Loading...
HomeMy WebLinkAbout2014-05-07; Planning Commission; ; CUP 90-03E|SDP 90-05I|CDP 97-0SB - COSTCO GAS STATION CANOPYThe City of Carlsbad Planning Division A REPORT TO THE PLANNING COMMISSION ltemNo.0 P.C. AGENDA OF: May 7, 2014 Application complete date: February 24, 2014 Project Planner: Christer Westman Project Engineer: Steve Bobbett SUBJECT: CUP 90-03(E}/SDP 90-05(1)/CDP 97-0S(B} -COSTCO GAS STATION CANOPY -Request for a recommendation of approval of a Conditional Use Permit Amendment CUP 90- 03(E), a Site Development Plan Amendment SDP 90-05(1), and a Coastal Development Permit Amendment CDP 97-05(8) to add three (3) new fuel pumps and a 2,080 square foot gas station canopy addition to the existing COSTCO Wholesale fueling station on property located at 951 Palomar Airport Road within the Mello II segment of the Local Coastal Program and in Local Facilities Management Zone 5. The City Planner has determined that this project is exempt from the requirements of the California Environmental Quality Act (CEQA) pursuant to Section 15301 "Existing Facilities" of the State CEQA Guidelines and will not have any adverse significant impact on the environment. This project is not located within the appealable area of the California Coastal Commission. I. RECOMMENDATION That the Planning Commission ADOPT Planning Commission Resolution No. 7049 RECOMMENDING APPROVAL of Conditional Use Permit Amendment CUP 90-03(E), Site Development Plan Amendment SDP 90-05(1), and Coastal Development Permit Amendment CDP 97-05(8), based on the findings and subject to the conditions contained therein. II. PROJECT DESCRIPTION AND BACKGROUND The 14.8 acre project site is located at 951 Palomar Airport Road. Table 1 below includes the General Plan designations, zoning, and current land uses of the project site and surrounding properties. TABLE 1 Location General Plan Designation Zoning Current Land Use Site Regional Commercial (R) General Commercial -COSTCO Wholesale Qualified Overlay (C-2-Q) building and gas station North Open Space (OS) Open Space (OS) Flower Fields South Open Space (OS) Open Space (OS) Preserved Open Space East Open Space (OS) Open Space (OS) Preserved Open Space Travel Recreation (TR) Tourist Commercial (C-T) Commercial West Office (O) Residential Professional (RP) Office Residential Agricultural (R-A) CalTrans Yard CUP 90-03(E)/SDP 90-05(I)/CDP 97-0S(B)-COSTCO GAS STATION CANOPY May 7, 2014 Pa e 2 The Costco Wholesale project was approved in 1991 and completed in October 1992. The existing fueling facility includes eight (8) pumps and a 3,136 sq.ft. canopy. The existing facility is located near the main entrance to the COSTCO warehouse off of Palomar Airport Road. The three (3) new fuel pumps will be located east of the existing pumps and the 2,080 square foot, 17.5 foot tall canopy addition will be attached to the east side of the existing canopy. The canopy addition is proposed with materials and colors which match the existing canopy. A portion of a landscape island will be removed to provide better vehicular access and queuing to the fueling station In addition to the fuel station expansion, an improvement to the Palomar Airport Road exit lanes will be made. Each of the four exit lanes will be widened to provide better space for through circulation. In order to gain the additional lane widths, the entry landscape island will have a portion reduced to a width of three feet and will be replanted with low shrubs and drip irrigation. Table 2 below includes the project site's gross and net acreage. TABLE 2 Gross Acres Net Acres 14.8 acres 14.8 acres Ill. ANALYSIS The proposed project is subject to the following