HomeMy WebLinkAbout2024-09-10; City Council; ; Approval of Plans, Specifications and Contract Documents and Authorization to Advertise for Bids for the Cannon Lift Station Improvements ProjectCA Review GH Meeting Date: Sept. 10, 2024 To: Mayor and City Council From: Scott Chadwick, City Manager Staff Contacts: Dave Padilla, Assistant Utilities Director dave.padilla@carlsbadca.gov, 442-339-2356 Neil Irani, Utilities Associate Engineer neil.irani@carlsbadca.gov, 442-339-2305 Subject: Approval of Plans, Specifications and Contract Documents and Authorization to Advertise for Bids for the Cannon Lift Station Improvements Project District: 2 Recommended Action Adopt a resolution approving the plans, specifications and contract documents and authorizing the City Clerk to advertise for bids for the Cannon Lift Station Improvements Project. Executive Summary The city operates 12 sewer lift stations that pump wastewater flow uphill to higher elevations in the sewer collection system. These stations use flow meters to measure sewer flow and to monitor lift station operation. The flow meter at the Cannon Lift Station, located at 2197 Cannon Road, as shown in Exhibit 3, is at the end of its service life and requires replacement. The estimated construction cost including contingency, construction management and inspection, public outreach, and engineering and administration is $983,500. The City Council’s approval of these plans, specifications and contract documents is required under Carlsbad Municipal Code Section 3.28.080(E) because the expected value of the work exceeds $200,000. Staff recommend that the City Council approve the project plans, specifications and contract documents and authorize the City Clerk to advertise and receive construction bids for the project. Explanation & Analysis The scope of the Cannon Lift Station Improvements Project, Capital Improvement Program Project No. 5552 is to: •Replace the existing flow meter, add an isolation valve and construct a larger vault •Install new power and signal cabling to the flow meter vault •Replace existing isolation valves and check valves Sept. 10, 2024 Item #3 Page 1 of 6 Staff recommend that the City Council approve the plans, specifications and contract documents and authorize the City Clerk to advertise for construction bids for the project. Fiscal Analysis Capital Improvement Program Project No. 5552 is funded by the city’s sewer replacement fund. Sufficient funds are available to complete the project. Available funding and estimated construction costs to complete the project are presented in the table below: Cannon Lift Station Improvements Project Capital Improvement Program Project No. 5552 Total appropriation to date $1,115,000 Total expenditures/encumbrances to date -$7,747 Total available balance $1,107,253 Construction contract (engineer’s estimate) -$690,000 Construction contingency (estimated) -$103,500 Construction management, inspection and testing, public outreach, engineering and administration (estimated) -$190,000 Total estimated construction costs -$983,500 Remaining balance $123,753 Next Steps With the City Council’s approval, the City Clerk will advertise a request for bids for the project. Staff will then evaluate the bids received and identify the lowest responsive and responsible bidder. Staff will return to the City Council with a recommendation to award a construction contract to the identified lowest responsible and responsive bidder, which is expected to be in fall 2024. Environmental Evaluation The City Planner, through the process outlined in Carlsbad Municipal Code Section 19.04.060, has determined that this project is exempt pursuant to California Code of Regulations Section 15302(c), Replacement or Reconstruction, which applies to the replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. Exhibits 1.City Council resolution 2.Plans, specifications and contract documents (on file in the Office of the City Clerk) 3.Location map Sept. 10, 2024 Item #3 Page 2 of 6 Exhibit 1 Sept. 10, 2024 Item #3 Page 3 of 6 Sept. 10, 2024 Item #3 Page 4 of 6 Exhibit 2 Plans, specifications and contract documents (on file in the Office of the City Clerk) Sept. 10, 2024 Item #3 Page 5 of 6 LOCATION MAP PROJECT NAME CANNON LIFT STATION PROJECT CIP PROJECT NO. 5552 EXHIBIT 3NUMBER PROJECT SITE IMPROVEMENTS PROJECT Exhibit 3 Sept. 10, 2024 Item #3 Page 6 of 6