <{ 0::: 0 0 <{ u ~ :::, .,:I O> "' r-- 0> co / <{ f-- <{ 0 0.. ;:::- 0 0 0::: 7 -(f) c_ -<{ u _J 0::: <{ u / m :::, :r: -<{ ~ z <{ ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 09 EL CAMINO REAL LEGEND: Aug. 5, 2024 Item #1 Page 6 of 17 200' TO BCR 'X77' 00 I 0 I-w w I en w 12.5' w en w z ...... _J I () I-< ~I \ Michael Baker INTERNATIONAL @ APPROX . 1 00 ' -- I I I I I WITHIN LIMITS OF MILL AND OVERLAY (11.5') ( 11 ' ) ( 11 ') zoo' TO BCR @ APPROX. 100' 38 194' :?:117' /®TY ~ ,z~ €3 -----t>- 1 -- 100' 39 50' FROM ECR @ APPROX.50' CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @) INSTALL CHANNELIZING LI NE PER CA MUTCD, DET 38. @) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. @ INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40. --t>-- @) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 35' SPACING. @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. @ PAINT MEDIAN NOSE YELLOW. @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. @ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. <] --R/C D 7 7 7 EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH '\. ( 12') I I I ~f 7. 5. !~~-I I I I I I "- -c11·i_ I I J J (11') --( 12' ) - (11.5') l! ~ ( 11 ' ) ~ -= -~ -4-( 11 ' ) ~ ~ (3') -~ \8') 3-- -~ (3')(8') 2 2 ~ 2 2 ~ -~ ( 11 ' ) ~ ii ( 11 ' ) ~ ~ ~ ( 11 ' ) ( 18') ( 11 ') ( 11 ' ) (11')- :;i... i3') (8') I I I If I ------ -~ ---- lo ..... --..g I-w w I en w w en w z ...... _J :::c a,.. - () I-< ,~ "AS BU I LT" P.E, __ _ EXP, ___ _ DATE REVIEWED BY: INSPECTOR DATE MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. [s"Hml CITY OF CARLSBAD I SHEETS I ~=====;====t================================t====j~====t=====1====j L__j ENGINEERING DEPARTMENT l---l---+-----------------1------l-----l----l------1 IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK 40 20 0 40 80 120 l~~~--1 _ __J1----11 SCALE: 1 "=40 ' CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: ---11 PROJECT NO. I DRAWING NO. f---O_TH_E_R_A..1.PP_R_OV_A_L-+--C-IT-Y _A.i.PP-'-R--'-OV--'-A=-L--,1 CHKD BY: . -~--XXXX __ -XXXX ____ ,_ L _x_x_x_-_x__, <{ ~ z <{ :;; <{ (f) 0.. 0 0::: ~ <{ _J "' ,?; 0 0 0.. I m 0 I m "' r--m ro / >-<{ _J 0::: w > 0 ...-N 0 ? 0.. (f) z <{ ~ 0 0 <{ ;;;!, (f) w u > 0::: w (f) "' z f--c_ <{ 0::: 0 0 <{ u ~ :::, .,:I m "' r--m ro / <{ f-- <{ 0 0.. ;:::- 0 0 0::: 7 -(f) LI. -<{ u _J 0::: <{ u / m :::, :r: -<{ ~ z <{ ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 10 EL CAMINO REAL LEGEND: Aug. 5, 2024 Item #1 Page 7 of 17 ml EL CAMINO REAL 0 1-w l========~-~~~=====================(3. l,03_') W (11') I (11') (/)~ 1 ( 11 ' ) (/) wzl I (11') ( 11 ' ) :J (11') o l======================::::;3--::==_~=======<3• \5•) 1- :i I @ APPROX. 50' 50' FROM ECR I EL CAMINO REAL > (3' )1~~===~~~================~'=4~ wt= (B') -~ 0 (11') ' 8' 11 ' 11 ' ID - <C (11') -~(/)1 (11') -11·~ WITHIN LIMITS OF MILL AND OVERLAY RP ____ ,, -----------------T-~~=~~~~~~:::::::::110~·¾ ----------I I -l--?-------,--~11~' _-2.__-F--i W (11') -<]-----~-~-~ (11') --- _J -<]1----1---~ - (8.) -( 12') -( 12' ) ---( 12' ) --( 10') 10' --(12') -~-\-f'> I (11') ~ ~( 3' )i( 8:::;:, -:;::.) =====~===='="¥=~ /)'_i= _= _=_ =_;:j.L == -f;_!,-. ~!'!:. ="./-=~=~ = -.-l,Y> (12') -(8') __ _ xw . <C - ~ I Michael Baker INTERNATIONAL '-l---.a..&.J../'.1...1 .......... .....,~~!!,,!,,,._ ........ /c===~-- ' ~,,.,\\\\\\\ -~~· IVL 54' (@ APPROX.100' 215' TOP BCR CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. @ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. @ INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A. 16' 16 \ ~· ~~ 0 @) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. @ PAINT MEDIAN NOSE YELLOW. @ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. (@ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. SINSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INST ALL CONT I NENT AL CROSSWALK ( WH !TE ) , SEE DETAIL "B" ON SHEET 1 . ► ► ( 12') 12· <l --R/C - EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. 