plans, ordinances, and standards: A. Regional Commercial (R), General Plan Land Use Designation; B. Carlsbad Municipal Code, Title 21, Chapter 21.06 -Qualified Development Overlay Zone; C. Carlsbad Municipal Code, Title 21, Chapter 21.28 -General Commercial Zone; D. Carlsbad Municipal Code, Title 21, Chapter 21.208 -Commercial/Visitor-Serving Overlay Zone; E. Coastal Development Regulations for the Mello II Segment of the Local Coastal Program; and Carlsbad Municipal Code, Title 21, Chapter 21.201 -Coastal Development Permit Procedures; and Carlsbad Municipal Code, Title 21, Chapter 21.203 -Coastal Resource Protection Overlay Zone; F. Carlsbad Municipal Code, Title 21, Chapter 21.90 Growth Management Ordinance; and Zone 5 Local Facilities Management Plan. The recommendation of approval for this project was developed by analyzing the project's consistency with the applicable policies and regulations listed above. Therefore, this section will cover the project's compliance with each of the regulations listed above in the order in which they are presented. A. Regional Commercial (R), General Plan Land Use Designation The site has a Regional Commercial (R) General Plan Land Use designation. The R designation identifies areas that are intended for commercial centers that draw customers from outside of the City. For this reason, R designated properties are customarily located on sites that are visible as well as accessible from interchange points between highways and freeways. The following Table 3 identifies General Plan goals and objectives relevant to the proposed project and describes the compliance of the proposal. CUP 90-03(E)/SDP 90-05(I)/CDP 97-05(8)-COSTCO GAS STATION CANOPY May 7, 2014 Pa e 3 TABLE 3 -GENERAL PLAN COMPLIANCE ELEMENT USE, CLASSIFICATION, GOAL, PROPOSED USES & OBJECTIVE, OR PROGRAM IMPROVEMENTS Land Use Commercial Goal A.1: The Costco facility, including the Provide a healthy and diverse fueling station addition economic base and quality improvements, is a regional commercial development to commercial use which draws serve the employment, customers from outside the city, shopping, and service needs. generates tax revenue and jobs, and provide goods and services to Commercial Goal A.2: residents in the city. Provide for the development of compatible regional commercial uses. Circulation Circulation Objective 8.1: All required roadway and onsite Provide adequate circulation improvements were constructed in infrastructure concurrent conjunction with the development with or prior to the actual of the existing retail building and demand for such facilities. fueling station. The project does include improving the existing four lanes exiting onto Palomar Airport Road by expanding their widths. Open Space & Water Quality Protection A storm water management plan Conservation Policy and Action Program has been prepared for the C.4: Utilize Best Management proposed project. In addition, the Practices for control of storm project has been conditioned to water and to protect water conform to all NPDES requirements quality. and Best Management Practices. Public Safety Geology and Seismic Safety The proposed structural Policy and Action Program improvements have been designed C.17: Design all structures in in conformance with all seismic accordance with the seismic design standards. design standards of the California Building Code (CBC) and State building requirements. Noise Land Use Objective 8.1: The COSTCO project and fueling Achieve noise compatibility station additions is adjacent to between commercial and other commercial uses and open surrounding land uses space neither of which would be adversely affected by