Loading...
HomeMy WebLinkAboutMS 02-05; CARLSBAD OCEANVIEW ESTATES; PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR CARLSBAD OCEAN ESTATES; 2021-08-10CITY OF CARLSBAD PRIORITY DEVELOPMENT PROJECT (PDP) STORM WATER QUALITY MANAGEMENT PLAN (SWQMP) FOR CARLSBAD OCEANVIEW ESTATES NE Corner of Hoover Street & Adams Street, Carlsbad, CA, 92008 MS 02-05 ENGINEER OF WORK: JOHN S. RIVERA, C73878 PREPARED FOR: HENRY OLIVIER & ILEANA VISCAL P.O. Box 9493 San Bernardino, CA 92427 Ph: (909) 880-1146 Fax: (909) 880-1557 HOlivier@Geo-Cal.com PREPARED BY: FUSION ENGINEERING AND TECHNOLOGY 1810 GILLESPIE WAY, SUITE 207 EL CAJON, CA 92020 Phone: 858-736-2800 Email: Johnny@FusionEngTech.com REVISION DATE: AUGUST 10TH, 2021 REPLACES ORIGINAL APPROVAL DATED MAY 23, 2018 TABLE OF CONTENTS • Certification Page • Project Vicinity Map • FORM E-34 Storm Water Standard Questionnaire • Site Information • FORM E-36 Standard Project Requirement Checklist • Summary of PDP Structural BMPs • Attachment 1: Backup for PDP Pollutant Control BMPs o Attachment la: OMA Exhibit o Attachment lb: Tabular Summary of DMAs and Design Capture Volume Calculations o Attachment le: Harvest and Use Feasibility Screening (when applicable) o Attachment ld: Categorization of Infiltration Feasibility Condition (when applicable) o Attachment le: Pollutant Control BMP Design Worksheets/ Calculations • Attachment 2: Backup for PDP Hydromodification Control Measures o Attachment 2a: Hydromodification Management Exhibit o Attachment 2b: Management of Critical Coarse Sediment Yield Areas o Attachment 2c: Geomorphic Assessment of Receiving Channels o Attachment 2d: Flow Control Facility Design • Attachment 3: Structural BMP Maintenance Thresholds and Actions • Attachment 4: Single Sheet BMP {SSBMP) Exhibit CERTIFICATION PAGE Project Name: CARLSBAD OCEANVIEW ESTATES Project ID: MS 02-05 I hereby declare that I am the Engineer in Responsible Charge of design of storm water BMPs for this project, and that I have exercised responsible charge over the design of the project as defined in Section 6703 of the Business and Professions Code, and that the design is consistent with the requirements of the BMP Design Manual, which is based on the requirements of SDRWQCB Order No. R9-2013-0001 (MS4 Permit) or the current Order. I have read and understand that the City Engineer has adopted minimum requirements for managing urban runoff, including storm water, from land development activities, as described in the BMP Design Manual. I certify that this SWQMP has been completed to the best of my ability and accurately reflects the project being proposed and the applicable source control and site design BMPs proposed to minimize the potentially negative impacts of this project's land development activities on water quality. I understand and acknowledge that the plan check review of this SWQMP by the City Engineer is confined to a review and does not relieve me, as the Engineer in Responsible Charge of design of storm water BMPs for this project, of my responsibilities for project design. _____________________________________C73878 Exp. 6/30/2023 Engineer of Work's Signature, PE Number & Expiration Date John S. Rivera________________________________________________________ Print Name Fusion Engineering & Technology_________________________________________ Company August 10th, 2021____________________________ Date No 73878 Exp .• 6/30/23 PROJECT VICINITY MAP ADAMS ---........ AGUA HEDIONDIA LAGOON CITY OF CARLSBAD VICINITY MAP NOT TO SCALE City of sbad STORM WATER STANDARDS QUESTIONNAIRE Development Services land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov E-34 [ INSTRUCTIONS: To address post-development pollutants that may be generated from development projects, the city requires that new development and significant redevelopment priority projects incorporate Permanent Storm Water Best Management Practices (BMPs) into the project design per Carlsbad BMP Design Manual (BMP Manual). To view the BMP Manual, refer to the Engineering Standards (Volume 5). This questionnaire must be completed by the applicant in advance of submitting for a development application (subdivision, discretionary permits and/or construction permits). The results of the questionnaire determine the level of storm water standards that must be appiied to a proposed development or redevelopment project. Depending on the outcome, your project will either be subject to 'STANDARD PROJECT' .requirements or be subject to 'PRIORITY DEVELOPMENT PROJECT' (PDP) requirements. Your responses to the questionnaire represent an initial assessment of the p.roposed project conditions and impacts. City staff has responsibility for making the final assessment after submission· of the development application. If staff determines that the questionnaire was incorrectly filled out and is subject to more stringent storm water standards than initially assessed by you, this will result in the return of the development application as incomplete. In this case, please make the changes to the questionnaire and resubmit to the city. If you are unsure about the meaning of a question or need help in determining how to respond to one or more of the questions, please seek assistance from Land Development Engineering staff. A completed and signed questionnaire must be submitted with each development project application. Only one completed and signed questionnaire is required when multiple development applications for the same project are submitted concurrently. PROJECT INFORMATION PROJECT NAME: CARLSBAD OCEANVIEW ESTATES PROJECT ID: MS 02-05 ADDRESS: NE Corner of Hoover Street & Adams Street, City of Carlsbad, CA APN: 206-180-32 The project is (check one): IX! New Development 0 Redevelopment The total proposed disturbed area is: 48,041 ft2( 1.103 _) acres - The total proposed newly created and/or replaced impervious area is: -19,865 ft2 ( 0.456 ) acres If your project is covered by an approved SWQMP as part of a larger develqpment project, provide the project ID and the SWQMP # of the larger development project: Project ID MS 02-05 SWQMP#: Then, go to Step 1 and follow the instructions. When completed, sign the form at the end and submit this with your application to the city. E-34 Page 1 of 4 REV 03/19 I STEP 1 TO BE COMPLETED FOR ALL PROJECTS To determine if your project is a "development project", please answer the following question: ' YES NO Is your project LIMITED TO routine maintenance activity and/or repair/improvements to an existing building □ IZI or structure that do not alter the size (See Section 1.3 of the BMP Design Manual for guidance)? If you answered "yes" to the above question, provide justification below then go to Step 5, mark the third box stating "my project is not a 'development project' and not subject to the requirements of the BMP manual" and complete applicant information. i Justification/discussion: (e.g. the project includes only interior remodels within an existing building): If vou answered "no" to the above question, the project is a 'development project', i:io to Step 2. STEP2 ,, TO BE COMPLETED FOR ALL DEVELOPMENT PROJECTS To determine if your project is exempt from PDP requirements pursuant to MS4 Permit Provision E.3.b.(3), please answer the following questions: Is your project LIMITED to one or more of the following: YES NO 1. Constructing new or retrofitting paved sidewalks, bicycle lanes or trails that meet the following criteria: a) Designed and constructed to direct storm water runoff to adjacent vegetated areas, or other non- erodible permeable areas; OR □ 00 b) Designed and constructed to be hydraulically disconnected from pav13d streets or roads; OR c) Designed and constructed with permeable pavements or surfaces in accordance with USEPA Green Streets guidance? 2. Retrofitting or redeveloping existing paved alleys, streets, or roads that afe designed and constructed in □ 00 accordance with the USEPA Green Streets guidance? 3. Ground Mounted Solar Array that meets the criteria provided in section 1.4.2 of the BMP manual? □ 00 'i If you answered "yes" to one or more of the above questions, provide discussion/justification below, then go to Step 5, mark the second box stating "my project is EXEMPT from PDP a -• ll and complete app!icant information. Discussion to justify exemption ( e.g. the project redeveloping existing road designed and constructed in accordance with the USEPA Green Street guidance): ' If vou answered "no" to the above questions, vour project is not exempt from PDP, Qo to Step 3. E-34 Page 2 of 4 REV 03/19 1. Is your project a new development that creates 10,000 square feet or: more of impervious surfaces collectively over the entire project site? This includes commercial, indµstrial, residential, mixed-use, and ublic develo ment ro ·ects on ublic or rivate land. ' 2. Is your project a redevelopment project creating and/or replacing 5,000 square feet or more of impervious surface collectively over the entire project site on an existing site of 10,000 square feet or more of impervious surface? This includes commercial, industrial, residential, mixed-use, and public 3. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a restaurant? A restaurant is a facility that sells prepared foods and drinks for consumption, including-stationary lunch counters and refreshment stands selling prepared foods and drinks for immediate consumption (Standard Industrial Classification SIC code 5812 . 4. Is your project a new or redevelopment project that creates 5,000 sq'Jare feet or more of impervious surface collectively over the entire project site and supports a hillside development project? A hillside develo ment ro·ect includes develo ment on an natural slo e that is twent -five ercent or reater. 5. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious surface collectively over the entire project site and supports a parking lot? A parking lot is a land area or facility for the temporary parking or storage of motor vehicles used personally for business or for commerce. 6. Is your project a new or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious street, road, highway, freeway or driveway surface collectively over the entire project site? A street, road, highway, freeway or driveway is any paved impervious surface used for the trans ortation of automobiles, trucks, motorc cles, and other vehicles. 7. Is your project a new or redevelopment project that creates and/or rep!aces 2,500 square feet or more of impervious surface collectively over the entire site, and discharges directly to an Environmentally Sensitive Area (ESA)? "Discharging Directly to" includes flow that is conveyed overland a distance of 200 feet or less from the project to the ESA, or conveyed in a pipe or open channel any distance as an isolated flow from the ro·ect to the ESA i.e. not commin led with flows fi'om ad·acent lands.* 8. Is your project a new development or redevelopment project that creates i;lnd/or replaces 5,000 square feet or more of impervious surface that supports an automotive repair' shop? An automotive repair shop is a facility that is categorized in any one of the following Standaro! Industrial Classification (SICj codes: 5013, 5014, 5541, 7532-7534, or 7536-7539. 9. Is your project a new development or redevelopment project that creates and/or replaces 5,000 square feet or more of impervious area that supports a retail gasoline outlet (R,GO)? This category inciudes RGO's that meet the following criteria: (a) 5,000 square feet or mom w (b) a project Average Daily Traffic ADT of 100 or more vehicles er da . ' 10. Is your project a new or redevelopment project that results in the disturbance of one or more acres of land and are expected to generate pollutants post construction? 11. !s your project located within 200 feet of the Pacific Ocean and (1) create;s 2,500 square feet or more of YES NO [X] □ □ □ [X] □ [X) □ [X] □ 00 □ 00 □ □ 00 IX! n impervious surface or (2) increases impervious surface on the properly by more than 10%? (CMC D 00 21.203.040 If you answered "yes" to one or more of the above questions, your project is a PDP. If your project is a redevelopment project, go to step 4. If your project is a new project, go to step 5, check the first box stating "My project is a PDP ... " and complete applicant information. • ; I If you answered "no" to all of the above questions, your project is a 'STAr•H)ARD PROJECT.' Go to step 5, check the second box statin "M ro·ect is a 'STANDARD PROJECT' .. ," and com lete'a licant information. E-34 Page 3 of 4 REV 03/19 .. STEP4 1 TO BE COMPLETED FOR REDEVELOPMENT PROJECTS THAT ARE PR.IORITY DEVELOPMENT PROJECTS (PDP) . ,· ONLY Complete the questions below regarding your redevelopment project (MS4;P19rmit Provision E.3.b.(2)): YES NO Does the redevelopment project result in the creation or replacement of impprvious surface in an amount of less than 50% of the surface area of the previously existing developnYlent? Complete the percent impervious calculation below: Existing impervious area (A) = sq. ft. i □ □ Total proposed newly created or replaced impervious area (B) = sq. ft. Percent impervious area created or replaced (B/A)*100 = % : If you answered "yes", the structural BMPs required for PDP apply only tp the creation or replacement of impervious surface and not the entire development. Go to step 5, check the first bo>; ~tating "My project is a PDP ... " and complete applicant information. ! if you answered "no," the structurai BMP's required for PDP apply to the entire development. Go to step 5, check the check the first box statinQ "My project is a PDP ... " and complete applicant information. STEPS CHECK THE APPROPRIATE BOX AND COMPLETE APPLICANTINFORMATION IXl My project is a PDP and must comply with PDP stormwater requirements of the BMP Manual. I understand I must prepare a Storm Water Quality Management Plan (SWQMP) for submittal at time of application. 0 My project is a 'STANDARD PROJECT' OR EXEMPT from PDP and mqst only comply with 'STANDARD PROJECT' stormwater requirements of the BMP Manual. As part of these requirements, I will submit a "Standard Project Requirement Checklist Form E-36" and incorporate low impact development strategies throughout my project. Note: For projects that are close to meeting the PDP threshold, staff may require detailed impervious area calculations and exhibits to verify if 'STANDARD PROJECT' stormwater requirements apply. D My Project is NOT a 'development project' and is not subject to the req4irements of the BMP Manual. Applicant Information and Signature Box i Applicant Name: HENRY OLIVIER Applicant Title: OWNER _,,,,.., .. Applicant Signature: (~~~/ &~"d,:1~ i Date: AugJst 10th, 2021 i • Environmentally Sensitive Areas include but are not limited to all Clean Water Act Section 303(d) irnpaired water bodies; areas designated as Areas of Special Siologica! Significar:co by the: State \"Jater Rescu1ces Cont;-o! Board (VVater Quality Control Plan for the San Diego Basin (1994) and amendments); water bodies designated vvith the RARE beneficial use by the State VVatei Resources Control Bodid (VVatei Uuality Control Plan for the San Diego Basin (1994) and amendments); areas designated as preser.Jes or their equivaient under the Multi Species Conservation Program vvithin the Cities and County of San Diego; Habitat Management Plan; and any other equivalent environmentally sensitive areas which have been identified by the City. This Box for City Use Onlv r '· YES NO City Concurrence: □ □ ' ~y: bate: Project ID: E-34 Page4of4 REV 03/19 SITE INFORMATION CHECKLIST Project Summary Information Project Name Carlsbad Oceanview Estates Project ID MS 02-05 Project Address NE Corner of Hoover Street & Adams Street, Carlsbad, CA, 92008 Assessor's Parcel Number(s) (APN(s))206-180-32 Project Watershed (Hydrologic Unit)Carlsbad 904 Parcel Area __1.103__ Acres (48,041 Square Feet) Existing Impervious Area (subset of Parcel Area)__0.000__ Acres (0 Square Feet) Area to be disturbed by the project (Project Area)__1.103 _Acres (48,041 Square Feet) Project Proposed Impervious Area (subset of Project Area)__0.456__ Acres (19,865 Square Feet) Project Proposed Pervious Area (subset of Project Area)__0.647__ Acres (28,177 Square Feet) Note: Proposed Impervious Area + Proposed Pervious Area = Area to be Disturbed by the Project. This may be less than the Parcel Area. The above numbers represent the onsite areas within the project lots, i.e. DMA’s 1, 2 & 3. Additional project areas include the following; ·DMA 4 (DMA’s; 4.1, 4.2 & 4.3): o Lot driveways within public ROW o 250 s.f. each (750 s.f. total) new concrete driveway. o Considered DeMinimis and not included within onsite lot biofiltration basin sizing. ·DMA 5: o Widening of Adams Street on the opposite side of the project. o 1,558 s.f. total new a.c. pavement o Green Street design elements implemented including impervious dispersion to pervious surface at edge of pavement, per Public Improvement Plan Dwg. No. 438-2. Description of Existing Site Condition and Drainage Patterns Current Status of the Site (select all that apply): o Existing development o Previously graded but not built out o Agricultural or other non-impervious use þ Vacant, undeveloped/natural Description / Additional Information: Existing Land Cover Includes (select all that apply): þ Vegetative Cover o Non-Vegetated Pervious Areas o Impervious Areas Description / Additional Information: Underlying Soil belongs to Hydrologic Soil Group (select all that apply): o NRCS Type A þ NRCS Type B o NRCS Type C o NRCS Type D Approximate Depth to Groundwater (GW): o GW Depth < 5 feet o 5 feet < GW Depth < 10 feet o 10 feet < GW Depth < 20 feet þ GW Depth > 20 feet Existing Natural Hydrologic Features (select all that apply): o Watercourses o Seeps o Springs o Wetlands þ None Description / Additional Information: Description of Existing Site Topography and Drainage [How is storm water runoff conveyed from the site? At a minimum, this description should answer (1) whether existing drainage conveyance is natural or urban; (2) describe existing constructed storm water conveyance systems, if applicable; and (3) is runoff from offsite conveyed through the site? if so, describe]: The existing site is comprised of vacant raw land with native and non-native vegetation cover. Runoff from the approximately 1.10 acre site sheet flows to adjacent Adams Street and Hoover Avenue, and is conveyed to existing catch basin at SE corner of Adams Street and Hoover Avenue. Description of Proposed Site Development and Drainage Patterns Project Description / Proposed Land Use and/or Activities: The current project proposes pad and slope grading. Ultimately, Development of 3 Residential buildings with associated hardscape and landscape improvements will be provided. However, the current phase will only include the rough grading design without ultimate impervious areas. List/describe proposed impervious features of the project (e.g., buildings, roadways, parking lots, courtyards, athletic courts, other impervious features): Minor street widening, driveway approach, curb and gutter as proposed impervious features per DWG 438-2. To contemplate the subsequent impervious area for the future development, the proposed project DCV applies an assumed building and hardscape footprint. List/describe proposed pervious features of the project (e.g., landscape areas): The current project will have slopes and pads and apply Erosion Control Construction BMP’s. The future project will apply formal landscape and irrigation for permanent stabilization of pervious surfaces. Does the project include grading and changes to site topography? þYes No Description / Additional Information: The project proposes pad and slope grading to accommodate future construction of 3 residential buildings and associated hardscape and landscape improvements. Does the project include changes to site drainage (e.g., installation of new storm water conveyance systems)? þYes No Description / Additional Information: The current project proposes ditches and swales within each lot to direct drainage to the respective temporary sediment basins, which then discharge (from the basin via overflow structure) to Adams Street and Hoover Avenue via Curb Outlet structures per the Public Improvement Plans. Ultimately, to address pollutant control of the future building and associated hardscape improvements, the sediment basins will be retrofitted to become Bioretention Basins per future Precise Grading Plans. Identify whether any of the following features, activities, and/or pollutant source areas will be present (select all that apply): þ On-site storm drain inlets o Interior floor drains and elevator shaft sump pumps o Interior parking garages o Need for future indoor & structural pest control o Landscape/Outdoor Pesticide Use o Pools, spas, ponds, decorative fountains, and other water features o Food service o Refuse areas o Industrial processes o Outdoor storage of equipment or materials o Vehicle and Equipment Cleaning o Vehicle/Equipment Repair and Maintenance o Fuel Dispensing Areas o Loading Docks o Fire Sprinkler Test Water o Miscellaneous Drain or Wash Water o Plazas, sidewalks, and parking lots Identification of Receiving Water Pollutants of Concern Describe path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable): All proposed runoff volume will be detained into the proposed bioretention systems and emergency overflow into Hoover and Adam Street through an existing 12” drainage pipe crossing adjacent residential property. An existing 6 feet wide storm drain easement for the drainage pipe was shown on City drawing No. R-332. List any 303(d) impaired water bodies within the path of storm water from the project site to the Pacific Ocean (or bay, lagoon, lake or reservoir, as applicable), identify the pollutant(s)/stressor(s) causing impairment, and identify any TMDLs for the impaired water bodies: 303(d) Impaired Water Body Pollutant(s)/Stressor(s)TMDLs Agua Hedionda (Creek/ Lagoon) Enterococcus, Coliform, Manganese, Phosphorus, Nitrogen, Selenium, Diazinon & Toxicity N/A Identification of Project Site Pollutants Identify pollutants anticipated from the project site based on all proposed use(s) of the site (see BMP Design Manual Appendix B.6): Pollutant Not Applicable to the Project Site Anticipated from the Project Site Also a Receiving Water Pollutant of Concern Sediment X Nutrients X Heavy Metals X Organic Compounds X Trash & Debris X Oxygen Demanding Substances X Oil & Grease X Bacteria & Viruses X Pesticides X Hydromodification Management Requirements Do hydromodification management requirements apply (see Section 1.6 of the BMP Design Manual)? o Yes, hydromodification management flow control structural BMPs required. þ No, the project will discharge runoff directly to existing underground storm drains discharging directly to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. o No, the project will discharge runoff directly to conveyance channels whose bed and bank are concrete-lined all the way from the point of discharge to water storage reservoirs, lakes, enclosed embayments, or the Pacific Ocean. o No, the project will discharge runoff directly to an area identified as appropriate for an exemption by the WMAA for the watershed in which the project resides. Description / Additional Information (to be provided if a 'No' answer has been selected above): Critical Coarse Sediment Yield Areas* *This Section only required if hydromodification management requirements apply Based on the maps provided within the WMAA, do potential critical coarse sediment yield areas exist within the project drainage boundaries? o Yes þ No, No critical coarse sediment yield areas to be protected based on WMAA maps If yes, have any of the optional analyses presented in Section 6.2 of the BMP Design Manual been performed? o 6.2.1 Verification of Geomorphic Landscape Units (GLUs) Onsite o 6.2.2 Downstream Systems Sensitivity to Coarse Sediment o 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite o No optional analyses performed, the project will avoid critical coarse sediment yield areas identified based on WMAA maps If optional analyses were performed, what is the final result? o No critical coarse sediment yield areas to be protected