HomeMy WebLinkAbout1991-02-20; Planning Commission; ; CUP 90-13 - CITY OF CARLSBAD HIRING CENTER•
Sf AFF REPORT
DATE: FEBRUARY 20, 1991
TO: PLANNING COMMISSION
FROM: PLANNING DEPARTMENT
SUBJECT: CUP 90-13 -CITY OF CARLSBAD lilRING CENTER -Request for a
Conditional Use Permit allowing a hiring center on property generally located
east of El Camino Real and west of the Coast Waste Management Access
Road in the M-Q Zone in Local Facilities Management Zone 5.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 3190
APPROVING CUP 90-13 based upon the findings and subject to the conditions contained
therein.
II. PROJECT DESCRIPTION AND BACKGROUND
In February, 1990, the City Council directed staff to research migrant hiring site
alternatives to address the problem of large numbers of documented and undocumented
workers who congregate along streets and intersections and commercial parking lots
seeking employment. The increasing numbers of migrant workers soliciting jobs from
passing motorists have raised citizen concern about loitering, traffic and pedestrian safety,
and resulted in complaints from local business owners who are concerned that large
numbers of workers congregating in parking lots and at store entrances is resulting in
property and business loss. In April, 1990, after investigating hiring site operations in
other cities, Council authorized staff to begin investigating potential hiring site locations
satisfying the following criteria:
1. a non-residential area;
2. provides maximum vehicular and pedestrian traffic safety;
3. close proximity to public transportation.
Staffs site investigation resulted in the selection of a .83 acre site located on County
owned land just east of the Carlsbad Municipal Water District facility and west of Coast
Waste Management in the M-Q zone.
The proposed hiring center is a government facility requiring the approval of a Conditional
Use Pennit to operate at the proposed location. The proposed project consists of a 1 O' X
20' office trailer, a circular decomposed granite driveway, two chemical toilets, picnic
tables, bicycle racks, and five parking spaces available only to hiring center employees and
potential employers. Minimal grading (approximately 240 cubic yards) is necessary to
accommodate the use. Access to the site is provided by a 24' wide County road which
intersects with El Camino Real and Faraday Avenue. The proposed hours of operation are
CUP 90-13
City of Carlsbad Hiring Center
February 20, 1991
Page 2
6:00 a.m. to 11 :00 a.m. Monday through Friday, and 7:00 a.m. to 12:00 p.m. on
Saturday. The hiring center will be staffed by a bi-lingual project supervisor and two
placement specialists contracted by the City.
m. ANALYSIS
Planning Issues
1. Can the four findings required for granting a Conditional Use Permit for the hiring
center in the M-Q zone be made?
Specifically:
a. That the requested use is necessary or desirable for the development of the
community, is essentially in harmony with the various elements and
objectives of the General Plan, and is not detrimental to existing uses or to
uses specifically permitted in the zone in which the proposed use is to be
located;
b. That the site for the intended use is adequate m size and shape to
accommodate the use;
c. That all of the yards, setbacks, walls, fences, landscaping, and other features
necessary to adjust the requested use to existing or permitted future uses in
the neighborhood will be provided and maintained; and
d. That the street system serving the proposed use is adequate to properly
handle all traffic generated by the proposed use.
DISCUSSION
As determined by the City Council, the proposed use is necessary and desirable to promote
the health, safety, and welfare of the community because it provides an employment center
with safe vehicular and pedestrian access away from residential areas for the increasing
numbers of migrant workers who solicit employment along roadways, intersections and
parking lots.
The proposed use in the M-Q zone is surrounded by industrial and governmental uses such
as the Safety Center and Fire Station, Coast Waste Management, and the Carlsbad
Municipal Water District, each requiring equipment storage onsite. The hiring center is not
detrimental to these uses since it is also a City facility offering a needed service and
requiring the storage of a temporary office trailer onsite.
The .83 acre relatively flat, previously graded parcel with access provided by a 24 foot
wide County access road is adequate in size and shape to accommodate the proposed use.
CUP 90-13
City of Carlsbad Hiring Center
February 20, 1991
Page 3
The parcel will require minimal grading to create a 7,000 square foot pad to locate the
small office trailer, circular driveway, picnic tables, chemical toilets, and
employee/employer parking; the majority of the parcel will not be disturbed. The parcel's
triangular shape provides adequate frontage along the access road to enable a one-way
circular driveway for safe ingress and egress to the project. Also, the site is located in a
non-residential area surrounded by other governmental and industrial uses and set back
from major roadways and intersections providing greater pedestrian and vehicular traffic
safety which satisfies the site selection criteria used by staff to identify appropriate hiring
center sites.
