Loading...
HomeMy WebLinkAbout2024-08-05; Traffic Safety and Mobility Commission; ; Beach Access Repair and Upgrades between Pine and Tamarack Avenues, Capital Improvement Program Project No. 3896Meeting Date: Aug. 5, 2024 To: Traffic Safety & Mobility Commission Staff Contact: Hossein Ajideh, Engineering Manager Hossein.Ajideh@carlsbadca.gov, 442-339-2756 Eric Zielke, Senior Engineer Eric.Aielke@carlsbadca.gov, 442-339-2230 Subject: Beach Access Repair and Upgrades between Pine and Tamarack Avenues, Capital Improvement Program Project No. 3896 Recommended Action Support staff’s recommendation to the City Council to approve the final plans and specifications for the Beach Access Repair and Upgrades – Pine Avenue to Tamarack Avenue, Capital Improvement Program Project No. 3896. Executive Summary The City of Carlsbad is working on several projects to make it easier and safer to get to the beach and travel along Carlsbad Boulevard, whether driving, walking or biking. One of those projects is the Beach Access Repair and Upgrades, Capital Improvement Program, or CIP, Project No. 3896, which will replace four upper seawall staircases and widen the sidewalk on the west side of Carlsbad Boulevard between Pine and Cherry avenues. The purpose of the project is to repair and replace beach access facilities including the deteriorated beach access stairways, elevated upper sidewalk, hand railings and repairs to the seawall. On Oct. 5, 2020, staff provided an informational presentation on the project to the Traffic Safety & Mobility Commission, formerly known as Traffic & Mobility Commission. The commission provided its support to implement the project. Discussion The project will replace the four stairways along Carlsbad Boulevard between Hemlock and Pine avenues and widen the sidewalk between Cherry and Pine avenues. The sidewalks and beach access stairways were built in the 1980s and are in urgent need of repair. Some of the identified deficiencies are deteriorating double T-girders supporting the upper sidewalk, exposed and rusted steel reinforcement, structural cracks, concrete spalling, corrosion in steel railings and stair tread supports and soil erosion. TRAFFIC SAFETY & MOBILITY COMMISSION Aug. 5, 2024 Item #6 Page 1 of 40 Staff Report The replacements and other improvements would use new high- strength beams with corrosion resistant precast concrete. The new stairs and sidewalk are expected to last approximately 50 years. Stair design details • The stair locations and general design, including the landing areas/platforms, will remain the same. • Four will utilize the existing reinforced concrete piles that support the stairway landings. • The stair handrails will be replaced with similar railings and would include downward facing lights. • Existing streetlight poles will be replaced. • The project will also help reinforce and stabilize the bluff. Sidewalk details • The sidewalk between Pine and Cherry avenues will be widened to make more room for the many walkers, joggers and other users who enjoy this popular location. • From Pine to Cherry avenues, people will get 2½ feet of additional space. Aug. 5, 2024 Item #6 Page 2 of 40 Carlsbad Boulevard Wider sidewalks and staircase replacement o 1 foot will come from the removal of the surface mounted railing and metal beam guardrail, which is consistent with sidewalks to the north and south. o The sidewalk will also be extended 1½ feet to the west. • Much of the sidewalk between Pine and Maple avenues was built using a cantilevered design, where a substructure allows the sidewalk to jut out over the bluff below. This is why it can be extended a bit to the west. • The ground level sidewalk south of Maple Avenue with a retaining wall would be extended to the west using a new concrete wall and pillars. Overlooks • The two sidewalk overlooks at Walnut Avenue and Acacia Avenue would be replaced without changing the size or location. • Both outlooks will get new railings. • The Acacia outlook railing will be replaced with new surface-mounted railing, which would provide additional usable space. Aug. 5, 2024 Item #6 Page 3 of 40 Proposed Widening of the Upper Sidewalk – Pine Ave to Maple Ave (Looking South) Proposed Widening of the On-Grade Upper Sidewalk –Maple Ave to Cherry Ave (Looking South) Coastal Development Permit On July 19, 2023, the city’s Planning Commission approved a Coastal Development Permit and Habitat Management Plan Permit. Construction Construction would be phased so some stairways will remain open while others are being replaced, and work would be planned to avoid busy summer months. Phase 1 of the project is anticipated to start in early 2025. Beach access stairs at Tamarack The project previously included work to the sidewalk around the Tamarack restroom and to the at-grade stairway near Tamarack Avenue. However, these improvements would only replace the existing facilities in-kind. Instead, these improvements will be included in the upcoming American Disabilities Act Beach Access CIP project that will incorporate enhanced accessibility features into the design. Aug. 5, 2024 Item #6 Page 4 of 40 Pine Avenue to Maple Avenue -11'-10" New Walking Width Removal of -'.+--------------------------' -New Side- Guardrail Existing Control Existing New Mounted Railing Carlsbad Boulevard Bike Lane Removal of Guardrail Carlsbad Boulevard Bike Lane 3, -10" J • t 6' -5" l' -5" om 42" High Existing On Grade Sidewalk I New Replace and Expand Topping Slab 1 I r New Double T-Beam Cantilever _...,._ Existing Inverted T-Beam '-------...----,.-----' Existing Concrete Support Pile Maple Avenue to Cherry Avenue -11' ·4" New Walking Width Existing 8' -9" Remove and Replace Topping Slab Existing 12" Diameter Pier New 1'-5" --NewSide- Mounted Railing 42" High Existing 8" Thick Wall Next Steps • After the Traffic Safety & Mobility Commission, staff will present the final project plans and specifications to the City Council to seek approval of the plans and specifications and authorization to put the project out to bid. • Once work begins, construction will take a total of 20 months, but this will be broken up to avoid constructing during the busy summer months. Public Notification This item was noticed in accordance with the Ralph M. Brown Act and was available for public viewing and review at least 72 hours prior to the scheduled meeting date. Exhibits 1. Location Map – Beach Access Repairs 2. Improvement Plans Aug. 5, 2024 Item #6 Page 5 of 40 PINE AV G A R F I E L D S T MAGNOLIA A V TAMARACK A V M A D I S O N S T CHESTNUT A V WALNUT AV PALM AV H I B I S C U S C R L I N C O L N S T OAK AV C A R L S B A D B L SHERI D A N P L CHESTNUT A V CAMELLIAPL WALNUT AV PINE AV R O O S E V E L T S T AVOCADO LN O C E A N S T LO N G P L T Y L E R S T H A R D I N G S T SYCAMORE A V W A S H I N G T O N S T H A R B O R D R MAPLE AV J E F F E R S O N S T ACACIA AV CHERRY AV JUNIPER AV HEMLOCK A V L I N M A R L N REDWOOD A V SEQUOIA A V CHINQUAPI N A V A N C H O R W Y PROJECT NAME PROJECTNUMBER3896 EXHIBIT1BEACH ACCESS REPAIRSBETWEEN PINE AVE AND TAMARACK AVE $!Å VISTA ENCINITAS S.D.COUNTY OCEANSIDE PACIFICOCEAN T A M A R A C K A V MELR O S E D R L A COSTAAV C A R L S B A D B L A VIA RAPY CARLS B A D VILLAGEDR RAN C H O S A N T A F E R D A L G A R D C O L LE G E BL P A L O M A R A IR P ORT RD FARADAY AV P O IN S E T T IA L N CANNO N R D C A R L S B A D B L ELCAMINOREAL $!Å NOT TOSCALE LOCATION PROJECT VICINITY MAP LOCATION MAP LOCATION PROJECT Aug. 5, 2024 Item #6 Page 6 of 40 Exhibit 1 --·1 . --~ \\_/ .,,.. :.-· .,, -'~ \ .. -~ \ \ \ \ I / \ . :. ~ _J ;:---. . > • • --------• . • • • • • ----\ I \ \ ... , . . ~ GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:19 June 2024 - 4:15 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-G01.dwgPlotted by:Bob Sherwood 1 95 IMPROVEMENT PLANS FOR: TITLE SHEET CIP #3896 529-8SC RS CM SCOTT CHADWICK - CITY MANAGER PAZ GOMEZ - DIRECTOR OF PUBLIC WORKS PROJECT TEAM DIRECTORY OWNER: CITY OF CARLSBAD PUBLIC WORKS DEPARTMENT CONTACT: ERIC ZIELKE, PE, TE, QSD/P, LEED AP SENIOR ENGINEER EMAIL: ERIC.ZIELKE@CARLSBADCA.GOV 1635 FARADAY AVENUE CARLSBAD, CA 92008 PHONE: 760-602-2780 PRIME CONSULTANT: GHD INC. 320 GODDARD WAY, SUITE 200 IRVINE, CA 92618 PHONE: 949-648-5200 CONTACT: ROBERT SHERWOOD, PE GHD Inc. DESIGN CONSULTANTS: LANDSCAPE ARCHITECT KTUA PLANNING + LANDSCAPE ARCH 3916 NORMAL STREET GEOTECHNICAL ENGINEER ENGEO INCORPORATED 320 GODDARD WAY, SUITE 100 SAN DIEGO, CA 92103 IRVINE, CA 92618 PHONE: 619-294-4477 PHONE: 760-525-3944 CONTACT: TIM HENDERSON, PLA CONTACT: TAYLOR STRACK, PE, GE G-01 INTERSTATE 5 INTERSTATE5 CARLSBAD BLVD BEACH ACCESS REPAIR PROJECT APPLICATION NUMBERS: CDP 2021-0011, HMP 2021-0002 CITY OF CARLSBAD, CALIFORNIA CITY COUNCIL KEITH BLACKBURN - MAYOR MELANIE BURKHOLDER - COUNCIL MEMBER PRIYA BHAT-PATEL - MAYOR PRO TEM CAROLYN LUNA - COUNCIL MEMBER PUBLIC WORKS DEPARTMENT CONSTRUCTION PLANS FOR: TERESA ACOSTA - COUNCIL MEMBER Aug. 5, 2024 Item #6 Page 7 of 40 Exhibit 2 PROJECT LOCATION SOURCE OF TOPOGRAPHY VICINITY CITY OF OCEANSIDE HIGHWAY 78 PACIFIC OCEAN MAP RO,o, AVE CITY OF ENCINITAS CITY OF VISTA TOPOGRAPHY SHOWN ON THESE PLANS WAS GENERA TED BY BOTH AERIAL AND CONVENTIONAL SURVEY METHODS BY AL TA LAND SURVEYING, INC., 9517 GROSSMONT SUMMIT DRIVE, LA MESA, CA 91941, PHONE: 619-713-2582. ASSESSOR'S PARCEL NUMBER: APN: 2043100100 BASIS OF BEARINGS: THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CALIFORNIA COORDINATE SYSTEM OF 1983, ZONE 6, EPOCH 1999.92 GRID BEARING BETWEEN GPS STATIONS 'CLSB-130' AND 'CLSB-141' PER CITY OF CARLSBAD CONTROL SURVEY AS SHOWN ON RECORD OF SURVEY 17271 FILED IN THE omcE OF THE COUNTY RECORDER OF SAN DIEGO COUNTY. FEBRUARY 8, 2002. I.E. N 21'19'17" W BENCHMARK BENCHMARK FOR THIS SURVEY IS THE ABOVE STATED GPS CONTROL STATION NO. CLSB-141 PER SAID RECORD OF SURVEY 17271, BEING A 2.5" BRASS DISC IN THE SE CORNER OF VAULT ADJACENT TO THE NNE CORNER OF THE NORTHBOUND COAST HIGHWAY 101 BRIDGE OVER AGUA HEDIONDA LAGOON, 0.1 MILE SOUTH OF TAMARACK AVENUE@ N 1,998,492.074, E 6,226,887.075, ELEVATION= 28.698. BENCHMARK DATUM:(NAVD88} PROJECT BOUNDARY WORKS BEGINS NEAR THE INTERSECTION OF CARLSBAD BULEVARD AND PINE A VENUE AND CARLSBAD BOULEVARD AND CHINQUAPIN A VENUE. POST CONSTRUCTION BMP NOTES TOTAL LOT AREA = 23.15 ACRES TOTAL DISTURBED AREA = 10.12 ACRES (THIS AREA INCLUDES BUT IS NOT LIMITED TO OFFS/TE WORK INCLUDING PUBLIC IMPROVEMENTS AND TEMPORARY DISTURBANCE SUCH AS VEHICLE AND EQUIPMENT STAGING AREAS, CONSTRUCTION WORKER FOOT TRAFFIC, SOIL/GRAVEL PILES, UTILITY TRENCHES, BACKFILL CUTS, AND SLOPE KEYWA YS} TOTAL REPLACED IMPERVIOUS AREA = 25,487 SQUARE FEET TOTAL PROPOSED IMPERVIOUS AREA = ADDITIONAL 3,574 SQUARE FEET FROM SIDEWALK WIDENING STORM WATER NOTES 1. THIS PROJECT SHALL COMPLY WITH THE CITY'S STORM WATER REGULATIONS, LA TEST VERSION, AND SHALL IMPLEMENT BEST MANAGEMENT PRACTICES AT ALL TIMES. 2. THIS PROJECT IS EXEMPT FROM PDP REQUIREMENTS PURSUANT TO MS4 PERMIT PROVISION E.3.B.(3}. EXISTING SIDEWALKS SHALL BE RETROFITTED / REDEVELOPED TO DIRECT STORMWA TER RUNOFF TO ADJACENT VEGETATED AREAS. 3. THIS PROJECT IS A STANDARD PROJECT AND MUST IMPLEMENT SOURCE CONTROL AND SITE DESIGN BMPs PER CITY OF CARLSBAD STORM WATER DESIGN MANUAL. CALL 8-1-1 2 Wirking Days Before Yoo Dig DATUM CONVERSION CHART NGVD29 +26.518' ELEV 0.000' ELEV -2.180' ELEV -12.180' ELEV NAVD88 +28.698' ELEV +2.180' ELEV 0.000' ELEV -10' ELEV CONVERSION VALUES BASED ON CITY BENCHMARK CLSB-141 ELEVATIONS IN ORA WINGS BASED ON NGVD29 a liiiiil "AS-BUILT" RCE: EXP: DATE REVIEWED BY: DATE, 6/30/2024 INSPECTOR DATE PROJECT LOCATION PACIFIC OCEAN SITE PLAN "DECLARATION OF RESPONSIBLE CHARGE" · .. '•. '. . . ,•,- · ...... NOT TO SCALE ... . . . .. .. I HEREBY DECLARE THAT I AM THE ENGINEER OF WORK FOR THIS PROJECT, THAT I HA VE EXERCISED RESPONSIBLE CHARGE OVER THE DESIGN OF THE PROJECT AS DEFINED IN SECTION 6703 OF THE BUSINESS AND PROFESSIONS CODE, AND THAT THE DESIGN IS CONSISTENT WITH CURRENT STANDARDS. I UNDERSTAND THAT THE CHECK OF PROJECT DRAWINGS AND SPECIFICATIONS BY THE CITY OF CARLSBAD DOES NOT RELIEVE ME. AS ENGINEER OF WORK, OF MY RESPONSIBILITIES FOR PROJECT DESIGN. FIRM: GHD INC. ADDRESS: 320 GODDARD WAY. SUITE 200, /RV/NE CA 92618 TELEPHONE: 949-648-5200 BY: ROBERT SHERWOOD P.E. DA TE: 06/30/2024 RC£ NO.: C64351 REGISTRATION EXP/RATION DA TE: 06/30/2025 GOVERNMENT AGENCIES AND UTILITY CONTACTS THE CONTRACTOR SHALL NOTIFY AFFECTED UTILITY COMPANIES (SEE BELOW} AT LEAST 2 FULL WORKING DAYS PRIOR TO STARTING WORK NEAR THEIR FACILITIES AND SHALL COORDINATE THE WORK WITH A COMPANY REPRESENTATIVE. CALIFORNIA STA TE PARKS {SEAN HOMER} UNDERGROUND SERVICE ALERT SDG&E AT&T TIME WARNER CABLE COX COMMUN/CATIONS CITY OF CARLSBAD {STREETS & STORM DRAIN} CITY OF CARLSBAD {SEWER, WATER & RECLAIMED WATER} 760-720-7001 800-422-4133 800-411-7343 800-892-0123 760-438-7741 619-262-1122 760-434-2980 760-438-2722 I SHEET I CITY OF CARLSBAD ENGINEERING DEPARTMENT APPROVED: HOSSEIN ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 I SHEETS I AJIDEH DATE II\ DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:19 June 2024 - 4:27 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-G02-KEY MAP.dwgPlotted by:Bob Sherwood N 2 95 IMPROVEMENT PLANS FOR: KEY MAP & SHEET INDEX CIP #3896 529-8 KEYPLAN 1" = 150' SHEET BOUNDARIES SC RS CM C-01 C-07 C-13 C-20 E-01 LC-01 LP-01 LI-01 C-02 C-08 C-14 C-21 E-02 LC-02 LP-02 LI-02 C-03 C-09 C-15 C-22 E-03 LC-03 LP-03 LI-03 C-04 C-10 C-16 C-23 E-04 LC-04 LP-04 LI-04 C-05 C-11 C-17 C-24 E-05 LC-05 LP-05 LI-05 C-06 C-12 C-18 C-25 E-06 LC-06 LP-06 LI-06 PACIFIC OCEAN PI N E A V E N U E WA L N U T A V E N U E S Y C A M O R E A V E N U E CH E S T N U T A V E N U E MA P L E A V E N U E AC A D I A A V E N U E CH E R R Y A V E N U E JU N I P E R A V E N U E HE M L O C K A V E N U E RE D W O O D A V E N U E TA M A R A C K A V E N U E SE Q U O I A A V E N U E CH I N Q U A P I N A V E N U E CARLSBAD BOULEVARD G-02 Aug. 5, 2024 Item #6 Page 8 of 40 SHEET SHEET NUMBER NAME 1 G-01 2 G-02 3 G-03 4 G-04 5 G-05 6 G-06 7 G-07 8 G-08 9 C-01 10 C-02 11 C-03 12 C-04 13 C-05 14 C-06 15 C-07 16 C-08 17 C-09 18 C-10 19 C-11 20 C-12 21 C-13 22 C-14 23 C-15 24 C-16 25 C-17 26 C-18 27 C-19 28 C-20 29 C-21 30 C-22 31 C-23 32 C-24 33 C-25 I I \ I I SHEET LIST TABLE SHEET TITLE TITLE SHEET KEY MAP & SHEET INDEX I I I I I GENERAL NOTES & ABBREVIATIONS STRUCTURAL NOTES & STANDARD DETAILS BORING LOG LOCATIONS BORING LOGS PROJECT PHASING 1 PROJECT PHASING 2 HORIZONTAL CONTROL 1 HORIZONTAL CONTROL 2 HORIZONTAL CONTROL 3 HORIZONTAL CONTROL 4 HORIZONTAL CONTROL 5 HORIZONTAL CONTROL 6 DEMOLITION PLAN 1 DEMOLITION PLAN 2 DEMOLITION PLAN 3 DEMOLITION PLAN 4 DEMOLITION PLAN 5 DEMOLITION PLAN 6 SITE CONSTRUCTION PLAN 1 SITE CONSTRUCTION PLAN 2 SITE CONSTRUCTION PLAN 3 SITE CONSTRUCTION PLAN 4 SITE CONSTRUCTION PLAN 5 SITE CONSTRUCTION PLAN 6 EROSION / SEDIMENT CONTROL PLAN 1 EROSION / SEDIMENT CONTROL PLAN 2 EROSION / SEDIMENT CONTROL PLAN 3 EROSION / SEDIMENT CONTROL PLAN 4 EROSION / SEDIMENT CONTROL PLAN 5 EROSION / SEDIMENT CONTROL PLAN 6 EROSION / SEDIMENT CONTROL PLAN 7 I I I I I I I I I I I I I I -----------,-i---. T I I I I I I I I I I I I I I I \ : I I I I I \: I I ' /0 -10 -' o 5 -5 ------~-. 