based on verification of GLUs onsite o Critical coarse sediment yield areas exist but additional analysis has determined that protection is not required. Documentation attached in Attachment 8 of the SWQMP. o Critical coarse sediment yield areas exist and require protection. The project will implement management measures described in Sections 6.2.4 and 6.2.5 as applicable, and the areas are identified on the SWQMP Exhibit. Discussion / Additional Information: Flow Control for Post-Project Runoff* *This Section only required if hydromodification management requirements apply List and describe point(s) of compliance (POCs) for flow control for hydromodification management (see Section 6.3.1). For each POC, provide a POC identification name or number correlating to the project's HMP Exhibit and a receiving channel identification name or number correlating to the project's HMP Exhibit. N/A Has a geomorphic assessment been performed for the receiving channel(s)? No, the low flow threshold is 0.1Q2 (default low flow threshold) Yes, the result is the low flow threshold is 0.1Q2 Yes, the result is the low flow threshold is 0.3Q2 Yes, the result is the low flow threshold is 0.5Q2 If a geomorphic assessment has been performed, provide title, date, and preparer: N/A Discussion / Additional Information: (optional) Other Site Requirements and Constraints When applicable, list other site requirements or constraints that will influence storm water management design, such as zoning requirements including setbacks and open space, or City codes governing minimum street width, sidewalk construction, allowable pavement types, and drainage requirements. N/A (Refer to Attached CCSYA MAP) Optional Additional Information or Continuation of Previous Sections As Needed This space provided for additional information or continuation of information from previous sections as needed. CARLSBADCARLSBAD ENCINITASENCINITAS ESCONDIDOESCONDIDO OCEANSIDEOCEANSIDE POWAYPOWAY S.D.S.D.COUNTYCOUNTY S.D.S.D.COUNTYCOUNTY S.D.S.D.COUNTYCOUNTY SANSANDIEGODIEGO SANSANMARCOSMARCOS VISTAVISTA WINDMILLLAKE GUAJOMELAKE HUBBERTLAKE TURNERLAKE LAKEWOHLFORDCALAVERASLAKEBUENAVISTALAGOONDIXONRESERVOIRSQUIRESDAMAQUAHEDIONDALAGOON BATIQUITOSLAGOON SANDIEGUITORESERVOIR RESERVOIR LAKEPOWAY SAN DIEGUITOLAGOON LAKERAMONA LAKEHODGES S a nDie g u ito Rive r San M a r c os C r ee k S a n Marcos C reek E scondi d o Creek Rattles n a k e Creek B u e na V i s t a Cree k Sa n Luis ReyRiver Lu sardi Cree k E n c i n it a sCr e ek S a n t a Y s a b el C reek S a n ta Margarita R iver A g u a Hedionda Creek S a n L u i s Re yRiver Potential Critical Coarse Sediment Yield Areas Exhibit Date: Sept. 8, 2014Carlsbad Watershed - HU 904.00, 211 mi2 Aerial Imagery Source: DigitalGlobe, 06/2012 0 50 100 15025Miles Legend Watershed Boundaries Municipal Boundaries Rivers & Streams Regional WMAA Streams Potential Critical Coarse Sediment Yield Areas NORTH I Geosyntec C> RICK consultants ENGINEERI NG C OMPANY DGot~ll-ltf .. w- v.iii;~laf -'I-• ' " Salt Cil j a C cityof Carlsbad STANDARD PROJECT REQUIREMENT CHECKLIST E-36 Project Information Project Name: Carlsbad Oceanview Estates Project ID: MS 02-05 DWG No. or Building Permit No.: 438-2A Source Control BMPs Development Services Land Development Engineering 1635 Faraday Avenue (760) 602-2750 www.carlsbadca.gov All development projects must implement source control BMPs SC-1 through SC-6 where applicable and feasible. See Chapter 4 and Appendix E.1 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement source control BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the source control BMP as described in Chapter 4 and/or Appendix E.1 of the Model BMP Design Manual. Discussion/justification is not required. • "No" means the BMP is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "N/A" means the BMP is not applicable at the project site because the project does not include the feature that is addressed by the BMP (e.g., the project has no outdoor materials storage areas). Discussion/justification may be provided. Source Control Requirement Applied? SC-1 Prevention of Illicit Discharges into the MS4 ~Yes □ No □ N/A Discussion/justification if SC-1 not implemented: SC-2 Storm Drain Stenciling or Signage ~ Yes □ No □ N/A Discussion/justification if SC-2 not implemented: SC-3 Protect Outdoor Materials Storage Areas from Rainfall, Run-On, Runoff, and Wind □ Yes □ No ~ N/A Dispersal Discussion/justification if SC-3 not implemented: There are no outdoor material storage areas proposed. E-36 Page 1 of 4 Revised 09/16 E-36 Page 2 of 4 Revised 09/16 Source Control Requirement (continued) Applied? SC-4 Protect Materials Stored in Outdoor Work Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-4 not implemented: SC-5 Protect Trash Storage Areas from Rainfall, Run-On, Runoff, and Wind Dispersal Yes No N/A Discussion/justification if SC-5 not implemented: SC-6 Additional BMPs based on Potential Sources of Runoff Pollutants must answer for each source listed below and identify additional BMPs. (See Table in Appendix E.1 of BMP Manual for guidance). On-site storm drain inlets Yes No N/A Interior floor drains and elevator shaft sump pumps Yes No N/A Interior parking garages Yes No N/A Need for future indoor & structural pest control Yes No N/A Landscape/Outdoor Pesticide Use Yes No N/A Pools, spas, ponds, decorative fountains, and other water features Yes No N/A Food service Yes No N/A Refuse areas Yes No N/A Industrial processes Yes No N/A Outdoor storage of equipment or materials Yes No N/A Vehicle and Equipment Cleaning Yes No N/A Vehicle/Equipment Repair and Maintenance Yes No N/A Fuel Dispensing Areas Yes No N/A Loading Docks Yes No N/A Fire Sprinkler Test Water Yes No N/A Miscellaneous Drain or Wash Water Yes No N/A Plazas, sidewalks, and parking lots Yes No N/A For “Yes” answers, identify the additional BMP per Appendix E.1. Provide justification for “No” answers. There are no material storage areas proposed. Single family residence trash cans are self enclosed to prevent contact with rain or wind. 1. Onsite storm drain inlets have been designed per each lots and it was connected into proposed BMP; all inlets will be signed "No dumpling! Flow to Bay"; BMP belongs to retention - infiltration INF-2 Bioretention per Appendix E.1 2. Drought tolerant plants used, pest resistant plants / hydroseed used. □ Iii □ Iii □ □ Iii Iii □ □ □ □ □ Iii □ □ □ Iii □ □ □ Iii Iii Iii □ □ □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii □ □ □ Iii Site Design BMPs All development projects must implement site design BMPs SD-1 through SD-8 where applicable and feasible. See Chapter 4 and Appendix E.2 thru E.6 of the BMP Design Manual (Volume 5 of City Engineering Standards) for information to implement site design BMPs shown in this checklist. Answer each category below pursuant to the following. • "Yes" means the project will implement the site design BMPs as described in Chapter 4 and/or Appendix E.2 thru E.6 of the Model BMP Design Manual. Discussion/ justification is not required. • "No" means the BMPs is applicable to the project but it is not feasible to implement. Discussion/justification must be provided. Please add attachments if more space is needed. • "N/A" means the BMPs is not applicable at the project site because the project does not include the feature that is addressed by the BMPs (e.g., the project site has no existing natural areas to conserve). Discussion/justification may be provided. Site Design Requirement I Applied? SD-1 Maintain Natural Drainage Pathways and Hydrologic Features I ~Yes I □ No I □ N/A Discussion/justification if SD-1 not implemented: SD-2 Conserve Natural Areas, Soils, and Vegetation I ~ Yes I □ No I □ N/A Discussion/justification if SD-2 not implemented: SD-3 Minimize Impervious Area I ~ Yes I □ No I □ N/A Discussion/justification if SD-3 not implemented: SD-4 Minimize Soil Compaction I ~ Yes I □ No I □ N/A Discussion/justification if SD-4 not implemented: SD-5 Impervious Area Dispersion I ~ Yes I □ No I □ N/A Discussion/justification if SD-5 not implemented: E-36 Page 3 of 4 Revised 09/16 Site Design Requirement (continued) I Applied? SD-6 Runoff Collection I iii Yes I □ No I □ N/A Discussion/justification if SD-6 not implemented: SD-7 Landscaping with Native or Drought Tolerant Species I Iii Yes I □ No I □ N/A Discussion/justification if SD-7 not implemented: SD-8 Harvesting and Using Precipitation I □ Yes I Iii No I □ N/A Discussion/justification if SD-8 not implemented: Infeasible per worksheet 1-7. E-36 Page 4 of 4 Revised 09/16 SUMMARY OF PDP STRUCTURAL BMPS PDP Structural BMPs All PDPs must implement structural BMPs for storm water pollutant control (see Chapter 5 of the BMP Design Manual). Selection of PDP structural BMPs for storm water pollutant control must be based on the selection process described in Chapter 5. PDPs subject to hydromodification management requirements must also implement structural BMPs for flow control for hydromodification management (see Chapter 6 of the BMP Design Manual). Both storm water pollutant control and flow control for hydromodification management can be achieved within the same structural BMP(s). PDP structural BMPs must be verified by the City at the completion of construction. This may include requiring the project owner or project owner's representative to certify construction of the structural BMPs (see Section 1.12 of the BMP Design Manual). PDP structural BMPs must be maintained into perpetuity, and the City must confirm the maintenance (see Section 7 of the BMP Design Manual). Use this form to provide narrative description of the general strategy for structural BMP implementation at the project site in the box below. Then complete the PDP structural BMP summary information sheet for each structural BMP within the project (copy the BMP summary information page as many times as needed to provide summary information for each individual structural BMP). Describe the general strategy for structural BMP implementation at the site. This information must describe how the steps for selecting and designing storm water pollutant control BMPs presented in Section 5.1 of the BMP Design Manual were followed, and the results (type of BMPs selected). For projects requiring hydromodification flow control BMPs, indicate whether pollutant control and flow control BMPs are integrated together or separate. Estimated total DCV after adjust runoff factor to account for site design BMPs: DMA 1: 427 c.f. DMA 2: 419 c.f. DMA 3: 357 c.f. Harvest and use are considered infeasible. Required demand for harvest and use / DCV: 25% Estimated demand for harvest and use/estimated total DCV: 20% Partial infiltration on site: Feasible, partial infiltration BMP’s details see Attachment 1e – Pollutant control BMP Design Worksheet. Note: Partial Retention by Biofiltration Basins are sized based on assumed future impervious area once each lot is developed with residential buildings and associated hardscape improvements. The future Partial Retention by Biofiltration Basins shall be installed after future precise grading plans are approved for the development of single-family homes. Sedimentation basins shall be installed per approved rough grading plans until such time. Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. PR-1-1 DWG ___TBD____ Sheet No. __TBD______ Type of structural BMP: o Retention by harvest and use (HU-1) o Retention by infiltration basin (INF-1) o Retention by bioretention (INF-2) o Retention by permeable pavement (INF-3) x Partial retention by biofiltration with partial retention (PR-1) o Biofiltration (BF-1) o Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) o Detention pond or vault for hydromodification management o Other (describe in discussion section below) Purpose: þ Pollutant control only o Hydromodification control only o Combined pollutant control and hydromodification control o Pre-treatment/forebay for another structural BMP o Other (describe in discussion section below) Discussion (as needed): BMP PR-1-1 is a Partial Retention by Biofiltration with Partial Retention Basin with bottom area of 261 s.f.. See attached DMA site map for details. Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. INF-2-2 DWG ___TBD____ Sheet No. __TBD______ Type of structural BMP: o Retention by harvest and use (HU-1) o Retention by infiltration basin (INF-1) o Retention by bioretention (INF-2) o Retention by permeable pavement (INF-3) x Partial retention by biofiltration with partial retention (PR-1) o Biofiltration (BF-1) o Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) o Detention pond or vault for hydromodification management o Other (describe in discussion section below) Purpose: þ Pollutant control only o Hydromodification control only o Combined pollutant control and hydromodification control o Pre-treatment/forebay for another structural BMP o Other (describe in discussion section below) Discussion (as needed): BMP PR-1-1 is a Partial Retention by Biofiltration with Partial Retention Basin with bottom area of 256 s.f.. See attached DMA site map for details. Structural BMP Summary Information [Copy this page as needed to provide information for each individual proposed structural BMP] Structural BMP ID No. INF-2-3 DWG ___TBD____ Sheet No. __TBD______ Type of structural BMP: o Retention by harvest and use (HU-1) o Retention by infiltration basin (INF-1) o Retention by bioretention (INF-2) o Retention by permeable pavement (INF-3) x Partial retention by biofiltration with partial retention (PR-1) o Biofiltration (BF-1) o Flow-thru treatment control included as pre-treatment/forebay for an onsite retention or biofiltration BMP (provide BMP type/description and indicate which onsite retention or biofiltration BMP it serves in discussion section below) o Detention pond or vault for hydromodification management o Other (describe in discussion section below) Purpose: þ Pollutant control only o Hydromodification control only o Combined pollutant control and hydromodification control o Pre-treatment/forebay for another structural BMP o Other (describe in discussion section below) Discussion (as needed): BMP PR-1-1 is a Partial Retention by Biofiltration with Partial Retention Basin with bottom area of 218 s.f.. See attached DMA site map for details. ATTACHMENT 1 BACKUP FOR PDP POLLUTANT CONTROL BMPS This is the cover sheet for Attachment 1. Check which Items are Included behind this cover sheet: Attachment Contents Checklist Sequence Attachment 1 a OMA Exhibit (Required) ~ Included See OMA Exhibit Checklist on the back of this Attachment cover sheet. (24"x36" Exhibit typically required) Attachment 1 b Tabular Summary of DMAs Showing ~ Included on OMA Exhibit in OMA ID matching OMA Exhibit, OMA Attachment 1a Area, and OMA Type (Required)* □ Included as Attachment 1 b, *Provide table in this Attachment OR on OMA Exhibit in Attachment 1 a separate from OMA Exhibit Attachment 1c Form 1-7, Harvest and Use Feasibility ~ Included Attachment 1 d Screening Checklist (Required unless □ Not included because the entire the entire project will use infiltration project will use infiltration BMPs BMPs) Refer to Appendix B.3-1 of the BMP Design Manual to complete Form 1-7. Form 1-8, Categorization of Infiltration Feasibility Condition (Required unless the project will use harvest and use BMPs) Refer to Appendices C and D of the BMP Design Manual to complete Form 1-8. ~ Included □ Not included because the entire project will use harvest and use BMPs Attachment 1 e Pollutant Control BMP Design ~ Included Worksheets / Calculations (Required) Refer to Appendices B and E of the BMP Design Manual for structural pollutant control BMP design guidelines ATTACHMENT 1a OMA EXHIBIT DMA 1 H O O V E R D RIV E A D A M S S T R E E T P RIV A T E D RIV E W A Y DMA 2 DMA 3 DMA 4.1 DMA 4.2 DMA 4.3 DMA 5 PR-1-1 PR-1-2 PR-1-3 PARCEL 1 PARCEL 2 PARCEL 3 *** SOURCE CONTROL BMPS SEE FORM E-36 IN SWQMP • PREVENTION OF ILLICIT DISCHARGE TO THE MS4 ·PROTECT TRASH STORAGE AREAS FROM RAINFALL, RUN-ON, RUNOFF, AND WIND DISPERSAL ·NEED FOR INDOOR PEST CONTROL ·LANDSCAPE/OUTDOOR PESTICIDE USE ·SWEEP SIDEWALKS REGULARLY SITE DESIGN BMPS SEE FORM E-36 IN SWQMP ·MAINTAIN NATURAL DRAINAGE PATHWAYS AND HYDROLOGIC FEATURES ·MINIMIZE IMPERVIOUS AREA ·MINIMIZE SOIL COMPACTION ·IMPERVIOUS AREA DISPERSION ·RUNOFF COLLECTION • LANDSCAPING WITH NATIVE OR DROUGHT TOLERANT PLANTS NOTES ·GROUNDWATER DEPTH > 20 FEET ·NO CCSYAS PRESENT ONSITE OR DRAINING THROUGH THE PROJECT BOUNDARY PER WMAA MAP PROPERTY LINE DMA BOUNDARY SUBAREA ACREAGE DMA ICON HYDROLOGIC SOIL TYPE POINT OF COMPLIANCE DMA 1 - SEE TABLE DMA 2 - SEE TABLE DMA 3 - SEE TABLE DMA 4 - SEE TABLE DMA 5 - SEE TABLE DMA 1 BMP TYPEBMP ID #SYMBOL CASQA NO.DRAWING NO.SHEET NO.(S)MAINTENANCEFREQUENCY BMP TABLE INSPECTION FREQUENCYQUANTITY TREATMENT CONTROL PR-1-1 PARTIAL RETENTION SEMI-ANNUALLY438-2A 3 ** ANNUALLYBY BIOFILTRATION PR-1-2 PR-1-3 * FUTURE PGP 438-2AFUTURE PGP 438-2AFUTURE PGP 1 EA.261 S.F. 1 EA.256 S.F. 1 EA.218 S.F. SEMI-ANNUALLY3 ANNUALLY SEMI-ANNUALLY3 ANNUALLY PER REQUEST OF CITY OF CARLSBAD TEMP SEDIMENT BASINS WILL BE PROVIDED WITHIN THE FOOTPRINT OF THE ASSUMED FUTURE PARTIAL RETENTION BY BIOFILTRATION WITH PARTIAL RETENTION BASIN. THE TEMP SEDIMENT BASIN WILL BE PROVIDED IN ADDITION TO THE STANDARD EROSION CONTROL CONSTRUCTION BMP'S PROVIDED FOR TYPICAL SINGLE FAMILY GRADED PADS. FUTURE PARTIAL RETENTION BY BIOFILTRATION WITH PARTIAL RETENTION BASINS TO BE CONSTRUCTED WITH DEVELOPMENT OF LOTS. **TC-32 / FT-4 TC-32 / FT-4 TC-32 / FT-4 PARTIAL RETENTIONBY BIOFILTRATION PARTIAL RETENTIONBY BIOFILTRATION / / / / 1 / I / / 0.006 ACRE ' ~ ""' \ ' I ; I ""' / y / I C / I f I ,, / I /1 ( , 1 I / / I I \ \ ' / V a a .t a ,..------y L, .... ~~ a ',""'---.;;;~ -'---.... --,,-...... ---c:=--. ......_ ...... --CJO<...r--:::.- ,,..----es~~~'Jtf~~-~ff"-~CJ:::,:<?~--. -9 c:i ---- C'~"""-\C""-2 2:1 ----{ I I I l \ -----, ,, ,, ,, ,..o--F ···-···-,/ .-::;;o.--c;::-:..:::,,···-.... / .... -, ·•, / " ' / ·•, '• \ \ r \ 1 I ( : i I ' ' \ l I I I 0.369 ACRES I I \ ~ F \ '--::_::_::_+ c"<, 'ASSUMED FUTURE IMPERVIOUS AREA ......._ -----<>--. ""' ' ""' ' \ F ~ ~ \ ' ' ', --- C -----o-----~- I I I i I URB oun.a i \ \ ---- I i I /B\ ( ) \ / \ _ _/ •SEE TABLE AT RIGHT FOR ASSUMED FUTURE IMPERVIOUS AREAS ,1i----------- ! ~'jj I j I 0.355 ACRES I I , ,' i ---- --- " --, I I I I I I \ \ \ I to I'=='"-'-~ CURB 0/JTl.IT I - I I 0.006 ACRES - ----------, \ -··-- \ \ \ \ ----........ __ -, ......... ----- I 0.378 ACRES I 'ASSUMED FUTURE IMPERVIOUS AREA ---- .... '• ' ' 0.006 ACRES 11 q PROPERTY BOUNDARY 'l- J--- 0 A 0.036 ACRESL----------- u LEGEND -------- 20 0 2_0 _____ 40 60 SCALE 1"= 20' OMA 1-PR Runoff Summation OMA Description OMA Type Factor % Imper Area (ac.) Area (s.f.) Runoff Factor x Area {ac.) moretention Basin Engineered Pervious Surface 0.10 0% 0.006 261 0.0006 Natural Slooe Natural Tvne 'B' Soil 0.14 0% 0.065 2825 0.0091 Landscape Slope / Pad Semi-Pervious Surface 0.30 0% 0.131 5692 0.0392 Roof/Hardscape/Driveway Impervious Surface 0.90 100% 0.168 7305 0.1509 Total Total Arota1= 0.369 16083 0.1998 Total Total Ached,= 0.369 Rfeompo,lte-DMA= 0 .54 OMA 2-PR Runoff Summation DMA Description DMA Type Factor % Imper Arec1 (nc.) Area (s.f.) Runoff Factor x Area (ac.) Bioretention Basin Engineered Pervious Surface 0.10 0% 0.006 256 0.0006 Natural Slope Natural T~·pe 'B' Soil 0.14 0% 0.059 2552 0.0082 Landscape Slope/ Pad Semi-Pervious Surface 0.30 0% 0.126 5499 0.0379 Roof/Hardscape/Driveway Impervious Surface 0.90 100% 0.165 7170 0.1481 Total Total Arota1= 0.355 15477 0.1948 Total Total Ac~cd= 0.355 Rfcompo•itc-DMA= 0.55 OMA 3-PR Runoff Summation OMA Description OMA Type % Imper Area (ac.) Area (s.f.) Runoff Factor Factor x Area {ac.) Bioretention Basin Engineered Pervious Surface 0.10 0% 0.005 218 0.0005 Natural Slope Natural Type 'B' Soil 0.14 0% 0.122 5302 0.0170 Landscape Slope/ Pad Semi-Pervious Surface 0.30 0% 0.128 5572 0.0384 Roof/Hardscape/Driveway Impervious Surface 0.90 100% 0.124 5390 0.1114 Total Total A101a1= 0.378 0.378 0.1673 Total Total ~.l1na= 0.378 Rf Composit~-DMA = 0.44 DMA 4-PR (DeMinimis, 250 s.f. per Lot Driveway Entrance) Runoff Summation DMA Description OMA Type % Imper Area (ac.) Area (s.f.) Runoff Factor Factor xArea (ac.) Driveway (ROW) Impervious Surfc1ce 0.90 100% 0.017 750 0.0155 Total Total Arotal= 0.017 750 0.0155 Total Total Ach~d= 0.017 Rfeomposilo-OMA= 0.90 DMA 5-PR (Adams Street Widening Opposite Side of Project) Runoff Summation OMA Description DMA Type % Imper Area (ac.) Area {s.f.) Runoff Factor Factor x Area {ac.) Pavement (Adams Street) Impervious Surface 0.90 100% 0.036 1558 0.0322 Total Total A1ota1= 0.036 1558 0.0322 Total Total Ached= 0.036 Rfeomposit~-DMA= 0.90 Note: Roof/Hardscape/Driveway in table are projected impervious area for Planning purposes. Actual areas may vary and require adjustment to bioretention basin sizes during building permit phase. Note: DMAS implements Greet Street design elements including impervious dispersion to pervious surface at edge of pavement. PREPARED BY= Fusion Eng Tech 1810 Gillespie Way, Suite 207 El Cajon, CA 92020 (619) 736-2800 I xx.xx ACRES I DEVELOPED CONDITION DRAINAGE MANAGEMENT AREA MAP CARLSBAD OCEANVIEW ESTATES CITY OF CARLSBAD, CALIFORNIA MAP 1 OF 2 -----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------R:\0109-0001 Corlsbod Ocecnview Estotes -Olivier, Henry\ Hy d \SW QM P \CAD\ 0109-0001 $SWQMP _DMA.dwg□Jun-24-2021 :15: 18 g 0 I fl 0 "" ci 3' ATTACHMENT 1 b TABULAR SUMMARY OF OMA DMA Description DMA Type Runoff Factor % Imper Area (ac.)Area (s.f.) Summation Runoff Factor x Area (ac.) Bioretention Basin Engineered Pervious Surface 0.10 0%0.006 261 0.0006 Natural Slope Natural Type 'B' Soil 0.14 0%0.065 2825 0.0091 Landscape Slope / Pad Semi-Pervious Surface 0.30 0%0.131 5692 0.0392 Roof/Hardscape/Driveway Impervious Surface 0.90 100%0.168 7305 0.1509 Total Total ATotal=0.369 16083 0.1998 Total Total ACheck=0.369 RFComposite-DMA=0.54 DMA Description DMA Type Runoff Factor % Imper Area (ac.)Area (s.f.) Summation Runoff Factor x Area (ac.) Bioretention Basin Engineered Pervious Surface 0.10 0%0.006 256 0.0006 Natural Slope Natural Type 'B' Soil 0.14 0%0.059 2552 0.0082 Landscape Slope / Pad Semi-Pervious Surface 0.30 0%0.126 5499 0.0379 Roof/Hardscape/Driveway Impervious Surface 0.90 100%0.165 7170 0.1481 Total Total ATotal=0.355 15477 0.1948 Total Total ACheck=0.355 RFComposite-DMA=0.55 DMA Description DMA Type Runoff Factor % Imper Area (ac.)Area (s.f.) Summation Runoff Factor x Area (ac.) Bioretention Basin Engineered Pervious Surface 0.10 0%0.005 218 0.0005 Natural Slope Natural Type 'B' Soil 0.14 0%0.122 5302 0.0170 Landscape Slope / Pad Semi-Pervious Surface 0.30 0%0.128 5572 0.0384 Roof/Hardscape/Driveway Impervious Surface 0.90 100%0.124 5390 0.1114 Total Total ATotal=0.378 0.378 0.1673 Total Total ACheck=0.378 RFComposite-DMA=0.44 DMA Description DMA Type Runoff Factor % Imper Area (ac.)Area (s.f.) Summation Runoff Factor x Area (ac.) Driveway (ROW)Impervious Surface 0.90 100%0.017 750 0.0155 Total Total ATotal=0.017 750 0.0155 Total Total ACheck=0.017 RFComposite-DMA=0.90 DMA Description DMA Type Runoff Factor % Imper Area (ac.)Area (s.f.) Summation Runoff Factor x Area (ac.) Pavement (Adams Street)Impervious Surface 0.90 100%0.036 1558 0.0322 Total Total ATotal=0.036 1558 0.0322 Total Total ACheck=0.036 RFComposite-DMA=0.90 Note: DMA5 implements Greet Street design elements including impervious dispersion to pervious surface at edge of pavement. Note: Roof/Hardscape/Driveway in table are projected impervious area for Planning purposes. Actual areas may vary and require adjustment to bioretention basin sizes during building permit phase. DMA 3-PR DMA 2-PR DMA 1-PR DMA 4-PR (DeMinimis, 250 s.f. per Lot Driveway Entrance) DMA 5-PR (Adams Street Widening Opposite Side of Project) ATTACHMENT 1c FORM I-7 & I-8 ATTACHMENT 1C FORMS I-7, I-8 & I-9 1. Is there a demand for harvested water ( check all that apply) at the project site that is reliably present during the wet season? Toilet and urinal flushing Landscape irrigation Other: _____ _ 2. If there is a demand; estimate the anticipated average wet season demand over a period of 36 hours. Guidance for planning level demand calculations for toilet/urinal flushing and landscape irrigation is provided in Section B.3.2. Estimated Toilet and Urinal Flushing for 36 hours is: 1.24* 20*1.5=37 cubic feet (residential total use per resident per day or 24 hours is 9.3 gallon or 1.24 cubic feet, estimated users on site is 20) Estimated Landscape Irrigation Demand is : 196*0.60=124 cubic feet (Assuming Hydrozone-Moderate Planter Water Use, 36 Hour Planning Level, demand is at 1470 gallon or 196 cubic feet/ acre) Total Demand: 37+124 =161 for 36 hours or 107 for 24 hours 3. Calculate the DCV using worksheet B-2.1. 