noise generated at the site. COMPLY? Yes Yes Yes Yes Yes B. Carlsbad Municipal Code, Title 21, Chapter 21.06-Qualified Development Overlay (Q) Zone The project site is located within a Qualified Development Overlay (Q) Zone and no building permit or other entitlement shall be issued for any use in the Q zone unless there is a valid site development plan approved for the property. The existing COSTCO Wholesale fueling station was approved by SDP 90- 05(C). There have been several subsequent amendments to the SOP and this amendment SOP 90-05(1) CUP 90-03{E)/SDP 90-05(I)/CDP 97-05{B) -COSTCO GAS STATION CANOPY May 7, 2014 Pa e 4 is the ninth. The required findings for approval of the SDP can be made. The project is the addition of three (3) new fuel pumps and a 2,080 square foot gas station canopy addition. The additions fit within the boundaries of the property, they do not encroach into any required parking area, landscape area, or setback area, and the COSTCO property is separated by 650 feet from the nearest residential use. The additions will add 480 average daily trips but not significantly increase traffic on the existing roadways or increase the need for other public services but will provide for more efficient vehicle fueling for existing and future customers. C. Carlsbad Municipal Code, Title 21, Chapter 21.28-General Commercial (C-2) Zone The project complies with the General Commercial Zone development standards as shown in Table 4. TABLE 4 -GENERAL COMMERCIAL COMPLIANCE Standard Maximum Provided Complies Building Height 35 feet Canopy: 17 feet 6 inches Yes Setbacks None Required N/A N/A D. Carlsbad Municipal Code, Title 21, Chapter 21.208 -Commercial/Visitor-Serving Overlay Zone The existing COSTCO Building project was approved as Price Club in 1991 prior to the adoption of the Commercial/Visitor Serving Overlay Zone in 1999. However, for existing buildings within the overlay zone, additions that invoke the requirement for additional parking or additions that are more than two hundred square feet of increased building area, require that the new or intensified portion of the existing use shall be subject to all of the procedures, standards and conditional use permit requirements of the overlay zone. Since the canopy addition is 2,080 square feet, it is subject to the overlay zone and requires the approval of a Conditional Use Permit by the City Council. The project complies with all applicable Commercial/Visitor-Serving Overlay development and design standards as shown on Table 5 below: TABLE 5 -COMMERCIAL/VISITOR-SERVING OVERLAY ZONE COMPLIANCE Standard Maximum/Minimum Provided Complies Parking: General Sales: warehouse building One space per 300 151,128 square feet. square feet plus two No parking required for employees. for the fueling station 504 + 3 spaces required 751 spaces Yes canopy or pumps. {507) Building Height 35 feet maximum 17.5 feet Yes Palomar Airport Road 50 feet minimum 330 feet Yes Setback Setbacks Side 10 feet minimum 130 feet Yes Rear 10 feet minimum 195 feet Yes Building Materials per TBD The canopy addition uses the same Yes discretionary approval materials and white color as the existing canopy. Alternative TBD Color, texture, and trim used are the Yes Architectural Style same as on the existing canopy. CUP 90-03(E)/SDP 90-05(I)/CDP 97-0S(B) -COSTCO GAS STATION CANOPY May 7, 2014 Pa e 5 The addition is desirable for the community since the additional fuel pumps will provide better access to fuel. In addition, the 2,080 square foot canopy addition is located entirely within or adjacent to a disturbed and constructed footprint established by the existing fueling station and will not create