HomeMy WebLinkAbout2666 FLOWER FIELDS WAY; ; CBC2024-0038; PermitBuilding Permit Finaled
{city of
Carlsbad
Commercial Permit
Print Date: 08/23/2024
Job Address:
Permit Type:
Parcel#:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
2666 FLOWER FIELDS WAY, CARLSBAD, CA 92010-8330
BLDG-Commercial Work Class:
1670308000 Track #:
$0.00 Lot#:
Project#:
Plan#:
Construction Type:
Orig. Plan Check #:
Plan Check#:
Repair
Permit No:
Status:
CBC2024-0038
Closed -Fina led
Applied: 01/31/2024
Issued: 06/12/2024
Finaled Close Out: 08/23/2024
Fina l Inspection: 08/20/2024
INSPECTOR: Renfro, Chris
Alvarado, Tony
Description: RETROFIT FOUNDATION STABILIZATION FOR APARTMENT COMPLEX WITH ANCHOR UNDERPINNING
FEE
BUILDING PLAN CHECK
Property Owner:
RAINTREE FLOWER FIELDS LLC
28202 CABOT RD, # 300
LAGUNA NIGUEL, CA 92677-1249
(760) 434-1060
BUILDING PLAN REVIEW -MINOR PROJECTS (LOE)
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
FOUNDATION REPAIR-COMMERCIAL
SB1473 -GREEN BUILDING STATE STANDARDS FEE
Total Fees: $1,168.25 Total Payments To Date: $1,168.25
Contractor:
CAMP FACILITY SERVICES
11 GODDARD
IRVINE, CA 92618-4600
(866) 924-4207
Balance Due:
AMOUNT
$341.25
$197.00
$104.00
$525.00
$1.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.car lsbadca.gov
{cityof
Carlsbad
Job Address 2666 Flower Field way
Tenant Name#: Flower Field Condominiums
COMMERCIAL
BUILDING PERMIT
APPLICATION
B-2
Plan Check ________ _
Est. Value
PC Deposit
Date
Suite: _____ APN: 167-030-80-00
Lot #:. ____ Year Built: _________ _
Year Built:. __ _ Occupancy: R-2 & U Construction Type: V-B Fire sprinklersO'ESQNO A/C:QYESQNO
BRIEF DESCRIPTION OF WORK: Proposed slab on grade stabilization at residential condominiums
D Addition/New:. ____________ New SF and Use,, __________ New SF and Use
______ SF Deck, _______ SF Patio Cover, SF Other (Specify). ___ _
OTenant Improvement: _____ SF,
_____ SF,
Existing Use: _______ Proposed Use: ______ _
Existing Use: Proposed Use: ______ _
D Pool/Spa: _____ SF Additional Gas or Electrical Features? ____________ _
D Solar: ___ KW,. ___ Modules, Mounted:ORoof O Ground
D Re roof:. ____________________________________ _
D Plumbing/Mechanical/Electrical
O0ther: -------------------------------------
APPLICANT (PRIMARY CONTACT)
Name: Camp Facility Services
Address· 11 Goddard
City· Irvine
Phone· (866)924-4207
Email· lscallon@campfs.com
State:_C_A __ Zip: 9261 8
DESIGN PROFESSIONAL
Name: EJD Engineering INC.
Address: 14 726 Ramona Ave. STE 41 o
PROPERTY OWNER
Name: Raintree Partners
Address: 34052 La Plaza, Ste 201
City: Dana Point
Phone: (480)797-3169
State: CA Zip:_9_26_2_9 __ _
Email: ___________________ _
CONTRACTOR OF RECORD
Business Name: Camp Facility Services
Address: 11 Goddard
City: Chino State:._C_A __ Zip: 9171 0 City: Irvine State:,_C_A __ Zip:92618
Phone: (909)517-2451 Phone: (866)924-4207
Email: Earnest@ejdenginerring.com Email: ___________________ _
Architect State License: _6_7_76_5 __________ CSLB License #:._1_0_88_9_2_3 ____ Class:._8 ______ _
Carlsbad Business License# (Required):, _______ _
APPLICANT CERT/FICA TION: /certify that I have read the application and state that the above information is correct and that the
information on the plans is accurate. /agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): _________ _ SIGN: __________ DATE: ______ _
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
REV. 07/21
THIS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON
SIGNING THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO
PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
/herebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChapter9(commencingwithSection7000)ofDivision3
of the Business and Professions Code, and my license is in full force and effect. I also affirm under penalty of perjury one of the
following declarations(CHOOSE ONE):
D1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the Labor Code, for the performance of the
work which this permit is issued. PolicyNo. ______________________________________ _
-OR-
(!]1 have and will maintain worker's compensation, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: lnsuranceCompany Name: E,tv\ PL.er-lee~ I~!';>. (' 01"'\ pA(V'j
Policy No. WC( lG I':\ '\(o(p(o So, 3 ExpirationDate:_~9~l_\_\-N:-Y~--------
-OR-
Ocertificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage is unlawful and shall subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: Lender's Address: ____________________ _
CONTRACTOR CERT/FICA TION: I certify that I have read the application and state that the above information is correct and that
the information on the plans is accurate. I agree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): LAgH s~~; SIGNATUR r:_,.-:;;..u,"'-'"C~f,-,l-' ....... :>,<;,.....:~-DATE: c,,/1::; l.:ie@'-1
Note: If the person signing above is an authorized agent for the contractor provide a letter of
-OR -
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the following reason: n I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
~. Business and Professions Code: The Contractor's License Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
D1, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's License Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's License Law).
-OR-□, am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND, D FORM 8-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors./ understand that a capyof the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted or at the following Web site: http: I /www.leginfo.ca.gov/ ca/aw.html.
OWNER CERTIFICATION: /certifythatlhavereadthe applicationandstatethattheaboveinformationiscorrectandthatthe
information on the plansisaccurate. lagree to comply with all City ordinances and State laws relating to building
construction.
NAME (PRINT): SIGN: __________ DATE: ______ _
Note: If the person signing above is an authorized agent for the property owner include form B-62 signed by property owner.
1635 Faraday Ave Carlsbad, CA 92008 Ph: 442-339-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
2 REV. 07/21
Building Permit Inspection History Finaled
{city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBC2024-0038)
Permit Type: BLDG-Commercial
Work Class: Repair
Application Date: 01/31/2024 Owner: RAINTREE FLOWER FIELDS LLC
Issue Date: 06/12/2024 Subdivision: CARLSBAD TCT#83-13
Status: Closed -Finaled Expiration Date: 01/13/2025 Address: 2666 FLOWER FIELDS WAY
CARLSBAD, CA 92010-8330 IVR Number: 54525
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection
Date Start Date Status
06/17/2024 06/17/2024 BLDG-SW-Inspection 251923-2024 Partial Pass Tony Alvarado Re inspection
Checklist Item COMMENTS Passed
Are erosion control BMPs No
functioning properly?
Are perimeter control BMPs No
maintained?
Is the entrance stabilized to No
prevent tracking?
Have sediments been tracked No
on to the street?
Has trash/debris accumulated No
throughout the site?
Are portable restrooms No
properly positioned?
Do portable restrooms have No
secondary containment?
BLDG-SW-Pre-Con 251922-2024 Partial Pass Tony Alvarado Re inspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency July 17, 2024: Yes
1. Spoke to Contractor representative
regarding apartment building engineered
Healy coil reinforcement foundation
system.
2. Inform Contractor representative
regarding City of Carlsbad preconstruction
meeting requirements and guidelines -OK.
3. Discussed with contractor
representative SWPPPS, BMPS, soil,
sediment, trash debris devices and
measures required. -OK.
06/21/2024 06/21/2024 BLDG-11 252514-2024 Partial Pass Chris Renfro Re inspection
Foundation/Ftg/Piers
(Rebar)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Partial pass on foundation stabilization on Yes
Building #11 . Verified (21) Helical Anchors
installed at multiple locations around
building. Collected engineering observation
reports.
07/03/2024 07/03/2024 BLDG-11 253871-2024 Partial Pass Chris Renfro Reinspection
Foundation/Ftg/Piers
(Rebar)
Friday, August 23, 2024
Inspection
Incomplete
Incomplete
Incomplete
Incomplete
Page 1 of 2
PERMIT INSPECTION HISTORY for (CBC2024-0038)
Permit Type: BLDG-Commercial
Work Class: Repair
Application Date: 01/31/2024 Owner: RAINTREE FLOWER FIELDS LLC
Status:
Scheduled
Date
07/16/2024
08/20/2024
Closed -Fina led
Issue Date: 06/12/2024 Subdivision: CARLSBAD TCT#83-13
Expiration Date: 01/13/2025
IVR Number: 54525
Address: 2666 FLOWER FIELDS WAY
CARLSBAD, CA 92010-8330
Actual Inspection Type
Start Date
Inspection No. Inspection
Status
Primary Inspector Reinspection Inspection
Checklist Item
BLDG-Building Deficiency
COMMENTS
Partial pass on foundation stabilization on
Building #10. Verified (21) Helical Anchors
installed at multiple locations around
building. Collected engineering observation
reports.
07/16/2024 BLDG-11 254784-2024 Partial Pass Chris Renfro
Foundation/Ftg/Plers
(Rebar)
Checklist Item
BLDG-Building Deficiency
COMMENTS
Partial pass on foundation stabilization on
Building #9. Verified (21) Helical Anchors
installed at multiple locations around
building. Collected engineering observation
reports.
08/20/2024 BLDG-11 258537-2024 Passed Chris Renfro
Foundation/Ftg/Piers
(Rebar)
Checklist Item
BLDG-Building Deficiency
NOTES Created By
Chris Renfro
COMMENTS
Partial pass on foundation stabilization on
Building #9. Verified (21) Helical Anchors
installed at multiple locations around
building. Collected engineering observation
reports.
TEXT
RECEIVED FINAL SPECIAL INSPECTION
REPORT FOR RETROFIT EPOXY
FOUNDATION REPAIRS
BLOG-Final Inspection
Checklist Item
258539-2024
COMMENTS
Passed Chris Renfro
BLDG-Building Deficiency
BLDG-Structural Final
Passed
Yes
Reinspection Incomplete
Passed
Yes
Passed
Yes
Created Date
08/20/2024
Passed
Yes
Yes
Complete
Complete
Friday, August 23, 2024 Page 2 of 2
consultants
FIELD
TO: File
engineering
geotechnical
applications f ROJECT NAME
A, (
LOCtlON I I ""'
SUPERINTEt-jDENT/FOREPERSON
REPORT
City of car\sbad
JUL 2 2 7.tJ24
ENGINEER "" -\J
PERSONNEL ON SITE V )
TYPE OF □ Structural Steel Assembly
INSPECTION □ Drainage
REQUIRED □ Reinforced Masonr □ As halt
SUMMARY OF OBSERVATIONS AND/OR DISCUSSIONS: \l .( :
~ 1=, I . ..,,,. \ I
(' LA { ,,. ~ ·H" r (,, .,_J \~,,, ( .}1-/.Id ,,,., I
....
l.A
Alf ✓ I'__ -{
I
TESTS PERFORMED: / CYLINDERS:
RECOMMENDATIONS:
Z...12 L.,
PROJECT NO.
Quality Control
0 Epoxy
0 Other
r-1vv l" , , 1
4 V .(
\
SIGNATURE, TITLE (POSITION)
PERSONNEL ON SITE
(o EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 9262 7
(949) 642-9309
FAX (949) 642-1290
engineering DATE 1 • \ \ J I t,
ROJECTNO. geotechnical 1 )
city of i0artsba ,I-I---'---'---'------'-'.::..:...J.-~,_;-.:.---=-..:...c.....:.::.:.-~c1'--T1------1
consultants
FIELD
TO: File \ \)
TYPE OF
INSPECTION
REQUIRED
R E p dht2 2024
BUILDING DIVIS
I 1,
I
□ Soils
□ Reinforced Concrete
0 Reinforced Masonr
L,.....,
I
□ Structural Steel Assembly P Quality Control
□ Drainage □ Epoxy
□ As halt □ Other
SUMMARY OF OBSERVATIONS AND/OR DISCUSSIONS: • .,,
r--..:..::;..i.::.------+--'-'-"'-'--c--~;.:;...__--'-'...c;;;....c.,---'--'--'-:,.,<--_;;_1c....,\c..:;__,_l1:....:,_-1,___...;.:\.,1'---'---\-'-=-~ :.....:{"--i;___;;_T_;\'-'-'-'-'...,_..:::...;.:..,::V:..._;F_,::...:.....;,.:.:.:c...J.----'-'':....:....:........:...:...&..-.=.c..:Y':.........:.'~c,""="c.:...' ____:_:.4 l 1(
n ,,,., I 4 \,i I I,
JJ lt -4 7 /./ (., ..
'..+ 1 I,.
~•t 't
J
lA 1 ).,,
• "t J tf ,J ~
-p I ('. ~
TESTS PERFORMED:
RECOMMENDATIONS:
PERSONNEL ON SITE
, ~I• Vt •
A,; I _,. F., ,t,
,J:.
.. I I 11 I
t. I, \(\. j,. 1,.
b ,\ ·, I , , • {A ..,
I '1 J II + ,,,, ~-~ w
I) ..\ \,
\
/ CYLINDERS:
~1 () C
I
I , l .. , I' l~ I {., ..,.. v
l I , ( ...,_,
IA,
SIGNATURE, TITLE (POSITION)
EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 9262 7
(949) 642-9309
FAX (949) 642-1290
consultants
engineering
geotechnical
c, .. ~afieifi
FIELD RE p O Rf 2 2 20'"11:--N1__:RAC:..__TO-~S_;__;....) .:.!__,r ------=----~J;..._.f,
BUILDING DI 51l'el~ER'-' ,·
1
.• , 'W'
,Qpy
TO: File
EQUIPM/=NT ONI Sl~E I I i) t I IT I -\', (I y \ .J'-V ., "t JI
PERSONNEL ON SITE 1,1
,--JI f'..,,
TYPE OF i!l Soils O Structural Steel Assembly
INSPECTION O Reinforced Concrete O Drainage
REQUIRED O Reinforced Masonr O As halt
().,, I k )
,
.. l y , l 7Jtb
I L• V, I\ I
J
i V V\ j I,, (" .At -,, J A
I',. ...... 1'\
(_ ( .\ V ( ... .... t:4 vv "I .\ \II \
.r\vt! '1-I I\,\ -\-\ L v'I:] -( I i.,(1 J
l I "1 • ◄ \ I ~ 1 , ll .t l("I I d , __ ,, ..
I
' (. \.Wt,
I -\ ( I I "" -
TESTS PERFORMED: / CYLINDERS:
RECOMMENDATIONS: ( t]\;
I \ , . )
j
0 Quality Control
0 Epoxy
0 Other
+
41 ..,
+
,/..
""i
~
' ~ v
SIGNATURE, TITLE (POSITION)
PERSONNEL ON SITE
EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 92627
(949) 642-9309
FAX (949) 642-1290
consultants
engineering
geotechnical
applications
FIELD REPORT
ro:AECQRD CO
OATH
..,J
I J
TYPE OF □ Soils □ Structural Steel Assembly l!l"Quality Control
INSPECTION □ Reinforced Concrete □ Drainage □ Epoxy
REQUIRED O Reinforced Masonr O As halt O Other
TESTS PERFORMED: / CYLINDERS:
RECOMMENDATIONS:
(A I ..\
PERSONNEL ON SITE
I , I (,""
SIGNATURE, TITLE (POSITION)
EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 9262 7
(949) 642-9309
FAX (949) 642-1290
consultants
engineering
. Sfi~tf ical ,ty of Carl appt:cations
JUL 2 2 202~
FIELD ~,~i£>~TsioN
TO: File '1 D, ,,_ ... ,
I
DAY\ I \
DATE
SUPERINTENDl_:NT/FOREPERSON
, f ~
TYPE OF O Soils O Structural Steel Assembly
INSPECTION O Reinforced Concrete O Drainage
REQUIRED O Reinforced Masonr O As halt
SUMMARY OF OBSERVATIONS AND/OR DISCUSSIONS: R r + : '' F .")v\,'\ { ,_, J, w,
I
I ~ I
v rn" t1v1
J
TESTS PERFORMED: / CYLINDERS:
RECOMMENDATIONS: 1/\ "' \•hA-<-
[!--Quality Control
0 Epoxy
0 Other
I C
"itlo
I
md v
PERSONNEL ON SITE
SIGNATURE, TITLE (POSITION)
f
EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 92627
(949) 642-9309
FAX (949) 642-1290
EGA
'
engineering
geotechnical
COR Cp/c o 1 CITY' U, .,
FIELD REPORT 1---------r------'--__;_::..:....:....l.-'-'-t-'-'--'----'---~,Vlof Carlsbad
TO: File UL 2 .2 2024
,
TYPE OF O Soils O Structural Steel Assembly O Quality Control
INSPECTION O Reinforced Concrete O Drainage O Epoxy
REQUIRED O Reinforced Masonr O As halt O Other
SUMMARY OF OBSERVATIONS AND/OR DISCUSSIONS: I<. ()J/' 11 ftJv"' ( d, ,,., ,,, { I, > P.v-k ,.~
f)r-l,1 /1 I Fl 1i..v ... · rq1 (, ll .,,fAl CJ\11(..IW\•y'\IUvvd I Z66t rJ 1-:1,,,.,. f ,IA ( \,Al\1.