0-----------' -0 0 0 --. . . . SHEET LIST TABLE SHEET LIST TABLE SHEET SHEET SHEET TITLE NUMBER NAME SHEET SHEET SHEET TITLE NUMBER NAME 34 S-01 STAIR LANDING PLAN & PROFILE 1 69 LC-01 LANDSCAPE CONSTRUCTION PLAN 1 35 S-02 STAIR LANDING PLAN & PROFILE 2 70 LC-02 LANDSCAPE CONSTRUCTION PLAN 2 36 S-03 STAIR LANDING PLAN & PROFILE 3 71 LC-03 LANDSCAPE CONSTRUCTION PLAN 3 37 S-04 STAIR LANDING PLAN & PROFILE 4 72 LC-04 LANDSCAPE CONSTRUCTION PLAN 4 38 S-05 STAIR LANDING PLAN & PROFILE 5 73 LC-05 LANDSCAPE CONSTRUCTION PLAN 5 39 S-06 STAIR LANDING DETAILS 1 74 LC-06 LANDSCAPE CONSTRUCTION PLAN 6 40 S-07 STAIR LANDING DETAILS 2 75 LC-07 LANDSCAPE CONSTRUCTION NOTES & LEGEND 41 S-08 MISCELLANEOUS DETAILS 1 76 Ll-01 LANDSCAPE IRRIGATION PLAN 1 42 S-09 MISCELLANEOUS DETAILS 2 77 Ll-02 LANDSCAPE IRRIGATION PLAN 2 43 S-10 MISCELLANEOUS DETAILS 3 78 Ll-03 LANDSCAPE IRRIGATION PLAN 3 44 S-11 PLATFORM RAILING PLAN 1 79 Ll-04 LANDSCAPE IRRIGATION PLAN 4 45 S-12 PLATFORM RAILING PLAN 2 80 Ll-05 LANDSCAPE IRRIGATION PLAN 5 46 S-13 PLATFORM RAILING PLAN 3 81 Ll-06 LANDSCAPE IRRIGATION PLAN 6 47 S-14 PLATFORM RAILING PLAN 4 82 Ll-07 LANDSCAPE IRRIGATION NOTES AND CALCS 48 S-15 STRUCTURAL DETAILS 1 83 Ll-08 LANDSCAPE IRRIGATION HYDROZONE MAP 49 S-16 STRUCTURAL DETAILS 2 84 Ll-09 LANDSCAPE IRRIGATION LEGEND 50 S-17 STRUCTURAL DETAILS 3 85 Ll-10 LANDSCAPE IRRIGATION DETAILS 51 S-18 STRUCTURAL DETAILS 4 86 Ll-11 LANDSCAPE IRRIGATION DETAILS 52 S-19 STRUCTURAL DETAILS 5 87 LP-01 LANDSCAPE PLANTING PLAN 1 53 E-01 ELECTRICAL PLAN 1 88 LP-02 LANDSCAPE PLANTING PLAN 2 54 E-02 ELECTRICAL PLAN 2 89 LP-03 LANDSCAPE PLANTING PLAN 3 55 E-03 ELECTRICAL PLAN 3 90 LP-04 LANDSCAPE PLANTING PLAN 4 56 E-04 ELECTRICAL PLAN 4 91 LP-05 LANDSCAPE PLANTING PLAN 5 57 E-05 ELECTRICAL PLAN 5 92 LP-06 LANDSCAPE PLANTING PLAN 6 58 E-06 ELECTRICAL PLAN 6 93 LP-07 LANDSCAPE PLANTING VIGNETTES 59 E-07 SINGLE LINE DIAGRAM 94 LP-08 LANDSCAPE PLANTING VIGNETTES 60 E-08 ELECTRICAL SCHEDULE 95 LP-09 LANDSCAPE PLANTING NOTES & LEGEND 61 E-09 ELECTRICAL DETAILS 62 TC-1 TRAFFIC CONTROL NOTES AND LEGENDS 63 TC-2 PHASE 1 A: TRAFFIC CONTROL PLAN 1 I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT 64 TC-3 PHASE 1 A: TRAFFIC CONTROL PLAN 2 65 TC-4 PHASE 1 B: TRAFFIC CONTROL PLAN 1 66 TC-5 PHASE 1 B: TRAFFIC CONTROL PLAN 2 67 TC-6 PHASE 2: TRAFFIC CONTROL PLAN 1 APPROVED: HOSSEIN AJIDEH 68 TC-7 PHASE 2: TRAFFIC CONTROL PLAN 2 ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DATE, 6/30/2024 /1\ DWN BY: I I DRAWING NO. PROJECT NO. DATE INlllAL DATE INITIAL DATE INITIAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:25 June 2024 - 2:11 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-G03 THRU G04.dwgPlotted by:Bob Sherwood 3 95 IMPROVEMENT PLANS FOR: GENERAL NOTES & ABBREVIATIONS CIP #3896 529-8SC RS CM A AREA AC ASPHALT PAVEMENT ACP ASBESTOS CEMENT PIPE AD AREA DRAINS ALUM ALUMINUM AP ANGLE POINT AVAC AIR VACUUM VALVE AVE AVENUE BEG BEGIN BF BACKFLOW BC BEGIN CURVE, BLOW COUNT BLVD BOULEVARD BP BEGINNING POINT BTM BOTTOM BW BACK OF WALK BX BOTTOM OF CURB TRANSITION C CIRCLE, CURVE CALCS CALCULATIONS C-VLT COMMUNICATIONS VAULT CHKD CHECKED CIP CAST IN PLACE CL CENTERLINE CLR CLEAR CJ CONTROL JOINT COM-BX COMMUNICATIONS BOX CONC CONCRETE CONA CONCRETE ANGLE POINT CONT CONTINUOUS, CONTROLLER D, DIA, DIAM DIAMETER DBL DOUBLE DL DAYLIGHT, DEAD LOAD DD DOWN DRAIN, DRY DENSITY DS DIRECT SHEAR TEST DWN DRAWN E EAST EA EACH EC END CURVE EB ELECTRIC BOX EJ EXPANSION JOINT EL, ELEV ELEVATION EG EXISTING GRADE EM ELECTRIC METER EMH ELECTRIC MANHOLE EOP EDGE OF PAVEMENT EP END POINT EQ EQUAL EQUIP EQUIPMENT EW EACH WAY (E), EXIST EXISTING E-PNL ELECTRIC PANEL E-VLT ELECTRIC VAULT FD FIRE DEPARTMENT FDC FIRE DEPARTMENT CONNECTION FF FINISH FLOOR FG FINISH GRADE FM FLOW METER FS FINISH SURFACE G GAS, GROUND GAL GALLON GALV GALVANIZED GB GRADE BREAK GBA GRADE BREAK ANGLE POINT GB GRADE BREAK GM GAS METERS/REGULATORS GP GUARD POST GR GRADE GS GRAIN SIZE DISTRIBUTION GSO GAS SHUT OFF GV GAS VALVE HCLD HANDICAP LOADING HD HEAVY-DUTY HDG HOT-DIP GALVANIZED HORIZ HORIZONTAL IE INVERT ELEVATION IP INTERSECTION POINT IRB IRRIGATION BOX IRV IRRIGATION VALVE JB JUNCTION BOX JT JOINT L LENGTH, LINE LC LABORATORY COMPACTION TEST LF LINEAR FEET LL LIVE LOAD LT LIGHT M METER MAX MAXIMUM MB MACHINE BOLT MC MOISTURE CONTENT MFR'S MANUFACTURER'S MH MANHOLE MILS THOUSANDTHS OF AN INCH MIN MINIMUM MT MULTIPLE TREE MV MASTER VALVE N NORTH (N)NEW NAVD88 NORTH AMERICAN VERTICAL DATUM OF 1988 NGVD29 NATIONAL GEODETIC VERTICAL DATUM OF 1929 NTS NOT TO SCALE O.C.ON CENTER PB PULLBOX PB-RSR PACBELL RISER PCF POUNDS PER CUBIC FEET PED PEDISTAL/PAD, PEDESTRIAN PERP PERPENDICULAR PI ATTERBERG LIMITS TEST PL PROPERTY LINE, PLATE PSF POUNDS PER SQUARE FOOT PT POINT PVC POLYVINYL CHLORIDE R RADIUS RCE REGISTERED CIVIL ENGINEER REINF REINFORCING REQ'D REQUIRED RET RETAINING ROW RIGHT OF WAY RRFB RECTANGULAR RAPID FLASHING BEACONS RSR UTILITY RISER RVWD REVIEWED S SOUTH SCO SEWER CLEAN OUT SD STORM DRAIN SDS SLOW DIRECT SHEAR TEST SDI/MH STORM DRAIN INLET W/MANHOLE SDHM STORM DRAIN MANHOLE SF SQUARE FEET SL STREETLIGHT SLB STREETLIGHT BOX SMH SEWER MANHOLE SQ SQUARE SS STAINLESS STEEL, SANITARY SEWER SSPWC STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION STA STATION STL STEEL S/W SIDEWALK T TREE TB TELEPHONE BOX TC TOP FACE OF CURB TCR TELECOMMUNICATIONS RISER TG TOP OF GRATE TOC TOP OF CURB TOW TOP OF WALL TP TANGENCY POINT TR ELECTRIC TRANSFORMER TRD TREAD TS TRAFFIC SIGNAL, TUBE SECTION TSB TRAFFIC SIGNAL BOX TSC TRAFFIC SIGNAL CONTROL TYP TYPICAL V VALVE VERT VERTICAL W WEST, WATER, WIDE W/WITH WM WATER METER WMH WATER MANHOLE WT WEIGHT WV WATER VALVE ABBREVIATIONS PROPERTY LINE ADJOINING LOT LINES/RIGHT-OF-WAY CENTERLINE OF RIGHT-OF-WAY BUILDING OVERHANG ELEVATION CONTOUR LINE (1 FOOT INTERVAL) ELEVATION CONTOUR LINE (1/2 FOOT INTERVAL) CHAIN LINK FENCING METAL BEAM GUARDRAIL OR RAILING GATE ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE PHASE 1A REPAIR AREA PHASE 1B REPAIR AREA PHASE 2 REPAIR AREA PROTECTED BLUFF WITHIN PROJECT LIMITS EXISTING TREES (TRUNKS OF VARYING DIAMETERS) STREETLIGHT FOUND SURVEY MONUMENT AS NOTED SPOT ELEVATION LEGENDGENERAL NOTES (IN ADDITION TO THE REQUIREMENTS OF CHAPTER 15.16 OF THE CARLSBAD MUNICIPAL CODE) 1. CITY OF CARLSBAD HAS ADOPTED THE 2022 CALIFORNIA BUILDING STANDARDS CODE (CALIFORNIA CODE OF REGULATIONS, TITLE 24) IN ITS ENTIRETY. 2. REFER TO CITY OF CARLSBAD, GENERAL PROVISIONS AND SUPPLEMENTAL PROVISIONS FOR THE PROJECT AND MODIFICATIONS TO THE 2021 SSPWC GREENBOOK. 3. THIS PLAN SUPERSEDES ALL OTHER PLANS PREVIOUSLY APPROVED BY THE CITY OF CARLSBAD REGARDING IMPROVEMENTS SHOWN ON THIS SET OF PLANS. 4. APPROVAL OF THIS PLAN DOES NOT LESSEN OR WAIVE ANY PORTION OF THE CARLSBAD MUNICIPAL CODE, RESOLUTION OF CONDITIONAL APPROVAL, CITY STANDARDS OR OTHER ADDITIONAL DOCUMENTS LISTED HEREON AS THEY MAY PERTAIN TO THIS PROJECT. 5. NO WORK SHALL BE COMMENCED UNTIL ALL PERMITS HAVE BEEN OBTAINED FROM THE CITY AND OTHER APPROPRIATE AGENCIES. 6. NO REVISIONS WILL BE MADE TO THESE PLANS WITHOUT THE WRITTEN APPROVAL OF THE CITY ENGINEER, NOTED WITHIN THE REVISION BLOCK, ON THE APPROPRIATE SHEET OF THE PLANS AND TITLE SHEET. 7. ACCESS FOR FIRE AND OTHER EMERGENCY VEHICLES SHALL BE MAINTAINED TO THE PROJECT SITE AT ALL TIMES DURING CONSTRUCTION. 8. A PRE-CONSTRUCTION MEETING SHALL BE HELD AT THE SITE PRIOR TO THE BEGINNING OF WORK AND SHALL BE ATTENDED BY ALL REPRESENTATIVES RESPONSIBLE FOR CONSTRUCTION, SUPERVISION, AND ALL OTHER ASPECTS OF THE WORK. THE CONTRACTOR SHALL SCHEDULE THE MEETING WITH THE CITY AT LEAST TEN (10) WORKING DAYS PRIOR TO STARTING CONSTRUCTION. 9. ALL INSPECTION REQUESTS OTHER THAN FOR PRE-CONSTRUCTION MEETING WILL BE MADE BY CONTACTING THE CITY AT LEAST TWO (2) WORKING DAYS BEFORE THE INSPECTION IS NEEDED. 10. THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE SOLELY RESPONSIBLE FOR CONFORMING TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 11. THE CONTRACTOR SHALL CONFORM TO LABOR CODE SECTION 6705 BY SUBMITTING A DETAIL PLAN TO THE CITY ENGINEER AND/OR CONCERNED AGENCY SHOWING THE DESIGN OF SHORING, BRACING SLOPE OR OTHER PROVISIONS TO BE MADE OF WORKER PROTECTION FROM THE HAZARD OF CAVING GROUND DURING THE EXCAVATION OF SUCH TRENCH OR TRENCHES OR DURING THE PIPE INSTALLATION THEREIN. THIS PLAN MUST BE PREPARED FOR ALL TRENCHES FIVE FEET (5') OR MORE IN DEPTH AND APPROVED BY THE CITY ENGINEER AND/OR CONCERNED AGENCY PRIOR TO EXCAVATION. IF THE PLAN VARIES FROM THE SHORING SYSTEM STANDARDS ESTABLISHED BY THE CONSTRUCTION SAFETY ORDERS, TITLE 8 CALIFORNIA ADMINISTRATIVE CODE, THE PLAN SHALL BE PREPARED BY A REGISTERED ENGINEER AT THE CONTRACTORS EXPENSE. A COPY OF THE OSHA EXCAVATION PERMIT MUST BE SUBMITTED TO THE INSPECTOR PRIOR TO EXCAVATION. 12.IF ANY ARCHAEOLOGICAL RESOURCES ARE DISCOVERED WITHIN ANY WORK ZONE DURING CONSTRUCTION, OPERATIONS WILL CEASE IMMEDIATELY, AND THE CONTRACTOR WILL NOTIFY THE CITY ENGINEER. OPERATIONS WILL NOT RESTART UNTIL THE CONTRACTOR HAS RECEIVED WRITTEN APPROVAL FROM THE CITY ENGINEER. 13.ALL OFF-SITE HAUL ROUTES SHALL BE SUBMITTED BY THE CONTRACTOR TO THE CITY ENGINEER FOR APPROVAL TWO FULL WORKING DAYS PRIOR TO BEGINNING OF WORK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DEBRIS OR DAMAGE OCCURRING ALONG THE HAUL ROUTE OR ADJACENT STREETS AS A RESULT OF THE GRADING OPERATION. 14. NO BLASTING SHALL BE PERMITTED ON SITE. 15. THE EXISTENCE AND LOCATION OF UTILITY STRUCTURES AND FACILITIES SHOWN ON THE CONSTRUCTION PLANS WERE OBTAINED BY A SEARCH OF THE AVAILABLE RECORDS. ATTENTION IS CALLED TO THE POSSIBLE EXISTENCE OF OTHER UTILITY FACILITIES OR STRUCTURES NOT SHOWN OR IN A LOCATION DIFFERENT FROM THAT SHOWN ON THE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN ON THE PLANS AND ANY OTHER EXISTING FACILITIES OR STRUCTURES NOT SHOWN. 16. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL EXISTING FACILITIES (ABOVEGROUND AND UNDERGROUND) WITHIN THE PROJECT SITE SUFFICIENTLY AHEAD OF THE CONSTRUCTION TO PERMIT THE REVISIONS OF THE CONSTRUCTION PLANS IF IT IS FOUND THAT THE ACTUAL LOCATIONS ARE IN CONFLICT WITH THE PROPOSED WORK. G-03 SOIL CLASSIFICATION CHART REFERENCE DRAWINGS 139-6 CARLSBAD BOULEVARD IMPROVEMENT PLANS 282-7 CARLSBAD BOULEVARD PROMENADE 272-1 CARLSBAD BOULEVARD SEAWALL Aug. 5, 2024 Item #6 Page 9 of 40 DAm 6/30/2024 -~~~--- SECONDARY DIVISIONS PRIMARY DIVISIONS ,. CLEAN GRAVEL well-graded GRAVEL less than 5% fines GP poorly graded GRAVEL GW-GM well-graded GRAVEL with silt ----400----GRAVEL GRAVEL with more than DUAL GP-GM poorly graded GRAVEL with silt 50% of CLASSIFICATIONS coarse 5% to 12% fines GW-GC well-graded GRAVEL with clay fraction ------x------retained on GP-GC poorly graded GRAVEL with clay No. 4 sieve GRAVEL with GM silty GRAVEL COARSE-FINES GC clayey GRAVEL GRAINED more than SOILS 12% fines GC-GM silty, clayey GRAVEL more than 50% retained CLEAN SAND SW well-graded SAND ------on No. 200 less than 5% fines . sieve SP poorly graded SAND SVV-SM well-graded SAND with silt SAND SAND with SP-SM poorly graded SAND with silt 50% or more DUAL _ , _,, _ -of coarse CLASSIFICATIONS .• SW-SC well-graded SAND with clay fraction 5% to 12% fines passes SP-SC pooriy graded SAND with clay No. 4 sieve SM silty SAND SAND with FINES ·¾!J more than ieJ SC cla:yey SAND 12% fines :ill SC-SM silty, clayey SAND CL lean CLAY SILT and INORGANIC II ML SILT CLAY CL-ML silty CLAY liquid limit FINE• less than 50% OL (Pl > 4) organic CLAY GRAINED ORGANIC SOILS OL (Pl < 4) organic SILT 50% ar CH fat CLAY more passes SILT and INORGANIC No_ 200 sieve CLAY MH elastic SILT liquid limit OH (plots on or organic CLAY 50% or more i,bove "A"-line) ORGANIC OH (pl0l5 below "A"-line) organic SILT Highly Organic. Soils PT Peat I I ................................... ... , ............................. . .. , ............................... . ... , ............................. . .. , .. , ............................ . ... , ............................. . .. , ............................... . ... , ............................. . .. , ............................... . ... , ............................. . .. , ............................... . ... , ............................. . oo ' / • X 39.24 1---1----+------------+---+---+--+------I I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT ~=:'.....:::::=========::...:::::=:::::; APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6 30 2026 DA TE DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL OWN BY: CHKD BY: __ _ RVWD BY: PROJECT NO. DRAWING NO. GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:19 June 2024 - 6:21 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-G03 THRU G04.dwgPlotted by:Bob Sherwood 4 95 IMPROVEMENT PLANS FOR: STRUCTURAL NOTES & STANDARD DETAILS CIP #3896 529-8SC RS CM G-04 D D D D db 90° bd 6 d OR 4" MIN b 135° 4 d FOR #3, #4, #5 6 d FOR #6, #7, #8 b b D= 12 d FOR #6, #7, #8 6 d FOR #3, #4, #5 b b TYP 90° END HOOKTYP BAR BEND DIAMETER 10 d FOR #14, #18 8 d FOR #9, #10, #11 6 d FOR #3 TO #8 D D=b b b d b D dh 12 d 2" MIN TYP 180° END HOOK 4d ORb b b d D dh #14 38 33 29 27 #18 50 43 39 35 BAR SIZE 3000 4000 5000 6000 #3 6 6 6 6 #4 8 7 6 6 #5 10 9 8 7 #6 12 10 9 9 #7 14 12 11 10 #8 16 14 12 11 #9 18 15 14 13 #10 20 17 16 14 #11 22 19 17 16 dh d S S/2 L BARC LC BAR LC BAR S/2 CONCRETE SURFACE CONCRETE SURFACE DEVELOPMENT LENGTH ( ) BAR 3000 PSI CONC (f'c)4000 PSI CONC (f'c)5000 PSI CONC (f'c) SIZE TOP OTHER TOP OTHER TOP OTHER s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" #3 13 22 12 17 12 19 12 15 12 17 12 13 #4 18 29 14 22 15 25 12 19 14 23 12 17 #5 22 36 17 28 19 31 15 24 17 28 13 22 #6 26 43 20 33 23 37 18 29 20 34 16 26 #7 38 63 29 48 33 54 25 42 29 49 23 38 #8 43 72 33 55 37 62 29 48 34 56 26 43 #9 49 81 37 62 42 70 33 54 38 63 29 48 #10 56 89 43 69 49 78 38 60 44 69 34 54 #11 68 98 52 76 59 85 45 66 53 76 41 59 TENSION LAP SPLICE LENGTH (CLASS 'B' SPLICE) BAR 3000 PSI CONC (f'c)4000 PSI CONC (f'c)5000 PSI CONC (f'c) SIZE TOP OTHER TOP OTHER TOP OTHER s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" s > 6" s < 6" #3 17 28 16 22 16 25 16 19 16 22 16 17 #4 23 38 18 29 20 33 16 25 18 29 16 23 #5 28 47 22 36 25 41 19 31 22 36 17 28 #6 34 56 26 43 29 49 23 38 26 44 20 34 #7 49 82 38 63 43 71 33 55 38 63 30 49 #8 56 93 43 72 49 81 38 62 44 72 34 56 #9 63 105 49 81 55 91 42 70 49 81 38 63 #10 73 116 56 90 63 101 49 78 57 90 44 70 #11 88 128 68 99 76 111 59 85 68 99 53 76 NOTES: LENGTHS SHOWN ARE FOR GRADE 60 UNCOATED BARS. LENGTHS SHOWN ARE IN INCHES. TOP BARS: HORIZONTAL BARS WITH MORE THAN 12” OF FRESH CONCRETE CAST BELOW THEM. THE QUANTITY ‘s’ IS DEFINED AS FOLLOWS: 212" MIN NORMAL WEIGHT CONCRETE, f'c, PSI FOR STANDARD END HOOKS ON REINFORCING BARS MINIMUM TENSION EMBEDMENT LENGTHS (IN.) PENETRATION 3" TYP d,TYP #5 DIAGONAL BARS x 3'-0" LONG CENTERED ON PENETRATION, SPACE AT 8" MAX THROUGHOUT WALL THICKNESS END MAIN BARS INTERRUPTED BY OPENING WITH STD HOOK WHERE MAIN BARS ARE INTERUPTED BY OPENING, ADD ONE HALF THE INTERUPTED BARS EACH SIDE OF OPENING. (MIN 2-#5 BARS EACH SIDE) STRUCTURAL STANDARD DETAILS - CONCRETESTRUCTURAL NOTES GENERAL 1. CONTRACTOR SHALL COORDINATE ALL STRUCTURAL DOCUMENTS WITH ALL OTHER DISCIPLINES AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO THE START OF ANY FABRICATION OR CONSTRUCTION. 2. UNLESS NOTED OTHERWISE, REFER TO DRAWINGS OTHER THAN STRUCTURAL FOR FINISHES, SLOPES, DEPRESSIONS, OPENINGS, CURBS, STAIRS, RAMPS, TRENCHES, EQUIPMENT AND LOCATIONS AND EXTENT OF SUCH CONDITIONS. 3. CONTRACTOR SHALL COORDINATE ALL NEW WORK WITH EXISTING SITE CONDITIONS AND REPORT ANY DISCREPANCIES TO THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. 4. DO NOT SCALE DRAWINGS 5. CONTRACTOR TO REVIEW AS-BUILT RECORD DRAWINGS FOR ALL STRUCTURES ON SITE AVAILABLE FROM THE CITY AND / OR PROVIDED BY THE IN THE PROJECT BID PACKAGE. RAILINGS 1. SEE SPECIFICATION SECTION 05 52 00 METAL RAILINGS 2. DETAILS SHOWN ARE MINIMUM REQUIREMENTS WITH RAILING DESIGN TO BE PROVIDED BY CONTRACTOR. CONTRACTOR MAY REVISE GUARDRAIL AND HANDRAIL DESIGN, LAYOUT, AND ANCHORAGES TO MEET MANUFACTURER RECOMMENDATIONS AND PROJECT SPECIFICATIONS, AS APPROVED BY CITY. REINFORCED CONCRETE 1. SEE SECTIONS 03 30 00 CAST-IN-PLACE CONCRETE AND SECTION 03 41 00 PRECAST STRUCTURAL CONCRETE 2. ALL REINFORCING TO TERMINATE WITH STANDARD HOOKS AS SHOWN THIS SHEET. ALL STIRRUPS AND TIES TO BE CLOSED WITH 135 DEGREE BENDS. STRUCTURAL STEEL 1. SEE SPECIFICATION SECTION 05 55 00 METAL FABRICATIONS 2. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING TEMPORARY BRACING / SUPPORTS AS REQUIRED UNTIL ALL MEMBERS HAVE BEEN BOLTED OR WELDED SO MEMBERS ARE NOT OVERSTRESSED. 3. ALL EXPOSED NON-GALVANIZED STEEL SURFACES AND FASTENERS SHALL BE COATED PER SPECIFICATIONS UNLESS OTHERWISE NOTED. 4. BOLTS - THREADS OF ALL BOLTS SHALL BE COATED WITH ANTI-SEIZE COMPOUND 5. REINFORCING STEEL SHALL BE EPOXY COATED IN ACCORDANCE WITH SPECIFICATION SECTION 03 30 00 CAST-IN-PLACE CONCRETE AND SECTION 03 41 00 PRECAST STRUCTURAL CONCRETE. FIELD REPAIRS 1. GALVANIZED/METALIZED COATING FIELD REPAIR - FIELD REPAIR OF FIELD WELDS OR OTHER DAMAGED AREAS SHALL CONFORM TO ASTM A760, USING ZINC-BASE SOLDERS, SUCH AS "GALV-STICK" OR APPROVED EQUAL, FOLLOWED BY A TOP COAT OF ZINC RICH PAINT. REPAIR SHALL FOLLOW PROCEDURES INDICATED IN ASTM A760, ANNEX A1, AND IN CONFORMANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 2. FIELD WELDING - PREHEAT STEEL TO A MINIMUM 50°F TO DRIVE OFF MOISTURE AND WELD PER AWS D1.1. 3. GROUT PLACEMENT: -- HIGH-STRENGTH GROUT SHALL BE PLACED PER MANUFACTURER'S RECOMMENDATIONS. CONTRACTOR SHALL SUBMIT INTENDED METHODS OF PREPARING SUBSTRATE, MIXING, TRANSPORTING, PLACING AND FINISHING GROUT. -- PRIOR TO PLACEMENT, GROUTED SURFACES SHALL BE FREED OF DUST AND DIRT USING HIGH-PRESSURE POTABLE WATER. MIX GROUT WITH MANUFACTURER'S RECOMMENDED WATER QUANTITY. DO NOT ADD ADDITIONAL WATER. -- COLD WEATHER GROUT/ CONCRETE SHALL FOLLOW APPROPRIATE RECOMMENDATIONS OF ACI 306R. WHERE AMBIENT TEMPERATURE IS LESS THAN 40°F PROVIDE HEATED MATERIAL OR INSIDE SHELTER TO MAINTAIN 40°F MATERIAL TEMPERATURE FOR 4 DAYS OR UNTIL GROUT/ CONCRETE OBTAINS f'c = 2,500 PSI. GEOTECHNICAL REPORT GEOTECHNICAL BASIS OF DESIGN, CARLSBAD BEACH ACCESS REPAIRS, PREPARED BY TERRACOSTA CONSULTING GROUP (NOW ENGEO), JULY 3, 2018. Aug. 5, 2024 Item #6 Page 10 of 40 fl. ----- I I ------ ' I 1 ,,. • • - ' ' ~ • V ' 1 l REINFORCING DEVELOPMENT AND LAP SPLICE IN CONCRETE l ' NOT TO SCALE ' -,, - JI. JI. •• Jl. •• • • • • • • , . , ' ' ~~-~ , •• ,:/' ~ , •• • • • . / I . . -·---. • \ ' • • \ / ,_.,, I , • • • • • • I \ I . .. . / -. • I -/ ' (I) BAR BENDS AND END HOOKS NOT TO SCALE -/' \ ~~ ' -I µ\ f ' ,,,,,-/\ / "'-/ :(/,~ l's./ r-1_.,,1 I \ r _ _, ' " V "'- , - " / \ ~) ( 'k__Jl. ~ (7 (7 ~J ' ' , , - --/ 3 \ PIPE PENETRATION /4' j l STIRRUP AND TIE HOOKS ,-) NOT TO SCALE ' I NOT TO SCALE \. --- I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT ~ofESS10~ ~ '\ II, S l{j ~ ..,~ ~ .j>* ':!