HomeMy WebLinkAbout2055 CHESTNUT AVE; ; CBR2022-4630; PermitBuilding Permit Finaled
Residential Permit
Print Date: 09/10/2024
Job Address:
Permit Type:
Parcel It:
Valuation:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
2055 CHESTNUT AVE, CARLSBAD, CA 92008-2716
BLDG-Residential Work Class:
2052603400 Track It:
$193,334.77 Lot It:
Project#:
Plan It:
Construction Type:
Orig. Plan Check It:
Plan Check It:
Addition
Permit No:
Status:
( City of
Carlsbad
CBR2022-4630
Closed -Finaled
Applied: 12/14/2022
Issued: 03/22/2023
Finaled Close Out: 09/10/2024
Final Inspection: 08/19/2024
INSPECTOR: de Roggenbuke, Dirk
Description: BAIG: ADDITION 1ST FLOOR ENTRY(112 SF} GARAGE (256 SF}/2ND FLR RECROOM (195 SF}/BALCONY (104 SF}/ROOF TOP
DECK W/STAIRCASE {206 SF}
Applicant: Property Owner:
TNT DESIGN AND BUILD INC
SAMUEL DURON
CO-OWNERS NABIL BAIG AND AMINA LODHI
2055 CHESTNUT AVE
3142 TIGER RUN CT, It 108
CARLSBAD, CA 92010-6706
FEE
BUILDING PLAN CHECK
BUILDING PLAN CHECK
CARLSBAD, CA 92008-2716
BUILDING PLAN REVIEW -MINOR PROJECTS (LOE}
BUILDING PLAN REVIEW -MINOR PROJECTS (PLN)
GREEN BUILDING STANDARDS PLAN CHECK & INSPECTION
REMODEL-RESIDENTIAL -OTHER
SB1473 -GREEN BUILDING STATE STANDARDS FEE
SFD & DUPLEXES
STRONG MOTION -RESIDENTIAL (SMIP}
SWPPP INSPECTION TIER 1 -Low BLDG
SWPPP PLAN REVIEW TIER 1 -Low
Total Fees: $4,215.88 Total Payments To Date: $4,215.88
Contractor:
TNT DESIGN AND BUILD INC
3142 TIGER RUN CT, It STE 108
CARLSBAD, CA 92010-6693
(760} 363-5584
Balance Due:
AMOUNT
$813.15
$508.42
$194.00
$98.00
$175.00
$782.18
$8.00
$1,251.00
$25.13
$292.00
$69.00
$0.00
Please take NOTICE that approval of your project includes the "Imposition" of fees, dedications, reservations, or other exactions hereafter
collectively referred to as "fees/exaction." You have 90 days from the date this permit was issued to protest imposition of these
fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the
protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section
3.32.030. Fai lure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their
imposition.
You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection
fees and capacity changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this
project. NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the
statute of limitation. has previously otherwise expired.
Building Division Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
, k
(_ City of
Carlsbad
RESIDENTIAL
BUILDING PERMIT
APPLICATION
B-1
Plan Check
Est. Value
PC Deposit
Date
Job Address 2055 Chestnut Ave, Carlsbad CA 92008 Unit: APN: 205-260-34-00 ----~
CT /Project #: __________________ Lot#: PAR\ Year Built: _1_99_1 _______ _
BRIEF DESCRIPTION OF WORK: Home rennovation and addition. Rough plumbing and electrical.
~ New SF : Living SF, ____ Deck SF, 206 Patio SF, ____ Garage SF _2_49 __
Is this to create an Accessory Dwelling Unit? OY ON New Fireplace? O YON, if yes how many? ___ _
EJ Remodel:_1_,2_14 ___ SF of affected area Is the area a conversion or change of use? O Y G N
□ Pool/Spa: ____ SF Additional Gas or Electrical Features? ____________ _
□Solar: ___ KW, ___ Modules, Mounted:0RoofQGround, Tilt: 0Y0N, RMA:OY ON,
Battery:OVC N, Panel Upgrade: OY ON
Other:
PRIMARY APPLICANT
Name: Samuel Duron
Address: 3142 Tiger Run Ct #108
City: Carlsbad State:_C_A __ Zip: 92010
Phone: 760-975-4869
Email: samuel@tntdnb.com
PROPERTY OWNER
I ~ ~~':11 Name: Nabil Baig fJ (b I kl a, !:::f2.CL./1
Address: 2055 Chestnut Ave
City: Carlsbad
Phone: 949.939.9381
Email: nabil.baig@gmail.com
State:_c_A __ .Zip: 92008
DESIGN PROFESSIONAL CONTRACTOR OF RECORD
Name: __________________ Business Name: TNT Design & Build
Address: Address: 3142 Tiger Run Ct #108
City: ________ State:, ___ Zip:_____ City: Carlsbad State: __ c_A __ Zip: 92010
Phone: Phone: 800-959-6558
Email: Email: __________________ _
Architect State License: CSLB License#: 1012379 Class: B ---------------
Car Is bad Business License# (Required): BLNR004269-11-2018
APPLICANT CERTIFICATION: I certify that I hove read the oppllcatian and state that the above information Is correct and that the information a/the plans Is accurate. I
agree to comply with all City ordinances and State laws re/at Ing to building construction.
NAME (PRINT): Samuel Duron DATE: 12/13/2022
1635 Faraday Ave Carlsbad, CA 92008 Ph: 760--602-2719 Fax: 760-602-8558 Email: Building@carlsbadca.gov
REV. 10/21
_6 T!-1C'IS PAGE REQUIRED AT PERMIT ISSUANCE PLAN CHECK NUMBER: ______ _
A BUILDING PERMIT CAN BE ISSUED TO EITHER A STATE LICENSED CONTRACTOR OR A PROPERTY OWNER. IF THE PERSON SIGNING
THIS FORM IS AN AGENT FOR EITHER ENTITY AN AUTHORIZATION FORM OR LETTER IS REQUIRED PRIOR TO PERMIT ISSUANCE.
(OPTION A): LICENSED CONTRACTOR DECLARATION:
/herebyaffirmunderpenaltyofperjurythatlamlicensedunderprovisionsofChopter9(commencingwithSection7000)ofDivision3
of the BusinessandProfessionsCode, and my license fs in full force and effect. I alsooffirm under penalty of perjury one of the
following declarotions(CHOOSE ONE):
0 1 have and will maintain a certificate of consent to self-insure for workers' compensation provided by Section 3700 of the labor Code, for the performance of the
work which this permit is issued. Policy No. __________________________________________ _
-OR-
~ I have and will maintain worker's compensation, as required by Section 3700 of the labor Code, for the performance of the work for which this permit is issued.
My workers' compensation insurance carrier and policy number are: Insurance Company Name: _Sta_1e_c_om_pe_ns_a_uo_n_1_ns_u_ra_nce_F_u_n_d _____________ 1
Policy No. 9230670 Expiration Date: _04_rz_1_t20_23 ______________ 1
-OR-
D Certificate of Exemption: I certify that in the performance of the work for which this permit is issued, I shall not employ any person in any manner so as to become
subject to the workers' compensation Laws of California. WARNING: Failure to secure workers compensation coverage Is unlawful and shaU subject an employer to
criminal penalties and civil fines up to $100,000.00, in addition the to the cost of compensation, damages as provided for in Section 3706 of the Labor Code,
Interest and attorney's fees.
CONSTRUCTION LENDING AGENCY, IF ANY:
I hereby affirm that there is a construction lending agency for the performance of the work this permit is issued (Sec. 3097 (i) Civil Code).
Lender's Name: ______________________ .lender's Address: ______________________ _
CONTRACTOR CERT/FICA TION: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and
utilities/utility easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail within these plans inconsistent with the si1e plan are
not approved for construction and may be required to be altered or removed. The city's approval of the application is based on the premise that the submitted documents and plans show
the correct dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed
use of each building as stated Is true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation.
All improvements existing on the property were completed in accordance with all regulations in existence at the time of their construction, unless otherwise noted.
NAME (PRINT): Avner Tamari SIGNATURE: A~/~· DATE: 12/13/2022 ---------------Note: If the person signing above is an authorized agent for the contra "d er of authorization on contractor letterhead.
-OR-
(OPTION B): OWNER-BUILDER DECLARATION:
I hereby affirm that I am exempt from Contractor's License Law for the follow;ng reason:
0 I, as owner of the property or my employees with wages as their sole compensation, will do the work and the structure is not intended or offered for sale (Sec.
7044, Business and Professions Code: The Contractor's license Law does not apply to an owner of property who builds or improves thereon, and who does such
work himself or through his own employees, provided that such improvements are not intended or offered for sale. If, however, the building or improvement is sold
within one year of completion, the owner-builder will have the burden of proving that he did not build or improve for the purpose of sale).
-OR-
O I, as owner of the property, am exclusively contracting with licensed contractors to construct the project (Sec. 7044, Business and Professions Code: The
Contractor's license Law does not apply to an owner of property who builds or improves thereon, and contracts for such projects with contractor(s) licensed
pursuant to the Contractor's license law).