40 20 0 40 80 120 1-~f----1 __ 1--1 SCALE: 1 "=40 ' I I "AS BU I LT" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE fsHml CITY OF CARLSBAD I SHEETS I 1----+---+----------------t----ii-----t----t----, L__j ENGINEERING DEPARTMENT 1----+--+--------------+----t--t-----t-----i IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. ,_O_TH_E_R_A__,P-PR-0-VA_L_.__C_IT_Y_A~PP_R_O_VA_L_, CHKD BY: ---L ___ XXXX __ -_XXXX ___ ~., _x_x_x_-_x_ .. -... N 0 ~ LO .::;:_ ,..._ <( i!: z <( ::;: <( (f) a. 0 D:'. i!: <( ...J (') ,:: 0 0 a. I 0 I O> LO ,..._ O> ro / >-<( ...J D:'. w > 0 ... N 0 ? a. (f) z <( ~ 0 0 <( ;;;!, (f) w u > D:'. w (f) (') z f-l,_ <( D:'. 0 0 <( u ~ :::, <(I O> LO ,..._ O> ro / <( f--- <( 0 a. ;:::- 0 0 D:'. 7 -(f) c_ -<( u ...J D:'. <( u / m :::, :r: -<( ~ z <( ;;]. / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT LEGEND: 12 PALOMAR AIRPORT RD Aug. 5, 2024 Item #1 Page 8 of 17 as I BB 73 39' 68 IVR ~ 52 0 z -I w C 0 w en ~ -0 ---------------10' ------•--==========d:-~73 ' ! ,I - I YIII -0 11 I 26169' 9 166' • --'t. ------------~ - -"' 0 ~ ~ (l.. ~ ® PALOMAR AIRPORT RD ~ CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 9. @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL LEFT EDGE LINE RPMS PER CA MUTCD, DET 26. @) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. @ INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40. @) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION 8) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "c" ON SHEET 1. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @ PAINT MEDIAN NOSE YELLOW. @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @rNTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INST ALL 12" THERMOPLAST I C WH !TE LI MIT LI NE . @:'.) REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @ INST ALL CONT I NENT AL CROSSWALK ( WH I TE ) , SEE DETAIL "8" ON SHEET 1 . ----I") : -: -J g ; -; ----~ ~ -- ~ ----~=---·--------------------------------------=~~:--,~ ~=========;;;;;;;;;::::::~==============~~~::::::::::::::::::=.------------...-7iii--1rrr-=--=---==----==------.-------~--------~ (/) --------®"= ' 11111111111111111 I ~ ~ I I I I I I I I Michael Baker INTERNATIONAL TYP 63 52 ► ► ( 12' ) 12' <l --R/C - 6.5'-11 ·x200· 60 EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. z ,____. @I TYP 63 0 .. II ' -w _J < u en "AS BU I LT" 40 20 0 40 80 120 P.E. __ _ EXP. ___ _ DATE I ~f----1 __ 1----;1 REVIEWED BY: SCALE: 1 "=40 ' INSPECTOR DATE [s"Hml CITY OF CARLSBAD I SHEETS I t----+----+----------------+-----,r----+----+-----1 L__j ENGINEERING DEPARTMENT l----+----+----------------+----11----+--+----I IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. .,_O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L .... CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~.• _x_x_x_-_x~ 2 <( r0 0 .. -... N 0 ~ LO "-r--- <( i!: z <( 2 <( (f) 0. 0 D:'. i!: <( ...J (') ,:: 0 0 0. I N I O> LO r--- 0> ro / >-<( ...J D:'. w > 0 ... N 0 ? 0. (f) z <( ~ 0 0 <( ;;;!, (f) w u > D:'. w (f) (') z f---LI. <( D:'. 0 0 <( u ~ :::, <(I O> LO r--- 0> ro / <( f--- <( 0 0. ;:::- 0 0 D:'. 