- "' 0 ~No. 1~ * ~-tit, /30/25 * APPROVED: HOSSEIN AJIDEH ,l',: CIVIi-2~>)-ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE 'I'~ C/f' et,UI /(\ DWN BY: I I DRAWING NO. PROJECT NO. DATE: 6/30/2024 DATE INITIAL DATE INITIAL DATE INlllAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: D D D D D D D D D D D D D D 6' OFF S E T 6' OFF S E T 6' OFF S E T 3' O F F S E T 3' O F F S E T 6' OFF S E T 3' O F F S E T PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PHASE 2 BEACH ACCESS ROUTE PHASE 2 BEACH ACCESS ROUTE PHASE 2 BEACH ACCESS ROUTE PHASE 1 BEACH ACCESS ROUTE ALWAYS OPEN BEACH ACCESS ROUTE ALWAYS OPEN BEACH ACCESS ROUTE APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:19 June 2024 - 9:10 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-G07 THRU G08.dwgPlotted by:Bob Sherwood 7 95 IMPROVEMENT PLANS FOR: PROJECT PHASING 1 CIP #3896 529-8SC RS CM 1 PROJECT PHASING PLAN 1" = 60' N G-07 CARLSBAD BOULEVARD PACIFIC OCEAN PI N E A V E N U E WA L N U T A V E N U E SY C A M O R E A V E N U E CH E S T N U T A V E N U E MA P L E A V E N U E AC A C I A A V E N U E LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE PHASE 1A REPAIR AREA PHASE 1B REPAIR AREA PHASE 2 REPAIR AREA PROTECTED BLUFF WITHIN PROJECT LIMITS 0 120'60'180'240' Aug. 5, 2024 Item #6 Page 11 of 40 I I I I I \I I ,/<l, I I I I I I I I I '~ ~" "~ ~" :J D D I I I I I I I I I I I I I I I I I I I I I I l I I I ---t- i I I I I I I I I I I I I I I I I I I I I I I I I I I I 45/ --__J , .··-~______.__l = = = !iiia __:==!'=c~cJ , ' :J '/ ~2~~ ~20 _...... ~ -15 _ _ =:;;~~,r- ----- - ~ D ,. ~~=:,==:-.:-:~=-:=====-= 25' "' / ___ }: ->~ ' -,.",. ~ -·.~ \"'0 ,. 0 ' ' 0 ' ,,, ~J ~15 • I ,. ,. -1 ..... ~ 50 50 I I ) I I lo I ,. ,. I I I I I v/ I Ill 11~\ I 11 111 0 I -~ = ~ ~ ~ =-~ ~ 35,. 0 ~ "' 25 "' "' ,. + ,. 0------ DAm 6/30/2024 I I I I I I 11 &El I I ' ,.. I~ d I I .l ) r 0 I I I ,',',',',',,:,+:,',',:,: ,', 40 J5 ------ I I I I ,. ,. ,. ,. ,. + ,. .. ,. + + I I I ------r -- I I I I I I I I I I I I I I I I I I I + I I I I I I I I I I I I I I I I ~ + + ,. -------- L_J TY OF CARLSBAD ISHEE~I EEft=t*~=====~==~~===~~==t=Ffq~~~=3[sHEfil CI F=::::::'..-===EN=G=IN=E=E~Rl~N~G~D~E~P~A~RT~M~E~N~T==Lb==d DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL OTHER APPROVAL DATE INITIAL CITY APPROVAL APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6 30 2026 DATE DWN BY: CHKD BY: RVWD BY: I PROJECT NO. I DRAWING NO. D D D D D D D DD D D D D D D 6' OFFSET 6' OFFSET 6' OF F S E T 6' OFF S E T 1' O F F S E T 1' O F F S E T CONSTRUCTION STAGING AREA PH 1 & 2 PROJECT LIMIT PROJECT LIMIT PROJECT LIMIT PHASE 1 BEACH ACCESS ROUTE PHASE 1 BEACH ACCESS ROUTE PHASE 1 BEACH ACCESS ROUTE ALWAYS OPEN BEACH ACCESS ROUTE PHASE 1 BEACH ACCESS ROUTE PHASE 1 BEACH ACCESS ROUTE ALWAYS OPEN BEACH ACCESS ROUTE APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT (8,000 SF) GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:19 June 2024 - 9:11 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-G07 THRU G08.dwgPlotted by:Bob Sherwood 8 95 IMPROVEMENT PLANS FOR: PROJECT PHASING 2 CIP #3896 529-8MD RS CM 1 PROJECT PHASING PLAN 1" = 60' N G-08 0 120'60'180'240' CARLSBAD BOULEVARD PACIFIC OCEAN CH E R R Y A V E N U E JU N I P E R A V E N U E HE M L O C K A V E N U E RE D W O O D A V E N U E TA M A R A C K A V E N U E SE Q U O I A A V E N U E CH I N Q U A P I N A V E N U E LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE PHASE 1A REPAIR AREA PHASE 1B REPAIR AREA PHASE 2 REPAIR AREA PROTECTED BLUFF WITHIN PROJECT LIMITS CONSTRUCTION TRAILER Aug. 5, 2024 Item #6 Page 12 of 40 I UI __ , __ ,_ -. . . . . . . . . . . . □ .. ,. ""l><I \ \ \ I I \ \ I I I I -----I ~ ' tj 0 0 " .. ~----=io Cl Ill _,_ .. . .. , .... .. .. •-.. ;,------,, . .. * 0----- DAm 6/30/2024 I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL I I I I I I \ I I I I I \ I I I I I \ I I I I \ I I I I I I I I I \ \ I \ I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE OWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL CHKD BY: CITY APPROVAL RVWD BY: 10" ACP D D D D 66+0 6 67+00 68+00 69+00 70+00 CARLSBAD BL V D OCEAN STREET 67 + 3 8 . 5 3 C L 67 + 7 1 . 9 1 C L 68 + 0 5 . 3 2 C L 68 + 3 8 . 7 1 C L 68 + 7 2 . 1 1 C L 69 + 0 5 . 4 7 C L 69 + 3 8 . 7 8 C L 69 + 7 2 . 1 0 C L 70 + 0 6 . 4 5 C L 70 + 4 0 . 9 4 C L APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:20 June 2024 - 3:38 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-C13 THRU C18 SP.dwgPlotted by:Bob Sherwood N1SITE CONSTRUCTION PLAN 1"=20'0 40'20'10' MA T C H L I N E S T A : 7 0 + 6 2 - S E E C - 1 4 21 95 IMPROVEMENT PLANS FOR: SITE CONSTRUCTION PLAN 1 CIP #3896 529-8MD RS CM SHEET KEYNOTES CARLSBAD BLVD CENTERLINE & UPPER S/W CONTROL LINE PROJECT LIMITS PROJECT LIMITS C-13 FOR ENLARGED TYPICAL CONC PRECAST DOUBLE TEE SIDEWALK SECTION SEE PRECAST SECTION 1 2 3 4 5 6 7 8 9 10 STREETLIGHT BEGIN INSTALL END INSTALL BEGIN 66 + 7 3 . 0 0 MA T C H E X I S T 3'-10" WIDE TYP 3 3 3 BEGIN INSTALL3 RAILING TRANSITION 3 43 8 41 41 41 41 41 41 41 PRECAST SECTION PRECAST SECTION PRECAST SECTION PRECAST SECTION PRECAST SECTION PRECAST SECTION41PRECAST SECTION 41PRECAST SECTION 41PRECAST SECTION 11 8 81 BEGIN STREETLIGHT11 8 ANGLE POINT 3ANGLE POINT 3 PROJECT LIMITS PROJECT LIMITS PROJECT LIMITS PROJECT LIMITS PROJECT LIMITS TRASH CAN17 TRASH CAN 17 1 S-16 CLR WIDTH APPROX 20' CL R W I D T H AP P R O X 1 0 ' LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE 1. RECONSTRUCT ELEVATED UPPER SIDEWALK ON DOUBLE TEE BEAMS, SEE SHEET S-17 2. RECONSTRUCT ELEVATED UPPER SIDEWALK OVERLOOK, SEE SHEET S-18 3. INSTALL UPPER SIDEWALK SURFACE-MOUNTED RAILING, SEE SHEET S-09 4. INSTALL UPPER SIDEWALK SIDE-MOUNTED RAILING, SEE SHEET S-09 5. RECONSTRUCT ELEVATED CONCRETE LANDING PLATFORM, SEE SHEET S-07 6. INSTALL LANDING PLATFORM RAILING, SEE SHEET S-09 7. INSTALL ELEVATED LANDING PLATFORM STAIRWAY, SEE SHEET S-08 8. RECONSTRUCT CONCRETE UPPER SIDEWALK ON GRADE, SEE SHEET S-19 9. WIDEN UPPER SIDEWALK ON GRADE, SEE SHEET S-19 10. RECONSTRUCT CONCRETE CURB, SEE SHEET S-16 11. INSTALL NEW DOUBLE ARM STREETLIGHT, PULLBOX AND WIRING, SEE ELECTRICAL SHEETS 12. CONSTRUCT NEW UPPER SIDEWALK FOUNDATION FASCIA, SEE SHEET S-16 13. CONSTRUCT NEW CONCRETE L-WALL EXTENSION AND PAVEMENT, SEE SHEET S-15 14. REINSTALL SIGN 15. CONSTRUCT NEW STORM WATER BIOFILTRATION BASIN, SEE SHEET C-23 16. RECONSTRUCT UPPER SIDEWALK BEAM SUPPORT, SEE SHEET S-10 17. REINSTALL BIKE RACK, TRASH CANS, AND BENCHES 99. PROTECT IN PLACE 16 16 16 16 16 16 16 16 16 16 Aug. 5, 2024 Item #6 Page 13 of 40 ---------------. -- • 0 I I I I I I I I I I I I ':Co ---.._ ...____ I I I I I I I I I I 6 I I I I ~ I t;. ', ..._ ------, '---... ' "':--.. ~---.._ '---... ~ ', ' 46 ~ I ,, 0 oo • SD ~ SD SD --- --- _, I:, • . ----=-- I 45 fl I l l... .._ ------1/ 25 0 ::· ··:,-~;·,-:~:-::--"'.;'. >. --. •• ·--\~~~,1'~r, · "r .c~'.c~\~/.\~ • · ---------- ss - ss w 15 -------------------------------------20 .., .., --\.<...f"4; A-{/);, 0 OAlE: 0 1, 1~~r-::11. J<'-j~,( l:/-! A;c.;;;.( J\l-P--"~ DATE INITIAL ENGINEER OF WORK IS DESCRIPTION REVISION 49 ss w - ss w -- ss w I - DA TE INITIAL OTHER APPROVAL i I I I I I I I I I I I I I ss w I I I IS 1 w 'I' IS IS IS IS • w so DATE INITIAL CITY APPROVAL I I I w w _,_ w w I I I =====-:: 16 ·1 CARLSBAD CITY OF DEPARTMENT ENGINEERING I I I I I I SHEETS I HOSSEIN AJIDEH APPROVED: 30 2026 DA TE GER RCE 75991 EXP ~ I DRAWING NO. ,::;ENJCGi1NiEiEEJiR@IN~G_jM~A!!'!N~A~I = PROJECT NO. . DWN BY: CHKD BY: RVWD BY: 10" ACP D D D D 10" ACP 10" ACP 71+00 72+00 73+00 74+00 75+00 76+00 77+00 CARLSBAD BLVD. WA L N U T A V E . SY C A M O R E A V E . CH E S T N U T A V E . APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:20 June 2024 - 3:44 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-C13 THRU C18 SP.dwgPlotted by:Bob Sherwood 1 SITE CONSTRUCTION PLAN 1"=20'0 40'20'10' MA T C H L I N E S T A : 7 7 + 3 3 - S E E C - 1 5 N MA T C H L I N E S T A : 7 0 + 6 2 - S E E C - 1 3 22 95 IMPROVEMENT PLANS FOR: SITE CONSTRUCTION PLAN 2 CIP #3896 529-8MD RS CM SHEET KEYNOTES CARLSBAD BLVD CENTERLINE & UPPER S/W CONTROL LINE L = 14 LF 5 6 7 7 5 6 5 6 7 13 PROJECT LIMITS PROJECT LIMITS C-14 FOR ENLARGED TYPICAL CONC. DOUBLE TEE PLATFORM AREA SEE FOR ENLARGED TYPICAL CONC. DOUBLE TEE PLATFORM AREA SEE FOR ENLARGED TYPICAL CONCRETE ON GRADE SIDEWALK SECTION SEE 12 1918 11 20 21 22 23 24 25 FOR ENLARGED TYPICAL CONC PRECAST DOUBLE TEE SIDEWALK SECTION SEE 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION 4PRECAST SECTION STREETLIGHT11 STREETLIGHT11 STREETLIGHT 11 4PRECAST SECTION 70 + 7 5 . 4 5 C L 71 + 0 9 . 9 5 C L 71 + 4 4 . 4 5 C L 71 + 7 8 . 9 4 C L 72 + 1 3 . 4 4 C L 72 + 4 7 . 9 4 C L 72 + 8 2 . 4 4 C L 73 + 1 6 . 9 5 C L 73 + 5 1 . 4 3 C L 74 + 3 4 . 2 5 C L 74 + 6 8 . 7 6 C L 75 + 0 3 . 0 0 C L 75 + 3 7 . 5 0 C L 75 + 7 2 . 0 4 C L 76 + 0 6 . 2 8 C L 76 + 4 0 . 7 5 C L 76 + 7 5 . 1 9 C L 77 + 0 9 . 6 9 C L 8 8 8 8 8 94 END4 BEGIN4 17 17 99 LIFEGUARD TOWER 17 1 S-16 1 S-18 1 S-17 1 S-17 99 PROJECT LIMITS CURB RAMP99 16 13 14 15 1 2 1 1 1 1 17 1 1 1 1 1 1 1 1 26 1 2 LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE 1. RECONSTRUCT ELEVATED UPPER SIDEWALK ON DOUBLE TEE BEAMS, SEE SHEET S-17 2. RECONSTRUCT ELEVATED UPPER SIDEWALK OVERLOOK, SEE SHEET S-18 3. INSTALL UPPER SIDEWALK SURFACE-MOUNTED RAILING, SEE SHEET S-09 4. INSTALL UPPER SIDEWALK SIDE-MOUNTED RAILING, SEE SHEET S-09 5. RECONSTRUCT ELEVATED CONCRETE LANDING PLATFORM, SEE SHEET S-07 6. INSTALL LANDING PLATFORM RAILING, SEE SHEET S-09 7. INSTALL ELEVATED LANDING PLATFORM STAIRWAY, SEE SHEET S-08 8. RECONSTRUCT CONCRETE UPPER SIDEWALK ON GRADE, SEE SHEET S-19 9. WIDEN UPPER SIDEWALK ON GRADE, SEE SHEET S-19 10. RECONSTRUCT CONCRETE CURB, SEE SHEET S-16 11. INSTALL NEW DOUBLE ARM STREETLIGHT, PULLBOX AND WIRING, SEE ELECTRICAL SHEETS 12. CONSTRUCT NEW UPPER SIDEWALK FOUNDATION FASCIA, SEE SHEET S-16 13. CONSTRUCT NEW CONCRETE L-WALL EXTENSION AND PAVEMENT, SEE SHEET S-15 14. REINSTALL SIGN 15. CONSTRUCT NEW STORM WATER BIOFILTRATION BASIN, SEE SHEET C-23 16. RECONSTRUCT UPPER SIDEWALK BEAM SUPPORT, SEE SHEET S-10 17. REINSTALL BIKE RACK, TRASH CANS, AND BENCHES 99. PROTECT IN PLACE 1616161616 16 16 16 16 16 16 16 16 16 16 16 16 16 Aug. 5, 2024 Item #6 Page 14 of 40 I w I I ■ ■ I I I I I I 0 \ ; t- .I D (/) \ D (/) D (/) \ ( \ I IJ IS IS IS IS IS IS IS IS IS IS I I L _ _J V I I t I D V, I I I I I I I l I I I II I ~\ 0 n ~ I Sl -IS IS ' I I I I I I I • .. w -• w • w w • w w w - V, w , __ ...,,===="===~===:!::==!::=~==~=====,~-=-=~~,~~~-•---'•---•'--•'---1w,---111-.,,_vi_,._ _ _.-1-_ ... ww---wW'----•wr--... w1--... ww---ww'---•'--'•--w,---1wr--... w1---ww--'w,--w ( __,,' el QJ • - -- ,I ' -- ' ' D V, - ------ _:::::=:::::::: --_,_ ' J rD ' ' rO ' 25- 20-,_ 16 - ii I - .-------~-----,s-_____________ __ --- -,_ ~ ~ Q1---------- DAm 6/30/2024 ·- , ' ' f ' . ◊ --5s?ttt?~ --,- -/----- / ' 6' ' ----- _/ ' ' 0, I I .. --- ■ - I I ■ - I I I I I SHEET I CITY OF CARLSBAD I SHEETS I c====i====±=============================+====+====t====t===~ ~=::::::..:::::=:::::E::::N:::Gl:::::N::EE:::R:::IN::::::G=D:::::E=P=A=RT=M=E=N=T =:::::::...:::::===i APPROVED: HOSSEIN AJIDEH [::::::::::::::::j:::::::::::::j::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::t====+====+====~t===i ENGINEERING MANAGER RCE 75991 EXP 6 30 2026 DATE DATE INITIAL ENGINEER OF WORK PROJECT NO. REVISION DESCRIPTION OWN BY: __ _ DATE INITIAL DATE INITIAL CHKD BY: __ _ OTHER APPROVAL CITY APPROVAL RVWD BY: I DRAWING NO. D D D D D D78+00 79+00 80+00 81+00 82+00 83+00 84+00 CARLSBAD BLVD. MA P L E A V E . AC A C I A A V E . APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:20 June 2024 - 3:51 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-C13 THRU C18 SP.dwgPlotted by:Bob Sherwood 1 SITE CONSTRUCTION PLAN 1"=20'0 40'20'10' MA T C H L I N E S T A : 8 4 + 0 3 - S E E C - 1 6 N MA T C H L I N E S T A : 7 7 + 3 3 - S E E C - 1 4 23 95 IMPROVEMENT PLANS FOR: SITE CONSTRUCTION PLAN 3 CIP #3896 529-8MD RS CM SHEET KEYNOTES L = 22 LF CARLSBAD BLVD CENTERLINE & UPPER S/W CONTROL LINE 5 6 76 7 5 13 7 PROJECT LIMITS PROJECT LIMITS C-15 FOR ENLARGED TYPICAL CONC PRECAST DOUBLE TEE SIDEWALK SECTION SEE 27 28 29 FOR ENLARGED TYPICAL CONCRETE ON GRADE SIDEWALK SECTION SEE 41PRECAST SECTION 41PRECAST SECTION 41PRECAST SECTION 77 + 4 4 . 1 7 C L 77 + 7 8 . 6 0 C L 78 + 1 3 . 0 8 C L STREETLIGHT11 STREETLIGHT11 8 8 8 8 FOR ENLARGED CONCRETE OVERLOOK ON GRADE SIDEWALK SECTION SEE 9 END 4 BEGIN3 65 8 3 9 3 9 3 9 3 3 9 99 17 1 S-16 1 S-18 1 S-19 17 PROJECT LIMITS CURB RAMP99161616 LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE 1. RECONSTRUCT ELEVATED UPPER SIDEWALK ON DOUBLE TEE BEAMS, SEE SHEET S-17 2. RECONSTRUCT ELEVATED UPPER SIDEWALK OVERLOOK, SEE SHEET S-18 3. INSTALL UPPER SIDEWALK SURFACE-MOUNTED RAILING, SEE SHEET S-09 4. INSTALL UPPER SIDEWALK SIDE-MOUNTED RAILING, SEE SHEET S-09 5. RECONSTRUCT ELEVATED CONCRETE LANDING PLATFORM, SEE SHEET S-07 6. INSTALL LANDING PLATFORM RAILING, SEE SHEET S-09 7. INSTALL ELEVATED LANDING PLATFORM STAIRWAY, SEE SHEET S-08 8. RECONSTRUCT CONCRETE UPPER SIDEWALK ON GRADE, SEE SHEET S-19 9. WIDEN UPPER SIDEWALK ON GRADE, SEE SHEET S-19 10. RECONSTRUCT CONCRETE CURB, SEE SHEET S-16 11. INSTALL NEW DOUBLE ARM STREETLIGHT, PULLBOX AND WIRING, SEE ELECTRICAL SHEETS 12. CONSTRUCT NEW UPPER SIDEWALK FOUNDATION FASCIA, SEE SHEET S-16 13. CONSTRUCT NEW CONCRETE L-WALL EXTENSION AND PAVEMENT, SEE SHEET S-15 14. REINSTALL SIGN 15. CONSTRUCT NEW STORM WATER BIOFILTRATION BASIN, SEE SHEET C-23 16. RECONSTRUCT UPPER SIDEWALK BEAM SUPPORT, SEE SHEET S-10 17. REINSTALL BIKE RACK, TRASH CANS, AND BENCHES 99. PROTECT IN PLACE Aug. 5, 2024 Item #6 Page 15 of 40 I I I 1.- I I I I I -- ---- Ills I I ■ ■ ■ ■ ■ I _, .. ' ' C-- SB SB SB w ' ' rO I I I / ----------- 0 SB w ' SB • < l . 7 /-;:==l----,1 Ir-;=: 1=,,ltr== l==j\l I . L----i-n .,,-, ___ ___,, i-,-----. ___ _J C -SB • • • w ' ' --- -·- ' I I 'L-----' I I I I J L C: --- - SB ---....... ... SB ' ' I I I --·--1--_, □ --...;:::: 0,-■--------- ------1--1--I-1--1- _1 ...., ·- L----- 1----~-- - - r--' I ' '-....,--..__ \ \ I I I I I ,J,-------'· \ I ..... I I I -. ■ I I I I ARLSBAD I SHEETS I ENGINEERING DEPARTMENT E===E==±====================~===f===t===±=~ ~I S=H=EE=T '..:::I;~~~=~~=~=~~==~= ~====f===i==========================~~===~====f===3===3 ~A\PP?IPRRCO~V~ED~: ==================~ f-HOSSEIN AJIDEH ~=iDA~TiE=ti,N;ITl~A~Lf======~=========================!~~~~=~~:==t====j~===j ~E~N~Gl~NE~E~R~IN~G -~M~A~N-A~G~E~R r==RC~E~75~9~91~EX~P~6~i/~3~0/~2~0~26~~D~A~TE~=:! ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL I g~~D B~~: I PROJECT NO. I DRAWING NO. OTHER APPROVAL CITY APPROVAL RVWD BY: D D D D D D D D D 84+00 85+00 86+00 87+00 88+00 89+00 90+00 CARLSBAD BLVD. CH E R R Y A V E . JU N I P E R A V E . FLOW FLOW FLOW APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:20 June 2024 - 3:55 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-C13 THRU C18 SP.dwgPlotted by:Bob Sherwood 1 SITE CONSTRUCTION PLAN 1"=20'0 40'20'10' N MA T C H L I N E S T A : 8 4 + 0 3 - S E E C - 1 5 24 95 IMPROVEMENT PLANS FOR: SITE CONSTRUCTION PLAN 4 CIP #3896 529-8MD RS CM MA T C H L I N E S T A : 9 0 + 7 3 - S E E C - 1 7 5 7 SHEET KEYNOTES CARLSBAD BLVD CENTERLINE & UPPER S/W CONTROL LINE 6 6 75 6 3 7 6 3 19 4 PROJECT LIMITS PROJECT LIMITS C-16 FOR ENLARGED TYPICAL CONCRETE ON GRADE SIDEWALK SECTION SEE NEW STORM WATER CAPTURE BIOFILTRATION BASIN15 STREETLIGHT11 8 STREETLIGHT 11 8 STREETLIGHT 11 END BEGIN 3 ANGLE POINT 3 3 86 + 1 1 . 2 5 SC O R E L I N E 99 3 9 3 9 S-18 17 PROJECT LIMITS TEMPORARY CONSTRUCTION STAGING AREA 1 99 PULLBOXES RECONSTRUCT EJ BETWEEN SIDEWALK AND DROP INLET SAWCUT CURB 12BEGIN 12 END LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE 1. RECONSTRUCT ELEVATED UPPER SIDEWALK ON DOUBLE TEE BEAMS, SEE SHEET S-17 2. RECONSTRUCT ELEVATED UPPER SIDEWALK OVERLOOK, SEE SHEET S-18 3. INSTALL UPPER SIDEWALK SURFACE-MOUNTED RAILING, SEE SHEET S-09 4. INSTALL UPPER SIDEWALK SIDE-MOUNTED RAILING, SEE SHEET S-09 5. RECONSTRUCT ELEVATED CONCRETE LANDING PLATFORM, SEE SHEET S-07 6. INSTALL LANDING PLATFORM RAILING, SEE SHEET S-09 7. INSTALL ELEVATED LANDING PLATFORM STAIRWAY, SEE SHEET S-08 8. RECONSTRUCT CONCRETE UPPER SIDEWALK ON GRADE, SEE SHEET S-19 9. WIDEN UPPER SIDEWALK ON GRADE, SEE SHEET S-19 10. RECONSTRUCT CONCRETE CURB, SEE SHEET S-16 11. INSTALL NEW DOUBLE ARM STREETLIGHT, PULLBOX AND WIRING, SEE ELECTRICAL SHEETS 12. CONSTRUCT NEW UPPER SIDEWALK FOUNDATION FASCIA, SEE SHEET S-16 13. CONSTRUCT NEW CONCRETE L-WALL EXTENSION AND PAVEMENT, SEE SHEET S-15 14. REINSTALL SIGN 15. CONSTRUCT NEW STORM WATER BIOFILTRATION BASIN, SEE SHEET C-23 16. RECONSTRUCT UPPER SIDEWALK BEAM SUPPORT, SEE SHEET S-10 17. REINSTALL BIKE RACK, TRASH CANS, AND BENCHES 99. PROTECT IN PLACE Aug. 5, 2024 Item #6 Page 16 of 40 I I I I I I \ I I I l,_1._-,-------J lL I I I I r ";...