739 cubic feet for 24 hours 3a. Is the 36 hour demand greater than or equal to the DCV? Yes I Noc=> ~ Harvest and use appears to be feasible. Conduct more detailed evaluation and sizing calculations to confirm that DCV can be used at an adequate rate to meet drawdown criteria. 3b. Is the 36 hour demand greater than 0.25DCV but less than the full DCV? Yes I Noc=> ,{J Harvest and use may be feasible. Conduct more detailed evaluation and sizing calculations to determine feasibility. Harvest and use may only be able to be used for a portion of the site, or ( optionally) the storage may need to be upsized to meet long term capture targets while draining in longer than 36 hours. Is harvest and use feasible based on further evaluation? Yes, refer to Appendix E to select and size harvest and use BMPs. No, select alternate BMPs. 3c. Is the 36 hour demand less than 0.25DCV? Yes Harvest and use is considered to be infeasible. Appendix I: Forms and Checklists I-3 February 2016 Categorization of Infiltration Feasibility Condition Form I-8 Part 1 - Full Infiltration Feasibility Screening Criteria Would infiltration of the full design volume be feasible from a physical perspective without any undesirable consequences that cannot be reasonably mitigated? Criteria Screening Question Yes No 1 Is the estimated reliable infiltration rate below proposed facility locations greater than 0.5 inches per hour? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 2 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. NO Per form I-9 the design infiltration rate is 0.44 in/hr which is less than 0.50 in/hr. YES Appendix I: Forms and Checklists I-4 February 2016 Form I-8 Page 2 of 4 Criteri a Screening Question Yes No 3 Can infiltration greater than 0.5 inches per hour be allowed without increasing risk of groundwater contamination (shallow water table, storm water pollutants or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. 4 Can infiltration greater than 0.5 inches per hour be allowed without causing potential water balance issues such as change of seasonality of ephemeral streams or increased discharge of contaminated groundwater to surface waters? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability. Part 1 Result * If all answers to rows 1 - 4 are “Yes” a full infiltration design is potentially feasible. The feasibility screening category is Full Infiltration If any answer from row 1-4 is “No”, infiltration may be possible to some extent but would not generally be feasible or desirable to achieve a “full infiltration” design. Proceed to Part 2 *To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Permit. Additional testing and/or studies may be required by the City to substantiate findings. YES YES PROCEED TO PART 2 Appendix I: Forms and Checklists I-5 February 2016 Form I-8 Page 3 of 4 Part 2 – Partial Infiltration vs. No Infiltration Feasibility Screening Criteria Would infiltration of water in any appreciable amount be physically feasible without any negative consequences that cannot be reasonably mitigated? Criteria Screening Question Yes No 5 Do soil and geologic conditions allow for infiltration in any appreciable rate or volume? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2 and Appendix D. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. 6 Can Infiltration in any appreciable quantity be allowed without increasing risk of geotechnical hazards (slope stability, groundwater mounding, utilities, or other factors) that cannot be mitigated to an acceptable level? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.2. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. YES YES Appendix I: Forms and Checklists I-6 February 2016 Form I-8 Page 4 of 4 Criteria Screening Question Yes No 7 Can Infiltration in any appreciable quantity be allowed without posing significant risk for groundwater related concerns (shallow water table, storm water pollutants or other factors)? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. 8 Can infiltration be allowed without violating downstream water rights? The response to this Screening Question shall be based on a comprehensive evaluation of the factors presented in Appendix C.3. Provide basis: Summarize findings of studies; provide reference to studies, calculations, maps, data sources, etc. Provide narrative discussion of study/data source applicability and why it was not feasible to mitigate low infiltration rates. Part 2 Result* If all answers from row 5-8 are yes then partial infiltration design is potentially feasible. The feasibility screening category is Partial Infiltration. If any answer from row 5-8 is no, then infiltration of any volume is considered to be infeasible within the drainage area. The feasibility screening category is No Infiltration. *To be completed using gathered site information and best professional judgment considering the definition of MEP in the MS4 Permit. Additional testing and/or studies may be required by the City to substantiate findings. YES YES PARTIAL INFILTRATION A Factor Category Suitability Assessment Factor Description Assigned Weight (w) Soil assessment methods 0.25 Predominant soil texture 0.25 Site soil variability 0.25 Depth to groundwater / impervious layer 0.25 Suitability Assessment Safety Factor, SA = Ip B Design Level of pretreatment/ expected sediment loads Redundancy/ resiliency Compaction during construction Design Safety Factor, SB = Ip Combined Safety Factor, Stora1= SA x SB Observed Infiltration Rate, inch/hr, K observed ( corrected for test-specific bias) Design Infiltration Rate, in/hr, Kciesign = K observed / Srotal Supporting Data Briefly describe infiltration test and provide reference to test forms: Please see the infiltration testing attached after this page. 0.5 0.25 0.25 Factor Value (v) Product (p) p =wxv 1 0.25 1 0.25 1 0.25 1 0.25 1 1 0.5 3 0.75 2 0.5 2.75 2.75 1.2 0.44 Todd R. Wyland, Civil Engineer PO Box 293622 Phelan, CA 92329 Phone: (760) 475-7371 email: toddinwrightwood@yahoo.com Slope Stability Analyses * Percolation & Compaction Testing * Soil Reports September 14, 2015 Mr. Henry Olivier Project No: 1471 4370 Hallmark Drive, Suite 101 San Bernardino, CA 92407 SUBJECT: Infiltration Testing NE Corner of Hoover & Adams Street Carlsbad, California REFERENCES: 1. Response to City of Carlsbad Geotechnical Plan Check Comments Prepared By Todd Wyland, Project No: 147G, July 24, 2015 Dear Mr. Olivier: 2. Update to Preliminary Geotechnical Engineering Study Report Prepared By Todd Wyland, Project No: 147G, April 10, 2014 3. Preliminary Geotechnical Engineering Study Report Henry's Lots Located at NE Corner of Hoover & Adams Street Carlsbad, California, Report Dated June 22, 2001 Prepared By Geotechnical Solutions, Inc., Project No. G-1845-06 As requested, I have performed an infiltration test on each of the three subject parcels, at the planned infiltration trench location and depth. The tests were performed using ELE Model 25- 0660 double ring infiltrometers with Mariotte tubes to maintain constant head according to ASTM D 3385. The purpose of the infiltration testing was to provide appropriate infiltration test rate data for design and to determine if the proposed infiltration trench locations are geotechnically feasible. Infiltration Testing Carlsbad Ocean Estates Procedure: September 14, 2015 A backhoe was utilized to excavate three test trenches, approximately 10 feet deep. The exposed materials and conditions were confirmed to be as described in Reference No. 3. The rings were carefully set, then presoaked by filling the rings with water to at least 8 inches. Based upon the measured drop over two 30-minute time intervals during presoak, the testing proceeded with 20-minute time intervals. Volume determinations and height readings were in centimeters and converted to inches in the infiltration rate calculations. The test pits were backfilled upon completion. Results: The test results are included on the attached Infiltration Test Data Sheets. The resulting Infiltration rates vs. time for each inner ring are plotted on the attached Chart. The most conservative stabilized infiltration test rate was 1.2 inches/hour. Cone I usions: Based upon the sandstone conditions encountered and the results of the subject infiltration tests, it is my opinion that the proposed infiltration trenches are feasible from a geotechnical standpoint. Groundwater or evidence of previous shallow groundwater was not encountered and the depth to groundwater beneath the Site was estimated to be about 60 feet (sea level). Therefore, both the depth of permeable soil beneath the proposed infiltration trenches and the separation to the historical high water depth exceed the standard minimums of 5 and -1 0 feet, respectively. The proposed infiltration trenches will not adversely affect the adjacent properties. I trust that this is sufficient for your needs at this time. If there any questions, please do not hesitate to contact me . Respectfully submitted, <-~~~~~~EJ Todd R. Wyland, RCE 60618 Attachments: Test Location Map Infiltration Test Data Sheets (3) Chart 2 --EAN ESTATES -CARLSBAD OC d Adams Streets - f Hoover an NE Corner o I b d California Cars a , Test location Map ffi ti 7'"'/ I = JU DOUBLE RING INFILTROMETER TEST DATA (ASTM D 3385) Test No: IT-1 (sheet 1 of 1) Ring Data Marriotte Tube CARLSBAD OCEAN ESTATES Water NE Corner of Hoover and Adams Streets Area, A, Depth No. Vol., V, Carlsbad, California (cm2) {in) {cc/cm) Inner Ring (12" ID): 729.7 4.5 1 {3,000 cc) 53.52 Test By: Todd Wyland I uses Class: (SP-SM) Annular Space (24" outer ring): 2189.0 4.5 2 (10,000 cc} 167.53 Depth to Water: 60' (approx) Penetration of Rings into Soil (in): Inner: 3 Outer: 3 Date of Test: 9/2/2015 I Water Source: Tank Filled From Fire Hydrant (water warmer than ground) Constant Head Maintanied by Using: Marriotte Tubes Test Location: Parcel 3 Test Elevation: 60 ft (approx) Time Time l:lT (min) Interval (hr:min) Total 1-Start 9:00 20 End 9:20 20 2-Start 9:20 20 End 9:40 40 3 -Start 9:40 20 End 10:00 60 4 -Start 10:00 20 End 10:20 80 5 -Start 10:20 20 End 10:40 100 6 -Start 10:45 20 End 11:05 120 7 -Start 11:05 20 End 11:25 140 8-Start 11:25 20 End 11:45 160 9 -Start 11:45 20 End 12:05 180 LO -Start 12:10 30 End 12:40 210 Ll -Start 12:40 30 End 1:10 240 L2 -Start 1:10 15 End 1:25 255 Inner Ring Elev. H l:lH Qf* (cm) (cm) (cc) 58.3 8.2 50.1 438.9 50.1 9.8 40.3 524.5 40.3 10.7 29.6 572.7 29.6 12.9 16.7 690.4 16.7 13.2 3.5 706.5 58.3 13.4 44.9 717.2 44.9 14.1 30.8 754.6 30.8 14.2 16.6 760.0 16.6 14.1 2.5 754.6 58.3 21.7 36.6 1161.4 36.6 21.7 14.9 1161.4 14.9 10.8 4.1 578.0 * Flow, Qf = ~H x Vr ** Infiltration Rate, I= (Qf/Ar)/~t Annular Ring Infiltration Rate I** Elev. H l:lH Qf* Inner Outer (cm) (cm) (cc) in/hr in/hr 58.3 8.5 0.71 0.77 49.8 1424.0 49.8 10.0 0.85 0.90 39.8 1675.3 39.8 10.5 0.93 0.95 29.3 1759.1 29.3 13.1 1.12 1.18 16.2 2194.6 16.2 13.3 1.14 1.20 2.9 2228.1 58.3 13.8 1.16 1.25 44.5 2311.9 44.5 14.4 1.22 1.30 30.1 2412.4 30.1 14.3 1.23 1.29 15.8 2395.7 15.8 14.1 1.22 1.27 1.7 2362.2 58.3 22.1 1.25 1.33 36.2 3702.4 36.2 21.9 1.25 1.32 14.3 3668.9 14.3 10.7 1.25 1.29 3.6 1792.6 Remarks Cool, Partly Cloudy No Wind Warm and Sunny Refilled Tubes Refilled Tubes DOUBLE RING INFILTROMETER TEST DATA (ASTM D 3385) Test No: IT-2 (sheet 1 of 1) Ring Data Marriotte Tube CARLSBAD OCEAN ESTATES Water NE Corner of Hoover and Adams Streets Area, Ar Depth No. Vol., Vr Carlsbad, California (cm2) (in) (cc/cm) Inner Ring (12" ID): 729.7 5 1 (3,000 cc) 53.52 Test By: Todd Wyland I USCS Class: {SP-SM) Annular Space (24"1D outer ring): 2189 5 2 (10,000 cc) 167.53 Depth to Water: 60' (approx)! Penetration of Rings into Soil (in}: Inner: 3 Outer: 3 Date of Test: 9/2/2015 I Water Source: Tank Filled From Fire Hydrant (water warmer than ground) Constant Head Maintanied by Using: Marriotte Tubes Test Location: Parcel 2 Test Elevation: 57 ft (approx) Time Time [ff (min) Interval (hr:min) Total 1-Start 10:10 20 End 10:30 20 2 -Start 10:30 20 End 10:50 40 3 -Start 10:50 20 End 11:10 60 4 -Start 11:10 20 End 11:30 80 5 -Start 11:30 20 End 11:50 100 6 -Start 11:55 20 End 12:15 120 7 -Start 12:15 20 End 12:35 140 8 -Start 12:35 20 End 12:55 160 9 -Start 12:55 20 End 1:15 180 .0 -Start 1:20 30 End 1:50 210 .1-Start 1:50 30 End 2:20 240 .2 -Start 2:20 15 End 2:35 255 Inner Ring Elev. H D.H Qf* (cm) (cm) (cc) 58.3 7.6 50.7 406.8 50.7 9.6 41.1 513.8 41.1 10.5 30.6 562.0 30.6 11.4 19.2 610.1 19.2 12.2 7.0 652.9 58.3 13.1 45.2 701.1 45.2 13.6 31.6 727.9 31.6 13.8 17.8 738.6 17.8 13.8 4.0 738.6 58.3 20.8 37.5 1113.2 37.5 21.0 16.5 1123.9 16.5 10.4 6.1 556.6 * Flow, Qf= ~H xVr ** Infiltration Rate, I= (Qf/Ar)/t::..t Annular Ring Infiltration Rate I** Elev. H D.H Qf* Inner Outer (cm) (cm) (cc) in/hr in/hr 58.3 7.9 0.66 0.71 50.4 1323.5 50.4 9.6 0.83 0.87 40.8 1608.3 40.8 10.3 0.91 0.93 30.5 1725.6 30.5 11.4 0.99 1.03 19.1 1909.8 19.1 12.3 1.06 1.11 6.8 2060.6 58.3 12.7 1.13 1.15 45.6 2127.6 45.6 13.4 1.18 1.21 32.2 2244.9 32.2 13.5 1.20 1.22 18.7 2261.7 18.7 13.6 1.20 1.23 5.1 2278.4 58.3 20.3 1.20 1.22 38.0 3400.9 38.0 20.5 1.21 1.24 17.5 3434.4 17.5 10.2 1.20 1.23 7.3 1708.8 Remarks Warm and Sunny No Wind Refilled Tubes Refilled Tubes DOUBLE RING INFILTROMETER TEST DATA (ASTM D 3385) Test No: IT-3 (sheet 1 of 1) Ring Data Marriotte Tube CARLSBAD OCEAN ESTATES Area, Water NE Corner of Hoover and Adams Streets Ar Depth No. Vol., Vr Carlsbad, CA (cm2) (in) (cc/cm) Inner Ring {12" ID): 729.7 4.5 1 (3,000 cc) 53.52 Test By: Todd Wyland I uses Class: (SP-SM) ,nnular Space (24"1D outer ring): 2189 4.5 2 (10,000 cc) 167.53 Depth to Water: 60' (approx~ Penetration of Rings into Soil (in): Inner: 2.5 Outer: 2.5 Date of Test: 9/2/2015 I Water Source: Tank Filled From Fire Hydrant {water warmer than ground) Constant Head Maintanied by Using: Marriotte Tubes Test Location: Parcel 1 Test Elevation: 61 ft (approx) Time Time AT (min) Interval (hr:min) Total 1-Start 1:45 20 End 2:05 20 2 -Start 2:05 20 End 2:25 40 3 -Start 2:25 20 End 2:45 60 4-Start 2:45 20 End 3:05 80 5 -Start 3:05 20 End 3:25 100 6-Start 3:30 20 End 3:50 120 7 -Start 3:50 20 End 4:10 140 8-Start 4:10 20 End 4:30 160 9-Start 4:30 20 End 4:50 180 10-Start 4:55 30 End 5:25 210 11-Start 5:25 30 End 5:55 240 tl.2-Start 5:55 15 End 6:10 255 Inner Ring Elev. H AH Qf* (cm) (cm) (cc) 58.3 8.5 49.8 454.9 49.8 10.3 39.5 551.3 39.5 11.5 28.0 615.5 28.0 12.3 15.7 658.3 15.7 13.2 2.5 706.5 58.3 13.8 44.5 738.6 44.5 14.6 29.9 781.4 29.9 14.7 15.2 786.7 15.2 14.8 0.4 792.1 58.3 23.1 35.2 1236.3 35.2 22.8 12.4 1220.3 12.4 11.4 1.0 610.1 * Flow, Qf = /lH x Vr ** Infiltration Rate, I= (Qf/Ar)/llt Annular Ring Infiltration R:ati> I** Elev. H AH Qf* Inner Outer (cm) (cm) (cc) in/hr in/hr 58.3 8.6 0.74 0.78 49.7 1440.8 49.7 10.2 0.89 0.92 39.S 1708.8 39.S 11.4 1.00 1.03 28.1 1909.8 28.1 12.3 1.07 1.11 15.8 2060.6 15.8 12.9 2.9 2161.1 1.14 1.17 58.3 14.0 1.20 1.27 44.3 2345.4 44.3 14.7 29.6 2462.7 1.26 1.33 29.6 14.6 1.27 1.32 15.0 2445.9 15.0 14.8 1.34 0.2 1.28 2479.4 58.3 22.5 35.8 3769.4 1.33 1.36 35.8 22.7 13.1 3802.9 1.32 1.37 13.1 11.3 1.8 1893.1 1.32 1.36 Remarks Warm and Sunny No Wind Refilled Tubes Refilled Tubes ATTACHMENT 1e POLLUTANT CONTROL BMP DESIGN WORKSHEETS Home ..,., 85th Percentile Rainfa ll .:i. Sign In [ 0 Details ] I 0 8 Basemap ~ Share lie" Print ..,. I ~ Measure [ ..... F_in_d_a_d_d_re_s_s_o_r_p_l_ac_e ____________ lLQ.__,] 0 □ Legend ·-·-·- 85th Percentile Rainfall Contact Us ◄ 0 0.3 0 .6mi Aqua Hed1onda Lagoon ~ ~,<) t ~ L gobnd C liforn1u R sort • 168 ft C o.,,. Frost Evans Point Crossings t C,rla d Golf Cour od a agement, Es<i, ERE, Garmin, ... ' t? i-e Category #Description i ii iii iv v vi vii viii ix x Units 1 Drainage Basin ID or Name DMA 1 DMA 2 DMA 3 DMA 4 DMA 5 unitless 2 85th Percentile 24-hr Storm Depth 0.59 0.59 0.59 0.59 0.59 inches 3 Impervious Surfaces Not Directed to Dispersion Area (C=0.90)7,305 7,170 5,390 750 1,558 sq-ft 4 Semi-Pervious Surfaces Not Serving as Dispersion Area (C=0.30)5,803 5,605 5,640 sq-ft 5 Engineered Pervious Surfaces Not Serving as Dispersion Area (C=0.10)150 150 150 sq-ft 6 Natural Type A Soil Not Serving as Dispersion Area (C=0.10)sq-ft 7 Natural Type B Soil Not Serving as Dispersion Area (C=0.14)2,825 2,552 5,302 sq-ft 8 Natural Type C Soil Not Serving as Dispersion Area (C=0.23)sq-ft 9 Natural Type D Soil Not Serving as Dispersion Area (C=0.30)sq-ft 10 Does Tributary Incorporate Dispersion, Tree Wells, and/or Rain Barrels?No No No No No No No No No No yes/no 11 Impervious Surfaces Directed to Dispersion Area per SD-B (Ci=0.90)sq-ft 12 Semi-Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.30)sq-ft 13 Engineered Pervious Surfaces Serving as Dispersion Area per SD-B (Ci=0.10)sq-ft 14 Natural Type A Soil Serving as Dispersion Area per SD-B (Ci=0.10)sq-ft 15 Natural Type B Soil Serving as Dispersion Area per SD-B (Ci=0.14)sq-ft 16 Natural Type C Soil Serving as Dispersion Area per SD-B (Ci=0.23)sq-ft 17 Natural Type D Soil Serving as Dispersion Area per SD-B (Ci=0.30)sq-ft 18 Number of Tree Wells Proposed per SD-A # 19 Average Mature Tree Canopy Diameter ft 20 Number of Rain Barrels Proposed per SD-E # 21 Average Rain Barrel Size gal 22 Total Tributary Area 16,083 15,477 16,482 750 1,558 0 0 0 0 0 sq-ft 23 Initial Runoff Factor for Standard Drainage Areas 0.54 0.55 0.44 0.90 0.90 0.00 0.00 0.00 0.00 0.00 unitless 24 Initial Runoff Factor for Dispersed & Dispersion Areas 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 unitless 25 Initial Weighted Runoff Factor 0.54 0.55 0.44 0.90 0.90 0.00 0.00 0.00 0.00 0.00 unitless 26 Initial Design Capture Volume 427 419 357 33 69 0 0 0 0 0 cubic-feet 27 Total Impervious Area Dispersed to Pervious Surface 0 0 0 0 0 0 0 0 0 0 sq-ft 28 Total Pervious Dispersion Area 0 0 0 0 0 0 0 0 0 0 sq-ft 29 Ratio of Dispersed Impervious Area to Pervious Dispersion Area n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a ratio 30 Adjustment Factor for Dispersed & Dispersion Areas 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 ratio 31 Runoff Factor After Dispersion Techniques 0.54 0.55 0.44 0.90 0.90 n/a n/a n/a n/a n/a unitless 32 Design Capture Volume After Dispersion Techniques 427 419 357 33 69 0 0 0 0 0 cubic-feet 33 Total Tree Well Volume Reduction 0 0 0 0 0 0 0 0 0 0 cubic-feet 34 Total Rain Barrel Volume Reduction 0 0 0 0 0 0 0 0 0 0 cubic-feet 35 Final Adjusted Runoff Factor 0.54 0.55 0.44 0.90 0.90 0.00 0.00 0.00 0.00 0.00 unitless 36 Final Effective Tributary Area 8,685 8,512 7,252 675 1,402 0 0 0 0 0 sq-ft 37 Initial Design Capture Volume Retained by Site Design Elements 0 0 0 0 0 0 0 0 0 0 cubic-feet 38 Final Design Capture Volume Tributary to BMP 427 419 357 33 69 0 0 0 0 0 cubic-feet False False Automated Worksheet B.1: Calculation of Design Capture Volume (V2.0) Dispersion Area, Tree Well & Rain Barrel Inputs (Optional) Standard Drainage Basin Inputs Results Tree & Barrel Adjustments Initial Runoff Factor Calculation Dispersion Area Adjustments No Warning Messages Category #Description i ii iii iv v vi vii viii ix x Units 1 Drainage Basin ID or Name DMA 1 DMA 2 DMA 3 DMA 4 DMA 5 -----unitless 2 85th Percentile Rainfall Depth 0.59 0.59 0.59 0.59 0.59 -----inches 3 Predominant NRCS Soil Type Within BMP Location B B B B B unitless 4 Is proposed BMP location Restricted or Unrestricted for Infiltration Activities? Unrestricted Unrestricted Unrestricted Unrestricted Unrestricted unitless 5 Nature of Restriction n/a n/a n/a n/a n/a unitless 6 Do Minimum Retention Requirements Apply to this Project?Yes Yes Yes No No Yes Yes Yes Yes Yes yes/no 7 Are Habitable Structures Greater than 9 Stories Proposed?No No No yes/no 8 Has Geotechnical Engineer Performed an Infiltration Analysis?Yes Yes Yes yes/no 9 Design Infiltration Rate Recommended by Geotechnical Engineer 0.440 0.440 0.440 in/hr 10 Design Infiltration Rate Used To Determine Retention Requirements 0.440 0.440 0.440 0.200 0.200 -----in/hr 11 Percent of Average Annual Runoff that Must be Retained within DMA 40.0%40.0%40.0%0.0%0.0%-----percentage 12 Fraction of DCV Requiring Retention 0.32 0.32 0.32 0.00 0.00 -----ratio 13 Required Retention Volume 137 134 114 0 0 -----cubic-feet -Retention requirements have been omitted in these calculations. Such an omission is only be acceptable for Green Street projects or projects that submit supplemental calculations demonstrating retention requirements are satisfied at the project-level. False Automated Worksheet B.2: Retention Requirements (V2.0) Advanced Analysis Basic Analysis Result Attention! Category #Description i ii iii iv v vi vii viii ix x 1 Drainage Basin ID or Name DMA 1 DMA 2 DMA 3 DMA 4 DMA 5 ----- 2 Design Infiltration Rate Recommended 0.440 0.440 0.440 0.200 0.200 ----- 3 Design Capture Volume Tributary to BMP 427 419 357 33 69 ----- 4 Is BMP Vegetated or Unvegetated?Vegetated Vegetated Vegetated 5 Is BMP Impermeably Lined or Unlined?Unlined Unlined Unlined 6 Does BMP Have an Underdrain?Underdrain Underdrain Underdrain 7 Does BMP Utilize Standard or Specialized Media?Standard Standard Standard 8 Provided Surface Area 261 256 218 9 Provided Surface Ponding Depth 6 6 6 10 Provided Soil Media Thickness 18 18 18 11 Provided Gravel Thickness (Total Thickness)12 12 12 12 Underdrain Offset 3 3 3 13 Diameter of Underdrain or Hydromod Orifice (Select Smallest)6.00 6.00 6.00 14 Specialized Soil Media Filtration Rate 15 Specialized Soil Media Pore Space for Retention 16 Specialized Soil Media Pore Space for Biofiltration 17 Specialized Gravel Media Pore Space 18 Volume Infiltrated Over 6 Hour Storm 57 56 48 0 0 0 0 0 0 0 19 Ponding Pore Space Available for Retention 0.00 0.00 0.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 20 Soil Media Pore Space Available for Retention 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 0.05 21 Gravel Pore Space Available for Retention (Above Underdrain)0.00 0.00 0.00 0.40 0.40 0.40 0.40 0.40 0.40 0.40 22 Gravel Pore Space Available for Retention (Below Underdrain)0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 23 Effective Retention Depth 2.10 2.10 2.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00 24 Fraction of DCV Retained (Independent of Drawdown Time)0.24 0.24 0.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25 Calculated Retention Storage Drawdown Time 6 6 6 0 0 0 0 0 0 0 26 Efficacy of Retention Processes 0.80 0.80 0.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 27 Volume Retained by BMP (Considering Drawdown Time)340 334 284 0 0 0 0 0 0 0 28 Design Capture Volume Remaining for Biofiltration 87 85 73 33 69 0 0 0 0 0 29 Max Hydromod Flow Rate through Underdrain 1.4948 1.4948 1.4948 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 30 Max Soil Filtration Rate Allowed by Underdrain Orifice 247.42 252.25 296.22 0.00 0.00 0.00 0.00 0.00 0.00 0.00 31 Soil Media Filtration Rate per Specifications 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 5.00 32 Soil Media Filtration Rate to be used for Sizing 5.00 5.00 5.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 33 Depth Biofiltered Over 6 Hour Storm 30.00 30.00 30.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 34 Ponding Pore Space Available for Biofiltration 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 35 Soil Media Pore Space Available for Biofiltration 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 36 Gravel Pore Space Available for Biofiltration (Above Underdrain)0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 37 Effective Depth of Biofiltration Storage 13.20 13.20 13.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 38 Drawdown Time for Surface Ponding 1 1 1 0 0 0 0 0 0 0 39 Drawdown Time for Effective Biofiltration Depth 2 2 2 0 0 0 0 0 0 0 40 Total Depth Biofiltered 43.20 43.20 43.