7 -(f) LI. -<( u ...J D:'. <( u / m :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 13 LEGEND: PALOMAR AIRPORT RD Aug. 5, 2024 Item #1 Page 9 of 17 - I -------------------- -----I - 52 Michael Baker INTERNATIONAL .,......._ .,......._ .,......._ .,......._ 52 571 ' 12 135' SHIFT TAPER 26B' 38 WITHIN LIMITS OF RP MILL AND OVERLAY 26' 29 52 " " " "' " --"' ~ I~ II PALOMAR AIRPORT RD ----- TYP 53 ---- ------- 1276' 39 52 WITHIN LIMITS OF MILL AND OVERLAY RP CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29. @ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @) @) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION 8) AND DETAIL "A" ON SHEET 1. SPACE MARK I NGS APPROX I MA TEL Y 300 ' FROM EACH OTHER . @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN. @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. @ PAINT MEDIAN NOSE YELLOW. @) INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC), @ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. @ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), SINSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "8" ON SHEET 1. ► ► ( 12') 12' <l --R/C - ---------------:it- 11 ~ ~ ~ " 0 0 N ~ ~ ~ 52 EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH 11 ' 3' B' MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. \ -------------•=--a --• -• -• • ----------\ 0 1f ' I~ 1; _w I -1; (/) I w z ..... _J I ,.,. (.) I- <( 52 I~ "AS BU I LT" P.E. EXP. 40 20 0 40 80 120 DATE I ~ I I I REVIEWED BY: SCALE: 1"=40' INSPECTOR DATE fsHml CITY OF CARLSBAD I SHEETS I 1----1----+-----------------1------1---+--+------I L__j ENGINEERING DEPARTMENT 1---1---+----------------l-------l---+---+------I 1----l-----+-----------------1------1---+--+------1 IMPROVEMENT PLANS FOR: l-----l-----+-----------------1------1---+--+------1 ~R=O=W=======S=IG::::N::::IN:::::G::::::=&::::S:::T:::::R:::::IP::::IN=G=P=L=A=NS========: APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION ....._D_ATE_~IN_ITI_A_L_,__DA_T_E~_IN_ITI_A_L_, I RVWD BY: ---11 PROJECT NO. I DRAWING NO. OTHER APPROVAL CITY APPROVAL CHKD BY: ....._ __ XXXX __ -XXXX ____ ,.L _x_x_x_-_x__, .. - " N 0 ~ LO .::;:_ r---- <( i!: z <( ::;: <( (f) o_ 0 D:'. i!: <( ...J (') ,:: 0 0 o_ I "' I O> LO r---- 0> ro / >-<( ...J D:'. w > 0 " N 0 ? o_ (f) z <( ~ 0 0 <( ;;;!, (f) w u > D:'. w (f) (') z f---c_ <( D:'. 0 0 <( u ~ :::, <(I O> LO r---- 0> ro / <( f--- <( 0 o_ ;:::- 0 0 D:'. 7 -(f) c_ -<( u ...J D:'. <( u / m :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT LEGEND: PALOMAR AIRPORT RD 14 Aug. 5, 2024 Item #1 Page 10 of 17 ll a::: C en (!) 7'X50 z -25 1. I en . . -en . o I . co 0 r--0 0 Cl co i -----I . X 0 0 CIC a.. a.. w < ® :::c I- MATCHLINE -MIDDLE RIGHT -- 217' 38 ~' ------t!) ------~ --------------w ---\\ ---- 'cl --(fl -\ --~ r'. 87' 39 ,,i.O i ,~2,0' ,\l.t--t-lS Michael Baker INTERNATIONAL c:, )t - CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. @) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. @INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A. @ PAINT MEDIAN NOSE YELLOW. @) INST ALL "AHEAD" PAVEMENT LEGEND ( THERMOPLAST IC) , @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. @ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. ® REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), - -- (8.) ( 12') ( 12') ----(12') MATCHLINE SEE ABOVE LEFT --.:-r:-~l ,__ ffl 253' 38 z -~ ~ i a::: 1-0 C I I I I I I 1: I I I -jg] xw _ l--Ll-!bl--- -?s-@ ----. . ----------1---1------- • 11111 LL 9' ' I " ':-:--::-!-~ .-..-O -ro 111-=--=--=-11 w (!) w ...I C a~ 52 --( 12') ( 12') ( 12') ( 11' ) - @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "C" ON SHEET 1. @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING . PALOMAR AIRPORi RD ---II --!II II " ------- 801' 12 TYP 53 WITHIN LIMITS OF RP MILL AND OVERLAY a.aAD A\RPORi RD pA\.0IW"I' 0 I I I I I I I I I I I I I I I I I I -----10· 10' ------ .5'-6.5'X90' - 73 -- WITHIN LIMITS OF RP MILL AND OVERLAY ~ EXISTING SIGN (ONE POST) ~ NEW SIGN (12') EXISTING WIDTH 12' <] --R/C - PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. 