-1\ =-----::...::.:::-"'\ I £J 1-----B I __ _ I I I I - 0 _, I I I I I L. \_ J ~ I------ I I I I 1 0 u----- ~ Ti I I - I _____ _JI I / I / I I / ________ J -~ 1 __ , __ I ___ _ ----- r-- I I " \ \ I I \ I I I I I I I ---- -- I I I I I I I I .;1::- L__ □ -I --I --I --I --I --I --1--,;;;;;..,i_+,_ .... _ --S0--SD--SD--SO--SD--SO--SD ------ __ , __ ,_ - --- -,_ so so so so SD so SD 0 SD so . -,_, ---G -,. ---._, ----cc ss ss ss ss ss ss ss ss ss • w w w w w w w w w w w __I __ I __ , __ _ --- so SD so so so SD SD SD SD SD SD Co \)( ::--Jo CJ CJ 0 [11 ---------__ ,_ 0-------- DAm 6/30/2024 SD • w - SD -' I_ ,~: -----' ss • w w w w w w , __ , __ I __ I_ .;z:- so SD so SD I SO 0 u, w w • w - I 0 <n 0 V, I Sl I § I g I C I \ \ \ I '- l I I I I I \. '-... --------~----------------• ~ ~ I , _______________ _ w w w w _,_ l-_, __ , __ , __ ,_ I -. o SD --SO--SD--SD--SD----f(i)l--SD-~x~S_D _ I I + 4(/ Js-------- JO X I -x-x-x-x• I I - 25- , __ -----------------_, _ _ , -i I I I t===~==+=====================±===t===i===±==JI SHEET I CITY OF CARLSBAD I SHEETS I I r===:..::::==E=N=G=IN=E=E=Rl=N:::::G=D::::E:::P:::::A::::R::::TM:::E::N:::::T:::::==:::..:==~ ~====t===~============================±====±====it====i====i r,A:==;:P:;;=PR;;';O';;'V;;::ED~-.=============d 1-1--,--t-----------------+--+--t--___j~_j HOSSEIN AJIDEH 1--1-,--t-------------l---l-------l-----l-_J l.:;==:-:-=:-:--::=----::-c--------1 ENGINEERING MANAGER RCE 75991 EXP 6 30 2026 DA TE 1o'□AAlTTEIININITITliAALLl----------------+-::-:--=~k-::----l-----!---_j ~D~W~N~B~Y=,= __ =i~-=';';====:::::'.':=~~~~=-=-:::!_~~~=-=--.~ ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL CHKD BY: ---PROJECT NO. I DRAWING NO. OTHER APPROVAL CITY APPROVAL RVWD BY: _ D D91+00 92+00 93+00 94+00 95+00 96+00 97+00 CARLSBAD BLVD. HE M L O C K A V E . RE D W O O D A V E . APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:20 June 2024 - 3:58 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-C13 THRU C18 SP.dwgPlotted by:Bob Sherwood 1 SITE CONSTRUCTION PLAN 1"=20'0 40'20'10' SHEET KEYNOTES N MA T C H L I N E S T A : 9 0 + 7 3 - S E E C - 1 6 25 95 IMPROVEMENT PLANS FOR: SITE CONSTRUCTION PLAN 5 CIP #3896 529-8MD RS CM MA T C H L I N E S T A : 9 7 + 4 3 - S E E C - 1 8 L = 18 LF CARLSBAD BLVD CENTERLINE & UPPER S/W CONTROL LINE 5 5 5 6 7 6 6 6 6 6 7 7 13 PROJECT LIMITS C-17 STREETLIGHT11 STREETLIGHT 11 STREETLIGHT11STREETLIGHT11 END 3 BEGIN3 3 3 3 3ANGLE POINT 17 9999 PROJECT LIMITS TEMPORARY CONSTRUCTION STAGING AREA PROJECT LIMITS LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE 1. RECONSTRUCT ELEVATED UPPER SIDEWALK ON DOUBLE TEE BEAMS, SEE SHEET S-17 2. RECONSTRUCT ELEVATED UPPER SIDEWALK OVERLOOK, SEE SHEET S-18 3. INSTALL UPPER SIDEWALK SURFACE-MOUNTED RAILING, SEE SHEET S-09 4. INSTALL UPPER SIDEWALK SIDE-MOUNTED RAILING, SEE SHEET S-09 5. RECONSTRUCT ELEVATED CONCRETE LANDING PLATFORM, SEE SHEET S-07 6. INSTALL LANDING PLATFORM RAILING, SEE SHEET S-09 7. INSTALL ELEVATED LANDING PLATFORM STAIRWAY, SEE SHEET S-08 8. RECONSTRUCT CONCRETE UPPER SIDEWALK ON GRADE, SEE SHEET S-19 9. WIDEN UPPER SIDEWALK ON GRADE, SEE SHEET S-19 10. RECONSTRUCT CONCRETE CURB, SEE SHEET S-16 11. INSTALL NEW DOUBLE ARM STREETLIGHT, PULLBOX AND WIRING, SEE ELECTRICAL SHEETS 12. CONSTRUCT NEW UPPER SIDEWALK FOUNDATION FASCIA, SEE SHEET S-16 13. CONSTRUCT NEW CONCRETE L-WALL EXTENSION AND PAVEMENT, SEE SHEET S-15 14. REINSTALL SIGN 15. CONSTRUCT NEW STORM WATER BIOFILTRATION BASIN, SEE SHEET C-23 16. RECONSTRUCT UPPER SIDEWALK BEAM SUPPORT, SEE SHEET S-10 17. REINSTALL BIKE RACK, TRASH CANS, AND BENCHES 99. PROTECT IN PLACE Aug. 5, 2024 Item #6 Page 17 of 40 I I I __J I I ' ---- --I - -I -- I - -I -- I ---' - - I I I I I 1 I I SD y SD -- ' ' ' I so-v~-so , ' " , ' !---,_ , ' =-----40 35 -·-·-I ___ I __ I __ I __ ,_ I ' ' 0 ' ' X I __ , ____ , __ , __ ,_ --- -,_ . . . □ - . -, , rD -, ' , ' , , __ w .£. _1,' ----11-_1 __ 1,i.----1--'- -I __ , __ / ______ , __ , __ ,~_, '~ ; I D u, , -'I I 71 D ,, '1 ,, ' tjtj \)~ 0 1? CJ O CJ [l] [l] ; , -✓• -, < ' ~ -:::::------::::-----::: 7 I ----:::..----: , --=-------~"'------. --1--1-- -•·---:::.. -. ....; __ I __ , I --· - -1--1 ·-- □ - Qr---------- ~ofESSJo~ ::f, -,. II, S lie ~ ~ ,p#,, ✓ 1 0 *"' I 12s '1 J'(f.,,_ CIVIi. ~ •c or CAUl'"--- oAm 6/30/2024 ' ------· . I I I I I I I SHEET I CITY OF CARLSBAD I SHEETS I ~====t===~============================±====±====t===JE==3 ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ~=~;~t;;;~~===========================±=~==±===~t===~c==3 ENGINEERING MANAGER RCE 75991 EXP 6130/2026 I DATE INITIAL OWN BY: ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL CHKD BY: --I PROJECT NO. I DRAWING NO. OTHER APPROVAL CITY APPROVAL RVWD BY: . . DATE D D DD CARLSBAD BLVD. TA M A R A C K A V E . SE Q U O I A A V E . APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT APPROXIMATE COASTAL COMMISSION JURISDICTIONAL LIMIT 98+00 99+00 100+00 101+00 102+00 103+00 104+00 GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:20 June 2024 - 4:05 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-C13 THRU C18 SP.dwgPlotted by:Bob Sherwood 1 SITE CONSTRUCTION PLAN 1"=20'0 40'20'10' N MA T C H L I N E S T A : 9 7 + 4 3 - S E E C - 1 7 26 95 IMPROVEMENT PLANS FOR: SITE CONSTRUCTION PLAN 6 CIP #3896 529-8MD RS CM SHEET KEYNOTES EJ CARLSBAD BLVD CENTERLINE & UPPER S/W CONTROL LINE PROJECT LIMITS PROJECT LIMITS C-18 STREETLIGHT99 CURB & DRINK FOUNTAIN99 PROJECT LIMITS 99BENCH LEGEND ENVIRONMENTAL BOUNDARY PROJECT LIMITS COASTAL COMMISSION JURISDICTIONAL LINE CULTURAL / HISTORICAL BOUNDARY CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE STREETLIGHT99 PIP RESTROOM, CMU WALLS AND COLUMNS99 1. RECONSTRUCT ELEVATED UPPER SIDEWALK ON DOUBLE TEE BEAMS, SEE SHEET S-17 2. RECONSTRUCT ELEVATED UPPER SIDEWALK OVERLOOK, SEE SHEET S-18 3. INSTALL UPPER SIDEWALK SURFACE-MOUNTED RAILING, SEE SHEET S-09 4. INSTALL UPPER SIDEWALK SIDE-MOUNTED RAILING, SEE SHEET S-09 5. RECONSTRUCT ELEVATED CONCRETE LANDING PLATFORM, SEE SHEET S-07 6. INSTALL LANDING PLATFORM RAILING, SEE SHEET S-09 7. INSTALL ELEVATED LANDING PLATFORM STAIRWAY, SEE SHEET S-08 8. RECONSTRUCT CONCRETE UPPER SIDEWALK ON GRADE, SEE SHEET S-19 9. WIDEN UPPER SIDEWALK ON GRADE, SEE SHEET S-19 10. RECONSTRUCT CONCRETE CURB, SEE SHEET S-16 11. INSTALL NEW DOUBLE ARM STREETLIGHT, PULLBOX AND WIRING, SEE ELECTRICAL SHEETS 12. CONSTRUCT NEW UPPER SIDEWALK FOUNDATION FASCIA, SEE SHEET S-16 13. CONSTRUCT NEW CONCRETE L-WALL EXTENSION AND PAVEMENT, SEE SHEET S-15 14. REINSTALL SIGN 15. CONSTRUCT NEW STORM WATER BIOFILTRATION BASIN, SEE SHEET C-23 16. RECONSTRUCT UPPER SIDEWALK BEAM SUPPORT, SEE SHEET S-10 17. REINSTALL BIKE RACK, TRASH CANS, AND BENCHES 99. PROTECT IN PLACE Aug. 5, 2024 Item #6 Page 18 of 40 0 I I I I I I II iJ ~ \ .£_ - t II - I w • / / SI ss w --1 ------ . I ------------I -----------I -----1 ---ss ss SS SS SI w~-~--W SI _J,~""':::-"''-- SI SI w w w SS SI w,-~11-----W-I -_ _,,, .. __ . ., __ .,,_:~~---• w I I SD SD SD SD SD SD SD I I SD SD SD so ----------S□---SD ---SD--:cr-SO ---SD---------- ----------- ---I I so---s□---J~:c,7,___ tD--IIJ,,.L,SD---SD---SD---o-SD----+ SD---SD-----,~--"f- ~==~--===== D; I ------..,:-_-..:-: ______ _ II II II II u II II II II -------- □ I I +-so --t'· I so SD --- ---- \\ \ I \ \ I \ \ I \ \ ' \ \ \ \ SD --- ' \ \ \ \ \ so- ' \ --- ---- \ \ \ \ \ ' \ \ \ \ \ \ ------------ 0 -----------., SD 0 w ----------- w w so SD so SD w ?--so---5 so---s□~ so---s __ -so---s□--- -------------------------- --- --- ' \ \ \ \ \ \ \ \ ' ' \ ---- \ \ \ \ \ ' \ \ ' \ \ \ \ \ \ ' --------- ----- ' \ \ \ ' \ \ \ ----~''<-----, \ \ \ \ \ ' \ \ ' \ \ \ \ \ \ ' ' \ \ \ \ \ \ \ ' \ ' \ \ \ \ \ \ \ \ ' ' \ \ \ \ \ \ \ \ ' ' \ \ \ \ \ \ ' \ \ \ ' \ \ \ \ \ \ ' \ ' \ \ \ \ I I l!I I \ _ _\.,_.--·, 1.-----i'---;:, \ ', I \ \ ' \ \ \ ' ' ' I I I I I I I I --_ ,_ .. 0 - -=,-a=----- -1--1-_, _ --- --- -,_ -,_ -------------- ------------------ □ o>-------- DAm 6/30/2024 1----.J, I I I I I I I I I I I I I I I I I I I I I l I I ---------~--:-I I I I I I I I I I I I I I I I I I I I I I I I I I I If I I I I I I I I I I I I I I / I I I I I I I I I I I I I I I I I +----, I I I I I I I I I I I I / / / / / / --f----1------1----I l II 1 1 / / / / / / / ,/ / ,/ / ,/ / / f----l----f----t---~r--/ / / / / ,.,.,,.,,,.. / I I I I I / + ---I I / I t I I I I // / ,' ,' / / / ,' / / / L 1'----1-----1------I / I / / / ,' l / / l I I I I I I I I I I +----r----I I I I I / / / / / / / / / / I I I I I I I f----f----I I I I I I f I J I I I I I I I ,' I / / +' ____ L----f----, I 1' I l I I 1' / / / / / / / / / / I I --/ -r I I I I I I I I I I I I f L~----r-----/----;1---~1 ---/ / / / / / / / / / / / / / / / 1 I I ////I I I I I I / I I I/// \ / / / / / / / / / I I I I I \ I I I I I I I I I I I I \ I I I I I I I I I I I I \II I I I I I I '\ I I t I I , I I I ', I I I ----~~"-.,=~ I \ \ \ \ \ \ ' \ \ \ \ \ ' DATE INITIAL ENGINEER OF WORK \ \ ' \ REVISION DESCRIPTION \ \ \ \ \ \ ' ' \ \ \ \ ' \ \ \ \ \ \ ' \ \ \ \ \ DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL \ \ \ \ \ \ \ \ \ ' \ \ \ \ \ ' \ \ \ \ ' \ \ \ ' \ \ ' \ \ \ ' \ \ CITY \ ' \ \ \ \ \ \ \ \ \ \ \ OF \ \ \ \ \ \ \ \ \ \ \ ' \ \ \ ' \ \ \ \ ,'-____ _ ' \ CARLSBAD \ ' ' \ \ \ I SHEET I ENGINEERING DEPARTMENT I SHEETS I APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE OWN BY: I PROJECT NO. I DRAWING NO. CHKD BY: RVWD BY: D GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:26 June 2024 - 4:11 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S01 THRU S05 LANDING PLAN.dwgPlotted by:Bob Sherwood N1SYCAMORE AVENUE STAIR LANDING PLAN 1"=5'0 10'5' 34 95 IMPROVEMENT PLANS FOR: STAIR LANDING PLAN AND PROFILE 1 CIP #3896 529-8RR RS -- INSTALL 19-STEP LANDING STAIRWAY SEE DETAIL INSTALL 19-STEP LANDING STAIRWAY SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL 14-STEP LANDING STAIRWAY SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL L (E) PIER AND PLATFORMC L (E) PIER AND PLATFORM L (E) PIER AND PLATFORMC C NEW ON GRADE CONC SIDEWALK EL. 48.96 EL. 48.96 EL. 40.22 FS EL. 40.22 EL. 28.56 FS EL. 28.56 EL. 17.48 TREAD NOSE CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL NEW ELEVATED CONC SIDEWALK EJ EJ EL. 39.63 EL. 48.38 EL. 40.80 EL. 40.22 EL. 27.97 EL. 16.90 (E) S/W FS EL. 29.14 EL. 28.56 EL. 48.96 FS S-01 EL. 50.00 NGVD29 48 . 9 6 F S 48 . 9 6 0 F S 48 . 3 7 7 47 . 7 9 4 47 . 2 1 1 46 . 6 2 8 46 . 0 4 5 45 . 4 6 2 44. 8 7 9 44. 2 9 6 43. 7 1 3 43. 1 3 0 42. 5 4 7 41. 9 6 4 41. 3 8 1 40. 7 9 8 40. 2 1 5 F S 0.0% 39.6 3 2 39.0 4 9 38.4 6 6 37.8 8 3 37.3 0 0 36.7 1 7 36.1 3 4 35.5 5 1 34.9 6 8 34.3 8 5 33.8 0 2 33.2 1 9 32.6 3 6 32.0 5 3 31.4 7 0 30.8 8 7 30.3 0 1 29.7 2 1 29.1 3 8 28.5 5 5 F S 0.0%27. 9 7 2 27. 3 8 9 26. 8 0 6 26. 2 2 3 25. 6 4 0 25. 0 5 7 24. 4 7 4 23. 8 9 1 23. 3 0 8 22. 7 2 5 22. 1 4 2 21. 5 5 9 20. 9 7 6 20. 3 9 3 19. 8 1 0 19. 2 2 7 18. 6 4 4 18. 0 6 1 17. 4 7 8 16. 8 9 5 F S 0.0% EL. 45.00 EL. 40.00 EL. 35.00 EL. 30.00 EL. 25.00 EL. 20.00 2 SYCAMORE AVENUE STAIR LANDING PROFILE 1"=2'0 4'2' 0.0% LOWER SIDEWALK UPPER SIDEWALK LEVEL UPPER ELEVATED PLATFORM LOWER ELEVATED PLATFORM MIDDLE ELEVATED PLATFORM CONSTRUCT NEW CONCRETE L-WALL EXTENSION PER DETAIL SEE SHEET S-11 FOR RAILING DIMENSIONS 5 S-08 3 S-09 3 S-09 5 S-08 3 S-09 3 S-09 3 S-09 5 S-08 1 S-07 1 S-07 1 S-07 PROVIDE EXPANSION JOINT BETWEEN PLATFORM AND SIDEWALK CONCRETE (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN PLATFORM PLATFORM PLATFORM (EL. 48.75 TC) (EL. 48.70 TC) EL. 49.00 (EL. 48.74 TC) EL. 48.95 EL. 15.00 LOWER SIDEWALK LOWER PLATFORM MIDDLE PLATFORM UPPER PLATFORM 2. 0 % M A X 0. 0 % SI D E W A L K 1 S-15 EJ EJ EJEJ INSTALL SIDE-MOUNTED ALUMINUM RAILING SEE DETAIL 2 S-09 INSTALL SIDE-MOUNTED ALUMINUM RAILING SEE DETAIL 2 S-09 A S-05 LEGEND CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE Aug. 5, 2024 Item #6 Page 19 of 40 [7 V .I> I> b b \;' b " • " -------------- D b ! • " ·b -~ , I i -------------------------------------------- l> [7. . . . . . . . . .. . . . • : . . ---------------------------- 01-------- -------,=,;.a.;:::=,__ - - - - - - - ------- - - DAlE, 6/30/2024 - - 0----- t---+----+-------------l---l----1--___j~__JI SHEET I CITY OF CARLSBAD I SHEETS I ~===--====EN=G=l=N=EE=R=l=N=G=D=E=P=A::R::T::M:::E=NT::==::::::-'===::: APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6 30 2026 DA TE DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL DATE INlllAL OTHER APPROVAL CITY APPROVAL DWN BY: ---PROJECT NO. DRAWING NO. CHKD BY: __ _ RVWD BY: GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:26 June 2024 - 4:10 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S01 THRU S05 LANDING PLAN.dwgPlotted by:Bob Sherwood 1 MAPLE AVENUE STAIR LANDING PLAN 1"= 5'0 10'5' N 35 95 IMPROVEMENT PLANS FOR: STAIR LANDING PLAN AND PROFILE 2 CIP #3896 529-8RR RS -- (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN PROVIDE EXPANSION JOINT BETWEEN PLATFORM AND SIDEWALK CONCRETE L (E) PIER AND (N) PLATFORM C (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN L (E) PIER AND (N) PLATFORM L (E) PIER AND (N) PLATFORM C C CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL INSTALL 17-STEP LANDING STAIRWAY SEE DETAIL INSTALL 15-STEP LANDING STAIRWAY SEE DETAIL INSTALL 17-STEP LANDING STAIRWAY SEE DETAIL CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL CONSTRUCT NEW WALL EXTENSION SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL EL. 47.230 FS EL. 47.23 EL. 36.736 FS EL. 36.736 EL. 26.242 EL. 26.242 FS NEW ELEVATED CONC SIDEWALK NEW ON GRADE CONC SIDEWALK EJ CJ EL. 25.659 EL. 26.825 EL. 26.242 EL. 17.497 TREAD NOSE EL. 16.914 (E) S/W FS EL. 36.153 EL. 37.319 EL. 36.736 EL. 47.230 EL. 45.010 S-02 EL. 50.00 NGVD29 47.2 3 0 F S 47.2 3 0 F S 46.6 4 7 46.0 6 4 45.4 8 1 44.8 9 8 44.3 1 5 43.7 3 2 43.1 4 9 42.5 6 6 41.9 8 3 41.4 0 0 40.8 1 7 40.2 3 4 39.6 5 1 39.0 6 8 36.7 3 6 F S 0.0% 23.3 2 7 22.7 4 4 22.1 6 1 21.5 7 8 20.9 9 5 20.4 1 2 19.8 2 9 19.2 4 6 18.6 6 3 18.0 8 0 35. 5 7 0 34 . 9 8 7 34 . 4 0 4 33 . 8 2 1 33 . 2 3 8 32 . 6 5 5 32 . 0 7 2 31 . 4 8 9 30 . 9 0 6 30 . 3 2 3 29 . 7 4 0 29 . 1 5 7 28 . 5 7 4 27 . 9 9 1 27 . 4 0 8 26 . 8 2 5 26 . 2 4 2 F S 0.0% 25.6 5 9 25.0 7 6 24.4 9 3 23.9 1 0 17.4 9 7 16.9 1 4 ( E ) S / W F S 0.0% EL. 45.00 EL. 40.00 EL. 35.00 EL. 30.00 EL. 25.00 EL. 20.00 0.0% LOWER SIDEWALK UPPER SIDEWALK LEVEL UPPER ELEVATED PLATFORM LOWER ELEVATED PLATFORM MIDDLE ELEVATED PLATFORM 38.4 8 5 37.9 0 2 37.3 1 9 36. 1 5 3 2 MAPLE AVENUE STAIR LANDING PROFILE 1"=2'0 4'2' SEE SHEET S-12 FOR RAILING DIMENSIONS 1 S-07 5 S-08 1 S-07 1 S-07 2 S-15 3 S-09 3 S-09 3 S-09 3 S-09 5 S-08 5 S-08 EL. 47.04 PLATFORM (EL. 46.99 TC) EL. 47.23 (EL. 46.79 TC) 2. 0 % M A X 0. 0 % SI D E W A L K (EL. 46.96 TC) NEW ON GRADE CONC SIDEWALK EJ EJ EJ EJ PLATFORM PLATFORM EL. 15.00 CJ LOWER PLATFORM MIDDLE PLATFORM UPPER PLATFORM INSTALL TOP-MOUNTED ALUMINUM RAILING SEE DETAIL 1 S-09 INSTALL SIDE-MOUNTED ALUMINUM RAILING SEE DETAIL 2 S-09 NEW ON GRADE CONC SIDEWALK B S-05 LEGEND CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE Aug. 5, 2024 Item #6 Page 20 of 40 SD---SD---SD---SD---SD---SD---SD---SD---SD---SD---SD---50---SD---SD- -SD---SD---SD---SD---SD---SD---SD---SD---SD---SD---SD---SD---'\ / --------------- 17. " • 17 l> i /> pl['-:.._ " 17 . I> I> " I> .. 17 -------, b \;> 11' .b 1> b 1> .b b \;>, 1> b ' __ __/ ------------------- t> ·v . i I i 17 I> t>-\7 • I> .. ~.-·--~---JZ. __ :.c__·_._·_ I>--,--- b • 1> • b· •. I . . I ·~· .. / "- ,. I -I ' .,, • \7 ------------------------------- " 17 . /> " I> I> . " •• " 1> .. ·/ .. ···t ·· . . .. . . . _. . oo --~------------~ ---------------------- I / 11 I ----------------------~---------,~------------- 0----- DAlE, 6/30/2024 - - - 0----- I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INlllAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:26 June 2024 - 9:25 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S01 THRU S05 LANDING PLAN.dwgPlotted by:Bob Sherwood 1 CHERRY AVENUE STAIR LANDING PLAN 1"= 5'0 10'5' N 36 95 IMPROVEMENT PLANS FOR: STAIR LANDING PLAN AND PROFILE 3 CIP #3896 529-8RR RS -- (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN EXISTING CONCRETE SIDEWALK TO REMAIN L (E) PIER AND (N) PLATFORM C (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN L (E) PIER AND (N) PLATFORM C CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL INSTALL 17-STEP LANDING STAIRWAY SEE DETAIL INSTALL 14-STEP LANDING STAIRWAY SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL 18-STEP LANDING STAIRWAY SEE DETAIL EL. 47.213 FS EL. 36.130 FS EL. 36.130 EL. 25.630 FS EL. 25.630 EL. 17.463 TREAD NOSE NEW ON GRADE CONC SIDEWALK CJ REPLACE STREETLIGHT SEE ELECTRICAL SHEETS EL. 46.630 EL. 36.713 EL. 36.130 EL. 35.546 EL. 16.88 (E) S/W FS EL. 26.213 EL. 25.630 EL. 25.046 S-03 EJ EL. 50.00 NGVD29 EL. 45.00 EL. 40.00 EL. 35.00 EL. 30.00 EL. 25.00 EL. 20.00 2 CHERRY AVENUE STAIR LANDING PROFILE 1"=2'0 4'2' 46. 