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 41 Option 1 - Biofilter 1.50 DCV: Target Volume 130 128 109 50 104 0 0 0 0 0 42 Option 1 - Provided Biofiltration Volume 130 128 109 0 0 0 0 0 0 0 43 Option 2 - Store 0.75 DCV: Target Volume 65 64 54 25 52 0 0 0 0 0 44 Option 2 - Provided Storage Volume 65 64 54 0 0 0 0 0 0 0 45 Portion of Biofiltration Performance Standard Satisfied 1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 46 Do Site Design Elements and BMPs Satisfy Annual Retention Requirements?Yes Yes Yes Yes Yes ----- 47 Overall Portion of Performance Standard Satisfied (BMP Efficacy Factor)1.00 1.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 48 Deficit of Effectively Treated Stormwater 0 0 0 -33 -69 n/a n/a n/a n/a n/a Biofiltration Calculations -This BMP does not fully satisfy the performance standards for pollutant control for the drainage area. False False False Result False False Attention! Retention Calculations Automated Worksheet B.3: BMP Performance (V2.0) False False BMP Inputs Low orifice:1 "Top orifice:1 " Number:0 Number:0 Cg-low:0.61 Cg-low:0.61 invert elev:69.50 ft invert elev:69.50 ft Middle orifice:1 "Emergency Inlet: number of orif:0 Rim Elev:70.00 ft Cg-middle:0.61 Area (SF=2)1.00 sq ft invert elev:69.50 ft Circumference 4.00 ft Elev H/D-low H/D-mid H/D-top Qlow-orif Qlow-weir Qtot-low Qmid-orif Qmid-weir Qtot-med Qtop-orif Qtop-weir Qtot-top Qemerg Qtot (ft)---(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs) 69.5 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 69.6 1.20 1.20 1.20 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 69.7 2.40 2.40 2.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 69.8 3.60 3.60 3.60 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 69.9 4.80 4.80 4.80 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 70.0 6.00 6.00 6.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 70.1 7.20 7.20 7.20 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.392 0.392 70.2 8.40 8.40 8.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.109 1.109 70.3 9.60 9.60 9.60 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.038 2.038 70.4 10.80 10.80 10.80 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.096 3.096 70.5 12.00 12.00 12.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.461 3.461 Carlsbad Oceanview Estates Basin PR-1-1 Stage Discharge Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet-Drawdown_Basin BF-3.xlsx Elev (ft.)Area (s.f.) Area (ac.) Elevation (ft.) Volume (c.f.) 69.5 91 0.0021 69.5 0 69.6 103 0.0024 69.6 10 69.7 115 0.0026 69.7 21 69.8 129 0.0030 69.8 33 69.9 143 0.0033 69.9 46 70.0 157 0.0036 70.0 61 70.1 173 0.0040 70.1 78 70.2 189 0.0043 70.2 96 70.3 206 0.0047 70.3 116 70.4 223 0.0051 70.4 137 70.5 241 0.0055 70.5 160 Carlsbad Oceanview Estates Basin PR-1-1 Stage Storage Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet- Drawdown_Basin BF-3.xlsx QSubdrain=0.011 Elevation (ft)QAVG (CFS)DV (CF)DT (HR)Total T (hrs) 69.5 0.011 10 0.2556 2.090 69.6 0.011 11 0.2877 1.835 69.7 0.011 12 0.3216 1.547 69.8 0.011 14 0.3575 1.226 69.9 0.011 15 0.3953 0.868 70.0 0.011 16 0.4350 0.473 70.1 0.207 18 0.0243 0.038 70.2 0.761 20 0.0072 0.013 70.3 1.584 21 0.0038 0.006 70.4 2.577 23 0.0025 0.003 70.5 3.289 0.0000 0.000 Carlsbad Oceanview Estates Basin PR-1-1 Stage Drawdown Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet- Drawdown_Basin BF-3.xlsx Low orifice:1 "Top orifice:1 " Number:0 Number:0 Cg-low:0.61 Cg-low:0.61 invert elev:64.50 ft invert elev:64.50 ft Middle orifice:1 "Emergency Inlet: number of orif:0 Rim Elev:65.00 ft Cg-middle:0.61 Area (SF=2)1.00 sq ft invert elev:64.50 ft Circumference 4.00 ft Elev.H/D-low H/D-mid H/D-top Qlow-orif Qlow-weir Qtot-low Qmid-orif Qmid-weir Qtot-med Qtop-orif Qtop-weir Qtot-top Qemerg Qtot (ft)---(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs) 64.5 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 64.6 1.20 1.20 1.20 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 64.7 2.40 2.40 2.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 64.8 3.60 3.60 3.60 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 64.9 4.80 4.80 4.80 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 65.0 6.00 6.00 6.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 65.1 7.20 7.20 7.20 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.392 0.392 65.2 8.40 8.40 8.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.109 1.109 65.3 9.60 9.60 9.60 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.038 2.038 65.4 10.80 10.80 10.80 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.096 3.096 65.5 12.00 12.00 12.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.461 3.461 Carlsbad Oceanview Estates Basin PR-1-2 Stage Discharge Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet-Drawdown_Basin BF-3.xlsx Elev (ft.)Area (s.f.) Area (ac.) Elevation (ft.) Volume (c.f.) 64.5 89 0.0020 64.5 0 64.6 101 0.0023 64.6 9 64.7 113 0.0026 64.7 20 64.8 126 0.0029 64.8 32 64.9 140 0.0032 64.9 45 65.0 155 0.0035 65.0 60 65.1 170 0.0039 65.1 76 65.2 186 0.0043 65.2 94 65.3 203 0.0047 65.3 114 65.4 220 0.0051 65.4 135 65.5 238 0.0055 65.5 158 Carlsbad Oceanview Estates Basin PR-1-2 Stage Storage Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet- Drawdown_Basin BF-3.xlsx QSubdrain=0.010 Elevation QAVG (CFS)DV (CF)DT (HR)Total T (hrs) 64.5 0.010 9 0.2557 2.004 64.6 0.010 10 0.2827 1.748 64.7 0.010 12 0.3112 1.466 64.8 0.010 13 0.3413 1.155 64.9 0.010 14 0.3730 0.813 65.0 0.010 15 0.4063 0.440 65.1 0.206 16 0.0220 0.034 65.2 0.761 18 0.0065 0.012 65.3 1.584 19 0.0034 0.006 65.4 2.577 21 0.0022 0.002 65.5 3.289 0.0000 0.000 Carlsbad Oceanview Estates Basin PR-1-2 Stage Drawdown Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet- Drawdown_Basin BF-3.xlsx Low orifice:1 "Top orifice:1 " Number:0 Number:0 Cg-low:0.61 Cg-low:0.61 invert elev:67.50 ft invert elev:67.50 ft Middle orifice:1 "Emergency Inlet: number of orif:0 Rim Elev:68.00 ft Cg-middle:0.61 Area (SF=2)1.00 sq ft invert elev:67.50 ft Circumference 4.00 ft Elev H/D-low H/D-mid H/D-top Qlow-orif Qlow-weir Qtot-low Qmid-orif Qmid-weir Qtot-med Qtop-orif Qtop-weir Qtot-top Qemerg Qtot (ft)---(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs)(cfs) 67.5 0.00 0.00 0.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 67.6 1.20 1.20 1.20 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 67.7 2.40 2.40 2.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 67.8 3.60 3.60 3.60 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 67.9 4.80 4.80 4.80 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 68.0 6.00 6.00 6.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 68.1 7.20 7.20 7.20 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.392 0.392 68.2 8.40 8.40 8.40 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.109 1.109 68.3 9.60 9.60 9.60 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.038 2.038 68.4 10.80 10.80 10.80 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.096 3.096 68.5 12.00 12.00 12.00 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.461 3.461 Carlsbad Oceanview Estates Basin PR-1-3 Stage Discharge Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet-Drawdown_Basin BF-3.xlsx Elev (ft.)Area (s.f.) Area (ac.) Elevation (ft.) Volume (c.f.) 67.5 43 0.0010 67.5 0 67.6 51 0.0012 67.6 5 67.7 60 0.0014 67.7 10 67.8 70 0.0016 67.8 17 67.9 80 0.0018 67.9 24 68.0 91 0.0021 68.0 33 68.1 103 0.0024 68.1 43 68.2 116 0.0027 68.2 54 68.3 129 0.0030 68.3 66 68.4 143 0.0033 68.4 79 68.5 158 0.0036 68.5 94 Carlsbad Oceanview Estates Basin PR-1-3 Stage Storage Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet- Drawdown_Basin BF-3.xlsx QSubdrain=0.005 Elevation QAVG (CFS)DV (CF)DT (HR)Total T (hrs) 69.5 0.005 5 0.2630 1.857 69.6 0.005 6 0.3109 1.594 69.7 0.005 7 0.3629 1.283 69.8 0.005 8 0.4188 0.920 69.9 0.005 9 0.4788 0.501 70.0 0.201 10 0.0134 0.022 70.1 0.756 11 0.0040 0.009 70.2 1.578 12 0.0022 0.005 70.3 2.572 14 0.0015 0.003 70.4 3.284 15 0.0013 0.001 70.5 1.736 0.0000 0.000 Carlsbad Oceanview Estates Basin PR-1-3 Stage Drawdown Table R:\0109-0001 Carlsbad Oceanview Estates - Olivier, Henry\Hyd\SWQMP\Calcs\0109-0001_Basin Storage-Outlet- Drawdown_Basin BF-3.xlsx STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST How to use this worksheet (also see instructions in Section G of the WQMP Template): 1. Review Column 1 and identify which of these potential sources of stormwater pollutants apply to your site. Check each box that applies. 2. Review Column 2 and incorporate all of the corresponding applicable BMPs in your WQMP Exhibit. 3. Review Columns 3 and 4 and incorporate all of the corresponding applicable permanent controls and operational BMPs in your WQMP. Use the format shown in Table G. lon page 23 of this WQMP Template. Describe your specific BMPs in an accompanying narrative, and explain any special conditions or situations that required omitting BMPs or substituting alternative BMPs for those shown here. IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative 0 A. On-site storm drain 0 Locations of inlets. 0 Mark all inlets with the words 0 Maintain and periodically repaint or inlets "Only Rain Down the Storm replace inlet markings. Drain" or similar. Catch Basin 0 Provide stormwater pollution Markers may be available from the prevention information to new site Riverside County Flood Control owners, lessees, or operators. and Water Conservation District, call 951.955.1200 to verify. 0 See applicable operational BMPs in Fact Sheet SC-44, "Drainage System Maintenance," in the CASQA Stormwater Quality Handbooks at www.cabm12handbooks.com 0 Include the following in lease agreements: "Tenant shall not allow anyone to discharge anything to storm drains or to store or deposit materials so as to create a potential discharge to storm drains." □ B. Interior floor drains □ State that interior floor drains and □ Inspect and maintain drains to prevent and elevator shaft sump elevator shaft sump pumps will be blockages and overflow. pumps plumbed to sanitary sewer. □ C. Interior parking □ State that parking garage floor □ Inspect and maintain drains to prevent garages drains will be plumbed to the blockages and overflow. sanitary sewer. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative 0 D1. Need for future 0 Note building design features that 0 Provide Integrated Pest Management indoor & structural pest discourage entry of pests. information to owners, lessees, and control operators. 0 D2. Landscape/ 0 Show locations of native trees or State that final landscape plans will 0 Maintain landscaping using minimum Outdoor Pesticide Use areas of shrubs and ground cover to accomplish all of the following. or no pesticides. be undisturbed and retained. 0 Preserve existing native trees, 0 See applicable operational BMPs in 0 Show self-retaining landscape shrubs, and ground cover to the "What you should know areas, if any. maximum extent possible. for ..... Landscape and Gardening" at 0 Show stormwater treatment and 0 Design landscaping to minimize http://rcflood.org/ stormwater/Error! hydrograph modification irrigation and runoff, to promote H yperlink reference not valid. management BMPs. (See surface infiltration where Provide 1PM information to new instructions in Chapter 3, Step 5 appropriate, and to minimize the 0 owners, lessees and operators. and guidance in Chapter 5.) use of fertilizers and pesticides that can contribute to stormwater 0 pollution. Where landscaped areas are used to retain or detain stormwater, specify plants that are tolerant of saturated 0 soil conditions. Consider using pest-resistant 0 plants, especially adjacent to hardscape. To insure successful establishment, select plants appropriate to site soils, slopes, climate, sun, wind, rain, land use, air movement, ecological consistency, and plant interactions. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative □ E. Pools, spas, ponds, 0 Show location of water feature and If the Co-Perrnittee requires pools 0 See applicable operational BMPs in decorative fountains, a sanitary sewer cleanout in an to be plumbed to the sanitary "Guidelines for Maintaining Your and other water accessible area within 10 feet. sewer, place a note on the plans Swimming Pool, Jacuzzi and Garden features. (Exception: Public pools must be and state in the narrative that this Fountain" at plumbed according to County connection will be made according http://rcflood.org/ stormwater/ Department of Environmental to local requirements. Health Guidelines.) □ F. Food service □ For restaurants, grocery stores, and □ Describe the location and features □ See the brochure, "The Food Service other food service operations, show of the designated cleaning area. Industry Best Management Practices for: location (indoors or in a covered □ Describe the items to be cleaned in Restaurants, Grocery Stores, area outdoors) of a floor sink or this facility and how it has been Delicatessens and Bakeries" at other area for cleaning floor mats, sized to insure that the largest http://rcflood.org/ stormwater/ containers, and equipment. items can be accommodated. Provide this brochure to new site □ On the drawing, show a note that owners, lessees, and operators. this drain will be connected to a grease interceptor before discharging to the sanitary sewer. □ G. Refuse areas □ Show where site refuse and □ State how site refuse will be □ State how the following will be recycled materials will be handled handled and provide supporting implemented: and stored for pickup. See local detail to what is shown on plans. Provide adequate number of municipal requirements for sizes □ State that signs will be posted on or receptacles. Inspect receptacles and other details of refuse areas. near dumpsters with the words "Do regularly; repair or replace leaky □ If dumpsters or other receptacles not dump hazardous materials receptacles. Keep receptacles covered. are outdoors, show how the here" or similar. Prohibit/prevent dumping of liquid or designated area will be covered, hazardous wastes. Post "no hazardous graded, and paved to prevent run-materials" signs. Inspect and pick up on and show locations of berms to litter daily and clean up spills prevent runoff from the area. immediately. Keep spill control □ Any drains from dumpsters, materials available on-site. See Fact compactors, and tallow bin areas Sheet SC-34, "Waste Handling and shall be connected to a grease Disposal" in the CASQA Stormwater removal device before discharge to Quality Handbooks at sanitary sewer. www.cabmphandbooks.com STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative □ H. Industrial processes. □ Show process area. □ If industrial processes are to be □ See Fact Sheet SC-10, "Non- located on site, state: "All process Stormwater Discharges" in the activities to be performed indoors. CASQA Stormwater Quality No processes to drain to exterior or Handbooks at to storm drain system." www.cabm1,2handbooks.com See the brochure "Industrial & Commercial Facilities Best Management Practices for: Industrial, Commercial Facilities" at http://rcflood.org/ stormwater/ STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative □ I. Outdoor storage of □ Show any outdoor storage areas, Include a detailed description of □ See the Fact Sheets SC-31, "Outdoor equipment or materials. including how materials will be materials to be stored, storage Liquid Container Storage" and SC-33, (See rows J and K for covered. Show how areas will be areas, and structural features to "Outdoor Storage of Raw Materials " source control graded and bermed to prevent run-prevent pollutants from entering in the CASQA Stormwater Quality measures for vehicle on or run-off from area. storm drains. Handbooks at cleaning, repair, and □ Storage of non-hazardous liquids Where appropriate, reference www.cabmphandbooks.com maintenance.) shall be covered by a roof and/ or documentation of compliance with drain to the sanitary sewer system, the requirements of Hazardous and be contained by berms, dikes, Materials Programs for: liners, or vaults. ■ Hazardous Waste Generation □ Storage of hazardous materials and Hazardous Materials Release ■ wastes must be in compliance with Response and Inventory the local hazardous materials ordinance and a Hazardous ■ California Accidental Release Materials Management Plan for the (CalARP) site. ■ Aboveground Storage Tank ■ Uniform Fire Code Article 80 Section 103(b) & (c) 1991 ■ Underground Storage Tank www.cchealth.org Lgroups Lhazmat L STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative □ J. Vehicle and □ Show on drawings as appropriate: □ If a car wash area is not provided, Describe operational measures to Equipment Cleaning (1) Commercial/industrial facilities describe any measures taken to implement the following (if having vehicle/ equipment cleaning discourage on-site car washing and applicable): needs shall either provide a explain how these will be enforced. □ Washwater from vehicle and covered, bermed area for washing equipment washing operations shall activities or discourage not be discharged to the storm drain vehicle/ equipment washing by system. Refer to "Outdoor Cleaning removing hose bibs and installing Activities and Professional Mobile Service signs prohibiting such uses. Providers" for many of the Potential (2) Multi-dwelling complexes shall Sources of Runoff Pollutants categories have a paved, bermed, and covered below. Brochure can be found at car wash area (unless car washing http://rcflood.org/ stormwater/ is prohibited on-site and hoses are □Car dealerships and similar may provided with an automatic shut-rinse cars with water only. off to discourage such use). (3) Washing areas for cars, vehicles, and equipment shall be paved, designed to prevent run-on to or runoff from the area, and plumbed to drain to the sanitary sewer. (4) Commercial car wash facilities shall be designed such that no runoff from the facility is discharged to the storm drain system. Wastewater from the facility shall discharge to the sanitary sewer, or a wastewater reclamation system shall be installed. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative □ K. Vehicle/Equipment □ Accommodate all vehicle □ State that no vehicle repair or In the Stormwater Control Plan, note Repair and equipment repair and maintenance maintenance will be done outdoors, that all of the following restrictions Maintenance indoors. Or designate an outdoor or else describe the required apply to use the site: work area and design the area to features of the outdoor work area. □ No person shall dispose of, nor permit prevent run-on and runoff of □ State that there are no floor drains the disposal, directly or indirectly of stormwater. or if there are floor drains, note the vehicle fluids, hazardous materials, or □ Show secondary containment for agency from which an industrial rinsewater from parts cleaning into exterior work areas where motor waste discharge permit will be storm drains. oil, brake fluid, gasoline, diesel obtained and that the design meets □ No vehicle fluid removal shall be fuel, radiator fluid, acid-containing that agency's requirements. performed outside a building, nor on batteries or other hazardous □ State that there are no tanks, asphalt or ground surfaces, whether materials or hazardous wastes are used or stored. Drains shall not be containers or sinks to be used for inside or outside a building, except in installed within the secondary parts cleaning or rinsing or, if there such a manner as to ensure that any are, note the agency from which an spilled fluid will be in an area of containment areas. industrial waste discharge permit secondary containment. Leaking □ Add a note on the plans that states will be obtained and that the vehicle fluids shall be contained or either (1) there are no floor drains, design meets that agency's drained from the vehicle immediately. or (2) floor drains are connected to requirements. No person shall leave unattended drip wastewater pretreatment systems □ parts or other open containers prior to discharge to the sanitary containing vehicle fluid, unless such sewer and an industrial waste containers are in use or in an area of discharge permit will be obtained. secondary containment. Refer to "Automotive Maintenance & Car Care Best Management Practices for Auto Body Shops, Auto Repair Shops, Car Dealerships, Gas Stations and Fleet Service Operations". Brochure can be found at htt12: /_ /_rcflood.org/_ stormwater /_ Refer to Outdoor Cleaning Activities and Professional Mobile Service Providers for many of the Potential Sources of Runoff Pollutants categories below. Brochure can be found at htt12: !. /_rcflood.org/_stormwater !. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... □ 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative L. Fuel Dispensing □ Fueling areas6 shall have □ The property owner shall dry sweep Areas impermeable floors (i.e., portland the fueling area routinely. cement concrete or equivalent □ See the Fact Sheet SD-30 , "Fueling smooth impervious surface) that Areas" in the CASQA Stormwater are: a) graded at the minimum Quality Handbooks at slope necessary to prevent ponding; www.cabmphandbooks.com and b) separated from the rest of the site by a grade break that prevents run-on of stormwater to the maximum extent practicable. □ Fueling areas shall be covered by a canopy that extends a minimum of ten feet in each direction from each pump. [Alternative: The fueling area must be covered and the cover's minimum dimensions must be equal to or greater than the area within the grade break or fuel dispensing area1.] The canopy [or cover] shall not drain onto the fueling area. 6 The fueling area shall be defined as the area extending a minimum of 6.5 feet from the corner of each fuel dispenser or the length at which the hose and nozzle assembly may be operated plus a minimum of one foot, whichever is greater. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative □ M. Loading Docks □ Show a preliminary design for the □ Move loaded and unloaded items loading dock area, including indoors as soon as possible. roofing and drainage. Loading □ See Fact Sheet SC-30, "Outdoor docks shall be covered and/ or Loading and Unloading," in the graded to minimize run-on to and CASQA Stormwater Quality runoff from the loading area. Roof Handbooks at downspouts shall be positioned to www.cabmphandbooks.com direct stormwater away from the loading area. Water from loading dock areas shall be drained to the sanitary sewer, or diverted and collected for ultimate discharge to the sanitary sewer. □ Loading dock areas draining directly to the sanitary sewer shall be equipped with a spill control valve or equivalent device, which shall be kept closed during periods of operation. □ Provide a roof overhang over the loading area or install door skirts ( cowling) at each bay that enclose the end of the trailer. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative 0 N. Fire Sprinkler Test 0 Provide a means to drain fire 0 See the note in Fact Sheet SC-41, Water sprinkler test water to the sanitary "Building and Grounds Maintenance," sewer. in the CASQA Stormwater Quality Handbooks at www.cabm12handbooks.com O. Miscellaneous Drain 0 Boiler drain lines shall be directly or Wash Water or Other or indirectly connected to the Sources sanitary sewer system and may not 0 Boiler drain lines discharge to the storm drain 0 system. 0 Condensate drain lines Condensate drain lines may 0 Rooftop equipment discharge to landscaped areas if the 0 Drainage sumps flow is small enough that runoff 0 will not occur. Condensate drain Roofing, gutters, and 0 lines may not discharge to the trim. storm drain system. □ Other sources Rooftop equipment with potential to produce pollutants shall be 0 roofed and/ or have secondary containment. Any drainage sumps on-site shall 0 feature a sediment sump to reduce the quantity of sediment in pumped water. 0 Avoid roofing, gutters, and trim made of copper or other unprotected metals that may leach into runoff. Include controls for other sources as specified by local reviewer. STORMWATER POLLUTANT SOURCES/SOURCE CONTROL CHECKLIST IF THESE SOURCES WILL BE ... THEN YOUR WQMP SHOULD INCLUDE THESE SOURCE CONTROL BMPs, AS APPLICABLE ON THE PROJECT SITE ... 