1 ®7 @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. ------------------------ 52 ------- ------ 52 "AS BU I LT" 40 20 0 40 80 120 P.E. __ _ EXP. ___ _ ~I ~~f----1 __ 1----;1 REVIEWED BY: SCALE: 1 "=40 ' INSPECTOR I '~ ..... I-w w ::r: -, (/) m I w z ..... ~ I- <( ,~ DATE DATE t----+---+--------------+----+---+----+----t LJ CITEllN~!NG ~~~~~N~AD I SHEETS I IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. .,_O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L .... CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~ 2 <( LO 0 ... N 0 ~ LO "-r-- <( i!: z <( 2 <( (f) a.. 0 CIC i!: <( ...J (') ,:: 0 0 o_ I ... -I O> LO r-- 0> co / >-< ...J CIC w > 0 ... N 0 ? o_ (f) z <( ~ 0 0 <( ;;;!, (f) w u > CIC w (f) (') z f---c_ <( CIC 0 0 <( u ~ :::, <I O> LO r-- 0> co / <( f--- <( 0 o_ ;:::- 0 0 CIC 7 -(f) c_ -<( u ...J CIC <( u / m :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 1515 LEGEND: PALOMAR AIRPORT RD Aug. 5, 2024 Item #1 Page 11 of 17 \ PALOMAR AIRPORT RD I vJ ~IE~~~~=~~=~~=~~~~~~~~~~~=~~=~~~~~~~~=~~=~~~~~~~~~~~=~~=~~~~~~~~~~~=~~~~~~~~~~~=~~=~~=~~~~~~~~~~~~~~~5 3: I 0 ~1=~------------------------------------------------------------------------------------------- fi1 I t;t ~~--=-------==--i~--=--------==-----=--=------==-----=-~=------=:-----=--------::=-----=--=--------==-----=---=-------==-----=--=------=:-----_----: I -!2! _J '- Ql===========::::::i I- TYP 53 ~, WITHIN LIMITS OF MILL ANO OVERLAY RP ------ ------------------------------------------------------ -------------------- ------- CONSTRUCTION NOTES @INSTALL 4" LANE LINE PER CA MUTCO, DET 12. @INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. -- 52 -- WITHIN LIMITS OF RP MILL ANO OVERLAY @INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. AND DETAIL ---~ ~ I PALOMAR AIRPORT RO ------------------- 52 "AS BU I LT" 40 20 D 40 80 120 P.E. EXP. I ~ I I I REVIEWED BY: SCALE: 1"=40" INSPECTOR ,- DATE DATE @) INSTALL 12" THERMOPLASTIC WHITE 45-0EGREE HATCHING AT 55' SPACING. @REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. EXISTING SIGN (ONE POST) NEW SIGN fSHEEll CITY OF CARLSBAD I SHEETS I 1----+----+----------------+-----11-----+--+-----1 L__j ENGINEERING DEPARTMENT l----+----+----------------+-----11-----+--+-----I @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), <l --R/C EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK Michael Baker -LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, DR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. CllY ENGINEER RCE 49070 EXP.9/30/24 DATE INTERNATIONAL DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL IRVWD BY: ---11 t-O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L-t CHKD BY: PROJECT NO. xxxx-xxxx I DRAWING NO. xxx-x 2 <( <O 0 .. -... N 0 ~ LO .::;:_ ,-.._ <( i!: z <( ::;: <( (f) o_ 0 D:'. i!: <( ...J (') ,:: 0 0 o_ I LO I O> LO r--- 0> ro / >-<( ...J D:'. w > 0 ... N 0 ? o_ (f) z <( ~ 0 0 <( 0 / (f) w 0 > D:'. w (f) (') z f--LL <( D:'. 0 0 <( 0 0 f--:::, <(I O> LO r--- 0> ro / ~ <( 0 ~ 0 0 D:'. :r: / -(f) LL 4: 0 ...J D:'. <( 53-m :::, :r: -<( 0 f--z <( (f) / ---------------------------------------------------------------------------------------------------------------------------------------✓ LEGEND: Aug. 5, 2024 Item #1 Page 12 of 17 ,_ !:J :e -------t1l -------PALOMAR AIRPORT RD I w - ------ J.;;:.1::-_-..;;;::~ ~ -- I 52 Michael Baker INTERNATIONAL - 5 TYP 53 TYP 53 5050 Avenida Encinas Suite 260 Carlsbad, CA 92006 Phone: (760) 476-9193 MBAKERINTL.COM 1806' 39 ---------- -10' ------- ~ / ~ 9.5'X200' 55 1994' 12 CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. 52 @ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. @ PAINT MEDIAN NOSE YELLOW. @) INST ALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC) , @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. (@) REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. 