significant impacts that would be detrimental to existing or other uses permitted in the vicinity. The COSTCO facility was designed to accommodate a large volume of customers including surplus parking. The street system serving the proposed use is adequate to properly handle all traffic generated by the proposed use, in that the anticipated ADT generated by the three new fuel pumps is 480 which is 1.2 % of the design capacity of Palomar Airport Road which is a prime arterial. E. Coastal Development Regulations for the Mello II Segment of the Local Coastal Program; and Carlsbad Municipal Code, Title 21, Chapter 21.201 -Coastal Development Permit Procedures; and Carlsbad Municipal Code, Title 21, Chapter 21.203 -Coastal Resource Protection Overlay Zone Mello II Segment of the Local Coastal Program The subject site is located in the Mello II Segment of the Carlsbad Local Coastal Program and is subject to the approval of a Coastal Development Permit, however, it is not located within the Coastal Commission's appeal area. The project site has an LCP Land Use designation of Regional Commercial (R) and Zoning of C-2-Q which are consistent with the City's General Plan and Zoning. The project's consistency with the (R) General Plan Land Use designation is analyzed in Section "A" above. The proposed project, which includes an addition to the fueling station, is consistent with the relevant policies of the Mello II Segment of the Local Coastal Program, the Coastal Program implementing ordinance (Zoning Ordinance), and the Coastal Resource Protection Overlay Zone. The project site is currently developed with an eight (8) pump fueling station. The project is consistent with the surrounding development, which includes commercial uses and open space uses. The proposed addition will not obstruct views of the coastline as seen from public lands or the public right-of-way nor otherwise damage the visual beauty of the coastal zone. No agricultural uses currently exist on the developed site, nor are there any sensitive resources located in the area of the proposed addition. In addition, the proposed addition is not located in an area of known geologic instability or flood hazards. Since the site does not have frontage along the coastline, no public opportunities for coastal shoreline access are available from the subject site. Furthermore, the commercially-designated site is not suited for water-oriented recreation activities. Coastal Resource Protection Overlay Zone The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone (CMC Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the City's Master Drainage Plan, Grading Ordinance, Storm Water Ordinance, Standard Urban Storm Water Mitigation Plan (SUSMP) and Jurisdictional Urban Runoff Management Program (JURMP) to avoid increased urban run- off, pollutants and soil erosion. No development is proposed in areas of natural steep slopes ~ 25% gradient, and no native vegetation will be removed. In addition, the site is not located in an area prone to landslides, or susceptible to accelerated erosion, floods or liquefaction. CUP 90-03(E)/SDP 90-05(I)/CDP 97-05(8) -COSTCO GAS STATION CANOPY May 7, 2014 Page 6 F. Carlsbad Municipal Code, Title 21, Chapter 21.90 Growth Management Ordinance, and Zone 5 Local Facilities Management Plan The proposed project is located within Local Facilities Management Zone 5 in the southwest quadrant of the City. The impacts on public facilities created by the project (three fuel pumps and 2,080 sq.ft. canopy), and its compliance with the adopted performance standards, are summarized in Table 6 below: TABLE 6-GROWTH MANAGEMENT STANDARD IMPACTS COMPLIANCE? City