-OR-O I am exempt under Business and Professions Code Division 3, Chapter 9, Article 3 for this reason:
AND,
0 FORM B-61 "Owner Builder Acknowledgement and Verification Form" is required for any permit issued to a property owner.
By my signature below I acknowledge that, except for my personal residence in which I must have resided for at least one year prior to completion of the
improvements covered by this permit, I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in its entirety by licensed
contractors. I understand that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application is
submitted orat the following Website: http://www.leginfa.ca.govlca/aw.html.
OWNER CERTTFICA TT0N: The applicant certifies that all documents and plans clearly and accurately show all existing and proposed buildings, structures, access roads, and utlll1ies/utillty
easements. All proposed modifications and/or additions are clearly labeled on the site plan. Any potentially existing detail within these plans inconsistent with the site plan are not approved
for construction and may be required to be altered or removed. The clty"s approval of the application is based on the premise that the submitted documents and plans show the correct
dimensions of; the property, buildings, structures and their setbacks from property lines and from one another; access roads/easements, and utilities. The existing and proposed use of each
building as stated Is true and correct; all easements and other encumbrances to development have been accurately shown and labeled as well as all on-site grading/site preparation. All
Improvements existing on the property were completed In accordance with all regulations in existence at the time of their construction, unless otherwise noted.
NAME (PRINT):
1635 Faraday Ave Carlsbad, CA 92008
___________ DATE: ______ _
Ph: 760-602-2719 Fax: 760-602-8558
2
Email: Building@carlsbadca.gov
REV.10/2
n"h -~bk_..,
('ew Sfo-<-L-
1 ~.J.-en ➔ > I I~
'J, ,.._J rl R ite flt;'dvvi I ct-S-YJ,,. Yr
307
n~ 0uY1 -heib-J-all-e_
/ ':if-J Ct re.. 7e j2 <;(t
1bc. I CHA-,) ; o 0
fo ov-rvf / Y\ vv.J J-e ( <;J-r-. l-r C ~
:JOG SP
oddecl s~c.ce ?::,07
~s&
Building Permit Inspection History Finaled
(city of
Carlsbad
PERMIT INSPECTION HISTORY for (CBR2022-4630)
Permit Type: BLDG-Residential Application Date: 12/14/2022 Owner: CO-OWNERS NABIL BAIG AND AMINA
LODH I
Work Class: Addition Issue Date: 03/22/2023 Subdivision: PAR CEL MAP NO 16271
Status: Closed -Finaled Expiration Date: 11/18/2024 Address: 2055 CHESTNUT AVE
CAR LSBAD, CA 92008-2716 IVR Number: 45252
Scheduled Actual Inspection Type Inspection No. Inspection Primary Inspector Reinspection
Date Start Date Status
05/21/2024 05/21/2024 BLDG-84 Rough 249064-2024 Passed Dirk de Roggenbuke
Combo(14,24,34,44)
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-14 Yes
Frame-Steel-Bolting-Welding
(Decks)
BLDG-24 Rough-Topout Yes
BLDG-34 Rough Electrical Yes
BLDG-44 Yes
Rough-Ducts-Dampers
08/15/2024 08/15/2024 BLDG-Final Inspection 258014-2024 Failed Dirk de Roggenbuke Reinspection
Checklist Item COMMENTS Passed
BLDG-Building Deficiency No
BLDG-Plumbing Final No
BLDG-Mechanical Final No
BLDG-Structural Final No
BLDG-Electrical Final 8/15/24 GFCI needed for bath and garage No
08/19/2024 08/19/2024 BLDG-Final Inspection 258507-2024 Passed Dirk de Roggenbuke
Checklist Item COMMENTS Passed
BLDG-Building Deficiency Yes
BLDG-Plumbing Final Yes
BLDG-Mechanical Final Yes
BLDG-Structural Final Yes
BLDG-Electrical Final 8/15/24 GFCI needed for bath and garage Yes
8/19/24 GFCI receptacles installed
Tuesday, September 10, 2024
Inspection
Complete
Incomplete
Complete
Page 1 of 1
~frt1e North
COMPLIAN'C S RVICFS
March 6, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Penn it No: CBR2022-4630
True North No.: 22-018-489
Carlsbad, CA 92008
Plan Review: Remodel and Addition to SFR
Address: 2055 Chestnut Ave
Applicant Name: Samuel Duron
Applicant Email: samuel@tntdnb.com
OCCUPANCY AND BUil.,DING SUMMARY:
Occupancy Groups: R-3
Occupant Load: NIA
Type of Construction: V-B
Sprinklers: No
Stories: 2
Area of Work (sq. ft.): Remodel: 1214 sq. ft. Deck: 206 sq-ft Garage: 249 sq-ft
The plans have been reviewed for coordination with the permit application.
Valuation: Confinned
Scope of Work: Confinned
Floor Area: Confirmed
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
1. Drawings: Electronic copy dated February 12, 2023, by TNT Design & Build.
2. Structural Calculations: Electronic copy dated November 21 , 2022, by Lovelace Engineering.
The 2019 California Building, Mechanical, Plumbing, and Electrical Codes (i.e., 2018 lBC, UMC, UPC, and 2017
NEC, as amended by the State of California), 2019 California Green Building Standards Code, 2019 California
Existing Building Code, and 2019 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments.
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or ifwe can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Richard Moreno -Plans Examiner
True North Compliance Services, Inc.
15375 Barranca Pkwy, Suite A202, Irvine, CA 92618
T / 562. 733.8030
Transmittal Letter
February 12, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: Remodel and Addition to SFR
Address: 2055 Chestnut Ave, Carlsbad CA
Applicant Name: Samuel Duron Applicant Email: samuel@tntdnb.com
lrue North
COMPLIANC S RVIC S
SECOND REVIEW
City Permit No: CBR2022-4630
True North No.: 23-018-489
True North Compliance Services, Inc. has completed the review of the following documents for the proj ect
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
1. Drawings: Electronic copy dated January 4, 2023, by Samuel Duron.
2. Structural Calculations: Electronic copy dated November 21, 2022, by Miles Lovelace.
3. Energy Calculations: Electronic copy dated December 9, 2022, by Joe Nunez
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of
work on the permit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation:
Scope of Work:
Floor Area:
Confirmed
Confirmed
Confirmed
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely,
True North Compliance Services
Review By: Richard Moreno -Plans Examiner
True North Compliance Services, Inc.
3939 Atlantic Avenue Suite 224, Long Beach, CA 90807
T / 562.733.8030
Remodel and Addition to SFR
2055 Chestnut Ave
February 12, 2023
RESUBMITT AL INSTRUCTIONS:
City of Carlsbad-SECOND REVIEW
City Pennit No.: CBR2022-4630
True North No.: 23-018-489
Page2
Plan Review Comments
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@carlsbadca.gov
Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of
Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The City will route the
plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions
for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire
Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2022 California Building, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comment generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536. I and CBPC 6735. This
item will be verified prior to plan approval.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: R-3/U
Occupant Load: n/a
Type of Construction: V-B
Sprinklers: No
Stories: 2
Area of Work (sq. ft.): Remodel: 1214 sq. ft. Deck: 206 sq-ft Garage: 249 sq-ft
ARCIIlTECTURAL COMMENTS:
No comments
GREEN BUD.,DING COMMENTS:
No comments
Remodel and Addition to SFR
2055 Chestnut Ave
February 12, 2023
ENERGY COMPLIANCE COMMENTS:
Tl. Provide energy calculations for review.
City of Carlsbad-SECOND REVIEW
City Permit No.: CBR2022-4630
True North No.: 23-018-489
Page3
PCl. On the cover sheet, list all special features required. Please coordinate with the Energy Report.
PCl. Incorporate the fenestration SHGC, U-factors and any Required special features as per CF-lR
form with window schedule.
STRUCTURAL COMMENTS:
General:
S l. Structural calculations were not submitted with set received. Provide structural calculations for review.
PCl: Provide calculations for FB-1 left support to show 6x6 adequacy.
If you have any questions regarding the above comments, please contact Richard Moreno via email
richardm@tncservices.com or telephone (562) 733-8030.
[END]
Transmittal Letter
January 4, 2023
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
Carlsbad, CA 92008
Plan Review: Remodel and Addition to SFR
Address: 2055 Chestnut Ave, Carlsbad CA
Applicant Name: Samuel Duron Applicant Email: samuel@tntdnb.com
True North
COMPLIANCE S RVIC S
FIRST REVIEW
City Pe1n1it No: CBR2022-4630
True North No.: 23-018-489
True North Compliance Services, Inc. has completed the review of the following documents for the project
referenced above on behalf of the City of Carlsbad. Our comments can be found on the attached list.
I. Drawings: Electronic copy dated December 12, 2022, by Samuel Duron.
2. Structural Calculations: Electronic copy dated November 12, 2022, by Miles Lovelace.
Attn: Permit Technician, the scope of work on the plans has been reviewed for coordination with the scope of
work on the pennit application. See below for information if the scope of work on plans differs from the permit
application:
Valuation:
Scope of Work:
Floor Area:
Confirmed
Confirmed
Confirmed
Our comments follow on the attached list. Please call if you have any questions or if we can be of further
assistance.
Sincerely
True North Compliance Services
Review By: Richard Moreno -Plans Examiner
True North Compliance Services, Inc.