("(Is\?.-., ( 1 C .,.I. <{7 'l \1) '' 11 . f .TO tr, 11,1a\". ...... , -.,, . \').,t., ( AL,.1 2S;, 2 v2<--/. ' '
I " °' •
tv✓l.t,,,~,p ... A.~ ... \~~''I ..t.. (v't,.,+•<MJ l,....,u ,/1{(,...,.l i b ,(ur-h ,{
~ 1 1 h ... , .. Ir 1 1, + > l,.., 1 ,c VI ( c .......,.. i ,., t /, -" l + t 1 \A__ v ,,. ..,., ( t+, \II J
\" h C n , 1 \ r. {), , , l1 Q I l J )l,, -C .,.., +. \• { A 1 1 ...._, "" "·
TESTS PERFORMED: / CYLINDERS:
RECOMMENDATIONS:
SJGNATURE, TITLE (POSITION)
PERSONNEL ON SITE TIME ON r:
--------+---f-----+--S_IT_E -+-----,<-----I SIGNATURE OF SUPERINTENDENT, TITLE (POSITION) L
EGA CONSULTANTS
375-C Monte Vista Avenue
Costa Mesa, CA 92627
(949) 642-9309
FAX (949) 642-1290
DATE engineering , ( #----'--'-~---'---..------'--.......L"-'----'-.......... ~---L------,I
City &f@a,l ~MF \ ( I
application (
JUL 2 2 zo EN~OREP:RSON . consultants
FIELD REPQ1BlJG DI t ., Jl ' C ,
TO: File fT ,). C \ ·r ;
I
1
TYPE OF
INSPECTION
REQUIRED
0 Soils
0 Reinforced Concrete
0 Reinforced Masonr
0 Structural Steel Assembly
0 Drainage
0 As halt
SUMMARY OF OBSERVATIONS AND/OR DISCUSSIONS:
1/ ,.;. • •.
TESTS PERFORMED: / CYLINDERS:
R.ECOMMENDATIONS: C , z i I) ,.
Q-Quality Control
0 Epoxy
0 Other
' ) 1((-l
w,
7
SIGNATURE, TITLE (POSITION)
PERSONNEL ON SITE
SIGNATURE OF SUPERINTENDENT, TITLE (POSITION)
EGA CONSULTANTS
375-C Monte VistaAvenue
Cosca Mesa, CA 9262 7
(949) 642-9309
FAX (949) 642-1290
consultants
EJD Engineering, Inc.
14726 Ramona Ave., Suite 410-W1
Chino, California 91710
Attention:
Subject:
Ernest De Leon , P.E.
FINAL REPORT -CERTIFICATION OF CONFORMANCE
CONSTRUCTION MONITORING/TESTING
engineeri11f!.
geotechnical
applications
July 22, 2024
Project No. EJ447.2
DURING FOUNDATION REPAIRS, UNDERPINNING, STABILIZATION:
BUILDING #11 at FLOWER FIELDS APARTMENTS
2666 FLOWER FIELDS WAY, CARLSBAD, CALIFORNIA
Associated References:
1. "Floor Level Survey -Results and Summary: Ground Level Manometer Surveys at Three Buildings: #9, #10, and #11 at
Flower Fields Apartments Located at 2666 Flower Fields Way, Carlsbad, California," by EGA Consultants, Inc. dated
September 15, 2023.
2. "Geotechnical Distress Investigation for Underpinning Stabilization at Buildings: #9, #10, and #11 at Flower Fields Apartments
Located at 2666 Flower Fields Way, Carlsbad, California," by EGA Consultants, Inc. dated November 9, 2023.
3. "Foundation RetrofiVAnchor Plans, Flower Fields Rental Condominiums, 2666 Flower Fields Way, Carlsbad, CA 92010," by
EJD Engineering, Inc. dated June 6, 2023, updated May 28, 2024.
Dear Team:
We are submitting this Certification of Conformance as follows:
This will advise you that representatives of EGA Consultants have conducted required
inspections during the foundation repairs and underpinning at the site referenced above. The
helical anchor installations and backfill compaction were performed between June 17, 2024
and July 17, 2024. The repairs were performed by Camp Facility Services, of Irvine, California.
The anchor screw installations were performed using an 18-horsepower Digga hydraulic
compressor. Each of the helical anchors (3" shafts) were installed to a total shaft depth of
12 to 15 ft. below grade (foundation anchors shafts were installed below 12 inches of existing
footing depth). A total of 21 foundation anchors were installed. All anchors were Installed
satisfactorily to minium torque values of 5,200 ft/lb. for footings. The excavated pits (approx.
3 by 3 by feet) were then backfilled with min. 90% compacted fill; completed on July 17, 2024.
We verify that construction and building materials conform with the regulatory Code and
project specifications outlined in the above-referenced Foundation Retrofit Plan by EJD
Engineering, Inc. and in our soils reports (reference Nos. 2 and 3).
This opportunity to be of service is appreciated. If you have any questions, please call.
Very truly yours,
DAVID A. WORTHINGTON, CEG 2124
Principal Engineering Geologist/President
cc: ( 1) Addressee
(1) Camp Facility Services. Attn: Stephan Osorio, General Manager
(1) Dalinghaus Construction, Inc., Attn: James Rodriguez, Superintendent
375-C Monte Vis ta Avenue• Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290
EGA RECORD COP\ engineering
geotechnical
applications
consultants City of Carrsbad
AUG 2 0 2024
BUILDING DIVISION
EJD Engineering, Inc. July 19, 2024
Project No. EJ447.2 14726 Ramona Ave ., Suite 410-W1
Chino, California 91710
Attention: Ernest De Leon, P.E.
Subject: FINAL REPORT -CERTIFICATION OF CONFORMANCE
CONSTRUCTION MONITORING/TESTING
DURING FOUNDATION REPAIRS, UNDERPINNING, STABILIZATION:
BUILDING #9 at FLOWER FIELDS APARTMENTS
2666 FLOWER FIELDS WAY, CARLSBAD, CALIFORNIA
Associated References:
1. "Floor Level Survey -Results and Summary: Ground Level Manometer Surveys at Three Buildings: #9, #10, and #11 at
Flower Fields Apartments Located at 2666 Flower Fields Way, Carlsbad, California," by EGA Consultants, Inc. dated
September 15, 2023.
2. "Geotechnical Distress Investigation for Underpinning Stabilization at Buildings: #9, #10, and #1 1 at Flower Fields
Apartments Located at 2666 Flower Fields Way, Carlsbad, California," by EGA Consultants. Inc. dated November 9, 2023.
3. "Foundation RetrofiUAnchor Plans, Flower Fields Rental Condominiums, 2666 Flower Fields Way, Carlsbad, CA 9201 0," by
EJD Engineering, Inc. dated June 6, 2023, updated May 28, 2024.
Dear Team:
We are submitting this Certification of Conformance as follows:
This will advise you that representatives of £GA Consultants have conducted required
inspections during the foundation repairs and underpinning at the site referenced above. The
helical anchor installations were performed between July 8, 2024 and July 17, 2024. The
repairs were performed by Camp Facility Services, of Irvine, California.
The anchor screw installations were performed using an 18-horsepower Digga hydraulic
compressor. Each of the helical anchors (3" shafts) were installed to a total shaft depth of
12 to 15 ft. below grade (foundation anchors shafts were installed below 12 inches of existing
footing depth). A total of 21 foundation anchors were installed. All anchors were installed
satisfactorily to minium torque values of 5,200 ft/lb. for footings. The excavated pits (approx.
3 by 3 by feet) were then backfilled with min. 90% compacted fill; completed on July 17, 2024.
We verify that construction and building materials conform with the regulatory Code and
project specifications outlined in the above-referenced Foundation Retrofit Plan by EJD
Engineering, Inc. and in our soils reports (reference Nos. 2 and 3).
This opportunity to be of service is appreciated. If you have any questions, please call.
Very truly yours,
DAVID A. WORTHINGTON, CEG 2124
Principal Engineering Geologist/President
cc: (1) Addressee
(1) Camp Facility Services, Attn: Stephan Osorio. General Manager
r mgto ~ * No.CEG2124
CERT/FrfO , I *
(1) Dalinghaus Construction, Inc. Attn: James Rodriguez. Superintendent
375-C Monte Vista Avenue• Costa Mesa, CA 9 2627 • (949) 642-9309 • FAX (9 49) 642-1290
EGA I
engi11eeri11g
ge11tech11ical
applications
consultants
EJD Engineering, Inc.
14726 Ramona Ave., Suite 410-W1
Chino, California 91710
Attention:
Subject:
Ernest De Leon, P.E.
FINAL REPORT -CERTIFICATION OF CONFORMANCE
CONSTRUCTION MONITOR! NG/TES Tl NG
July 20, 2024
Project No. EJ447.2
DURING FOUNDATION REPAIRS, UNDERPINNING, STABILIZATION:
BUILDING #10 at FLOWER FIELDS APARTMENTS
2666 FLOWER FI ELDS WAY, CARLSBAD, CALIFORNIA
Associated References:
1. "Floor Level Survey -Results and Summary: Ground Level Manometer Surveys at Three Buildings: #9, #10, and #11 at
Flower Fields Apartments Located at 2666 Flower Fields Way, Carlsbad, California," by EGA Consultants, Inc. dated
September 15, 2023.
2. "Geotechnical Distress Investigation for Underpinning Stabilization at Buildings: #9, #10, and #11 at Flower Fields Apartments
Localed at 2666 Flower Fields Way, Carlsbad, California," by EGA Consultants, Inc. dated November 9, 2023.
3. "Foundation RetrofiVAnchor Plans, Flower Fields Rental Condominiums, 2666 Flower Fields Way, Carlsbad, CA 9201 0," by
EJD Engineering, Inc. dated June 6, 2023, updated May 28, 2024.
Dear Team:
We are submitting this Certification of Conformance as follows:
This will advise you that representatives of EGA Consultants have conducted required
inspections during the foundation repairs and underpinning at the site referenced above. The
helical anchor installations were performed between June 22, 2024 and July 17, 2024. The
repairs were performed by Camp Facility Services, of Irvine, California.
The anchor screw installations were p erformed using an 18-horsepower Digga hydraulic
compressor. Each of the helical anchors (3" shafts) were installed to a total shaft depth of
12 to 15 ft. below grade (foundation anchors shafts were installed below 12 inches of existing
footing depth). A total of 21 foundation anchors were installed. All anchors were installed
satisfactorily to minium torque values of 5,200 ft/lb. for footings. The excavated pits (approx.
3 by 3 by feet) were then backfilled with min. 90% compacted fill; completed on July 17, 2024.
We verify that construction and building materials conform with the regulatory Code and
project specifications outlined in the above-referenced Foundation Retrofit Plan by EJD
Engineering, Inc. and in our soils reports (reference Nos. 2 and 3).
This opportunity to be of service is appreciated. If you have any questions, please call.
Very truly yours,
EGA Consultants, inc. ~( e_ ____ _
DAVID A. WORTHINGTON, CEG 2124
Principal Engineering Geologist/President
cc: (1) Addressee
(1) Camp Facility Services. Attn: Stephan Osono, General Manager
(1) Dalinghaus Construction, Inc .. Attn-James Rodriguez. Superintendent
375-C M o nte Vista Avenue• Costa Mesa, CA 92627 • (949) 642-9309 • FAX (949) 642-1290
February 7, 2024
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: Tl Foundation Stabilization for Apartment Complex
Address: 2666 Flower Field Ways
Applicant Name: Benjamin McNamara
Applicant Email: Benjamin@EJDEngineering.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: R-2/U
Occupant Load: N/ A
Type of Construction: V-B
Sprinklers: N/ A
Stories: 3
Area of Work (sq. ft.): N/ A sq. ft.
The plans have been reviewed for coordination with the pennit application.
Valuation: See Notes Below
Scope of Work: Confirmed
Floor Area: See Notes Below
Notes: No valuation or floor area provided in permit application.
Attn: Building & Safety Department,
True Nortl1
COMPLIANCE SERVICES
City of Carlsbad -FINAL REVIEW
City Penn it No: CBC2024-0038
True North No.: 24-018-097
True North Compliance Services, Inc. has completed the final review of th e fo llowing documents for the proj ect
referenced above on behalf of the City of Carl sbad:
1.
2.
3.
Drawings: One (I) copy dated December 12, 2023, by EJD Engineering, Inc.
Geotechnical Report: One ( 1) copy dated November 9, 2023, by EGA Consultants, Inc.
Other Documents: One (I) copy dated January 16, 2024, by EJD Engineering, Inc .
The 2022 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California), 2022 California Green Building Standards Code, 2022 California
Existing Building Code, and 2022 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments, however, we bring the
following to your attention:
I. Approved with the following condition: Geotech engineer to stamp and sign sheet plans sheets FON-I and
DI.
True North Compliance Services, Inc.
8369 Vickers Street, Suite 207, San Diego, CA 92111
T / 562. 733.8030
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or ifwe can be of frnther assistance.
Sincerely,
True North Compliance Services
Review By: Alaa Atassi -Pl an Review Engineer
BJD ENGINEERING, INC.
14726 Ramona Ave. (410-W1) PH: 909.517.2451
Chino, CA 91710 FAX: 877.795.9778
FOUNDATION RETROFIT
FLOWER FIELDS RENTALCONDOMINIUVIS
2666 FLOWER FIELDS WAY
CARLSBAD, CA 92010
IIATD JOB#23-009
DESIGN BASED ON 2022 CBC
RE~ORDCQpy
MAY28,2024
TABLE OF CONTENTS:
HELICALANCHOR DESIGN
GRADEBEAM DESIGN .
Page 1 of 5
PAGE2
PAGE4
FLOWER FIELDS CONDOS
CARLSBAD.CA
FIELD TESTED VALUES -COMPRESSION:
(23-009) ANCHORS.xmcd
TI-lE HELICALANCHORSARE DESIGNED SUCH TI-lATTI-lERE IS A CORRELATION BETWEEN TI-lE SOIL RESISTANCE
AND TI-lE INSTALLATION lDRQUE. BY VERIFYING IN REAL TIME TI-lE INSTALLATION TORQUE OF TI-lEANCHORS, IT
CAN BE ASSURED TI-lAT IT REACHES TI-lE MINIMUM SPECIFIED, AND TI-lUS THE REQUIRED SOIL CAPACITY
AN IN-SITU LOAD TEST SHALL BE PROVIDED PRIOR TO TI-lE INSTALL OF TI-lE HELICALANCHORS TO VERIFY lHAT
TI-lE MINIMUM SPECIFIED TORQUE CAN BE OBTAINED IN THE FIELD. FOLLOW ALL MANUFACTURER DIRECTIONS
FOR PERFORMANCE OF TI-lE LOAD TEST TORQUE MEASUREMENTS WlLLALSO BE TAKEN ON ALL INSTALLED
ANCHORS TO VERIFYTI-lATTHE MINIMUM SPECIFIED TORQUE IS REACHED.
FURTHERMORE, TI-lE INSTALLER SHALL PROVIDE TO TI-lE ENGINEER OF RECORD A CALIBRATION OF TI-lE
EQUIPMENT USED SHOWING THE CORRELATION OFTI-lE INSTALLATION TORQUE lD TI-lE TOTAL FORCE
RESISTANCE OFTI-lE SOIL. BASED ON PAST EXPERIENCE, EJD ENGINEERING, INC. EXPECTSTI-lEANCHORSTO
BE INSTALLED WlTI-l A KD8000, WHICH CORRELATES 1 FT-LB OF INSTALLATION TORQUE TO 10 LB OF TOTAL SOIL
RESISTANCE.
MINIMUM SPECIFIED TORQUE= 3,000 FT-LB
PER KD8000: LOAD= 30,000 LB MINIMUM SPECIFIED SOIL FORCE Pspecified := 30000-lb*
PER CBC EQUATION 18-4 TO CONVERT TO ALLOWABLE STRESS
Psoil := 0.5· Pspecified*jPsoil = 15000 lb I ALLOWABLE STRESS
A: DESIGN FOOTING ANCHORS -DOUBLE HELICAL FOUNDATION ANCHORS
FOUNDATION BRACKET
PER ICC-ESR 3559 -(PER TABLE-5) FOUNDATION BRACKET FOR
2-7/8" PIPE SHAFT
FOUNDATION PIERS
CHECK FOR AXIAL FORCE:
PER ICC-ESR 3559 -(PER TABLE-5) 2-7/8" PIPE SHAFT WITH
1 O" + 12" DIAMETER DOUBLE HELIXANCHOR
CHECK FOR COLUMN BUCKLING (USE DAVISSON METHOD):
IPbracket := 20700-lb.l
Paxiat := 58600-lb*
E5 := 29000000-PSI*
I:= 1.854-in\
ASSUME PIN-PIN CONNECTION WITH MINIMUM Ucr
FOR HELICAL PILE -TI-llS IS CONSERVATIVE.
lb Kh := 50·-• . 3
ASSUMEDKh.
In
R = 2.061 ft
(
E ·IJ Pbuckling := Ucr" :2 * Pbuckling = 175828 lb
ALLOWABLE ANCHOR POINT LOAD FORCE IS MIN OF AXIAL AND BUCKLING CAPACITIES:
Panchor := min( Pbuckling, Paxial)* jPanchor = 58600 lb I
Page 2 of 5
FLOWER FIELDS CONDOS
CARLSBAD.CA
(23-009) ANCHORS.xmcd
THE DESIGN ALLOWABLE POINT LOAD FORCE IS GOVERNED BY THE MIN OF SOIL, BRACKET AND ANCHOR:
Pdesigncomp := min{ Psoil , Pbracket, Panchor)* IPctesigncomp = 15000 lb I
GRAVITY LOADS:
ROOF LIVE LOAD: RLL := 20-PSF* FLOOR LIVE LOAD:
ROOF DEAD LOAD: RDL := 15-PSF* FLOOR DEAD LOAD:
AT A DEPTH OF 15 FT. EMBEDMENT MIN.
PER SOILS REPORT
FLL := 40-PSF* SOIL FRICTION:
FOL:= 12-PSF* FOOTING DEPTH:
WALL DEAD LOAD: WOL := 15· PSF,.. CONCRETE DEAD LOAD: COL := 150-PCF,..
(1 ): EXTERIOR FOOTING MAXIMUM VERTICAL LOADING AT GRIDUNE A -SEE STRUCTURAL PLANS
SHEET 53 FOR THE FLOOR AND ROOF LOADS -WALL LOADS AND CONCRETE FDN DEAD LOAD
SF:= 500 -PSF*
0 := 2-FT*
W := (RDL + RLL){ 3
2
°-FT) +(FOL+ FLL){ l!.5 -FT)+ (WOL)-(26.417-FT) + (COL)·[(l2-IN-32-IN) + (3·IN·8·1N)] *
W = 1671.255-PLF
SPACING OF FOOTING ANCHORS (DENOTED P1 TO P21) SEE SHEET S3 S := 8.25-FT,..