Administration Not Applicable N/A Library Not Applicable N/A Waste Water Treatment Not Applicable Yes Parks Not Applicable N/A Drainage 13.78 CFS Yes Circulation 480ADT Yes Fire Station No. 4 Yes Open Space Not Applicable N/A Schools Not Applicable N/A Sewer Collection System Not Applicable Yes Water Not Applicable Yes IV. ENVIRONMENTAL REVIEW The City Planner has determined that the project belongs to a class of projects that the State Secretary for Resources has found do not have a significant impact on the environment; therefore, the project is categorically exempt from the requirement for the preparation of an environmental document pursuant to Section 15301, Existing Facilities, of the California Environmental Quality Act (CEQA) Guidelines. In light of the above, a Notice of Exemption will be filed by the City Planner upon project approval. ATTACHMENTS: 1. Planning Commission Resolution No. 7049 2. Location Map 3. Disclosure Statement 4. Reduced Exhibits "A-H" 5. Full Size Exhibit "A-H" dated May 7, 2014 SITE MAP • N NOT TO SCALE Costco Gas Station Canopy CUP 90-03(E) / SOP 90-05(1) / CDP 97-05(8) ( -·------------------------------------. -l~ '-,i,J .~ CI TY OF DISCLOSURE STATEMENT P-1(A) Development Services Planning Division 163S Faraday Avenue (760) 602-4610 www.carlsbadca.gov CARLSBAD Applicant's statement or disclosure of certain ownership interests on atl applications which will require discretionary action on the part of the City Council or any appointed Board, Commission or Commrttee. • The following information MY§! be disclosed at the time of application submittaJ. Your project cannot be reviewed until this lnfonnatron Is compfeted. Please print. Note: Penson is defined as "Any Individual, finn, co-partnership, joint venture. association, social club, fraternal organization, corporation, estate, trust, receiver, syndicate, In this and any other county, city and county, city municipality, district or other polltlcal subdivision or any other group or combination acting as a unit.• Ageni. may sign this document however; the legal name and entity of the appffcant and property owner must be provided below. 1. APPLICANT (Not the applicant's agent) Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial interest in the application. If the applicant includes a corporation or partnershiQ, Include the names, titl~s. adt;fre$SeS of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES, PLEASE INDICATE NON-APPLICABLE {NIA) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A sepa~te page may l;)e attached if necessary.) • Person. __________ _ Corp/Part Co1.Ro t.),)\Ml\)1$¾2 (DAAl"-0-1\oW litle. __________ .,.,..... __ Titre. ____________ _ Address:_.... ________ _ Address 5,~"\ ·l,,,.!WJg \!l» a'\lri I t.St M'N»Y '-,)R C\ t>o'l. 7- 2. OWNER (Not the owner's agent) P•1(A) Provide the COMPLETE. LEGAL names and addresses of Abb persons having any ownership interest in the property involved. Also, provide the nature of the legal ownership (i.e., partnership, tenants in common, non-profit, corporation, etc:.). If the ownership includes a corporation or partnership. include the names, titles, addresses of all individuals owning more than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES. PLEASE INDICATE NON-APPLICABLE (NIA) IN THE SPACE BELOW. If a publicly-owned corporation, include the names, titles, and addresses of the corporate officers. (A separate page may be attached if necessary.) Parson.· __________ _ Corp/Part C OS51 o , !tl)M:.