3939 Atlantic Avenue Suite 224, Long Beach, CA 90807
T / 562. 733.8030
Remodel and Addition to SFR
2055 Chestnut Ave
January 4, 2023
RESUBMITT AL INSTRUCTIONS:
Plan Review Comments
City of Carlsbad-FIRST REVIEW
City Permit No.: CBR2022-4630
True North No.: 23-018-489
Page2
Please do not resubmit plans until all departments have completed their reviews. For status, please
contact building@cal"lsbadca.gov
Deliver THREE corrected sets of plans and TWO corrected calculations/reports directly to the City of
Carlsbad Building Division, 1635 Faraday Ave., Carlsbad, CA 92008, (442) 339-2719. The City will route the
plans to True North, Planning and Land Development Engineering Departments (if applicable) for continued
review.
Note: If this project requires FIRE PREVENTION review, ensure that you follow their specific instructions
for resubmittal review. The City will not route plans back to Dennis Grubb & Associates for continued Fire
Prevention review.
GENERAL INFORMATION:
A. The following comments are referred to the 2022 California BuildiJig, Mechanical, Plumbing, Electrical
Codes, California Green Building Standards Code, and Energy Code (i.e., 2021 IBC, UMC, UPC, and 2020
NEC, as amended by the State of California).
B. There may be other comments generated by the Building Division and/or other City departments that will
also require your attention and response. This attached list of comments, then, is only a portion of the plan
review. Contact the City for other items.
C. Respond in writing to each comment by marking the attached comment list or creating a response letter.
Indicate which details, specification, or calculation shows the required information. Your complete and
clear responses will expedite the re-check.
D. Where applicable, be sure to include the architect and engineer's stamp and signature on all sheets of the
drawings and on the coversheets of specifications and calculations per CBPC 5536.1 and CBPC 6735. This
item will be verified prior to plan approval.
OCCUPANCY & BUILDING SUMMARY:
Occupancy Groups: R-3/U
Occupant Load: n/a
Type of Construction: Y-B
Sprinklers: No
Stories: 2
Area of Work (sq. ft.): Remodel: 1214 sq. ft. Deck: 206 sq-ft Garage: 249 sq-ft
ARCIDTECTURAL COMMENTS:
General:
A 1. Energy T-24 sheets were not included in the set received. Please provide for review.
Remodel and Addition to SFR
2055 Chestnut Ave
City of Carlsbad-FIRST REVIEW
City Permit No.: CBR2022-4630
True North No.: 23-018-489
Page3
January 4, 2023
VV'.)WHt: t"KAMINl) Ut I AIL::,
TITLE 2<1
Tl ENERGY CALCS 1
T2 ENERGY CALCS 2
T3 ENERGY REPORT
A2. Provide approved spiral stair design sheet from manufacturer or provide structural and architectural design
per CRC 311.
a) Provide spiral stair detail and address the following comments per CRC R3 l 1.7.10:
i) Specify the clear width below the handrails of the spiral stairs to be 26" minimum.
ii) Specify The walk line radius to not be greater than 24.5".
iii) Specify tread depth to be 6.75" minimum.
iv) Specify the riser to be 9.5" maximum.
v) Specify the headroom to be 6'6" maximum.
vi) Provide light fixture to illuminate the walking surface of the stairs per CRC R3 l l .7.9.
vii) 36" Minimum landing at the top and bottom of the stairs per CRC R3 l l.7.6.
A3. On sheet A4.0 In bathrooms, at least one lurninaire shall be controlled by a vacancy sensor. ES 150.0
:3FI
A4. Provide the following for the proposed roof deck:
a) Enclosed framing in wood exterior balconies and decks shall be provided with openings that
provide a net free cross ventilation area not less than 1 / I 50 of the area of each separate space.
Section R317.1.6
b) Wood balconies and decks that support moisture-permeable floors shall be provided with an
impervious moisture barrier system under the moisture-permeable floor, with positive drainage.
Section R317. l.
c) Where balconies or other elevated walking surfaces are exposed to water from direct or blowing
rain, snow or irrigation, and the structural framing is protected by an impervious moisture barrier,
the construction documents shall include details for all elements of the impervious moisture barrier
system , The construction documents shall include the manufacturer's installation instructions.
Section R 106. l.5
i) Specify on the plans the following information for the deck/balcony smfacing materials,
per Section RI 06 .1.1:
ii) Manufacturer's name and product name/number.
iii) ICC approval number, or equal.
d) Provide roof deck slope and direction of slope on sheet A3 .0
e) If applicable: Show the sizes/locations ofroof drains and overflows for roof decks. Section
R903.4.
. .
Remodel and Addition to SFR
2055 Chestnut Ave
January 4, 2023
MECHANICAL COMMENTS:
No comments
ELECTRICAL COMMENTS:
EI. Show EVSE on electrical plans, as required by the City's CAP fonn.
PLUMBING COMMENTS:
City of Carlsbad-FIRST REVIEW
City Permit No.: CBR2022-4630
True No1th No.: 23-018-489
Page 4
Pl. Overflow roof drains shall terminate in an area where they will be readily visible and will not cause damage
to the building. lfthe roof drain tenninates through a wall, the overflow drain shall tenninate 12" minimum
above the roof drain. City Policy 84-35
GREEN BUILDING COMMENTS:
No comments
ENERGY COMPLIANCE COMMENTS:
Tl. Provide energy calculations for review.
STRUCTURAL COMMENTS:
General:
S l. Structural calculations were not submitted with set received. Provide structural calculations for review.
If you have any questions regarding the above comments, please contact Richard Moreno via email
richardm@tncservices.com or telephone (562) 733-8030.
rEND]
JOB J22410 -BAIG RESIDENCE LOVELACE
ENGINEERING SHEET NO. _________ OF _____ _
CALCULATED BY A.S. DATE 2/16/2023
STRUCTURAL ENGINEERING SERVICES
OECKEOBY _________ DATE _____ _
10509 Vista Sorrento Parkway, Suite 102. San Diego, CA 92121
phoneBSB.535.9111 • fax858.535.1989 • www.lovelaceeng.com SCALE ________________ _
BAIG RESIDENCE
ADDRESS, 2055 CHESTNUT AYENUTE, GA-RLSBAD, GA '{2008
STRUCTURAL CORRECTIONS
PROJECT# 23-018-489
0 GORREG TION #I
PLEASE SEE ATTACHED FOR ADDITIONAL CALCULATIO NS FOR THE FB-1
LEFT SUPPORT. THE 6x6 POST IS SHOHN TO BE ADEQUATE TO SUPPORT THE
REACTIONS FROM FB-1.
~ LOVELACE
ENGINEERING
STRUCTVP.:AL ENCil l~EE FflNG S-ERVIC ES
Level 2
Element Type
Diaphragm ROOF
Diaphragm
Diaphragm
Wall EXTERIOR
Wall INTERIOR
Wall
Misc./ Concentrated
Total Weight {lbs.)
Level 1
Element Type
Diaphragm FLOOR
Diaphragm DECK
Diaphragm ROOF
Wall EXTERIOR
Wall INTERIOR
Wall
Misc./ Concentrated
Total
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
SEISMIC WEIGHT
ROOF Typical Plate Ht. {ft.)
Dead Load {psf) Area (sf)
25 2100
Dead Load {psf) Length {ft.)
I
16 200
7 171
Dead Load (lbs.)
87676 Seismic Weight {lbs.)
FLOOR Typical Plate Ht. (ft.)
Dead Load (psf) Area (sf)
14 lSOO
25 1400
Dead Load (psf) Length {ft.)
16 250
7 150
Dead Load (lbs.)
101450 Seismic Weight
8
Weight
52500
0
0
Weight
25600
9576
0
Weight
0
70088
9
Weight
21000
0
35000
Weight
36000
94SO
0
Weight
0
96313
L-1
A.S.
11/18/2022
Page:
LOVELACE
ENGINEERING
STRUCTURAL ENGINEERING SERVICES
STRUCTURAL CALCULATIONS
(ADDITIONAL CALCULATIONS FOR CORRECTION RESPONSE)
DATE:
PROJECT:
DESIGNER:
JOB:
FEBRUARY 16, 2023
BAIG RESIDENCE
2055 CHESTNUT AVENUE
CARLSBAD, CA 92008
TNT DESIGN BUILD
3142 TIGER RUN COURT #8
CARLSBAD, CA 92010
J22470
ts!>ts.!>5!}.~ 111 I tax ts!>ts.535.1989 I www.lovelaceeng.com
10509 Vista Sorrento Pkwy, Suite 102 San Diego, CA 92121
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy. Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr.
BAIG RESIDENCE
A.S.
J22470
Love ace ng1neenng, nc.