1 2 3 4 Potential Sources of Permanent Controls-Show on Permanent Controls-List in WQMP Operational BMPs-lnclude in WQMP Runoff Pollutants WQMP Drawings Table and Narrative Table and Narrative 0 P. Plazas, sidewalks, 0 Sweep plazas, sidewalks, and parking and parking lots. lots regularly to prevent accumulation of litter and debris. Collect debris from pressure washing to prevent entry into the storm drain system. Collect washwater containing any cleaning agent or degreaser and discharge to the sanitary sewer not to a storm drain. ATTACHMENT 2 BACKUP FOR PDP HYDROMODIFICATION CONTROL MEASURES [NOT APPLICABLE.] Indicate which Items are Included behind this cover sheet: Attachment Contents Checklist Sequence Attachment 2a Hydromodification Management □ Included (N/A) Exhibit (Required) See Hydromodification Management Exhibit Checklist on the back of this Attachment cover sheet. Attachment 2b Management of Critical Coarse □ Exhibit showing project drainage Sediment Yield Areas (WMAA Exhibit boundaries marked on WMAA is required, additional analyses are Critical Coarse Sediment Yield optional) Area Map (Required) See Section 6.2 of the BMP Design Optional analyses for Critical Coarse Manual. Sediment Yield Area Determination □ 6.2.1 Verification of Geomorphic Landscape Units Onsite □ 6.2.2 Downstream Systems Sensitivity to Coarse Sediment □ 6.2.3 Optional Additional Analysis of Potential Critical Coarse Sediment Yield Areas Onsite Attachment 2c Geomorphic Assessment of Receiving lg] Not performed Channels (Optional) □ Included See Section 6.3.4 of the BMP Design Manual. Attachment 2d Flow Control Facility Design and □ Included Structural BMP Drawdown N/A Calculations (Required) See Chapter 6 and Appendix G of the BMP Design Manual ATTACHMENT 2 BACKUP FOR HYDROMODIFICATION CONTROL MEASURES This Attachment 2 is not applicable to this site since it is HMP Exempt beacuse: The project will discharge runoff directly to conveyance channels whose bed and bank are concrete- lined all the way from the point of discharge to water storage reservoirs, Lakes, enclosed embayments, or the Pacific Ocean. This project discharges directly to Agua Hedionda Lagoon. Please refer to Hydromodification Exemption Analysis for Select Carlsbad Watersheds, prepared by Chang Consul- tants, dated September 17, 2015. ATTACHMENT 3 Structural BMP Maintenance Information Use this checklist to ensure the required information has been included in the Structural BMP Maintenance Information Attachment: Preliminary Design/Planning/CEQA level submittal: Attachment 3 must identify: ~ Typical maintenance indicators and actions for proposed structural BMP(s) based on Section 7.7 of the BMP Design Manual Final Design level submittal: Attachment 3 must identify: ~ Specific maintenance indicators and actions for proposed structural BMP(s). This shall be based on Section 7.7 of the BMP Design Manual and enhanced to reflect actual proposed components of the structural BMP(s) ~ How to access the structural BMP(s) to inspect and perform maintenance ~ Features that are provided to facilitate inspection (e.g., observation ports, cleanouts, silt posts, or other features that allow the inspector to view necessary components of the structural BMP and compare to maintenance thresholds) ~ Manufacturer and part number for proprietary parts of structural BMP(s) when applicable ~ Maintenance thresholds for BMPs subject to siltation or heavy trash(e.g., silt level posts or other markings shall be included in all BMP components that will trap and store sediment, trash, and/or debris, so that the inspector may determine how full the BMP is, and the maintenance personnel may determine where the bottom of the BMP is . If required, posts or other markings shall be indicated and described on structural BMP plans.) ~ Recommended equipment to perform maintenance ~ When applicable, necessary special training or certification requirements for inspection and maintenance personnel such as confined space entry or hazardous waste management FT-4 Dry Extended Detention Basin BMP MAINTENANCE FACT SHEET FOR FLOW-THRU STRUCTURAL BMP FT-4 DRY EXTENDED DETENTION BASIN Dry extended detention basins are basins that have been designed to detain storm water for an extended period to allow sedimentation and typically drain completely between storm events. The slopes, bottom, and forebay of above-ground dry extended detention basins are typically vegetated. Dry extended detention basins may serve multiple uses including parks, playing fields, tennis courts, open space, and overflow parking lots. This BMP category also includes detention basins that serve a purpose of flow control for hydromodification management only, which may or may not include vegetation. They can be underground structures, in many possible configurations, including both proprietary and non-proprietary systems. They may be constructed of a single large vault, one or multiple large pipes, or other modular units. Outlet structures control outflow from either above- ground or underground detention systems; outlet structures may be weirs, orifice plates, risers, or other control structures. Typical dry extended detention basin components include: • Forebay for pretreatment • Surface ponding for captured flows • Vegetation selected based on basin use, climate and ponding depth (above-ground basins) • Low flow channel, outlet, and overflow device • Impermeable liner or uncompacted native soils at the bottom of the facility Normal Expected Maintenance Dry extended detention basins require routine maintenance to: remove accumulated materials such as sediment, trash or debris; maintain vegetation health; and maintain integrity of side slopes, inlets, energy dissipators, and outlets. A summary table of standard inspection and maintenance indicators is provided within this Fact Sheet. Non-Standard Maintenance or BMP Failure If any of the following scenarios are observed, the BMP is not performing as intended to protect downstream waterways from pollution and/or erosion. Corrective maintenance, increased inspection and maintenance, BMP replacement, or a different BMP type will be required. • The BMP is not drained between storm events. Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface or underground ponding longer than approximately 96 hours following a storm event poses a risk of vector (mosquito) breeding. Poor drainage can result from clogging of underlying native soils and/or the outlet structure. The specific cause of the drainage issue must be determined and corrected. If it is determined that the drainage of the basin relies on infiltration and the underlying native soils have been compacted or do not have the infiltration capacity expected, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. • Sediment, trash, or debris accumulation greater than 25% of the surface ponding volume within one month. This means the load from the tributary drainage area is too high, reducing BMP function or clogging the BMP. This would require pretreatment measures within the tributary area draining to the BMP to intercept the materials. • Erosion due to concentrated storm water runoff flow that is not readily corrected by adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. FT-4 Page 1 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin Other Special Considerations Some above-ground dry extended detention basins are vegetated structural BMPs. Vegetated structural BMPs that are constructed in the vicinity of, or connected to, an existing jurisdictional water or wetland could inadvertently result in creation of expanded waters or wetlands. As such, vegetated structural BMPs have the potential to come under the jurisdiction of the United States Army Corps of Engineers, SDRWQCB, California Department of Fish and Wildlife, or the United States Fish and Wildlife Service. This could result in the need for specific resource agency permits and costly mitigation to perform maintenance of the structural BMP. Along with proper placement of a structural BMP, routine maintenance is key to preventing this scenario. Underground dry extended detention basins are typically designed to be cleaned from above-ground using a vactor. If maintenance conditions require maintenance personnel to enter the underground structure, the maintenance personnel must be trained and certified in confined space entry. FT-4 Page 2 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR FT-4 DRY EXTENDED DETENTION BASIN The property owner is responsible to ensure inspection, operation and maintenance of permanent BMPs on their property unless responsibility has been formally transferred to an agency, community facilities district, homeowners association, property owners association, or other special district. Maintenance frequencies listed in this table are average/typical frequencies. Actual maintenance needs are site-specific, and maintenance may be required more frequently. Maintenance must be performed whenever needed, based on maintenance indicators presented in this table. The BMP owner is responsible for conducting regular inspections to see when maintenance is needed based on the maintenance indicators. During the first year of operation of a structural BMP, inspection is recommended at least once prior to August 31 and then monthly from September through May. Inspection during a storm event is also recommended. After the initial period of frequent inspections, the minimum inspection and maintenance frequency can be determined based on the results of the first year inspections. Threshold/Indicator Maintenance Action Typical Maintenance Frequency Accumulation of sediment, litter, or debris in forebay and/or basin Remove and properly dispose of accumulated materials, (without damage to vegetation when applicable). • Inspect monthly. If the forebay is 25% full* or more in one month, increase inspection frequency to monthly plus after every 0.1-inch or larger storm event. • Remove any accumulated materials found within the basin area at each inspection. • When the BMP includes a forebay, materials must be removed from the forebay when the forebay is 25% full*, or if accumulation within the forebay blocks flow to the basin. Obstructed inlet or outlet structure Clear blockage. • Inspect monthly and after every 0.5-inch or larger storm event. • Remove any accumulated materials found at each inspection. Poor vegetation establishment (when the BMP includes vegetated surface by design) Re-seed, re-plant, or re-establish vegetation per original plans. • Inspect monthly. • Maintenance when needed. Dead or diseased vegetation (when the BMP includes vegetated surface by design) Remove dead or diseased vegetation, re-seed, re-plant, or re-establish vegetation per original plans. • Inspect monthly. • Maintenance when needed. Overgrown vegetation (when the BMP includes vegetated surface by design) Mow or trim as appropriate. • Inspect monthly. • Maintenance when needed. *“25% full” is defined as ¼ of the depth from the design bottom elevation to the crest of the outflow structure (e.g., if the height to the outflow opening is 12 inches from the bottom elevation, then the materials must be removed when there is 3 inches of accumulation – this should be marked on the outflow structure). FT-4 Page 3 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR FT-4 DRY EXTENDED DETENTION BASIN (Continued from previous page) Threshold/Indicator Maintenance Action Typical Maintenance Frequency Erosion due to concentrated irrigation flow Repair/re-seed/re-plant eroded areas and adjust the irrigation system. • Inspect monthly. • Maintenance when needed. Erosion due to concentrated storm water runoff flow Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. • Inspect after every 0.5-inch or larger storm event. If erosion due to storm water flow has been observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed. If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. Standing water in above-ground BMP for longer than 24- 96 hours following a storm event Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, or removing/replacing clogged or compacted surface treatments and/or scarifying or tilling native soils. Always remove deposited sediments before scarification, and use a hand-guided rotary tiller. If it is determined that the drainage of the basin relies on infiltration and the underlying native soils have been compacted or do not have the infiltration capacity expected, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. • Inspect monthly and after every 0.5-inch or larger storm event. If standing water is observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed. Standing water in underground BMP for longer than 24- 96 hours following a storm event Make appropriate corrective measures such as removing obstructions at the outlet, clearing underdrains, or flushing fine sediment from aggregate layer when applicable. If it is determined that the drainage of the basin relies on infiltration and the underlying native soils have been compacted or do not have the infiltration capacity expected, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. • Inspect monthly and after every 0.5-inch or larger storm event. If standing water is observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed. FT-4 Page 4 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin SUMMARY OF STANDARD INSPECTION AND MAINTENANCE FOR FT-4 DRY EXTENDED DETENTION BASIN (Continued from previous page) Threshold/Indicator Maintenance Action Typical Maintenance Frequency Presence of mosquitos/larvae For images of egg rafts, larva, pupa, and adult mosquitos, see http://www.mosquito.org/biology If mosquitos/larvae are observed: first, immediately remove and properly dispose any standing water; second, make corrective measures as applicable to restore BMP drainage to prevent standing water. For underground detention basins, ensure access covers are tight fitting, with gaps or holes no greater than 1/16 inch, and/or install barriers such as inserts or screens that prevent mosquito access to the subsurface storage. If mosquitos persist following corrective measures to remove standing water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an orifice installed on the underdrain, the [City Engineer] shall be contacted to determine a solution. A different BMP type, or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health, may be required. • Inspect monthly and after every 0.5-inch or larger storm event. If mosquitos are observed, increase inspection frequency to after every 0.1-inch or larger storm event. • Maintenance when needed Damage to structural components such as weirs, inlet or outlet structures Repair or replace as applicable. • Inspect annually. • Maintenance when needed. References American Mosquito Control Association. http://www.mosquito.org/ California Storm Water Quality Association (CASQA). 2003. Municipal BMP Handbook. https://www.casqa.org/resources/bmp-handbooks/municipal-bmp-handbook County of San Diego. 2014. Low Impact Development Handbook. http://www.sandiegocounty.gov/content/sdc/dpw/watersheds/susmp/lid.html San Diego County Copermittees. 2016. Model BMP Design Manual, Appendix E, Fact Sheet FT-4. http://www.projectcleanwater.org/index.php?option=com_content&view=article&id=250&Itemid=220 FT-4 Page 5 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin Page Intentionally Blank for Double-Sided Printing FT-4 Page 6 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin Date: Inspector: BMP ID No.: Permit No.: APN(s): Property / Development Name: Responsible Party Name and Phone Number: Property Address of BMP: Responsible Party Address: INSPECTION AND MAINTENANCE CHECKLIST FOR FT-4 DRY EXTENDED DETENTION BASIN PAGE 1 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Accumulation of sediment, litter, or debris Materials must be removed from the forebay when the forebay is 25% full*. In any case, materials must be removed if accumulation blocks flow to the basin area. Materials must be removed from the basin area any time accumulation is observed in the basin area. Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Remove and properly dispose of accumulated materials, (without damage to the vegetation when applicable) ☐ If accumulation within the forebay is greater than 25% in one month, increase the inspection and maintenance frequency* ☐ Other / Comments: *“25% full” is defined as ¼ of the depth from the design bottom elevation to the crest of the outflow structure (e.g., if the height to the outflow opening is 12 inches from the bottom elevation, then the materials must be removed when there is 3 inches of accumulation – this should be marked on the outflow structure). **If no forebay is present, if sediment, litter, or debris accumulation exceeds 25% of the surface ponding volume within one month, add a forebay or other pre-treatment measures within the tributary area draining to the BMP to intercept the materials. FT-4 Page 7 of 12 January 12, 2017 I I I FT-4 Dry Extended Detention Basin Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR FT-4 DRY EXTENDED DETENTION BASIN PAGE 2 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Poor vegetation establishment (when the BMP includes vegetated surface by design) Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Re-seed, re-plant, or re-establish vegetation per original plans ☐ Other / Comments: Dead or diseased vegetation (when the BMP includes vegetated surface by design) Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Remove dead or diseased vegetation, re-seed, re-plant, or re-establish vegetation per original plans ☐ Other / Comments: Overgrown vegetation (when the BMP includes vegetated surface by design) Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Mow or trim as appropriate ☐ Other / Comments: FT-4 Page 8 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR FT-4 DRY EXTENDED DETENTION BASIN PAGE 3 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Erosion due to concentrated irrigation flow Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Repair/re-seed/re-plant eroded areas and adjust the irrigation system ☐ Other / Comments: Erosion due to concentrated storm water runoff flow Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Repair/re-seed/re-plant eroded areas, and make appropriate corrective measures such as adding erosion control blankets, adding stone at flow entry points, or minor re-grading to restore proper drainage according to the original plan ☐ If the issue is not corrected by restoring the BMP to the original plan and grade, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction ☐ Other / Comments: FT-4 Page 9 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR FT-4 DRY EXTENDED DETENTION BASIN PAGE 4 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Obstructed inlet or outlet structure Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Clear blockage ☐ Other / Comments: Damage to structural components such as weirs, inlet or outlet structures Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Repair or replace as applicable ☐ Other / Comments: FT-4 Page 10 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin Date: Inspector: BMP ID No.: Permit No.: APN(s): INSPECTION AND MAINTENANCE CHECKLIST FOR FT-4 DRY EXTENDED DETENTION BASIN PAGE 5 of 5 Threshold/Indicator Maintenance Recommendation Date Description of Maintenance Conducted Standing water in above-ground BMP for longer than 24-96 hours following a storm event* ☐ Make appropriate corrective measures such as adjusting irrigation system, removing obstructions of debris or invasive vegetation, or repairing/replacing clogged or compacted soils.* ☐ Other / Comments: Standing water in underground BMP for longer than 24-96 hours following a storm event* ☐ Make appropriate corrective measures such as removing debris obstructions, clearing underdrains, or flushing fine sediment from aggregate layer when applicable.* ☐ Other / Comments: Presence of mosquitos/larvae For images of egg rafts, larva, pupa, and adult mosquitos, see http://www.mosquito.org/biology Maintenance Needed? ☐ YES ☐ NO ☐ N/A ☐ Apply corrective measures to remove standing water in BMP when standing water occurs for longer than 24-96 hours following a storm event.** ☐ Other / Comments: FT-4 Page 11 of 12 January 12, 2017 FT-4 Dry Extended Detention Basin *Surface ponding longer than approximately 24 hours following a storm event may be detrimental to vegetation health, and surface ponding longer than approximately 96 hours following a storm event poses a risk of vector (mosquito) breeding. Poor drainage can result from clogging of the outlet structure or the underlying soils. The specific cause of the drainage issue must be determined and corrected. If it is determined that the drainage of the basin relies on infiltration and the underlying native soils have been compacted or do not have the infiltration capacity expected, the [City Engineer] shall be contacted prior to any additional repairs or reconstruction. **If mosquitos persist following corrective measures to remove standing water, or if the BMP design does not meet the 96-hour drawdown criteria due to release rates controlled by an orifice installed on the underdrain, the [City Engineer] shall be contacted to determine a solution. A different BMP type, or a Vector Management Plan prepared with concurrence from the County of San Diego Department of Environmental Health, may be required. FT-4 Page 12 of 12 January 12, 2017 Site Design & Landscape Planning SD-10 Description Design Objectives 0 Maximize Infiltration 0 Provide Retention 0 Slow Runoff 0 Minimize Impervious Land Coverage Prohibit Dumping of Improper Materials Contain Pollutants Collect and Convey Each project site possesses unique topographic, hydrologic, and vegetative features, some of which are more suitable for development than others. Integrating and incorporating appropriate landscape planning methodologies into the project design is the most effective action that can be done to minimize surface and groundwater contamination from stormwater. Approach Landscape planning should couple consideration of land suitability for urban uses with consideration of community goals and projected growth. Project plan designs should conserve natural areas to the extent possible, maximize natural water storage and infiltration opportunities, and protect slopes and channels. Suitable Applications Appropriate applications include residential, commercial and industrial areas planned for development or redevelopment. Design Considerations Design requirements for site design and landscapes planning should conform to applicable standards and specifications of agencies with jurisdiction and be consistent with applicable General Plan and Local Area Plan policies. January 2003 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com CALIFORl\1A SfORMWATER I I< 1 of 4 SD-10 Site Design & Landscape Planning Designing New Installations Begin the development of a plan for the landscape unit with attention to the following general principles: ■ Formulate the plan on the basis of clearly articulated community goals. Carefully identify conflicts and choices between retaining and protecting desired resources and community growth. ■ Map and assess land suitability for urban uses. Include the following landscape features in the assessment: wooded land, open unwooded land, steep slopes, erosion-prone soils, foundation suitability, soil suitability for waste disposal, aquifers, aquifer recharge areas, wetlands, floodplains, surface waters, agricultural lands, and various categories of urban land use. When appropriate, the assessment can highlight outstanding local or regional resources that the community determines should be protected (e.g., a scenic area, recreational area, threatened species habitat, farmland, fish run). Mapping and assessment should recognize not only these resources but also additional areas needed for their sustenance. Project plan designs should conserve natural areas to the extent possible, maximize natural water storage and infiltration opportunities, and protect slopes and channels. Conserve Natural Areas during Landscape Planning If applicable, the following items are required and must be implemented in the site layout during the