\lf\~ e c ona\>WA'ltotJ Title. ____________ _ Title._·--------~--- Address, _________ _ Page 1 of2 Reviae<1 07/1 0 ( ( 3. NON•PROFIT ORGANIZATION OR TRUST If any person identified pursuant to (1) or (2) above Is a nonprofit organization or a trust, list the names and addresses of ANl cerson serving as an officer or director of the non• profit organization or as trustee or beneficiary of the. Non Profit/Trust. _________ ___ Non Proflt/Trust'---------- Title. __________ _ Title. ____________ _ Address. ____ .,_;._.....;._"""----Addre$S'"'--__________ _ 4. Have you had more than $500 worth of business transacted wlth any member of City staff, Boards, Commissions, Committees and/or Council within the past twelve (12) months? 0 Yes [8/ No If yes, please indicate person(s):. ______ ............ _____ _ NOTE: Attach additional sheets if necessary. () l .n . ""Ehe. C&~Ieo. WH,uCAY: Print or ype name of owner C..U~'NA-TtorJ Signature of owner/applicant's agent if applicable/date Print or type name of owner/applicant's agent P·1(A) Page 2of2 Revised 07/10 ~---=------ 11111 0 ~ JO .---~----, □ D L,.,,, n-11 __J n Lm D ~ 11111111 ~ I !:=:)111111111110 -----~ ~ \\\ PHA El CMRSTOCICCCCISt lllJERIEPAMlE PERIIT •• ' ' -------------------------- // ,/PHASE II /, N!EACF- IHIERSEPAM'TEPEIUT , I . -·4 : / --r _________ .,., OAIICNO'V N0(4) - I .... : I I I I ~ I I I I I I I I I I I _, PROJECT DATA CLIENT: COSTCO 'M-IOLESALE 999LAKE DRIVE ISSAQUAH, WA 98027 PROJECT ADDRESS 951 PALOMAR AIRPORT ROAD CARLSBAD, CA 92009 ZONING: C-2Q -COMMERCIAL vvtni QOVERLAY SITEAREA: 14.80 ACRES (644,688 S.F.) EXIST. Bl.HLOING DATA: EXIST. BUILDING AREA EXIST. TIRE CENTER EXIST. FOOD SERVICE TOTAL EXIST. BUILDING PHASE I NEW DAIRY COOLER ADDITION NEW OVERSTOCK COOLER PHASE I RECEIVING ADDmON TOTAL BUILDING EXISTING GAS CANOPY NEW GAS CANOPY PARKING DATA: PARKING PROI/IDEO: 1"3,09!5S.F. 4,040S.F. 1,096S.F. 148,231 S.F. 1,383S.F. 941 S.F. 1,878S.F. 152,433 S.F. 3,136S.F. 2,040S.F. @ 9'WIOESTALLS 718 STALLS @. HANOI CAP STALLS 18 STALLS TOTAL PARKING 736 STALLS NUMBER OF STALLS PER 1.000 S.F . OF EXISTING BUILDING AREA: (148,231 S.F.) 4 97 STALLS NUMBER OF STALLS PER 1,000 S.F . Of PROPOSED BUILDING AREA: (152,.:33 S.F.) 4.84 STALLS NOTES: EXISTING CONOITIONS TO BE FIELD VERIFIED. COSTCO WHOLESALE PROPOSED SITE PLAN CARLSBAD, CALIFORNIA OCTOBER 09, 2013 "" Ht-1 I a..co ·---·-CARLSBAD, CA #462 951 PALOMAR AIRPORT ROAD CARLSBAD, CA 92009 1110112'TH ... VE.NE I suneeoo 9£L.l,.£VUE.-i-»ol 94-0150-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN 0011-02 ________ _J o-+---'---+---+-------- 5 ---I I 8 DEMOLITION PLAN PROPOSED PLAN COSTCO WHOLESALE DEMO & ENLARGED SITE PLAN CARLSBAD, CALIFORNIA OCTOBER 09, 2013 0 S' 16' 32' l'""H-1 I 1/16"•Nl" a.s.co IUFW:ZMIP CARLSBAD, CA #462 951 PALOMAR AIRPORT ROAD CARLSBAD, CA 92008 111011zn.lA\IENl!j8UITE500 SELliWE.-IIIIOO' uzusuooo I ICC!,.2X12 -, 94-0150-22 OCTOBER 09, 2013 DEMO & ENLARGED SITE PLAN DD11-02A 4"' i ~---------~-----------------0 --0 ,------1 ~ Oo 0 0 0 ¢:, 11: @] @] :I) u ~ ¢:, _u ______________ Q __ 0 I I I 7---------r 0 I ¢:i I ~---------L-=-~-~-=-~-~-~-=-~-~-=-~-~-~-=-~-~-=-~-~-'-----~ I I ¢:, I I 11: @] @] : II ¢:, I I ~---------L-I O I I I -,---------r ¢:, I I 11: @] @] : II ¢:, --------------- ¢:, n :: <=i _u _________________ _ "r " I u ¢:i ¢:, -------------------- COSTCO WHOLESALE CARLSBAD, CALIFORNIA ¢:, ¢:i ¢:, I I I / / / L ____ _ DEMOLITION KEW NOTES EJ =-~a:==:"·--,.,.,.., 0---.ocllllUHPGII. [!J_,....,.,_...._Toflll_,..,_l'IMI I I ENLARGED DEMO PLAN OCTOBER 09, 2013 I I I I I I I I / $ "' l""H-1 I co.s.co nm:_,, CARLSBAD, CA #462 "1 PALOMAR AIRPORT R~ CARLSBAD, CA 92009 111DnZTH,._VE1'1El~500 IIEI..LEVUE.