DESCRIPTION: FB-1 LEFT SUPPORT
Code References
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combinations Used: ASCE 7-16
General Information
Analysis Method Allowable Stress Design
End Fixities Top & Bottom Pinned
Overall Column Height
Wood Species Douglas Fir-Larch
Wood Grade No.1
Fb+ 1,200.0psi Fv
Fb-1,200.0psi Ft
Fe -Prll 1,000.0 psi Density
Fe-Perp 625.0 psi
9 ft
170.0 psi
825.0 psi
31.210 pcf
Wood Section Name 6x6
Wood Grading/Manuf. Graded Lumber
Wood Member Type Sawn
Exact Width
Exact Depth
Area
Ix
ly
5.50 in Allow Stress Modification Factors
5.50 in Cf or Cv for Bending 1.0
30.250 inA2 Cf or Cv for Compressio1 1.0
76.255 inA4 Cf or Cv for Tension 1.0
76.255 inA4 Cm : Wet Use Factor 1.0
Ct : Temperature Fact 1.0
Cfu : Flat Use Factor 1.0 E : Modulus of Elasticity . . . x-x Bending y-y Bending
Basic 1,600.0 1,600.0
Axial
1,600.0 ksi
Kf: Built-up columns
Use Cr : Repetitive ?
1.0 ND,, 1511
No
Minimum 580.0 580.0
A lied Loads
Column self weight included : 59.006 lbs * Dead Load Factor
AXIAL LOADS ...
Brace condition for deflection (buckling) along columns :
X-X (wdth) axis : Unbraced Length for buckling ABOUT Y-Y Axis= 91
Y-Y (depth) axis : Unbraced Length for buckling ABOUT X-X Axis = 9 1
Service loads entered. Load Factors w,11 be applied for calculations.
FB-1: Axial Load at 9.0 ft, D = 8.550, Lr= 2.51 0, L = 7.80, W = 0.2650, E = 0.1250 k
DESIGN SUMMARY
Bending & Shear Check Results
PASS Max. Axial+Bending Stress Ratio =
Load Combination
0.7148 : 1
+D+L
Comp Only, fc/Fc' Governing NDS Forumla
Location of max.above base
At maximum location values are .
Applied Axial
Applied Mx
Applied My
Fe : Allowable
0.0 ft
16.409 k
0.0 k-ft
0.0 k-ft
758.85 psi
PASS Maximum Shear Stress Ratio = o.o : 1
Load Combination +0.4858D-0.70E
Location of max.above base
Applied Design Shear
Allowable Shear
Load Combination Results
9.0 ft
0.0 psi
272.0 psi
Maximum SERVICE Lateral Load Reactions ..
Top along Y-'r 0.0 k Bottom along Y-Y 0.0 k
Top along X-)< 0.0 k Bottom along X-X 0.0 k
Maximum SERVICE Load Lateral Deflections ...
Along Y-Y 0.0 in at 0.0 ft above base
for load combination : n/a
Along X-X 0.0 in at 0.0 ft above base
for load combination : n/a
Other Factors used to calculate allowable stresses ...
~ Compression Tension
Co Cp Mi!~i!!ll.!!!l &ii!I + 6!!nging ~lC!!lili Bs1li2li Ma~i!Ill.!!Il ~bi:ar Bs1li2li
Load Combination Stress Ratio Status Location Stress Ratio Status Location
DOnly 0.900 0.788 0.4013 PASS 0.0 ft 0.0 PASS 9.0 ft
+D+L 1.000 0.759 0.7148 PASS 0.0ft 0.0 PASS 9.0 ft
+D+Lr 1.250 0.687 0.4279 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.750Lr+0.750L 1.250 0.687 0.6289 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.750L 1.150 0.715 0.5810 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.60W 1.600 0.596 0.3037 PASS 0.0ft 0.0 PASS 9.0 ft
+D-0.60W 1.600 0.596 0.2927 PASS 0.0ft 0.0 PASS 9.0 ft
+D+O. 750Lr+O. 750L +0.450W 1.600 0.596 0.5702 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.750Lr+O. 750L-0.450W 1.600 0.596 0.5619 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.750L+0.450W 1.600 0.596 0.5050 PASS 0.0ft 0.0 PASS 9.0 ft
+D+0.750L-0.450W 1.600 0.596 0.4967 PASS 0.0ft 0.0 PASS 9.0 ft
+0.60D+0.60W 1.600 0.596 0.1844 PASS 0.0ft 0.0 PASS 9.0ft
,.,.., ....... Lovelace Engineering, Inc. ~ 10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Wood Column
21.1 .30
DESCRIPTION: FB-1 LEFT SUPPORT
Load Combination Results
Load Combination
+0.60D-0.60W
+1 .11 4D+0.70E
+1 .11 4D-0.70E
+ 1.086D+0. 750L +0.5250E
+1.086D+0.750L-0.5250E
+0.4858D+0.70E
+0.4858D-0. 70E
Maximum Reactions
Load Combination
DOnly
+D+L
+D+Lr
+D+0. 750Lr+0. 750L
+D+0.750L
+D+0.60W
+D+0. 750Lr+0. 750L +0.450W
+D+0. 750L +0.450W
+0.60D+0.60W
+D+0.70E
+D+0. 750L +0.5250E
+0.60D+0. 70E
Lr Only
LOnly
WOnly
EOnly
Co
1.600
1.600
1.600
1,600
1.600
1.600
1.600
Cp
0.596
0.596
0.596
0.596
0.596
0.596
0.596
X-X Axis Reaction
@Base @Top
Maximum Deflections for Load Combinations
Project Title:
Engineer:
BAIG RESIDENCE
A.S.
Project ID: J22470
Project Descr:
Project File: J22470 OPTION2.ec6
Love ace Engineering. nc. (c) EN CALC NC 1983-2021
Mii!~irnurn 8iiii!I + 6eoaiog Stce:i:i Bii!li2:i Mii!~irnurn Sbeii!r Bii!li2:i
Stress Ratio Status Location
0.1734 PASS 0.0ft
0.3353 PASS 0.0ft
0.3292 PASS 0.0ft
0.5287 PASS 0.0ft
0.5241 PASS 0.0ft
0.1479 PASS 0.0ft
0.1418 PASS 0.0ft
k Y-Y Axis 'Reaction Axial Reaction
@ Base @ Top @ Base
8.609
16.409
11.119
16.342
14.459
8.768
16.461
14.578
5.324
8.697
14.525
5.253
2.510
7.800
0.265
0.125
Stress Ratio Status Location
0.0 PASS 9.0 ft
0.0 PASS 9.0 ft
0.0 PASS 9.0 ft
0.0 PASS 9.0 ft
0.0 PASS 9.0 ft
0.0 PASS 9.0 ft
0.0 PASS 9.0 ft
Note. Only non-zero reaclJons are listed.
My -End Moments k..ft Mx -End Moments
@ Base @Top @ Base @ Top
Load Combination Max. X-X Deflection Distance Max. Y-Y Deflection Distance
DOnly 0.0OO0in 0.000ft 0.000in 0.000ft
+D+L 0.0000in 0.000ft 0.000in 0.000ft
+D+Lr 0.0000in 0.000ft 0.000 in 0.000ft
+D+0. 750Lr+0. 750L 0.0000in 0.000ft 0.000 in 0.000ft
+D+0.750L 0.0000in 0.000ft 0.000 in 0.000ft
+D+0.60W 0.0OO0in 0.000ft 0.000 in 0.000ft
+D+0. 750Lr+0. 750L +0.450W 0.0OO0in 0.000ft 0.0OOin 0.000tt
+D+0. 750L +0.450W 0.0OO0in 0.000ft 0.000 in 0.000ft
+0.60D+0.60W 0.0000in 0.000ft 0.000 in 0.000tt
+D+0.70E 0.0000in 0.000ft 0.000in 0.000ft
+D+0. 750L +0.5250E 0.0OO0in 0.000ft 0.0OOin 0.000ft
+0.60D+0.70E 0.0000in 0.000ft 0.000in 0.000tt
Lr Only 0.0000in 0.000ft 0.0OOin 0.000ft
LOnly 0.0000in 0.000ft 0.000 in 0.000ft
WOnly 0.0000in 0.000ft 0.000 in 0.000ft
EOnly 0.0000in 0.000ft 0.000 in 0.000ft
Wood Column
9, Bui :20.21.11.
FB-1 LEFT SUPPORT
Sketches
.!:
0 ~
IO
+
6 6
5.50 in
Project Title:
Engineer:
Project ID:
Project Descr:
Love ace Engineering, nc.
+X Load 1
BAIG RESIDENCE
A.S.
J22470
Project File: J22470 OPTION2.ec6
(c) ENERCALC NC 1983-2021
LOVELACE
E~GINEERING
STRUCTUR A L ENG I NEERING SERVI C E S
STRUCTURAL CALCULATIONS
DATE:
PROJECT:
DESIGNER:
JOB:
NOVEMBER 21, 2022
BAIG RESIDENCE
2055 CHESTNUT AVENUE
CARLSBAD, CA 92008
TNT DESIGN BUILD
3142 TIGER RUN COURT #8
CARLSBAD, CA 92010
]22470
858.535.9111 I fax 858.535.1989 I WW\
10509 Vista Sorrento Pkwy, Suite 102 San Diego, CA 92121
0("1')0 ON sq-O(Y)
MN ,,_. o-~
(0~,. ""-1.('.)N
~ N
N
0 N ~
al
0
JOB J22410
SHEET NO. TG-1 OF
LOVELACE
ENGi EERJ G -------
CALCULATEDBY _______ A_.S_. _ DATE _____ _
STRUCTURAL ENG I NEER I NG SERVI CES CHECKEDBY __________ DATE _____ _
10509 Vista Sorrento Parkway, Suite 102, San Diego, CA 92121
phone858.535.9111 • faxBSB.535.1989 • www.lovelaceeng.com SCALE __________________ _
TABLE OF CONTENTS
SOOJEGT SHEET
•~N CRITERIA·····························································......................................................................................... DG-1
DESl 6N LOADS........................................................................................................................................................... DL-1
I V-y3CI VERTICAL ANAL YSIS/DESl6N ............................................................................................................................. .