Fweighl := W-S,.. Fweight = 13788 lb < Pctesigncomp = 15000 lb OK
ULTIMATE CAPACITIES HAVE BEEN REDUCED BY A FACTOR OF 2 TO ASSURE A MINIMUM FAClOR OF SAFETY OF 2.
MULTIPLY DEMAND CAPACITY RATIOS BY 2 TO GET ACnJAL FAClORS OF SAFETY.
FACTORS OF SAFETY:
Psoil FACTOR OF SAFETY FS:= 2---* IFS =2.l76 I OK
(SOIL FORCE): Fweight OTE: ADDITIONAL RESISTANCE OF
Panchor RAVITY LOADS IS PROVIDED BY SOIL
FACTOR OF SAFETY FS:= 2---* IFS = 8.500 I OK RICTION ON EXISTING FOOTING -THIS IS
(HELICAL ANCHOR): Fweight EGLECTED FOR THIS CALCULATION -
Pbrackel IS IS CONSERVATIVE
FACTOR OF SAFETY FS:= 2---* IFS = 3.003 I OK
(BRACKET): Fweight
USE 1 0" + 12" DIAMETER DOUBLE HELIX ANCHOR WITH 1-3/4" SQUARE SHAFT x 5' -0" LENGTH
WITH (2) 5'-0" EXTENSION FOR 15 FT. MINIMUM EMBEDMENT BELOW GRADE.
Page 3 of 5
FLOWER FIELDS CONDOS
CARLSBAD, CA
FOUNDATION RETROFIT
FLOWER FIELDS RENTALCONDOMINIU\IIS
2666 FLOWER FIELDS WAY
CARLSBAD, CA 92010
CHECK EXISTING INTERIOR FOOTING(S) AS GRADE BEAM(S)
TO SPAN BElWEEN ANCHOR SPACING:
PLEASE NOTE THE CONCRETE BEAM BELOW IS DESIGNED ASA SIMPLE SPAN BEAM
FOR THE EXISTING CONCRETE FOUNDATION lO SPAN BElWEEN ANCHORSAND SUPPORTTHE
EXISTING DEAD AND LIVE LOAD OF RESIDENCE
IN REALITY THE FOUNDATIONS WOULD BE SUPPORTED BY THE SOIL AS ABEAM ON AN ELASTC
FOUNDATION -THE SOIL IS NEGLECTED (THESE CALCULATIONS ARE VERY CONSERVATIVE).
GRAVITY LOADS:
ROOF LIVE LOAD:
ROOF DEAD LOAD:
FLOOR DEAD LOAD:
FLOOR LIVE LOAD:
WALL DEAD LOAD:
RLL := 20-PSF*
RDL := I5-PSF*
FDL := I2-PSF*
FLL := 40-PSF*
WDL := I 5-PSF*
CONCRETE DEAD LOAD: CDL := I50-PCF*
REINFORCED CONCRETE: WORKING STRESS DESIGN
fe• := 2500-psi
Fe:= 0.45•fc•
Fs := 24000-psi
Fe= II25-psi
Ve = 55-psi
(23-009) GRADEBEAM.xmcd
Es:= 29000000-psi Ee := 57000-..jr;,-psi"5 Ee = 2850000-psi
Es
n:=-n =I0.175
Ee
(F1) VERIFY EXISTING FOUNDATION AND ANCHOR SPACING AS A GRADE BEAM FOR EXTERIOR BEARING
WALL:
(1 ): EXTERIOR FOOTING MAXIMUM LOADING AT GRIDUNES 1 &11 AND MAXIMUM SPAN AT GRIDUNE A. VERIFY
TYPICAL SPAN BETWEEN PIERS. SEE STRUCTURAL PLANS SHEET 53 FOR ANCHOR LAYOUT AND CONCRETE
FDN DEAD LOAD. SEE SHEET S4 FOR THE ROOF LOADS AND WALL LOADS TRIBUTARY WIDTHS.
IL:= 8.25-F] MAXIMUM SPACING. SEE FOUNDATION PLAN SHEET S3.
W := (RDL + RLL)·Ci°-FT) +(FOL + FLL){ 1~-5 ·FT)+ (WDL)-(26.4I7-FT) + (CDL)·[(I2•1N•32·1N) + (3-IN-8-IN)] *
W = I67 1.255-PLF
W-L2
M:=--
8
W-L V:=-
2
IM = I42 I9ft-lb I
IV = 6893.927 lb I
Page 4 of 5
FLOWER FIELDS CONDOS
CARLSBAD.CA
BOUNDARY CONDITIONS:
(23-009) GRADEBEAM.xmcd
REINFORCEMENT BAR# BarNum := 4
NUMBER OF BARS: INO := ~
cp := BarNum -in l<I> = 0.5•id
8
FOOTING DEPTH: !cone thick:= (24 + 8)•id
cover:= 3-in d := conc_thick -cover Id = 29·id
FOOTING WIDTH:
2
As:= 7\"·<P ·NO-2
4
As p·--.-b-d
k := ,Ji-p-n + (p·n)2 -p-n
. k J := I --3
As = 0.785-in2
p = 0.002
k = 0.193
j = 0.936
M5 = 42629-ft-lb
Mc= 85252-ft-lb
Vallow:= Vc·j ·b·d !Vallow= 1791 1 lb I
Mallow:= if{Ms < Mc, M5,Mc} !Mallow = 42629-ft•ltj
>
>
E CONCRETE BEAM USES THE FOOTING
ND THICKENED EDGE SLAB DOWN 1D THE
OTTOM REINFORCEMENTTO CALCULATE
E (d) DISTANCE TO STEEL MINUS AN
SSUMED 3" COVERAGE OF CONCRETE
ROM BOTTOM OF FOOTING
Iv = 68941b I
IM = 14219-ft-Iij
OK
OK
MINIMUM DESIGN: 8" THICKENED SLAB EDGE OVER 12" WIDE X 24" DEEP CONTINUOUS
FOOTING LOCATED BELOW GRADE W/ (2) #4 BAR MIN AT TOP & BOTTOM OF EXISTING
FOUNDATION IS ADEQUATE 10 SPAN BETWEEN ANCHORS
Page 5 of 5
JIJ/fll.Jr1) EH6/NEERIN6 IN~
City of Carlsbad
5847 Pine Ave (Unit A) -Chino Hills, CA 91709
Phone 909.517.2451 • www.EJDEngineering.com
BtTD Project #: (23-009)
Foundation Retrofit -Flower Fields
2666 Flower Fields Way
Carlsbad, CA 92010
RE: Alternate Materials for Helical Anchors:
JUL 2 2 2024
BUILDING DIVISION
BJ'D Engineering, Inc. has reviewed and hereby approves the request of the helical
anchor installer, Dalinghaus Construction, to substitute the Maclean Dixie helical anchor
lead sections, extensions, and brackets for those manufactured by Earth Contact Products.
Refer to the attached updated plans (revision date 05/24/24, stamped May 28, 2024) and
calculations (stamped May 28, 2024) for the revised design with approved alternate anchors.
Thank you,
Benjamin McNamara, PE
BtTD Engineering, Inc.
On behalf of
Ernest J. De Leon
Professional E ngineer-CA 67755
President -BtTD Engineering, Inc.
Page 1 of 1
IIJD ENGINEERING, INC.
14726 Ramona Ave. (410-W1) PH: 909.517.2451
Chino, CA 91710 FAX: 877.795.9778
FOUNDATION RETROFIT
FLOWER FIELDS RENTAL CONDOMNIUMS
2666 FLOWER FIELDS WAY
CARLSBAD, CA 92010
1/ATD JOB#23-009
DESIGN BASED ON 2022 CBC
> ~ c;;ma
0
TABLE OF CONTENTS:
HELICAL ANCHOR DESIGN
GRADEBEAM DESIGN .
Page 1 of 5
PAGE2
PAGE4
CBC2024-0038
2666 FLOWER FIELDS WAY
RETROFIT FOUNDATION STABILIZATION FOR APARTMEJ\
COMPLEX WITH ANCHOR UNDERPINN ING
1670308000
1/3 1/2024
CBC2024-0038
FLOWER FIELDS CONDOS
CARLSBAD.CA
FIELD TESTED VALUES -COMPRESSION:
(23-009) ANCHORS.xmcd
THE HalCAL ANCHORS ARE DESIGNED SUCH THATTHERE IS A CORRaATION BETV\IEEN THE SOIL RESISTANCE
AND THE INSTALLATION lORQUE. BY VERIFYING IN REAL TIME THE INSTALLATION TORQUE OF THE ANCHORS, IT
CAN BE ASSURED THAT IT REACHES THE MINIMUM SPECIFIED, AND THUS THE REQUIRED SOIL CAPACITY.
AN IN-SITU LOAD TEST SHALL BE PROVIDED PRIOR TO THE INSTALL OF THE HELICALANCHORS TO VERIFY lHAT
THE MINIMUM SPECIFIED TORQUE CAN BE OBTAINED IN THE FIELD. FOLLOW ALL MANUFACTURER DIRECTIONS
FOR PERFORMANCE OF THE LOAD TEST TORQUE MEASUREMENTS WILLALSO BE TAKEN ON ALL INSTALLED
ANCHORS TO VERIFYTHATTHE MINIMUM SPECIFIED TORQUE IS REACHED.
FURTHERMORE, THE INSTALLER SHALL PROVIDE TO THE ENGINEER OF RECORD A CALIBRATION OF THE
EQUIPMENT USED SHOWING THE CORRELATION OF THE INSTALLATION TORQUE 10 THE TOTAL FORCE
RESISTANCE OF THE SOIL. BASED ON PAST EXPERIENCE, EJD ENGINEERING, INC. EXPECTS THE ANCHORS TO
BE INSTALLED WITHA KD8000, VVHICH CORRELATES 1 FT-LB OF INSTALLATION TORQUE TO 10 LB OF TOTAL SOIL
RESISTANCE.
MINIMUM SPECIFIED TORQUE= 3,000 FT-LB
PER KD8000: LOAD= 30,000 LB MINIMUM SPECIFIED SOIL FORCE Pspecified := 30000-lb,,.
PER CBC EQUATION 18-4 TO CONVERT TO ALLOWABLE STRESS
Psoil := 0.5·Pspecifiedi<IPsoil = 15000 lb I ALLOWABLE STRESS
A: DESIGN FOOTING ANCHORS -DOUBLE HELICAL FOUNDATION ANCHORS
FOUNDATION BRACKET
PER ICC-ESR 3032 -(PER TABLE-2) FOUNDATION BRACKET FOR
1-3/4" SQUARE SHAFT
FOUNDATION PIERS
CHECK FOR AXIAL FORCE:
PER ICC-ESR 3032 -(PER TABLE-5) 1-3/4" SQUARE SHAFT WITH
1 O" + 12" DIAMETER DOUBLE HELIX ANCHOR
CHECK FOR COLUMN BUCKLING (USE DAVISSON METHOD):
Paxial := 50129-lb..
E5 := 29000000· PSI,,.
I := 0.746-in4.
ASSUME PIN-PIN CONNECTION WITH MNIMUM Ucr
FOR HELICAL PILE -THIS IS CONSERVATIVE.
lb
Kh := 50·-• . 3 m
(
E •IJ Pbuckling := Ucr· ;2 •
I PER MANUFACTURER SUPPLIED INFORMATION.
ASSUMED Ki,.
R = 1.858 ft
Pbuckling = 87017 lb
ALLOWABLE ANCHOR POINT LOAD FORCE IS MIN OF AXIALAND BUCKLING CAPACmES:
Panchor := min(Pbuckling,Pax,al)• IP anchor = 50129 lb I
Page 2 of 5
FLOWER FIELDS CONDOS
CARLSBAD.CA
(23-009) ANCHORS.xmcd
THE DESIGN ALLOWABLE POINT LOAD FORCE IS GOVERNED BY THE MN OF SOIL, BRACKET AND ANCHOR:
P designcomp := min(Psoil, Pbracket, P anchor)* IPdesigncomp = 15000 lb I
GRAVITY LOADS:
ROOF LIVE LOAD: RLL := 20· PSF * FLOOR LIVE LOAD:
ROOF DEAD LOAD: RDL := 15-PSF* FLOOR DEAD LOAD:
AT A DEPTH OF 15 FT. EMBEDMENT MIN.
PER SOILS REPORT
FLL := 40• PSF * SOIL FRICTION:
FDL := 12-PSF,. FOOTING DEPTH:
WALL DEAD LOAD: WDL := 15-PSF* CONCRETE DEAD LOAD: CDL := 150-PCF*
(1): EXTERIOR FOOTING MAXIMUM VERTICAL LOADING AT GRIDUNE A-SEE STRUCl\JRAL PLANS
SHEET 53 FOR THE FLOOR AND ROOF LOADS-WALL LOADS ANO CONCRETE FDN DEAD LOAD
SF := 500-PSF*
D := 2-FT.
W := (RDL + RLL)-(3
2
° .fT) + (FDL + FLL){ 1:·5 ·FT)+ (WDL)·(26.417•FT) + (CDL)·[(IHN-32·1N) + (3·IN·8·TN)] *
W = 167J.255·PLF
SPACING OF FOOTING ANCHORS (DENOTED P1 TO P21) SEE SHEET S3 S := 8.25-FT.
Fweight := W·S. Fweight = 13788 lb < P designcomp = l 5000 lb OK
ULTIMATE CAPACmES HAVE BEEN REDUCED BY A FACTOR OF 2 TO ASSURE A MNIMUM FAClOR OF SAFETY OF 2.
MULTIPLY DEMAND CAPACITY RATIOS BY 2 TO GET ACn.JAL FAClORS OF SAFETY.
FACTORS OF SAFETY:
Psoil FACTOR OF SAFETY FS:= 2·--• IFS = 2.1 76 ! OK
(SOIL FORCE): Fweight TE: ADDmONAL RESISTANCE OF
.F P anchor RAVITY LOADS IS PROVIDED BY SOIL
FACTOR OF SAFETY S:=2·--• IFS = 7.271 ! OK ICTION ON EXISTING FOOTING -THIS IS
(HELICAL ANCHOR): Fweight EGLECTED FOR THIS CALCULATION -
FS := 2_ Pbracke\
IS IS CONSERVATIVE
FACTOR OF SAFETY IFS = 5.585 ! OK
(BRACKET): Fweight
USE 10" + 12" DIAMETER DOUBLE HEUXANCHOR WITH 1-3/4" SQUARE SHAFTx 5'-0" LENGTH
WITH (2) 5'-0" EXTENSION FOR 15 FT. MNIMUM ENIBEDMENT BELOW GRADE.
Page 3 of 5
FLOWER FIELDS CONDOS
CARLSBAD.CA
FOUNDATION RETROFIT
FLOWER FIELDS RENTALCONDOMNIUMS
2666 FLOWER FIELDS WAY
CARLSBAD, CA 92010
CHECK EXISTING INTERIOR FOOTING(S) AS GRADE BEAM(S)
TO SPAN BETWEEN ANCHOR SPACING:
PLEASE NOTE lHE CONCRETE BEAM BELOW IS DESIGNED ASA SIMPLE SPAN BEAM
FOR lHE EXISTING CONCRETE FOUNDATION lD SPAN BElV\/EEN ANCHORSAND SUPPORTlHE
EXISTING DEAD AND LIVE LOAD OF RESIDENCE
IN REALITYlHE FOUNDATIONS WOULD BE SUPPORTED BYlHE SOIL ASA BEAM ON AN ELASTC
FOUNDATION -lHE SOIL IS NEGLECTED (THESE CALCULATIONS ARE VERY CONSERVATIVE).
GRAVITY LOADS:
ROOF LIVE LOAD:
ROOF DEAD LOAD:
FLOOR DEAD LOAD:
FLOOR LIVE LOAD:
RLL := 20· PSF *
RDL := 15-PSF*
FOL := 12-PSF*
FLL := 40· PSF •
WALL DEAD LOAD: WDL := 15-PSF.
CONCRETE DEAD LOAD: CDL := 150-PCF*
REINFORCED CONCRETE: WORKING STRESS DESIGN
fe• := 2500· psi
Fe:= 0.45-fe'
Fs := 24000-psi
Fe = 1125-psi
Ve= 55-psi
(23-009) GRADEBEAM.xmcd
Es := 29000000· psi Ee:= 57000·~·psi"5 Ee = 2850000-psi Es n :=-n =l0.175
Ee
(F1) VERIFY EXISTING FOUNDATION AND ANCHOR SPACING AS A GRADE BEAM FOR EXTERIOR BEARJNG
WALL:
(1): EXTERIOR FOOTING MAXIMUM LOADING ATGRIDUNES 1&11 ANDMAXIMUMSPANATGRJDUNEA. VERIFY
TYPICAL SPAN BElWEEN PIERS. SEE STRUCTURAL PLANS SHEET S3 FOR ANCHOR LAYOUT AND CONCRETE
FON DEAD LOAD. SEE SHEET S4 FOR THE ROOF LOADS AND WALL LOADS TRIBUTARY WIDTHS.
lL := 8.25-Fjj MAXIMUM SPACING. SEE FOUNDATION PLAN SHEET S3.
W := (RDL + RLL)-(3
2
°-FT) +(FOL+ FLL){ l~.S ·FT)+ (WDL)·(26.417-FT) + (CDL)-[(12·IN·32•JN) + (3•JN•8-JN)] •
W = 1671.255-PLF
W-L2
M:=--8
W-L V:=-2
lM = 14219ft-lb !
lV = 6893.927 lb !