56' LL - 73 73 --- =--- 593' 12 ~ EXISTING SIGN (ONE POST) ~ NEW SIGN ( 12' ) EXISTING WIDTH 12' PROPOSED WIDTH <] MATCH EXISTING STRIPING/END PROPOSED STRIPING --R/C PROPOSED RED CURB -LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. DATE INITIAL ENGINEER OF WORK ------------------------- 40 20 0 40 80 I ~ I I SCALE: 1"=40' DATE INITIAL REVISION DESCRIPTION OTHER APPROVAL \ --------------------------------------------------------------------\ "AS BUil T" P.E. EXP. DATE 120 I REVIEWED BY: INSPECTOR DATE [jrJ CITY OF CARLSBAD ~ 6 ENGINEERING DEPARTMENT 6 IMPROVEMENT PLANS FOR: 2024 OVERLAY PROJECT PALOMAR AIRPORT RD ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE 11 I DRAWING NO. IRVWD BY: PROJECT NO. DATE INITIAL CHKD BY: xxxx-xxxx CITY APPROVAL xxx-x .. --a-N D ~ Lf) ,::::__ r---- <( ~ z <( ::e <( V) o_ 0 (l:'. ~ <( ...J ~ 0 0 o_ I <D I a, Lf) r----a, OJ < <( ...J (l:'. w > 0 -a-N 0 N / ~ o_ V) z <( ~ 0 0 <( ~ V) w u > (l:'. w V) '-' z f-"-<( (l:'. 0 0 <( u ~ :::, <(I a, Lf) r----a, OJ / <( f---<( 0 o_ ;:::- 0 0 (l:'. 7 -V) "--<( u ...J (l:'. <( u / a:, :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 17 LEGEND: PALOMAR AIRPORT RD Aug. 5, 2024 Item #1 Page 13 of 17 sl ~ -------- !J!l --------------------------------------- -------- - I -- I Michael Baker INTERNATIONAL ------------------------------------------ WITHIN LIMITS OF MILL AND OVERLAY RP CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. --- IVL @) INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION 8) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. @ PAINT MEDIAN NOSE YELLOW. @_) INST ALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC ) , @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. (@) REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "8" ON SHEET 1. PALOMAR AIRPORT RD 9.5'X200' 55 <] --R/C - ...-_..I ro - --- - -- - EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH - IVL 54' MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. _. _. _. 73 -::.-:10·, --~---_. -- --------------------------------------------- ----------- ------------------------ ----------- ----- 40 20 0 40 80 120 I ~f-----1 __ 1-----il SCALE: 1 "=40 ' \ ,./ \ "AS BU I LT" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE f"sHml CITY OF CARLSBAD I SHEETS I t----+----+----------------+--------,r---+----+--------1 L__j ENGINEERING DEPARTMENT 1----+-----+----------------+-------ll----+--+------I IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. ._O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L__. CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~ 2 <( CX) 0 ... N 0 ~ LO "'-r---- <( i!: z <( ::;: <( (f) o_ 0 D:'. i!: <( ...J (') ,:: 0 0 o_ I r---- 1 O> LO r---- 0> CX) / >-<( ...J D:'. w > 0 ... N 0 ? o_ (f) z <( ~ 0 0 <( ;;;!, (f) w u > D:'. w (f) (') z f---c_ <( D:'. 0 0 <( u ~ :::, <(I O> LO r---- 0> CX) / <( f--- <( 0 o_ ;:::- 0 0 D:'. 7 -(f) c_ -<( u ...J D:'. <( u / m :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 18 LEGEND: PALOMAR AIRPORT RD Aug. 5, 2024 Item #1 Page 14 of 17 I I ,------ Michael Baker INTERNATIONAL ..... 1-w w I ;1 en I w z ..... _J I u 1- ~I 10· ~ . l() ~ ~ . "' ~ ----------------10· --=c:._,--- I I I I I I I I ~ ~ ~ . . . N "' l() -~ ~ ~ ~ ., 73 PALOMAR AIRPORT RD TYP 53 WITHIN LIMITS OF MILL AND OVERLAY RP PALOMAR AIRPORT RD TYP 53 WITHIN LIMITS OF MILL AND OVERLAY RP CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. @ INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29. @ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @ INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. @ INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A. @ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @ INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "C" ON SHEET 1. @ PAINT MEDIAN NOSE YELLOW. @) INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC), @ INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. @ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), @INSTALL TYPE VII ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. <] --R/C - EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH AH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. ---------------- ---------------- ------------------------19 --_m -------,~ --I --~ -..... - 52 -:t -~ 9.5'X111' 55 ~ I Im I~ I 1; en I w z ..... _J I u I- <( 52 ,~ "AS BU I LT" 40 20 0 40 80 120 P.E. __ _ EXP. ___ _ DATE I ~f----1 __ 1----;1 REVIEWED BY: SCALE: 1 "=40 ' INSPECTOR DATE [s"Hml CITY OF CARLSBAD I SHEETS I t----+----+----------------+------,r---+----+------1 L__j ENGINEERING DEPARTMENT l----+----+----------------+------11----+--+-----I DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. ._O_TH_E_R_A~P-PR-0-VA-L-+--C-IT_Y_A~PP_R_OV_A_L_. CHKD BY: ---~ ___ XXXX __ -_XXXX ___ ~-• _x_x_x_-_x~ 2 <( 0, 0 .. -... N 0 ~ l() "'-,-.._ <( i!: z <( 2 <( (f) o_ 0 D:'. i!: <( ...J (') ,:: 0 0 o_ I co I 0, l() r---0, co / >-<( ...J D:'. w > 0 ... N 0 ? o_ (f) z <( ~ 0 0 <( ;;;!, (f) w u > D:'. w (f) (') z f---c_ <( D:'. 0 0 <( u ~ :::, <(I 0, l() r--- 0, co / <( f--- <( 0 o_ ;:::- 0 0 D:'. 7 -(f) c_ -<( u ...J D:'. <( u / m :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 19 LEGEND: PALOMAR AIRPORT RD Aug. 5, 2024 Item #1 Page 15 of 17 ..... \ -~~ ------------------CQ ----------:.(, ----- \.I.\\ -----la\ I - i, ----i - t.J ~ ~ -IVR Michael Baker INTERNATIONAL 9.5'-11·x120· 60 - -- --- -- PALOMAR AIRPORT RD -- 11 ' 11 ' 11' ======:=====:=z::::i•3'·b=.====-=r=,=-.;:=======tf=-======~~~:z::::::===::/ .::: 8. 12' WITHIN LIMITS OF MILL AND OVERLAY PALOMAR AIRPORT RD - 8.5'-10.5'X204' 60 WITHIN LIMITS OF P MILL AND OVERLAY --- ----10 -----~I :: lillllllllll- 1 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ I (8') ( 12') -( 12 ') -(12')-------I ( 10 ') ----------------------9. 5' X120' 60 I \ -t. \ -t. \ -t. \ \ -t. -t. \ \ \ \ \ \ \ \ \ \ \ \ \ \ CONSTRUCTION NOTES @ INSTALL 4" LANE LINE PER CA MUTCD, DET 12. @ INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @) INSTALL BIKE LANE LINE PER CA MUTCD, DET 39. \ I \ I \ \ "AS BU I LT" ~INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A. ® INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @) INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 55' SPACING. @ PAINT GREEN BIKE LANE. DIMENSIONS PER PLAN. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "C" ON SHEET 1. @ PAINT MEDIAN NOSE YELLOW. @) INSTALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC), @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. @ REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @) INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. <] --R/C - EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. I I 40 20 0 40 80 120 P.E. __ _ EXP. ___ _ DATE I ~f----1 __ 1----;1 REVIEWED BY: SCALE: 1 "=40 ' INSPECTOR DATE [s"Hml CITY OF CARLSBAD I SHEETS I 1------1---+----------------+-----+---+-----tr-----1 L__j ENGINEERING DEPARTMENT l------l---+----------------+-----+--+-----11-----1 t------t---+----------------+-----+---+-----tr-----1 IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. .,_O_TH_E_R_A~PP-RO-V-AL--+-C-IT_Y_A~P-PR-0-VA_L---, CHKD BY: ---~ __ XXXX __ -_XXXX ___ ~., _x_x_x_-_x~ ... N 0 ~ LO "'-r---- <( i!: z <( ::;: <( (f) o_ 0 D:'. i!: <( ...J (') ,:: 0 0 o_ I 0) -I 0) LO r---- 0) ro / >-<( ...J D:'. w > 0 ... N 0 ? o_ (f) z <( ~ 0 0 <( ;;;!, (f) w u > D:'. w (f) (') z .... c_ <( D:'. 0 0 <( u ~ :::, <(I 0) LO r---- 0) ro / <( .... <( 0 o_ ;:::- 0 0 D:'. 