~ ANAL YSIS/DESl6N .............................................................................................................................. . L-½s
FOUNDATIONS I -R.ET AININ6 WALLS .................................................................................................................. . F-y2
STRUCTURAL NOTES/ SCHEDULES/ DETAILS (HHERE APPLICABLE) ............................................ .
TOTAL /08
JOB J22410
SHEET NO. DC-I OF ------LOVELACE
NGIN E I G CALCULATED BY ______ L.:A ...... S.,_,___ DATE _____ _
STRUCT URA L ENCi lN E E RINCi SERVI CES CHECKEDBY _________ DATE _____ _
10509 Vista Sorrento Parkway, Suite 102, San Diego, CA 92121
phone858.535.9111 • fax858.535.1989 • www.lovelaceeng.com SCALE _________________ _
DESIGN CRITERIA
60VERNIN6 CODE: CBC 20IC!
CONG-RETE: ACI 3 18 -14
f'c=2500 psi, NO SPECIAL INSPECTION -REQ'D. (U.N.O.)
MASONRY, TMS 402-lb / ACI 530-13
MEDIUM HEl6HT, ASTM o::io, f 'm= 1500 psi, SPECIAL INSP. -REQ'D
MORTAR: ASTM C210, f'c.=1800 psl, TYPES
eROUT, ASTM C416, f'c.=2000 psi
'REINFORCIN6 STEEL: ASTM Abl5, Fy= 40ksl FOR # 4 AND SMALLER
ASTM A615, Fy= 60ksl FOR# 5 AND LA--RGER (U.N.O.)
STRUCTURAL STEEL: AISC 360-16, 15TH EDITION
ASTM A512, Fy= 50 ksi (STEEL SHAPES) U.N.O.
ASTM A500, 6RADE B, Fy= 46ksi (ST-RUCTVRAL TUBE)
ASTM A53, 6RADE B, Fy = 35ksl (STRUCTURAL PIPE)
ASTM A36, Fy= 36 ksl (PLATES)
BOLTIN6: A301, SINGLE PLATE SHEAR CONN.
WELDIN6:
WOOD:
6LULAMS,
SOIL,
A325-N, A490-N HIGH STRENGTH, SINGLE PLATE SHEAR CONN.
ElOXX SER.IES-TYP., EC!O SERIES FOR A615 6RADE 60 -REBAR
SHOP HELDIN6 TO BE DONE IN AN APPROVED FABRICATOR'S SHOP
FIELD V'IELDING TO HAVE CONTINUOUS SPECIAL INSPECTION.
NDS-18
DOU6LAS FtR LARCH
24F-V4 FOR SIMPLE SPAN CONDITIONS
24f-V8 FOR CANTILEVER CONDITION
ALLOV'IABLE BEA-RIN6 PRESSURE =1500
ACTIVE SOIL PRESSURE = __ _
AT-REST SOIL PRESSURE (REST-RAINED) = __ _
PASSIVE SOIL PRESSURE = __ _
LATER.AL EARTHQUAKE PRESSURE = __ _
COEFFICIENT Of FRICTION = ---
psF
pc.F
pc.F
pc.F
pcf
181 EXISTING NATURAL SOIL PER. CBC TABLE 1806.2
SOILS -REPORT BY,
PROJECT NUMBER:
DATED,
LOVELACE
E Gf r::ERI
J22410 JOB __________________ _
SHEET NO. DL-1 OF -------
CALCULATED BY
STRUCTURAL ENGINEERI NG SERVI CES
A.S. DATE _____ _
10509 Vista Sorrento Parkway, Suite 102, San Diego, CA 92121
CHECKEOBY __________ DATE _____ _
phone 858.535.91 11 • fax 858.535.1989 • www.lovelaceeng.com SCALE _________________ _
DESIGN LOADS
-ROOF
DEAD LOAD:
-ROOFIN& ( CLAY TILE) . . ........................... .
SHEA THIN& ................................................ .
-RAFTER/CEILIN& JOISTS OR TRUSSES ...................... .
INSULATION ................................................ .
DRYHALL ................................................. .
OTHER (ELEC., MECH., MISC.) ............................... .
TOTAL DEAD LOAD,
LIVE LOAD, (ROOF USE PER IBC TABLE 1601.1)
TOTAL LOAD:
FLOOR
DEAD LOAD,
FLOORIN& ( CctP/HOODNINYL/DEX-0-TEX ) ............... .
LT. HEl&HT CONCRETE .................................... .
SHEATHIN& ................................................ .
JOISTS .................................................... .
DRYHALL ................................................. .
OTHER (ELEC., MECH., MISC.) .............................. .
TOTAL DEAD LOAD:
LIVE LOAD, (RESIDENTIAL USE PER IBC TABLE 1601.1)
TOTAL LOAD:
EXTERIOR HALL
STUDS ..................................................... .
DRYHALL ................................................. .
INSULATION ................................................ .
EXTERIOR FINISH ( STUGGO) .............................. .
OTHER (MISC.)
TOTAL LOAD:
. . ..... " . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
INTERIOR HALL
STUDS ..................................................... .
DRYHALL ................................................. .
OTHER (MISC..) ............................................ .
TOTAL LOAD:
11.0 psf
1.5
3.5
1.5
2.5
1.0
2 1.0 p sf
20.0psf
41.0psf
4.0psf
.0
2.0
3.5
2.5
2.0
14.0 psf
40.0psf
54.0psf
I.Opsf
2.5
1.5
10.0
1.0
16.0psf
I.Opsf
5.0
1.0
1.0psf
+ SOLAR
4.0
25.0psf
20.0psf
45.0psf
DECK/OTHER
4.0psf
.0
2 .0
3.5
2.5
.0
14.0psf
60.0psf
14.0psf
◄
Project Title:
Engineer:
BAIG RESIDENCE
AS. V-1
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RR-1
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
J22470
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Fb +
Fb.-
900 psi
900psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
I
i
'
Douglas Fir-Larch
No.2
Beam is Fully Braced against lateral-torsional buckling
Fc -Prll
Fe-Perp
Fv
Ft
D(0.033325~ Lr(0.02666)
1350 psi
625psi
180 psi
575psi
·Ebend-xx 1600ksi
Eminbend -xx 580 ksi
Density 31.21 pcf
Repetitive Member Stress Increase
/"'...,_ ____________________________________________ ..,..L,_
A 2x6
Span = 8.50 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Uniform Load: D = 0.0250, Lr = 0.020 ksf, Tributary Width = 1.333 ft, (ROOF)
DESIGN SUMMARY
IM~xim um Bending Stress Ratio
Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.511: 1
2x6
859.62psi
1,681.88psi
+D+Lr
4.250ft
Span# 1
0.095 in Ratio =
O in Ratio=
0.213 in Ratio=
O in Ratio=
Maximum Forces & Stresses for Load Combinations
load Combination Max Stress Ratios
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1077>=360 Span: 1 : Lr Only
0<360 n/a
4 78 >=240 Span: 1 : +D+lr
0 <240 nla
Moment Values
Segment Length Span# M V Cd CFN Ci Cr Cm C t CL M fb
DOnly
Length = 8.50 ft 1 0.394 0.159 0.90 1.300 1.00 1.15 1.00 1.00 1.00 0.30 477.57
+D+Lr 1.300 1.00 1.15 1.00 1.00 1.00
Length = 8.50 ft 1 0.511 0.206 1.25 1.300 1.00 1.15 1.00 1.00 1.00 0.54 859.62
+D+0.750Lr 1.300 1.00 1.15 1.00 1.00 1.00
Length = 8.50 ft 1 0.4!;>4 0.183 1.25 1.300 1.00 1.15 1.00 1:00 1.00 0.48 764.11
+0.60D 1.300 1.00 1.15 1.00 1.00 1.00
Length = 8.50 ft 1 0.133 0.054 1.60 1.300 1.00 1.15 1.00 1.00 1.00 0.18 286.54
Overall Maximum Deflections
load Combination Span Max.•-• Def! location in Span Load Combination
+D+Lr 0.2130 4.281
=
=
=
=
F'b V
0.00 0.00
1210.95 0.14
0.00 0.00
1681 .88 0.25
0.00 0.00
1681 .88 0.23