6 3 0 46. 0 4 6 45. 4 6 3 44. 8 8 0 44. 2 9 6 43. 7 1 3 43. 1 3 0 42. 5 4 6 41. 9 6 3 41. 3 8 0 40. 7 9 6 40. 2 1 3 39. 6 3 0 39. 0 4 6 38. 4 6 3 37. 8 8 0 37. 2 9 6 35.5 4 6 34.9 6 3 34.3 8 0 33.7 9 6 33.2 1 3 32.6 3 0 32.0 4 6 31.4 6 3 30.8 8 0 30.2 9 6 29.7 1 3 29.1 3 0 28.5 4 6 27.9 6 3 27.3 8 0 26.7 9 6 0.9%UPPER SIDEWALK LEVEL 25.6 3 0 F S 25.04 6 23.8 8 0 23.29 6 22.7 1 3 22.1 3 0 21.5 4 6 20.96 3 20.3 8 0 19.79 6 19.2 1 3 18.6 3 0 36. 7 1 3 36. 1 3 0 F S 0.0% MIDDLE ELEVATED PLATFORM 26.2 1 3 25.6 3 0 F S 0.0% LOWER ELEVATED PLATFORM24.46 3 18.0 4 6 17.46 3 16.88 0 F S 0.0%LOWER SIDEWALK LOWER ELEVATED PLATFORM SEE SHEET S-13 FOR RAILING DIMENSIONS 1 S-07 5 S-08 3 S-09 5 S-08 1 S-07 3 S-09 1 S-07 3 S-09 3 S-09 5 S-08 EJ 2. 0 % M A X 0. 0 % SI D E W A L K (EL. 48.09 TC) EJ (EL. 48.29 TC) EL. 48.54 CJ (EL. 48.23 TC)(EL. 48.17 TC) EL. 47.43 EL. 48.29 EP EL. 48.00 EP EL. 47.71 EP EL. 48.12 EP 1. 0 % EL. 47.71 EP 0. 5 % EL. 47.30 EP EL. 47.26 4. 2 % 4.2% NEW ON GRADE CONC SIDEWALK (EL. 48.05 TC)(EL. 48.08 TC) (EL. 48.06 TC) (EL. 47.42 TC) (EL. 46.93) (EL. 47.59 EP) EL. 46.78 (EL. 47.03 GB)(EL. 47.09 GB) FLOW FLOW (EL. 46.95 TC) (EL. 46.56 FL) EL. 46.94 FL EL. 46.99 EP EL. 46.99 EP 0.9 % (EL. 47.22 TC) EJ EJ EL. 47.21 EL. 47.21 EL. 47.13 EL. 47.26 1.5% 4.2 % MATCH EXIST. FLOW F L O W EL. 46.79 0. 5 % CONSTRUCT 2' WIDE RIBBON GUTTER 47. 2 1 3 F S 0.0% 1 . 7 5 % EL. 46.75 FL EL. 46.80 EPEL. 46.80 EP GB PLATFORM PLATFORM EL. 15.00 LOWER PLATFORM MIDDLE PLATFORM UPPER SIDEWALK BEGIN CONSTRUCT NEW FASCIA ALONG (E) RET WALL PER SECTION INSTALL TOP-MOUNTED ALUMINUM RAILING SEE DETAIL 1 S-09 INSTALL TOP-MOUNTED ALUMINUM RAILING SEE DETAIL 1 S-09 C S-05 LEGEND CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE BEGIN CONSTRUCT NEW FASCIA ALONG (E) RET WALL PER SECTION C S-05 C S-05 CJ EJ Aug. 5, 2024 Item #6 Page 21 of 40 ---- -------------- I> . P.V ~ ----- I ~-. . I i • ;---I C,.. 17. -------- - \7 • I> 17 • " ~-'------17 • / I. .v· \ ~---J5 I 8 0------ ----.____ .____ '--'--'-- 8 DAlE, 6/30/2024 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION '-'-'-'-'-'-'-'-'- DA TE INITIAL OTHER APPROVAL - - ---'-.____ '-'-'--~ '--\ '--.____ I .____ ------J --.._ I ----/ --------- - APPROVED: HOSSEIN AJIDEH DATE INlllAL CITY APPROVAL ENGINEERING MANAGER DWN BY: CHKD BY: RVWD BY: RCE 75991 EXP 6 30 2026 DATE I PROJECT NO. I DRAWING NO. GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:26 June 2024 - 4:08 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S01 THRU S05 LANDING PLAN.dwgPlotted by:Bob Sherwood 37 95 IMPROVEMENT PLANS FOR: STAIR LANDING PLAN AND PROFILE 4 CIP #3896 529-8RR RS -- 1 HEMLOCK AVENUE STAIR LANDING PLAN 1"= 5'0 10'5' N EXISTING CONCRETE SIDEWALK TO REMAIN L (E) PIER AND (N) PLATFORM C (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN L (E) PIER AND (N) PLATFORM L (E) PIER AND (N) PLATFORM C C CONSTRUCT ELEVATED REINFORCED CONCRETE LANDING SEE DETAIL INSTALL 9-STEP LANDING STAIRWAY SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN INSTALL PLATFORM RAILING SEE DETAIL INSTALL 19-STEP LANDING STAIRWAY SEE DETAIL INSTALL 19-STEP LANDING STAIRWAY SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL INSTALL PLATFORM RAILING SEE DETAIL CONSTRUCT L-WALL EXTENSION SEE DETAIL (E) 4' Ø CONCRETE FOUNDATION PILE BELOW TO REMAIN EL. 28.500 FS EL. 28.500 EL. 17.417 TREAD NOSE EL. 40.750 EL. 40.167 EL. 46.000 EL. 46.10 FS EL. 45.417 EL. 46.00 FS EL. 40.167 EL. 39.583 EL. 40.167 FS EL. 29.083 EL. 28.500 EL. 27.917 EL. 16.833 (E) S/W FS S-04 44.8 3 3 44.2 5 0 43.6 6 7 43.0 8 3 42.5 0 0 41.9 1 7 41.3 3 3 40.7 5 0 40.1 6 7 F S 39. 0 0 0 38. 4 1 7 37. 8 3 3 37 . 2 5 0 36 . 6 6 7 36 . 0 8 3 35. 5 0 0 34 . 9 1 7 34 . 3 3 3 33 . 7 5 0 33 . 1 6 7 32 . 5 8 3 46.0 0 F S 32. 0 0 0 31 . 4 1 7 46.0 0 0 F S 30 . 8 3 3 30 . 2 5 0 45.4 1 7 27.9 1 7 27.3 3 3 26.7 5 0 26.1 6 7 25.5 8 3 25.0 0 0 24.4 1 7 23.8 3 3 23.2 5 0 22.6 6 7 0.0% 22.0 8 3 21.5 0 0 20.9 1 7 20.3 3 3 39. 5 8 3 29 . 6 6 7 19.7 5 0 19.1 6 7 18.5 8 3 28 . 5 0 0 F S 0.0% 16.83 3 F S 0.0% EL. 45.00 NGVD29 EL. 40.00 EL. 35.00 EL. 30.00 EL. 25.00 EL. 20.00 2 HEMLOCK AVENUE STAIR LANDING PROFILE 1"=2'0 4'2' 0.0% LOWER SIDEWALK UPPER SIDEWALK LEVEL UPPER ELEVATED PLATFORM LOWER ELEVATED PLATFORM MIDDLE ELEVATED PLATFORM 29 . 0 8 3 18.0 0 0 17.4 1 7 SEE SHEET S-14 FOR RAILING DIMENSIONS 1 S-07 5 S-08 3 S-09 3 S-09 3 S-09 5 S-08 5 S-08 3 S-09 3 S-09 3 S-15 REPLACE STREETLIGHT SEE ELECTRICAL SHEETS PROVIDE EXPANSION JOINT BETWEEN PLATFORM AND SIDEWALK CONCRETE LOWER PLATFORM MIDDLE PLATFORM UPPER PLATFORM PLATFORM PLATFORM PLATFORM MATCH EXIST. GB EL. 15.00 INSTALL TOP-MOUNTED ALUMINUM RAILING SEE DETAIL 1 S-09 INSTALL TOP-MOUNTED ALUMINUM RAILING SEE DETAIL 1 S-09 A S-05 LEGEND CONCRETE REPAIR / REPLACEMENT NEW LITHOCRETE SURFACE Aug. 5, 2024 Item #6 Page 22 of 40 - .. I ./ . . . . J.._,, • . . . ,: I . ==--~-:=:t~~b .J5 00 - 0 Qi--------- □ . .. . 0------ ~i¾=!=~=====~===~~====~===t~~==t=Etq=r~=3LJHEET CI Fr--=+=t=======~===t=+=t==i=~ TY OF CARLSBAD ISHEETSI F=====~====t============jjjjjjjjj===========i====~~====t====3~~~~~ F=='...::::==E=N=G=IN=E=ER~l~N~G~D~E~P~A~R~TM~EgN~T~=Jl==~ HOSSEIN AJIDEH RCE 75991 EXP 6 30 202S DATE DAlE, 6/30/2024 OTHER APPROVAL CHKD BY: CITY APPROVAL RVWD BY: PROJECT NO. I DRAWING NO. (E) CURB AND GUTTER TO REMAIN IN PLACE 2% MAX (N) 9" THK CONC SLAB ON GRADE PER PLAN 3'-10" 1/2" (#4) x 24" SMOOTH DOWEL AT 30" OC DOWELED EXPANSION JOINT AT SIDEWALK TO PLATFORM TRANSITION SAWCUT CONTROL JOINT 1/8" WIDE x 1/2" DEEP 1'-0" 12" MIN PER ORIGINAL AS-BUILT DRAWINGS (E) SOIL LINE VARIES PER LOCATION (E) #4 @ 10" (E) #4 @ 12" #5 @ 18" EA WAY 3" CL R M I N CHIP OUT CONCRETE AROUND EXIST #4@12 REBAR AND CUT LEG TO 18" MIN PIP (E) SIDEWALK FOUNDATION 5" CAB (N) PLATFORM 6'-6" (E) CURB AND GUTTER TO REMAIN IN PLACE 2% MAX (N) 9" THK CONC SLAB ON GRADE PER PLAN 3'-10" 1/2" (#4) x 24" SMOOTH DOWEL AT 30" OC DOWELED EXPANSION JOINT AT SIDEWALK TO PLATFORM TRANSITION SAWCUT CONTROL JOINT 1/8" WIDE x 1/2" DEEP 1'-0" 12" MIN PER ORIGINAL AS-BUILT DRAWINGS (E) SOIL LINE VARIES PER LOCATION (E) #4 @ 10" (E) #4 @ 12" #5 @ 18" EA WAY 3" CL R M I N CHIP OUT CONCRETE AROUND EXIST #4@12 REBAR AND CUT LEG TO 18" MIN PIP (E) SIDEWALK FOUNDATION 5" CAB (N) PLATFORM 1'-4" 6'-6" 0.9% (N) 9" THK CONC SLAB ON GRADE PER PLAN SAWCUT CONTROL JOINT 1/8" WIDE x 1/2" DEEP (SEE PLAN VIEW) 1'-0" (E) SOIL LINE VARIES FIELD VERIFY (E) #4 @ 10" (E) #4 @ 12" #5 @ 18" EA WAY 3" CL R M I N CHIP OUT CONCRETE AROUND EXIST #4@12 REBAR AND CUT LEG TO 18" MIN PIP (E) SIDEWALK FOUNDATION 5" CAB (N) ELEVATED STAIRWAY 6'-2" 1'-0" 12" MIN 45.00°' B/W J-BARS 12" MAX TYP(E) PREVIOUS CONCRETE REPAIR (DIMENSIONS VARY W/ LOCATION) 6" 10" #4 CONT AT 12" O.C. (QUANTITY VARIES W/ LOCATION) 5 8" DRILLED HOLE 6" DEEP AND FILL W/ EPOXY ADHESIVE PER SPECIFICATIONS #4 AT 12" MAX O.C. EACH WAY (N) REINFORCED CONCRETE REPAIR (HEIGHT VARIES WITH LOCATION) GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:26 June 2024 - 9:17 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S01 THRU S05 LANDING PLAN.dwgPlotted by:Bob Sherwood 38 95 IMPROVEMENT PLANS FOR: STAIR LANDING PLAN AND PROFILE 5 CIP #3896 529-8RR RS -- S-05 A TOP OF STAIRWAY CROSS-SECTION (SYCAMORE AND HEMLOCK AVE) NTS B TOP OF STAIRWAY CROSS-SECTION (MAPLE AVE) NTS C TOP OF STAIRWAY CROSS-SECTION (CHERRY AVE) NTS Y - EXISTING UPPER SIDEWALK FOUNDATION AT CHERRY AVENUE STAIRS NOT TO SCALE Aug. 5, 2024 Item #6 Page 23 of 40 ---- J 8 J • • • • • • ~ -7------ L __ _ l ,, of-------- I of-------- • • APPROVED: • • • ITY OF CARLSBA C ENGINEERING DEPARTMENT D I SHEETS I HOSSEIN AJIDEH RCE 75991 EXP 6 30 2026 ~~;=t;~f===~~::~~;;;;==---lh~~~6~~;f~[f~cD~AiT-;;~E~~]IN~ITl,~A1L_j g~~D s~~, I DATE INITIAL RVWD BY: . CITY APPROVAL Tl ON OTHER APPROVAL DATE INITIAL REVISION DESCRIP ENGINEER OF WORK ENGINEERING MANAGER PROJECT NO. I DRAWING NO. DATE EXISTING 48"Ø CONC FOUNDATION PILE PLATFORM CL 24 " T Y P EXISTING ESTIMATED BEDROCK AT ELEV +10' EXISTING #6 VERT BAR (18 TOTAL) EXISTING #3 TIE @ 12" TYP 4" CLR PILE ONLY GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:27 June 2024 - 11:32 AM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S06 THRU S10.dwgPlotted by:Bob Sherwood 39 95 IMPROVEMENT PLANS FOR: STAIR LANDING DETAILS 1 CIP #3896 529-8RR RS -- 1 - TYPICAL ELEVATED LANDING DEMOLITION 3/4" = 1'-0"0 3'1'2' A - TYPICAL LANDING DEMOLITION SECTION 3/4" = 1'-0"0 3'1'2' REMOVE EXIST REINF CONC PLATFORM PROTECT EXISTING 48"Ø REINF CONC FOUNDATION PILE AND ALL 18- #6 J-BARS AND HOOPS (SEE SECTION A) REMOVE EXISTING ELEVATED STAIRWAY REMOVE EXISTING ELEVATED STAIRWAY CARE SHALL BE TAKEN TO MAINTAIN (E) VERT REINF IN PLACE IN PORTION OF PILE CAP TO BE REPLACED NOTE: 1. REINFORCEMENT SHALL BE CLEANED OF CORRODED MATERIAL PRIOR TO PLACEMENT OF NEW CONCRETE. WHERE EXISTING REINFORCEMENT IS DAMAGED BY CONCRETE REMOVAL OR WHERE AT LEAST 20% OF ORIGINAL AREA HAS BEEN LOST TO CORROSION, REMOVE EXISTING BAR AND REPLACE WITH #6 DOWEL EMBEDDED 48" IN (E) CONCRETE SUPPORT PILE WITH SIMPSON SET-3G EPOXY ADHESIVE PER MANUFACTURER'S INSTRUCTIONS. 1 ROUGHEN SURFACE OF (E) CONCRETE TO REMAIN S-06 PROTECT (E) 48"Ø REINF CONC FOUNDATION PILE AND ALL 18- #6 J-BARS AND HOOPS A - Aug. 5, 2024 Item #6 Page 24 of 40 L I J L I 0 - - - - - - - - - - - - - - - - L J :a, :a, wocc _J Cl:'. 0 -LL LL ct_ BEAM ct_ BEAM (L' r::i L J f-O> \ I :::, I (L o· Nu_ (L w 0 \ I I > o._ ooo ~f- ------ 8 0 C '· 0 C C ., 0 1-Tl I I I I I . . . . . . . . . . . . . . . . . . . . . . . . . --"----"--------~ " " ~--. . -. . . . . . . . . . . . . . . . . . . · . . . . ------------- . . . . . . . . . . . . . . . . I . . -,-.. ----- ~ v ----- I ---- ' -=111 111 I I I I I I I -1-1 I /' ✓ 0 •--,-__ ,_ • ✓ I I I f) ,, f) f) ,, f) I I \ I \ ct_ BEAM ct_ BEAM 8 v- 8 v- I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DAlE, 6/30/2024 DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INlllAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: 2- #7 BARS CONT TOP & BOTTOM #5 @ 12" O.C. EW #4 @ 12" O.C. STIRRUPSVARIES 8" PLA T F O R M I N T E R N A L B E A M C L PLATFORM INTERNAL BEAM CL P L A T F O R M I N T E R N A L B E A M C L #5 102" EA LEG 90" EA LEG 78" EA LEG 54" EA LEG 42" EA LEG 26" EA LEG #5 #5 #5 #5 TOP & BOT TOP & BOT TOP & BOT TOP & BOT TOP & BOT TOP & BOT 2- #7 BARS CONT TOP & BOTTOM 2- #7 BARS CONT TOP & BOTTOM #4 @ 12" O.C. STIRRUPSVARIES 8" #4 @ 12" O.C. STIRRUPS 8" VARIES #5 #5 66" EA LEG TOP & BOT 3" CL R T Y P 3" CL R T Y P EXISTING 48"Ø CONC FOUNDATION PILE 2- #7 BARS CONT T&B PER PLAN W/ HOOKS EA END #5 #5 #5 #5 #5 #5 #5 #4 @ 12" O.C. STIRRUPS PER PLAN VIEWVARIES 8" PLATFORM FS PLATFORM CL 2' - 9 " 1' - 2 " PLATFORM RAILING MOUNTED TO FACE OF CONCRETE WHERE OCCURS IN PLAN VIEW, PER DETAIL 3 ON SHEET S-09 102" EA LEG TOP & BOT 90" EA LEG TOP & BOT 78" EA LEG TOP & BOT 66" EA LEG TOP & BOT 54" EA LEG TOP & BOT 42" EA LEG TOP & BOT 26" EA LEG TOP & BOT #5 PLATFORM DECK REINF EW PER PLAN 3" CL R T Y P EXISTING 48"Ø CONC FOUNDATION PILE #5 #5 #5 #5 #5 #5 #5 PLATFORM DECK FS PLATFORM CL 2' - 9 " 1' - 2 " PLATFORM RAILING MOUNTED TO FACE OF CONCRETE WHERE OCCURS IN PLAN VIEW, PER DETAIL 3 ON SHEET S-09 102" EA LEG TOP & BOT 90" EA LEG TOP & BOT 78" EA LEG TOP & BOT 66" EA LEG TOP & BOT 54" EA LEG TOP & BOT 42" EA LEG TOP & BOT 26" EA LEG TOP & BOT #5 PLATFORM DECK REINF EW PER PLAN (4) 1/2" SS THREADED ROD INSTALLED PER POST W/ EPOXY GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:27 June 2024 - 11:34 AM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S06 THRU S10.dwgPlotted by:Bob Sherwood 40 95 IMPROVEMENT PLANS FOR: STAIR LANDING DETAILS 2 CIP #3896 529-8RR RS -- 1 - TYPICAL STAIRWAY PLATFORM REINFORCEMENT 3/4" = 1'-0"0 3'1'2' A - TYPICAL LANDING SECTION (THROUGH BEAM) 3/4" = 1'-0"0 3'1'2' NOTES 1. FOR GENERAL STRUCTURAL NOTES SEE SHEET G-04 S-07 A - B - CONCRETE STAIRWAY PLATFORM SECTION 3/4" = 1'-0"0 3'1'2' B - A S-10 Aug. 5, 2024 Item #6 Page 25 of 40 L " J L J \ L J I \ I \ L J I \ I D I 0 \ I \ I \ I \ 8 0 0 0 0 0 0 DAlE, 6/30/2024 / I== -I I== I I I 8 • 8 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION D 0 0 0 0 0 0 0 . I_I 1-1 I 1-1-, 0 0 0 0 0 0 0 -111== l==- 1 I I I I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INlllAL CHKD BY: OTHER APPROVAL CITY APPROVAL RVWD BY: 4" 12" 7"12" 1/4" END CLOSURE PLATE CONC TREADS SEE 4 - 30.26° CONC TREADS SEE 4 - 7" 212" 12" 12" TYP 7" T Y P . 1 2" THK ALUM CAP PL BENT TO MATCH STRINGER PROFILE 12" 2" TYP 4x12x1/4" ALUM STRINGER 4x12x1/4" ALUM STRINGER CONC PLATFORM CONC PLATFORM (E) CONC FOOTING 4" 12" 7"12" 1/4" END CLOSURE PL CONC TREADS SEE 4 - 5" M I N EM B E D 4x12x1/4" ALUM STRINGER LOWER SIDEWALK FS CONC TREADS SEEA _ 3/16"3/16" 5/8" DIA 316 SS TITEN HD ANCHOR W/ NYLON INSULATING BUSHINGS AND WASHERS ALUM 9"x10"x1/2" PL W/ 2" SLOTTED HOLE PERPENDICULAR TO STRINGER 12" 5/8" DIA 316 SS TITEN HD ANCHOR W/ NYLON INSULATING BUSHINGS AND WASHERS ALUM 9"x10"x1/2" PL W/ 2" SLOTTED HOLE PERPENDICULAR TO STRINGER A _ C _ 3/16" (2) HILTI HAS-R 316 SS 1/2" DIAM x 10" LONG THREADED RODS INSTALLED PER ESR-3814 W/ HILTI HIT-RE 500 V3 EPOXY ADHESIVE, AND W/ SS NUTS, NYLON INSULATING BUSHINGS AND WASHERS, OR APPROVED EQUAL 43 4" 5" M I N EM B E D 43 4" 8" M I N EM B E D PRECAST CONC STAIR TREAD CONT 4"x12"x1/4" ALUMINUM STRINGER 12" MIN HANDRAIL EXTENSION 36 " T O P O F H A N D R A I L 1 1/2" x 2 3/4" ALUM TOP RAIL C P O S T L C P O S T L C P O S T L C P O S T L C P O S T L C P O S T L C P O S T L C P O S T L 1 1/2" DIAM HANDRAIL CONC PLATFORM FS CONC PLATFORM FS 36" TYP 3-7/8" MAX CLR TYP C P O S T L 3-7/8" MAX CLR TYP 1 1/2" x 2 3/4" ALUM TOP RAIL 3/4" SQ ALUM PICKET 1 1/4" x 1 3/4" ALUM MID RAIL 2" x 2" x 1 4" ALUM RAILING POST 1 1/2" DIAM HANDRAIL 1 1/4" x 1 3/4" ALUM MID RAIL 24" MIN HANDRAIL EXTENSION 42 " M I N T O P O F R A I L I N G 36 " T O P O F H A N D R A I L 42 " M I N T O P O F R A I L I N G D _ C P O S T L 2" x 2 3/16" ALUM POST 3/4" SQ ALUM PICKET 1 1/4" x 1 3/4" ALUM MID RAIL 1 1/2" x 2 3/4" ALUM TOP RAIL 1 1/4" x 1 3/4" ALUM BTM RAIL 42 " M I N 34 " T O 3 8 " 1 34" CLR 5'-11" (71") WIDE STAIR TREAD 1 1/2" DIAM HANDRAIL C P O S T L CONT 4x12 ALUMINUM STRINGER PRECAST CONC STAIR TREAD 3" CLR 1 12" MIN 2" 4x12x1/4" ALUM STRINGER L3x3x38 ALUMINUM W/ TWO 3x3x3 8" GUSSET PLATES PRECAST CONC STAIR TREAD 5" M I N EM B E D 3/16" 9" 2" 10" 4x12x1/4" ALUM STRINGER 1/4" END CLOSURE PL 3/16"3/16" ALUM 9"x10"x1/2" PL W/ 2" SLOTTED HOLE PERPENDICULAR TO STRINGER ALUM 9"x10"x1/2" PL W/ 2" SLOTTED HOLE PERPENDICULAR TO STRINGER 5/8" DIA 316 SS TITEN HD ANCHOR W/ NYLON INSULATING BUSHINGS AND WASHERS B - 12" THK ALUM CAP PL 4x12x1/4" ALUM STRINGER 12" 3/16" 4" CONC TREADS SEE 4 - CONC PLATFORM 212" RAILING POST EDGE OF PLATFORM 7/16" 312" 43 4"43 4" RAILING ANCHORS 1'-2" 3" PRECAST CONCRETE STAIR TREAD WITH COLOR PER SHEET LC-07 (3) #3 CONT REINF (2) 1/2" DIA STAINLESS STEEL HEADED STUD ANCHORS W/ INSULATING BUSHING, WASHER AND LOCKING NUT L3x3x38 ALUMINUM W/ TWO 3x3x38" GUSSET PLATES CONTINUOUS 4x12x1/4" ALUMINUM STRINGER TYPICAL SECTION TYPICAL END CONNECTION GROOVED TREAD WITH CONTRASTING GREY COLOR 1 4" R NOSE TYP PRECAST CONC STAIR TREAD 3/16" 3/16" GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:2 July 2024 - 6:54 AM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S06 THRU S10.dwgPlotted by:Bob Sherwood 41 95 IMPROVEMENT PLANS FOR: MISCELLANEOUS DETAILS 1 CIP #3896 529-8RR RS -- 5 - TYPICAL PLATFORM STAIR ELEVATION SCALE: 1/2" = 1'-0" 1 - PLATFORM STAIR CONNECTION (BOTTOM) SCALE: 1-1/2" = 1'-0" 3 - PLATFORM STAIR CONNECTION (TOP) SCALE: 1-1/2" = 1'-0" 4 - TYPICAL STAIR TREAD DETAIL SCALE: 1 1/2" = 1'-0" S-08D - TYPICAL STAIRWAY SECTION SCALE: 3/4" = 1'-0" 2 - LOWER SIDEWALK STAIR CONNECTION SCALE: 1-1/2" = 1'-0" A - STAIR SECTION SCALE: 1-1/2" = 1'-0" B - STAIR SECTION SCALE: 1-1/2" = 1'-0" C - STAIR SECTION SCALE: 1-1/2" = 1'-0" Aug. 5, 2024 Item #6 Page 26 of 40 8 II II u II II u 8 • 8 • • II II u II II u • •--+---~ • 8 I 8 8 II II u II II u I 8 I .1 •· I I ' • 8 -8--- DAlE, 6/30/2024 Q • • I • I 8 DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION 8 8 DATE INITIAL DATE INlllAL