subdivision design and approval process, consistent with applicable General Plan and Local Area Plan policies: ■ Cluster development on least-sensitive portions of a site while leaving the remaining land in a natural undisturbed condition. ■ Limit clearing and grading of native vegetation at a site to the minimum amount needed to build lots, allow access, and provide fire protection. ■ Maximize trees and other vegetation at each site by planting additional vegetation, clustering tree areas, and promoting the use of native and/ or drought tolerant plants. ■ Promote natural vegetation by using parking lot islands and other landscaped areas. ■ Preserve riparian areas and wetlands. Maximize Natural Water Storage and Infiltration Opportunities Within the Landscape Unit ■ Promote the conservation of forest cover. Building on land that is already deforested affects basin hydrology to a lesser extent than converting forested land. Loss of forest cover reduces interception storage, detention in the organic forest floor layer, and water losses by evapotranspiration, resulting in large peak runoff increases and either their negative effects or the expense of countering them with structural solutions. ■ Maintain natural storage reservoirs and drainage corridors, including depressions, areas of permeable soils, swales, and intermittent streams. Develop and implement policies and 2 of 4 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com January 2003 Site Design & Landscape Planning SD-10 regulations to discourage the clearing, filling, and channelization of these features. Utilize them in drainage networks in preference to pipes, culverts, and engineered ditches. ■ Evaluating infiltration opportunities by referring to the stormwater management manual for the jurisdiction and pay particular attention to the selection criteria for avoiding groundwater contamination, poor soils, and hydrogeological conditions that cause these facilities to fail. If necessary, locate developments with large amounts of impervious surfaces or a potential to produce relatively contaminated runoff away from groundwater recharge areas. Protection of Slopes and Channels during Landscape Design ■ Convey runoff safely from the tops of slopes. ■ Avoid disturbing steep or unstable slopes. ■ Avoid disturbing natural channels. ■ Stabilize disturbed slopes as quickly as possible. ■ Vegetate slopes with native or drought tolerant vegetation. ■ Control and treat flows in landscaping and/ or other controls prior to reaching existing natural drainage systems. ■ Stabilize temporary and permanent channel crossings as quickly as possible, and ensure that increases in run-off velocity and frequency caused by the project do not erode the channel. ■ Install energy dissipaters, such as riprap, at the outlets of new storm drains, culverts, conduits, or channels that enter unlined channels in accordance with applicable specifications to minimize erosion. Energy dissipaters shall be installed in such a way as to minimize impacts to receiving waters. ■ Line on-site conveyance channels where appropriate, to reduce erosion caused by increased flow velocity due to increases in tributary impervious area. The first choice for linings should be grass or some other vegetative surface, since these materials not only reduce runoff velocities, but also provide water quality benefits from filtration and infiltration. If velocities in the channel are high enough to erode grass or other vegetative linings, riprap, concrete, soil cement, or geo-grid stabilization are other alternatives. ■ Consider other design principles that are comparable and equally effective. Redeveloping Existing Installations Various jurisdictional stormwater management and mitigation plans (SUSMP, WQMP, etc.) define "redevelopment" in terms of amounts of additional impervious area, increases in gross floor area and/ or exterior construction, and land disturbing activities with structural or impervious surfaces. The definition of" redevelopment" must be consulted to determine whether or not the requirements for new development apply to areas intended for redevelopment. If the definition applies, the steps outlined under "designing new installations" above should be followed. January 2003 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com 3 of 4 SD-10 Site Design & Landscape Planning Redevelopment may present significant opportunity to add features which had not previously been implemented. Examples include incorporation of depressions, areas of permeable soils, and swales in newly redeveloped areas. While some site constraints may exist due to the status of already existing infrastructure, opportunities should not be missed to maximize infiltration, slow runoff, reduce impervious areas, disconnect directly connected impervious areas. Other Resources A Manual for the Standard Urban Stormwater Mitigation Plan (SUSMP), Los Angeles County Department of Public Works, May 2002. Stormwater Management Manual for Western Washington, Washington State Department of Ecology, August 2001. Model Standard Urban Storm Water Mitigation Plan (SUSMP) for San Diego County, Port of San Diego, and Cities in San Diego County, February 14, 2002. Model Water Quality Management Plan (WQMP) for County of Orange, Orange County Flood Control District, and the Incorporated Cities of Orange County, Draft February 2003. Ventura Countywide Technical Guidance Manual for Stormwater Quality Control Measures, July 2002. 4 of 4 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com January 2003 Roof Runoff Controls Rain Garden Description Various roof runoff controls are available to address stormwater SD-11 Design Objectives 0 Maximize Infiltration 0 Provide Retention 0 Slow Runoff Minimize Impervious Land Coverage Prohibit Dumping of Improper Materials 0 Contain Pollutants Collect and Convey that drains off rooftops. The objective is to reduce the total volume and rate of runoff from individual lots, and retain the pollutants on site that may be picked up from roofing materials and atmospheric deposition. Roof runoff controls consist of directing the roof runoff away from paved areas and mitigating flow to the storm drain system through one of several general approaches: cisterns or rain barrels; dry wells or infiltration trenches; pop-up emitters, and foundation planting. The first three approaches require the roof runoff to be contained in a gutter and downspout system. Foundation planting provides a vegetated strip under the drip line of the roof. Approach Design of individual lots for single-family homes as well as lots for higher density residential and commercial structures should consider site design provisions for containing and infiltrating roof runoff or directing roof runoff to vegetative swales or buffer areas. Retained water can be reused for watering gardens, lawns, and trees. Benefits to the environment include reduced demand for potable water used for irrigation, improved stormwater quality, increased groundwater recharge, decreased runoff volume and peak flows, and decreased flooding potential. Suitable Applications Appropriate applications include residential, commercial and industrial areas planned for development or redevelopment. Design Considerations Designing New Installations Cisterns or Rain Barrels One method of addressing roof runoff is to direct roof downspouts to cisterns or rain barrels. A cistern is an above ground storage vessel with either a manually operated valve or a permanently open outlet. Roof runoff is temporarily stored and then released for irrigation or infiltration between storms. The number of rain CALIFORl\1A SfORMWATER January 2003 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbook.com I I< 1 of 3 SD-11 Roof Runoff Controls barrels needed is a function of the rooftop area. Some low impact developers recommend that every house have at least 2 rain barrels, with a minimum storage capacity of 1000 liters. Roof barrels serve several purposes including mitigating the first flush from the roof which has a high volume, amount of contaminants, and thermal load. Several types of rain barrels are commercially available. Consideration must be given to selecting rain barrels that are vector proof and childproof. In addition, some barrels are designed with a bypass valve that filters out grit and other contaminants and routes overflow to a soak-away pit or rain garden. If the cistern has an operable valve, the valve can be closed to store stormwater for irrigation or infiltration between storms. This system requires continual monitoring by the resident or grounds crews, but provides greater flexibility in water storage and metering. If a cistern is provided with an operable valve and water is stored inside for long periods, the cistern must be covered to prevent mosquitoes from breeding. A cistern system with a permanently open outlet can also provide for metering stormwater runoff. If the cistern outlet is significantly smaller than the size of the downspout inlet (say ¼ to ½ inch diameter), runoff will build up inside the cistern during storms, and will empty out slowly after peak intensities subside. This is a feasible way to mitigate the peak flow increases caused by rooftop impervious land coverage, especially for the frequent, small storms. Dry wells and Infiltration Trenches Roof downspouts can be directed to dry wells or infiltration trenches. A dry well is constructed by excavating a hole in the ground and filling it with an open graded aggregate, and allowing the water to fill the dry well and infiltrate after the storm event. An underground connection from the downspout conveys water into the dry well, allowing it to be stored in the voids. To minimize sedimentation from lateral soil movement, the sides and top of the stone storage matrix can be wrapped in a permeable filter fabric, though the bottom may remain open. A perforated observation pipe can be inserted vertically into the dry well to allow for inspection and maintenance. In practice, dry wells receiving runoff from single roof downspouts have been successful over long periods because they contain very little sediment. They must be sized according to the amount of rooftop runoff received, but are typically 4 to 5 feet square, and 2 to 3 feet deep, with a minimum of 1-foot soil cover over the top (maximum depth of 10 feet). To protect the foundation, dry wells must be set away from the building at least 10 feet. They must be installed in solids that accommodate infiltration. In poorly drained soils, dry wells have very limited feasibility. Infiltration trenches function in a similar manner and would be particularly effective for larger roof areas. An infiltration trench is a long, narrow, rock-filled trench with no outlet that receives stormwater runoff. These are described under Treatment Controls. Pop-up Drainage Emitter Roof downspouts can be directed to an underground pipe that daylights some distance from the building foundation, releasing the roof runoff through a pop-up emitter. Similar to a pop-up irrigation head, the emitter only opens when there is flow from the roof. The emitter remains flush to the ground during dry periods, for ease of lawn or landscape maintenance. 2 of 3 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbook.com January 2003 Roof Runoff Controls SD-11 Foundation Planting Landscape planting can be provided around the base to allow increased opportunities for stormwater infiltration and protect the soil from erosion caused by concentrated sheet flow coming off the roof. Foundation plantings can reduce the physical impact of water on the soil and provide a subsurface matrix of roots that encourage infiltration. These plantings must be sturdy enough to tolerate the heavy runoff sheet flows, and periodic soil saturation. Redeveloping Existing Installations Various jurisdictional stormwater management and mitigation plans (SUSMP, WQMP, etc.) define "redevelopment" in terms of amounts of additional impervious area, increases in gross floor area and/ or exterior construction, and land disturbing activities with structural or impervious surfaces. The definition of" redevelopment" must be consulted to determine whether or not the requirements for new development apply to areas intended for redevelopment. If the definition applies, the steps outlined under "designing new installations" above should be followed. Supplemental Information Examples ■ City of Ottawa's Water Links Surface -Water Quality Protection Program ■ City of Toronto Downspout Disconnection Program ■ City of Boston, MA, Rain Barrel Demonstration Program Other Resources Hager, Marty Catherine, Stormwater, "Low-Impact Development", January/February 2003. www.stormh2o.com Low Impact Urban Design Tools, Low Impact Development Design Center, Beltsville, MD. www.lid-stormwater.net Start at the Source, Bay Area Stormwater Management Agencies Association, 1999 Edition January 2003 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbook.com 3 of 3 Efficient Irrigation SD-12 Design Objectives 0 Maximize Infiltration 0 Provide Retention 0 Slow Runoff Minimize Impervious Land Coverage Prohibit Dumping of Improper Materials Description Contain Pollutants Collect and Convey Irrigation water provided to landscaped areas may result in excess irrigation water being conveyed into stormwater drainage systems. Approach Project plan designs for development and redevelopment should include application methods of irrigation water that minimize runoff of excess irrigation water into the stormwater conveyance system. Suitable Applications Appropriate applications include residential, commercial and industrial areas planned for development or redevelopment. (Detached residential single-family homes are typically excluded from this requirement.) Design Considerations Designing New Installations The following methods to reduce excessive irrigation runoff should be considered, and incorporated and implemented where determined applicable and feasible by the Permittee: ■ Employ rain-triggered shutoff devices to prevent irrigation after precipitation. ■ Design irrigation systems to each landscape area's specific water requirements. ■ Include design featuring flow reducers or shutoff valves triggered by a pressure drop to control water loss in the event of broken sprinkler heads or lines. ■ Implement landscape plans consistent with County or City water conservation resolutions, which may include provision of water sensors, programmable irrigation times (for short cycles), etc. CALIFORl\1A SfORMWATER January 2003 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com I I< 1 of 2 SD-12 Efficient Irrigation ■ Design timing and application methods of irrigation water to minimize the runoff of excess irrigation water into the storm water drainage system. ■ Group plants with similar water requirements in order to reduce excess irrigation runoff and promote surface filtration. Choose plants with low irrigation requirements (for example, native or drought tolerant species). Consider design features such as: Using mulches (such as wood chips or bar) in planter areas without ground cover to minimize sediment in runoff Installing appropriate plant materials for the location, in accordance with amount of sunlight and climate, and use native plant materials where possible and/ or as recommended by the landscape architect Leaving a vegetative barrier along the property boundary and interior watercourses, to act as a pollutant filter, where appropriate and feasible Choosing plants that minimize or eliminate the use of fertilizer or pesticides to sustain growth ■ Employ other comparable, equally effective methods to reduce irrigation water runoff. Redeveloping Existing Installations Various jurisdictional stormwater management and mitigation plans (SUSMP, WQMP, etc.) define "redevelopment" in terms of amounts of additional impervious area, increases in gross floor area and/ or exterior construction, and land disturbing activities with structural or impervious surfaces. The definition of" redevelopment" must be consulted to determine whether or not the requirements for new development apply to areas intended for redevelopment. If the definition applies, the steps outlined under "designing new installations" above should be followed. Other Resources A Manual for the Standard Urban Stormwater Mitigation Plan (SUSMP), Los Angeles County Department of Public Works, May 2002. Model Standard Urban Storm Water Mitigation Plan (SUSMP) for San Diego County, Port of San Diego, and Cities in San Diego County, February 14, 2002. Model Water Quality Management Plan (WQMP) for County of Orange, Orange County Flood Control District, and the Incorporated Cities of Orange County, Draft February 2003. Ventura Countywide Technical Guidance Manual for Stormwater Quality Control Measures, July 2002. 2 of 2 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com January 2003 Storm Drain Signage Description SD-13 Design Objectives Maximize Infiltration Provide Retention Slow Runoff Minimize Impervious Land Coverage 0 Prohibit Dumping of Improper Materials Contain Pollutants Collect and Convey Waste materials dumped into storm drain inlets can have severe impacts on receiving and ground waters. Posting notices regarding discharge prohibitions at storm drain inlets can prevent waste dumping. Storm drain signs and stencils are highly visible source controls that are typically placed directly adjacent to storm drain inlets. Approach The stencil or affixed sign contains a brief statement that prohibits dumping of improper materials into the urban runoff conveyance system. Storm drain messages have become a popular method of alerting the public about the effects of and the prohibitions against waste disposal. Suitable Applications Stencils and signs alert the public to the destination of pollutants discharged to the storm drain. Signs are appropriate in residential, commercial, and industrial areas, as well as any other area where contributions or dumping to storm drains is likely. Design Considerations Storm drain message markers or placards are recommended at all storm drain inlets within the boundary of a development project. The marker should be placed in clear sight facing toward anyone approaching the inlet from either side. All storm drain inlet locations should be identified on the development site map. Designing New Installations The following methods should be considered for inclusion in the project design and show on project plans: ■ Provide stenciling or labeling of all storm drain inlets and catch basins, constructed or modified, within the project area with prohibitive language. Examples include "NO DUMPING January 2003 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com CALIFORl\1A SfORMWATER I I< 1 of 2 SD-13 Storm Drain Signage -DRAINS TO OCEAN" and/or other graphical icons to discourage illegal dumping. ■ Post signs with prohibitive language and/ or graphical icons, which prohibit illegal dumping at public access points along channels and creeks within the project area. Note -Some local agencies have approved specific signage and/or storm drain message placards for use. Consult local agency stormwater staff to determine specific requirements for placard types and methods of application. Redeveloping Existing Installations Various jurisdictional stormwater management and mitigation plans (SUSMP, WQMP, etc.) define "redevelopment" in terms of amounts of additional impervious area, increases in gross floor area and/ or exterior construction, and land disturbing activities with structural or impervious surfaces. If the project meets the definition of "redevelopment", then the requirements stated under " designing new installations" above should be included in all project design plans. Additional Information Maintenance Considerations ■ Legibility of markers and signs should be maintained. If required by the agency with jurisdiction over the project, the owner/operator or homeowner's association should enter into a maintenance agreement with the agency or record a deed restriction upon the property title to maintain the legibility of placards or signs. Placement ■ Signage on top of curbs tends to weather and fade. ■ Signage on face of curbs tends to be worn by contact with vehicle tires and sweeper brooms. Supplemental Information Examples ■ Most MS4 programs have storm drain signage programs. Some MS4 programs will provide stencils, or arrange for volunteers to stencil storm drains as part of their outreach program. Other Resources A Manual for the Standard Urban Stormwater Mitigation Plan (SUSMP), Los Angeles County Department of Public Works, May 2002. Model Standard Urban Storm Water Mitigation Plan (SUSMP) for San Diego County, Port of San Diego, and Cities in San Diego County, February 14, 2002. Model Water Quality Management Plan (WQMP) for County of Orange, Orange County Flood Control District, and the Incorporated Cities of Orange County, Draft February 2003. Ventura Countywide Technical Guidance Manual for Stormwater Quality Control Measures, July 2002. 2 of 2 California Stormwater BMP Handbook New Development and Redevelopment www.cabmphandbooks.com January 2003 Non-Stormwater Discharges JJrotect tire 1311 y Description Use the Household Waste Treat111e11t Facility Non-stormwater discharges are those flows that do not consist entirely of stormwater. Some non-stormwater discharges do not include pollutants and may be discharged to the storm drain. These include uncontaminated groundwater and natural springs. There are also some non-stormwater discharges that typically do not contain pollutants and may be discharged to the storm drain with conditions. These include car washing, air conditioner condensate, etc. However there are certain non-stormwater discharges that pose environmental concern. These discharges may originate from illegal dumping or from internal floor drains, appliances, industrial processes, sinks, and toilets that are connected to the nearby storm drainage system. These discharges ( which may include: process waste waters, cooling waters, wash waters, and sanitary wastewater) can carry substances such as paint, oil, fuel and other automotive fluids, chemicals and other pollutants into storm drains. They can generally be detected through a combination of detection and elimination. The ultimate goal is to effectively eliminate non- stormwater discharges to the stormwater drainage system through implementation of measures to detect, correct, and enforce against illicit connections and illegal discharges of pollutants on streets and into the storm drain system and creeks. Approach Initially the industry must make an assessment of non- stormwater discharges to determine which types must be eliminated or addressed through BMPs. The focus of the following approach is in the elimination of non-stormwater discharges. Jan uary 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com SC-10 Objectives ■ Cover ■ Contain ■ Educate ■ Reduce/Minimize ■ Product Substitution Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics Association ✓ ✓ ✓ ✓ ✓ 1 of 6 SC-10 Non-Stormwater Discharges Pollution Prevention ■ Ensure that used oil, used antifreeze, and hazardous chemical recycling programs are being implemented. Encourage litter control. Suggested Protocols Recommended Complaint Investigation Equipment ■ Field Screening Analysis pH paper or meter Commercial stormwater pollutant screening kit that can detect for reactive phosphorus, nitrate nitrogen, ammonium nitrogen, specific conductance, and turbidity Sample jars Sample collection pole A tool to remove access hole covers ■ Laboratory Analysis Sample cooler Ice Sample jars and labels Chain of custody forms ■ Documentation Camera Notebook Pens Notice of Violation forms Educational materials General ■ Develop clear protocols and lines of communication for effectively prohibiting non- stormwater discharges, especially those that are not classified as hazardous. These are often not responded to as effectively as they need to be. ■ Stencil or demarcate storm drains, where applicable, to prevent illegal disposal of pollutants. Storm drain inlets should have messages such as "Dump No Waste Drains to Stream" stenciled or demarcated next to them to warn against ignorant or intentional dumping of pollutants into the storm drainage system. 