0.00 0.00
2152.80 0.08
0.206 : 1
2x6
46.35psi
225.00 psi
+D+Lr
0.000ft
Span# 1
Sfiear values
fv F'v
0.00 0.00
25.75 162.00
0.00 0.00
46.35 225.00
0.00 0.00
41.20 225.00
0.00 0.00
15.45 288.00
Max. "+" Defl Location in Span
0.0000 0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RR-1
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-2
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAX1mum
Overall MINimum
DOnly
+D+Lr
+D+0.750Lr
+0.60D
Lr Only
Support 1 Support 2
0.255 0.255
0.113 0.113
0.142 0.142
0.255 0.255
0.227 . 0.227
0.085 0.085
0.113 0.113
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-3
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
I Wood Beam
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: OJ-1
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470.ec6 J
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Fb +
Fb-
900 psi
900psi
E : Modulus of Elasticity
I
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Fc -Prll
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
D(0.018662) l(0.07998)
"
1.50X 10.0
Span= 13.0 ft
1350 psi
625psi
180psi
575psi
Ebend-xx 1600ksi
Eminbend -xx 580 ksi
Density 31 .21 pcf
Repetitive Member Stress Increase
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Uniform Load: D = 0.0140, L = 0.060 ksf,
DESIGN SUMMARY
Tributary Width = 1.333 ft, (DECK)
IM~ximum Bending Stress Ratio =
: Section used for this span
fb: Actual =
Fb: Allowable =
Load Combination
Location of maximum on span =
Span # where maximum occurs =
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.879 1
1.50 X 10.0
1,000.23psi
1, 138.50psi
+D+L
6.500ft
Span# 1
0.258 in Ratio=
O in Ratio=
0.319 in Ratio=
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowab)e
Load Combination
Location of maximum on span
Span # where maximum occurs
603 >=360 Span: 1 : L Only
0 <360 n/a
489 >=240 Span: 1 : +D+l
0 <240 n/a
Maximum Forces & Stresses for Load Combinations
Load Combination l'illax Sfress Ra!1os lli'lomen! 17alues
Segment Length Span# M V Cd CFN Ci Cr Cm C t CL M fb
DOnly
Length= 13.0 ft 1 0.185 0.075 0.90 1.100 1.00 1.15 1.00 1.00 1.00 0.39 189.23
+D+L 1.100 1.00 1.15 1.00 1.00 1.00
Length = 13.0 ft 1 0.879 0.356 1.00 1.100 1.00 1.15 1.00 1.00 1.00 2.08 1,000.23
+D+0.750L 1.100 1.00 1.15 1.00 1.00 1.00
Length = 13.0 ft 1 0.560 0.227 1.25 1.100 1.00 1.15 1.00 1.00 1.00 1.66 797.48
+0.600 1.100 1.00 1.15 1.00 1.00 1.00
Length = 13.0 ft 1 0.062 0.025 1.60 1.100 1.00 1.15 1.00 1.00 1.00 0.24 113.54
Overall Maximum Deflections
Load Combination Span Max."." Dell Location in Span Load Combination
+D+L 1 0.3188 6.547
=
=
=
=
=
F'b
0.00
1024.65
0.00
1138.50
0.00
1423.13
0.00
1821.60
Design OK
0.356 : 1
1.50 X 10.0
64.12psi
180.00 psi
+D+L
0.000ft
Span# 1
Sfiear 17alues
V fv F'v
0.00 0.00 0.00
0.12 12.13 162.00
0.00 0.00 o:oo
0.64 64.12 180.00
0.00 0.00 0.00
0.51 51.12 225.00
0.00 0.00 0.00
0.07 7.28 288.00
Max."+" Dell Location in Span
0.0000 0.000
I Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: DJ-1
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-4
Project File: J22470.ec6
(c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values.in KIPS
Load Combination
Overall MAX1mum
Overall l\t11Nimum
DOnly
+D+L
+D+0.750L
+0.60D
LOnly
Support 1 Support 2
0.641 0.641
0.520 0.520
0.121 0.121
0.641 0.641
0.511 0.511
0.073 0.073
0.520 0.520
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-5
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
I Wood Beam
UC# : KW-06013959, Bulld:20.21.11.30
DESCRIPTION: DJ-2
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, JBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Fb +
FQ-
900psi
900psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Fc -Prll
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
0(0.018662) L(0.07998)
0
2x8
Span= e.son
135opsi
625psi
180psi
575psi
Ebenq-xx 1600ksl
Eminbend -xx 580ksi
Density 31.21 pcf
Repetitive Member Stress Increase
v
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Uniform Load : D = 0.0140, L = 0.060 ksf, Tributary Width = 1.333 ft, (DECK)
DESIGN SUMMARY
Maximum Bending Stress Ratio
Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
0.655 1
2x8
813.53psi
1,242.00psi
+D+L
4.250ft
Span# 1
0.124 in Ratio=
O in Ratio=
0.153 in Ratio=
O in Ratio =
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span# where maximum occurs
822>=360 Span: 1 : L Only
0 <360 n/a
667>=240 Span: 1 : +D+L
0 <240 n/a
Maximum Forces & Stresses for Load Combinations lii'!omenf 'i7alues Load Combination lii'lax Sfress Ral1os
Segment Length Span·# M V Cd CFN C; Cr Cm Ct CL M fb
DOnly
Length = 8.50 ft 0.138 0.068 0.90 1.200 1.00 1.15 1.00 1.00 1.00 0.17 153.91
+D+L 1.200 1.00 1.15 1.00 1.00 1.00
Length = 8.50 ft 1 0.655 0.321 1.00 1.200 1.00 1.15 1.00 1.00 1.00 0.89 813.53
+D+0.750L 1.200 1.00 1.15 1.00 1.00 1.00
Length = 8.50 ft 0.418 0.205 1.25 1.200 1.00 1.15 1.00 1:00 1.00 0.71 648.63
+0.60D 1.200 1.00 1.15 1.00 1.00 1.00
Length = 8.50 ft 1 0.046 0.023 1.60 1.200 1.00 1.15 1.00 1.00 1.00 0.10 92.35
Overall Maximum Deflections
Load Combination Span Max."-" Deft Location in Span Load Combination
+D+L 1 0.1529 4.281
=
=
-.
=
=
F'b
0.00
1117.80
0.00
1242.00
0.00
1552.50
0.00
1987.20
V
0.00
0.08
0.00
0.321 : 1
2x8
57.82psi
180.00psi
+D+L
0.000ft
Span# 1
Sfiear 'i7alues
fv F'v
0.00 0.00
10.94 162.00
0.00 ·o.oo
0.42 57.82 180.00
0.00 0.00 0.00
0.33 46.10 225.00
0.00 0.00 0.00
0.05 6.56 288.00
Max."+" Deft Location in Span
0.0000 0.000
I Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: DJ-2
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-6
Project File: J22470.ec6 I
(c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 .Values in KIPS
Load Combination
Overall MAX1mum
Overall MINimum
D Only
+D+L
+D+0.750L
+0.600
LOnly
Support 1 Support 2
0.419 0.419
0.340 0.340
0.079 0.079
0.419 0.419
0.334 0.334
0.048 0.048
0.340 0.340
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-7
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
LIC#: -06013959, Build:20.21.11.30 Lovelace Engineering, Inc.