The proposed project includes no permanent structures, however, the temporary office
trailer and chemical toilets will be screened from El Camino Real along the western side
by 8 -10 foot redwood trellises. Directional signage on the City's kiosk structures along
Palomar Airport Road and El Camino Real in Spanish and English is being required to
direct potential employees and employers to the site. Additional signage must meet the
City's sign ordinance standards.
The street system serving the proposed hiring center includes Faraday Avenue, a secondary
arterial, and a County owned and maintained access road which runs diagonally from
Faraday Avenue to El Camino Real. The proposed site design includes a one-way circular
driveway with a northern entrance approximately 50 feet south of the Coast Waste
Management driveway and an exit 100 feet south of the project entrance. This circular
driveway design precludes cars from backing out onto the private road from the hiring
center thereby ensuring greater traffic safety. The access road is primarily used by Coast
Waste Management trash disposal trucks and the Carlsbad Municipal Water District. Since
parking along the east side of the private access road will be prohibited and no onsite
employee parking will be provided, hiring center vehicular traffic on this road should be
limited to staff and potential employers. Daily bus service is available within one quarter
mile of the center along El Camino Real from the northern and southern City boundaries.
Safe pedestrian access to the site is provided along Faraday Avenue and the County access
road.
Growth Management
The subject site is located in Local Facilities Management Zone 5, however, Chapter
21.090.160(a) of the Zoning Ordinance exempts City projects from Growth Management
requirements.
SUMMARY
Based on the above discussion the proposed use is consistent with General Plan Elements,
is compatible with surrounding uses, and can be adequately accommodated at the proposed
site. Staff therefore recommends approval of CUP 90-13.
CUP 90-13
City of Carlsbad Hiring Center
February 20, 1991
Page 4
IV. ENVIRONMENfAL REVIEW
Sections 15303(c) and 15304(c) of the California Environmental Quality Act (CEQA) state
that a small temporary structure involving only minor alteration to the existing landform
is exempt from environmental review. Based on the above referenced sections of CEQA
the Planning Director has issued a Notice of Exemption on October 5, 1990.
ATTACHMENTS
1. Planning Commission Resolution No. 3190
2. Location Map
3. Background Data Sheet
4. Exhibits "A" and "B", dated February 20, 1991.
AH:lh:rvo:km
January 23, 1991
SQURESDAM
4 SITE
AIRPORT A~PORT
• • • • • • ACCESS ROAD City of Carlsbad
CARLSBAD HIRING SITE CUP 90-13
• BACKGROUND DATA SHEET •
CASE NO.: ....,C=U=P_9""0,.__-..:::.1=3 ____________________ _
CASE NAME: CI1Y OF CARLSBAD HIRING SITE
APPLICANT: CI1Y OF CARLSBAD
REQUEST AND LOCATION: REQUEST FORA CONDITIONAL USE PERMIT TO ALLOW
A HIRING CENTER ON PROPER1Y LOCATED EAST OF EL CAMINO REAL AND WEST OF
THE COAST WASTE MANAGEMENT ACCESS ROAD IN LOCAL FACILITIES
MANAGEMENT ZONE 5.
LEGAL DESCRIPTION: PORTION OF LOT B. MAP 823 RANCHO AGUA HEDIONDA.
APN: 209-050-25 Acres .83
(Assessor's Parcel Number)
Proposed No. of Lots/Units ---"-'N....,/A~----
GENERAL PLAN AND ZONING
Land Use Designation _P::..;;I;.....__
Density Allowed NA Density Proposed ---"-'N=A'---_
Existing Zone ____ M=---0 _____ Proposed Zone ______ N ....... A _____ _
Surrounding Zoning and Land Use: (See attached for information on Carlsbad's Zoning
Requirements)
Zoning Land Use
Site M-0 PI
North M-0 PI
South M-0 G
East OS OS
West M-0 PI
PUBLIC FACILITIES
School District CARLSBAD Water District CARLSBAD Sewer District CARLSBAD
Equivalent Dwelling Units (Sewer Capacity) _N-L-A~---
Public Facilities Fee Agreement, dated _____ _
ENVIRONMENTAL IMPACT ASSESSMENT
__ Negative Declaration, issued ___ _
__ Certified Environmental Impact Report, dated _____ _
Other, NOTICE OF EXEMPTION -OCTOBER 5. 1990
POlNSE1 f AL.A~,,:::
0
J> ,;;
2
0
;tJ "' J> r
VICINITY MAP
NO SCALE
----
2 PORT-A-=er T.E3
I,,,_
\ ' .
/EDGE
(
NOTE: S:
I. PORT-A-POTTIES TO BE ENCLOSED WITH E!GHT (8') FOOT
HIGH REDWOOD LATICE STRUCTURE.