OTHER APPROVAL CITY APPROVAL II II u I 8 11 II u CITY I I I I OF CARLSBAD I SHEET I ENGINEERING DEPARTMENT I SHEETS I APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DWN BY: I PROJECT NO. I DRAWING NO. CHKD BY: RVWD BY: 3/4" SQ ALUM PICKET 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL C P O S T L ALUM BASE PL PER ELEVATION VIEW OUTLINE OF PRECAST TEE FLANGE, WHERE OCCURS CONCRETE SLAB PER PLANS. REINF NOT SHOWN FOR CLARITY 9" 2- 1 / 2 " 8" 4" 2- 1 / 2 " 1-3/4" TYP (4) 1/2" HILTI HAS-R 316 SS THREADED ROD PER POST INSTALLED W/ HILTI HIT EPOXY W/ SS NUTS AND NYLON INSULATING WASHERS 1/4 1/4 C P O S T L 3-1/2" TYP ELEVATED SIDEWALK FS 3/4" SQ ALUM PICKET 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL 4'-0" (48") TYP ELEVATED SIDEWALK 3" C P O S T L 3' - 6 " ( 4 2 " ) ALUM PL 3/8 CENTERED ON EA POST C P O S T L ELEVATED TEE BEAM 6" EMBEDMENT ELEVATIONELEVATION 2" x 2" x 1 4" ALUM RAILING POST 3/4" SQ ALUM PICKET 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL C P O S T L ALUM BASE PL PER PLAN VIEW BELOW CONCRETE SIDEWALK ON GRADE PER PLANS. REINF NOT SHOWN FOR CLARITYSIDEWALK FS 3/4" SQ ALUM PICKET 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL SIDEWALK ON GRADE 3" 3' - 6 " ( 4 2 " ) RETAINING WALL IN VARIOUS LOCATIONS 3-1/2" TYP 4'-0" (48") TYPC P O S T L C P O S T L 5" EMBEDMENT 6" 6" 3" 3" 1-3/4" TYP 6" ALUM PL 3/8 CENTERED ON EA POST EDGE OF SIDEWALK EDGE OF SIDEWALK ELEVATION PLAN VIEW 2" x 2" x 1 4" ALUM RAILING POST (4) 1/2" HILTI HAS-R 316 SS THREADED ROD PER POST INSTALLED W/ HILTI HIT EPOXY W/ SS NUTS AND NYLON INSULATING WASHERS 1' - 2 " PLATFORM DECK FS 3.5" TYP 3/4" SQ ALUM PICKET 1-1/4" x 1-3/4" ALUM BTM RAIL PLATFORM DECK FS 3/4" SQ ALUM PICKET 1-1/4" x 1-3/4" ALUM MID RAIL 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL 3'-0"18.27" 1-1/4" x 1-3/4" ALUM MID RAIL 1-1/2" x 2-3/4" ALUM TOP RAIL CORNER OF PLATFORM CORNER OF PLATFORM 3" RA I L I N G AN G L E P T C P O S T LC P O S T L C P O S T L 3' - 6 " ( 4 2 " ) ALUM PL 3/8 CENTERED ON EA POST 6" EMBED PL 3/8 CENTERED ON EA POST CAP PL 1/4 EA POST 1/4 1/4 1/4 SEE PLATFORM PLANS AND SECTION FOR REINFORCEMENT C P O S T / P L A T F O R M L 3'-0" 10 "6" 8" 2- 1 / 2 " 1-3/4" TYP C P O S T L ELEVATIONELEVATION 2" x 2" x 14" ALUM RAILING POST 3- 1 / 2 " 4- 1 / 2 " FIELD VERIFY 17.12"17.12" RA I L I N G AN G L E P T 18.27" FIELD VERIFY (4) 1/2" HILTI HAS-R 316 SS THREADED ROD PER POST INSTALLED W/ HILTI HIT EPOXY W/ SS NUTS AND NYLON INSULATING WASHERS 3/4" SQ ALUM PICKET 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL C P O S T L 2" x 2" x 14" ALUM RAILING POST CONCRETE CURB EXISTING CONCRETE SIDEWALK ON GRADE PER PLANS. REINF NOT SHOWN FOR CLARITY SIDEWALK FS 3/4" SQ ALUM PICKET 1-1/2" x 2-3/4" ALUM TOP RAIL 1-1/4" x 1-3/4" ALUM BTM RAIL 3" 3' - 6 " ( 4 2 " ) CONCRETE CURB 3-1/2 TYP 4'-0" (48") TYPC P O S T L C P O S T L ELEVATION GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:1 July 2024 - 7:31 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S06 THRU S10.dwgPlotted by:Bob Sherwood 42 95 IMPROVEMENT PLANS FOR: MISCELLANEOUS DETAILS 2 CIP #3896 529-8RR RS -- C - PLATFORM RAILING SECTION SCALE: 3/4" = 1'-0" B - SIDE-MOUNTED RAILING SECTIONS SCALE: 3/4" = 1'-0" 3 - PLATFORM RAILING ELEVATION SCALE: 3/4" = 1'-0" S-09 A - TOP-MOUNTED RAILING SECTIONS SCALE: 3/4" = 1'-0" 2 - SIDE-MOUNTED RAILING ELEVATION SCALE: 3/4" = 1'-0" 1 - TOP-MOUNTED RAILING ELEVATION SCALE: 3/4" = 1'-0" D - CURB-MOUNTED RAILING SECTION SCALE: 3/4" = 1'-0" 4 - CURB-MOUNTED RAILING ELEVATION SCALE: 3/4" = 1'-0" Aug. 5, 2024 Item #6 Page 27 of 40 I I I I I I I I I I I I I I I I I I I I <> I I I< > < > I I I< > I I v I I i..-.,-- I I v I I i..- -I I _v-. I I _v-I r v- I I 0 0 0 0 ------------------------- 0 I 0 0 I 0 , , [ t----------+--r: ! t+-r--: ----1 I I r L----I A V 8 8 8 .I u 8 I I I I ,,v I I <> I I <> I I F I I .,-- I I I I ~ I v-"' I I I ~ I I I I I I I I I I I I < ~ I I I ~> -~ I I I J/,.---- I I I I I I I 1.,.,,....-- 0 0 0 0 0 0 v-I I >, ' V V 0 0 0 0 /0 0 I --; I I 0 > I 0 0 - > 8 8 _/ 8 8 I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DAlE, 6/30/2024 DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INlllAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: PL A T F O R M I N T E R N A L B E A M C L PLATFORM FS 3" CL R T Y P #5 PLATFORM DECK REINF EW PER PLAN#4 @ 12" O.C. STIRRUPS PER PLAN VIEWVARIES 8" PLATFORM UNDERSIDE VARIES WITH LOCATION 2- #7 BARS CONT T&B PER PLAN W/ HOOKS EA END #5 66" EA LEG TOP & BOT BOT #5 BOT #5 BOT #5 54" EA LEG 42" EA LEG 26" EA LEG EXISTING FOUNDATION PILE CAB 3 8" GAP R=1 4" TYP 1/2" (#4) x 24" SMOOTH DOWEL AT 30" OC REINF EW REINF EW EXPANSION JOINT FILLER MATERIAL CAB SAWCUT CONTROL JOINT 1/8" WIDE x 1/2" DEEP REINF EW 3" C L R M I N 3" C L R M I N GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:25 June 2024 - 10:41 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S06 THRU S10.dwgPlotted by:Bob Sherwood 43 95 IMPROVEMENT PLANS FOR: MISCELLANEOUS DETAILS 3 CIP #3896 529-8RR RS -- S-10 A - CONCRETE STAIRWAY PLATFORM SECTION 3/4" = 1'-0"0 3'1'2' 1 - TYPICAL EXPANSION JOINT DETAIL (J-01) SCALE: N.T.S. 1 - TYPICAL CONTROL JOINT DETAIL (J-02) SCALE: N.T.S. Aug. 5, 2024 Item #6 Page 28 of 40 8 0 0 0 D _____________ ,.,......,..."" _:..._f-'"--· ':::--....... ~--:-~--~--,>,.--"-!/-------- ,1 4 ,• __ .....,__.,. __ _ 0 8 8 • • • • DAlE, 6/30/2024 DATE INITIAL DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DWN BY: I PROJECT NO. I DRAWING NO. DATE INlllAL CHKD BY: CITY APPROVAL RVWD BY: GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:1 July 2024 - 8:18 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S11 THRU S14 RAILING.dwgPlotted by:Bob Sherwood N2SYCAMORE AVE MIDDLE LANDING RAILING PLAN 1/2"=1'-0"0 4'2' 44 95 IMPROVEMENT PLANS FOR: PLATFORM RAILING PLAN 1 CIP #3896 529-8SC RS CM 1.5" DIAM. HANDRAIL R=4.75" F O R H A N D R A I L BOTTOM CONCRETE STAIR ABOVE LANDING CONCRETE LANDING L PIER AND PLATFORMC PLATFORM RAILING 2x2 POST GUARDRAIL 2 S-08 S-11 N1SYCAMORE AVE UPPER LANDING RAILING PLAN 1/2"=1'-0"0 4'2' N3SYCAMORE AVE LOWER LANDING RAILING PLAN 1/2"=1'-0"0 4'2' 8.5 " T Y P 18.27"3'-0"GUARDRAIL 4 S-08 2x2 POST 2x2 POST 2x2 POST 12" C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP GUARDRAIL GUARDRAIL 1.5" DIAM. HANDRAIL 3'-0 " 3'-0 " 18. 2 7 " 3 S-09 8.5 " T Y P 18.27"3'-0" 12" C L TO T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP L PIER AND PLATFORMC 3 S-09 1 8 . 2 7 " 3' - 0 " 3' - 0 " 3 S-09 BOTTOM CONCRETE STAIR ABOVE LANDING 1.5" DIAM. HANDRAIL 1.5" DIAM. HANDRAIL 1.5" DIAM. HANDRAIL 12" C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP R=4.75" FOR HANDR A I L GUARDRAIL 3' - 0 " 1 8 . 2 7 " 1' - 6 " SIDE-MOUNTED RAILING 3 S-08 5 S-08 R=4.75" FOR HANDRAIL 12" GUARDRAIL 1.5" DIAM. HANDRAIL GUARDRAIL PLATFORM RAILING PLATFORM RAILING PLATFORM RAILING PLATFORM RAILING PLATFORM RAILING 10" T Y P 8 . 5 " T Y P 3'-0 " 18. 2 7 " 2'-3 " L PIER AND PLATFORMC 2 S-08 3 S-08 1.5" DIAM. HANDRAIL 4 S-08 12" 1.5" DIAM. HANDRAIL 21" 21" 1.5" DIAM. HANDRAIL 3" CL R M A X T Y P 3" C L R M A X T Y P 3" C L R M A X T Y P SIDE-MOUNTED RAILING 1 8 . 2 7 " 18. 2 7 " FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND PLACEMENT 1 S-08 Aug. 5, 2024 Item #6 Page 29 of 40 V- \ \ . \ ' ' i . ' I I . 0-------- \ · . . I I \ 01----------- ---- 'v ----- \ ----- \ o~-------- I SHEET I CITY OF CARLSBAD I SHEETS I t====±====±=============================+====+====t====t===i ENGINEERING DEPARTMENT DATE: ~====±====±=============================t====+====t====t===i ~E~NG~IN~E~ER~IN~G~M~A~NA~G~ER~R:::C~E ~75~9~91:=,E~X~P~6~3~0:::'2::0=26~~D~A TE~~ 11-----:::--:--=--k=c--t-----------------tf---}~~=t~~~~cE:~~=tiB::~~~ DWN BY: ___ PROJECT NO. 1 DRAWING NO. I-DATE INITIAL DATE INITIAL CHKD BY: __ DATE INITIAL REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: ENGINEER OF WORK APPROVED: HOSSEIN AJIDEH 6/30/2024 GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:1 July 2024 - 8:13 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S11 THRU S14 RAILING.dwgPlotted by:Bob Sherwood 45 95 IMPROVEMENT PLANS FOR: PLATFORM RAILING PLAN 2 CIP #3896 529-8SC RS CM S-12 N2MAPLE AVE MIDDLE LANDING RAILING PLAN 1"=2'0 4'2' N1MAPLE AVE UPPER LANDING RAILING PLAN 1"=2'0 4'2' N3MAPLE AVE LOWER LANDING RAILING PLAN 1"=2'0 4'2' 12" GUARDRAIL R=4.75" FOR HANDRAIL 1.5" DIAM. HANDRAILGUARDRAIL 8.5 " T Y P 12" C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP 1.5" DIAM. HANDRAIL S-08 5 18.27"3'-0" 2x2 POST L PIER AND PLATFORMC S-09 3 3'-0 " 3'-0 " 18. 2 7 " R=4. 7 5 " F O R H A N D R A I L BOTTOM CONCRETE STAIR ABOVE LANDING 1.5" DIAM. HANDRAIL 1.5" DIAM. HANDRAIL S-08 2 GUARDRAIL PLATFORM RAILING PLATFORM RAILING GUARDRAIL 8.5 " T Y P 12" C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP S-08 3 18.27"3'-0"2x2 POST L PIER AND PLATFORMC S-09 3 18. 2 7 " 3'-0 " 3'-0 " 17. 1 2 " PLATFORM RAILING PLATFORM RAILING 16.5"21" S-09 3 18. 2 7 " 3'-0 " 3'-0 " 1.5" DIAM. HANDRAIL 8 . 5 " T Y P 12" C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP S-08 3 R=4.75" F O R H A N D R A I L 1.5" DIAM. HANDRAIL S-08 2 PLATFORM RAILINGGUARDRAIL PLATFORM RAILING L PIER AND PLATFORMC 4 S-08 4 S-08 BOTTOM CONCRETE STAIR ABOVE LANDING 4 S-08 1.5" DIAM. HANDRAIL GUARDRAIL GUARDRAIL SIDE-MOUNTED RAILING TOP-MOUNTED RAILING 12" 1.5" DIAM. HANDRAIL 21" 21" 3" CL R M A X T Y P 3" C L R M A X T Y P 3" C L R M A X T Y P 18. 2 7 " 18. 2 7 " FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND PLACEMENT S-08 1 Aug. 5, 2024 Item #6 Page 30 of 40 ---------------~ v \/ . . . . I . • I 0----- . . . I • \ 0----- DAlE, 6/30/2024 -'--'---'--'--'----=..:..::..C- Qr-------- t---+----+-------------l----l----1--____j~_JI SHEET I CITY OF CARLSBAD I SHEETS I ~=='....::::==E=N=G=IN=E=ER=l=N=G=D=E:::::P=A::R::TM::E::N::T==::::'....:=== APPROVED: HOSSEIN AJIDEH t---t---+-----------------l------l-----1------l--------1 ~E:::NG::::IN:::E~E:::Rl:::':NG:::::':M:':::AN:::A::::G::ER;';::::::RC::E::::7':::5':::99:::1::E:::X::::P:::'6=::::30=::2:::02=:6';::::::::::D:::A:::TE:::::::=:::' DATE INITIAL DWN BY: ---PROJECT NO. I DRAWING NO. f----'----'-=--'----"-=+.::.:DAc.::T..:.E__J__::_1N::..:ITl.::.:A:::.L -I CH KD BY: __ _ OTHER APPROVAL CITY APPROVAL RVWD BY: DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:1 July 2024 - 8:04 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S11 THRU S14 RAILING.dwgPlotted by:Bob Sherwood 46 95 IMPROVEMENT PLANS FOR: RAILING PLAN 3 CIP #3896 529-8SC RS CM S-13 N2CHERRY AVE MIDDLE LANDING RAILING PLAN 1"=2'0 4'2' N1CHERRY AVE UPPER LANDING RAILING PLAN 1"=2'0 4'2' N3CHERRY AVE LOWER LANDING RAILING PLAN 1"=2'0 4'2' 12" R=4.75" F O R H A N D R A I L 1.5" DIAM. HANDRAIL GUARDRAIL GUARDRAIL 1.5" DIAM. HANDRAIL 8.5" TYP 12" CL TO TOP STAIR NOSING 5 S-08 18.27 " 3'-0" 3'-0" 3 S-09 2x2 POST PLATFORM RAILING L PIER AND PLATFORMC L PIER AND PLATFORMC 2 S-08 R=4.75" F O R H A N D R A I L 1.5" DIAM. HANDRAIL GUARDRAIL GUARDRAIL 3'-0" 3'-0" 18.27 " 3 S-09 2x2 POST PLATFORM RAILING 8.5" T Y P 18.2 7 " 3'-0 " R=4.75" FOR HAND R A I L 8.5" T Y P 1.5" DIAM. HANDRAIL BOTTOM CONCRETE STAIR ABOVE LANDING 1 2 " C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TYP 3 S-08 4 S-08 4 S-08 4 S-08 2 S-08 3 S-08 12" C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH TOP-MOUNTED RAILING TOP-MOUNTED RAILING R=4.75" TYP HANDRAIL GUARDRAIL GUARDRAIL 1.5" DIAM. HANDRAIL 1.5" DIAM. HANDRAIL PLATFORM RAILING PLATFORM RAILING GUARDRAIL GUARDRAIL 1.5" DIAM. HANDRAIL 1.5" DIAM. HANDRAIL 18.2 7 " 3'-0" 21" 21" 12" 3" CLR MAX TYP 3 " C L R M A X T Y P 18.27" 18.27 " FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND PLACEMENT S-08 1 3 S-08 5'-5" CLR STAIR WALKING WIDTH TYP Aug. 5, 2024 Item #6 Page 31 of 40 I ·/ \: . \ : .. / I I \ ~--~ l • ••. \ -;.·. I . "-..: • / : I __ A I \ . I . • ' \ • ;-. ------;,,- ------------= =------------------ I / .,,.,..,,,,.. .,,,,.. \ _[_ I ·; I DAlE, 6/30/2024 ----1~· ----1 __ __Jj. DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION --------------- --------------------- ------------------ ---------/ DA TE INITIAL OTHER APPROVAL DATE INlllAL CITY APPROVAL APPROVED: ENGINEERING MANAGER DWN BY: CHKD BY: RVWD BY: ------------------------ HOSSEIN AJIDEH RCE 75991 EXP 6 30 2026 DATE I PROJECT NO. I DRAWING NO. GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:1 July 2024 - 8:09 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-S11 THRU S14 RAILING.dwgPlotted by:Bob Sherwood 47 95 IMPROVEMENT PLANS FOR: PLATFORM RAILING PLAN 4 CIP #3896 529-8SC RS CM S-14 N2HEMLOCK AVE MIDDLE LANDING RAILING PLAN 1"=2'0 4'2' N1HEMLOCK AVE UPPER LANDING RAILING PLAN 1"=2'0 4'2' N3HEMLOCK AVE LOWER LANDING RAILING PLAN 1"=2'0 4'2' 12" GUARDRAIL 1.5" DIAM. HANDRAIL GUARDRAIL 8.5" TYP 12" C L T O T O P S T A I R N O S I N G 1.5" DIAM. HANDRAIL 4 S-08 5 S-08 5'-5" CLR STAIR WALKING WIDTH TYP 18.27"3'-0"2x2 POST L PIER AND PLATFORMC 18. 2 7 " 3'-0 " 3'-0 " PLATFORM RAILING PLATFORM RAILING 3 S-09 BOTTOM CONCRETE STAIR ABOVE LANDING 2 S-08 1.5" DIAM. HANDRAIL GUARDRAIL GUARDRAIL R=4.75" F O R H A N D R A I L R=4.75" FOR HANDRAIL 1.5" DIAM. HANDRAIL 12" CL T O T O P S T A I R N O S I N G 1.5" DIAM. HANDRAIL GUARDRAIL S-08 4 3 S-08 3'-0 " 3'-0 " 18. 2 7 " PLATFORM RAILING PLATFORM RAILING L PIER AND PLATFORMC 3 S-09 3'-0 " 3'-0 " 18. 2 7 " 3 S-09 2x2 POST 2x2 POST PLATFORM RAILING 2 S-08 3 S-08 8.5" TYP 12 " C L T O T O P S T A I R N O S I N G 5'-5" CLR STAIR WALKING WIDTH L PIER AND PLATFORMC 3'-0 " 18. 2 7 " 3' - 0 " 1 8 . 2 7 " PLATFORM RAILING BOTTOM CONCRETE STAIR ABOVE LANDING R = 4 . 7 5 " F O R H A N D R A I L GUARDRAIL GUARDRAILGUARDRAIL GUARDRAILGUARDRAIL 1.5" DIAM. HANDRAIL 1.5" DIAM. HANDRAIL TOP-MOUNTED RAILING TOP-MOUNTED RAILING 5'-5" CLR STAIR WALKING WIDTH 12" 1.5" DIAM. HANDRAIL 21" 21" 3" C L R M A X T Y P 3" CLR M A X T Y P 3" C L R M A X T Y P 18. 2 7 " 18. 2 7 " 18. 2 7 " FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND PLACEMENT S-08 1 S-08 3 Aug. 5, 2024 Item #6 Page 32 of 40 ---- ----------.... / I· • • I . . .. • I of-----------....,___ __ _ --- of----------- i===t==i=====================+===f==j===1==3 LI S=HE=E::::::..::TI =C=I=TY===O=F=C=A=R=L=S=B=A=D=-=I S=HE=ET7S I ~ r-ENGINEERING DEPARTMENT \ of----------~=====t====i================================t=====~====t====jt===3 l_tE~N~Gl~NE~E';R~IN!::G~M~A~NA~G~E~Rr==RC~E~75g9~91~EX~P~6~3:':0'::::2:::0:::26rn~D~A~TE~~ I-;::DWN BY: ---1 PROJECT NO. 1 DRAWING NO. CHKD BY: __ _ RVWD BY: APPROVED: HOSSEIN AJIDEH DAlE, 6/30/2024 -~--- DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DA TE INITIAL OTHER APPROVAL DATE INlllAL CITY APPROVAL GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:19 June 2024 - 3:16 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-E09.dwgPlotted by:Bob Sherwood 61 95 IMPROVEMENT PLANS FOR: ELECTRICAL DETAILS CIP #3896 529-8MM MM TM E-09 1 - STREETLIGHT REPLACEMENT DETAIL NOT TO SCALE REPLACE EXISTING STREETLIGHT WITH AMERON CENTRECON M-SERIES ROUND POLE, CATALOG NUMBER MBR08, OR APPROVED EQUAL. AP P R O X . 2 6 ' - 3 " F R O M T O P O F S L T O B A S E P L A T E BACK OF CURB CHIP OUT EXISTING CONCRETE TO EXPOSE BOLTS AND BASE PLATE PROTECT EXISTING CURB AND GUTTER PROTECT EXIST STREETLIGHT J-BOLTS AND FOUNDATION CONSTRUCT NEW SIDEWALK REPLACE EXISTING PULLBOX PROTECT EXISTING CONDUITS AND CABLES 3 - EXISTING DISTRIBUTION PANEL AT PINE AVE NOT TO SCALE 4 - EXISTING DISTRIBUTION PANEL AT TAMARACK AVE NOT TO SCALE SHEET KEYNOTES 1. PROVIDE NEW 15A CB. REFER TO E-08 FOR PANEL SCHEDULE. 1 1 18" CLR TOP OF CURB FACE TYP Aug. 5, 2024 Item #6 Page 33 of 40 e - a...;."--..... -.,,!\of~':-:-·. . .. . • . _,. •::r " 4 • " ·" q j • ,..,, e ' <1 <1 DAm 6/30/2024 ,, C 0 C 0 <, 0 V , , v ' ' I I ! .. ::t* Ill,,~-~ . ..__, ... ,.,.. ~:.-..-.•"~ -..:~·:-.:~- ~ -=-.-;;.;-I ~':lit') ' I ;"' ,,,,•.,,-,,1,., nn,~-, "'"'""" ~1 ,.,. _ __J ' t------hJ -·-~~ • ·o ;:; 0 " 0 C ~ 0 ~ C ~ ,, 0 " ~ CJ;, " '"-.../ j 0 < I • -' , , ·'· • . . J • , ~--t· 0 e I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE If\ OWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:2 July 2024 - 7:02 AM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC01.dwgPlotted by:Bob Sherwood 62 95 IMPROVEMENT PLANS FOR: TRAFFIC CONTROL NOTES AND LEGENDS CIP #3896 529-8RS LR EH TC-01 1. WORK HOURS TO BE RESTRICTED TO MONDAY TO FRIDAY FROM 8:30 AM TO 3:30 PM AND SATURDAYS FROM 8:00 AM TO SUNSET, EXCLUDING LEGAL HOLIDAYS, UNLESS APPROVED OTHERWISE. 2. PEDESTRIAN CONTROLS WILL BE PROVIDED AS SHOWN. 3. PEDESTRIANS SHALL BE PROTECTED FROM ENTERING THE EXCAVATION BY PHYSICAL BARRIERS DESIGNED, INSTALLED, AND MAINTAINED TO THE SATISFACTION OF THE CITY ENGINEER. 4. TEMPORARY "NO PARKING/TOW AWAY" SIGNS STATING THE DATE AND TIME OF PROHIBITION WILL BE POSTED 72 HOURS PRIOR TO COMMENCING WORK. CALL CARLSBAD POLICE DISPATCH AT (760) 931-2197 TO VALIDATE POSTING. 