DESCRIPTION: 08-1
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb-
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0psl
675.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
V
Douglas Fir-Larch
No.1
Fc -Prll
Fe -Perp
Fv
Ft
Beam is Fully Braced against lateral-torsional buckling
D(0.42 L(1.8)
DI0.018662) L(0.07998\
7 V
6x8
Span= 8.50ft
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksl
Density 31.210pcf
V V
I ) A
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load : D = 0.0140, L = 0.060 ksf, Tributary Width = 1.333 ft, (DECK)
Point Load : D = 0.420, L = 1.80 k@ 2.750 ft
DESIGN SUMMARY
'Maximum Bending Stress Ratio
Section used fo~ this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.85! 1
6x8
1, 157 .66psi
1,350.00psi
+D+L
2.761 ft
Span# 1
0.140 in Ratio=
O in Ratio:::
0.175 in Ratio:::
0 in Ratio:::
Maximum Forces & Stresses for Load Combinations
Load Combination fJlax S{ress Ra!los
Segment Length Span# M V Cd CFN Ci Cr
·DOnly
Length ::: 8.50 ft 1 0.191 0.095 0.90 1.000 1.00 1.00
+D+L 1.000 1.00 1.00
Length = 8.50 ft 1 0.858 0.419 1.00 1.000 1.00 1.00
+D+0.750L 1.000 1.00 1.00
Length ::: 8.50 ft 0.549 0.269 1.25 1.000 1.00 1.00
+0.600 1.000 1.00 1.00
Length = 8.50 ft 1 0.065 0.032 1.60 1.000 1.00 1.00
Overall Maximum Deflections
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
730>=360
( <360
581 >:::240
(' <240
Cm C t
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
Span: 1 : L Only
n/a
Span: 1 : +D+L
n/a
fJlomen{ llalues
CL M fb
1.00 1.00 232.38
1.00
1.00 4.97 1,157.66
1.00
1.00 3.98 926.34
1.00
1.00 0.60 139.43
Load Combination Span Max."." Defl Location in Span Load Combination
+D+L 1 0.1755 3.971
= 0.419 : 1
6x8
= 71.24 psi
= 170.00 psi
+D+L
= 0.000ft
= Span# 1
Sliear llalues
F'b V fv F'v
0.00 0.00 0.00 0.00
1215.00 0.40 14.60 153.00
0.00 0.00 0.00 0.00
1350.00 1.96 71.24 170.00
o.cio 0.00 0.00 0.00
1687.50 1.57 57.08 212.50
0.00 0.00 0.00 0.00
2160.00 0.24 8.76 272.00
Max."+" Dell Location in Span
0.0000 0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#; KW-06013959, Build:20.21.11.30
DESCRIPTION: DB-1
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-8
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAXtmum
Overall MINimum
D Only
+D+L
+D+0.750L
+0.600
LOnly
Support 1 Support 2
1.959 1.175
1.558 0.922
0.401 0.253
1.959 1.175
1.570 0.945
0.241 0.152
1.558 0.922
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-9
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
I Wood Beam
UC# : KW-06013959, Build:20.21.11.30
DESCRIPTION: RH-1
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470.ec6 I
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination : ASCE 7-16
Fb +
Fb-
875 psi
875 psi
600 psi
625 psi
170psi
425psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Completely Unbraced
J .-----,
A
I ------••
Fc -Prll
Fe-Perp
Fv
Ft
D(0.098) L(0.42)
6x10
Span = 8.0ft
Ebend-xx 1300)<si
Eminbend -xx 470ksi
Density 31.21 pcf
l
_j
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0140, L = 0.060 ksf, Tributary Width= 7.0 ft, (DECK)
DESIGN SUMMARY r···----
1Maximum Bending Stress Ratio
! Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
0.705 1
6x10
614.23psi
870.71 psi
+D+L
4.000ft
Span# 1
0.076 in Ratio =
O in Ratio =
0.096 in Ratio =
O in Ratio ;::
Maximum Forces & Stresses for Load Combinations
Load-Combination Max Stress Ratios
Segment Length Span# M V Cd CFN
DOnly
Length ;:: 8.0 ft
+D+L
Length = 8.0 ft
+D+0.750L
Length = 8.0 ft
+0.60D
0.162 0.082 0.90 1.000
1.000
0. 705 0.358 1.00 1.000
1.000
0.453 0.229 1.25 1.000
1.000
Length= 8.0 ft 1 0.055 0.028 1.60 1.000
Overall Maximum Deflections
1.00 • 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
Maximum Shear Stress Ratio
Section used for this span
fy: Actual
Fv: Allowable
Load Combination
Lo'38tion of maximum on span
Span # where maximum occurs
1259>=360 Span: 1: L Only
0<360 n/a
999 >=240 Span: 1 : +D+L
0<240 n/a
Moment Values
M fb
1:00 1:00 1.00 0.87 126.86
1.00 1.00 1.00
1.00 1.00 1.00 4.23 614.23
1.00 1.00 1.00
1.00 1.00 0.99 3.39 492.39
1.00 1.00 0.99
1.00 1.00 0.99 0.52 76.12
Load Combination Span Max. "-" Defl Location in Span Load Combination
+D+L 0.0960 4.029
=
=
=
=
F'b V
0.00 0.00
784.06 0.44
0.00 0.00
870.71 2.12
0.00 0.00
1086.90 1.70
0.00 0.00
1388.42 0.26
0.358 : 1
6x10
60.78 psi
170.00 psi
+D+L
0.000ft
Span# 1
Sfiear Values
fv F'v
0.00 0.00
12.55 153.00
0.00 0.00
60.78 170.00
0.00 0.00
48.73 212.50
0.00 0.00
7.53 272.00
Max."+" Defl Location in Span
0.0000 0.000
• 1woodBeam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RH-1
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-10
Project File: J22470.ec6 I
(c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
load Combination
Overall MAX1mum
Overall MINimum
DOnly
+D+L
+D+0.750L
+0.60D
LOnly
----
Support 1 Support 2
2.117 2.117
1.680 1.680
0.437 0.437
2.117 2.117
1.697 1.697
0.262 0.262
1.680 1.680
--------------------
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-11
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RH-2
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Fb + 1350 psi E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
r \ A
Douglas Fir-Larch
No.1
Completely Unbraced
Fb -
Fe -Prll
Fe-Perp
Fv
Ft
0 0.15 Lr0.12
6x14
Span = 16.0 ft
1350psi Ebend-xx 1600ksl
925psi Eminbend -xx 580ksi
625 psi
170 psi
675psi Density 31.21 pcf
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0250, Lr= 0.020 ksf, Tributary Width= 6.0 ft, (ROOF)
DESIGN SUMMARY ,------------
!Maximum Bending Stress Ratio
• Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.401: 1
6x14
657.60psi
1,639.06psi
+D+Lr
8.000ft
Span# 1
0.099 in Ratio =
0 in Ratio =
0.235 in Ratio =
O in Ratio =
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1946>=360 Span: 1 : Lr Only
0<360 n/a
816>=240 Span: 1 :+D+Lr
1<240 nfa
Maximum Forces & Stresses for Load Combinations
Load Combination l'vlax S[ress Ral10s l'vlomenf Qalues
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb
DOnly
Length = 16.0 ft 1 0.320 0.175 0.90 0.987 1.00 1.00 1.00 1.00 0.98 5.31 381.77
+D+Lr 0.987 1.00 1.00 1.00 1.00 0.98
Length = 16.0 ft 1 0.401 0.218 1.25 0.987 1.00 1.00 1.00 1.00 0.97 9.15 657.60
+D+0.750Lr 0.987 1.00 1.00 1.00 1.00 0.97
Length = 16.0 ft 1 0.359 0.195 1.25 0.987 1.00 1.00 1.00 1.00 0.97 8.19 588.64
+0.600 0.987 1.00 1.00 1.00 1.00 0.97
Length = 16.0 ft 1 0.111 0.059 1.60 0.987 1.00 1.00 1.00 1.00 0.96 3.19 229.06
Overall Maximum Deflections
Load Combination Span Max."-" Den Location in Span Load Combination
+D+Lr 1 0.2352 8.058
Design OK
= 0.218 : 1
6x14
= 46.24 psi
= 212.50 psi
+D+Lr
= 0.000ft
= Span# 1
Sfiear Qalues
F'b V fv F'v
0.00 0.00 0.00 0.00
1192.90 1.33 26.84 153.00
0.00 0.00 0.00 0.00
1639.06 2.29 46.24 212.50
0.00 0.00 0.00 0.00
1639.06 2.05 41.39 212.50
0.00 0.00 0.00 0.00
2068.70 0.80 16.11 272.00
Max. •+• Def! Location in Span
0.0000 0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RH-2
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-12
Project File: J22470 OPTION2.ec6
(c) EN RCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAX1mum
Overall MINimum
DOnly
+D+Lr
+D+0.750Lr
+0.60D
Lr Only
Support 1 Support 2
2.289 2.289
0.960 0.960
1.329 1.329
2.289 2.289
2.049 2.049
0.797 0.797
0.960 0.960
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-13
j woodBeam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RB-1
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470.ec6 I
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design Fb + 1000 psi E : Modulus of Elasticity
Load Combination : ASCE 7-16
Wood Species Douglas Fir-Larch
Wood Grade No.1
Beam Bracing Completely Unbraced
Fb-
Fe -Prll
Fe-Perp
Fv
Ft
Q(o.09al .10.1.21
4•14
Span= 4.0 ft
1000psi Ebend-xx 1700ksi
1500psi Eminbend -xx 620ksi
625psl
180psi
675psi Density 31.21 pcf
•
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0140, L = 0.060 ksf, Tributary Width= 7.0 ft, (DECK)
DESIGN SUMMARY
~ximum Bending Stress Ratio I Section used for this span
, fb: Actual
I Fb: Allowable
I
I l
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.125 1
4x14
123.75psi
991.75psi
+D+L
2.000ft
Span# 1
0.002 in Ratio =
0 in Ratio=
0.003 in Ratio =
O in Ratio=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
22752 >=360
0 <360
18096>=240
0 <240
Span: 1 : L Only
n/a
Span: 1 : +D+L
n/a
Maximum Forces & Stresses for Load Combinations
Load Combination 1111ax S!fess RaUos fiilomenf IJ'alues
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb
DOnly
Length = 4.0 ft 1 0.028 0.043 0.90 1.000 1.00 1.00 1.00 1.00 0.99 0.22 25.32
+D+L 1.000 1.00 1.00 1.00 1.00 0.99
Length = 4.0 ft 1 0.125 0.190 1.00 1.000 1.00 1.00 1.00 1.00 0.99 1.06 123.75
+D+0.750L 1.000 1.00 1.00 1.00 1.00 0.99
Length = 4.0 ft 1 0.080 0.122 1.25 1.000 1.00 1.00 1.00 1.00 0.99 0.85 99.14
+0.60D 1.000 1.00 1.00 1.00 1.00 0.99
Length = 4.0 ft 1 0.010 0.015 1.60 1.000 1.00 1.00 1.00 1.00 0.99 0.13 15.19
Overall Maximum Deflections
Load Combination Span Max.•-• Oefl Location in Span Load Combination
+D+L 0.0027 2.015
= 0.190 : 1
4x14
= 34.16 psi
= 180.00 psi
+D+L
-= 0.000ft
= Span# 1
--,_
Sliear IJ'alues
F'b V fv F'v
0.00 0.00 0.00 0.00
893.42 0.22 6.99 162.00
0.00 0.00 0.00 0.00
991.75 1.06 34.16 180.00
0.00 0.00 0.00 0.00
1236.63 0.85 27.37 225.00
0.00 0.00 0.00 0.00
1576.89 0.13 4.19 288.00
Max. •+• Def! Location in Span
0.0000 0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
I Wood Beam
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RB-1
Vertical Reactions
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-14
Project File: J22470.ec6 I
(c) ENERCALC INC 1983-2021
Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAx1mum
Overall MINimum
D Only
Support 1 Support 2
+D+L
+D+0.750L
+0.60D
LOnly
1.056 1.056
0.840 0.840
0.216 0.216
1.056 1.056
0.846 0.846
0.130 0.130
0.840 0.840
Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-15
Project File: J22470 OPTION2.ec6
LIC#: K 0.21.11.30 Lovelace ngineering, Inc. (c) ENERCALC INC 198 2021
DESCRIPTION: RB-2
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Wood Species Douglas Fir-Larch
Wood Grade No.1
Beam Bracing Completely Unbraced
Fb+ 1000 psi E : Modulus of Elasticity
Fb-1000 psi Ebend-xx 1700ksl
Fe-Prll 1500psi Eminbend -xx 620ksi
Fe -Perp 625psi
Fv 180psi
Ft 675psi Density 31.21 pcf
;)
~ ~'·'·'·""' "'''·'·"'": ~ l ~ .. 4X10
Span= 10.50 ft
Applied Loads
Beam self weight calculated and added to loads
Loads on all spans ...