7 -(f) c_ -<( u ...J D:'. <( u / m :::, :r: -<( ~ z <( ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT PASEO DEL NORTE LEGEND: 20 Aug. 5, 2024 Item #1 Page 16 of 17 16' ------0 "' '-- Michael Baker INTERNATIONAL _,--,,RP !THIN LIMITS OF MILL AND OVERLAY 7' -·· -""~ 1035' 39 APPROX· 160 ' ~-----1.t'IJ' J----------1.70 10 SPACES AT 21 CONSTRUCTION NOTES @ INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. @ INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29. @) INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. @) INST ALL BI KE LANE LI NE PER CA MUTCD, DET 39 . @INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A. -►---- -- - -- @ INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. @) INSTALL GREEN BIKE LANE SKIP PER DETAIL "D" ON SHEET 1. @) INST ALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. @) INSTALL PARKING SPACE MARKING AT SPACING PER PLAN PER DETAIL "J" ON SHEET 1. @INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. @ INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. (® REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. @ INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. 40 20 0 40 80 120 l~~f-----1 __ 1-----;1 SCALE: 1 "=40 ' PASEO DEL NORTE <] --R/C - EXISTING SIGN (ONE POST) NEW SIGN EXISTING WIDTH PROPOSED WIDTH MATCH EXISTING STRIPING/END PROPOSED STRIPING PROPOSED RED CURB LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING TRAFFIC STRIPING, MARKING, OR ARROW WITHIN LIMITS, INCLUDING RAISED PAVEMENT MARKERS. I I "AS BU I LT" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE t----+---+--------------+---+---+---+----t LJ CITEllN~!NG ~~~~~N~AD I SHEETS I 1------1---+----------------+-----+--+-----1f-----1 IMPROVEMENT PLANS FOR: ROW SIGNING & STRIPING PLANS APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. .,_O_TH_E_R_A~PP-RO-V-AL--+-C-IT_Y_A~P-PR-O-VA-L--1 CHKD BY: ---~ __ XXXX __ -_XXXX ___ ~., _x_x_x_-_x~ v N 0 ~ Lf) '--,.... <{ ~ z <{ :;; <{ (f) 0.. 0 0::: ~ <{ _J "' ,?; 0 0 0.. I 0 N I O> Lf) ,.... O> ro / >-<{ _J 0::: w > 0 v N 0 ? 0.. (f) z <{ ~ 0 0 <{ ;;;!, (f) w u > 0::: w (f) "' z .... LI.. <{ 0::: 0 0 <{ u ~ :::, .,:I O> Lf) ,.... O> ro / <{ .... <{ 0 0.. ;:::- 0 0 0::: 7 -(f) LI.. -<{ u _J 0::: <{ u / m :::, :r: -<{ ~ z <{ ;;;- / 5050 Avenida Encinas Suite 260 Carlsbad, CA 92008 Phone: (760) 476-9193 MBAKERINTL.COM 26 2024 OVERLAY PROJECT 25 PASEO DEL NORTE ## ############## LEGEND: Aug. 5, 2024 Item #1 Page 17 of 17 59' --------IVL -------- - --------- ----------------------------------- \ 12 1055' 12 1050' -~ -------18' -10' 8' VAR 0'-3' - \ ~(!) I : ,-.;;;;;;;;;-..-~4.5'X60' 0 CD <( w t--------L-r---:::1-+- ~ l--' _______ ..L____:~-~, ~----- w z ..... _J :::c 0 ii I 1- ffi -..... a:: w > 0 50' TRANSITION ---,ti)>- CD 1----------....;,,,,1__ APPROXIMATE CITY OF CARLSBAD R/W (8') ( 12' ) ( 12' ) ----( 12') RP WITHIN LIMITS OF MILL AND OVERLAY ( 11 ' ) --( 12') -- (11.5') (11.57- 1023' 12 38 245' -- - 1027' 12 IVL WITHIN LIMITS OF RP MILL AND OVERLAY 63 TYP 39 910' EL CAMINO REAL WITHIN Ll:S OF ✓ MILL AND OVERLAY ~ - 825' 39 12 1132' 121128' EL CAMINO REAL ------ ------ -- ----- 52 -~ ------ -- - EL CAMINO REAL ___________ ~------i _.::.=--------i _39_7_79_· -/-39 453' VAR 0'-3' 23' TYP 63 WITHIN LIMITS OF RP MILL AND OVERLAY VAR 11 '-21' 8, VAR 0'-3' SG SCALE 1"=40' -=---........ i 21t c::_____ lj / I ~ ~ ,,,,,,,,,,,,, C ir 2' j 2' ~ -_, .J' 10' 10' ------ ------ ---------- ~ ~t;::::::::== --- -- 39' xw -- -- 7'X50 12 12 7'X50 -- -- ~ ~ -~~ ---\~ .c( --'i -..... -:e \~ \ I -f:--i~ .::::, ,.,,, 9' ...... ....... . 0 • __,,_ 40 1 I 55 4.5'X140 • ..___ 12 140' / --,~~----.... -n---~ --_,_.__ ~:.~· ,A~ k ,,,,. ,,, $--- ,1 0-fg-1--z:-~-~:11, ~~--:~7;>-... ~---; '. D,--• \V"~~;~J 39' 8 ' , 2 <( <O -.. -v N 0 ~ Lf) '--r-- <( ~ z <( 2 <( (f) 0.. 