Page 4 of 5
FLOWER FIELDS CONDOS
CARLSBAD,CA
BOUNDARYCONDmONS:
(23-009) GRADEBEAM.xmcd
REINFORCEMENT BAR# BarNum := 4
NUMBER OF BARS: !NO := ~
<i> := BarNum ·in l<i> = 0.5•iq
8
FOOTING DEPTI-1: !cone thick := (24 + 8)-iq
cover:= 3-in d := conc_thick -cover Id = 29· iq
FOOTING WIDTI-1:
2
'lT· <i> As:= ---N0-2
4
As
p:=~
k := J 2-p-n + (p·nl-p·n
. k J := 1 --3
Fd·k·b-ct2
Mc:=---2
As = 0.785-in2
p = 0.002
k =0.193
j = 0.936
Ms= 42629-ft-lb
Mc= 85252-ft·lb
V0110w:= Vd·b·d !Vallow= 17911 lb l
Mallow:= if{Ms < Mc,Ms,Mc) IMa11ow = 42629-ft•l~
>
>
E CONCRETE BEAM USES TI-IE FOOTING
D TI-IICKENED EDGE SLAB DOWN 10 TI-IE
OTTOM REINFORCEMENTTO CALCULATE
E (d) DISTANCE TO STEEL MINUS AN
SSUMED 3" COVERAGE OF CONCRETE
OM BOTTOM OF FOOTING
Iv = 68941b I
IM = 14219-ft-lij
OK
OK
MINIMUM DESIGN: 8" THICKENED SLAB EDGE OVER 12" WIDE X 24" DEEP CONTINUOUS
FOOTING LOCATED BELOW GRADE W/ (2) #4 BAR MIN AT lOP & BOTTOM OF EXISTING
FOUNDATION IS ADEQUATE 10 SPAN BETWEEN ANCHORS
Page 5 of 5
EGA
1011s 11 /la 11 ts
GEOTECHNICAL DISTRESS INVESTIGATION
FOR UNDERPINNING STABILIZATION AT
FLOWER FIELDS APARTMENTS
Buildings: #9, #10, and #11 at
2666 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
Presented to:
EJD Engineering, Inc.
14726 Ramona Ave., Suite 410-W1
Chino, California 91710
Attention:
Ernest De Leon, President
Prepared by:
EGA Co11sulta11ts, Jue.
375-C Monte Vista Avenue
Costa Mesa, California 92627
(949) 642-9309
CBC2024-0038
t'/1,V. Ill fr rf II.(/,
,l!,i'(J/etln1iral
applica/1011.r
>
November 9,
Project No. E
2666 FLOWER FIELDS WA y
RETROFIT FOUNDATION STABILIZATION FOR APARTMEI\
COMPLEX WITH ANCHOR UNDERPINNING
1670308000
1/31/2024
CBC2024-0038
f O II .fl/ / f (I II / S
fll,~lllfl'l'illJ!.
.~flJ/edJ11it't1!
t1pplfft1li1JIIS
Site: Flower Fields Apartments -Bldgs 9, 10 and 11
November 9, 2023
Project No. EJ447.1
2666 Flower Fields Way Road, Carlsbad, California
Executive Summary
Based on our geotechnical study of the site, our review of available reports and literature and our
experience, it is our opinion that the proposed foundation stabilization/repair is feasible from a
geotechnical standpoint. There appear to be no significant geotechnical constraints on-site that cannot be
mitigated by proper planning, design, and utilization of sound construction practices.
The following key elements are conclusions confirmed from this investigation:
Extensive cracks/deflection/distress was noted to the exterior/interior units.
According to the results of the interior floor level surveys (manometer) performed on September
5, 2023, there is a total floor slab deflection of approximately 3.0 to 4.2 inches (see Floor Level
Surveys, Appendix). The floor tilt is indicative of soil movement and correlates with a down-slope
direction. The magnitude of floor tilt is significant and beyond conventional construction
tolerances.
Based on our investigation, it is our opinion that the distress to the structure is due to the
settlement of poorly compacted fill, coupled with seasonal expansion of the underlying clay
materials.
SUMMARY OF RECOMMENDATIONS
Design Item
Foundations:
Footing Bearing Pressure
Passive Lateral Resistence
Coefficient of Friction
Floor Slabs (where applicable):
Recommendations
1,500 psf -building, continuous; 2,000 psf iso. pads.
150 psf per foot
0.25
min. 5 inches thick with a min. No. 4 bars at 18-inches on
center underlain by 2 inches of sand over 15 mil
visqueen, over 2 inches of low/non-expansive materials
Underpinning/Stabilization is recommended using galvanized steel helical anchors. The following Geotechnical
Parameters may be used in the design of the underpinning repair:
Bearing Capacity
End Bearing 1500 psf
Friction 500 psf
Coefficients
Active Ka=0.25
Passive Kp=3.60
At Rest Ko=0.50
For design purposes the upper 2 feet of soils shall not be considered for skin friction values.
No lateral or downdrag loads need to be considered. A representative sample of the anchors should be load-tested
after installation.
The anchors/piers shall be drilled a minimum depth of 15 ft below grade and verified by the geotechnical consultant.
Depths should be verified in the field by the geologist or his representative. Helical anchor spacing and dimensions
should be determined by the structural engineer .
. PS-C \l ontl' \'isra \\l'nuc • Co,1,1 \ksa, (. \ 9262-• (949) 642 9.109 • 1-',\X (949) 642 1290
E(;A
l"ons 11lta,1ts
EJD Engineering, Inc.
14726 Ramona Ave., Suite 410-W1
Chino, California 91710
Attention:
Subject:
Dear Team,
Ernest De Leon , P.E.
GEOTECHNICAL DISTRESS INVESTIGATION
FOR UNDERPINNING STABILIZATION AT
BUILDINGS: #9, #10, and #11 at
FLOWER FIELDS APARTMENTS LOCATED at
2666 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
tllf,lflttrJng
1,tntuhn1rol
oppl1u1110111
November 9, 2023
Project No. EJ447.1
In accordance with your request we have completed our Geotechnical Investigation of
the above referenced multi-tenant site. This investigation was performed to determine
the site soil conditions and to provide geotechnical parameters for the proposed repairs
to the distressed slabs/foundations at the subject buildings.
It is our understanding that underpinning/anchoring of the building foundation is
contemplated as a result of continued differential settlement/heaving. Our investigation
consisted of site-specific document review, floor level surveys, subsurface exploration,
laboratory testing, geotechnical analysis of field and laboratory data, and the preparation
of this report including anchor specifications and minimum embedment depths.
This opportunity to be of service is appreciated. If you have any questions, please call.
Very truly yours,
GA Consultants, Inc.
{~ • r
DAVID A. WORTHINGTON, CEG 2124
Principal Engineering Geologist/CEO
0~~-
JOHN F. EGGERS
Project Geologist
Copies: (3) Addressee
375-C M onte \'1s t a Avenue • Cost:i :vies a, CA 92627 • (949) 642-9~09 • FAX (9 49) 642-1290
Attachments:
GEOTECHNICAL DISTRESS INVESTIGATION
FOR UNDERPINNING STABILIZATION AT
FLOWER FIELDS APARTMENTS
Buildings: #9, #10, and #11 at
2666 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
Figure 1: Site Location Map
Figure 2: Building Locations (Plot Plan)
Figure 3: Regional Geologic Map
Appendix A: Geologic Logs
Appendix B: Laboratory Test Results
Appendix C: Manometers Surveys, C-1, C-2, and C-3
Appendix D: USGS Design Map Summary
INTRODUCTION
November 9, 2023
Project No. EJ447 .1
We have completed a geotechnical investigation at the subject Apartment Complex site
located at 2666 Flower Fields Way, in the City of Carlsbad, County of Carlsbad, California
(see Site Location Map, Figure 1). The purpose of our investigation was to evaluate the
existing geotechnical conditions at the subject site and provide recommendations and
geotechnical parameters for the proposed foundation stabilization.
The study area is limited to the Building Nos: 9, 10, and 11 located in the southeast portion
of the greater complex known as "Flower Field" Apartments. Other outer lying units within
the greater 6.63-acre "Flower Fields Apartment" comp lex are beyond the scope of this
investigation.
This report presents the results of our findings, as well as our conclusions and
recommendations.
SCOPE OF STUDY
The scope of our investigation included the following tasks:
• Geologic reconnaissance and distress mapping in select units;
• Floor level (manometer) surveys of the three (3) ground level,
aforementioned buildings (living areas), consisting of six (6) units;
• Excavation and sampling of five (5) exploratory borings, to a maximum depth
of 15 feet below existing grade (b.g.);
2
• Laboratory testing of representative samples obtained from the exploratory
borings;
• Engineering and geologic analysis including soil parameters for
recommended underpinning repairs;
• Preparation of this report presenting our findings, conclusions, and
recommendations.
GENERAL SITE CONDITIONS
Buildings Nos. 9, 10, and 11 are part of the greater Flower Fields Apartment complex,
which comprises of three-story luxury apartment buildings. The three (3), three-story,
multi-family apartments form a row of buildings which extends longitudinally in the
southwest-northeast direction. The Building Location layout (Plot Plan) is presented as
Figure 2, herein.
The subject site is legally described as Lot 1, Tract 80, Block 030 in the City of Carlsbad ,
County of San Diego, California (APN 167-0308-000). Reportedly, the complex was built
circa, 1990.
The subject buildings are supported on continuous perimeter footings with concrete slab-
on-grade floors. The buildings' exterior wall s are finished with stucco finish and wood trim.
Exterior improvements include CMU block walls, concrete flatwork and landscaped
common areas, including a community dog park and community tennis court with a parking
lot underneath.
For report clarity, the subject building row (9, 10 and 11) is bound to the west by Flower
Fields Way and a tennis court, to the north by common areas and Building 8, to the south
by a community Dog Park, and to the east by an apparent fill-over-native slope which
descends to the Buena Vista Creek Ecological Reserve nature area (see Figures 1 and 2).
The buildings are split-level with interior retaining walls running roughly parallel to the top
of the rear slope. The building front units (and attached garages) are approximately 12
feet above the ground units of the rear living space. Beyond the property boundary, the
descending rear slope is approximately 40 feet in height and sloped at an approximate 2: 1
grade (horizontal to vertical slope). This slope is setback approximately 15 feet from the
subject row of buildings (9, 10 and 11 ).
I lo\\cr Fields Apartmcnts • Bid gs. 9. IO & 11 • Distress lnvcs11gu11011
2666 FIO\\Cr Fields Way. Curlsbud. CA
l'rOJCCI Nu EJ44 7 I
Nm cm her 9, 2023 3
SUBSURFACE EXPLORATION
Our subsurface exploration consisted of the excavation of five (5) exploratory borings (B-1
through B-5) to a maximum depth of 15 feet below grade (b.g.). Representative bulk and
relatively undisturbed soil samples were obtained for laboratory testing. Geologic logs of
the soil borings are included in Appendix A.
The borings were continuously logged by a geologist with our firm who obtained soil
samples forgeotechnical laboratory analysis. The approximate locations of the exploratory
borings are shown on Figure 2.
Geotechnical soil samples were obtained using a modified California sampler filled with
2% inch diameter, 1-inch tall brass rings. Bulk samples were obtained by collecting
representative bore hole cuttings. Locations of geotechnical samples and other data are
presented on the boring logs in Appendix A.
The soils were visually classified according to the Unified Soil Classification System.
Classifications are shown on the boring logs included in Appendix A.
LABORATORY TESTING
Laboratory testing was performed on representative soil samples obtained during our
subsurface exploration. The following tests were performed:
*
*
*
*
*
*
*
Dry Density and Moisture Content
(ASTM: D 2216)
Maximum Dry Density and Optimum Moisture Content
(ASTM: D 1557)
Direct Shear
(ASTM D 3080)
Soil Classification
(ASTM: D 2487)
Sulfate Content
(CA 417, Hach Procedure)
Expansion Index
(ASTM: D 4829)
Atterberg Limits Test
(ASTM: D 4318)
f'hmcr Fields Apnnmcrm -llldgs 9, 10 & 11 -Di,trcs~ lmc,11ga11011
2M<, l-h111cr Fields Wa)'. Curl~bnd, CA
PrnJCCl No EH~? I
'fo, ember 9. 2023 ,1
* Consolidation Test
(ASTM D 2435)
All laboratory testing was performed by our sub-contractor, G3SoiIWorks, Inc., of Costa
Mesa, California. Geotechnical test results are shown in Appendix B of this report.
SOIL AND GEOLOGIC CONDITIONS
The site soil and geologic conditions are as follows:
Seepage and Groundwater
Seepage or surface water ponding was not noted at the time of our study.
Groundwater was not encountered in our test excavations to a maximum depth of
15 feet below existing grade. Based on hydrologic maps and documents,
groundwater occurs at a depth greater than 50 feet below the building pads.
According to a United States Geological Survey (USGS) Map ot'the San Luis Rey
Quadrangle, the upper pads of the subject buildings are approximately 115 feet
above Mean Sea Level (MSL).
Seismicity
The site is underlain by fill and native soils which are characterized by sandy clays
and silty clayey sands. For design purposes, two-thirds of the maximum anticipated
bedrock acceleration may be assumed for the repeatable ground acceleration. The
effects of seismic shaking can be mitigated by adhering to the 2022 California
Building Code or the standards of care established by the Structural Engineers
Association of California.
Based on Chapter 16 of the 2022 CBC and on Maps of Known Active Near-Source
Zones in California and Adjacent Portions of Nevada (ASCE 7-16 Standard), the
following parameters may be considered:
2022 CBC Seismic Design Parameters
SI I E ADDRESS: 2666 Flower Fields Way, Ca,rbbad, CA
Site Latitude (Decimal Degrees)
Site Longitude (Decimal Degrees)
Site Class Definition
Mapped Spectral Response Acceleration at 0.2s Period, S5
Mapped Spectral Response Acceleration at ls Period, S1
~IO\\Cr I 1dds Apur1mc111s -Oldg~ 9, 10 & 11 -Distress lmcstign11on
~666 I I011cr Fields Way. Carlsb11d, CA
l'rn,1cct No EJ44 7 I
Nm ember 9. 202.l 5
33.177379
-117.32067
D-default
0.988 g
0.362 g
Sho1t Period Site Coefficient at 0.2 Period, Fa 1.2
Long Period Site Coefficient at Is Period, Fv 1.8
Adjusted Spectral Response /\cceleration at 0.2s Period, S,1~ 1.186 g
Adjusted Spectral Response /\cceleration at Is Period. SM1 0.652 g
Design Spectral Response /\cceleration at 0.2s Period, Sus 0.790 g
Design Spectral Response Acceleration at Is Period Su1 0.434 g
In accordance with the USGS Design Maps, and assuming Site Class "D -default,"
the mean peak ground acceleration (PGAm) per USGS is 0.518 g. The stated
PGAm is based on a 2% probability of exceedance in a 50 year span (see copies
of the USGS Design Maps Detailed Report, Appendix D, herein).
The proposed stabilization/repair work shall be designed in accordance with seismic
considerations contained in the 2022 CBC and the City of Carlsbad requirements.
Seismically Induced Landslide Hazard Zones
Based on our review of the State of California Seismic Hazard Zone Map Database
for the State of California, the subject row of building pads are located in an area
that has not been evaluated by the California Geologic Survey for liquefaction or
seismic landslide hazards. The subject buildings are outside of delineated
Earthquake Fault Zones.
Other Geologic Hazards and Faults
A review of available geologic records indicates that no active faults cross the
subject property (reference No. 5). The site is not located within the Alquist-Priolo
Fault Rupture Hazard Zone.
The Regional Geologic Map (Figure 3) shows no landslides located within the
immediate area of the subject site (though they are mapped over 1,500 feet east of
the site within portions of the Buena Vista Creek Ecological Reserve.
Note bedding and fracture orientations were not mappable in our recent hand
augered, confirmatory borings (B-1 through 8-5). However, based on a review of
geologic maps by others, geologic bedding attitudes of the native bedrock beneath
the site vi cinity dip gently (approx. 5 degrees) to the northeast (reference: Kennedy
and Tan, 2007). In terms of slope stability, this is considered a neutral geologic
condition.
A Regional Geologic Map is presented as Figure 3, herein ["Geologic Map of the
Oceanside 30' x 60' Quadrangle and Adjacent Areas, California: California
Flower Fields Apurtmc111s • Hldgs. 9. IO & 11 • Distress Investigation
2666 t-10,,cr Field~ Wuy, Carlsbnd. CA
l'rUJCCt No E.144 7. I
November 9, 2023 6
Geological Survey, Regional Geologic Map RGM-2," by Kennedy, M.P., Tan, S.S.,
Bovard, K.R., Alvarez, R.M., Watson, M.J., and Gutierrez, C.I., dated 2007.
1:100,000 scale.)
FINDINGS
Subsurface Soils
As encountered in our test borings, the site is underlain by fill and native soils as
follows :
Fill
Fill soils were encountered in the upper 3 to 4 feet within each test borings
(8-1 through 8-5). Based on our document review and subsurface
confirmatory borings, the building pads are likely a cut-fill transition. The fill
soils consist generally of moist, soft to firm, clayey sand with trace gravels.
Based on the laboratory results dated October 27, 2023, the site maximum
dry density is 124.0 pcf at an optimum moisture content of 10.5% (per ASTM
D 1557). The expansion potential of the fill soils was tested to be low
(Expansion Index of 30) when exposed to an increase in moisture content.
The complete laboratory reports are presented in Appendix B, herein.
Native -Santiago Formation (Tsa)
The fill is underlain by sedim entary native material of th e Eocene-age
Santiago Formation. The native soils are described as fine-to medium-
grained, massive, silty clay, clayey sand and sandstone (reference No. 2).
DISTRESS NOTES
Interior
Floor surface deformations were felt throughout the interior floor slabs of all units
measured (Units 2745, 2759, 2754, 2768, 2770, and 2784). Floor tilt in the down-
slope direction was readily noticeable;
Slab cracks with slight vertical offset within the floor slabs are apparent;
Separation along the slab and stem walls;
Some doors and window jams were out-of-square and bulging at drywall seams,
emanating from door/window frames;
Significant displacement/migration of drywall panels;
I l,mcr Field, Apanmcnl> -Oldgs. 9. IO & 11 -L>i.ln:,s hwc~t1ga1,on
2666 f-hll\cr l'1cld~ \Iva), Carlshud. CA
l'm,1ccl Nn FJ.J4 7 I
Nu, ~mhcr 9. 2023 7
Settlement gaps on the order of 1/4-inch between kitchen cabinets and ceiling;
Ceiling and wall drywall cracking/bu lging/separation with evidence of prior patching;
Separation/bulging along drywall seams;
Horizontal and vertical separation across and along joints of floor coverings.
Note: Due to the presence of modern floor coverings, inspection of the living area
slabs was not feasible.
Exterior
Exterior concrete flatwork cracking/heaving ;
Extensive patio slab cracks with vertical offset in several ground units, esp. along
slope side of building.
FLOOR LEVEL SURVEYS
On September 5, 2023 a manometer (floor level) survey was performed across
each of the three (3) above-referenced floor-level Buildings (there are 2 slab-on-
grade units per building). The surveys were performed in order to establish the
magnitude and direction of elevation difference or floor tilt. Measurements were
made on an approximate 10 foot grid to the nearest 1/10-inch . Results are
presented as contours of equal elevation to the nearest inch on the attached
Manometer (Floor Level) Survey.
Based on the readings of the floor level surveys, a summary of the floor slab
deflection is as follows:
Building # 9: 3.0 inches
Building #10: 4.2 inches
Building #11 : 3.5 inches
Copies of the Manometer Surveys are presented in Appendix C, herein.
For each of the three buildings, the direction of tilt directly correlates with the descending
slope located east and adjacent of the buildings (see Appendix C, Figures C-1, C-2, and
C-3). This amount of deflection is considered below construction standards for
conventional concrete floors.
Also, deformation of the slab was noticeable and likely indicates the presence of slab
cracks (obscured by the existing floor coverings).
I lower Fields Ap11nmcnts • Oldgs 9. 10 & 11 • l)istrc,s hl\cst1gn11011
:!6M H1mcr 1-icld, \\a). Carl~bnd. C:1\
l'rnJcCI No. EN 17.1
"''" c111hcr <J. 2023 8
IN-SITU LOAD TEST
For further determination of anchor capacity and embedment depths, we
recommend in-situ load tests be performed by a certified, qualified contractor.
The on-site load test may utilize 10-and 12-inch diameter double helix with a 1 ¾"
by 1 ¾" solid shaft.
DISCUSSION AND CONCLUSIONS
Based on our investigation, it is our opinion that the distress to the three Buildings (9, 10
& 11) and exterior improvements is primarily due settlement of poorly compacted fill
combined with expansive clays underlying the site.
This opinion appears to be supported by the following:
1. The low densities of the fill as determined by fie ld and laboratory
testing;
2. The presence of sandy clays underlying the foundation, which are
subject to shrink/swell when exposed to a decrease/increase in
moisture content;
3. The pattern and magnitudes of floor tilt and distress observed
throughout the floor level units;
4. The presence of the fi ll-over-cut wedge setback approximately 15 feet
from the top of the rear yard descending slope.
RECOMMENDATIONS
Geotechnical Re air Parameters
The upper 4 to 5 feet of soils are within the "active zone" of soil expansion and settlement.
Based on our discussions with Ernest Deleon, SE, the Project Structural Engineer, helical
anchors are planned to stabilize the foundation by underpinning into a deeper, more
competent zone. The advantage of this underpinning method, as opposed to cast-in-place
caissons and/or compaction grouting, is less soil disturbance, less concrete, limited
access, unpredictable yields (esp. near slopes), shorter construction time and target load
capacity of each anchor is verified in the field. Additionally, adjustable brackets and lifting
bolts allow for future elevation corrections.
FIimer I 1clds Apartments -llldg.s 9, IO & 11 -l)istrcs~ lnl'es11gat1on
26<,(, I lm1er Field~ Wa), Curlsbad. CA
l'rnJCCl No U447 I
~m cmhcr 9. 2023 CJ
The following Geotechnical parameters may be used in the design of the underpinning
repair:
Bearing Capacity
End Bearing 1500 psf
Friction 500 psf
Coefficients
Active Ka=0.25
Passive Kp=3.60
At Rest Ko=0.50
Passive Lateral Resistence150 psf per foot
Coefficient of Friction0.25
No lateral or downdrag loads need to be considered . A representative sample of
the anchors should be load-tested after installation.
The helical anchors are screwed into the ground using rotational forces which are
measured in the field. The steel shaft anchors shall be connected to the existing
building footings by means of an approved steel bracket designed to transfer the
structural load from the footing to the helical anchor. To minimize the effects of
soil/moisture corrosion, we recommend the anchors be galvanized steel.
The foundation slab anchors shall be advanced a minimum depth of 15 feet
below grade. Depths should be verified in the field by the geologist.
Prior to driving or pushing pipe piles, a check should be made for underground
utilities.
We understand that the helical piers will consist of a 1 ¾ inch by 1 ¾ inch square
solid shaft with 12-inch (foundation anchors) and 10-inch (slab anchors) diameter
helices. Extension shafts are then used to insert the piers to the adequate depth
generating the desired load bearing capacity. We understand that the number and
dimension of the helices, plates, and shafts may be varied to meet the installation
and structural requirements.
We understand that the anchors will be installed along the building perimeter at
locations and spacing determined by the project structural engineer. The piers will
then be structurally connected to the building footings.
I lm,cr F1d1b Apartments• Oldg., 9. IO & 11 -Distress lnvc~ug:111011
266(, I h111cr F1dds Wn~. Cnrlshud. Cl\
Proiccl No. FJ447 I
N11\·cmhcr 9. 2023 IO
Precise helical anchor spacing and dimensions should be determined by the structural
engineer.
Cement Type for Concrete in Contact with On-Site Earth Materials, if any
Concrete mix design should be based on sulfate testing with Section 1904.2 of the
2022 CBC. Preliminary laboratory testing indicates the site soils possess negligible
sulfate exposure (23 ppm by volume). Test Results are presented in Appendix B.
ACI 318-14 BUILDING CODE (Table 19.3.1.1)
REQUIREMENTS FOR CONCRETE EXPOSED TO SULFATE-CONTAINING SOLUTIONS
Sulfate Water soluble Sulfate (SO,) in Cement Type Maximum water-Minimum fc' . Exposure sulfate (SO,) In soil water. ppm cementitious material normal-weight percent by weight ratio, by weight, normal and light weight
weight concrete concrete, psi
Negligible 0.00 SO,<0.10 0 S so, <150 ............ -----... ---[SO]
Moderate 0.10 <so,< 0.20 150 <so,< 1500 11,IP(MS). 0.50 4000 [S1J IS(MS),P(MS)
l(PM)(MS).
l(SM)(MS)
Severe 0.20 ~ so,< 2.00 1500 <so,< V 045 4500 [S2] 10,000
Very Severe SO,> 2.00 SO,> 10,000 V plus 0.45 4500 [S3] pozzalan
As a conservative approach, cement with a concrete strength f'c of 3,000 psi
should be used for concrete in contact with on -site earth materials.
Foundation Design -if any
If applicable, new structures on properly compacted fill may be supported by
conventional, continuous or isolated spread footings. Footings should be a
minimum of 24 inches deep by 15 inches wide. At this depth footings founded in
fill materials may be designed for an allowable bearing value of 1,500 and 2,000
psf (for dead-plus-live load) for continuous wall and isolated spread footings,
respectively. These values may be increased by one-third for loads of short
duration, including wind or seismic forces. We recommend that a minimum Type
II concrete be used for the footing pour.
Continuous perimeter footings, if any, should have a minimum width of 15
inches and be reinforced with No. 4 rebar (two at the top and two at the bottom).
Reinforcement requirements may be increased if recommended by the project
structural engineer. In no case should they be decreased from the previous
recommendations.
l·lo"c' Fields Ap;irtmcnt~ -Bldgs 9, 10 & 11 • Distress lnvcsttg,11,on
2666 Fl,mcr Piclds Way, Carlsbad.CA
l'rn.1cc1 No l'J.1-17 I
S"' cm her'>. 2023 I I
Interior Floor Slab Cracks -if any
Any damaged areas of floor slabs should be patched or replaced with new slab
sections. Cracks wider than approximately 1/4 inch should be saw cut 12 inches
on either side and replaced with new slab sections. Cracks smaller than
approximately 1 /4 inch in width may be patched with pressure injected epoxy
cement. New slab sections should be dowelled into the old slab. New slab
sections should be at least 5 inches thick (actual) over 2 inches of sand over a
15 mil visqueen moisture barrier, over 4 inches of imported non expansive soils
compacted to at least 90 percent relative compaction. Minimum slab
reinforcement should consist of No. 4 bars placed at 18 inches on centers in two
directions, supported on concrete block chairs to ensure positioning of the
reinforcement at mid height in the slab. Additional minor cracking is possible.
New Slabs-on-grade -if any
If applicable, concrete slabs cast against properly compacted fill materials shall
be a minimum of 5 inches thick (actual) and reinforced with a minimum No. 4
bars at a spacing of 18-inches on center each way placed at mid-height. Interior
slabs shall be underlain by 2 inches of sand over a 15 mil visqueen moisture
barrier, with all laps sealed, over 4 inches of low or non-expansive materials.
Exterior slabs, if any, shall conform to the requirements for interior slabs except
that the slab thickness may be decreased to a minimum 4-inches, the moisture
barrier may be omitted and the steel reinforcement may be replaced by minimum
No. 3 bars placed at mid-height. Slab subgrade soils shall be thoroughly
moisture-conditioned prior to placing the concrete.
Some slab cracking due to shrinkage should be anticipated. The potential for
the slab cracking may be reduced by careful control of water/cement ratios. The
contractor should take appropriate curing precautions during the pouring of
concrete in hot weather to minimize cracking of slabs. We recommend that a
slipsheet (or equivalent) be utilized if crack-sensitive flooring is planned directly
on concrete slabs. All slabs should be designed in accordance with structural
considerations.
Drought Resistant Planters and Hardscape
Differential heaving/settlement in part, is a function of differential impervious-
pervious ground surfaces adjacent to building foundations.
To further reduce over-watering and the shrink/swell potential of the onsite soils,
we recommend a careful control of the irrigation of drought-resistant vegetation
around the existing buildings. Concrete aprons are also recommended options
for the building perimeters.
I lo\\cr hclds Aparlmcnls -Bldg.~. 9. IO & 11 -Distress lnvcsllgallon
2666 Flo"o.:r Fields Way. Carlsbad. CJ\
l'roJCCI No. EJ4-17. I
Nol'Clllbcr 9. 2023 12
Fills -if any
If applicable, after removal of any loose, compressible soils, all areas to receive
fill and/or other surface improvements should be scarified to a minimum depth of
12 inches, brought to at least 2 percent over optimum moisture conditions and
compacted to at least 90 percent relative compaction (based on ASTM: D 1557).
If necessary, slurry, or import soils for nearsurface fills should be predominately
granular, possess a low expansion potential, and be approved by the
geotechnical engineer.
Lift thicknesses, if any, will be dependent on the size and type of equipment
used. In general, fill should be placed in uniform lifts not exceeding 6 inches.
Placement and compaction of fill should be in accordance with local grading
ordinances under the observation and testing of the geotechnical consultant.
We recommend that fill soils be placed at moisture contents at least 4 percent
over optimum for cohesive soils and at least 2 percent overt optimum for
granular soils (based on ASTM: D 1557).
We recommend that oversize materials (materials over 4 inches) should they be
encou ntered, be stockpiled and removed from the site.
Trench backfill should be compacted in uniform lifts (not exceeding 6 inches in
compacted thickness) by mechanical means to at least 90 percent relative
compaction (ASTM: D 1557).
Surface Drainage
Surface drainage shall be controlled at all times. Roof gutters, area drains, and
downspouts were observed and are tightlined to the area drains system. We
recommend that the roof gutters, area drains and downspouts, be maintained
and free of clogging. Positive surface drainage should be provided to direct
surface water away from the structures and slopes. Ponding of water should be
avoided adjacent to the structures.
If warranted, the domestic water lines may be pressure-tested by a qualified
contractor.
Repairs described herein should be performed by a qualified , licensed subcontractor in
compliance with governing regulations and appropriate construction materials. To
verify compliance with guidelines provided in this report, a consultant should review the
proposed repair recommendations prior to the onset of construction. The consultant
should also observe and evaluate ongoing repairs.
I hmcr I 1d ds /\partmcnls • llldg~ 9. IO & 11 -l>i~lrc,, Im cs11ga11011
26(,6 I lcmcr Fields \\II), Carlsbad. C/\
l'r<>JCCI 1':o r J44 7 I
:-..o,cmhcr 9. 2023 11
LIMITATIONS
The geotechnical services described herein have been conducted in a manner consistent with the level of
care and skill ordinarily exercised by members of the geotechnical engineering profession practicing
contemporaneously under similar conditions in the subject locality. Under no circumstance is any
warranty, expressed or implied, made in connection with the providing of services described herein. Data,
interpretations, and recommendations presented herein are based solely on information available to this
office at the time work was performed. EGA Consultants, Inc. will not be responsible for other parties'
interpretations or use of the information developed in this report.
We do not direct the contractor's operations, and we cannot be responsible for the safety of others. The
contractor should notify the owner if he considers any of the recommended actions presented herein to be
unsafe.
Flmwr l iclds i\panmcnts • llldgs. 9. IO & 11 • Distrcs~ Im c,ugutwn
:!(,<,<, I lol\cr Fields \\'ay, C:urlshud. Ci\
Project No. l'J-14 7. I
N,l\cmbcr9. 2023 I.J
REFERENCES
1. "Geologic Map of California -San Diego Sheet: California Division Of Mines and Geology" by
California Mines and Geology (CDMG) dated 1962.
3. "Maximum Credible Rock Acceleration from Earthquakes in California," by Roger W. Reensfelder.
dated 1974.
4. "Foundations & Earth Structures -Design Manual 7.02" by the Naval Facilities Engineering
Command, 200 Stovall Street, Alexandria, Virginia, dated September 1, 1986.
5. "The Offshore Newport-Inglewood -Rose Canyon Fault Zone, California: Structure, Segmentation
and Tectonics," by Fischer, P.J., The Geological Society of America, dated 1991 .
6. "Fault Rupture Hazard Zones in California, Alquist-Priolo Special Studies Zone Act of 1972:
California Division of Mines and Geology" by California Department of Conservation, Division of
Mines and Geology dated 1992.
7. Maps of Known Active Fault Near-Source Zones in California and Adjacent Portions of Nevada,"
prepared by California Department of Conservation Division of Mines and Geology, published by
International Conference of Building Officials, dated February, 1998.
8. Earthquake Accelerations -All Faults -Soil," by Boore, Joyner and Fumal, dated 1997.
9. "Guide for Concrete Floor and Slab Construction," by American Concrete Institute, ACI 302.1 R-
04, dated 2004.
10. "Geologic map of the Oceanside 30' x 60' Quadrangle, California," [1 : 100,000 scale], by Michael
P. Kennedy and Siang S. Tan, California Geological Survey, Published 2005.
11 . "USGS Topographic maps, 7.5 minute map for San Luis Rey, CA," dated January 3, 2022.
12. "Provisional Fault Map for San Diego/Tijuana Earthquake Scenario" by California Geological
Survey [v.3.0] dated 2016.
13. "California Building Code, California Code of Regulations, Title 24, Part 2," by California Building
Standards Commission, 2022.
rlowcr Fields Apartrn~nts • llldgs. 9. IO & 11 • Distress lnvcst1gut1on
2666 Fhmcr Fields Way. Carlsbad. CA
PmJCCl No. EJ4·17. I
l\11,cmhcr 9. 2023 15
'b \. ~ ~ ~~ .,.~ t:
f/1( MO,_,,.,~ ~ 5 at\,
~ " 1,,~
;
;
"',;. ~ !. .. ,;.
,;. ;
: ,~ ~ ... # .. ~ IOC,
71
•• 1 f<~,,.J
l ~
IIJCHA 'il$TA w_.,-
EGA
Consultants
~%
l,
&4IIWOOO AVl ~
engineering geotechnical applications
0
flt# Mtn
I ~ ~ $ !
~ !.
VIS,.A "'Al'
~ ;
o~•P ~•'·
IC,~1
;
SITE LOCATION MAP
2666 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
~
"'" O" o,◄"'
Lomo Alta Mtn
0 o' "o
(~,.i; ~-t11 ;-
i 0
§ 4 /-.. Mtre CoSla l t i ~ ~ Cote,,-~ ~
••• ~ .y .... ., ii • Dq, ~ g
~
NOlfTH ti\-AI
~~ t,l-0((
a,.1RfOtl flt>
~ i ,,
,l~" -it, l,, \4,. .. :~ '4-),
~ ,.. fO(k lflCK,t •o ~ \ ; .. \ -;.
" \-t''" ~
~ .., ._ .,. ..
~ ';i ,.. ~ <> .. ~ • C)
C
Project No:
Date:
Figure No:
l( .;
EJ447.l
Nov., 2023
1
,ou11 ••
co,is11lt,11rts
00
-....... -.. . . . -----------------_.,
,----; . . ,--.. .. . . :--: D .. :... ' ···o·· ; ~ -------
·o-.-----.
C:] r ••.
.... q
LEGEND
-$-GEOTECHNICAL BORINGS
BY EGA CONSULTANTS
15
0
D
. -----·
o : TE N/S
CO RT $..8-4
.. --;·:..,
9
10 8-2 ,.,
: ~
~ ~Go-all
: 8-1
I'-' n '"-···' -0
BUILDING LOCATIONS
2666 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
SCALE
(feet)
0 20 40 80
·➔••t'
Project No:
Date:
Figure No:
EJ447.l
I~
I ... ,a
"-C'
1--
Nov.L.2023
2
> "O "O ;o--
~
~
0
;:s,
I
Q
I
!':' ~
·en----r 0
"O m
GEOLOGIC UNITS:
~ Alluvial flood-plain deposits (late Holocene)
G Landslide deposits, undivided (Holocene and Pleistocene
EJ Marine beach deposits (late Holocene)
~ Point Loma Formation (Upper Cretaceous)
0 Lusardi Formation (Upper Cretaceous)
0 Tonalite, undivided (mid-Cretaceous) B Old alluvial flood-plain deposits, undivided (late to middle Pleistocene)
EJ Old paralic deposits, undivided (late to middle Pleistocene)
8 Metasedimentary and metavolcanic rocks, undivided (Mesozoic)
I QopfH I Units 6-7 I Qopz.,i I Units 2-4 I ~~-3 , Units 1-13
B Very old paralic deposits, undivided (middle to early Pleistocene)
I ovop13 j Unit 13 j 0vop,2 j Unit 12 I Qvop,o j Unit 10
G Daclte stock (Miocene)
~ Santiago Formation (middle tocene)
Source:
MAP SYMBOLS:
70
1.andslide -Arrows Indicate
principal direction of
movement. Querred where
existence is questionable.
....1....-%-···· Fault -Solid where
accurately located; dashed where approximately
located: dotted where concealed. u , upthrown
block, D u downthrown block. Arrow and number
indicate direction and angle of dip of fault plane.
Strike and dip of beds
.JJ Inclined
70 -tr Overturned
Vertical
9 Horizontal
•Geologic Map of the Oceanside 30' x 60' Quadrangle and AdJacent Areas, California: California Geological Su,vey, Regional Geologic Map RGM-2." by Kennedy, M.P., Tan, S.S., Bovard,
K.R., Alvarez, R.M., Watson, M.J., and Gutierrez, C.1., dated 2007. 1:100,000 scale.
EGA
Consultants
engineering geotechnical applications
REGIONAL GEOLOGIC MAP
2666 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
Project No:
Date:
Figure No:
EJ447.1
Nov., 2023
3
APPENDIX A
GEOLOGIC LOGS
UNIFIED SOIL CLASSIFICATION SYSTEM
ASTM D-2457
UNIFIED SOIL CLASSIFICATION AND SYMBOL CHART
COARSC-GRAINCD SOILS
(nioro than 50~. of matenal ts lmucr than No. 200 ~,evu size /
GRAVELS
Mor~ fhcm 50°~,
or <,OJrb8
fracuon largar
th,m No. 4
SIIIVtl StZ&
SANOS
50°, o, more
Of CU,Ul,8
1r,1ctIon s1n;iller
111dn No. 4
$11;,Hlt.:f >ILtl
Cleon Gravels (Less than 5% fi11;~)--•··• _,_.;~ Well-gradoel grovels, gravel-sand ~-~~ GW , ,mxtures, ltltle or no fines
Poorly-grnd11d 9rav11ls, gravt:I-set'd
GP _J m1xtu1cs. little or i,o fin,;s
Gr.wels v,Ith fino~ (More than 12% r,nes)
GM I Silty gravels gmvcl-sand-s11t ITllxtum~
Cldyey gravels gfflvul-s,mu-cI11y
m,xtures
Clean Sanus (Less Utan 5% f1ncs1 a SW Wull-gmded sands. gravelly Sdlld~
ltltle or no fines
SP Poorly gr<1dod sands. gravelly s;indi,,
!,Ille or no fines
__ Sands w,lh fine~ (More thRn 12% f,nes)
SM Silly sands. s<1mJ-s1lt mixtures
SC Cldytly ~nd,;, sand-ctay m,xturt.fo
FINC-GRAINED SOILS
(50% or mori, nf matenal Is srn;illt>r th.-111 No. 200 sieve s,ze I
SILTS
AND
CLAYS
Ltqwd ltnul
less 111.in
50'•
SILTS
AND
CLAYS
ltQuid limit
50~•
I ML
CL
OL
lt1org;1111c ,.,its and very fin11 ~,,nds, roe,
1 nour. silty of .:.lc1yey r,ne sands or c.lay&y
Stlt!> Wtlh !;itght fllilSll<"lty
lnorgan"; clays of low 10 111odi11111
µl.:ist1c1ly. grnvully clay~. 5andy clays,
silty clays lean clay,.
01ganic sill~ and organic silty clays or
low plast,oty
lnor11c1n,c bill!>, mlcact10us or
d1utomaceous 1,ne sandy or s,lty l>Otls
eli.sllc ~tits
Inorganic cla~s or h1yh pl.ist,c,ty, rat
cJayb
or greater OH Org,mic clays of mod,um to l11gh 1 plasltcity. org,mIc sill!.
1-itGHLY
ORGANIC
SOILS
Cohesionless
Sands and Slits
Very loose
Loose
Medium dense
Dense
Very dense
PT Peat and olhi,r highly organic srnls
RELATIVE DENSITY
Blows/ft• Blows/ft••
0-4 0-30
4-10 30-60
10-30 80-200
30-50 200-400
Over 50 Over 400
LABORATORY CLASSIFICATION CRITERIA
--------
cw
CJP Not 11I1,ettng u!I grodat1011 wquircmcnt~ f0< GW
~ Alle;barg lirmts bi,low "A" I
11110 or Pl l&sb than 4 1 Al>ove 'A" l1ne w,lh Pl. botwuu,,
GC
4 ar•d 7 are borderline cases
lll(JUlflng llSH of duiil ~ymllol~ AttNl/crg limits Hbove "A" I
lino w,t11 P.I. groatcr than 1! t-----
SW
SP
SM
SC
0 so C0 • grouter than 4 Cc o,o
Nol rneet,nu all yradalton requiroments for GW
Allcrliu~ l,m,ts lit:llow "A" f L~n~ plottmg ,n st1adccl 1.--::::--
lu '" ()I P I labs thim 4 V,•,th Pf belwt,011 4 dlld 7 die
Attcrt,erg ltm,ts aliov& • A"
hne with PI. y1eater than 7
l.order1,ne castis requiring use
or dual sy111bol~
Uoto,rn:no pc.:rcontt,)OS of so~d c1nd gro'vol from gr.:un•s.zo u 1rvf· Dopo,.,d,ng
on po,,e:n,ogc. of f,no:.. Jroc11on smaHor than No. 200 s1cvu s1zv1,
conrso-{)rc:11ncd t,0:ls ilro c~1ss,tiod .1s fo·10.-.s.
Loss than 5 p~rcent .. . . . . .. . . . . . . .. .. .. .. . .. . . GW, GP. SW SP
Moro lllJn 12 peru•nt ... , ., ... , ... , , .. , .. , .. , , , , . , . GM, CC, SM, SC
5 to 12 por,e,u . . . ....... , 0wdttrl1ne r .. a .... os ruqumn,1 ctu.11 syrnbl>:s
PLASTICITY CHART
GO
! 50
~
)( -10 w ~ 0 3: 30 ~
8 2U
VI j 10
Cl.
uo 10 20 JO 40 !JO 60 '" 80 90 IOIJ
LtQUID LIMtT (LL) (¾)
CONSISTENCY
Cohesive Soils Blows/ft• Blows/ft••
Very soft 04 0-4
Soft 2-4 4-11
Firm 4-8 11-50
Stiff 8-16 50-110
Very stiff 16-32 110-220
Hard Over 32 Over 220
• Blows/foot for a 140-pound hammer falling 30 inches to drive a 2-inch O.D., 1·3/8 inch 1.0. Split Spoon sampler
(Standard Penetration Test).
• • Blows/foot for a 36-pound hammer falling 24 inches to drive a 3.25 O.D., 2.41 I.D. Sampler (Hand Sampling). Blow
count convergence to standard penetration test was done in accordance with Fig. 1.24 of Foundation Engineering
Handbook by H.Y. Fang, Von Nostrand Reinhold, 1991.
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number: EJ447.1 Boring No: B-1
Project: 2666 Flower Fields Way, Carlsbad, CA Boring Location: See Figure 2
Flower Fields Apartments
Date Started: 9/29/2023 Rig: Mob. 4" augers
Date Completed: 9/29/2023 Grnd Elev. +/-110 ft. NAVD88
Sample '/1. '/1. 'n Direct
lype C )( a. Shear 0 8. (/) QI fl c II) i-■ThinWall [Z]2.5"Ring 'O I-
II) ~ "' II) E iii (/)
LL 'O Tube Sample a. C: -~ C cii w ,s; ~ E 0 "' C ~ . a. I-I-0 .,. 0 u C 'iii .. a: .c 0 2 "5 lZ] Bulk [D standard Splrt sz static Water u ~ E a. ~ C u w
(/) "' m Sample Spoon Sample '; Table -~ "' ::, J: II) "g ::,
0 .i i!" a. E I-)( ::, i'o 0 0 w -~ 0 QI ::E ::E <:/"\II nic-, '" ·~· a:
I FILL: Light to yellowish brown, fine to medium Opt~
1 SC grained clayey sand, moist, trace gravel, soft to 91.3 10.1 113.2 124.0 10 5%
x firm.
SCISM At 4 ft.: Light yellowish brown. fine grained 11 .7
5 -~ silty sand with clay, moist, firm, trace gravel.
CL At 6 ft .. Becomes medium brown silty clay, with 12.5
trace sand, moist, firm to stiff.
SC z At 8 ft.: Becomes medium brown. fine grained 12.8
clay with sand, moist, firm to stiff.
10 -SC/CL z At 10 ft. Same, more clayey, less sandy, with silt, 10 2
moist, stiff.
SC z At 12 ft.: Same, slightly more sand. 11.0
At 14 ft.: Medium brown fine grained clay with fine
2 sand, moist, stiff to very stiff. 11 4
15
Total Depth: 15.0 ft.
No Groundwater.
No Caving.
Backfilled and Compacted 9/29/2023.
20 -
25 -
30 -
35 -
40
I EGA Consultants II ':~;· I
---
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number: EJ447.1 Boring No: B-2
Project: 2666 Flower Fields Way, Carlsbad, CA
Flower Fields Apartments
Boring Location: See Figure 2
Date Started: 9/29/2023 Rig: Mob. 4" augers
Date Completed: 9/29/2023 Grnd Elev. +/. 107 ft. NAVD88
Sample -;J?. -;J?. '13 Direct Type C: )( 0. Shear 0 i 't3 (/) ai ts Q) ~ ■ThinWall
~
2.S"Rlng 0. -0 f-Q) Q) «> ~ ~ .E ., (/) u.. 0. -0 Tube Sample 0. C: C: .... w ~ ~ C ., .!: E 0 Cl) Q) 0 0. f-0 0 a :, ~ 0 (.) C: 'iii -e-a:: ·5 .; ;j 12] Bulk [D Standard Split sz Static Water (.) ~ ~ C: E (.) w ~ (/) '5 00 Si:.mple Spoon Sample -=-Table ~ :, <O ::, J: in 2':' 0. E f-C: ~ ~ :) ·5 0 -~ 0 Qj ::E C::f'\11 n1::c::ro10Tlf'l"-I a:: ~
I Fill: Light to yellowish brown, fine to medium Opt
1 SC grained clayey sand, moist, trace gravel, soft to 87.3 9.1 108.3 124.0 26 0 162 10 5% ->< firm.
At 4 ft.: Medium yellowish brown, fine grained SC ~ sandy clay with silt, moist, firm. 87.3 9 1 108.3
5 -
SM tz At 6 ft.: Yellowish brown, fine grained sand with 8.3
silt, damp to moist, medium dense.
CL z At 8 ft.: Medium brown, fine grained silt with trace 9.8
gravel and clay, moist, firm.
10 -cusc k2: At 10 ft.: Medium to dark brown, fine grained clay 10.6
with sand, moist, firm to stiff.
kZ At 12 ft.: Becomes medium brown, fine grained 10.1
sa ndy silt, moist, firm to stiff.
SC tz At 14 ft.: Tan to brown, fine sandy clay, moist, stiff. 12 5
15
Total Depth: 15.0 ft.
No Groundwater.
No Caving.
Backfilled and Compacted 9/29/2023.
20 -
25 -
30 -
35 -
40
EGA Consultants ~ 2
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number: EJ447.1 Boring No: B-3
Project: 2666 Flower Fields Way, Carlsbad, CA Boring Location: See Figure 2
Flower Fields Apartments
Date Started: 9/29/2023 Rig: Mob. 4" augers
Date Completed: 9/29/2023 Grnd Elev. +/-105 ft. NAVD88
Sample ~ 0 Direct 0 ~ Type C )( 0. Shear 0 't; (/) ii, ti i (I) ~ ■ThinWall 0 2.S"Ring 0. 'O I-(I) ~ "' J! ~ E 'iii (/) u. "fil Tube Sample a. C C -LU ~ E 0 ·;;; C (I) VI I-.!: -e 0 0 0 a. -" 0 u C 'iii ,0, a:: .s: :::, [Z] Bulk DJ Standard Spilt sz Static Water u 8 C. ·5 iii 3 ~ C E u LU (I) (/) '5 CD Sample Spoon Sample = Table (I) ~ "' :::, ~ .2: 2':-a. E 0 C 1ii 0 >< 'i( 0 ~ ·5 LU Gi ~ "' c:n11 ncc-,.,.., ,, ,~, a:: ~
I FILL: Light to yellowish brown, fine to medium Op1 %
1 SC grained clayey sand, very moist, trace gravel, 90.0 15.1 111.6 124.0 10 5%
5< soft to firm.
At 3 ft.: Medium brown, fine grained sandy clay, tz SC with trace silt, moist, soft to firm. 11.8
5 -At 6 ft.: Medium brown, fine grained silty clay with
SC/CL [Z trace sand, moist to very moist, soft to firm. 12.8
At 8 ft.: Medium brown, fine grained clay with trace
CL tz silt and sand, very moist, soft to firm. 13.9
At 10 ft.: Light to medium brown, fine grained clay
L. 10 -t7 with sand, moist, firm. 12.2
Total Depth: 11.0 ft.
No Groundwater.
No Caving.
15 -Backfilled and Compacted 9/29/2023.
20 -
25 -
30 -
35 -
40
I EGA Consultants II ,:,~· I
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number· EJ447.1 Boring No: B-4
ProJect: 2666 Flower Fields Way, Carlsbad, CA Boring Location: See Figure 2
Flower Fields Apartments
Date Started 9/29/2023 Rig: Mob. 4" augers
Date Completed: 9/29/2023 Grnd Elev. +/-116 ft. NAVD88
Somple ~ 'ti Direct 0 ~ Type C 0 )( Q. Shear 0 '13 i (f)
QI 'fl C: QJ ■Thin Wall r2J 2.5" Ring Q. 'O I-QJ 8. "' QJ }i, £ "' (f) u.. 'O Tube Sample a. C: C ..... w >, QJ E 0 ·.;; C ~ . "' I-.!: I--e Q Q.
~ 0 u C -0-0:: ~ J [ZJ Bulk OJ Standard Spl~ sz Static Water u ~ "' a. ·5 iii '5 !!! C: E u w
~ (f) -0 CD Semple Spoon Sample • Teble QJ J "' J :t: .~ iii c!' Q. § I-C in ::> iv ·5 0 )( 0
qj ~ "' c::rlll ni:c::r-~1PT1n"1 0:: :::E
I FILL: Light to yellowish brown, fine to medium ()pi 'lit
1 SC grained clayey sand, very moist, trace gravel, 84.2 11.5 104.4 30 124.0 30.0 108 10 5% x soft to firm.
kZ At 3 ft.: Medium brown, fine grained sandy clay, :>u,I
SC with trace silt, very moist, soft to firm. 16.7 23ppn,
5 -At 6 ft.: Medium brown, fine grained silty clay with ISOI
SM kZ very trace sand, very moist to wet, soft. 18.0
At 8 ft.: Medium tan brown, fine grained clay with ll 32
cusc CZ trace silt and sand, very moist, soft to firm. 14.4 PL 1(
At 10 ft.: Medium brown, fine grained clay Pl 18
10 -SC [7 with sand, very moist, firm. 15 0
Total Depth: 11.0 ft.
No Groundwater.
No Caving.
15 -Backfilled and Compacted 9/29/2023.
20 -
25 -
30 -
35 -
40
EGA Consultants ~ 4
LOG OF EXPLORATORY BORING Sheet 1 of 1
Job Number: EJ447.1 Boring No: 8-5
Project: 2666 Flower Fields Way, Carlsbad, CA Bonng Location See Figure 2
Flower Fields Apartments
Date Started: 9/29/2023 Rig: Mob. 4" augers
Date Completed: 9/29/2023 Grnd Elev +/-116 ft. NAVD88
Sample :,e u Direct 0 ';!. Type C: )( 0. Shear 0 'U en Qi 'fl c Cl) ~ ■Th1n Wall IZJ 2.S"R1ng 0. 'O I-Cl) ~ <11 Cl) ~ -= 1/) en LL 'O Tube Sample 0. c C: vi ~ ~ Cl) E 0 C: Cl) s -e 1/) 0 Cl • 0. .,. 0 u C: ·;;; ~ a:: £ 0 :, :S [Z] Bulk OJ Standard Split sz Static Water u Cl) E iii I!! Cl C: u UJ 0. CJ) ID Sample Spoon Sample = Table Cl) <11 :, I Cl) 'ii :, > .; 2:-i E I-Cl C: .:> ::> <11 0 Cl ·x 0 qi ~ <11
S("lll -,,_,, .K•-111')11.l a:: ~
I FILL: Light to yellowish brown, fine to medium Opt '4
1 SC grained clayey sand, very moist, trace gravel, 83 8 10 6 103.9 30 124.0 30.0 108 10 5%
>< I soft lo slinhtlv firm
At 3 ft.: Medium brown, fine grained sandy clay,
SC :g with trace silt, very moist, soft to firm. 81.1 7.4 100.6
5 -At 6 ft.: Medium brown, fine grained silty clay with
CUSM 2 very trace sand, very moist to wet, soft. 12.1
At 8 ft.: Tan to light brown, fine grained sand,
SP rz damp, medium dense. 6.4
At 10 ft.: Medium brown, fine grained clay
10 -CL tz with sand, wet, soft. 23 2
Total Depth: 11. 0 ft.
No Groundwater
No Caving.
15 -Backfilled and Compacted 9/29/2023.
20 -
25 -
30 -
35 -
40
I EGA Consultants IC;J
EGA Consultants
375-C Monte Vista Avenue
Costa Mesa, California 92627
Attention:
Subject:
Mr. David Worthington, C.E.G.
Laboratory Test Results
2666 Flower Fields Way
Carlsbad, California
Dear Mr. Worthington:
October 27, 2023
Project No. 114-848-10
G3SoiIWorks, Inc. performed the requested laboratory tests on the soil specimens delivered to
our office for the subject project. The results of these tests are included as an attachment to this
report.
We appreciate the opportunity of providing our services to you on this project. Should you have
any questions, please contact the undersigned.
Sincerely,
G3Soi1Works, Inc.
Attachment: Laboratory Test Results
350 Fischer Ave. Front • Costa Mesa, CA 92626 P: 714 668 5600 • www.G3Soi1Works.com
EGA Consultants
Laboratory Test Results
2666 Flower Fields Way
Carlsbad, California
LABORATORY TEST RES UL TS
October 27, 2023
Project No. 114-848-1 O
Page 2 of 3
Summarized below are the results of requested laboratory testing on samples submitted to our
office.
Dry Density and Moisture Content
Tabulated below are the requested results of field dry density and moisture contents of
undisturbed soils samples retained in 2.42-inch inside diameter by 1-inch height rings.
Sample Dry Density Moisture Content
Identification {pcf) {%)
B-1 @ 2.5' 113.2 10.1
B-2@2.5' 108.3 9.1
B-2 @4.0' 108.3 10.0
B-3@2.5' 111.6 15.1
B-4@ 2.5' 104.4 11.5
8-5@ 2.5' 103.9 10.6
B-5 @4.0' 100.6 7.4
Soil Classification
Requested soil samples were classified using ASTM D2487 as a guideline and are based on
visual and textural methods only. These classifications are shown below:
Sample Identification Soil Description Group Symbol
B-5 @4.0' Clayey sand, dark yellowish brown, SC fine-to coarse-grained.
B-1 @ 0-3' Clayey sand, light yellowish brown, SC fine-to medium-grained.
Maximum Dry Density and Optimum Moisture Content
Maximum dry density and optimum moisture content test was performed on the submitted bulk
soil sample in accordance with ASTM D 1557. The results are shown below:
Sample Identification Maximum Ory Density Optimum Moisture
(pcf) Content(%)
B-1 @ 0-3' 124.0 10.5
350 Fischer Ave. Front • Costa Mesa, CA 92626 • P: 714 668 5600 • www.G3Soi1Works.com
EGA Consultants
Laboratory Test Results
2666 Flower Fields Way
Carlsbad, California
Expansion Index
October 27, 2023
Project No. 114-848-10
Page 3 of 3
A bulk soil sample was tested for expansion potential following the ASTM D4829 Test
Procedure. Test results are presented below:
Sample Identification Expansion Index Expansion Potential
{UBC 18-1-B)
B-4@ 0-3' 30 Low
Sulfate Content
A selected bulk sample was tested for soluble sulfate content in accordance with Hach
procedure. The test result is shown below:
Sample Identification Water Soluble Sulfate in Soil Sulfate Exposure
{PPM) {ACI 318-08, Table 4.2.1)
B-4@ 0-3' 23 so
Atterberg Limits Test
The results of Atterberg Limits test on designated sample are shown below. These tests were
performed in accordance with ASTM D4318.
Sample Liquid Limit Plastic Limit Plasticity Index
Identification {%) {%) {%)
8-4@ 0-3' 32 14 18
Direct Shear
The results of direct shear testing (ASTM 03080) on samples identified as 8-2 @ 2.5 feet and
8-4 @ 2.5' are plotted on Figures S-1 and S-2, respectively. Soil specimens were soaked in a
confined state and sheared under varied loads ranging from 1.0 ksf to 4.0 ksf with a direct shear
machine set at a controlled rate of strain of 0.01 inch per minute.
Consolidation
A consolidation test was performed on sample identified as 8-2 @ 4 feet. The test specimen
was initially loaded to 0.2 tons per square foot and soaked during the test. Progressive loading
was then applied to a maximum of 1.6 tons per square foot. Loading was then reduced to
determine rebound characteristics. The consolidation test is presented on Figure C-1.
350 Fischer Ave. Front • Costa Mesa, CA 92626 P: 714 668 5600 www.G3Soi1Works.com
LL
Cl)
0..
Cl)
Cl) w er: f-Cl)
er: <( w I Cl)
4,000
3,750
3,500
3,250
3,000
. . . . . ... .. ·····
DIRECT SHEAR TEST
Undisturbed
•:-•. I •· ••••;••,• • ... . . ~ ... : .. '~ . . ' ; ' . ' . : ; .. ······· ..• ,. .. ...
·····. .... . ... ······ . . .. . . . . . . .. . . .: . \. ~ : ... ~ .;.
' ' ' . ',· . . ' . . . .. ... ' . ' . . ' .. .. . . .. ... '. . . . I I I'(',••,· I ' : 'i :-'.· :, : • ' ':,.
I t,·,.•,,•, • 1, ,1 •
:·•·'·". ·:··:·'•'• ....
·-. •'.
, .......... , . '. . . ' . .. . .. ..... ... ' ... ....................... ···• ···•··· . . • t O. ••• <,• 't • • I 0 ·ti •' .. •,·• .· .. \ i•,.
, ,,I, ,I\,.•,,·., ,1,1, ,, . ' . ' . . . . ~. . . . : ~ : ,.. . , . : , .... .. . .. ........... ''. . . . . . ... . . . . . . .. . -.. ' .. ' ... ·-... --· ...
. , ........ . . . . . '
...... '' j ' •
. . . . ......... ,,.
.. .. , ..... '. ... ··• . ....... ..
2,750 • • • ~ ' ...... : . " ... ' .. ' .. : ' .. : .. , .,. . . . . : . . ~ . ~. . . . .. ;. ... ; ... .. ..... ..,
2,500
2,250
2,000
1,750
1,500
1,250
1,000
750
500
250
0
. . .,., ........ , . . . . , ...... ··· ... \'•. :-i :-: • : , .•. , ........ _._,, ,., .. .. , ...... •,, , .. . . . ... ... .... . .
i••-:••·· ',' ; ' j I•~ • ' •'.• ' ' \ • j ·; •: •. ••· . . •• • ' • ~ • •,• • 'lo ' I I •
.••.••. • .. ·.: •• 1., . . . . . . . ' .. ' ..... , ' . . . . . .... . . . ....
. . ' . . . . ',., ., ... ,. . . . . . . . . . . . . . '. . • • ~ • I• I • I • •• ' • • ' •• • \. I • I •, • ~ • ,• • • • • • I • • • f • • •,• • • •• • • • ' • •I•,• •,• •• • \ . ' .,,:,,:-i.•i•· ••,•·.··•i p.;,, •. ;,,, •: -. \ : .-
.,,.,,,.1.\.'.,••·••'• •••I•\,\,• ,•, •• ,1,:. ,\ \o',,'.,',,",j I I• . . . . . . . . . . ..... . , .... ,., ........... , ...... , ····· ,., .... " .... ' ..
. . . . .. '. . . . . . . . ' . .-::::::::::; :.:::r:::::f::::: ::::::.:::.:>::.:: :: ::;:·.~::.:::::: :>: : :\:_:; /: '.:. • /
·····.•i•:• .,.. ••:-·i .;,: .. :-,:. •:-•i·'. ·i -:--: .. :, .. :,.-. ··<··· ·:-· ...... ·.; ... . .. ~-:· . ~' .. : .. '~. . .. . . .. ' . . . . . •'• •'• .. . .. . ' .. '• -·· .-.... , ... ' •'• . ........ , ............. ······. . .... , .. . ... " ....... :: .. • :-,/
.. ...... ·•·· ...... . . . . . . . . . , . , .... . . . .. ..... ,, . . . . . .
. . . . ..... '· ·,· .. ,. '
.•.. :--· ./··:··
I·:::· .. / ·i·::: ... v.-~:·.:_,. : :·· :-
' , '
. . . ·;-.. ~. ~. : ........ -; . . . . . . . . ·:· .. . . . . . : .. ': ·;·
-: :
. . .......... ..... , ... ········· ....
..... ;.,.; .••-:;
0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000
NORMAL STRESS, PSF
2666 Flower Fields Way, Carlsbad COHESION 162 psf.
FRICTION ANGLE 26.0 degrees
symbol boring depth (ft.) symbol boring depth (ft.) FIGURE S-1
DIRECT SHEAR TEST • B-2 2.5
PN: 114-848-10 REPORT DATE: 10/27/23
FIG. S-1
lJ.. Cl) a..
Cl).
Cl) w a:: I-Cl)
a:: <( w
I Cl)
4,000
3,750
3,500
3,250
3,000
2,750
2,500
2,250
2,000
1,750
1,500
1,250
1,000
750
500
250
0
0
DIRECT SHEAR TEST
Undisturbed
\ , .....
:, ,:
~ ~. : . . . . •' ·: ; . ,••,•· .. : .. i • I ,\ . ' • , • • •' • r •. • • • • • •' • ·•• ••• ' '.. . ....
. . . ' ....... ·-•·
;.,,I>' . :,:,'. •,
' ..... . . . . ... ... .. . . . . . . . . -... ' .. . ' . . . ... ··•·•·•. ··-.. . ' ....
·····••.• . ,., ' \ .... , ' ,.;,.:--: ... \• i. ,•·,• \·\·'•i •,
' ..... , , .. ~-, ... ' . ' ' . ' . . . . ... . .. . ... ' .. ' . ' . . . . . . .. . . . . ' . . . . . . ... . . . " . . . . ., ... ~-. ' . . . . .. -... . . . . ......... . . . '.. .. : ... : . . . .'. .. :. ,, . ; ' : . : . . -:. ... ~. : . : . : .:. .: .. :
,.,. , •·,•1·1•
...
. ' ... . , ........... ,.,. . _,,'. ,••'.···'
. . . . ........ ,. . ., .. , .
,• ,•, I, I '·•'•, I .',I l ,•,', . .
. . . . -........... •·. . . . . . . . . .
,,._ •,.
f I., .. '•••• .... '
. . . . . . .. , ,•
i ,·i·'.·. ',,,.,.j ,,,: ..... : ..... ,
•·.•·· ;
' ..... ''. ' . . . • ,• , , ~, I, I , \ , '• ••• , ••• ~ • I , I , \ '. •'• ·'• • ' . . . . . . ..... . '• . . . ' . '' . ' ............. , .. •'• ' . ' ' . . .. . . . . . . ... .
/ . . ~ . :• . . . : ..
' ........... . .. ' ...... ' .... ' ... ' . ' . . . . . . . ' . . . . . . ... . .. , . . . . . . . ' ... .. . . . . . ' . . . . . . ................................... ,., ...... .
... ,' ', ,:. ·i ·,:,,_ ',i,;,,,\ ...... •.
:•• .. i• -:-,:-•• \. ;.; .. ••
•• ,\ ••• ,.1 ••. , ••••.••• . . . ... .. . ..... . .............. , ....... . . . '. . . . ..
. •:· ,., ..
•. ' ~ : : : . :· ., ............ .
. . ' . . ' ........ ' ... . . ..... .
·,• ',' • i.; •. :,
, . . . . . .
.. .. , ..... -... -.. ... ' .. .......... •··
. . ...
, •,·•.·.
! •• ••.··
. : . . . . . ~ ... " ~. . . . . . . ·;· -· ... ' ............. ~ .. . . .. . .... . .... .. . ' ' . . . . ..... .... .... ............ .......... ...... . ········· ..... ..
• .• -: .. i ;,;.,• ..
. , .. ' . , •'••·· ....
. . . ,., ...... ,, ··••>• . . . ··••.•••1·, .. •.•···· •• ,
....... ' ·: .'
' ' ·' ... , . . . . . .. ..... .. ...... "'"'' ...... '
• .: ' 0 • ; • •; ,:, '• • • • • ; •; • ~ • :, ,:, ,: • ' ' 0 • o • i, ,'., ,;, • o .. o 1 • 0 • I , ... ;. •,• '.;.. . . ~ .,. '
• . • . . I ' I • ; • • •• : •• :. •, ... ' ••• ~ • ,• • :. • • ; , ';, • ', ,: "' j j '~. ' ' ' ' '• , \ O • ,: . = · -:--. <· :• .. = · ,:. •\ .; .. · .. :, .... -:• •.• ',' ..... ! • ,:, •• :, ,.
~ •!• •~ •, ,' !•,-:.,•,,: .. • .. : l, ~. -:•• ~ :·i• ,:.,·~•II~•:••.,,: •,J ! . . ... . .. ' ... : . '":"'. . .. .. : . ,,, .. ~. . . . . . ,., ,· ... : .... '~ .... ' ,·. . . . ... ..
. . . .. . . :. ·-· . . . .. . . . . .. .. . ~ ... '.. . . ....... ~. . . . . . . . . .. . . . . . . . . . ... , ... .
o, •I• • , .. ••o• ,, ..... ••• \'\ t I ·••,• .·•,·\·1• •. •·.••, •• , • '. . . • .. ,,, I• ,, •• , . . . ............ , .. ' ......... . . . . '
. . . . ,., , ....... ,,
·:•• . ,. , ....
500 1,000 1,500 2,000 2,500 3,000 3,500 4,000
NORMAL STRESS. PSF
2666 Flower Fields Way, Carlsbad COHESION 108 psf.
FRICTION ANGLE 30.0 degrees
symbol boring depth (ft.) symbol boring depth (ft.) FIGURE S-2
DIRECT SHEAR TEST • B-4 2.5
PN: 114-848-10 REPORT DATE: 10/27/23
FIG. S-2
1-:c
(.'.)
ui :c
z
w
(.'.) z
<( :c u
1-z w u 0::: UJ n..
0.01
0 .0
2
COMPRESSIVE STRESS IN TSF
3 4 5 6 7 8 a>.1 2 3 4567891 2 3 4 5678910
' .. , , . .. .... , , ........ , ..... ..
, .... ,. ' ·:•••,· . . . . . . . . • ....... .. . ·•·· ··•··· ....... . 1 .0 i------. -... -.. -. -....... -.......... -;..~. ___ ..,__ ____ .,........ ____ '--_...,....;._ .. ...,._ ....... -.. --.-.. ----1
I ,',,I . . . ~ . : . : . : . ·-. : .:. :. : ' ' ' . ' " ' . ~' . . .. , ... : .. • ~. ,. • . : .: : ; ~ : : • ; :. : ; ~ ::: : ~ , .. . . . '~ . . . . . . .. . . ... . ...
.-., .•. , ·,·1 ·11 . . . . . . . . . .... , . ,. , ... " . . , ..... , ... ' . '' . . . ··• , ... . ... -• ........ . . . . .. . ...... , .. ,,, .
•• 1••: ;. • •. _... ..: • 2.0 t-----,-----,--.. -,-,.-,.-,-, -,.,:-.,-,-,,-,-:,-. ...,..,,-.. -.. ----:----......... ,---------,--,-----,-,,-,-l ---,-.,.,.-------i
0 0 0 • 0 0,0 0 0 0 0 0 0 0 0 0 0 0 0 K • 0 0 • 0, 0 0 0 0 .. 0 • 0 0 • 0 •
•, ''"> •• •• • •.i f, If I, . . . . ..... , .. ' .,., ..... •' .... ,. ,,,,, .:: : ::: • , : : ~ ::: : .':;: •
, ... \,,,,, . . . .. . ............... .,.,., .... . ,, ..... , . ,.-.. , ............ ,., .. . ,_ .. ········• .. ····,,.-......... , ..
', i· • . .. . . . . ... . ...... ,., ... , ..... .. ,• • •,• • •: • .• • • •> j ,;.:.•,, ,.;.;," " I' •' .;, .; .. •'• ........... . . ' .. . ;., .. ; .. ,, "
. . ' • '"' ' ' -• ,,-• • • o • ·O • o • ♦ I t Io ••" .,,,., • • • -• , • , , • , o , , • o • " o -. • , , o •• , , , , , o I• tu .,. • 0 0 0 0 0 • 3.0 t------'---'--. -.-_-,,-.. -... ~ .. ...; .......... ""' .. ,.:..; .. -.. -.. -...... --.-....,...--,,.....,._,......,......,.......-'I-~----.~-'-,-.. ~ .. -'-................ -........ -.. ------i
.,. . . ': ~:::~ ~:; ~:::~~: .. ::'::"' ... ~-.. ; .. , .......... ··•. , .. ..
•. o •, 0 , ' to• .•. 0 # ••••• ._' ._ • • • " • I " • # • I•• ••• • ,• • •' • • • .. •'• • ,·, • • , o • ' • .... ~-,.; .:.~ ~-:, .• ;.~,-...... ' .......... ''' .... -~ .... , • ... : .. . , . ' : . ... ;. : .. ; , : : ...
• , • • • •••' o ·•••• ._ • ~ ... • " ' • • • ' • ; ' I' ,• ..... : • , •,• t '.; •.• ,.,, .• • • • • ' • • .• . •,• . : . •.· ' . ..
0 • 0, • 0 0 o00 0 0 N -0 1 1 • " • 0 " • " • •" • < ••• '0 '° 0 0 •" • ,o., • 0 0 0 • • 0 • • • .. .. • • • • ; • ; ~ .-• i • .•. • • • . • . • I• • ' ,: • " • .•, • . • •.
4.0 i----,----,-----;:-::-: . .,-::·-:....,.;·:....,.~!.,,..1'-.. -. ---.::---,----:---:-----'t---:------:.-... -,-.. .,-.. -.... -,-.-.. -.. -. --1
, I, 1. , • • ·'• ', ._ • • •. , • , I . .. . ., ..... _, ' .... , ............. , .. ... , ........ , ............. ' ... , ......... . . . . . . .. . ' .. , ..... ,., . ,., ..... ···•··· ........... ..
•" : • ; •. '. l ·. ,'. ,: , ,', ,•. .:, ; .. :
. ' . . ,.. ·' '' ··········· .... ,.,, .. ,, ,,,. ·;' ;·~ .<: ' ... ·.:· .. ::·:~:::·.:::;:: .. ~:;~.;-;; .. ;;:::·
5.0 t------,,.-... -.-.. -.-.--.-. -. ------,.-.-.. -.-.-......... -. -... -.-.. -.. --.. -.. -. -.. -.. _,,_-;_ .-... -................... -........ -.. -. -1
, •, I
......... ' ..... , ' ... .... ; : ' . : : ; : ~ •••• '• .. '
, • , • • •. f ~ I .' , ,
",
.• .· .•.;•• ······•
................... ,1-,,, .....
• • ' • • • • • ' • • ••• • , I '# • # • • I O " " . ......... , ..... . . . .. , , .. ,,.,,.' .. "., ................ .
\ .. ~ • j •• :-i .. i 6.0 i------...,.....,..-:-:----------------------,-:-.. .,..., .:-"-·.·,...,.., -:-.,.,-,.-.. -.. -.---1 ....... ··-. ·•·· , , ' ... .
' ~ ; ... ; ' :. ,, .. . . . '
I' • •••
••'••····•'''·''''
• ••• ••• ••I • •,•, f " • • • • ' ~ ······•·······'····· ,., .... ,,,,., .. ~ ....... ' . ;.,, :-:-i i 1 ..... ... ' .... .. 7.0 i-------.-. -.. -... ---.......... --.. ----~-------,,---------:-,-----;
.. , ... ,,
' . ,-.,, ....
8.0 .__--'-------'--:-----------:----:--:---:----:------;-:----f
' . . . •' ' . ,., .......... , .. .... ,,;,, . . , .... . . ... ... . 9.0 .__-~-......... ....,.......,........;.~~--~...,......-.---.;.....,.-+,-----;----;..-.--,-......,.... _ __,...,.....,._---:--f
. . .. '.. . ... . . . . .... '. . . . . . . .... ,. . . ..... .. . . . . . . .... , .. . . . . .. .. . . . ·. ' ~ ..... , .. •' .. '....... . ........ ·········· .
Boring Depth(ft.) og,1itv in situ Moist.
B-2 '1.0 102.4 6.3
,, .... .......
-200 sieve Group Symbol
·: ''.
• ; •t
,,.. . ,.; ....
Soil Description
2666 Flower Fields Way, Carlsbad
WATER ADDED AT 0.8 TSF.
FIGURE C-1
CONSOLIDATION CURVE
PN:114-8'18-10 REPORT DATE: 10/27/23
Jl It-r 11• r 1-\\,1 • !\ t
FIG. C-1
MOISTURE CONTENT WORKSHEET
PROJECT LOCATION: 2666 Flower Fields Way, Carlsbad, CA
BORING ID B-1 8-1
SAMPLE DEPTH (ft.) 4' 6'
MOISTURE CAN ID B L
WET SOIL AND TARE (g) 226.2
DRY SOIL AND TARE (g) 207.7
MOISTURE LOSS (g) 18.5
MOISTURE CAN TARE (g) 50.1
DRY SOIL ONLY {g) 157.6
MOISTURE CONTENT(%) 11.7
BORING ID B-2 B-2
SAMPLE DEPTH (ft.) 8' 10'
MOISTURE CAN ID T s
WET SOIL AND TARE (g) 234.1
DRY SOIL AND TARE (g) 217.7
MOISTURE LOSS (g) 16.4
MOISTURE CAN TARE (g) 50.1
DRY SOIL ONLY (g) 167.6
MOISTURE CONTENT{%) 9.8
moisture loss
Moisture Content= m =Wt.of Dry Soil
216.0
197.6
18.4
49.9
147.7
12.5
223.7
207.1
16.6
50.5
156.6
10.6
B-1
8'
C
238.9
217.5
21.4
50.1
167.4
12.8
B-2
12'
G
215.7
200.5
15.2
50.1
150.4
10.1
YweL
Ydry = m + 1
B-1
10'
K
213.8
198.6
15.2
so.a
148.6
10.2
B-2
14'
F
216.4
197.9
18.5
49.9
148.0
12.5
DATE: Drilled 9/29/2023
8-1 B-1 B-2
12' 14' 6'
EE p pp
216.9 217.7 232.0
200.3 200.5 218.0
16.6 17.2 14.0
49.8 49.9 49.9
150.S 150.6 168.1
11.0 11.4 8.3
B-3 B-3 8-3
4' 6' 8'
0 R E
230.5 213.8 213.3
211.4 195.3 193.4
19.1 18.5 19.9
49.9 50.5 50.4
161.5 144.8 143.0
11.8 12.8 13.9
SHEET 1 OF 2
EGA CONSULTANTS, INC.
MOISTURE CONTENT WORKSHEET
PROJECT LOCATION: 2666 Flower Fields Way, Carlsbad, CA
BORING ID 8-3 B-4
SAMPLE DEPTH (ft.) 10' 4'
MOISTURE CAN ID N cc
WET SOIL AND TARE (g) 228.9
DRY SOIL AND TARE (g) 209.S
MOISTURE LOSS (g) 19.4
MOISTURE CAN TARE (g) 50.1
DRY SOIL ONLY (g) 159.4
MOISTURE CONTENT(%) 12.2
BORING ID B-5
SAMPLE DEPTH (ft.) 10'
MOISTURE CAN ID GG
WET SOIL AND TARE (g) 216.3
DRY SOIL AND TARE (g) 184.9
MOISTURE LOSS (g) 31.4
MOISTURE CAN TARE (g) 49.8
DRY SOIL ONLY (g) 135.1
MOISTURE CONTENT(%) 23.2
moisture loss
Moisture Content= m =Wt.of Dry Soil
216.1
192.3
23.8
49.9
142.4
16.7
B-4
6'
y
233.7
205.7
28.0
50.1
155.6
18.0
Ywet
Ydry = m + 1
8-4
8'
J
217.0
196.0
21.0
50.1
145.9
14.4
DATE: Drilled 9/29/2023
8-4 B-5 B-5
10' 6' 8'
w BB AA
229.8 220.5 219.9
206.4 202.1 209.6
23.4 18.4 10.3
50.0 50.1 49.9
156.4 152.0 159.7
15.0 12.1 6.4
SHEET 2 OF 2
EGA CONSULTANTS, INC.
APPENDIX C
MANOMETER SURVEYS
Figure C-1 (Building# 9): 3.0 inches
Figure C-2 (Building #10): 4.2 inches
Figure C-3 (Building #11 ): 3.5 inches
Low Point = 3.0 inches
0
co11sullants
/
5 10 20
MANOMETER SURVEY -BUILDING 9
2754 & 2768 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
C 0 ·;:;
RI -a; ~ -..c LU U
a, C > ·-·---RI a:; a:
Project No:
Date:
Figure No:
High Point
0.0
-0.5
-1.0
-1.5
-2.0
-2 .5
-3.0
low Point
EJ447.1
N ov..:.t.1_02 3
C-1
0
consultants
/
(Ifft)
s 10 20
MANOMETER SURVEY -BUILDING 10
2770 & 2784 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
Low Point= 4.2 inches
C 0 ;:;
ti) -> V't (I> (I> -.c w u
<U C > ·-;:; -(0 a; a:
Project No:
Date:
Figure No:
High Point
0.0
-0.5
-1.0
-1.5
-2.0
-2.5
-3.0
-3.5
-4.0
Low Point
EJ447.l
Nov~023
C-2
Low Point= 3.S inches
0
co11:;ultnt1ls
/
(feet)
5 10 20
MANOMETER SURVEY -BUILDING 11
2745 & 2759 FLOWER FIELDS WAY
CARLSBAD, CALIFORNIA
C:
0 .;
11) -> "' Cl/ C1I -.s:: UJ u
Cl/ C: > ·-·.:; -
11)
ai a::
Project No:
Date:
Figure No:
High Point
0.0
-0.5
-1.0
-1.5
-2.0
-2.5
-3.0
-3.5
Low Point
EJ447.l
Nov~023
C-3
APPENDIX D
USGS Design Map Summary
ASCE.
M.EICAN SOQl.lYO: CM Nl'JUIIS
Address:
2666 Flower Fields Way
Carlsbad, California
92010
''
-; I
' "
https //a see 7hazardtool. on line/
ASCE 7 Hazards Report
Standard: ASCE/SEI 7-16
Risk Category: II
Soil Class: D -Default (see
Section 11.4.3)
Page 1 of 2
Latitude: 33.177379
Longitude: -117.32067
Elevation: 116.77609714562763 ft
(NAVO 88)
...
' . ( ... ,
,, II
...... ,, '
ASCE.
MIIIICAIISOOOYO' CM. Ct;J~HIIS
Seismic
Site Soil Class:
Results:
Ss :
S1
Fa :
Fv :
SMs
D -Default (see Section 11.4.3)
0.988
0.362
1.2
NIA
1.186
S o,
T L :
PGA:
PGAM :
F PGA
S~11 NIA I.,
NIA
8
0.431
0.518
1.2
1
Sos 0.79 C. : 1.294
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.
Date Source: USGS Se,sm,c Design Maps
https //a see 7hazardtool onllne/ Page 2 of 2
SAN DI EGO REGIONAL OFFICE USE ONLY
HAZARDOUS MATERIALS RECORD ID#
PLAN CHECK#
QUESTIONNAIRE BP DATE
Business Name Business Contact Telephone#
Camp Facility Services Larry Scallon (714) 306-9054
Project Address (include suite). City State Zip Code APN#
2666 Flower Fields Way Carlsbad CA 92010
Mailing Address (include suite) City State Zip Code Plan File#
11 Gaddard Irvine CA 92618
Project Contact Applicant E--mail Telephone#
Larry Scallon lscallon@campfs.com (714 )306-9054
The following questions represent the facility's activities, NOT the specific project description.
PART I: FIRE DEPARTMENT-HAZARDOUS MATERIALS DIVISION: OCCUPANCY CLASSIFICATION: (not required for pro;ects within the City of San
Diego): Indicate by circling the item, whether your business will use, process, or store any of the following hazardous materials. I any of the items are circled,
applicant must contact the Fire Protection Agency with jurisdiction prior to plan submittal.
Occupancy Rating: Facility's Square Footage (including proposed project):
1. Explosive or Blasting Agents 5. Organic Peroxides 9. Water Reactives 13. Corrosives
2. Compressed Gases 6. Oxidizers 10. Cryogenics 14. Other Health Hazards
3. Flammable/Combustible Liquids 7. Pyrophorics 11. Highly Toxic or Toxic Materials 15. None of These.
4. Flammable Solids 8. Unstable Reactives 12. Radioactives
PART II: SAN DIEGO COUNTY DEPARTMENT OF ENVIRONMENTAL HEAL TH -HAZARDOUS MATERIALS DIVISION (HMDl: If the answer to any of the
questions is yes, applicant must contact the County of San Diego Hazardous Materials Division, 5500 Overland Avenue, Suite 170, San Diego, CA 92123.
Call (858) 505-6700 prior to the issuance of a building permit.
FEES ARE REQUIRED Project Completion Date: Expected Date of Occupancy: 0 CalARP Exempt
I
1.
2.
3.
4.
5.
6.
7.
8.
YES NO
□ 0 □ 0 □ 0
□ 0 □ 0 □ 0 □ 0 □ 0
(for new construction or remodeling projects)
Is your business listed on the reverse side of this form? (check all that apply).
Will your business dispose of Hazardous Substances or Medical Waste in any amount?
Will your business store or handle Hazardous Substances in quantnies greater than or equal to 55 gallons, 500
pounds and/or 200 cubic feet?
Will your business store or handle carcinogens/reproductive toxins in any quantity?
Will your business use an existing or install an underground storage tank?
Will your business store or handle Regulated Substances (CalARP)?
Will your business use or install a Hazardous Waste Tank System (Title 22, Article 10)?
Will your business store petroleum in tanks or containers at your facility with a total facility storage capacity equal to
or greater than 1,320 gallons? (California's Aboveground Petroleum Storage Act).
Date Initials
0 CalARP Required
I
Date lnijials
0 CalARP Complete
I
Date Initials
PART Ill: SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT {APCD): The following questions are intended to identify the majority of air pollution
issues at the planning stage. Your project may require additional measures not identified by these questions. Some residential projects may be exempt from APCD
requirements. If yes is answered for enher questions 1, 2 or 5 or for more comprehensive requirements, please contact APCD at apcdcomp@sdcounty.ca.qov;
(858) 586-2650; or 10124 Old Grove Road, San Diego, CA 92131.
1.
2.
3.
4.
5.
6.
YES NO
□ 0 □ 0 □ 0
□ 0
Will the project disturb 100 square feet or more of existing building materials?
Will any load supporting structural members be removed?
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Has an asbestos survey been performed by an individual that has passed an EPA-approved
building inspector course?
(ANSWER ONLY IF QUESTION 1 or 2 IS YES) Based on the survey results, will the project disturb any asbestos containing material? If yes, a
notification may be required at least 10 working days prior to commencing asbestos removal. Additionally, a notification may be required prior to
the removal of a load supporting structural member(s) regardless of the presence of asbestos.
□
□
0 Will the project or associated construction equipment emit air contaminants? See the reverse side of this form for typical equipment requiring an
APCD permit. If yes, contact APCD prior to the issuance of a building permit.
0 (ANSWER ONLY IF QUESTION 5 IS YES) Will the project or associated construction equipment be located within 1,000 feet of a school
bounda ?
Briefly describe business activities: Briefly describe proposed project:
Stabilization Retrofit Stabilization Retroit
&6 I I .2 l~oJ,1
Date
FIRE DEPARTMENT OCCUPANCY CLASSIFICATION: _______________________________ _
BY· DATE· I I
EXEMPT OR NO FURTHER INFORMATION REQUIREO RELEASED FOR BUILDING PERMIT BUT NOT FOR OCCUPANCY RELEASED FOR OCCUPANCY
COUNTY-HMD' APCD COUNTY-HMD APCD COUNTY-HMD APCD
.. *A stamp in this box only exempts businesses from completing or updating a Hazardous Matenals Business Plan. Other permitting requirements may still apply
HM-9171 (9/18) County of San Diego -DEH -Hazardous Materials Division
STORM WATER POLLUTION PREVENTION NOTES
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION
OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN
IS EMINENT.
2. THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION
OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING
RAINFALL.
3. THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR
UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE.
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE
AT THE END OF EACH WORKING DAY WHEN THE FIVE (5)
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT
( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER
EACH RAINFALL.
5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM
AGGREGATE.
6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER
PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST
BE INSTALLED AND MAINTAINED.
7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER
THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY
REGULATIONS.
.,.
OWNER'S CERTIFICATE:
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES {BMPS) DURING CONSTRUCTION
ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO
AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES,
COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP
THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED
BY THE CITY OF CARLSBAD.
L.ti~f{/c S ~L-Lo ✓ OWNER SOWNER'S ~GENT NAME (PRINT)
/'_J,"l,u ~
E-29
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP
BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials
BMPs Control BMPs Management BMPs Pollution Control BMPs
C: C: C: 0 ..... ...,
0 0 :;:; C: C: "O :;:; :;:; c,, 0 Q) "O Q) "O (/) C: CJ CJ C: C: c,, E C: E C: ..... 0 ..... ::, ::, 0 '5 ·.::: a. 0 0 0 E Q) .... .... :;:; .... Q) ::;; "O (/) c,, .... ..... ..... C: '-::, >, c,,
C: Q) .... C: Q) c (/) (/) (/) ~ ·.::: O'" .... 0 C: c,, Oc a. Q) ·.::: -C: (/) C: .... w ~ 0 Best Management Practice* <Id £ 0 CD a.. .... 0 Q) 0 .... <.!) Q) C: :;:; (/) 3:: (/) ~ Q) ..... Q) 0 ...,
.s:: C: E Q) 0 C: u .... u (/) "O a, (/) ::;; C: Q) C:
(BMP) Description (/) CJ Q) (/) (/) c,, Q) c,, CD ·o c:: c,, "O (/) 0 ➔ ·e Q) C: 3: C: 0 :::::> ~ ..., Q)
Q) :5 ~ Q) CJ ..., 0 0 3:: C: .... 0 "OW "O >, 0 (/) C: C: 0 ~E :;:; C: 0 0 CD (/) ·-c,, 0:;:; Q)......__ u Q) Oo c,, Q) Q) ::;; 0 c,, 0 C: Q) c::: E 0 N Cl) ~ 0 CTI~ Q) c Q) c a. ..__ 3: Q) X Q) E g CJ Q) C: ·-c,, CL O Q) 0 E ~ a, ..., ::, ..0 == "' == 3:: ~~ :0 u·c ·.::: c,,
"O .s:: C: Q) LL. .... Q) ::, :.0 Q) ·-"O C: 0 .... 0 ~ .... "O 0 .... 0 ....,,_ a. '5 CJ Q) > "O .... ..... ..0 0 ..... CJ --.... 0 ·-0 Q) .... Q) CJ _...,
0 .... 0 0 ..... Q) 0 Q) CJ C: 0 0 0 .... .B 0 00 f; & ..... .s:: Q) ..... 0 ..... 0 = C: ·-C:
Q) 0 0 .... 1n Q) .s:: ..0 .... .!:;o 0 ..., .... ..., c,, 0 Q) _ o..., 0 ..., a. 0 oo
<.!) 3: WO c7i (/) u ii: <.!) U,> (/) (/) a.. (/) C: (/) c::: 3: a: a..o a.. >u ::;; (/) ::;; (/) u,u (/)::;;
CASQA Designation ➔ r--<X) O> ...... I") ~ U) r--<X) 0 N I") r--<X) N I") '<t-U) ...... ...... c.o ~ ~ ......
I I I I I I I I I I I I I I I I I I I I I I I
u u u u w w w w w w w w ~ ~ (/) (/) (/) (/) ::;; ::;; i i ::;;
Construction Activity w w w w (/) (/) (/) (/) (/) (/) (/) (/) z z z z 3:: 3:: 3::
Gradina/Soil Disturbance
Trenchina/Excavation
Stockoilina
Drill in a /Borina
Concrete/Asohalt Sawcuttina
Concrete Flatwork
Pavina
Conduit/Pipe Installation
Stucco/Mortar Work
Waste Disposal
Staaina/Lav Down Area
Eauioment Maintenance and Fuelina
Hazardous Substance Use/Storaae
Dewaterina
Site Access Across Dirt
Other (list):
Instructions:
1. Check the box to the left of all applicable construction activity {first column) expected to occur during construction .
2. Located along the top of the BMP Table is a list of BMP's with it's corresponding California Stormwater Quality Association (CASQA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check the box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
PROJECT INFORMATION -/ Site Address: .:J(p6t, fJ....ow€rc, h € ~ti u }41.1 ;
Assessor's Parcel Number: /~ 7 a:,~c 80 Qt)
Emergency Contact:
Name: JOH Go="'~
24 Hour Phone: (11'-f) 3~(p-9~[P~
Construction Threat to Storm Water Quality
(Check Box)
0 MEDIUM 6(1 LOW
Q) ..... (/) 0 3:..., C:
(/) Q) ::, E 0 Q) ~ c,, oO NC: oo I::,;
c.o
I ::;;
3::
Q) ..... (/) 0..., 3: C: Q)
Q) E ..., Q)
Q) c,,
bo C: C: oo u::.:
<X)
I ::;; 3::
Page 1 of 1 REV 11/17