Loading...
HomeMy WebLinkAbout1430 YOURELL AVE; ; CBR2022-3328; PermitBuilding Permit Finaled Residential Permit Print Date: 08/08/2024 Job Address: Permit Typ e: Parcel#: Valuation: Occupancy Group: #of Dwelling Units: Bedrooms: Bathrooms: Occupant Load: Code Edition: Sprinkled: Project Title: 1430 VOURELL AVE, BLDG-Residential 1560510400 $44,794.80 CARLSBAD, CA 92008-1051 Work Class: Track#: Lot#: Project#: Plan#: Construction Type: Orig. Plan Check#: Plan Check #: Description: 1430 YOU RELL: NEW (690 SF) POOL/ SPA Applicant: Property Owner: Pool CARRIE JONES 9921 CARMEL MOUNTAIN RD, # STE 189 SAN DI EGO, CA 92129-2898 CO-OWNERS MURPHY WILLIAM J II AND JILL ti 1430 YOURELL AVE CARLSBAD, CA 92008-1051 (619) 343-5908 FEE BUILDING PLAN REVIEW -M INOR PROJECTS (LOE) BUILDING PLAN REVIEW -MINOR PROJECTS (PLN) SB1473-GREEN BUILDING STATE STANDARDS FEE STRONG MOTION -RESIDENTIAL (SMIP) SWIMMING POOL -RESIDENTIAL SWPPP INSPECTION FEE TIER 1 -Medium BLDG SWPPP PLAN REVIEW FEE TIER 1 -Medium Total Fees: $906.82 Tota l Payments To Date: $906.82 {city of Carlsbad Permit No: Status: CBR2022-3328 Closed -Finaled Applied: 09/13/2022 Issued: 10/17/2022 Finaled Close Out: ()8/08/2024 Final Inspection: 07/31/2024 INSPECTOR: Renfro, Chris Contractor: IMAGE POOLS INC 1076 VALE VIEW DR VISTA, CA 92081-6730 (858) 877-4074 Balance Du e: AMOUNT $194.00 $98.00 $2.00 $5.82 $246.00 $292.00 $69.00 $0.00 Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter co llectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition oft ese fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Cod e Section 3.32.030. Fail ure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the stat ute of limitation has previously otherwise expired. Building Division Page 1 of 1 1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov B-1 /B-2 APPLlCATION MISSING FOR THIS PROJECT Building Permit Inspection History Finaled (cityof Carlsbad PERMIT INSPECTION HISTORY for (CBR2022-3328) Permit Type: BLDG-Residential Application Date: 09/13/2022 Owner: CO-OWNERS MURPHY WILLIAM J 11 AND JILL M Work Class: Pool Issue Date: 10/17/2022 Subdivision: SHANGRILA TRACT Status: Closed -Finaled Expiration Date: 10/23/2023 Address: 1430 YOURELL AVE IVR Number: 43259 CARLSBAD, CA 92008·1051 Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection Inspection Date Start Date Status 1012112022 1012112022 BLOG-51 194657-2022 Passed Chris Renfro Complete Excav/Steel(Pools) Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes BLDG-52 Pool Plumbing 194655-2022 Passed Chris Renfro Complete BLOG-53 194656-2022 Passed Chris Renfro Complete Elec/Conduit/Wlrlng(Po ols) 1210812022 1210812022 BLDG-54 Equipotential 198295-2022 Passed Chris Renfro Complete Bond(Pools) 0412612023 0412612023 BLDG-55 209120-2023 Passed Chris Renfro Complete Fence/Preplaster Checklist Item COMMENTS Passed BLDG-Building Deficiency Yes NOTES Created By TEXT Created Date Angie Teanio 760-481-8965 Aaron 04/25/2023 0713112024 07/31/2024 BLDG-Final Inspection 256675-2024 Passed Chris Renfro Complete Checklist Item COMMENTS Passed BLDG-Building Deficiency FINAL INSPECTION COMPLETED AT Yes EARLIER DA TE BLDG-Plumbing Final Yes BLDG-Mechanical Final Yes BLDG-Structural Final Yes BLDG-Electrical Final Yes Thursday, August 8, 2024 Page 1 of 1