2. CONSTRUCT EIGHT (8') FOOT HIGµ REDWOOD LATICE
STRUCTURE ON WEST SIDE OF T["IAILER.
3. SPECtAL SIGN-CONSTRUCT 30" l! 18" SIGN, WHITE
BACKGROUND WI TH WHITE LETTERS, WHICH READS
"ENTRANCE ONLY".
4. SITE ro HAVE 3" D.G. SPREt.D IN LIMITS SHOWN.
I
!
I
i
i
I
I
' ;
I
' DATE ' INITIAL
ENGINEER Of WORlf.
i
!
'
'
'
'
REVISION DESCRIPTION
,,.
SCALE• 1" = 20'
---CiTY OF CARLSfJ.AD . fJJf!J. PLA::•l'//tO!"'IISS108 "AS BUiL_T" . ~P 1~t~-=· Srt£ .... I CASE NO -r) '@-f. .
I ~:~~-'° _ ·A":-·~:;-1';2r£l!.-·-··'.:2fv_-RCE EXP. DATE
I . . .
RE\/1El'i1::D BY:
iNSPECTOR DATE
W I_
CITY OF' CARLSBAD I S2ETS I
' ENGINEERING D~PAR™ENT
HIRING SITE
SITE PLAN
APPROVED
CITY ENGINEER RCE :;;3839 EXP. 2 31 93 DATE
DATE iN!nAL DATE INITIAi.
D'lvN BY: .J. T
i
PROJECT NO. I DRAWING NO. CHKD BY: GK
011-![R APPROVAL CITY APPROVAL RVWD BY: GK 316-5
CMWD 90-C.OOQ
'" en
-•, TOP ?:I ¥,T,, • -SLOPE
\
,.o w
'"-2:2·:t:;,;·-···--;¥,.~.-,_ "~-""~.;,,--.,,,, ., ,,
'.O
--i
S)
cP
GRADING NOTES'
I. A PRECONSTRUCTION CONFERENCE SHALL BE HELD AT THE SITE
PRIOR TO THE BEGINNING OF WORK AND SHALL BE ATTENDED
BY ALL REPRESENTATIVES RESPONSIBLE FOR CONSTRUCTION,
INSPECTION AND SUPERVISION.
2 BRUSH SHALL BE REMOVED ONLY WITHIN THE AREA TO BE
GRADED.
3. ALL AREA SHALL BE GRADED TO DRAIN.
4.ALL EARTHEN SWALES SHALL HAVE MINIMUM ONE PERCENT
(l 01.,) SLOPE.
5.ALL CUT AND FILL SLOPES SHALL BE TRIMMED TO A
FINISH GRADE TO PRODUCE A SMOOTH AND UNIFORM SURFACE
OR CROSS SECTION. THE SITE SHALL BE LEFT IN A NEAT
AND ORDERLY CONDITION.
6. ALL EXPOSED SLOPES SHALL BE HAND SEEDED FOR EROSION
CONTROL
7. Fl LL AREAS SHALL BE COMPACTED TO THE SATISFACTION
OF THE INSPECTOR:
1 /I
SWALE
-·-·· ,._..,,w_, __ -••••••"'•"•'N
_, ....... ,., .... _._.,.
OA 11, lNl71AL
ENGINEER OF WORK
..... _
\
\
\
\
\
REVISION
I
GRADING QUANT I TIES
CUT=l50CY
FILL= 150 CY
..._..,,.... _____
c1n OF CARlssAo
t~•'.N'"Gi.',.OSSlON ,. . -ILle_, "f.l!fbh.~
CASE ~O _ et;P_ q(lc J.3 ~~••
·--~-~---4~---·~~-l!-....... ,. ...... ____, .. ~ ... ,.,,.,.~-.~ .. -... ... ,,,~,..,~ .. ,-
lXH!!JtT ~0.~ _,_!')AH:_ z~ ::!iL
M---~~-~-,.
!
C O II I S ,,LE• I =20
"AS BUil_ ··,-,,
' '
RCE EXP. DATE
REVIEWED BY:
.... -
INSPECTOR DATE
I SHEETJ
! 2 CITY OF CARLSBAD I SH2ETS I
L: .. _ ENGINc.ERING DEPARTMENT -
····-·--
HIRING SIT r-
GRADING PLAN
APPROVED
•"••·
CITY ENGINEER RCE 23889 EXP. ., •• 31 93 DA TI:
''" . --........
1
owN BV: IT
I
PROJECT NO.
I
DRAWING NO. DAIT INl71Al. DATE INITIAL G ,< DESCRIPTION 1CHKD BY:
GK 316-5 OTHER APPROVAi. CHY APPROVAi. ,RVwP BY:
CMWD 90-C.OOQ