2 of 6 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Non-Stormwater Discharges SC-10 ■ See SC44 Stormwater Drainage System Maintenance for additional information. Illicit Connections ■ Locate discharges from the industrial storm drainage system to the municipal storm drain system through review of "as-built" piping schematics. ■ Isolate problem areas and plug illicit discharge points. ■ Locate and evaluate all discharges to the industrial storm drain system. Visual Inspection and Inventory ■ Inventory and inspect each discharge point during dry weather. ■ Keep in mind that drainage from a storm event can continue for a day or two following the end of a storm and groundwater may infiltrate the underground stormwater collection system. Also, non-stormwater discharges are often intermittent and may require periodic inspections. Review Infield Piping ■ A review of the "as-built" piping schematic is a way to determine if there are any connections to the stormwater collection system. ■ Inspect the path of floor drains in older buildings. Smoke Testing ■ Smoke testing of wastewater and stormwater collection systems is used to detect connections between the two systems. ■ During dry weather the stormwater collection system is filled with smoke and then traced to sources. The appearance of smoke at the base of a toilet indicates that there may be a connection between the sanitary and the stormwater system. Dye Testing ■ A dye test can be performed by simply releasing a dye into either your sanitary or process wastewater system and examining the discharge points from the stormwater collection system for discoloration. TV Inspection of Drainage System ■ TV Cameras can be employed to visually identify illicit connections to the industrial storm drainage system. Illegal Dumping ■ Regularly inspect and clean up hot spots and other storm drainage areas where illegal dumping and disposal occurs. ■ On paved surfaces, clean up spills with as little water as possible. Use a rag for small spills, a damp mop for general cleanup, and absorbent material for larger spills. If the spilled material is hazardous, then the used cleanup materials are also hazardous and must be sent to a certified laundry (rags) or disposed of as hazardous waste. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 3 of 6 SC-10 Non-Stormwater Discharges ■ Never hose down or bury dry material spills. Sweep up the material and dispose of properly. ■ Use adsorbent materials on small spills rather than hosing down the spill. Remove the adsorbent materials promptly and dispose of properly. ■ For larger spills, a private spill cleanup company or Hazmat team may be necessary. Once a site has been cleaned: ■ Post "No Dumping" signs with a phone number for reporting dumping and disposal. ■ Landscaping and beautification efforts of hot spots may also discourage future dumping, as well as provide open space and increase property values. ■ Lighting or barriers may also be needed to discourage future dumping. ■ See fact sheet SC11 Spill Prevention, Control, and Cleanup. Inspection ■ Regularly inspect and clean up hot spots and other storm drainage areas where illegal dumping and disposal occurs. ■ Conduct field investigations of the industrial storm drain system for potential sources of non-stormwater discharges. ■ Pro-actively conduct investigations of high priority areas. Based on historical data, prioritize specific geographic areas and/ or incident type for pro-active investigations. Reporting ■ A database is useful for defining and tracking the magnitude and location of the problem. ■ Report prohibited non-stormwater discharges observed during the course of normal daily activities so they can be investigated, contained, and cleaned up or eliminated. ■ Document that non-stormwater discharges have been eliminated by recording tests performed, methods used, dates of testing, and any on-site drainage points observed. ■ Document and report annually the results of the program. ■ Maintain documentation of illicit connection and illegal dumping incidents, including significant conditionally exempt discharges that are not properly managed. Training ■ Training of technical staff in identifying and documenting illegal dumping incidents is required. ■ Consider posting the quick reference table near storm drains to reinforce training. ■ Train employees to identify non-stormwater discharges and report discharges to the appropriate departments. 4 of 6 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Non-Stormwater Discharges SC-10 ■ Educate employees about spill prevention and cleanup. ■ Well-trained employees can reduce human errors that lead to accidental releases or spills. The employee should have the tools and knowledge to immediately begin cleaning up a spill should one occur. Employees should be familiar with the Spill Prevention Control and Countermeasure Plan. ■ Determine and implement appropriate outreach efforts to reduce non-permissible non- stormwater discharges. ■ Conduct spill response drills annually (if no events occurred to evaluate your plan) in cooperation with other industries. ■ When a responsible party is identified, educate the party on the impacts of his or her actions. Spill Response and Prevention ■ See SC11 Spill Prevention Control and Cleanup. Other Considerations ■ Many facilities do not have accurate, up-to-date schematic drawings. Requirements Costs (including capital and operation & maintenance) ■ The primary cost is for staff time and depends on how aggressively a program is implemented. ■ Cost for containment and disposal is borne by the discharger. ■ Illicit connections can be difficult to locate especially if there is groundwater infiltration. ■ Indoor floor drains may require re-plumbing if cross-connections to storm drains are detected. Maintenance (including administrative and staffing) ■ Illegal dumping and illicit connection violations requires technical staff to detect and investigate them. Supplemental Information Further Detail of the BMP Illegal Dumping ■ Substances illegally dumped on streets and into the storm drain systems and creeks include paints, used oil and other automotive fluids, construction debris, chemicals, fresh concrete, leaves, grass clippings, and pet wastes. All of these wastes cause stormwater and receiving water quality problems as well as clog the storm drain system itself. ■ Establish a system for tracking incidents. The system should be designed to identify the following: Illegal dumping hot spots January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 5 of 6 SC-10 Non-Stormwater Discharges Types and quantities (in some cases) of wastes Patterns in time of occurrence (time of day/night, month, or year) Mode of dumping (abandoned containers, "midnight dumping" from moving vehicles, direct dumping of materials, accidents/spills) Responsible parties One of the keys to success of reducing or eliminating illegal dumping is increasing the number of people at the facility who are aware of the problem and who have the tools to at least identify the incident, if not correct it. Therefore, train field staff to recognize and report the incidents. What constitutes a "non-stormwater" discharge? ■ Non-stormwater discharges to the stormwater collection system may include any water used directly in the manufacturing process (process wastewater), air conditioning condensate and coolant, non-contact cooling water, cooling equipment condensate, outdoor secondary containment water, vehicle and equipment wash water, sink and drinking fountain wastewater, sanitary wastes, or other wastewaters. Permit Requirements ■ Facilities subject to stormwater permit requirements must include a certification that the stormwater collection system has been tested or evaluated for the presence of non- stormwater discharges. The State's General Industrial Stormwater Permit requires that non- stormwater discharges be eliminated prior to implementation of the facility's SWPPP. Performance Evaluation ■ Review annually internal investigation results; assess whether goals were met and what changes or improvements are necessary. ■ Obtain feedback from personnel assigned to respond to, or inspect for, illicit connections and illegal dumping incidents. References and Resources California's Nonpoint Source Program Plan http://www.swrcb.ca.gov/nps/index.html Clark County Storm Water Pollution Control Manual http://www.co.clark.wa.us/pubworks/bmpman.pdf King County Storm Water Pollution Control Manual http://dnr.metrokc.gov/wlr/dss/spcm.htm Santa Clara Valley Urban Runoff Pollution Prevention Program http://www.scvurppp.org The Storm Water Managers Resource Center http://www.stormwatercenter.net/ 6 of 6 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Vehicle and Equipment Cleaning SC-21 Photo Credit: Geoff Brosseau Description Wash water from vehicle and equipment cleaning activities performed outdoors or in areas where wash water flows onto the ground can contribute toxic hydrocarbons and other organic compounds, oils and greases, nutrients, phosphates, heavy metals, and suspended solids to stormwater runoff. Use of the procedures outlined below can prevent or reduce the discharge of pollutants to stormwater during vehicle and equipment cleaning. Approach Reduce potential for pollutant discharge through source control pollution prevention and BMP implementation. Successful implementation depends on effective training of employees on applicable BMPs and general pollution prevention strategies and objectives Pollution Prevention ■ If possible, use properly maintained off-site commercial washing and steam cleaning businesses whenever possible. These businesses are better equipped to handle and properly dispose of the wash waters. ■ Good housekeeping practices can minimize the risk of contamination from wash water discharges. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com Objectives ■ Cover ■ Contain ■ Educate ■ Reduce/Minimize ■ Product Substitution Targeted Constituents Sediment Nutrients Trash Metals Bacteria Oil and Grease Organics ✓ ✓ ✓ ✓ ✓ 1 of 5 SC-21 Vehicle and Equipment Cleaning Suggested Protocols General ■ Use biodegradable, phosphate-free detergents for washing vehicles as appropriate. ■ Mark the area clearly as a wash area. ■ Post signs stating that only washing is allowed in wash area. ■ Provide trash container in wash area. ■ Map on-site storm drain locations to avoid discharges to the storm drain system. ■ Emphasize the connection between the storm drain system and runoff, help reinforce that car washing activities affect local water quality through storm drain stenciling programs. Vehicle and Equipment Cleaning ■ Have all vehicle washing done in areas designed to collect and hold the wash and rinse water or effluent generated. Recycle, collect or treat wash water effluent prior to discharge to the sanitary sewer system. ■ If washing/ cleaning must occur on-site, consider washing vehicle equipment inside the building or on an impervious surface to control the targeted constituents by directing them to the sanitary sewer. ■ If washing must occur on-site and outdoor: Use designated paved wash areas. Designated wash areas must be well marked with signs indicating where and how washing must be done. This area must be covered or bermed to collect the wash water and graded to direct the wash water to a treatment or disposal facility. Do not conduct oil changes and other engine maintenance in the designated washing area. Perform these activities in a place designated for oil change and maintenance activities. Cover the wash area when not in use to prevent contact with rain water. ■ Install sumps or drain lines to collect wash water for treatment. ■ Use hoses with nozzles that automatically turn off when left unattended. ■ Do not permit steam cleaning wash water to enter the storm drain. ■ Pressure and steam clean off-site to avoid generating runoff with high pollutant concentrations. If done on-site, no pressure cleaning and steam cleaning should be done in areas designated as wellhead protection areas for public water supply. 2 of 5 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Drainage System Maintenance SC-44 Description AB a consequence of its function, the stormwater conveyance system collects and transports urban runoff and stormwater that may contain certain pollutants. The protocols in this fact sheet are intended to reduce pollutants reaching receiving waters through proper conveyance system operation and maintenance. Approach Pollution Prevention Maintain catch basins, stormwater inlets, and other stormwater conveyance structures on a regular basis to remove pollutants, reduce high pollutant concentrations during the first flush of storms, prevent clogging of the downstream conveyance system, restore catch basins' sediment trapping capacity, and ensure the system functions properly hydraulically to avoid flooding. Suggested Protocols Catch Basins/Inlet Structures ■ Staff should regularly inspect facilities to ensure compliance with the following: Immediate repair of any deterioration threatening structural integrity. Cleaning before the sump is 40% full. Catch basins should be cleaned as frequently as needed to meet this standard. Stenciling of catch basins and inlets (see SC34 Waste Handling and Disposal). January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com Objectives ■ Cover ■ Contain ■ Educate ■ Reduce/Minimize Targeted Constituents Sediment ✓ Nutrients Trash ✓ Metals Bacteria ✓ Oil and Grease Organics Association 1 of 6 SC-44 Drainage System Maintenance ■ Clean catch basins, storm drain inlets, and other conveyance structures before the wet season to remove sediments and debris accumulated during the summer. ■ Conduct inspections more frequently during the wet season for problem areas where sediment or trash accumulates more often. Clean and repair as needed. ■ Keep accurate logs of the number of catch basins cleaned. ■ Store wastes collected from cleaning activities of the drainage system in appropriate containers or temporary storage sites in a manner that prevents discharge to the storm drain. ■ Dewater the wastes if necessary with outflow into the sanitary sewer if permitted. Water should be treated with an appropriate filtering device prior to discharge to the sanitary sewer. If discharge to the sanitary sewer is not allowed, water should be pumped or vacuumed to a tank and properly disposed. Do not dewater near a storm drain or stream. Storm Drain Conveyance System ■ Locate reaches of storm drain with deposit problems and develop a flushing schedule that keeps the pipe clear of excessive buildup. ■ Collect and pump flushed effluent to the sanitary sewer for treatment whenever possible. Pump Stations ■ Clean all storm drain pump stations prior to the wet season to remove silt and trash. ■ Do not allow discharge to reach the storm drain system when cleaning a storm drain pump station or other facility. ■ Conduct routine maintenance at each pump station. ■ Inspect, clean, and repair as necessary all outlet structures prior to the wet season. Open Channel ■ Modify storm channel characteristics to improve channel hydraulics, increase pollutant removals, and enhance channel/ creek aesthetic and habitat value. ■ Conduct channel modification/improvement in accordance with existing laws. Any person, government agency, or public utility proposing an activity that will change the natural ( emphasis added) state of any river, stream, or lake in California, must enter into a Steam or Lake Alteration Agreement with the Department of Fish and Game. The developer-applicant should also contact local governments (city, county, special districts), other state agencies (SWRCB, RWQCB, Department of Forestry, Department of Water Resources), and Federal Corps of Engineers and USFWS. Illicit Connections and Discharges ■ Look for evidence of illegal discharges or illicit connections during routine maintenance of conveyance system and drainage structures: 2 of 6 Is there evidence of spills such as paints, discoloring, etc? California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Drainage System Maintenance SC-44 Are there any odors associated with the drainage system? Record locations of apparent illegal discharges/illicit connections? Track flows back to potential dischargers and conduct aboveground inspections. This can be done through visual inspection of upgradient manholes or alternate techniques including zinc chloride smoke testing, fluorometric dye testing, physical inspection testing, or television camera inspection. Eliminate the discharge once the origin of flow is established. ■ Stencil or demarcate storm drains, where applicable, to prevent illegal disposal of pollutants. Storm drain inlets should have messages such as "Dump No Waste Drains to Stream" stenciled next to them to warn against ignorant or intentional dumping of pollutants into the storm drainage system. ■ Refer to fact sheet SC-10 Non-Stormwater Discharges. Illegal Dumping ■ Inspect and clean up hot spots and other storm drainage areas regularly where illegal dumping and disposal occurs. ■ Establish a system for tracking incidents. The system should be designed to identify the following: Illegal dumping hot spots Types and quantities (in some cases) of wastes Patterns in time of occurrence (time of day/night, month, or year) Mode of dumping (abandoned containers, "midnight dumping" from moving vehicles, direct dumping of materials, accidents/spills) Responsible parties ■ Post "No Dumping" signs in problem areas with a phone number for reporting dumping and disposal. Signs should also indicate fines and penalties for illegal dumping. ■ Refer to fact sheet SC-10 Non-Stormwater Discharges. Training ■ Train crews in proper maintenance activities, including record keeping and disposal. ■ Allow only properly trained individuals to handle hazardous materials/wastes. ■ Have staff involved in detection and removal of illicit connections trained in the following: OSHA-required Health and Safety Training (29 CFR 1910.120) plus annual refresher training (as needed). January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 3 of 6 SC-44 Drainage System Maintenance OSHA Confined Space Entry training (Cal-OSHA Confined Space, Title 8 and Federal OSHA 29 CFR 1910.146). Procedural training (field screening, sampling, smoke/dye testing, TV inspection). Spill Response and Prevention ■ Investigate all reports of spills, leaks, and/or illegal dumping promptly. ■ Clean up all spills and leaks using "dry" methods (with absorbent materials and/or rags) or dig up, remove, and properly dispose of contaminated soil. ■ Refer to fact sheet SC-11 Spill Prevention, Control, and Cleanup. Other Considerations (Limitations and Regulations) ■ Clean-up activities may create a slight disturbance for local aquatic species. Access to items and material on private property may be limited. Trade-offs may exist between channel hydraulics and water quality/riparian habitat. If storm channels or basins are recognized as wetlands, many activities, including maintenance, may be subject to regulation and permitting. ■ Storm drain flushing is most effective in small diameter pipes (36-inch diameter pipe or less, depending on water supply and sediment collection capacity). Other considerations associated with storm drain flushing may include the availability of a water source, finding a downstream area to collect sediments, liquid/sediment disposal, and prohibition against disposal of flushed effluent to sanitary sewer in some areas. ■ Regulations may include adoption of substantial penalties for illegal dumping and disposal. ■ Local municipal codes may include sections prohibiting discharge of soil, debris, refuse, hazardous wastes, and other pollutants into the storm drain system. Requirements Costs ■ An aggressive catch basin cleaning program could require a significant capital and O&M budget. ■ The elimination of illegal dumping is dependent on the availability, convenience, and cost of alternative means of disposal. The primary cost is for staff time. Cost depends on how aggressively a program is implemented. Other cost considerations for an illegal dumping program include: 4 of 6 Purchase and installation of signs. Rental of vehicle(s) to haul illegally-disposed items and material to landfills. Rental of heavy equipment to remove larger items (e.g., car bodies) from channels. Purchase of landfill space to dispose of illegally-dumped items and material. California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Drainage System Maintenance SC-44 ■ Methods used for illicit connection detection (smoke testing, dye testing, visual inspection, and flow monitoring) can be costly and time-consuming. Site-specific factors, such as the level of impervious area, the density and ages of buildings, and type of land use will determine the level of investigation necessary. Maintenance ■ Two-person teams may be required to clean catch basins with vactor trucks. ■ Teams of at least two people plus administrative personnel are required to identify illicit discharges, depending on the complexity of the storm sewer system. ■ Arrangements must be made for proper disposal of collected wastes. ■ Technical staff are required to detect and investigate illegal dumping violations. Supplemental Information Further Detail of the BMP Storm Drain Flushing Flushing is a common maintenance activity used to improve pipe hydraulics and to remove pollutants in storm drainage systems. Flushing may be designed to hydraulically convey accumulated material to strategic locations, such as an open channel, another point where flushing will be initiated, or the sanitary sewer and the treatment facilities, thus preventing resuspension and overflow of a portion of the solids during storm events. Flushing prevents "plug flow" discharges of concentrated pollutant loadings and sediments. Deposits can hinder the designed conveyance capacity of the storm drain system and potentially cause backwater conditions in severe cases of clogging. Storm drain flushing usually takes place along segments of pipe with grades that are too flat to maintain adequate velocity to keep particles in suspension. An upstream manhole is selected to place an inflatable device that temporarily plugs the pipe. Further upstream, water is pumped into the line to create a flushing wave. When the upstream reach of pipe is sufficiently full to cause a flushing wave, the inflated device is rapidly deflated with the assistance of a vacuum pump, thereby releasing the backed up water and resulting in the cleaning of the storm drain segment. To further reduce impacts of stormwater pollution, a second inflatable device placed well downstream may be used to recollect the water after the force of the flushing wave has dissipated. A pump may then be used to transfer the water and accumulated material to the sanitary sewer for treatment. In some cases, an interceptor structure may be more practical or required to recollect the flushed waters. It has been found that cleansing efficiency of periodic flush waves is dependent upon flush volume, flush discharge rate, sewer slope, sewer length, sewer flow rate, sewer diameter, and population density. As a rule of thumb, the length ofline to be flushed should not exceed 700 feet. At this maximum recommended length, the percent removal efficiency ranges between 65- 75% for organics and 55-65% for dry weather grit/inorganic material. The percent removal efficiency drops rapidly beyond that. Water is commonly supplied by a water truck, but fire hydrants can also supply water. To make the best use of water, it is recommended that reclaimed water be used or that fire hydrant line flushing coincide with storm sewer flushing. January 2003 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com 5 of 6 SC-44 Drainage System Maintenance References and Resources California's Nonpoint Source Program Plan http://www.swrcb.ca.gov/nps/index.html Clark County Storm Water Pollution Control Manual http://www.co.clark.wa.us/pubworks/bmpman.pdf Ferguson, B.K. 1991. Urban Stream Reclamation, p. 324-322, Journal of Soil and Water Conservation. King County Storm Water Pollution Control Manual http://dnr.metrokc.gov/wlr/dss/spcm.htm Oregon Association of Clean Water Agencies. Oregon Municipal Stormwater Toolbox for Maintenance Practices. June 1998. Santa Clara Valley Urban Runoff Pollution Prevention Program http: //www.scvurppp.org The Storm Water Managers Resource Center http://www.stormwatercenter.net United States Environmental Protection Agency (USEPA). 