-......1~ 94-0150-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN D010-02 ..... " ..... -_ _.. -- ------------------~-----r------1 11:□ ®'-@] □:11 g 0 ~ ¢:l I ~ ~ B I I I i---------r -------------- I ¢:l I .J _________ L. I ¢:l I ¢:l D§-t ¢:l I ¢:l ~ .J---------------I I ¢:l -,--------------- ¢:l I~ ¢:l g D®'-0 ~ ¢:l I ¢:l ffl B ¢:l ::::a:::11 ¢:l Q COSTCO WHOLESALE CARLSBAD, CALIFORNIA -- ¢:l ¢:l Q KEYNOTES III:=~-::..-=:---(Q .. .,.......,.. ...... ('Q,_MUIIINLlllffllll 0--•--~-[I] ....... .-. .. 1WIIIIXIIICl'---0 ........ ... ill _...._,....,__lllllll [!] :--===::i-.=r~ ---•-&.a_.,..CIMtmwMPI ml'Q-.....,flCllffllillClall III ==---IIM'Cfll-.-••LIIIICIIII---· m=-~..._ ... ......,. 0-CCllll:mlQN ~-aaama..- r.:, -NL111D:CINIMl~IC10aMIJ--l...'.!J l'ltlr!ID..,...-.... 14 [!]•~ I!] -c:acMll----l'IIIIICTIM.,-MDCM.-- ~ -.,._._. [!1-0QllH- [!]-..... -·-CM.-~--[!] -Cllalat----·-CM.--- ~ -.... -WnllM.TllNI" oolN:°'_....,_ ~--~ ~ ......... 'li:7.-~~ [!] .... -----~ [!] :::r~~~-=--==- r.:, l'ltlrllD1!Wfl:cc:na. ....... ~ ~ IC10--------~ [!)l'ltlrllD'IIHIII' ________ @ [!] ........... , ........ @ r-, ..... "IWfelalll ~ ~.11D...,. ______ 'e' [!] _.__,. ___ 11111111. [!] ICWRIJNll'WIIC~ [!] -CQIMICllfflll9Cllllll!'1D--- [!] -WMr"'11 ENLARGED SITE PLAN OCTOBER 09,2013 a..co .. ,_,, CARLSBAD, CA #462 951 PALOMAR NRPORT ROl'D CARLSMD, CA 92008 11111112THAVI: l'fE I SUl'!Eilm IEU.£VUE. -I NIM 94-0150-22 OCTOBER 09. 2013 PRELIMINARY SITE PLAN 0D12-02 L__---------------------------~------------------ F,, , , , r~ "T g =-= ¢::, 51 I ~ ¢::, ¢::, ~ ¢::, g ~ ¢::, ii fl ¢::, COSTCO WHOLESALE CARLSBAD, CALIFORNIA / / / / L ____ _ / / / / / ENLARGED SITE PLAN OCTOBER 09,2013 I I I I I I I I ~ l'""H-1 I co.s.co I n-w.11•• CARLSBAD, CA #462 951 PALOMAR AIRPORT ROAD CARLSBAD, CA 920C» I 1 1, L \' 1 I, 11 1. '.:., '.: 111011:ZTIU,V'ENEISUITE!IOO BELLEVUE.WlilllllOOI lffl"413.2000114Z-M3.2002 94-0150-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN DD12-02S SCALE: 3116"•1'.(7' • . I . ~ I ' 0912 @ ?~~;~,~ER ELEVATIONS COSTCO WHOLESALE CARLSBAD, CALIFORNIA J -- QTY _-ill 0 ' 0 0 0 ' I § r 0 0 y 0 ' l!XITl!l.!YA11DN 0 ' 0 ' 0112 0 ' KEYNOTES 0=-=-=~1:=-IIl===-i:-.,..,_ 0tlUM'IIIII.Cf---.WJ1.N't1Xlnl. 0~-:-.. ,:=~ ... -.wt1191aMl ... l'Nll'UMLMU.• ... -. m·- [!]:=»,:="--=:"-="~,..- 0 ==--•Tm-.mmRCl'llat [!]MJJ.AQ. ..... amunia. [!]•-10••---WfflWICII ~=--=:i:=::::.---- [!l==-=~=-CIINUl'MID..UU..,..fla---CllilllaMI• ---~-.... a,---.n,a.. ~ ::=,=.W:-:::,,".::'m ...... ,.. ..... GENERAL NOTES SOIC -FUEL FACILITY SIGNAGE DESCRIPTION TYPICAL PLACEMENT MEMBERS<»ILYIENTERHIERE W/OOSTCOLOGC1,1r•N"AL-... Pl.EASEPUl.l.TORJll't,MDPUlilP £t4DOl'E/OllSI..ANOFACINGltCOUINGntMl'IC :wxN"".-...--SEEOETAll,.ll',t,G.6FOR"'°""'ING __ , ENO OF EACH ISl,N,ID ""'°"'3 DtT N"x:Z..-~ SEEDETAl.ll'.<06FORMOIMTING DEBIT ICIIEDTOIIILY. NOC"51-1AOCEPTED 1TOPOFOISPENSERFACINGTIIAFFlC 1'2"•12'AU-.IM 1 0NCANOP'l'COI.UMNSf..clNOnttfflC HOURSOFOPEMTION,OPEtl/Q.OSEO IEl.OW"SEIJ'-SERVICE"SIOIIWiE,<»ISIOE _, OFTIEDISPE~FACNGTRAFFIC,.TEHTRY NOSfllOKINGISTOPENOINE FtUSHMOUNTONE,\CHSIOEOFENTRYCOl.lJMNWfl.N'. 1rxN"AL.-.... f.-.clNOr«>ZZLE INCASEOFAREORSPIU. ftUSHlltOUNTOlll"'810EF#rCEOl'EMl-lEXJTCOLIJMNWRN' 1rxN"AL..- INCASEOFFIREORSPIU. 1rx24"Al.UM-ONESIDE NO CASI-I ON PREMISES _, EME"'lENCYSHJT,OFF CONCEPT ELEVATIONS OCTOBER 09, 2013 aJs.co ---·-CARLSBAD, CA #462 951 PALOMAR AIRPORT ROAD CARLSMD, CA 92009 r\'JL\/NNf.~2 l110112TH4VENEiSUITE,CO &EllEVUE.-1 NQO,I 1'2!S..a2000I1~cZ102 94-0150-22 OCTOBER 09, 2013 PRELIMINARY SITE PLAN 0D31-01 _,, ~-~ ~---,,.- ~-~;._T•· -.... COSTCO WHOLESALE CARLSBAD. CALIFORNIA "'. .., J. J __ .. ""°"""1:,,, nSlQ_.....-...~ 11-e "'-""--(~iw:--.. LEGALOUCAiP110N: E.NeilNIEEA: --S....Ol«l,.~•i,,, l~~~~ ESTIMATEOFOUANTITID: l'!C.l,IO,.,_ Qlt,l,OoJ,O· CC'" a,t = ,, ru oc~ t ECTIOHA-A GEHERA.l HOTU lj,,O,,VU,C.."Oo'l.,,,,,r.l"""'--,Ol,.