5. ACCESS WILL BE MAINTAINED TO ALL DRIVEWAYS UNLESS OTHER ARRANGEMENTS ARE MADE. 6. TRENCHES MUST BE BACKFILLED OR PLATED DURING NON-WORKING HOURS UNLESS K-RAIL BARRIERS ARE PROVIDED. K-RAIL IS APPROVED ONLY WHEN SPECIFICALLY SHOWN ON THE APPROVED TRAFFIC CONTROL PLAN. PLATES SHALL HAVE CLEATS AND COLD MIX AT THE EDGES AS APPROVED BY THE CITY INSPECTOR. 7. STRIPING WILL BE REPLACED BY THE CONTRACTOR WITHIN 24 HOURS, IF REMOVED OR DAMAGED. 8. WORK THAT DISTURBS NORMAL TRAFFIC SIGNAL TIMING OPERATIONS SHALL BE COORDINATED WITH THE CITY OF CARLSBAD. CONTACT JIM MILTON AT (442) 339-2736. 9. TRAFFIC SIGNALS SHALL REMAIN FULLY ACTUATED AT ALL TIMES, UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER OR THEIR REPRESENTATIVE. IF TRAFFIC SIGNAL LOOP DETECTORS ARE RENDERED INOPERATIVE BY THE PROPOSED WORK, VIDEO DETECTION SHALL BE USED TO PROVIDE ACTUATION. 10. FLAGGERS SHALL BE EQUIPPED WITH A WHITE HARD HAT, APPROPRIATE SAFETY VEST, AND A "STOP/SLOW" PADDLE ON A 5 FOOT STAFF. 11. ALL TRAFFIC CONTROL DEVICES MUST BE MAINTAINED 24 HOURS A DAY, 7 DAYS PER WEEK, BY THE CONTRACTOR. 12. ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE CALIFORNIA MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (LATEST VERSION). 13. TRAFFIC CONTROL PLAN SUBMITTALS ARE REQUIRED FOR EACH PHASE OF THE WORK IN THE DETAIL, FORMAT, AND QUALITY ILLUSTRATED ON THIS SHEET. 14. ALL TRAFFIC CONTROL DEVICES SHALL BE REMOVED FROM VIEW OR COVERED WHEN NOT IN USE. 15. THE CITY ENGINEER OR THEIR REPRESENTATIVE HAS THE AUTHORITY TO INITIATE FIELD CHANGES TO INSURE PUBLIC SAFETY. 16. ALL WORK AFFECTING BUS STOPS SHALL BE COORDINATED WITH NORTH COUNTY TRANSIT DISTRICT. CONTRACTOR SHALL CALL NCTD AT (760) 967-2828 AT LEAST 72 HOURS IN ADVANCE OF STARTING WORK. 17. CHANGEABLE MESSAGE SIGNS SHALL BE USED IN ADVANCE OF TRAFFIC CONTROL ON MAJOR AND PRIME ARTERIALS, UNLESS OTHERWISE APPROVED. THESE SIGNS SHALL BE SHOWN ON THE TRAFFIC CONTROL PLAN. 1. AT LEAST ONE PERSON SHALL BE ASSIGNED TO FULL TIME MAINTENANCE OF TRAFFIC CONTROL DEVICES ON ALL NIGHT LANE CLOSURES. 2. ALL WARNING SIGNS FOR NIGHT LANE CLOSURES SHALL BE ILLUMINATED OR REFLECTORIZED AS SPECIFIED IN THE SPECIFICATIONS. 3. ALL ADVANCE WARNING SIGN INSTALLATIONS SHALL BE EQUIPPED WITH FLAGS FOR DAYTIME CLOSURES OF ALL MAJOR AND PRIME ARTERIALS. FLASHING BEACONS SHALL BE USED DURING NIGHT LANE CLOSURES. 4. A G20-2 "END ROAD WORK" SIGN SHALL BE PLACED AT THE END OF THE LANE CLOSURE. 5. ALL CONES USED FOR NIGHT LANE CLOSURES SHALL BE ILLUMINATED TRAFFIC CONES OR FITTED WITH 13" REFLECTIVE SLEEVES. 6. FLASHING ARROW SIGNS SHALL BE USED PER THE CALIFORNIA MUTCD. SILENT TYPE SHALL BE USED IN RESIDENTIAL AREAS. 7. THE MAXIMUM SPACING BETWEEN CONES IN A TAPER SHALL BE 30' FOR AN APPROACH SPEED OF 30 MPH AND 35' FOR AN APPROACH SPEED OF 35 MPH. THE MAXIMUM SPACING BETWEEN CONES IN A TANGENT SHALL BE 60' FOR AN APPROACH SPEED OF 30 MPH AND 70' FOR AN APPROACH SPEED OF 35 MPH. 8. ADDITIONAL ADVANCE FLAGGERS SHALL BE REQUIRED WHEN TRAFFIC QUEUES DEVELOP. FLAGGER STATIONS FOR WORK AT NIGHT SHALL BE ILLUMINATED AS NOTED IN SECTION 6G.20 OF MUTCD. 9. PLACE C30 (CA) "LANE CLOSED" SIGN AT 500'-1000' INTERVALS THROUGHOUT EXTENDED WORK AREAS. 10. ALL REQUIRED SIGNS THAT ARE TO BE LEFT IN PLACE OVER A WEEKEND OR HOLIDAY SHALL BE POST MOUNTED. W20-1 (36"x36") G20-2 (36"x18") W6-3 (36"x36") W4-2(L) (36"x36") C20(CA)(L) (36"x36") C30(CA) (30"x30") R9-9 (24"x12") R3-5(R) (30"x36") R3-2 (36"x36") M4-8a (24"x18") W1-7 (48"x24") M4-9b(R) (24"x30") M4-9b(L) (24"x30") R9-11a(R) (24"x12") R1-2 (48"x48"x48") R1-6 (12"x36") W4-2(R) (36"x36") C20(CA)(R) (36"x36") W1-4(R) (36"x36") G20-5aP (24"x18") R2-1(20) (30"x36") W3-5(20) (36"x36") W3-5a(20) (36"x36") R4-7a (24"x30") W11-1 (30"x30") W16-7PR (24"x12") WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN TRAFFIC CONES/DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING SIGNALIZED INTERSECTION CMS C9A(CA) (36"x36") N-3 (CA) (18"x18") W11-2 (36"x36") M4-9(R) (30"x24") M4-9(L) (30"x24") M3-3 (12"x6") W16-9P (24"x12") D3-1 (VARIESx12") W1-4(L) (36"x36") R9-11(L) (24"x18") R9-11a(L) (24"x12") R9-10 (24"x12") CONSTRUCTION OF THE PROJECT IS ANTICIPATED TO OCCUR OVER APPROXIMATELY 20 CALENDAR MONTHS AND WILL BE PHASED TO MAINTAIN PUBLIC ACCESS TO THE BEACH OVER THE DURATION OF THE PROJECT. NO ONSITE WORK ALLOWED DURING THE SUMMER MONTHS BETWEEN MEMORIAL DAY AND LABOR DAY UNLESS AUTHORIZED IN ADVANCE BY THE CITY. SEE PROJECT SPECIFICATIONS FOR OTHER SPECIAL EVENT DATES TO BE AVOIDED. PHASE 1 OF THE CONSTRUCTION IS ANTICIPATED TO CONSIST OF REMOVAL AND REPLACEMENT OF THE ELEVATED / ON-GRADE UPPER SIDEWALK AND OVERLOOKS BETWEEN PINE AVENUE AND MAPLE AVENUE, THE SYCAMORE AVENUE STAIRWAY, THE MAPLE AVENUE STAIRWAY, AND ADJACENT SIDEWALKS AND RAILING. PHASE 1 MAY BE SPLIT INTO PHASE 1A AND 1B TO ACCOMMODATE PROCUREMENT OF PRECAST PANELS AND MINIMIZE AREAS AFFECTED BY TRAFFIC CONTROL MEASURES ASSOCIATED WITH THE WORK. PHASE 2 OF THE CONSTRUCTION IS ANTICIPATED TO OCCUR AFTER PHASE 1 AND CONSISTS OF REMOVAL AND REPLACEMENT OF THE ON-GRADE UPPER SIDEWALK BETWEEN MAPLE AVENUE AND CHERRY AVENUE, THE CHERRY AVENUE STAIRWAY, THE HEMLOCK AVENUE STAIRWAY, AND RAILING BETWEEN MAPLE AVENUE AND TAMARACK AVENUE. THE CONSTRUCTION STAGING AREA IS ANTICIPATED TO BE IN THE SAME LOCATION FOR ALL PHASES OF THE PROJECT AND REMOVED DURING THE SUMMER MONTHS BETWEEN MEMORIAL DAY AND LABOR DAY. R9-10 (24"x12") R4-11 (36"x36") R26A(CA) (24"x30") R9-3a (12"x18")SC3(CA) (36"x12") R1-1 (36"x36")R10-6(LT) (24"x36") W13-1P(20) (18"x18")R49(CA) (24"x12") Aug. 5, 2024 Item #6 Page 34 of 40 TRAFFIC CONTROL NOTES LEGEND - --I> = 8888= 001:::::R:-1 't SIGNAGE NOTES PROJECT PHASING DESCRIPTION SIGN LEGEND END ROAD WORK ...... (f ONLY SPEED LIMIT 20 DAm 6/30/2024 SIDEWALK CLOSED !E..91! END DETOUR ~ IIE !Carlsbad DATE INITIAL ENGINEER OF WORK Blvdl fwoRK1 ~ I AHEAD I ~ MAY USE FUil LANE REVISION DESCRIPTION NO PARKING ANY TIME DATE ~ DETOUR <:= ~ DETOUR =:> ~ I ◊DETOUR! INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL STOP HERE ON RED I:? CITY rn ~ KEEP ~ RIGHT ~ - OF CARLSBAD I SHEET I ENGINEERING DEPARTMENT I SHEETS I APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE I DRAWING NO. OWN BY: I PROJECT NO. CHKD BY: RVWD BY: Plot Date:Cad File No:25 June 2024 - 1:45 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC02 THRU TC03.dwgPlotted by:Elijah Berry 63 95 IMPROVEMENT PLANS FOR: PHASE 1A: TRAFFIC CONTROL PLAN 1 CIP #3896 529-8BS LR EH 0 80'40' N 120'160' TC-02 CARLSBAD BLV D . (SPEED LIMIT = 3 0 M P H ) N OAK AVE. LINC O L N S T . PINE A V E . M A T C H L I N E S T A : 6 6 + 5 0 - S E E B E L O W MA T C H L I N E S T A : 6 6 + 5 0 - S E E A B O V E MA T C H L I N E S T A : 7 9 + 0 0 - S E E T C - 0 3 WALNUT AVE.SYCAMORE AVE.CHESTNUT AVE. W20-1 (36"x36") G20-2 (36"x18") W6-3 (36"x36") C30(CA) (30"x30") PHASE 1A: TRAFFIC CONTROL PLAN SCALE: 1" = 40' CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) R3-5(R) (30"x36") R3-2 (36"x36") W1-7 (48"x24") M4-9b(R) (24"x30") R9-11a(L) (24"x12") W4-2(R) (36"x36") C20(CA)(R) (36"x36") R2-1(20) (30"x36") W3-5(20) (36"x36") W3-5a(20) (36"x36") G20-5aP (24"x18") PHASE 1A: TRAFFIC CONTROL PLAN SCALE: 1" = 40' 1. CONTRACTOR SHALL INSPECT AND REPAIR OR REINSTALL ALL DAMAGED DELINEATORS OR TRAFFIC CONTROL DEVICES DAILY 2. CONTRACTOR SHALL BAG/COVER EXISTING SPEED LIMIT SIGNS IN THE WORK AREAS R9-9 (24"x12") R4-7a (24"x30") W11-1 (30"x30") W16-7PR (24"x12") MODIFY EXISTING TRAFFIC SIGNAL OPERATION AT CARLSBAD AND PINE TO TURN OFF LEFT TURN PHASE AND KEEP OTHER PHASES IN OPERATION INCLUDING PEDESTRIAN CROSSING DURING CONSTRUCTION. REPLACE SOUTHBOUND LEFT TURN SIGNAL HEAD ON A SIGNAL MAST ARM WITH A R/Y/G BALL SIGNAL HEAD. COVER ALL OTHER EXISTING LEFT TURN SIGNAL HEADS. AFTER CONSTRUCTION WORK, TRAFFIC SIGNAL SHALL REVERT TO NORMAL OPERATION. ANY CABINET/SIGNAL MODIFICATIONS SHALL BE APPROVED AND TESTED BY THE CITY ENGINEER PRIOR TO RESTARTING SIGNAL OPERATIONS. FLAGGER SHALL SAFELY GUIDE BICYCLISTS DURING CRANE ACTIVITIES. COVER EXISTING RRFB DURING CONSTRUCTION. TEMPORARY BUS STOP CLOSURE. THE CONTRACTOR SHALL COORDINATE WIT THE NORTH COUNTY TRANSIT DISTRICT. 1 2 3 TWO WEEKS PRIOR TO CONSTRUCTION W O R K O N C A R L S B A D X X / X X / X X T O X X / X X / X X DURING CONSTRUCTION W O R K O N C A R L S B A D U S E A L T R O U T E S TWO WEEKS PRIOR TO CONSTRUCTION W O R K O N C A R L S B A D X X / X X / X X T O X X / X X / X X DURING CONSTRUCTION W O R K O N C A R L S B A D R T L A N E C L O S E D A H E A D C20(CA)(L) (36"x36") W1-4(R) (36"x36") C9A(CA) (36"x36") N-3 (CA) (18"x18") WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN SURFACE-MOUNT DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING SIGNALIZED INTERSECTION CMS R9-10 (24"x12") 4 R10-6(LT) (24"x36") W13-1P(20) (18"x18") Aug. 5, 2024 Item #6 Page 35 of 40 NOTES: PORTABLE CHANGEABLE MESSAGE: filfflffi filfflffi PROJECT KEYNOTES (THIS SHEET): □ □ □ □ LEGEND ... -CJ = ~ ""l>d:::I E3ll9 ... ··-I I I ------------- ' .,,.,, ✓' .. \ ~ -----------~ 1------~'--r _ _,__ ........ ..._ ·------ W20-1 £ W3-5(20) rn C20(CA)(R)~ W3-5a(20) ,j G20-2 r - PORTABLE CHANGEABLE MESSAGE: W4-2(R) R2-1(20) G20-5aP filfflffi filfflffi filfflffi filfflffi ------ ~ E <1-- ~ ~ <l- s R2-1(20) ;:::, ,G""' l""G20-5aP ~ :--£> ±►- EB ' filfflffi filfflffi \ \ \ ----- -= - ., 180' MERGING TAPER--------1-----::c/4(-'1/~'\ ---1/ 100' BUFFER ~...,._--J I I ;E P T MARKING \ \ \ \ -- ,~ I I I 90' SHIFTING TAPER -- I I 90' BICYCLE SHIFTING TAPER (CA) 30(CA) ,--~\c ~J~~=-i 9,Ha(l;f'\ d. I . .I J ,---r:===jj " I I \ '---,-I I ' j I I '~ ~~ _ 1 I t 1 , 1 ~,..,,. 1 I ., G 20 • 2 l::::=::s==" ::-.:--c~ 1 Ir '----c=== -1 1~ 1 1 \ Bu~~ER ~ ~ i ~ MERG1~~·TAPE~ l r R'---, -~ , 350'.7_,~ -· ,:-,. --------= ,,,_ • 'I /"' I' IJ_~~=-t-.L.1+----+-Vl ~l~(~~~~' I 1+-+1 -t1=--~_J----p;\~;IR~~~ ', I ~-~ .,. " ----------".::::1"~t:==~~;--;:::::':::~-~-~~~-•:-1-:~:~:::-~ L VY:6·=(=\J=,,.~~-i\17~70/' ~J ~-1(20). ~=.=-,,,,,==·-=--==] L --=,4 ':l-~\91 -L+ .L !UU-U ~-~ ::. ,ocl I'<: ~""c:::::;;i:l~L~-~~~~l)::_::;;:~l-~-1-:L _=-~L.3~::::;::::;;~;J.::J-c __ -_-_ _:c__. 67 ' , -, I' '% ~ ---, R4-7a-,R -1u , -rR3-5(RI □ --□,, -----...J R3-5'R'):,r"_ =-====---==·=====lc==-c; ===cil I ~ •_ +oo -L -------------s, ~ "';:-_"==""-1'------,,,~----------~ I '= - • -__ , 7f' ·-~ .;._ --":. ---"+-\7 4--s-__ +-------+--- ', ~-~(gl_ -1' -1' :2 ~----i ~~----------.__:<l--~~0 R4·7a W1-7 I R4-7aL <!--_ ~ --------<J----=--0 R4-7a .J1_7 ~<l----~ ~ ~ R4-7a W1·7 I , R4-7a~<!---;" 1 !~:--~-~ .. l - ---:::::c-:~•oo ., ~If.. 'f-'f-"" ~ -It>-~ ---t> ~ ! _ -, £.fill(l,_A)] _ _ '!59+~,'f\j. 'f. . 0 0 10+00 _,.j n ;oo -+ .-.-----"',,--~-72•00 """' j 73+00 J :; ;~_J_ ~)-7~•00---r~ j 75+00 4 J ~ \ 76+00 -+ • ■- -R9-9,j, "" -' ' I LJ I :--s;:_ ::.:._:· ~, ""~ 'J. = ,-.. <I- C, <J----C, <l--1 -~ 791 ......-... ~ A --:. ' ::::::r:S::;~f;::,~ u 1~! ® 8 ~lb--=-=-=-=-=-;:=-~~=-=-=-=-=-=-=-=-~;=...=-=-=-=-=-=-~=,;,1/~;-~· ~~~~t::=:'===t=========2-===!::::~=z:: -==~ • u ·u □ r LI ·u LI u • u n --,..._ ,.... I ~ o <J, ---3 LP-"' , o\. /J W1-4(R) ~ BUFFER -·~-~ SHIFTINGTAPER --....._LJ":i"l ___ _ --___ ...,..,. -...:::......,...._ - ----- ----- ----- -----_ ------__ ---__ ---__ ---__ ---__ ---__ --=~=--_ -----_ _ OJ_ ---__ ---_ _ W13-1P(20) _ _ I L.:.J _ I I ~ R9-9 0 ' l ' • - I I SIGN LEGEND END ROAD WORK . . . . SPEED LIMIT 20 ' -D. D 0 . ~ ~ ,o ' ' -0 u . . . \ 0 . SIDEWALK CLOSED KEEP c:::;> RIGHT rF ONLY ~ DETOUR ~ STOP HERE ON RED t? DAlE: 6/30/2024 'NO BEACH ACCESS AHEAD' SIGN I I I SHEET I CITY OF CARLSBAD I SHEETS I t====±====r=============================+====+====+====f===~ ENGINEERING DEPARTMENT ~L====±====±=============================+====+====+====f===~ ~E~NG~IN~E~ER~IN~G~M~A~NA~G~ER~R~C~E:=7~59~9~1 ~EX~P~6~30==:20=:26~~D~A~TE~~ L~-=--h=c--f----------------t~~~~=t~~~~cE.~~=r~~~~ DWN BY, ___ PROJECT NO. 1 DRAWING NO. DATE INITIAL DATE INITIAL CHKD BY: __ DATE INITIAL REVISION DESCRIPTION OTHER APPROVAL CITY APPROVAL RVWD BY: ENGINEER OF WORK APPROVED: HOSSEIN AJIDEH D D D D D D D D D D D D D D 350' W4-2(L)C20(CA)(L)W20-1 CONSTRUCTION STAGING AREA 79+00 80+00 81+00 82+00 83+00 84+00 85+00 86+00 87+00 88+00 89+00 90+00 91+00 92+00 R9-11(R) 6' M I N . 10 ' (1 0 ' ) (1 0 ' ) (1 0 ' ) (1 0 ' ) (5 ' ) (7 ' ) R2-1(20) G20-5aP 350'350' (1 0 ' ) (1 0 ' ) R2-1(20) G20-5aP 6' M I N . 10 ' (1 0 ' ) (1 0 ' ) (7 ' ) 6' M I N . 10 ' (1 0 ' ) (1 0 ' ) (5 ' ) 6' M I N . 10 ' (1 0 ' ) (1 0 ' ) (1 0 ' ) (7 ' ) 6' M I N . 10 ' 10 0 ' W20-1 G20-2 10 0 ' W20-1 G20-2 CM S W11-2 W16-9P W11-2 W16-9P TEMPORARY FENCE R9-9 D D D G20-2 92+00 93+00 94+00 95+00 96+00 97+00 98+00 99+00 100+00 50' DOWNSTREAM TAPER R1-2 R1-6 (1 0 ' ) (1 0 ' ) (1 0 ' ) (7 ' ) (1 0 ' ) (1 0 ' ) (7 ' ) W11-2 W16-9P (1 0 ' ) (1 0 ' ) (7 ' ) R9-9 GHD STANDARD A1 ATTRIBUTE BLOCK CAD File No.: GHD_G_0045_T Updated: 08-07-03 Version: 1.1GHD STANDARD A1 SHEET CAD File No.: GHD_G_0045 Updated: 08-07-03 Version: 1.1 Plot Date:Cad File No:2 July 2024 - 7:21 AM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC02 THRU TC03.dwgPlotted by:Bob Sherwood 64 95 IMPROVEMENT PLANS FOR: PHASE 1A: TRAFFIC CONTROL PLAN (2 OF 2) CIP #3896 529-8BS LR EH N 0 80'40'120'160' TC-03 MA T C H L I N E S T A : 7 9 + 0 0 - S E E T C - 0 2 CHERRY AVE.ACACIA AVE.JUNIPER AVE.MAPLE AVE. CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) MA T C H L I N E S T A : 9 2 + 0 0 - S E E A B O V E MA T C H L I N E S T A : 9 2 + 0 0 - S E E B E L O W HEMLOCK AVE. CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) PHASE 1: DETOUR PLAN SCALE: N.T.S. N CARL S B A D B L V D . P I N E A V E . LINC O L N S T . GARF I E L D S T . W20-2 M4-8a W20-2 (36"x36") M4-8a (24"x18") W A L N U T A V E . W20-1 (36"x36") G20-2 (36"x18") W4-2(L) (36"x36") C20(CA)(L) (36"x36") R1-2 (48"x48"x48") R1-6 (12"x36") R2-1(20) (30"x36") G20-5aP (24"x18") PHASE 1A: TRAFFIC CONTROL PLAN SCALE: 1" = 40' TAMARACK AVE.REDWOOD AVE. R9-9 (24"x12") TWO WEEKS PRIOR TO CONSTRUCTION W O R K O N C A R L S B A D X X / X X / X X T O X X / X X / X X DURING CONSTRUCTION W O R K O N C A R L S B A D L T L A N E C L O S E D A H E A D CMS M A P L E A V E . S Y C A M O R E A V E . C H E S T N U T A V E . A C A C I A A V E . C H E R R Y A V E . M4-9(L) D3-1a M4-9(R) D3-1a D3-1 M3-3 M4-9(L) W11-2 (36"x36") M4-9(R) (30"x24") M4-9(L) (30"x24") M3-3 (12"x6") W16-9P (24"x12") D3-1 (VARIESx12") WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN SURFACE-MOUNT DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING SIGNALIZED INTERSECTION CMS SC3(CA) (36"x12") SC3(CA) SC3(CA) 1. CONTRACTOR SHALL INSPECT AND REPAIR OR REINSTALL ALL DAMAGED DELINEATORS OR TRAFFIC CONTROL DEVICES DAILY 2. CONTRACTOR SHALL BAG/COVER EXISTING SPEED LIMIT SIGNS IN THE WORK AREAS Aug. 5, 2024 Item #6 Page 36 of 40 I 11 I i ~ ll, II I I I I I I i It ! I I I I I I ' i-1 I ,1 I ~1 -I I I j! w; I '::: ' ' "' ~/ ;--I "' \ "~' -~ .,_ I .,_ I "<l-, ~ . -• :,'<l-0 ....5-~ □-l:::::i> J-_5-j = " ----------- - I u •~-=-=-J====---1 I • 0 -------- - --~ ~ c;t;.- ~--1 -------- l~•~--~aJ=-~-=~=-=--=:_·:_::3;_~!l}.~!:;;_~;_~:._~~=_=:o_~_o~-=o==v-~~~;_~c:_~~~-D~~=.=2-v~~~~-~~=(:=~::o_=~~h~-~~~--~ o " I I LEGEND --!> .... - D = 8883ooo E3ll9 't PORTABLE CHANGEABLE MESSAGE: EHfflffi EHfflffi EHfflffi EHfflffi SIGN LEGEND END ROAD WORK END DETOUR SPEED LIMIT 20 rwoRi<l ~ SIDEWALi( CLOSED rn - ~ I DETOUR I l..S2..J ~ GE) !AHEAD! !Carlsbad Blvd! - -- • • I I . ' , , ~=~~=-=-=-y-----~------ • .. 0 DAm 6/30/2024 \ NOTES: DATE INITIAL ENGINEER OF WORK m REVISION DESCRIPTION o DATE INITIAL OTHER APPROVAL I I --, <l- • <1- -----------;'-----I =-'> --I "71 ----_2! = : = ■-0 ■ : I 0 ' ' ' ' ' I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE OWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL CHKD BY: CITY APPROVAL RVWD BY: Plot Date:Cad File No:25 June 2024 - 1:46 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC04 THRU TC05.dwgPlotted by:Elijah Berry 65 95 IMPROVEMENT PLANS FOR: PHASE 1B: TRAFFIC CONTROL PLAN 1 CIP #3896 529-8BS LR EH 0 80'40' N 120'160' TC-04 MA T C H L I N E S T A : 7 9 + 0 0 - S E E B E L O W WALNUT AVE.SYCAMORE AVE.CHESTNUT AVE. PHASE 1B: TRAFFIC CONTROL PLAN SCALE: 1" = 40' CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) MA T C H L I N E S T A : 7 9 + 0 0 - S E E A B O V E CHERRY AVE.ACACIA AVE.JUNIPER AVE.MAPLE AVE. CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) MA T C H L I N E S T A : 9 2 + 0 0 - S E E T C - 0 5 PHASE 1B: TRAFFIC CONTROL PLAN SCALE: 1" = 40' N 1. CONTRACTOR SHALL INSPECT AND REPAIR OR REINSTALL ALL DAMAGED DELINEATORS OR TRAFFIC CONTROL DEVICES DAILY 2. CONTRACTOR SHALL BAG/COVER EXISTING SPEED LIMIT SIGNS IN THE WORK AREAS R9-11a(R) (24"x12") W20-1 (36"x36") G20-2 (36"x18") W6-3 (36"x36") W4-2(L) (36"x36") C20(CA)(L) (36"x36") C30(CA) (30"x30") R3-5(R) (30"x36") W4-2(R) (36"x36") C20(CA)(R) (36"x36") R2-1(20) (30"x36") W3-5a(20) (36"x36") G20-5aP (24"x18") R4-7a (24"x30") FLAGGER SHALL SAFELY GUIDE BICYCLISTS DURING CRANE ACTIVITIES TEMPORARY BUS STOP CLOSURE. THE CONTRACTOR SHALL COORDINATE WITH THE NORTH COUNTY TRANSIT DISTRICT 1 TWO WEEKS PRIOR TO CONSTRUCTION W O R K O N C A R L S B A D X X / X X / X X T O X X / X X / X X DURING CONSTRUCTION W O R K O N C A R L S B A D L T L A N E C L O S E D A H E A D TWO WEEKS PRIOR TO CONSTRUCTION W O R K O N C A R L S B A D X X / X X / X X T O X X / X X / X X DURING CONSTRUCTION W O R K O N C A R L S B A D U S E A L T R O U T E S WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN TRAFFIC DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING CMS W3-5(20) (36"x36") W1-4(L) (36"x36") R9-9 (24"x12") W1-7 (48"x24") M4-9b(L) (24"x30") C9A(CA) (36"x36") N-3 (CA) (18"x18") W11-2 (36"x36") W16-9P (24"x12") R9-11(L) (24"x18") W11-1 (30"x30") W16-7PR (24"x12") R3-2 (36"x36") 2 W1-4(R) (36"x36") W13-1P(20) (18"x18") R49(CA) (24"x12") Aug. 5, 2024 Item #6 Page 37 of 40 --<> • LI - ---,---- PORTABLE CHANGEABLE MESSAGE: filfflffi filfflffi filfflffi filfflffi I I -===;\ d.1 . .