0 0:: ~ <( _J "' ,?; 0 0 0.. I Lf) N I O> Lf) r-- 0> ro a;~ ' ~ _,u 1 ,'.::: ~1-/· . ' 135 ...._,, ~ 0 o .. CONSTRUCTION NOTES / >- w z ..... _J :::c 0 I- <( ~ @ @ @ @) CD @ @) @ (@ @) e @ _,_,-,....._ I INST ALL 4" LANE LI NE PER CA MUTCD , DET 12 . • '--~ / ..._, INSTALL 4" DOUBLE YELLOW CENTER LINE PER CA MUTCD, DET 22. TY /;0;t INSTALL 4" MEDIAN ISLAND PER CA MUTCD, DET 29. J;:;. INSTALL CHANNELIZING LINE PER CA MUTCD, DET 38. INSTALL BIKE LANE LINE PER CA MUTCD, DET 39 . INSTALL BIKE LANE INTERSECTION LINE PER CA MUTCD, DET 39A. INSTALL 4" LANE LINE EXTENSION PER CA MUTCD, DET 40. INSTALL HELMETED BICYCLIST SYMBOL AND ARROW PER CA MUTCD FIGURE 9C-3 (OPTION B) AND DETAIL "A" ON SHEET 1. SPACE MARKINGS APPROXIMATELY 300' FROM EACH OTHER. INSTALL GREEN BIKE LANE SKIP PER DETAIL "E" ON SHEET 1. ,~ EXISTING SIGN (ONE POST) NEW SIGN (12') EXISTING WIDTH 12' PROPOSED WIDTH INSTALL 12" THERMOPLASTIC WHITE 45-DEGREE HATCHING AT 45' SPACING. <] MATCH EXISTING STRIPING/END PROPOSED STRIPING PAINT MEDIAN NOSE YELLOW. --R/C PROPOSED RED CURB "" _J 0:: w > 0 v N 0 ? 0.. (f) z <( ~ 0 0 <( ;;;!, (f) w u > 0:: w (f) INST ALL "AHEAD" PAVEMENT LEGEND (THERMOPLASTIC) , INSTALL TYPE I ARROW PER CALTRANS STD PLAN A24A. D "' LIMITS OF MILL AND OVERLAY. GRIND ALL EXISTING z INSTALL TYPE IV ARROW (LEFT) PER CALTRANS STD PLAN A24A. INTALL TYPE IV ARROW (RIGHT) PER CALTRANS STD PLAN A24A. INSTALL 12" THERMOPLASTIC WHITE LIMIT LINE. REMOVE EXISTING TRAFFIC STRIPING, MARKINGS, AND ARROWS BY GRINDING. INCLUDING RAISED PAVEMENT MARKERS. INSTALL "SIGNAL" PAVEMENT LEGEND (THERMOPLASTIC), INSTALL TYPE Vil ARROW (RIGHT) PER CALTRANS STD PLAN A24A. INSTALL CONTINENTAL CROSSWALK (WHITE), SEE DETAIL "B" ON SHEET 1. TRAFFIC STRIPING, MARKING, OR ARROW WITHIN t;: LIMITS, INCLUDING RAISED PAVEMENT MARKERS. ~ "AS BU I LT" P.E. __ _ EXP. ___ _ DATE REVIEWED BY: INSPECTOR DATE 0 0 <( u ~ :::, <(I O> Lf) r-- 0> ro / <( >--<( 0 0.. ;:::-~1- ~, 50' TRANSITION CONTRACTOR IS REQUIRED TD DBTAI ~ 5 ;:L~N~E~C~ES~S~AR~Y::;c;c;c;c;c;c;c;c;c;c;c;;;c;c;c;cE~L~C~AM~~lijN~0~jR~EAl~~=======:.__~~~~~~-~~-~-~~:-~-;0_~_~~=~__, PERMITS FROM THE CITY OF ENCINITAS FOR CONSTRUCTION IMPROVEMENTS IN THE JURISDICTION 0 [s"Hml CITY OF CARLSBAD I SHEETS I l-----t--+----------------1----+--+----t----.l L_j ENGINEERING DEPARTMENT l-----l--+----------------1----+--+----1----I 1-----+--+----------------1----+--+---+----.I IMPROVEMENT PLANS FOR: 0 0 0:: 7 -(f) LL -,,,,,,,,,,, n"--J Michael Baker SCALE 1 "=40 • ...................... .--:--.: c::_____ 40 20 0 40 80 120 l~___J~--1 _ ___J1----11 INTERNATIONAL SCALE: 1 "=40 ' l-----+--+----------------1----+--+----1----.I ~R=O=W======S=IG=N=IN:::::G::::::::&::::::::ST=R=IP:::::IN::':::G===:P:=LA::::N:':::S:::=====~ APPROVED:THOMAS FRANK CITY ENGINEER RCE 49070 EXP.9/30/24 DATE DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL I RVWD BY: 11 PROJECT NO. I DRAWING NO. CHKD BY: ---~ __ XXXX __ -_XXXX ___ _,_, ~X_X_X_-_X____, <( u _J 0:: <( u / m :::, :r: -<( ~ z <( ;;;- / Traffic Safety & Mobility Commission Memorandum Aug. 5, 2024 To: Members of the Traffic Safety & Mobility Commission From: Hossein Ajideh, Engineering Manager Via Paz Gomez, Deputy City Manager, Public Works Re: Additional Material Related to Staff Report Item #1 – 2024 Resurfacing Project, Capital Improvement Project No. 6001-24 This memorandum is to correct information provided in the staff report for agenda Item #1. The following revisions have been made for the record: •On page two of the Staff Report for agenda item #1, 2024 Resurfacing Project, Capital Improvement Project No. 6001-24, the bullet on page 2 of 17 explaining the first location of street segments is corrected from Interstate 5 to State Route, SR-78, as follows: o El Camino Real between SR-78 and Marron Road •Also, in the Striping Plans provided as Exhibit 2, on page 5 of 17, the I-5 NB Off Ramp and I-5 NB On Ramp has been corrected to read as follows: o SR-78 EB Off Ramp and SR-78 EB On Ramp. cc: Scott Chadwick, City Manager Geoff Patnoe, Assistant City Manager Cindie McMahon, City Attorney Faviola Medina, City Clerk Services Director Gina Herrera, Assistant City Attorney Tom Frank, Transportation Director/ City Engineer Eric Zielke, Senior Engineer {'city of Carlsbad