__(')<1"114""1t', ..... 'O#Oo~~'/0,, C.-.i ~....0,,.-(IIOQO.J-.-oo.Url!Q~ ~o,,l'l,_."OCC•v;uo.. JJ~~ ~c::\,:,; :;.~~~ =-!'Oolll "1CO--Ol<"lll'C"""'"-a.4t~ C,U ASI\I -...e~t:#'.I ...... ~ ... ~Cf.. -... ~""-fa& .s.. ~"""""'-lllltf>.t.,..,.. .. .,,.~c,ro .. &al-Y =-~::::-::t1~ttN IIIOl:.II ~..-((lo,l1t'"'• ...0 •1!9'"'..,_•~~o~.=::1:-,~-=:: ~~ ~I. COi a;£._..,~ t1C. Co,( fQ M ~W -C:!Oo "° t)<u. ...... ftll-lrl.i,l'()fllQll'llil,~Po,tt.l,-lli~~~-!l,t◄ tf,lf 1;~ ~4'!110o1 f'OI 1111),t,O ..C, MCICf COO<S~To,.. G,,W)JI c,-nc-, •~ "'""""''I.. 0 ,__Dial •t~C..llb.Sl'caurt1'0l.>CIOTOl~K W'll.._"'t "OU..,l,,~ r "' s1•· -'(IC 1;.• .,...~ -~~ "~.,,~~--~-..--~~~---••;ti ,O~• •► lr,I.\. ~ 6ct:uf4~ 1,olCh ~ "ft,l.l,.. ~-.4,o,;,ll(i;U•'-O'>'J. L£G£HD --(1.n--Cft--~ a>o~ __ ,, ___ ..,._. ------~------1,A-or,11""" -----(•j(ICJ>l [] ·---· [] ~---· □ ~-.. -. ~ =-~ -c--ta$':l,CI e....,,.., ~ _,.,__ ~ ,~ - -•~ ::;::~l-". --C--~C--OII• -.;..".-t•IN;ID!Ct'l<,IL~ -·--..,...,._ -[...i;•.,-CtlWbC,o,_."0,1,M --~•·o.-t -~ t'll)S-•~----~«,.--~ -:u -[lllli"'4V:.•~ -r--coin,.,:.,·~u,t ---coin:•~~pi..,. [~ ... IUIN ---OOt'"JriCI ~ .---.1,~ oo.::>UTION MOTU UI) ..,,.. [D~.,._~a.-lOKC.,OC,A ill~~~f'bOVf•• lJl~~ObAIO""""'°""' [llta:.l"QIIIION<,tJ. o-tlD•~ l!Jb."01tl1CWC#Cil.o.ft6Cll~ m~~aa,,,11'•~10• COHITIIUCTION NOTU ©~•~~,.c?..=-~=~ t;"<tLJlltf'll'f; .. 3..CO,O"OQl'l'"(IIM'> :=.~~r·~ u;-1$,0 sn !LU'Olo'•~• (j)=r~~~"'<"""~"' Q) td'f-.... ~ 'II.A fltlt ...,..•cu~ .. .,..., © :r:;;: :-,;;::;r,.:, I& C?tl::l,,\.l G)(lQlij; It-..CU .. U. •<Q. Ft/II•-""'( ~~fD.Anll),A'..;[,011£.0 .-...c,4'1n,Q((Jfa,. .,,.,._ ..... , "'1'•' r..o..r ft)l'V'Cl"'W•t DCI @N11-."'•1-•N.10Qo-•,..~,c;rl!l)f Q) f'llt.t4L •• -.c ,-.c,111v ~ • 1.ft --~;,« ®~n:'" ... ~c-=:-.- @ =-"l I~ Cl't-IQ t.n~ •• Qllfl,tt 8 M~••_,,r•.-~....S,.,CX.~ 11'1f~OV-•t'OI @wrrA1.•·~•11,,,"°".,_ • .__r @MT ...... IIJ'TEla..-c:1.KllQtl'6'-l'ttlJ~ 0 ~ .. """' D,t' -~,. _, @Mtr,u ~ ~ IUMOlt ,0 ~-tt-oo NOT£: SCAI.I! t'• 10' O~JO ,0 JO e1 Wm NMU ., casn:o . ---CARLSBAD\ CA t462 94-0160-22 SEPT 19, 2013 PLANNING SUBMITTAL PRELIMINARY GRADING Pl.AN PRELIMINARY GRADING PLAN C1.0 SEPTEMBER 19 , 2 0 1 3 rt;;~ ~--<;~:~--~:Z~lLtlJ g J ~~ I I,~ '-------------~~ ~-,~.::i~..: L ::~.. -~ ~ fiTI-•-":'1.~ ... ~ H ---.. I ' ..._-.i ~1) ¢·J b -ri '-J,,f" ' -I ~.r~.J . ' ' ' ' -------~ ~,~ t,r-----------------------------· ,.... ---... "" ~ ~-°""'"'--·-_,......._, .... ~ .. --- '. i ,_.,_ e-...-----, .. _ .. ..... --"'" ........... "" 0 __,_....,a.. ... .,_......,.. 0 ....,. __________ _ \ <::, I'M" ~ <::, -;:?;',----· ,<) L, __ ,.._ ~:. .. Gfl!f'Wr ONfiNlteJJI ~ ............ -.--~ ....... .,_....._,.._.._...._...,._Nll_........_ ___ b ................ _....... ..... ___..... ......... __ :,, M .... __ .... ___ rit,c,,}-......-d-........ D-l•._..., ........ ~I .... w 1-w:w-.......... 1. -..~ ....... ...,..... .. _..,. .. .....,_ ... ___ s._.,._ .. __ _ _____ ___,..,.._____, .. ,.o-..-.~ • ....._ .. ._,~.,.,. ..... _"'.,,..,.._ 2. n. ...... ~ ....... ~-~~"'-Olllc. ... 1,:,..,•t:J ...... ltM..__SW...,,.,. ~tct11-.1,.,._ ,.....,..,_,.('141~-...... -----"" ... o.-t'a._._, 2. h -..llMl-,.W.,__.,.....,._ .. _,_..,,.-b ... ~ uso,.~~'-"'-•-~ ....... -.... __,,,c;-'"""""'d~Solf ..... T-... ~........., _ _._..___......,., __ ...,...._ __ ___ .. ~ ............. _ ... __ * ____ ~ ... ~-....... ....,_-.......... ... __,.., .. ~ ... -..,i,,,_ ......... ...-..Ol!>trll..,. ..... ~.---..........,,,_ ~..-.---. ....... ........ t ~ I COSTCO WHOLESALE ENLARGED LANDSCAPE PLAN CARLSBAD, CALIFORNIA APRIL 1, 2014 i CGsft'o II PPNP CARLSBAD, CA J-462 ..... -........ ·--1 --•r--, 94--0·150--20 APRl. 1, 2014 PREUMINARY PW< DD1.1-01L