\ J I I rr=---i..0" =5l'E'.'.".~-I "' ->< -<> -R3-2 ~ , -<> -74+00 -1= 75+00 -NOC> __;:..---'"' • ,___; -_ _ ~ ~ b. 76+00 -<> 77 +00 78+00 -J -791 ;::g = <l-•• <l- 90+00 I ' ~-- I I I I =+===========::::::::::::::::::. ============~][ ~-=============---=====-==-=====fQ~. I I I I LEGEND -I> - CJ = 8888ooo ""l><I E3IIB 't ··- SIGN LEGEND SIDEWALK CLOSED ~o (wORi<l l™1 1 AHEAD 1 ~ r-=~1 END ROAD WORK SPEED LIMIT 20 ~ DETOUR <:::== (? ONLY KEEP c::;) RIGHT DATE, 6/30/2024 PORTABLE CHANGEABLE MESSAGE: filfflffi filfflffi filfflffi filfflffi NOTES: DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL O1HER APPROVAL PROJECT KEYNOTES (THIS SHEET): DATE □ □ INITIAL CITY APPROVAL I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE I DRAWING NO. DWN BY: I PROJECT NO. CHKD BY: RVWD BY: Plot Date:Cad File No:25 June 2024 - 1:46 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC04 THRU TC05.dwgPlotted by:Elijah Berry 66 95 IMPROVEMENT PLANS FOR: PHASE 1B: TRAFFIC CONTROL PLAN (2 OF 2) CIP #3896 529-8BS LR EH PHASE 1B: TRAFFIC CONTROL PLAN SCALE: 1" = 40' N 0 80'40'120'160' TC-05 MA T C H L I N E S T A : 9 2 + 0 0 - S E E A B O V E HEMLOCK AVE. CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) G20-2 (36"x18") R1-2 (48"x48"x48") R1-6 (12"x36") 1. CONTRACTOR SHALL INSPECT AND REPAIR OR REINSTALL ALL DAMAGED DELINEATORS OR TRAFFIC CONTROL DEVICES DAILY W11-2 (36"x36") W16-9P (24"x12") WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN TRAFFIC DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING CMS R26A(CA) (24"x30") Aug. 5, 2024 Item #6 Page 38 of 40 LEGEND ---t> p NOTES: - D = SIGN LEGEND 8888ooo 001:><t:-1 "tNf-NO ~ E3ll9 PARKING ... END I AHEAD I ANY ROAD WORK TIME .. ··- I I I J \ ~I ; \ ■n___J; I I I ~ 00 __.5'-j I .. \ I I I I I I I I ~~. g cs-- I~===·--..!. -i.-: I ~ [;'--L.!----~-- ======= ---e -- D R1-~93+0ci 94+00 C Nl' ----,~,,..------- j s -95< s 5 0 ---I> '.:, 1==::1> '-I> ~W11-2 ° ---t> :::: ® ---t> ----~~~ E __,. ---G20--2 __ £ __ _ s - DAlE: 6/30/2024 I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/30/2026 DATE DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL DATE INITIAL CHKD BY: ENGINEER OF WORK REVISION DESCRIPTION O1HER APPROVAL CITY APPROVAL RVWD BY: Plot Date:Cad File No:25 June 2024 - 1:46 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC06 THRU TC07.dwgPlotted by:Elijah Berry 67 95 IMPROVEMENT PLANS FOR: PHASE 2: TRAFFIC CONTROL PLAN 1 CIP #3896 529-8RS LR EH PHASE 2: TRAFFIC CONTROL PLAN SCALE: 1" = 40' N 0 80'40'120'160' TC-06 MA T C H L I N E S T A : 8 4 + 5 0 - S E E B E L O W ACACIA AVE.MAPLE AVE. CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) MA T C H L I N E S T A : 8 4 + 5 0 - S E E A B O V E CHESTNUT AVE.SYCAMORE AVE. CHERRY AVE.JUNIPER AVE. CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) HEMLOCK AVE.REDWOOD AVE. MA T C H L I N E S T A : 9 6 + 5 0 - S E E T C - 0 7 W20-1 (36"x36") R9-9 (24"x12") M4-9b(R) (24"x30") W4-2(R) (36"x36") C20(CA)(R) (36"x36") R2-1(20) (30"x36") W3-5(20) (36"x36") W3-5a(20) (36"x36") G20-5aP (24"x18") 1. CONTRACTOR SHALL INSPECT AND REPAIR OR REINSTALL ALL DAMAGED DELINEATORS OR TRAFFIC CONTROL DEVICES DAILY C30(CA) (30"x30") TWO WEEKS PRIOR TO CONSTRUCTION W O R K O N C A R L S B A D X X / X X / X X T O X X / X X / X X DURING CONSTRUCTION W O R K O N C A R L S B A D R T L A N E C L O S E D A H E A D COVER EXISTING RRFB DURING CONSTRUCTION1 R9-10 (24"x12") M4-9(R) (30"x24") M4-9b(L) (24"x30") R9-11(L) (24"x18") WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN TRAFFIC DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING CMS Aug. 5, 2024 Item #6 Page 39 of 40 LEGEND --t> .... - D = 8888= ldll:><I E3IID "t ··- ----------~~' ..J....:::- 1 i ' i 11 - I I ! ; I I I 1"'/,l'JI 1, t 1l1 I ~- , __ _ ' 0 • e-'-----t"~---- ' 0 =--==-=----=:-==c;c:::i =--=c---:=-= =-=--==----:-~== ---\-"I> -----t> -I -----t> g_ -----t> ' -' -~ ~ -_\ -""- -- :=. -L W11-1. _::ff -L _,_ "' --W16-7P -lf9-11 (L)lf == W4-2(R) ji=' C20(CA)(R ,, 0 • 3-5a(20) R2-1(20i ' ------J-;;-77+00 78+00 -~ ~ J ~ ~r-~ -0 - ~ ~ =--c, -~ ----C30~ .so t R~9 f ow '--' J 0 °o) -IJ G20-5aP ---------~t J~! )/ 90' BICYCLE "' ~ ~ ~ SHIFTING TAPER --- -350' r 350' _,, ~ . '-- I r --,d I I ~ ~l1 i \ I L -I I I " -I I ,,,---_JI I ! I~ I ' I . SC, -,,----~-I -:, -® I 1----------- 1 I I I I PROJECT KEYNOTES (THIS SHEET): □ SIGN LEGEND --- -350' ..,, . LJ L.::J \Ul SIDEWAU< CLOSED ' ~ DETOUR <:r==----i ;: DETOUR =:> Firl I DETOUR I !CJ! l™1 c:::::::> 0 - -. 180' MERGING TAPER z "' .l "' SPEED LIMIT 20 0 - - \_ RELOCATE BUS STOP -• " TEMPORARY FENCE _J ' -------1---- M4-9a(L) ' ,c_ CONSTRUCTION °01><:I DATE, 6/30/2024 L R~9 M4-9(R) -------~ • ---------------- 0 M4-9b(R) I 0 PORTABLE CHANGEABLE MESSAGE: filfflffi Effia filfflffi Effia NOTES: • • R2-1(20) -j =---C: u20-5aP-P ------I ---------------.►-,;:--84•~ J" ~--t> -'· --l ~ ---r-....... - --------- = w..J 0.... J-J-;;-J--95+00 ~ ;;- I & --t> ;;---~ --C ,, I ~\ . --I I - I I I I I I I SHEET I CITY OF CARLSBAD I SHEETS I t====f===f==========================~t===j====[===~===~ ENGINEERING DEPARTMENT t====[===f==========================j~===j===~[===~===~ ~:;:;;:;;~~=======H(HO~SiSISEEIIINOAJIIJIDJEE~H7 APPROVED: t-t====[===f==========================jt===j=~~=[~~~~~;;~ l!;E~NG~IN~EE~Rl~NG -~~MA~N~AG~ER~R~CE:::::7~5~99~1 ~EX~P~6~3~0:'.::'.2::::02l6WR~D~A~TEfNo.j I-'OWN BY: I PROJECT NO. I DRAWING NO. t~::::~;;;+==--------=-:~---t~DA~TE~J~1N~ITl~A~L~~D~AT-;-ES~~IN~ITl~A.LL~ I CHKD BY: _ . DATE INITIAL PTION I CITY APPROVAL RVWD BY: REVISION DESCRI 01HER APPROVAL ENGINEER OF WORK Plot Date:Cad File No:25 June 2024 - 1:46 PM N:\US\Irvine\Projects\111\11146346 City of Carlsbad Beach Access Repairs\06-CAD\Sheets\111-46346-TC06 THRU TC07.dwgPlotted by:Elijah Berry 68 95 IMPROVEMENT PLANS FOR: PHASE 2: TRAFFIC CONTROL PLAN 2 CIP #3896 529-8RS LR EH PHASE 2: TRAFFIC CONTROL PLAN SCALE: 1" = 40' N 0 80'40'120'160' TC-07 MA T C H L I N E S T A : 9 6 + 5 0 - S E E T C - 0 6 CARLSBAD BLVD. (SPEED LIMIT = 30 MPH) TAMARACK AVE. ROW SEQUOIA AVE. ROW ROW ROW R9-9 (24"x12") 1. CONTRACTOR SHALL INSPECT AND REPAIR OR REINSTALL ALL DAMAGED DELINEATORS OR TRAFFIC CONTROL DEVICES DAILY G20-2 (36"x18") R9-11 (24"x18") WORK ZONE DIRECTION OF TRAVEL TEMPORARY PAVEMENT MARKING ARROW PORTABLE SIGN TRAFFIC DELINEATORS (SPACED AT 10') FLASHING ARROW SIGN TYPE III BARRICADE PORTABLE CHANGEABLE MESSAGE SIGN TEMPORARY "WATER-WALL" BARRIER WITH REFLECTIVE MARKERS ON TOP CRASH CUSHION CONSTRUCTION STAGING AREA TRAILER CRASH ATTENUATOR (ABSORB 350 SYSTEM) FLAGGER TEMPORARY STRIPING CMS Aug. 5, 2024 Item #6 Page 40 of 40 LEGEND - CJ = OHl><EI E3IIIJ 't ··- NOTES: SIGN LEGEND SIDEWALi( CLOSED END ROAD WORK I I --- I [ I ----I ~ I --:::, ~-------- 1~---------------- I I 1];, I I ~ R9-S"> 11 I • \ I . I I I i I \If. I ) I 1/ l • / 0 DATE, 6/30/2024 • • • I 102•:00~:;;:===~ ----L\\,------~~ -------- t " ' I\ ' ' \ ----- \ ' ' ' ' \ \ \ \ \ \ \ ' ' ' ' \ \ \ \ \ \ \ \ \ \ \ I ' ' I \ \ \ \ \ \ \ \ \ \ \ ' ' \ ' \ ' ' ' 1--). \ ' ' I I I I ' I I I I ,,, ,,, ,,..--7 I / I I I / /I 1t/lfl I I /111/1 11 ( L~,PARKIN(j LOT/_;'_ \ 1 jJl 1 1 /tl \ 1,,1',,1'' \,/,,1,,,,,, '.J I I I I ' - DATE INITIAL ENGINEER OF WORK REVISION DESCRIPTION I SHEET I CITY OF CARLSBAD I SHEETS I ENGINEERING DEPARTMENT APPROVED: HOSSEIN AJIDEH ENGINEERING MANAGER RCE 75991 EXP 6/3012026 DATE DWN BY: I PROJECT NO. I DRAWING NO. DATE INITIAL DATE INITIAL CHKD BY: O1HER APPROVAL CITY APPROVAL RVWD BY: From:Frank Sung To:Traffic Cc:Robin Sung Subject:Fwd: Project to replace upper seawall stairs and widen sidewalk reviewed at commission Date:Sunday, July 21, 2024 5:25:43 PM Hi Commissioners - Thank you for planning to expand and widen the pedestrian walkway. My input isthat we do need some protective barrier which protects pedestrians from the cars whizzing by. Therendering of the wider sidewalk doesn't show the protective barrier. You also state that the path can be widened by eliminating that guard rail. Widening the path is a good idea. Eliminating the protective guard rail is a bad idea. Thank you for your consideration. Frank Sungwww.ficm.org(m) 760-213-9036 ---------- Forwarded message ---------From: City of Carlsbad <communications@carlsbadca.gov>Date: Sat, Jul 20, 2024 at 8:42 AMSubject: Project to replace upper seawall stairs and widen sidewalk reviewed at commissionTo: <franksung01@gmail.com>   View this email in your web browser The City of Carlsbad’s Traffic Safety & Mobility Commission will review a project to replace the upper seawall stairs along Carlsbad Boulevard and widen the sidewalk between Cherry and Pine avenues. After considering the proposed design and community feedback, the commission will vote to make a recommendation to the City Council. Traffic Safety & Mobility Commission Monday, Aug. 5, 4 p.m. Council Chamber 1200 Carlsbad Village Drive Sign up to get notified when the agenda and staff report are available on the city’s website by Friday, Aug. 2 How to participate You can email traffic@carlsbadca.gov before the meeting or come in• person and fill out a request to speak Watch the meeting live on the website Watch a recording of the meeting afterward About the project The Beach Access Repair Project will replace the four stairways along Carlsbad Boulevard between Hemlock and Pine avenues and widen the sidewalk between Cherry and Pine avenues. The sidewalks and stairways were built in the 1980s and concrete has chipped away in places to expose rebar, there is visible corrosion, and soil has eroded away from some of the foundations.  • • Ii] The stair locations and general design, including the overlooks and landing areas/platforms, will remain the same. The sidewalk between Cherry and Pine avenues will be widened by 2 ½ feet to make more room for the many walkers, joggers and other users who enjoy this popular location. One foot will come from the removal of the surface mounted railing and metal beam guardrail, which is consistent with sidewalks to the north and south. The sidewalk will also be extended 1½ feet to the west over the bluff. Existing streetlight poles will be replaced. The project will help reinforce and stabilize the bluff. Learn more Construction Construction would be phased so some stairways will remain open while • • • • • • others are being replaced, and work would be planned to avoid busy summer months. Next steps After the Traffic Safety & Mobility Commission, staff will present the final project to the City Council to seek approval of the final design and authorization to put the project out to bid. Once work begins, construction will take about 20 months, not including breaks for summer months. City of Carlsbad | Website City of Carlsbad | 1200 Carlsbad Village Drive | Carlsbad, CA 92008 US Unsubscribe | Update Profile | Constant Contact Data Notice CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. • • From:JOEL QUIRT To:Traffic Cc:Joel Quirt Subject:Carlsbad Beach Access Repair and Upgrade Feedback Date:Tuesday, July 23, 2024 10:55:41 AM Attachments:PastedGraphic-1.png Importance:High Per a City of Carlsbad post on NextDoor, I am writing to provide feedback on the project based on that post. First, thank you as my wife and I (and many citizens and tourists) walk this stretch every day - we comment daily that we wished the sidewalk was wider, so we are all for it. HOWEVER, one major concern is for pedestrian safety with the elimination of the guardrail. We think some sort of safety barrier like the guardrail between the sidewalk and street to protect pedestrians is required. As shown in the picture below, the proposed solution has no protection from cars, motorcycles, bikes (especially E bikes) or any wheeled vehicles on the street from hopping the tiny curb and causing catastrophic harm to one more multiple pedestrians. This will happen. Thank you for the opportunity to provide feedback for this project. Sincerely, Joel Quirt 626-771-6699 CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. From:Kalim Smith To:Traffic Subject:Sea wall and access Date:Tuesday, July 23, 2024 1:12:20 PM Hello please keep me informed of the sea wall rebuild plans. I started work on this topic back in 2014. Thank you, Kalim Smith Disabled resident Oak Ave, Carlsbad CA CAUTION: Do not open attachments or click on links unless you recognize the sender and know the content is safe. 1 Replacing beach stairs and widening sidewalk – Beach Access Repair and Upgrades CIP 3896 Project Hossein Ajideh, Engineering Manager Eric Zielke, Senior Engineer Aug. 5, 2024 1 { City of Carlsbad PROPOSED ACTION Support staff’s recommendation to the City Council to approve the project plans ITEM 6: BEACH ACCESS REPAIRS 2 { City of Carlsbad BACKGROUND •Beach access stairways built in 1980s •Project area within State Parks •October 2020 – Traffic Safety & Mobility Commission supported implementation of the project •July 2023 – Planning Commission approved permits ITEM 6: BEACH ACCESS REPAIRS 3 { City of Carlsbad PROJECT GOALS •Repair beach access facilities to maintain public safety and access •Enhance pedestrian experience and aesthetics ITEM 6: BEACH ACCESS REPAIRS 4 {city of Carlsbad WIDENING SIDEWALK AND REPLACING STAIRS ITEM 6: BEACH ACCESS REPAIRS 5 Project Improvements 6 - EXISTING CONDITIONS – SYCAMORE AVENUE 7 EXISTING CONDITIONS – CARLSBAD BOULEVARD 8 ITEM 6: BEACH ACCESS REPAIRS 9 New 1’-5’’ Existing 6’-5’’ Existing 3’-10’’ Control Joint Pine Avenue to Maple Avenue – 11’-10’’ New Walking Width Existing On Grade Sidewalk New Replace and Expand Topping SlabCarlsbad Boulevard Bike Lane New Side- Mounted Railing 42’’ High New Double T-Beam Cantilever Existing Inverted T-Beam Existing Concrete Support Pile New Side-Mounted Railing 42’’ Existing Slope Removal of Guardrail ITEM 6: BEACH ACCESS REPAIRS 10 . -- . .I . - I I I I l ' -~ I I l..J .L I I I - I -__.__ \ ' u-- --s- i -- ~- . l _L"" (.__ City of Carlsbad New 1’-5’’ Existing 8’-9’’ Remove and Replace Topping Slab Maple Avenue to Cherry Avenue – 11’-4’’ New Walking Width New Side- Mounted Railing 42’’ High Existing 12’’ Diameter Pier Carlsbad Boulevard Bike Lane Removal of Guardrail Existing 8’’ Thick Wall ITEM 6: BEACH ACCESS REPAIRS 11 {city of Carlsbad Near the intersection of Carlsbad Boulevard and Walnut Avenue Before Project Improvements. Near the intersection of Carlsbad Boulevard and Walnut Avenue After Project Improvements. 12 ITEM X: BEACH ACCESS REPAIRS 12 Near the intersection of Carlsbad Boulevard and Sycamore Avenue Before Project Improvements. Near the intersection of Carlsbad Boulevard and Sycamore Avenue After Project Improvements. 13 ITEM X: BEACH ACCESS REPAIRS 13 PERMITS •July 2023 - Planning Commission approved the coastal development permit and Habitat Management Plan •Right-of-Entry permit from State Parks - pending ITEM 6: BEACH ACCESS REPAIRS 14 { City of Carlsbad BEACH ACCESS AT TAMARACK • Improvements will be included in the upcoming American Disabilities Act Beach Access CIP project that will incorporate enhanced accessibility features into the sidewalk and stair design at Tamarack and Pine avenues ITEM 6: BEACH ACCESS REPAIRS 15 { City of Carlsbad CONSTRUCTION •No construction during the summer •Phased over ~20 months •Phase 1 expected to start in early 2025 •Beach access will be maintained at all times ITEM 6: BEACH ACCESS REPAIRS { City of Carlsbad State Parks final approval City Council review, authorization to bid Construction NEXT STEPS ITEM 6: BEACH ACCESS REPAIRS { City of Carlsbad PROPOSED ACTION Support staff’s recommendation to the City Council to approve the project plans ITEM 6: BEACH ACCESS REPAIRS 18 { City of Carlsbad THANK YOU ITEM 6: BEACH ACCESS REPAIRS 19 { City of Carlsbad