2002. Pollution Prevention/Good Housekeeping for Municipal Operations Storm Drain System Cleaning. On line: http://www.epa.gov/npdes/menuofbmps/poll 16.htm 6 of 6 California Stormwater BMP Handbook Industrial and Commercial www.cabmphandbooks.com January 2003 Appendix E: BMP Design Fact Sheets E-57 February 2016 E.11 PR-1 Biofiltration with Partial Retention Location: 805 and Bonita Road, Chula vista, CA. Description Biofiltration with partial retention (partial infiltration and biofiltration) facilities are vegetated surface water systems that filter water through vegetation, and soil or engineered media prior to infiltrating into native soils, discharge via underdrain, or overflow to the downstream conveyance system. Where feasible, these BMPs have an elevated underdrain discharge point that creates storage capacity in the aggregate storage layer. Biofiltration with partial retention facilities are commonly incorporated into the site within parking lot landscaping, along roadsides, and in open spaces. They can be constructed in ground or partially aboveground, such as planter boxes with open bottoms to allow infiltration. Treatment is achieved through filtration, sedimentation, sorption, infiltration, biochemical processes and plant uptake. Typical biofiltration with partial retention components include:  Inflow distribution mechanisms (e.g, perimeter flow spreader or filter strips)  Energy dissipation mechanism for concentrated inflows (e.g., splash blocks or riprap)  Shallow surface ponding for captured flows  Side Slope and basin bottom vegetation selected based on climate and ponding depth  Non-floating mulch layer (Optional)  Media layer (planting mix or engineered media) capable of supporting vegetation growth  Filter course layer consisting of aggregate to prevent the migration of fines into uncompacted native soils or the optional aggregate storage layer  Aggregate storage layer with underdrain(s)  Uncompacted native soils at the bottom of the facility  Overflow structure MS4 Permit Category NA Manual Category Partial Retention Applicable Performance Standard Pollutant Control Flow Control Primary Benefits Volume Reduction Treatment Peak Flow Attenuation Appendix E: BMP Design Fact Sheets E-58 February 2016 Typical plan and Section view of a Biofiltration with Partial Retention BMP CURB cut} ,' •, • 12" MIN. :.:'.: }~-.. ;..~~::: . >}}:: (~;)_;} .~ + + + + ., ., PRON ISSIPA .,3H:1V (MIN ) "' + + + + + + + + + + + + + + + + MAINTENANCE ., ACCESS JAS !"EE?EDJ "' + + + + 3H:1V (MIN.) ., <<\ .. < ~ VEGETATED SIDE SLOPE PLAN NOTTO SCALE 4-6" DROP FROM CURB CUT TO APRON APRON FOR ENERGY DISSIPATION EXCAVATED SLOPE (SHOWN AT 1H:1V) MIN. 18" MEDIA WITH MIN7 5 IN/HR FILTRATION RATE INFILTRATION STORAGE (MIN. 3" AGGREGATE BELOW UNDERDRAIN) AGGREGATE STORAGE LAYER 3" WELL-AGED, SHREDDED HARDWOOD MULCH 6" MIN. TO 12" MAX. SURFACE PONDING 2" MIN. F RD OVERFLOW STRUCTURE UNDERDRAIN FILTER COURSE EXISTING UNCOMPACTED SOILS SECTION A-A' NOTTO SCALE MAINTENANCE ACCESS (AS NEEDED) Appendix E: BMP Design Fact Sheets E-59 February 2016 Design Adaptations for Project Goals Partial infiltration BMP with biofiltration treatment for storm water pollutant control. Biofiltration with partial retention can be designed so that a portion of the DCV is infiltrated by providing infiltration storage below the underdrain invert. The infiltration storage depth should be determined by the volume that can be reliably infiltrated within drawdown time limitations. Water discharged through the underdrain is considered biofiltration treatment. Storage provided above the underdrain within surface ponding, media, and aggregate storage is included in the biofiltration treatment volume. Integrated storm water flow control and pollutant control configuration. The system can be designed to provide flow rate and duration control by primarily providing increased surface ponding and/or having a deeper aggregate storage layer. This will allow for significant detention storage, which can be controlled via inclusion of an orifice in an outlet structure at the downstream end of the underdrain. Design Criteria and Considerations Biofiltration with partial retention must meet the following design criteria and considerations. Deviations from the below criteria may be approved at the discretion of the City Engineer if it is determined to be appropriate: Siting and Design Intent/Rationale □ Placement observes geotechnical recommendations regarding potential hazards (e.g., slope stability, landslides, liquefaction zones) and setbacks (e.g., slopes, foundations, utilities). Must not negatively impact existing site geotechnical concerns. □ Selection and design of basin is based on infiltration feasibility criteria and appropriate design infiltration rate (See Appendix C and D). Must operate as a partial infiltration design and must be supported by drainage area and in-situ infiltration rate feasibility findings. □ Contributing tributary area shall be ≤ 5 acres (≤ 1 acre preferred). Bigger BMPs require additional design features for proper performance. Contributing tributary area greater than 5 acres may be allowed at the discretion of the City Engineer if the following conditions are met: 1) incorporate design features (e.g. flow spreaders) to minimizing short circuiting of flows in the BMP and 2) incorporate additional Appendix E: BMP Design Fact Sheets E-60 February 2016 Siting and Design Intent/Rationale design features requested by the City Engineer for proper performance of the regional BMP. □ Finish grade of the facility is ≤ 2%. Flatter surfaces reduce erosion and channelization within the facility. Surface Ponding □ Surface ponding is limited to a 24-hour drawdown time. Surface ponding limited to 24 hours for plant health. Surface ponding drawdown time greater than 24-hours but less than 96 hours may be allowed at the discretion of the City Engineer if certified by a landscape architect or agronomist. □ Surface ponding depth is ≥ 6 and ≤ 12 inches. Surface ponding capacity lowers subsurface storage requirements. Deep surface ponding raises safety concerns. Surface ponding depth greater than 12 inches (for additional pollutant control or surface outlet structures or flow- control orifices) may be allowed at the discretion of the City Engineer if the following conditions are met: 1) surface ponding depth drawdown time is less than 24 hours; and 2) safety issues and fencing requirements are considered (typically ponding greater than 18” will require a fence and/or flatter side slopes) and 3) potential for elevated clogging risk is considered. □ A minimum of 2 inches of freeboard is provided. Freeboard provides room for head over overflow structures and minimizes risk of uncontrolled surface discharge. □ Side slopes are stabilized with vegetation and are = 3H:1V or shallower. Gentler side slopes are safer, less prone to erosion, able to establish vegetation more quickly and easier to maintain. Vegetation Appendix E: BMP Design Fact Sheets E-61 February 2016 Siting and Design Intent/Rationale □ Plantings are suitable for the climate and expected ponding depth. A plant list to aid in selection can be found in Appendix E.20 Plants suited to the climate and ponding depth are more likely to survive. □ An irrigation system with a connection to water supply should be provided as needed. Seasonal irrigation might be needed to keep plants healthy. Mulch (Optional) □ A minimum of 3 inches of well-aged, shredded hardwood mulch that has been stockpiled or stored for at least 12 months is provided. Mulch must be non-floating to avoid clogging of overflow structure. Mulch will suppress weeds and maintain moisture for plant growth. Aging mulch kills pathogens and weed seeds and allows the beneficial microbes to multiply. Media Layer □ Media maintains a minimum filtration rate of 5 in/hr over lifetime of facility. An initial filtration rate of 8 to 12 in/hr is recommended to allow for clogging over time; the initial filtration rate should not exceed 12 inches per hour. A filtration rate of at least 5 inches per hour allows soil to drain between events, and allows flows to relatively quickly enter the aggregate storage layer, thereby minimizing bypass. The initial rate should be higher than long term target rate to account for clogging over time. However an excessively high initial rate can have a negative impact on treatment performance, therefore an upper limit is needed. □ Media is a minimum 18 inches deep, meeting either of these two media specifications: City of San Diego Storm Water Standards Appendix F (February 2016, unless superseded by more recent edition) or County of San Diego Low Impact Development Handbook: Appendix G -Bioretention Soil Specification (June 2014, unless superseded by more recent edition). Alternatively, for proprietary designs and custom media mixes not meeting the media specifications contained in the 2016 City of San Diego Storm Water Standards or County LID A deep media layer provides additional filtration and supports plants with deeper roots. Standard specifications shall be followed. For non-standard or proprietary designs, compliance with Appendix F.1 ensures that adequate treatment performance will be provided. Appendix E: BMP Design Fact Sheets E-62 February 2016 Siting and Design Intent/Rationale Manual, the media meets the pollutant treatment performance criteria in Section F.1. □ Media surface area is 3% of contributing area times adjusted runoff factor or greater. Greater surface area to tributary area ratios: a) maximizes volume retention as required by the MS4 Permit and b) decrease loading rates per square foot and therefore increase longevity. Adjusted runoff factor is to account for site design BMPs implemented upstream of the BMP (such as rain barrels, impervious area dispersion, etc.). Refer to Appendix B.2 guidance. Use Worksheet B.5-1 Line 26 to estimate the minimum surface area required per this criteria. □ Where receiving waters are impaired or have a TMDL for nutrients, the system is designed with nutrient sensitive media design (see fact sheet BF-2). Potential for pollutant export is partly a function of media composition; media design must minimize potential for export of nutrients, particularly where receiving waters are impaired for nutrients. Filter Course Layer □ A filter course is used to prevent migration of fines through layers of the facility. Filter fabric is not used. Migration of media can cause clogging of the aggregate storage layer void spaces or subgrade. Filter fabric is more likely to clog. □ Filter course is washed and free of fines. Washing aggregate will help eliminate fines that could clog the facility □ Filter course calculations assessing suitability for particle migration prevention have been completed. Gradation relationship between layers can evaluate factors (e.g., bridging, permeability, and uniformity) to determine if particle sizing is appropriate or if an intermediate layer is needed. Aggregate Storage Layer Appendix E: BMP Design Fact Sheets E-63 February 2016 Siting and Design Intent/Rationale □ Class 2 Permeable per Caltrans specification 68-1.025 is recommended for the storage layer. Washed, open-graded crushed rock may be used, however a 4-6 inch washed pea gravel filter course layer at the top of the crushed rock is required. Washing aggregate will help eliminate fines that could clog the aggregate storage layer void spaces or subgrade. □ Maximum aggregate storage layer depth below the underdrain invert is determined based on the infiltration storage volume that will infiltrate within a 36-hour drawdown time. A maximum drawdown time is needed for vector control and to facilitate providing storm water storage for the next storm event. Inflow, Underdrain, and Outflow Structures □ Inflow, underdrains and outflow structures are accessible for inspection and maintenance. Maintenance will prevent clogging and ensure proper operation of the flow control structures. □ Inflow velocities are limited to 3 ft/s or less or use energy dissipation methods. (e.g., riprap, level spreader) for concentrated inflows. High inflow velocities can cause erosion, scour and/or channeling. □ Curb cut inlets are at least 12 inches wide, have a 4-6 inch reveal (drop) and an apron and energy dissipation as needed. Inlets must not restrict flow and apron prevents blockage from vegetation as it grows in. Energy dissipation prevents erosion. □ Underdrain outlet elevation should be a minimum of 3 inches above the bottom elevation of the aggregate storage layer. A minimal separation from subgrade or the liner lessens the risk of fines entering the underdrain and can improve hydraulic performance by allowing perforations to remain unblocked. □ Minimum underdrain diameter is 6 inches. Smaller diameter underdrains are prone to clogging. □ Underdrains are made of slotted, PVC pipe conforming to ASTM D 3034 or equivalent or corrugated, HDPE pipe conforming to AASHTO 252M or equivalent. Slotted underdrains provide greater intake capacity, clog resistant drainage, and reduced entrance velocity into the pipe, thereby reducing the chances of solids migration. □ An underdrain cleanout with a minimum 6- inch diameter and lockable cap is placed every 250 to 300 feet as required based on underdrain length. Properly spaced cleanouts will facilitate underdrain maintenance. Appendix E: BMP Design Fact Sheets E-64 February 2016 Siting and Design Intent/Rationale □ Overflow is safely conveyed to a downstream storm drain system or discharge point. Size overflow structure to pass 100-year peak flow for on-line infiltration basins and water quality peak flow for off-line basins. Planning for overflow lessens the risk of property damage due to flooding. Nutrient Sensitive Media Design To design biofiltration with partial retention with underdrain for storm water pollutant control only (no flow control required), the following steps should be taken: Conceptual Design and Sizing Approach for Storm Water Pollutant Control Only To design biofiltration with partial retention and an underdrain for storm water pollutant control only (no flow control required), the following steps should be taken: 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Calculate the DCV per Appendix B based on expected site design runoff for tributary areas. 3. Generalized sizing procedure is presented in Appendix B.5. The surface ponding should be verified to have a maximum 24-hour drawdown time. Conceptual Design and Sizing Approach when Storm Water Flow Control is Applicable Control of flow rates and/or durations will typically require significant surface ponding and/or aggregate storage volumes, and therefore the following steps should be taken prior to determination of storm water pollutant control design. Pre-development and allowable post-project flow rates and durations should be determined as discussed in Chapter 6 of this manual. 1. Verify that siting and design criteria have been met, including placement requirements, contributing tributary area, maximum side and finish grade slopes, and the recommended media surface area tributary ratio. 2. Iteratively determine the facility footprint area, surface ponding and/or aggregate storage layer depth required to provide detention and/or infiltration storage to reduce flow rates and durations to allowable limits. Flow rates and durations can be controlled from detention storage by altering outlet structure orifice size(s) and/or water control levels. Multi-level orifices can be used within an outlet structure to control the full range of flows. 3. If biofiltration with partial retention cannot fully provide the flow rate and duration control required by this manual, an upstream or downstream structure with significant storage volume such as an underground vault can be used to provide remaining controls. 4. After biofiltration with partial retention has been designed to meet flow control Appendix E: BMP Design Fact Sheets E-65 February 2016 requirements, calculations must be completed to verify if storm water pollutant control requirements to treat the DCV have been met. ATTACHMENT 4 City standard Single Sheet BMP (SSBMP) Exhibit [Use the City’s standard Single Sheet BMP Plan.] DMA 1 H O O V E R D RIV E A D A M S S T R E E T P RIV A T E D RIV E W A Y DMA 2 DMA 3 DMA 4.1 DMA 4.2 DMA 4.3 DMA 5 PR-1-1 PR-1-2 PR-1-3 PARCEL 1 PARCEL 2 PARCEL 3 *** ROOF DRAIN TOLANDSCAPING4 1. THESE BMPS ARE MANDATORY TO BE INSTALLED PER MANUFACTURER'S RECOMMENDATIONS OR THESE PLANS. 2. NO CHANGES TO THE PROPOSED BMPS ON THIS SHEET WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 3. NO SUBSTITUTIONS TO THE MATERIAL OR TYPES OR PLANTING TYPES WITHOUT PRIOR APPROVAL FROM THE CITY ENGINEER. 4. NO OCCUPANCY WILL BE GRANTED UNTIL THE CITY INSPECTION STAFF HAS INSPECTED THIS PROJECT FOR APPROPRIATE BMP CONSTRUCTION AND INSTALLATION. BMP NOTES: PARTY RESPONSIBLE FOR MAINTENANCE: NAME ADDRESS PHONE NO. PLAN PREPARED BY: NAME ADDRESS PHONE NO. CERTIFICATION COMPANY SD-11 LOW IMPACT DESIGN (L.I.D.) 6 5. REFER TO MAINTENANCE AGREEMENT DOCUMENT. TBD EA.ANNUALLY ANNUALLY 6. SEE PROJECT SWMP FOR ADDITIONAL INFORMATION. SIGNATURE BMP CONSTRUCTION AND INSPECTION NOTES: THE EOW WILL VERIFY THAT PERMANENT BMPS ARE CONSTRUCTED AND OPERATING IN COMPLIANCE WITH THE APPLICABLE REQUIREMENTS. PRIOR TO OCCUPANCY THE EOW MUST PROVIDE: 1. PHOTOGRAPHS OF THE INSTALLATION OF PERMANENT BMPS PRIOR TO CONSTRUCTION, DURING CONSTRUCTION, AND AT FINAL INSTALLATION. 2. A WET STAMPED LETTER VERIFYING THAT PERMANENT BMPS ARE CONSTRUCTED AND OPERATING PER THE REQUIREMENTS OF THE APPROVED PLANS. 3. PHOTOGRAPHS TO VERIFY THAT PERMANENT WATER QUALITY TREATMENT SIGNAGE HAS BEEN INSTALLED. PRIOR TO RELEASE OF SECURITIES, THE DEVELOPER IS RESPONSIBLE FOR ENSURING THE PERMANENT BMPS HAVE NOT BEEN REMOVED OR MODIFIED BY THE NEW HOMEOWNER OR HOA WITHOUT THE APPROVAL OF THE CITY ENGINEER. HENRY OLIVIER P.O. BOX 9493 SAN BERNARDINO, CA 92427 951-232-4378 JOHN S. RIVERA FUSION ENG. & TECH. 1810 GILLESPIE WAY SUITE 207 EL CAJON, CA 92117 619-736-2800 1 SWQMP NO.________________16-07 MAINTENANCE AGREEMENT DOCUMENT: YES___ NO___ RECORDATION NO. __________________MS 02-05 X BMP TYPEBMP ID #SYMBOL CASQA NO.DRAWING NO.SHEET NO.(S)MAINTENANCE FREQUENCY BMP TABLE INSPECTION FREQUENCYQUANTITY TREATMENT CONTROL PR-1-1 PARTIAL RETENTION SEMI-ANNUALLY438-2A 3 ** ANNUALLYBY BIOFILTRATION PR-1-2 PR-1-3 * FUTURE PGP 438-2AFUTURE PGP 438-2AFUTURE PGP 1 EA.261 S.F. 1 EA.256 S.F. 1 EA.218 S.F. SEMI-ANNUALLY3 ANNUALLY SEMI-ANNUALLY3 ANNUALLY TC-32 / FT-4 PER REQUEST OF CITY OF CARLSBAD TEMP SEDIMENT BASINS WILL BE PROVIDED WITHIN THE FOOTPRINT OF THE ASSUMED FUTURE BIORETENTION BASIN. THE TEMP SEDIMENT BASIN WILL BE PROVIDED IN ADDITION TO THE STANDARD EROSION CONTROL CONSTRUCTION BMP'S PROVIDED FOR TYPICAL SINGLE FAMILY GRADED PADS. FUTURE BIORETENTION BASINS TO BE CONSTRUCTED WITH DEVELOPMENT OF LOTS. **TC-32 / FT-4 TC-32 / FT-4 ONSITE STORMDRAIN INLETS7 SD-13 SOURCE CONTROL 9 3 EA.3 ANNUALLY ANNUALLY 2 3 1 2 9 4 5 6 3 8 7 FUTURE PGP TBD 438-2A PERMANENT WATER QUALITY TREATMENT FACILITY WATER QUALITY SIGN BMP SITE PLAN PARTIAL RETENTIONBY BIOFILTRATION PARTIAL RETENTIONBY BIOFILTRATION FUTURE PARTIAL RETENTION BY BIOFILTRATION BASIN / / 0.006 ACRES ~ 7.5' / / / / 1 / I ·-., ""' y / / / /1 ( , 1 I { I 0.369 ACRES I 'ASSUMED FUTURE IMPERVIOUS AREA O• ........_ -----<>--. I ,, f I I ·-.,. __ ,,,---f / I C ~ ..... _ -~ ' ""' ' ""' ' \ ' / \ ,..------y ~---------------------~ ,V V ~ r / I I I I I q ' / V a ,,. a - ,.._ §:, a L, , "',~.,._ a ..... --.;;; c-:::........_ -........ -..... ~=-----::=--i / / ............. --00........:::,.-----.:es~~~~~~-~~-~o~O~--,,.. -9 c:i ---- 2:1 ,,,---/ ---- i i i ----- --·71 ; ! i ! i ! I ! I 1 f I I I /B\ ( ) \ / \ __ / •SEE TABLE AT RIGHT FOR ASSUMED FUTURE IMPERVIOUS AREAS j-------&--- / . / f I 0.355 ACRES I I I I ' ~7"----,,t-/-'.._.j_l'__ ••ASSUMED FUTURE 2:1 IMPERVIOUS ------~ AREA o• ---- -, \ I I I I I t j I I !!!I"===-+-~ I I I I I I -;;;; ( 0/JTl.IT 0.006 ACRES - ' I.\ \ ',c ---- I 0.378 ACRES I 'ASSUMED FUTURE IMPERVIOUS AREA O• ---------- I I 0.006 ACRES 11 q PROPERTY BOUNDARY 'l- ,-1-- \ ""' 0 A o.036 ACREsL---------- I ; I BASIN ULTIMATE FINISH GRADE ' ""' ' ~ ®PROPOSED 12"X12" C.B. FOR OVERFLOW NOT TO SCALE CONSlRUCTION NOTE CONCEPTUAL WATER QUALITY BASIN TO BE INSTALLED IN FUTURE BY OWNER ONCE PRECISE GRADING PERMITS ARE APPROVED FOR HOUSE CONSTRUCTION. w _J CD 0 1o :s i'5 <( :r: > <C 6.0' BERM u 20 CONSTRUCTION NOlES A PERMANENT DURABLE SIGN WITH THE FOLLOWING LANGUAGE TO BE PLACED IN FUTURE BIORETENTION BASIN. "PERMANENT WATER QUALITY TREATMENT FACILITY KEEPING OUR WATERWAYS CLEAN MAINTAIN WITH CARE -NO MODIFICATIONS WITHOUT AGENCY APPROVAL" IT SHALL BE PLACED ON A POLE OR PLACED ON A CONCRETE TILE OR PLAQUE LIKE SURFACE FLUSH WITH BUT SLIGHTLY RAISED ABOVE GROUND AT THE TOP OF THE BASIN SUBJECT TO THE CITY ENGINEER'S DISCRETION. Fusion Eng Tech 1810 Gillespie Way, Suite 207 El Cajon, CA 92020 (619) 736-2800 0 20 40 ----- SCALE 1"= 20' 24" KEIP OUR WATERWAYS CLEAN M/>JNTAIN WITH CARE NO MODIFlCATIONS WITHOI/T AGENCY APPROVIJ. NOT TO SCALE DMA 1-PR Runoff Summation OMA Description DMA Type Factor % Imper Area (ac.} Area (s.f.) Runoff Factor x Arc;;i (.le.) Bioretention Bo~in Engineered Perviou~ Surface 0.10 0% 0.006 261 0.0006 Natural Slope Natural Type 'B' Soil 0.14 0% 0.065 2825 0.0091 Landscape Slope/ Pad Semi-Pervious Surface 0.30 0% 0.131 5692 0.0392 Roof/Ha rd sea pe/Driveway Impervious Surface 0.90 100% 0.168 7305 0.1509 Total Total A-roca1= 0.369 16083 0.1998 Total Total Ached= 0.369 RFcompo,ite-DMA= 0.54 DMA 2-PR Runoff Summation OMA Descriplion DMA Type Factor %Imper Area (ac.) Area (s.f.) Runoff Faclor x Area (ac.) Bioretention Basin Engineered Pervious Surface 0.10 0% 0.006 2SG 0.000G Natural Slope Natural Type 'B' Soil 0.14 0% 0.059 2552 0.0082 Landscape Slope/ Pad Semi-Pervious Surface 0.30 O'½ 0.126 5499 0.0379 Roof/Ha rd sea pe/Driveway Impervious Surface 0.90 100'½ 0.165 7170 0.1481 Total Total ATuldl= 0.355 15477 0.1948 Total Total Ached= 0.355 RF composite-OMA;; 0.55 DMA 3-PR Runoff Summation DMA Descriplion DMA Type % Imper Area (ac.} Area (d.) Runoff Factor Factor x Area (ac.) Bioretention Basin Engineered Pervious Surface 0.10 0% 0.005 218 0.0005 Natural Slope Natural Type 'B' Soil 0.14 O'½ 0.122 5302 0.0170 Landscape Slope/ Pad Semi-Pervious Surface 0.30 0% 0.128 5572 0.0384 Roof/Ha rdsca pe/Driveway Impervious Surface 0.90 100'½ 0.124 5390 0.1114 Total Total A-rma1= 0.378 0.378 0.1673 Total Total .\_:heck -0.378 RF composite-OM/\= 0.44 DMA 4-PR (DeMinimis, 250 s.f. per Lot Driveway Entrance) Runoff Summation DMA Description DMA Type Factor %Imper Are;:i (;:ic.} AreJ (s.f.) Runoff Factor x Area (ac.) Driveway (ROW) Impervious Surface 0.90 100'½ 0.017 750 0.0155 Tot,:11 Total ATotal= 0,017 750 0.0155 Tot,:11 Total A-.h•ck= 0,017 RFcomposlt~-CMA= 0.90 DMA 5-PR (Adams Street Widening Opposite Side of Project) Runoff Summation OMA Description DMA Type % Imper Area (ac.} Area (s.f.) Runoff Fcictor Factor x Area (ac.) Pilvement (Adilms Street) Impervious Surface 0.90 100% 0.036 1558 0.0322 Total Total ATot~I= 0.036 1558 0.0322 Tola I Tolal A.check-0,036 RFcompo,1te-DMA= 0.90 Note: Roof/HJrdscJpc/Drivcw;:iy in table Jre projected impervious Jrc;:i for PIJnning purposes. ActuJI ;:ireas mJy v;:iry ;:ind require adjustment to bioretention basin sizes during building permit phase Note: DMA5 implements Greet Street design elements including impervious dispersion to pervious surface at edge of pavement. 60 0 0 0 0-0 • 0-0 ~ ® I S4ET I CITY OF CARLSBAD I SH4ETS I ENGINEERING DEPARTMENT BMP SITE PLAN FOR: CARLSBAD OCEANVIEW ESTATES GR-2016-0030 HDP02-04/CDP02-16 1 REVISE FROM PRECISE TO ROUGH GRADING DA TE INITIAL ENGINEER OF WORK REVISION DESCRIPTION DATE INITIAL DATE INITIAL OTHER APPROVAL CITY APPROVAL DWN BY: '~ □ I PROJECT NO. I DRAWING NO. CHKD BY: MS-02-05 438-2SW RVWD BY: