HomeMy WebLinkAbout2007-03-07; Planning Commission; ; GPA 05-05|ZC 05-02|LCPA 05-02|RP 05-03|CDP 05-14|SDP 05-04 - DKN HOTEL~ ~
Ciry of ~RlsbAd HousiNG ANd REdEVElopMENT DEpARTMENT
A REPORT TO THE DESIGN REVIEW BOARD
AND THE PLANNING COMMISSION
ApplicATiON CoMplETE DATE:
DECEMbER 1, 2006
ENViRONMENTAl REViEW:
MITiGATEd NEGATivE DEclARATioN
DECEMbER 28, 2006
DATE: March 7, 2007
STAff: Cliff JoNES
VAN LyNCH
DAvid Rick
ITEM N0.8
SUBJECT: GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04 -DKN
HOTEL: Request for a recommendation to the City Council to adopt a Negative Declaration,
and recommendation of approval of a General Plan Amendment, Zone Change, Local Coastal
Program Amendment, and Coastal Development Permit, and approval of a Site Development
Permit; and a recommendation to the Housing and Redevelopment Commission to adopt a
Negative Declaration and a recommendation of approval of a Major Redevelopment Permit and
Coastal Development Permit for the demolition of an existing hotel, restaurant, and single family
residence and for the construction of a 3-story, 1 04-room hotel project on property located at
3136 Carlsbad Boulevard on the east side of Carlsbad Boulevard between Pine Avenue and
Oak Avenue in Land Use District 9 of the Carlsbad Village Redevelopment Area, in the Village
Redevelopment and Mello II Segments of the Local Coastal Program and in Local Facilities
Management Zone 1.
I. RECOMMENDATION
Planning Commission
That the Planning Commission ADOPT Planning Commission Resolution No. 6254
RECOMMENDING ADOPTION of a Negative Declaration and ADOPT Planning Commission
Resolutions No. 6255, 6256, 6257 and 6258 RECOMMENDING APPROVAL of General Plan
Amendment 05-05, Zone Change 05-02, Local Coastal Program Amendment 05-02 and
Coastal Development Permit 05-14 and ADOPT Planning Commission Resolution No. 6259
APPROVING Site Development Permit 05-04 and based on the findings and subject to the
conditions contained therein.
Design Review Board
That the Design Review Board ADOPT Design Review Board Resolution No. 321
RECOMMENDING ADOPTION of a Negative Declaration and ADOPT Design Review Board
Resolution Nos. 319 and 320 recommending APPROVAL of Major Redevelopment Permit RP
05-03 and Coastal Development Permit CDP 05-14 based on the findings and subject to the
conditions contained therein.
II. DEVELOPMENT APPROVAL PROCESS
The proposed project requires a Major Redevelopment Permit because a portion of the property
is located within the Village Redevelopment (V-R) area and involves new construction of a
building that has a building permit valuation greater than $150,000. This Major Redevelopment
Permit serves as the Site Development Plan required by Chapter 21.53 of the Carlsbad
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE2
Municipal Code for the portion of the property that falls within the V-R zoning. The project also
includes a request for approval of a General Plan Amendment, Zone Change and local Coastal
Program Amendment, to change the General Plan and Local Coastal Program Land Use
designations from Residential High Density (RH) to Travel/Recreation Commercial (T-R) and to
change the Citywide Zoning and Local Coastal program designations from Multiple-Family
Residential Zone (R-3) to Commercial Tourist Zone (C-T) for the portion of property located
outside the Village Redevelopment Zone. In addition, the project requires a Site Development
Permit for the portion of development located outside the V-R Zone and a Coastal Development
Permit as the entire site is located within the Coastal Zone.
Because the property is partially within and partially out of the Village Redevelopment Area, the
split zoning designations on the property, the project's discretionary review is within the purview
of both the Design Review Board and the Planning Commission. The Design Review Board
maintains authority over all Redevelopment Permits and Coastal Development Permits within
the Village Redevelopment Zone (V-R). For these permits the Design Review Board functions
as an advisory board to the Housing and Redevelopment Commission. The Planning
Commission has authority over the portion of the site that is located within the area currently
Zoned R-3, with final approval authority over the Site Development Permit and functioning as a
recommending body to the City Council for the General Plan Amendment, Zone Change, local
Coastal Program Amendment and Coastal Development Permit.
The Design Review Board and Planning Commission are being asked to hold a joint public
hearing on the permits requested, consider the public testimony and staff's recommendation on
the project, discuss the project and then take action on the project.
Table A, below, indicates the decision-making bodies that have authority over the various
aspects of the project:
Table A
Planning Design City Housing & Coastal
Commission Review Council Redev. Commission
E Board Commission
C» NEGATIVE DECLARATION RA RA X X .:t:: -u GPA 05-05 RA X C»
0 zc 05-02 RA X ... D.
LCPA 05-02 RA X •
CDP 05-14 RA RA X X
RP 05-03 RA X
SDP 05-04 X
RA =Recommended adoption/approval
X = Final City decision-making authority
• = Requires Coastal Commission approval
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE3
Ill. PROJECT DESCRIPTION AND BACKGROUND
The applicant, DKN Hotels, is requesting to construct a 1 04-room, SpringHill Suites, Marriott
hotel on property located at 3136 Carlsbad Boulevard on the east side of Carlsbad Boulevard
between Pine Avenue and Oak Avenue. The subject property is bordered by a 7-11
convenience store and other retail uses to the north, multi-family residential use to the south,
multi-family residential and a proposed mixed use project to the east, and Carlsbad Boulevard
to the west. The subject property consists of two-separate parcels (203-250-08 & 26) that are
currently owned by the applicant. The total site area is .84 acres of which, .35 acres are
located within the Village Redevelopment Area with frontage along Carlsbad Boulevard. The
remaining .49 acres is located outside the redevelopment area boundaries and front Lincoln
Street. Currently a 28 room two-story motel (Surf Motel), a 1,125 square foot restaurant (The
Armenian Cafe), and a single-family structure occupy the site, all of which are proposed for
demolition.
The proposed project consists of the construction of a 62,354 square foot, three-story hotel with
on-site amenities for guests including a breakfast room, business center, and ground-floor
outdoor dining areas, as well as roof-top dining areas that front Carlsbad Boulevard with views
of the ocean. The interior of the hotel includes amenities such as conference rooms, a
business library, guest laundry, a swimming pool & spa, and an exercise room. On-site
improvements include 125 underground parking spaces, circulation drive aisle, trash
enclosures, exterior lights, and a six-foot tall masonry perimeter wall. The various guest rooms
are broken down into king, double, accessible double, and suite rooms. The following chart
shows the breakdown of room type per floor:
--------King Double Double Suite Total
(Accessible)
First Floor 15 8 1 -24
Second Floor 22 16 1 -39
Third Floor 24 15 1 1 41
Total 61 39 3 1 104
ANALYSIS
The proposed project is subject to the following plans, ordinances and standards:
A. General Plan; Village Redevelopment and Travel/Recreation Commercial (T-R)
Land Use Designations;
B. Local Coastal Program; Land Use Plan; Village Redevelopment and Mello II
Segments.
C. Carlsbad Municipal Code, Title 21 (Zoning Ordinance) including:
1. Chapter 21.35-Village Redevelopment Zone (V-R) ;
2. Chapter 21.29-Commercial Tourist Zone (C-T) ;
3. Chapter 21.06 -Site Development Plan findings required by the Beach
Area Overlay Zone;
4. Chapter 21.203 -Coastal Resource Protection Overlay Zone and;
D. Growth Management Ordinance (Local Facilities Management Plan Zone 1)
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE4
The recommendation for approval of this project was developed by analyzing the project's
consistency with the applicable policies and regulations listed above. The following analysis
section discusses compliance with each of these regulations/policies utilizing both text and
tables.
A. GENERAL PLAN CONSISTENCY
Design Review Board Considerations
The General Plan includes the following goals for the Village: 1) a City which preserves,
enhances and maintains the Village as a place for living, working, shopping, recreation, civic
and cultural functions while retaining the Village atmosphere and pedestrian scale; 2) a City
which creates a distinct identity for the Village by encouraging activities that traditionally locate
in a pedestrian-oriented downtown area, including offices, restaurants, and specialty shops; 3)
a City which encourages new economic development in the Village and near transportation
corridors to retain and increase resident-serving uses; and 4) a City that encourages a variety
of complementary us~s to generate pedestrian activity and create a lively, interesting social
environment and a profitable business setting. The General Plan objective is to implement the
Redevelopment Plan through the comprehensive Village Master Plan and Design Manual.
The proposed project is consistent with the goals and objectives for the Village, as outlined
within the General Plan, because it provides for a tourist/traveler serving use normally
associated with coastal highways (Carlsbad Boulevard) in an appropriate location within the
Village. The use in turn provides an additional customer base for local restaurants, specialty
shops, and nearby convenience services. Additionally, the project provides new economic
development by replacing the existing older underutilized uses on the subject property with a
new full-service hotel use. The General Plan objective is to implement the Redevelopment Plan
through the comprehensive Village Master Plan and Design Manual. By providing more hotel
lodging, the project helps to create a lively, interesting social environment by encouraging and
increasing the opportunity for 24-hour life in the Village, which provides the necessary customer
base to attract complementary uses. The project reinforces the pedestrian-orientation desired
for the downtown area with a hotel location that provides an opportunity for hotel patrons to
walk to shopping, recreation, and mass transit functions. The projects proximity to existing bus
routes and mass transit will help to further the goal of providing new economic development
near transportation corridors. Furthermore, the project will provide a strong street presence
with extensive architectural relief, including outdoor patios along Carlsbad Boulevard. Parking
is provided in a subterranean garage and not visible from public view. Overall, the new hotel
will enhance the Village as a place for living and working.
CONSISTENCY WITH VILLAGE REDEVELOPMENT AREA VISION, GOALS AND
OBJECTIVES
Design Review Board Considerations
The proposed project will be able to address a variety of objectives as outlined within the Village
Master Plan and Design Manual as follows:
Goal 1: Establish Carlsbad Village as a Quality Shopping, Working and Living Environment.
The proposed project will result in the development of additional lodging opportunities within the
visitor-serving Tourism Support Area (District 9) that is close to the retail and commercial core
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGES
of the Village Center (District 1 ). The proposed project is highly compatible with the
surrounding area and contributes to establishing the Village as a quality shopping, working, and
living environment by providing additional lodging for visitors who will shop and dine within the
Village adding to the lively environment within the downtown area. The attractive architectural
design of the project will serve to enhance the site and the surrounding area.
Goal 2: Improve the Pedestrian and Vehicular Circulation in the Village Area. The absence of
at-grade parking improves pedestrian and vehicular circulation in the area by eliminating the
need for additional curb cuts. Additionally, the proposed project will be in close proximity to
both bus and rail mass transit options and will thus encourage and promote the use of mass
transit, further improving vehicular circulation in the Village.
Goal 3: Stimulate Property Improvements and New Development in the Village. The Master
Plan and Design Manual was developed in an effort to stimulate new development and/or
improvements to existing buildings in the Village. The intent is that new development or
rehabilitation of existing facilities will then stimulate other property improvements and additional
new development. The proposed project will assist in the continued effort to improve the
Village Redevelopment Area, specifically in the Tourism Support Area (District 9) by providing
for an appropriate intensity of development that is compatible with the surrounding area. The
proposed development of the subject property will serve as an additional catalyst for further
redevelopment along Carlsbad Boulevard.
Goal 4: Improve the Physical Appearance of the Village Area. The project has a design that is
visually appealing. The architecture of the new structure meets the requirements of the design
guidelines for the Village. Construction of the proposed project will reinforce the Village
character with appropriate site planning and architectural design and materials that comply with
City standards and requirements. In addition, the proposed project will establish a hotel with a
scale and character that is appropriate along Carlsbad Boulevard.
Planning Commission Considerations
The proposed General Plan Amendment to the Land Use Element would change the Land Use
designation of a portion of the site from Residential High Density (RH) to Travel/Recreation
Commercial (T-R). The proposed T-R designation would be appropriate as a portion of the
existing 28-room motel is presently located within the RH Land Use designation and is
considered an existing non-conforming use. The existing single family residence makes up the
remainder of the proposed Land Use change area. The project can be found compatible with
surrounding uses of multi-family, commercial and other hotel uses in the immediate area. The
site is topographically suitable for the development of T-R type uses, as the majority of the
developable portion of the site has been previously developed with motel, commercial and
residential uses. The proposed T-R Land Use designation would not result in any unavoidable
adverse impacts to the area. The project will not generate a significant increase in average
daily vehicle trips and Carlsbad Boulevard is capable of handling the proposed vehicle trips.
Adequate buffers in the form of building placement, setbacks and landscaping will separate the
existing residential land uses to the south from the proposed hotel site.
The project is proposing to change the General Plan Land Use designation from RH to T -R on
.49 acres of the property. This would reduce the dwelling unit potential of the site by 9.3
dwelling units. Consistent with Program 3.8 of the City's certified Housing Element, all of the
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE&
dwelling units, which were anticipated toward achieving the City's share of the regional housing
need that are not utilized by developers in approved projects, are deposited in the City's Excess
Dwelling Unit Bank. These excess dwelling units are available for allocation to other projects.
Accordingly, there is no net loss of residential unit capacity and there are adequate properties
identified in the Housing Element allowing residential development with a unit capacity,
including second dwelling units, adequate to satisfy the City's share of the regional housing
need.
The project is consistent with the applicable policies and programs of the General Plan.
Particularly relevant to the proposed hotel development are the Land Use, Circulation, Noise,
and Public Safety elements. Table B below indicates how the project complies with these
particular elements of the General Plan.
TABLE B-GENERAL PLAN COMPLIANCE
Element Use Classification, Proposed Use and Improvements Compliance
Goal, Objective or
Program
Land Use T -R development to serve The project proposes a General Plan
the travel and recreational Amendment to T-R for the Yes
needs of tourist, residents development of a 1 04 room motel.
as well as employees of
business and industrial
centers.
Circulation Adequate circulation The existing Carlsbad Boulevard
infrastructure to serve the roadway is adequate in capacity to Yes
projected trips generated handle the traffic generated by the
by the use. proposed use.
Noise To achieve noise impact Project has been designed to reduce
compatibility between the amount of potential noise Yes
land uses through the impacts to adjacent residential land
land use uses through building form and
planning/development restricting the hours of outdoor
review process activities.
Public Enforce the Uniform All necessary water mains, fire
Safety Building and Fire Codes, hydrants, and appurtenances must
adopted by the City, to be reviewed during building design Yes
provide fire protection and installed prior to occupancy of
standards for all proposed any building.
structures.
B. LOCAL COASTAL PROGRAM AMENDMENT
The subject properties are located in both the Village Redevelopment and Mello II Segments of
the City's Local Coastal Program (LCP). The eastern portion of the site is located within the
Mello II Segment and the western portion of the site is within the Village Redevelopment
Segment of the LCP. The LCP consists of two parts-the Land Use Plan and the implementing
ordinances. For the portion of the project site located in the Mello II Segment, the implementing
ordinances consist of the applicable portions of the Zoning Ordinance. This analysis section
-
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE7
only addresses compliance with the Land Use Plan since Zoning Ordinance compliance is
discussed in Section C below.
The policies of the Mello II Land Use Plan emphasize topics such as preservation of agricultural
and scenic resources, protection of environmentally sensitive resources, provision of shoreline
access, and prevention of geologic instability and erosion. The proposed LCP Land Use
Amendment from Residential High Density (RH) to T-R is consistent with the policies contained
in the Land Use Plan for the Mello II Segment of the LCP. Since all of the affected properties
are already subdivided and developed, no impacts to any physical features, such as scenic
resources, environmentally sensitive areas, or geologic features, will occur. The change to the
land uses over most of the existing developed properties does not preclude the continued
conformance with the Mello II Segment policies. The policies of the LCP call for additional
hotel/ motel rooms and visitor-serving uses within the Coastal Zone.
No agricultural uses currently exist on the site, nor are there any sensitive resources located on
the property. The proposed hotel is not located in an area of known geologic instability or flood
hazard. The site is proposed to be Land Use designated Travel Recreation/Commercial and is
proposing a hotel use.
The property is located on the east side of Carlsbad Boulevard and there are no opportunities
for vertical coastal access or recreational activities from the subject site. There is adequate
vertical public access to public beaches located to the southwest of the site. Therefore, the
project will not interfere with the public's right to physical access to the sea.
The project is consistent with the provisions of the Coastal Resource Protection Overlay Zone
(Chapter 21.203 of the Zoning Ordinance) in that the project will adhere to the City's Master
Drainage Plan, Grading Ordinance, Storm Water Ordinance, Standard Urban Storm Water
Mitigation Plan (SUSMP) and Jurisdictional Urban Runoff Management Program (JURMP) to
avoid increased urban run off, pollutants and soil erosion. No development is proposed in
areas of steep slopes (coastal bluff) and no native vegetation is located on the subject property.
The site is not located in an area prone to landslides, or susceptible to accelerated erosion,
floods or liquefaction.
The proposed DKN Hotel project must be consistent with the proposed C-T Zoning. The
proposed actions would change the LCP zoning from R-3 to C-T zoning over the eastern
portion of the site. The C-T zone implements the T-R Land Use designation.
As stated above, the area proposed for the Land Use changes covers the eastern portion of the
site. The proposed hotel project is consistent with the Zoning Ordinance and the existing
development.
Consistency with the Village Redevelopment and Mello II Segments of the Local Coastal
Program Land Use Plan is applicable to this project. The Village Master Plan and Design
Manual functions as the Local Coastal Program for the area. Therefore, as long as the project
is consistent with the Village Master Plan and Design Manual, the project is consistent with the
Local Coastal Program. Staff finds the proposed use to be consistent with the Village Master
Plan and Design Manual and therefore the Local Coastal Program. A Coastal Development
Permit is being processed in both Local Coastal Program Segments concurrently and is a
common permit for both the Redevelopment Permit and the GPAIZC and SDP applications.
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGES
The Coastal Permit is not in the appeal area of the Calif. Coastal Commission.
Given the above, the proposed DKN Hotel project is consistent with the Village Redevelopment
and Mello II Segment Land Use Plans of the LCP. To date, no comments have been received
during the required six-week LCPA public notice of availability period (February 24, 2006 -April
7, 2006).
C. CONSISTENCY WITH ZONING DESIGNATION
Design Review Board Considerations
The Village Redevelopment Master Plan and the Village Redevelopment Design Manual, which
implements the goals and objectives of the Village Redevelopment Master Plan are the
controlling documents for projects within the Village. As set forth in the Village Master Plan and
Design Manual, hotel projects are classified as permitted uses within Land Use District 9 of the
Village Redevelopment Area. Permitted uses are defined as those uses which are permitted by
right because they are considered to be consistent with the vision and goals established for the
district. Although these land uses may be permitted by right, satisfactory completion of the
Design Review Process and compliance with all other requirements of the Redevelopment
Permit Process is still required.
The overall vision for the development of District 9 (Tourism Support) is to accommodate a wide
mix of uses with an emphasis upon facilities, goods and services to tourists and regional visitors
traveling along the coast. High quality hotels, restaurants, and retail shops are emphasized and
multi-family development is permitted as part of a mixed-use project. The proposed project
achieves this vision by providing a highly desirable hotel project, which promotes tourist lodging
to the travelers along the coastal highway, while remaining sensitive to the adjacent residential
uses to the east through scale and design. The architectural design and site planning of the
project helps to ensure that the residential portions of Oak Avenue remain a quality residential
neighborhood.
The proposed project supports the Village character for the area. The project is located in
close proximity to mass transit, parks, the beach, retail, and commercial services. The project
is consistent with the Village Master Plan and Design Manual and has also been determined to
be consistent with the General Plan, as related to the Village Redevelopment Area.
Development of the subject property will serve as a catalyst for future projects and help to
promote the Village Design further within District 9.
CONSISTENCY WITH DEVELOPMENT STANDARDS
The project complies with all development standards and design criteria specified by the
applicable ordinances as shown in Table C below.
-
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE9
TABLE C -VR and CT/BAOZ Compliance
Standard Proposed Conformance
Arterial Setbacks:
Setbacks required for arterials.
V-R Zone -5'-20' 7'-3" (See "reduction on standards" Yes
C-T/BAOZ -N/A discussion below)
N/A
Side Yard Setback
V-R Zone -5'-10' 0' *(See "reduction of standards" Yes
C-T/BAOZ -10' discussion below)
1 0' adjacent to residential
Rear Yard Setback V-R Zone -N/A Yes
C-T/BAOZ -N/A
Building Height
V-R Zone -45' 43' Yes
C-T/BAOZ -35' 33 feet 8.5 inches
Lot Coverage
V-R Zone < 80% 53% Yes
C-T/BAOZ -N/A N/A
Parking
1.2 spaces/ room 125 spaces provided Yes = 125 parking spaces required
Design Review Board Considerations
Building Setbacks within V-R Zoning:
The development standards within the Village Redevelopment Area require specific findings for
projects that are below the maximum of the setback standard range. As set forth in the Village
Redevelopment Master Plan and Design Manual, the top of the setback range is considered to
be the desired setback standard. However, a reduction in the standard to the minimum, or
anywhere within the setback range, may be allowed if the project warrants such a reduction and
the following findings are made by the Housing & Redevelopment Commission:
1. The reduced standard will not have an adverse impact on surrounding properties.
2. The reduced standard will assist in developing a project that meets the goals of the
Village Redevelopment Area and is consistent with the objectives for the land use
district in which the project is to be located.
3. The reduced standard will assist in creating a project design which is interesting and
visually appealing and reinforces the Village character of the area.
The findings required allowing reductions in the front yard setback and the south side yard
setback at a level below the maximum and within the standard range are as follows. First, the
proposed setback will not have an adverse impact on surrounding properties as the reduced
setback will allow for the outdoor dining areas and the business center to be close to the street
reinforcing the pedestrian interaction along Carlsbad Boulevard helping to create a lively
commercial block frontage. The reduced front yard setback will, therefore, encourage and
maintain the existing visitor-serving commercial continuity and synergy that exists along
Carlsbad Boulevard adding to the shopping experience in the Village. The reduced side yard
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE10
standard will help to break up the mass of the building allowing other portions of the building to
be setback further. Second, the reduced standards will assist in developing a project that
meets the goals of the Village Redevelopment Area and is consistent with the land use
objectives in that the project will replace existing blighted structures with a visually appealing
project that has scale and character that will improve the appearance and condition of the
current Village hotel lodging stock helping to stimulate property improvements and further new
development in the Village. The project will help to further establish Carlsbad Village as a
quality shopping and living environment by providing an attraction for additional tourist-serving
uses. Lastly, the reduced standards will assist in creating a project design that is interesting,
visually appealing and reinforces the Village character of the area through setbacks that provide
adequate space for landscaping and decorative paving at the ground floor allowing building
recesses and relief along the various building planes. The reduced standards will assist in
creating greater architectural articulation adjacent to the street and will assist in the effort to
make the building visually interesting and more appealing which is a primary goal of the Village
Design guidelines in reinforcing the Village character. Based on these findings, it is staff's
position that the proposed project satisfies the setback requirements set forth for Land Use
District 9 for the reduced front yard and south side yard setbacks.
For approval of a portion of the north side yard setback, which is below the minimum setback
range requirements for the subject land use district, a variance must be approved by the
Housing and Redevelopment Commission. Variances may only be granted if the findings set
forth in Section 21.35.130 of the Carlsbad Municipal Code are met.
In order to approve the requested variance to allow the side yard building setback to be
reduced to zero along a portion of the northern property line, the Design Review Board and
Housing and Redevelopment Commission must be able to make the five findings contained
within Carlsbad Municipal Code Section 21.35.130. Staff offers the following justification for
granting the requested variances to exceed the setback standards:
Variance Finding #1: Because of special circumstances applicable to the subject property,
including size, shape, topography, location or surroundings, the strict application of the zone
regulation deprives such property of privileges enjoyed by other property in the vicinity and
under identical zoning classification. Justification: Special circumstances exist that are
applicable to the subject property that justify granting the requested variance. First the shape
of the lot is unusual due to its "wedged" shape configuration at the north end of the site fronting
Carlsbad Boulevard. This shape restricts the design flexibility for new visitor-serving
commercial uses. However, through the reduction (variance), the applicant is able to provide a
large enough outdoor dining area at the north end of the site that will serve to reinforce the
pedestrian interaction between hotel patrons and pedestrians helping to generate a lively
commercial block frontage with visitor-serving commercial continuity. This is consistent with the
goals and objectives of the Village that include attracting additional tourist serving commercial
uses and reinforcing the pedestrian commercial continuity within the Village commercial
districts. The additional outdoor dining area, enabled through the variance, is necessary at the
north corner of the site in order to maintain the existing visitor-serving commercial continuity
and synergy that exists along Carlsbad Boulevard.
Variance Finding #2: The variance shall not constitute a grant of special privileges inconsistent
with the limitations upon other properties in the vicinity and zone in which the subject property is
located. Justification: The granting of the variance will not constitute a granting of special
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE11
privileges as the property to the north currently has a zero foot side and rear yard setback. By
allowing the subject project to abut the property line to the north, the project will share the same
setback standard as the property to the north. Allowing the setback standard below the 5-foot
minimum will eliminate an area between the proposed and existing building that could collect
trash and debris and eventually become a health and safety concern.
Variance Finding #3: The variance does not authorize a use or activity, which is not otherwise
expressly authorized by the zone regulation governing the subject property. Justification: The
variance for this project falls on property within the V-R zoning designation. The variance does
not authorize a use or activity, which is not expressly authorized by the zone regulation
governing the subject property, as a hotel use is a permitted use within Land Use District 9
(Tourism Support Area) of the V-R zoning designation.
Variance Finding #4: The variance is consistent with the general purpose and intent of the
General Plan, Carlsbad Village Area Redevelopment Plan, and the Carlsbad Village
Redevelopment Master Plan and Design Manual. Justification: The standards established in
the Village Master Plan and Design Manual were intended to be somewhat flexible in order to
encourage diversity and variety of development and to take into consideration the unique
conditions associated with many of the properties in the redevelopment area. The reduced side
yard setback is consistent with the existing site conditions to the north. The requested variance
in no way changes the use or development of the site in a manner that is inconsistent with the
general purpose and intent of the General Plan, Carlsbad Village Area Redevelopment Plan,
and the Carlsbad Village Redevelopment Master Plan and Design Manual.
Variance Finding #5: In addition, in the Coastal Zone, the variance is consistent with and
implements the requirements of the certified Local Coastal Program and the variance does not
reduce or in any manner adversely affect the protection of coastal resources as specified in the
zones included in this title, and the variance implements the purposes of zones adopted to
implement the Local Coastal Program Land Use plan. Justification: The variance is consistent
with the intent of the requirements of the Village Master Plan and Design Manual, which
functions as the Local Coastal Program for the area. As long as the project is consistent with
the Village Master Plan and Design Manual, the project is consistent with the Local Coastal
Program. The variance allows for a permitted hotel use with outdoor seating, which is
consistent with the Village Master Plan and Design Manual and therefore is consistent with the
Local Coastal Program.
Based on these variance findings, it is staff's position that the proposed project warrants the
granting of a variance to allow the side yard building setback to be reduced to zero along the
northern property line.
Residential Density and lnclusionary Housing Requirements:
There is no residential component proposed within this project. Therefore, residential density
and inclusionary housing requirements are not applicable to this project.
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE12
CONSISTENCY WITH DESIGN GUIDELINES
Design Review Board Considerations
All new projects within the Village Redevelopment Area must make a good faith effort to design
a project that is consistent with a village scale and character. The Design Review Board and
the Housing and Redevelopment Commission, as appropriate, must be satisfied that the
applicant has made an honest effort to conform to ten (10) basic design principles. These
design principles are:
1. Development shall have an overall informal character.
2. Architectural design shall emphasize variety and diversity.
3. Development shall be small in scale.
4. Intensity of development shall be encouraged.
5. All development shall have a strong relationship to the street.
6. A strong emphasis shall be placed on the design of the ground floor facades.
7. Buildings shall be enriched with architectural features and details.
8. Landscaping shall be an important component of the architectural design.
9. Parking shall be visibly subordinated.
10. Signage shall be appropriate to a village character.
The proposed project is consistent with the design principles outlined above. The project design
provides for an overall informal character while expressing the unique nature of the use and site
location. The architectural design provides for variety and diversity through the incorporation of
the following elements: varying roof heights; a variety of roof pitches that range from a
minimum of 5:12 to a maximum of 14:12; building articulation on all elevations; and varied
building setbacks. The project incorporates an abundance of informal landscaping along the
perimeter of the property, which works well with the building design. The building provides for a
variety of architectural features and details, which in addition to those previously described
include divided-pane windows, a columned entryway, decorative rock work, and outdoor eating
areas oriented towards the street. A summary of the design features related to the project is
provided as Exhibit 1 to this report.
D. GROWTH MANAGEMENT (TRAFFIC, CIRCULATION, SEWER, WATER. RECLAIMED
WATER AND OTHER SPECIAL CONSIDERATIONS)
The project, as conditioned, shall comply with the City's requirements for the following:
Traffic & Circulation:
Projected Average Daily Traffic (ADT): 824 ADT (additional new ADT of 452)
Traffic Study was prepared by Linscott Law and Greenspan Engineers, dated October 27,
2005.
Comment: Carlsbad Boulevard access to the site will be restricted to right turns only. A raised
median on Carlsbad Boulevard will prevent left turns from the project driveway. There is also
an access restricted to "loading only" on Lincoln Street. Outbound project traffic wishing to
travel south on Carlsbad Boulevard can make a U-turn at the intersection of Carlsbad Village
c
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE13
Drive and Carlsbad Boulevard. Southbound project traffic entering the project site can make a
U-turn at the intersection of Carlsbad Boulevard and Pine Avenue.
The proposed project will generate 824 ADT. The existing uses on site to be ,demolished
generate 372 ADT. Since the ADT from existing uses will be nullified by demolition, the net
expected ADT generated will be 452. All frontage and project related roadways are conditioned
to be designed and constructed concurrent with development of this project.
Sewer:
Sewer District: Carlsbad Municipal Water District
Sewer EDUs Required: 104 units without kitchens
(0.60) edu/dwelling x 104 suites= 171.6 EDUs
Comment: An 8 inch sewer main exists in Lincoln Street and a 6 inch sewer main exists in
Carlsbad Boulevard. Provided that the existing sewer lateral in Lincoln Street is appropriately
sized, the project will connect to this lateral. Otherwise a new (minimum 6 inch) lateral will be
installed. The project is conditioned to require a submittal of a sewer study to determine the
required lateral size and other pertinent information.
Water:
Water District: Carlsbad Municipal Water District
GPO required: 61,860 square foot building x 2,300 gpd/1 0,000 square foot building = 14,228
gpd
Comment: No major water issues are associated with this proposed project. Adequate fire and
domestic water supply will be available to the project. Service will be provided by connecting to
the existing 10 inch water service in Carlsbad Boulevard.
Soils & Grading:
Quantities: Cut: 14,870 cy Fill: 80 cy Export: 14,790 cy Import: 0 cy
Permit required: Yes
Off-site approval required: No
Hillside grading requirements met: N/A
Addendum No. 1 Preliminary Geotechnical Investigation performed by: Leighton Consulting,
Inc. dated November 23, 2005
Comment: The onsite soils have a low to very low expansion potential. The onsite soils are
suitable for compacted fill. Excavations approximately 20 feet deep are proposed for the
underground parking garage. Given the depth of cut and close proximity to offsite structures,
the soils engineer recommends that shoring operations be performed by a specialty contractor.
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE14
Drainage & Erosion Control:
Drainage basin: B
Preliminary hydrology study performed by: Aquaterra Engineering Inc. 1843 Camesino Place,
Oceanside CA 92054.
Erosion Potential: Low
Comment: There are no major drainage issues associated with this project. The drainage
patterns affecting the site are divided into four basins. The net difference in runoff from the
existing development to the proposed development for a 100 year frequency storm is -0.1 cubic
feet per second (cfs). A combination of rerouting drainage, directing drainage through grass
swales and to a retention basin with dewatering pit allows for a slight decrease in offsite
drainage runoff.
A Preliminary Storm Water Management Plan was submitted to address storm water quality
concerns. A combination of vegetated swales, an infiltration basin, inlet filters for the
underground garage and filters installed in the downspouts for treatment of roof drainage will
treat onsite drainage for anticipated pollutants prior to discharge to the public storm drain pipe.
Land Title:
Conflicts with existing easement: None.
Easement dedication required: a private drainage easement will need to be recorded for the
abutting property to the south.
Site boundary coincides with land title: Yes
Comment: No major land title issues are associated with this project. The project is conditioned
to consolidate the four parcels within the development boundaries into one lot.
Improvements:
Off-site improvements: Curb, gutter, sidewalk, street and bike lanes and medians on Carlsbad
Boulevard exist. No further improvements are necessary on Carlsbad Boulevard other than
removal of a driveway and replacement with curb, gutter and sidewalk and installation of a new
driveway and drainage curb outlet. On Lincoln Street, new curb, gutter and sidewalk will be
installed along with street pavement widening needed to bring the street-to-centerline width to
21.5 feet. These improvements will transition into exiting curb, gutter and sidewalk to the
northwest and southeast. Also, the pavement between the street centerline and curb along the
property frontage shall be resurfaced where needed. A domestic water line and fire service line
will be installed on Lincoln Street.
Standard variance required: No.
Comment: No major improvement issues are associated with this proposed project.
-----·--·-·~--~---
c
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE15
IV. ENVIRONMENTAL REVIEW
The Planning Department has conducted an environmental review of the above described
project pursuant to the Guidelines for Implementation of the California Environmental Quality
Act and the Environmental Protection Ordinance of the City of Carlsbad. As a result of said
review, the initial study (EIA Part 2) identified no potentially significant environmental impacts
and a Negative Declaration was issued for the subject project by the Planning Director on
December 28, 2006 and made available for public review. No comments were received on the
environmental document during the 30 public review period (December 28, 2006 through
January 27, 2007).
Because the project is subject to the approval of two different decision-making bodies (City
Council and Housing and Redevelopment Commission), the Negative Declaration, which
applies to both parts of the project, must be adopted by both the City Council and Housing and
Redevelopment Commission.
V. ECONOMIC IMPACT
The proposed project is anticipated to have a significant positive financial impact on the City
and the Redevelopment Agency. First, the redevelopment of under-utilized properties will result
in increased property taxes. This increase in property tax will result in increased tax increment
to the Redevelopment Agency. Second, the project will generate significant transient
occupancy taxes which will benefit the City as a whole. Third, it is hoped that the project will
serve as a catalyst for other improvements in the area, either new development or rehabilitation
of existing buildings. Finally, the project will result in the construction of a new development
and elimination of a blighting influence within the area.
VI. CONCLUSION
Staff is recommending approval of the project with findings to grant a variance for a portion of
the north side yard setback that is below the minimum of the standard range. The project will
have a positive fiscal impact on both the City and the Redevelopment Agency and will assist in
fulfilling the goals and objectives of the Village Redevelopment Master Plan.
DKN HOTEL-GPA 05-05/ZC 05-02/LCPA 05-02/RP 05-03/CDP 05-14/SDP 05-04
MARCH 7, 2007
PAGE16
EXHIBITS:
1. Exhibit 1, Staff Analysis of Project Consistency with Village Master Plan Design
Guidelines.
2. Design Review Board Resolution No. 319 (RP)
3. Design Review Board Resolution No. 320 (COP)
4. Design Review Board Resolution No. 321 (Neg. Dec.)
5. Planning Commission Resolution No. 6254 (Neg.Dec.)
6. Planning Commission Resolution No. 6255 (GPA)
7. Planning Commission Resolution No. 6256 (ZC)
8. Planning Commission Resolution No. 6257 (LCPA)
9. Planning Commission Resolution No. 6258 (COP)
10. Planning Commission Resolution No. 6259 (SDP)
11 . Location Map
12. Background Data Sheet
13. Local Facilities Impact Assessment Form
14. Disclosure Statement
15. Reduced Exhibits
16. Exhibits "A" -"R" dated March 7, 2007
VILLAGE MASTER PLAN DESIGN GUIDELINES
CHECKLIST
Provide variety of setbacks along any single commercial
block front.
Provide benches and low walls along public pedestrian
frontages.
Maintain retail continuity along pedestrian-oriented
frontages.
Avoid drive-through service uses.
Minimize privacy loss for adjacent residential uses.
Encourage off-street courtyards accessible from· major
pedestrian walkways
Emphasize an abundance of landscaping planted to
create an informal character
Treat structures as individual buildings set within a
landscaped green space, except for buildings fronting on:
Carlsbad Village Drive, State Street, Grand Avenue,
Carlsbad Boulevard and Roosevelt Street
Provide landscaping within surface parking lots
Provide access to parking areas from alleys wherever
possible.
Locate parking at the rear of lots.
Project: DKN Marriott
The project provides various setbacks and outdoor
eating areas in order to provide setback from
Carlsbad Boulevard. The building setbacks are
appropriate for the location.
The project does not provide benches or low lying
walls but does have outdoor seating areas for
guests of the hotel. Outdoor dining and seating
areas are incorporated along the Carlsbad
Boulevard frontage.
The proposed project will not conflict with retail
continuity. Outdoor dining is provided along
building frontage in order to encourage greater
interaction with the pedestrians along Carlsbad
Boulevard.
No drive through service use is included in project.
The project provides ample setbacks and
appropriate landscaping in order to reduce
impacts to adjacent residential uses to the south.
In addition, the building has minimal windows
facing to the south in order to reduce privacy loss.
The project location does not lend itself to
courtyards for pedestrian use.
Landscaped areas along all sides of the building,
within the parking lot, and within the recreational
area of the project will provide for an informal
character/setting.
Landscaping will be provided along all sides of the
building.
The project provides two-levels of subterranean
parking, in which landscaping is not suitable for
growth. ·
The property is not located adjacent to an alley.
Parking is subterranean and not visible from the
street.
Devote all parking lot areas not specifically required for
parking spaces or circulation to landscaping.
Avoid parking in front setback areas.
Avoid curb cuts along major pedestrian areas.
Avoid parking in block corner locations.
Provide setbacks and landscaping between any parking
lot and adjacent sidewalks, alleys or other paved
pedestrian areas.
Avoid buildings which devote significant portions of their
ground floor space to parking uses.
Place parking for commercial or larger residential
projects below grade wherever feasible.
Enhance parking lot surfaces.
Provide for variety and diversity. Each building should
express its uniqueness of structure, location or tenant
and should be designed especially for their sites and not
mere copies of generic building types.
Step taller buildings back at upper levels.
Break large buildings into smaller units.
Maintain a relatively consistent building height along
block faces.
Utilize simple building forms. Trendy and "look at me"
design solutions are strongly discouraged.
2
All areas not required for parking spaces, driveway
aisles, or trash enclosures have been landscaped.
No parking is provided in the front setback area.
There will be one curb cut of minimal width along
Carlsbad Boulevard to provide ingress and egress
to the property.
The subject property is not located on a corner.
Landscaped setbacks are provided around the
entire perimeter of the property.
The parking is provided below-grade.
The parking is provided below-grade.
The driveway entry provides enhanced paving.
The proposed design of the building provides for
articulation in the building, varying roof forms, and
other architectural features which provide for a
unique character.
At its peak, the proposed project is approximately
43' in height. The project includes several varying
roof heights and roof pitches that range from 5:12
to 14:12. These design elements serve to break
up the overall mass of the structure.
The project is designed in an "L" shape which
serves to break up the overall mass of the
structure.
The height of the building is consistent with the
height of the Carlsbad Inn located to the west of
the subject property and recently approved
projects to the east. Existing hotels along
Carlsbad Boulevard range from 2-3 stories in
height.
The building has been designed with simple lines
and forms but allows for representation of the
Village character desired for the area. The building
is not trendy or "look at me" in design.
Emphasize the use of gable roofs with slopes of 7 in 12
or greater.
Encourage the use of dormers in gable roofs.
Emphasize wood and composition shingle roofs, with the
exception that in the Land Use District 5 clay tile roofs
are acceptable.
Avoid Flat Roofs
Screen mechanical equipment from public view.
Avoid mansard roof forms.
Emphasize an informal architectural character. Building
facades should be visually friendly.
Design visual interest into all sides of buildings.
Utilize small individual windows except on commercial
storefronts.
Provide facade projections and recesses.
Give special attention to upper levels of commercial
structures.
3
Roof pitches of 12:12 and 14:12 are common with
the proposed project resulting in the desired steep
roof pitch.
Dormers have been incorporated into the project
design.
The project provides a wood composition shingle
roof which is consistent with the architectural
design intended for the project as well as other
projects in the area.
The building does not incorporate flat roofs.
This will be a requirement of the project.
The project utilizes mansard roof forms in order to
reduce overall building height and provide desired
roof pitch.
By providing for attractive facades and
landscaping, the project is very visually appealing.
Visual interest is added to the building through
architectural features.
The design of the building incorporates design
elements into all building facades, thereby creating
visual interest in the building. The project makes
good use of divided-pane windows, a columned
entry feature, applied surface ornamentation,
varying roof peaks, and landscaping.
The proposed project provides for divided paned
windows through out the building to achieve the
Village character.
The building design provides for recesses and
projections which will create shadows and
contrast.
The upper levels of this building provide for
attractive window features, applied ornamentation,
and varying roof heights which reflects special
attention in design.
-
Provide special treatment to entries for upper level uses.
Utilize applied surface ornamentation and other detail
elements for visual interest and scale.
Respect the materials and character of adjacent
development.
Emphasize the use of the following wall materials: wood
siding; wood shingles; wood board and batten siding; and
stucco.
Avoid the use of the simulated materials; indoor/outdoor
carpeting; distressed wood of any type
Avoid tinted or reflective window glass.
Utilize wood, dark anodized aluminum or vinyl coated
metal door and window frames.
Avoid metal awnings and canopies.
Utilize light and neutral base colors.
Limit the materials and color palette on any single
building (3 or less colors)
Provide significant storefront glazing.
Avoid large blank walls.
Encourage large window openings for restaurants.
Encourage the use of fabric awnings over storefront
windows and entries.
Emphasize display windows with special lighting.
Encourage the use of dutch doors.
4
The upper levels of this building will be accessed
through internal stairways. Therefore, no special
treatment of upper level use entries is necessary.
Detail elements have been incorporated into the
entire project by design. The windows and
entrance design all provide for detail which adds
visual interest. Applied surface ornamentation and
varying wall materials also enhance the overall
architectural detail.
The materials and colors proposed for the building
will not conflict with adjacent developments.
The exterior walls utilize river rock detail on the
first and second stories. Stucco is used on other
surfaces.
None of the noted materials have been indicated
for use.
The windows are clear glass.
The applicant will be using divided-pane vinyl
windows.
The applicant has proposed no awnings or
canopies.
The project utilizes a light and neutral color
scheme.
The project incorporates less than 3 colors.
Due to the type of commercial facility, this design
feature is not applicable.
The project has been designed with no large blank
walls.
Not applicable; no restaurant proposed within the
project. Large windows are provided along lower
level in order to encourage greater interaction with
the street.
No fabric awnings to be used; not a retail or
storefront operation.
No display lighting. Not applicable to project.
Project design does not lend itself to the use of
dutch doors.
The applicant is using small divided paned
Utilize small paned windows. windows throughout.
Develop a total design concept. All facade design elements are unified. The appli-
cant was able to develop a total design concept
with is also functional and visually interesting.
Provide frequent entries. The project does provides a sufficient number of
entrances acceptable for the proposed use.
Limit the extent of entry openings. The extent of the entry openings has been limited
through the design.
Avoid exterior pull down shutters and sliding or fixed The project does not include pull down shutters,
security grilles over windows along street frontages. sliding or fixed security grilles over windows along
the street frontage.
Emphasize storefront entries. Not applicable to this project.
Integrate fences and walls into the building design. Fences and walls have been incorporated into the
building design.
'" ''
Encourage front entry gardens Not applicable.
Locate residential units near front property lines and Not applicable.
orient entries to the street.
Provide front entry porches. Not applicable.
Provide windows looking out to the street. Not applicable.
Utilize simple color schemes. Not applicable.
Provide decorative details to enrich facades. Not applicable.
Emphasize "cottage" form, scale and character Not applicable.
Emphasize an abundance of landscaping. Not applicable.
Limit access drives to garages or surface parking areas. Not applicable.
Encourage detached garages which are subordinate in Not applicable.
visual importance to the house itself.
Provide quality designed fences and walls. Not applicable.
Visually separate multi-family developments into smaller Not applicable.
components.
5
SITE MAP
• N
NOT TO SCALE
DKN Marriott
GPA 05-05/ZC 05-02/LCPA 05-02/SDP 05-04
/COP 05-14/RP 05-03
c 0 BACKGROUND DATA SHEET
CASE NO: GP A 05-05/ZC 05-02/LCP A 05-02/RP 05-03/SDP 05-04/CDP 05-14
CASE NAME: DKN MARRIOTT
APPLICANT: =D=K~N~H=o=t=el=s ____________________________________________________________________________________________________ __
REQUEST AND LOCATION: Request for a recommendation to the City Council to adopt a
Negative Declaration, and recommendation of approval of a General Plan Amendment, Zone Change,
Local Coastal Program Amendment, and Coastal Development Permit, and approval of a Site
Development Permit; and a recommendation to the Housing and Redevelopment Commission to adopt a
Negative Declaration and a recommendation of approval of a Major Redevelopment Permit and Coastal
Development Permit for the demolition of an existing a hotel, restaurant, and single family residence and
for the construction of a 3-story, I 04-room hotel project on property located at 3I36 Carlsbad Boulevard
on the east side of Carlsbad Boulevard between Pine Avenue and Oak Avenue in Land Use District 9 of
the Carlsbad Village Redevelopment Area, in the Village Redevelopment and Mello II Segments of the
Local Coastal Program and in Local Facilities Management Zone I.
LEGAL DESCRIPTION: Portion of Block 18, Town of Carlsbad per Map No. 775,
Recorded 2-15-1894 and Portion of Tract 100, Carlsbad Lands per Map 1661, Recorded 3-1-
1915, all in the City of Carlsbad, County of San Diego, State of California.
APN: 203-250-08 and 26 Acres: .84 Proposed No. ofLots/Units: ..o..10.::...4.:...=ho=t=el"-'u=n=it=s ____ _
GENERAL PLAN AND ZONING
Existing Land Use Designation: ...!.V-l(....!V-2ci~lla!:lg:>.!:e~)/RH~~---------------
Proposed Land Use Designation: ....!.V.!..._/T.!o..;R~--------------------
Density Allowed: N/ A Density Proposed: =-N"-'1 A:;.,:_ _________ _
Existing Zone: VR/R-3 Proposed Zone: ....!.V-"'-R/""-C=--T~----------
Surrounding Zoning, General Plan and Land Use:
Zoning General Plan Current Land Use
Site V/R-3 VRIRH Motel/SFR
North VR v Retail (7111)
South R-3 RH Multi-family residential
East R-3 RH Single and Multi-family
West V-R v Multi-family residential
Revised 0 1 /06
CiocALCOASTALPROGRAM CJ
Coastal Zone: [8J Yes D No Local Coastal Program Segment: Village Redevelopment and
Mello II
Within Appeal Jurisdiction: DYes [8J No Coastal Development Permit: [8J Yes D No
Local Coastal Program Amendment: [8J Yes D No
Existing LCP Land Use Designation: RH
Existing LCP Zone: R-3
Proposed LCP Land Use Designation: -=-T-=-R-=-----
Proposed LCP Zone: =C-'-T~-------
PUBLIC FACILITIES
School District: Carlsbad Unified Water District: Carlsbad Sewer District: Carlsbad ===----
Equivalent Dwelling Units (Sewer Capacity): ..o..l7-'--'1:....:.·.:::...6=E=D:....::U"---------------
ENVIRONMENTAL IMPACT ASSESSMENT
D Categorical Exemption,-----------------------
1:8] Negative Declaration, issued D~e~ce~m!!.:b~e::!.r-=2~6~20~0~6::.___ ____________ _
D Certified Environmental Impact Report, dated---------------
0 Other, ____________________________ _
Revised 01/06
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: DKN MARRIOTT -GP A 05-05/ZC 05-02/LCP A 05-02/RP 05-03/CDP
05-14/SDP 05-04
LOCAL FACILITY MANAGEMENT ZONE: 1 GENERAL PLAN: =RH~------
ZONING:~R~-3~------------------------------------------------
DEVELOPER'SNAME:~D=K~N~H=o=te=ls~----------------------------------
ADDRESS: 540 Golden Circle Dr, #214, Santa Ana, CA 92705
PHONE NO.: (714) 480-0661 ASSESSOR'S PARCEL NO.: 203-250-08 and 26
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): =·8...:...4 .:...!A"'--c _____ _
ESTIMATED COMPLETION DATE: ASAP
A. City Administrative Facilities: Demand in Square Footage= N/A
B. Library: Demand in Square Footage= NIA
C. Wastewater Treatment Capacity (Calculate with J. Sewer) 171.6 EDU
D. Park: Demand in Acreage = N/A
E. Drainage: Demand in CFS = 4.37
Identify Drainage Basin = B
F. Circulation: Demand in ADT = 452
G. Fire: Served by Fire Station No. = 1
H. Open Space: Acreage Provided = N/A
I. Schools: Carlsbad N/A
J. Sewer: Demands in EDU 171.6
Identify Sub Basin = Vista/Carlsbad
K. Water: Demand in GPD = 14 228
L. The project is 9 units below the Growth Management Dwelling unit allowance.
~
City
~ .....,
of Carlsbad
IQFJ,j ,j le(•i •l§.fflii e .I§ ,j I
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership interests on all applications which will require
discretionary action on the part of the City Council or any appointed Board, Commission or Committee.
The following information MUST be disclosed at the time of application submittal. Your project cannot
be reviewed until this information is completed. Please print.
Note:
Person is defined as "Any individual, fum, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city
municipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this docume;nt; however, the legal name and entity of the applicant and property owner must be
provided below. ·
1. APPLICANT (Not the applicant's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having a financial
interest in the application. If the applicant includes a corporation or partnership, include the
names, title, addresses of all individuals owning more than 10% of the shares. IF NO
INDIVIDUALS OWN MORE TIIAN 10% OF THE SHARES, PLEASE INDICATE NON-
APPLICABLE (NIA) IN THE SPACE BELOW If a publicly-owned corporation. include the
names, titles, and addresses of the corporate officers. (A separate page may be attached if
necessary.)
Person ______________________ _____
Title ___________ _____
Address __________ _
2. OWNER (Not the owner's agent)
Corp/Part DKN Hotels
Title. ________________________ _
Address 540 Golden Circle Dr. #214
Santa Ana, CA 92705
Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership
interest in the property involved. Also, provide the nature of the legal ownership (i.e,
partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a
corporation or partnership, include the names, title, addresses of all individuals owning more
than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES,
PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publicly-
owned comoration. include the names, titles, and addresses of the corporate officers. (A separate
page may be attached if necessary.)
Person. ___________ _ Corp/Part DKN Hotels I Dahya Patel
Title ___________ _____ Title. _____________ _
Address. __________ _ Address 540 Golden Circle Dr. #214
Santa Ana, CA 92705
1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 @
,_
.....
3. NON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust, list the
names and addresses of A,NX person serving as an officer or director of the non-profit
organization or as trustee or beneficiary of the.
Non Profit/Trust _______ _ Non Profit/Trust _________ _
Title ___________ _ Title~-------------
Address __________ _ Address _______________ _
4. Have you had more than $250 worth of business transacted with any member of City staff,
Boards, Commissions, Committees and/or Council within the past twelv.~ (12) months?
0 Yes lXI No If yes, please indicate person(s): ____________ _
NOTE: Attach additional sheets if necessary.
I certify that all the above information is true and correct to the best of my knowledge.
_. oia~4< lOf owner/dat I Signature of applicant/date
Print of type name of owner
er/applicant' s agent if applicable/date
Print or type name of owner/applicant's agent
H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2
SPRINGHILL SUITES
~ .,\\arrtott
SPRINGHILL SUITES
PROJECT SUMMARY
CITY OF CARLSBAD
BUILDING
ADDRESS:
ASSESSOR'S PARCEL NO.:
LEGAL
DESCRIPTION:
EXISTING ZONE:
PROPOSED ZONE:
203-ZM-08, -20
~.~ emc:_:::l::: !a~ :,•r.:C ~i-~~~"=~Coufl4oot ==~1~.:~~~~~~~=· ol Son ~ State of Califomkl.•
R-3 and V-R DISTRICT i
C-T and V-R DtSTRICT 8 (lo REMAIN)
EXISTING GENERAl PLAN: RH. v
PROPOSED GENERAL PlAN: RJ ond V (To RWAIN)
EXISTING LAND
USE DESIGNATION:
EXISTING LAND USE:
PROPOSED LAND USE:
STORIES:
BUILDING HEIGHT:
TYPE OF CONSTRUCTION:
OCCUPANCY GROUP:
CODE OF DESIGN:
SJTEAREA:
BUILDING COVERAGE:
45' IM)(. (V-R DISTIUCT 9)
35' .we. (R-3)
TYPE I -FUU.Y SPRINKlERED -GARAGE TYPE V-1HR. -FULlY SPRINKLERED -HOTEl
S-J -GAAAGE R-! -HOTEL (U<JOO US£)
A-3 -U£EEilNG I RESfAURANT B-2 -SUPPORT SER\IK:E AREAS
2001 CAl.IRJRMA BllllDING COOE
DJlE 2f, PART 2, ~ -COO£ .........,.,. ........... ""' 2001 CAl.JRlRtM El.ECTRICAl.. COO£ 2001 Co*LJfORNA. PWUBitiQ CODE
2001 CM.WQRtrM t.C£aWMc.AL COO£
:lOO'f CAtEtiRIM FIRE CODE
0.84 ACRES
~ .A\arrtott
PARKING REQUIRED: 1.:1: sPACES PER GtJ£SrR00t.t
104 x 1.2 • 124.8 SPACES
PARKING PROVIDED:
~ .......
LMl. ..
lOWEll LMl. .. ..
'"'"' ,,.
ZONING ORDINANCE:
21.53.230: t.IOT APPUCASL£
OPEN SPACE REQUIRED: 20X .........
OPEN SPACE PROVIDED: 11.500 SQ. FT. • 31.50 X
SEWER DISTRICT SERVING PROJECT: CARlSBOD SEWER DISIRICf
WATER DISTRICT SERVlNG PROJECT: CAR1..SBAD t.IUNICIPAL WATER DISTRICT
WATER DISTRICT SERVING PROJECT: CAR1..SBAD UH1F1E0 SCHOOl D15TRICT
GENERAl NOTES:
1.-=:.!l:..C.~~Inlhlo
2.-F.,. ~ .td be installed thro!!Mut the .........
3.-DwatM cw lnt.riot ~&hall DI:COIIIOdola on ombulclnclft aum.y af 84" x 24• at a height of
38". •
BUILDING DATA
8lJIDOIG NIEk
"""'""" "'"""' """""' -"· SQ.fT. 20,471 SQ.fT.
111.411S4.FT.
HOlELRQCIMt.UX: ....... • ....... .. ..,.
PROJECT TEAM
OWNER/
DEVELOPER;
PlANNER/
PROCESSOR:
ARCHITECT:
Parcel• 1.2 Clncl 3
Dohyo 8tiGI L PalAII oM~ Polel, huaband and .U• 01 joint tanont .......
Oahya Bbal L PaW
"""H01£tS !.40 Colden Qrcle Dr., I 214
Santono. Collomkl 02705 Tal: (7H) 410-oe&l
foil:" (7H) 480-0299 Contoct: Nd PaW
~ Pt..w.K. awn.. R•p. E-mull:~corn
PlNIHOIG S\'SlEMS 1530 f"III"Qday Ava.. Suitt. 1 DO Ca~d. CA 02008 Tal: (7&0) 831-0780
F"a>e (760) 831-5744
COntoct: Pawl KIUka•
E-moll: ~OploMI~tema.n•t
JOSEPH WONCil DfSION ASSOCIATES
2358 Fourth AveniMI, SUite 300
$Qn l.1iago ~omia 1112101
Tel: (819) 2.ll-8777
faa: (6111) 237-0541
Canl~~Gt: Rick Raunda
E-I"IIQI:~Ojwdalnc.com
SURVEYOR/ AQUATERRA ENGINEERING INC. CIVIL ENGINEER: 1843 Ca11'1pMbQ ptQC& ~.CA82054
Tal: (7150) 438-2802
foe (700) 2866
Contact: Goly llpaka
E-mal: glipllkoOeoa.net
lANDSCAPE wt.K1NS0H ()EgGN GROUP
ARCHITECT: 2810 Roouvelt 11: • Cor1abad. CGIIfomla 82008
T•l: (7150) 414-2152
TRAFFIC
ENGINEER:
GEOTECHNICAL
ENGINEER:
fax: (7CSO) <134-oB42
Contact: Bob Wllklnaon
E -mall: wdnlgngroupOjunD.cam
UHSCOTT. l.AW • ORaNSPAN ENGINEERS 45-42 Ruffner Str .. t, SuRa 100
Son D~i~Qo, CA 82111 t•: (858) JOo-8800
FOK: (868) J00-8810
ContGct John A. Boarman
E-mait:~.tom
WGHTOH COHSut..DHC
Jll34 lokwphy Canyoo ROGel SlAW b2~ San Olaga. Ccaifomkl 0212) Tel: (868) 212-8030
f011: (858) 2e2-on1
Contact; Willam a.on
£-mal: mdol750oalcam
CITY OF CARLSBAD APPliCAllON NUMBERS:
RP 05-03,SDP 05-04, COP Q5..14,lCPA 05-02, ZC ()5....()2. GPA 05-05
SHEET SCHEDULE
ARCHITECTURAl.
CS CCNER SHEET
A-1 SITE PL.Nf A-2 FlRST fl.DOR PLAN
A-l SECOHO flOOR PlAN
A-4 THIRD flOOR PLAN
A-5 UPPER PARKING Fl.OOA PUoH
A-6 LOWER PARKING fl..OOR PlAN
A-7 BUil..DING El..EVATIOHS
A-8 BUI..OING ELEVAllONS
A-9 ROOF PLAN
A-10 8Ut.OCNG SEcnoNS
A-11 SHADOW ~YSIS -PROf>OSED SUil..OING
A-12 StWXlW HW.~S -ALTERNATE SCHEI.IE
A-ll SHADOW AtW..'tSIS -SITE & SEcnoN
A-14 WALL El£VATlONS
A-15 SPOT PERSPECfi\IES
CML A-18 COLOA REND£RINGS
LANDSCAPE
L-1 I.NI)SCApf PlAN
VICINITY MAP
............ ,~···--••1•~·· .. ·· ..... . ___ _.__
____ ...... Q._ .. __ __ (at.,_.._-···-
SPRINGHJU. Sums .,.,...
3136 CARLSBAD BLVD .
CARLSBAD, CA
TITLE SHEET GENERAL INFORMATION cs
E3
r=J
c:=J
l>V•.h.
NEW CONCRETE PAVHl P£R CI\II.DRAWINGS
NEWCOHCAEIE SIDEWAU<PA.VHl
/
/
/
/
/
/
/
SllEPLAN
TO 20 JD 40
-QRAPNC SCN..E: I" • 20"
CITY OF CARLSBAD APPUCATION NUMBERS:
RP 05-03,SDP ()5.0.4, COP OS..14, LCPA 05-02, zc 05-02, GPA Q5..05
BUILDING
ROOMCOUHT:
BUII..OINGAREA:
"""'"'"' .......... ..........
TOTAl:
-111.1H •
20.471 SQ.f'T •
2\IQt; SQ.tt.
12.354 son.
PARKING: REQUIRED PARKING: 104 x 1.~ = 124.80
PARKING PROVIDED:
"-''""-.. ... "'
TRAFFIC IMPACT AR§A; ............. """"'"-
To<al
SITE PLAN KEY NOTES
[!] EXISTING CURB, GUITER TO REMAIN
0 ~g. ~~:ypl~N~E RESURFACED
0 EXISTING LANDSCAPING TO REt.WN
252 '"'
82< "' '"'
m EXISTING CONCRETE SIDEWAlK TO REMAIN
ill NEW 6" CONCRETE CURB
0 PROVIDE NEW CONCRETE PAVING
0 NEW CONCRETE W/ACCENT PAVING
[!] ~~~~~S~~~" HIGH MASONRY
(!] :;ON~~~~Gp~
QE] NEW CONCRETE WAU<.WA't
JWDA ............ , ........ ,. ............ . ,..... _ __.-..... __ .. ___ co._ .. _,_
-r•_,.._.,.,....,c-a.a-
SPRINGHILl SUITES ......
3136 CARLSBAD BLVD.
CARLSBAD, CA
SITE PLAN
--2 ID/11/2111111
l v•rv-
06~29· 2006
A-1
I I' ,I
I I' ,I
I I' ,I
I I'
I I I
I I' ,I
I I' ,I
JWDA ••••••••••••'•L>••••••h•••••• •••••• _.:;::-.:--_a.::,..~_ ... --1)--nTI .... c-., __
3136 CARLSBAD BLVD.
CARlSBAD, CA
FIRST FLOOR P1.AN
SECOND FLOOR PUIN
0' 32' 64' 128'
JWDA ............ ,.~ ...... , ............. . ----------co.-·-·--c-.. -.rro __ ., __
SPRINGHILl SUITES
•.Mimlll
3138 CARLSBAD BLVD.
CARLSBAD, CA
SECOND FLOOR PI.AN
SCALE: 3/32-·1'-G'"
A-3
0 32' 64' t28'
SCALE: 3/32•-t•-o·
JWDA
•••••n•••uf•~~·••••l•••u••• •••••" -----______ .. _., __ _ .., ___ .,_._
3138 CARLSBAD BLVD.
CARLSBAD, CA
THIRD FLOOR PLAN A-4
,/
/
/
.1/
/ /~
"' I
"'
/
/
/ _/
,,..,. ..
,,.._,.
I"
.,, "' ~ ~ .... .,, ~ ~ t------IC;=:: l====:===tjj .. • ~ , .. • rafl , .. "• ... . .. .... '"' "' '" ,.._,.
I IV""'~~ ,,.
... -~~~
I , .. I•·
I I ... , ...
~ I --I "'I '"
I
... I'"' I
'" ////
I [G --~
l j ·-, "' """-~/~ ......... , c.
·-·· I
~
UPPER PARKING FLOOR PLAN
I
J
CITY OF CARLSBAD APPIJCATION NUUBERS'
RP 05-03,SDP 05-04, COP 05-14, LCPA 05-02, ZC 05-02, GPA 05-05
JWDA
...... -.--_____ co._ .. _ ... _.., __ ~---
SPRINGHill. SUITES •Mnlll
3136 CARLSBAD BLVD.
CARLSBAD, CA
UPPER PARKING FLOOR PLAN
0 32' 64' 128'
SCAL£: 3/321•1'-o'
:r •Gin/ZIM :s 1/lcv-.
10-17-2006
A-5
/
/
LOWER PARKING FLOOR PLAN
CITY OF CARLSBAD APPLICATION NUt.eERS:
RP05-03,SDP 05-04, COP05-14,LCPAD5-62, ZCQ5.02, GPA05-05
PARKING PROVIDED:
BASEMENT GARAGE:
PARKING DESIGNATION
STANDARD WN. 8' -6" 11 20' -0"
COUPACT WN. 8'-0" x 15'-0"
g• -o· x 2o' -o"
JWDA .•• ~ ........ ,.h ..... , ............. . ------------CiMICII-a.o -··----.. --
SPRINGHILL SUITES .........
3136 CARLSBAD BLVD.
CARLSBAD, CA
LOWER PARKING FLOOR PLAN
a 32' 64' 128' ~l/32·-~·-W
1 .""' ..... I M/U/l!IXII
Jl/1~
A-6
~-....--ror--1--------
~~·
ELEVATION-C a:uw-r:cr
CrTY OF CARLSBAD APPLICATlON NUMBERS:
RP 05-03,SDP05-04, CDP05-14, LCPAO!Hl2, ZC 05-02, GPA 05-05
--!~."::.·
JWDA ,.,_.._ __ __ .., ___ CI> __ , _ _ ""' ____ ,...1_
SPRINGHILL SUITES .,.,....
¢ FtDJECT ~136 CARLS8AO BLW.
CARLSBAD, CA
ELEVATIONS
--
" ""' 10-25-2006
A-7
~~~-----L-~~;~A I
I ------j-
ELEVATION· E l.INCOU<ST a.~i}il'-··:..r
ELEVATION-F tCUi/ii'-r...-
JWDA ............ , ......... , ............. .. ------=:= ;:-_:;:,-=-:.,-.:::::
3138 CARLSBAD BLVD.
CARLSBAD, CA.
ELEVATIONS
I
\
VR • DiSTRICT 9 ·-·
ROOF PLAN
CllY OF CARLSBAD APPLICATION NUMIIERS:
RP 05-03,SOP 05-04, COP 05-14, LCPA 05-02, ZC 05-U2, GPA 05-05
All. ROOF MOUNTED EQUIPMENT TO BE INSTAU.£0 IN
ACCORDANCE Willi BUilDING DEPARniENT POUCY 80-fi
ROOF PLAN KEY NOTES
[!] UAHSARD ROOf
III Rlla' liRRAC£
III BUILT-UP ROOI'IHC
III ""'"' PARAPET WAU.S
0 ROOF' WALK PADS
III ROOF DRAIN, T'll'
0CRia<£T
[!} CANT STRIP
0 LO\IER Rlla'
(ill ~~~=~laJ= =CAL
0 J2' 84' 1208'
SCAle ,;;;.,._,.
JWDA
IOOoiiO•t•o 1/~oo•OOOO/UOUIOo 000100 ---------------·--~---~..,--
SPRINGHIU SUITES . ....,....,
3136 CARlSEIAD BLVD.
CARlSBAD, GA
ROOF PLAN
·--' IA/11/21111:1 ~ 1/IG/*IH
""' 10-17-2000
A-9
@!UILDING SECTION
ICM.I:OVSi'-1'=#
0 J2' M' 128'
SCALE: 3/32.8•11-(i
CllY Of CARLSBAD APPLICATION NUIABERS:
RP Q5...03,SDP 05-04, COP 05-14, LCPA ()5.02, ZC. 05-02, GPA 05-05
JWDA
······~·~··•t ......... , .............. . ,......._ ____ ------.a..----.... , __ hiE..., ___
SPRINGHill. SUITES ........
3138 CARLSBAD BLVD.
CARLSBAD, CA
BUILDING SECTIONS
" .....
10-17-2006
A-10
z z
8 N ~
JUNE SEPTEMBER DECEMBER CITY OF CARLSBAD APPUCATION NUMBERS: RPOIHl3,SDP~. COP05-14, LCPA05-ll2, ZC 05-ll2, GPA05-<15
JWDA .............. , ........................ . -------_.._. ___ ...,..ca ......... _(U.., __ JUI*e)--
SPRINGHill. SUITES
•JIImlll
3136 CARLsBAD BLVD.
CARLSBAD, CA
5HEtt11JLE:
SHAD0\1>' ANALYSIS
0
0
---~-·-1 IG/11/I(Ig:l
J 1/1..,...
06-29-2006
A-11
~
8 6i
z z g
i-J ~
JUNE SEPTEMBER DECEMBER CITY OF CARLSBAD APPLICATION NUMBERS:
RP 05-03,SDP 05-04, COP 05-14,LCPA05-02, ZC 06-02, GPA Q5.00
JWDA •• •••••n••••~•••••••l•••••• ao •••••" -----=:;:::::.:;:..-= ::.,-:::=
SPRINGHILL SUITES
•}llmlll
3136 CARLSBAD BLVD.
CARLSBAD, CA
SHADOW ANALYSIS
A1 TERNATE SCHBE FOR EXISTING RESilEHTIAL ZONING
0
Ul/>1~
f/IOI/2GH
0
A-12
·------
BUILDING SECTION-PROPOSED HOTEL
SCILE 1/te• • •'-o"
---:l---~~~-l===============il-«lt=~=t
*w..._ ______ .J__.__,._.F===============r.J.,.--,..l-,-.,. "if/Ill' .... ,... ------~~~--~~----------~w•
BUILDING SECTION X-ALTERNATE SCHEME
SCAI.£ t/16' -t•-o•
SCN.£ 1 -10 -o
SITE PLAN-ALTERNATE SCHEME
SCALE t• • 80-0"' JWDA
ElEVATION-E UNCOLN ST DlliPI• r::r
CITY OF CARlS8AD APPliCATION NUMBERS:
RP 06-03,SDP 05-04, COP Q5..14, LCPA 05-02, ZC Q5.02, GPA 05-05
ELEVATION-F
ICIUJP/i'•I':V
JWDA ••••uun••'"""""'""l•••••••••••••• -= .. :-..--:... ~----t-_, __ joOIOlut·-
SPRINGHill. SUITES .........
3136 CARLSBAD BLVD.
CARLSBAD, CA
WALL-ELEVATIONS
0
0
~-2 UVII/211115
Jl/1~
10..25·2006
A-14
CITY OF CARLS8AD APPLICATION NUMBERS:
RP 05-03,SOP 05-04, COP Q5..14,LCPA05-02, ZC Q&.02, GPA05-{)5
VIEW1
VIEW2 JWDA
•~c•o•••••-c,•••••••ofuOOoooo •o•u• -...---..~ =-~ ;;;..:-;.-= :0.:-!::!.."':
3136CARLSBAD BLVD.
CARLSBAD, CA
SPOT PERSPECTIVES A-15
VIEW ALONG UNCOlN ST.
VIEW ALONG CARLSBAD BLVD.
CITY OF CARLSBAD APPUCAllON NUMBERS:
RP 05-03,SOP 05-04, COP 06-14,LCPA ~. ZC ~. GPA O!Kl5
JWDA
~----rswt& ..... -....... w. ..... -....
-· (eUt -an ...., 1a<ll ---
SPRINGHILL SUITES .... 'IIIII
3136 CARLSBAD BLVD.
CARLSBAD, CA
RENDERINGS
Cl)D&M:.aa».:IIBIMJ
(!)M1D'llft1801U'P£11I'AISIIDSII.a!;5--a
® QIDI[ ~I'll 1W.L Ill ... 1'1 ftiU)
C!> D~DeSIDII.I-.
(() GIDIJ[aa.IIIIIIOIIIU UAU. H(hf£1)
(!) Mli.'!IIIA'IEioiiii'IIU.IU5.U.S.I.C-4(J'IP£4)
@ IUIIIE.EII:lDNI:PBCMISMSilDIIG-ll(l'ft.lll
SPRINGHILL SUITES
RP 05-03/CDP 05-14/ZC, 05-02/
---GPA 05-05/LCPA, 05-02/SDP, 05-04/
•''\, -~ I -I
-I
-I +""4. -I
_(CI [a::r::
-I
~I _I
-I -I I'
<D Jllllf1EIQiliiiiR£T I'D S.U.U.l-f:II1WIIl.E IEl..£tD)
@ I:ATCIIIASINVJlH'fi.OiiiiU'lNSEIIllfRlVATD
~ MIIIWIW&PII'£(6'1111l1W CNlVATD
• O.Uillll£TPDtu.IU.I.H:I
G) GIIASSLN: IIWNNi: SV.U PElt 10M. 'A' Di H£T 2
Q') CIJIOCE VlllinP£1£ABWM..LG'RIVAlO
<D GWS. LbO IWI...lllli: M$llt
EIA 05-02
LEGAL DE$CRIPVDN
I'IRfUI\I OF' a..o:K 18, TD\oiN I:F CNILSaAII PER MAP NO. 71S. REC. i!-15-lS').t AND PI:RTIDH OF' TRACT liiD, I:ARLSMD LloNDS P£R """ 1&61, REC. 3-1-191~ i\LL IN THE em [I" CARLSBAD, CD.JfiY Dr IAN Dl(6D. STATE IF tAL.Jf'llRHlA N'tt~.-26
SITE AQQRESS
3136 CNIL.SIIdl 1L VL CARLSIIAJJ Cll 9i!OOII
SQLIRCf Of TOPOGRAPHY Tli"'GRN'tfY' stiJ\oi'N DN THESE PLANS VAS GEHERAT£D IY rtaD SIJRVEY NElliJDS fiU»> DflliiHAnttt GAn£REJI DM. ..IANUAIIY 20DS
IY MEJ..O.m. LAH11 SURVEY!tl>.
TIPOCiRAPHY SKNtt HEREON CONFIRMS ro HIITtttw. HAP
AcctRACY SfAHIJARD$.
JMPERVIDlJS AREA TABLE ClMR£NT Pf'£RVDJS llt£.N. 22970 SF, aL:27 ACfl£> PAIJ'OS£0 IHPERVDJS ltR£N 294:54 s.r. CD.676 ACAD NET JM:REAS£ ltf'ERVIOUS AREA> 6-184 S.F'. (IJ.I49 ACRE>
Ulll ITY SffMCf" Bf"DUIBEM£N[S
DSDolaii3JUIISJ_, ......... ,.IIUiiU efKJUNoe~t1JII.~IOJIS :DII[DI:\NIDIIJIIDirlztliM.JIIIIIlllTJ2.11RIJIIU/61111L~11-'Ifll GfiDiumEWD U"G'IIl2" 351Cil'll
SPRINGHILL SUITES
3136 CARLSBAD BlVD.
CARLSBAD, CA
PRELIMINARY GRADING
AND DRAINAGE PlAN
~ M ~
~ A """ r" --; .... I I"Ol I }II ~~-! .. s; ~ ~ ~ ~ c ~ ..L • f-ll "' j!PROJ u;-~ ~i ~ M.'~ ,IN . Ill!.
n.i~[]f';;~~lllli'' . ••• ~1'•20'
..._-• ...., ,._ IA\OFIAII · GRASS liNED DRAINAGE SWAL£
Englneerina Inc. 9.... "' JCAl£
843 CtliD~ Pr.ce p fUI:E 3 HOlliS 1U $llJMI[ YNUI (f' M1£11M. ~d~CA liZD04 FaE~)4::= ~~mnw•~at.~.NaJJC
l'llh .. !i
-" 1;;,
riWIII
}-',
~ ..
=-=--;--
;--
S1C1JnK •r•-•e•
XIUo .... Nf', \Uf 1"'8'
~'--
SYMBOl l EGfNQ
Eli:ISTINii a»>TOJRS
PRDPOSED atmiUA:$
----{OSl----
EXlSTlHG GRAD£S m..EVATlflN) ~
PRilPO$E]l GRAll£$ <n.EVATIJJN) 7Dlr\.
$11'[: BOJNIWI;Y -·-·-·-·-
--....
SICI'JON r-·s· SCU:IE.r-1',\UI'ra,t
SPRINGHILL SUITES
RP 05-03/CDP 05-14/ZC, 05-02/
GPA 05-05/LCPA, 05-02/SDP, 05-04/
EIA 05-02
SIT
SI
0. VICIN!,J'fo.uHAP
-~""YfJ7J"YISJOI llF•
---~llo\TC_~~
GNft LIP RC£ 231180 EXP1R£S 12/31107
JWDA
00~000000 .. 0I,hoOOUOII0000100 000000
____ ,_
-~·---,... ...... _,_ -1'1111) --a-n ...... .., .... _..
SPRINGHILL SUITES
3136 CARLSBAD BLVD.
f, ..... =c:Tm£=,--CARLS--_BAD_,:_CA ____ --1""" C-2 PRELIMINARY GRADING
AND DRAINAGE PlAN
PLOT 11A T£• 6130106
Landscape Concept
--L..~--'-L--"t~15ru_N _._r_L...____.__E_,G'--E.._,_,_N_..o,_____ DKN -5PRIN6HILL HOTEL
ll)antdo~~----~~------·---TNIHrNOQN..y
............ TQ&to. ~!Wol .. ...u4 llmtcnlCMII
~De41~--------------IIIMDoUlllft •. T. -·------QINI\P•-r-...Gt~p.-c.~
-------------·----»-211-~ ... ln~ ... ARQIGNrGif'HCitWl( ............. ..............
~~------------~·..;&<flrw:hlkllt
~~ ~
~en-..r. ll*hO.....,.
lloTI'tl!l..ll'J1,nlo::oftll OI!Rl!llr4ol'r.-•tu
~T~------·---···-~----~-.a.t~ ..... q.:a.r•...:o~r.~&a a_,of"allll
rtfODIIIC~ ..... p.u .....
T,....b.:ec.'~ ,._ ~~)
SHRUB LIST
ea:eorGGIKf~
"""""'=------·--·-·--·------1~ ~--6<Jid' Y•llwt.-.:oi .... LJIU
.__ -....... ~rqlnM ~titf'.-..;llw .,...,._'"""----·-------··'~ 13M•--~ !Cal'lr"LIII Llri"!M-.:a"t e~tBIIwU..6..-z..tedeKtllll~ c..IIIILAI
B'-4"1"'0l.lo1611----------l00-150-JJ6AU..Gtl
~dMdbW ........ """ -------·--......,...~ L.Mti.-Uiollfi"MII
....-------~------~~ ~~ "'*l"c:UIMI'pM c:-.-....'alld .... ~lila ~~ ......aof-.... ~~......,._.NIIIlll
~,._..__ -.-uc:IA~ ... ...,l"t..t I"JJcritn'-N.Z.I'IM . ......,_.
MelllaTec:;a.~~---~---...... ~~c::.p.I'Uih
.......... .........__ _____ _eo...tfMU.GIH •e-o ."''.L..M
.....,.......r~ ~
~.,.Cia ~ .TI"IIdlll...,__.......,._ ._......._
~·P~JC~ao ~
SITEQATA
TOT'AI...~MI.V.·•JXIC'IIf' ... ot''J)CTOTAI..tlflli~• .. ~T ~con'......a.a. TteTOfAL.n.AH'Ta'NU!APrGCSHOTtla..I.Cle'n&~
8LVO.f"~YE!Ur~ICUIPI!'RCI...tk:GIUt~Tfta'I;HCA.
C.ARLSBAD (VILLAGE) C.A.
~T"'HI!)QC'..t,M .. ...,. .-ALHJ. ~ ne11!H'I)'t:I~>N•"MmDNCJ~ acor n..•l"''tGGI''OII!TOee
~....,~rmtote~(PU.1.tilaJ ,_llf,,.TNf¥.M/JNM1WroTN.Ler:~~
2. ALI-'nal!lloiHALL.HOT'~J'dMftEIUC,GIIl ........ ATallni.J1'8NC'WWL.M~'BDA~CJII',I'TI"''tCCt--H,.I.. _,_
•· ALL""""'-~"""" ew-u.~T01le~NID......,..r'O.IID l'fntTlCCft'r'orGN'UICIH) ~HN«...ltl..exczrTAfoHI:XIII"'e!)NCJN'P'flDo/f!!l,'lh'ncf'IIQI~ .
... n.~P!CIIIoMOfa:wr ..... N«"..-e~~
!I.ALL~~atw..L~A.·tcft~Qf'~~
•• NfA~ J"'U.I!IeJoUGe:TO~.ATOIIlaNCJ .... nti!I!!&~T~QNMI!lc:il.olalt'""-te; fi'I6MYOA1E,......._~.wn-.-ocrro~
'1.1M!~~~llle$AUlN6>Tiel..ICCILMa'ntiCI"I"RQofT'A111(Qe~A111.'MO ~""""4-N --. &TJ:8 GQNSEBYAT!ON
11'HIIin.Ntea!IC$TOLHI1'K<o.'fa'~D"''tKK«LYJ1MtQl&l TMI! .... CJ/I'~LD't ..... Ttl'-tJ0411tGPLNI'R
1'1Hrti.Nt6!l~Cf'~. 2.H.l..I"'LHHftoo6AAV6.a..Citln...I"'LAH,..,._eeHirrln'......,lh'neM~::Jt~L a. ne........,. CAU.$1"G:ft 2W wo cr 2Qcaeii"U«<II6 ~ neMliKfiCH NtV.auriCJI' ICU.I:IIN6,..: casTit6
NtMACI'lUfU'Ioll\e~--'II'P.,.~'t.(1~JM..LonelHtV.ot'nte~~....e~b'D Mnel!,t,N!NO~OI'z.cte&SC!ft,4.
4. rtW.~~IIH.ItU.~n...-:;ol'al~eoLI"NP'NIIAlJCit,~UM.I..CoKH$oOI'~
~.et"'""Ceef' ..... TINIH&~NIP~L.NCICiCH'II~HG~-._ N..L.~HA.,..,._'fMA,TN.l.LieeCClKT~I"&.LeeGHA ... """'TII...nl:lMA~~Ih1im!M.
llml
~
~
YINE LI5I
HC:Iti~VIHL.------100-·6~ ,...,.,.,..,. ~ ....
xfA~IIul ~ ~wt!.-----·----.!IO·D....u.oM ~ ..... lelrlot'.,... ~~ llklod .... Tn.lllpeL ........ ..,.._...,.,.._.. ~..-...
GROUND GOVER LIST-HERBACIOUS ........ _ .,..,.._ --.,.,_.......,_,. ----eo--... --............. Cf"up~r~Qiladl'~ ....,.,.._ Gf"uptlg u., 1\ri ---·-"""' ..... -GfitOUND GOVER. LIST -INER.T
0
0
SHEET 1 OF 1