4X10 A
Span= 7.0 ft
Service loads entered. Load Factors will be applied for calculations.
Varying Uniform Load : D= 0.0->0.3130, Lr= 0.0->0.250 k/ft, Extent= 0.0 --» 17.50 ft
DESIGN SUMMARB..}Y~---------------------------------■■D•!Jli41::1D1~•ID,i~•!ll1'3■■l
~ximum Bending Stress Ratio 1 Section used for this span
fb: Actual
= 0.438 1
4x10
= 637.13psi
= 1,461.38psi ·Fb: Allowable
Load Combination +D+Lr+H, LL Comb Run (LL)
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
= 0.000ft
Span#2
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
3876>=360
8336>=360
2183>=240
= 0.381 : 1
4x10
= 85.63 psi
= 225.00psi
+D+Lr+H, LL Comb Run (LL)
= 0.000ft
= Span #2
Max Upward Total Deflection
0.033 in Ratio =
-0.015 In Ratio =
0.058 in Ratio =
-0.004 in Ratio = 31037>=240
Span: 2 : Lr Only, LL Comb Run (•L)
Span: 2 : Lr Only, LL Comb Run (L •)
Span: 2 : +D+Lr+H, LL Comb Run ('L)
Span: 2 : +D+Lr+H, LL Comb Run (L*)
Maximum Forces & Stresses for Load Combinations
Load Combination l'v'lax Stress Ra!1os llilomen! !Jalues Sfiear !Jalues
Segment Length Span# M V Cd CFN Cj Cr Cm Ct CL M fb F'b V fv F'v
+D+H 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.341 0.298 0.90 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1062.17 1.04 48.33 162.00
Length = 7.0 ft 2 0.339 0.298 0.90' 1.200 1'.00 1.00 1.00 1.00 0.99 1.51 362.24 1068.39 1.04 48.33 162.00
+D+L +H, LL Comb Run (•L) 1.200 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.308 0.269 1.00 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1177.27 1.04 48.33 180.00
Length<::; 7.0 ft 2 0.306 0.269 1.00 1.200 1.00 1.00 1.00 1.00 0.99 1.51 362.24 1185.36 1.04 48.33 180.00
+D+L+H, LL Comb Run (L*) 1.200 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length= 10.50 ft 2 0.308 0.269 1.00 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1177.27 1.04 48.33 180.00
Length = 7 .0 ft 2 0.306 0.269 1.00 1.200 1.00 1.00 1.00 1.00 0.99 1.51 362~24 1185.36 1.04 48.33 180.00
+D+L +H, LL Comb Run (LL) 1.200 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length= 10.50 ft 2 0.308 0.269 1.00 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1177.27 1.04 48.33 180.00
Project Title: BAIG RESIDENCE V-16 Engineer: A.S.
Lovelace Engineering, Inc. Project ID: J22470
10509 Vista Sorrento Pkwy, Ste. 102 Project Descr:
San Diego, CA 92121
Project File: J22470 OPTION2.ec6
LIC#: KW-06013959, Build:20.21.11.30 Lovelace Engineering, Inc. (c) ENERCALC INC 1983--2021
DESCRIPTION: RB-2
Maximum Forces & Stresses for Load Combinations
Load Combination l'v'lax Slfess Ral10s l'v'lomenl 'i7alues Sfiear 'i7alues
Segment Length Span# M V Cd CFN Cj Cr Cm Ct CL M fb F'b V fv F'v
Length= 7.0 ft 2 0.306 0.269 1.00 1.200 1.00 1.00 1.00 1.00· 0.99 1.51 362.24 1185.36 1.04 48.33 180.00
+D+Lr+H, LL Comb Run (*L) 1.200 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.327 0.361 1.25 1.200 1.00 1.00 1.00 1.00 0.97 1.99 478.09 1461.38 1.75 81.25 225.00
Length = 7.0 ft 2 0.324 0.361 1.25 1.200 1.00 1.00 1.00 1.00 0.98 1.99 418.09 1475.84 1.75 81.25 225.00
+D+Lr+H, LL Comb Run (L*) 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.357 0.294 1.25 1.200 1.00 1.00 1.00 1.00 0.97 2.17 521.28 1461.38 1.43 66.05 225.00
Length ;:: 7.0 ft 2 0.353 0.294-1.25 1.200 1.00 1.00 1.00 1.00 0.98 2.17 521.28 1475.84 1.14 66.05 225.00
+D+Lr+H, LL Comb Run (LL) 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.436 0.381 1.25 1.200 1.00 1.00 1.00 1.00 0.97 2.65 637.13 1461.38 1.85 85.63 225.00
Len~th = 7.0 ft 2 .0.432 0.381 1.25 1.200 1.00 1.00 1.00 1.00 0.98 2.65 637.13 1475.84 1.85 85.63 225.00
+D+S+H 1.200 1.00 1.00 1.00 1.00 0.98 o.od 0.00 0.00 0.00
Length= 10.50 ft 2 0.269 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1348.41 1.04 48.33 207.00
Length = 7.0 ft 2 0.266 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.99 1.5.1 362 .. 2.4 1360.00 1.04 48.33 207.00
+D+0.750Lr+0.750L +H, LL Cc 1.200 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.307 0.325 1.25 1.200 1.00 1.00 1.00 1.00 0.97 1.87 449.12 1461.38 1.58 73.02 225.00
Length = 7.0 ft 2 0.304 0.325 1.25 1.200 1.00 1.00 1.00 1.00 0.98 1.87 449.12 1475.84 1.58 73.02 225.00
+D+0.750Lr+0.750L+H, LL Cc 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.329 0.263 1.25 1.200 1.00 1.00 1.00 1.00 0.97 2.00 481.52 1461.38 1.28 59.24 225.00
Length= 7.0 ft 2 0.326 0.263 1.25 1.200 1.00 1.00 1.00 1.00 0.98 2.00 481.52 1475.84 1.11 59.24 225.00
+D+0.750Lr+0.750L+H, LL Cc 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.389 0.339 1.25 1.200 1.00 1.00 1.00 1.00 0.97 2.36 568.41 1461.38 1.65 76.30 225.00
Length = 7 .0 ft 2 0.385 0.339 1.25 1.200 1.00 1.00 1.00 1.00 0.98 2.36 568.41 1475,84 1.65 76.30 225.00
+D+0.750L+0.750S+H, LL Co1 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length= 10.50 ft 2 0.269 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1348.41 1.04 48.33 207.00
Length = 7 .0 ft 2 0.266 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.99 1.51 362.24 1360.00 1.04 48.33 207.00
+D+0.750L+0.750S+H, LL Cor 1.200 1.00 1:00 1.00 1.00 0.99 0'.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.269 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1348.41 1.04 48.33 207.00
Length = 7 .0 ft 2 0.266 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.99 1.51 362.24 1360.00 1.04 48.33 207.00
+D+0.750L +0.750S+H, LL Co1 1.200 1.00 1.00 1.00 1,00 0.99 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.269 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1348.41 1.04 48.33 207.00
Length = 7 .0 ft 2 0.266 0.233 1.15 1.200 1.00 1.00 1.00 1.00 0.99 1.51 362.24 1360.00 1.04 48.33 207.00
+D+0.60W+H 1.200 1.00 1 .. 00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96 1.51 362.24 1848.19 1.04 48.33 288.00
Length = 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1877.10 1.04 48.33 288.00
+D+0.750Lr+0.75DL +0A50W➔ 1.200 1.00 1.00 1.00 1.00 0.98 0,00 .o.oo 0.00 0.00
Length = 10.50 ft 2 D.243 0.254 1.60 1.200 1.00 1.00 1.00 1.00 0.96 1.87 449.12 1848.19 1.58 73.02 288.00
Length= 7.0 ft 2 0.239 0.254 1.60 1.200 1.00 1.00 1.00 1.00 0.98 1.87 449.12 1877.10 1.58 73.02 288.00
+D+Q. 7!:iOLr+Q .7501,.+0 .450W➔ 1.200 1.00 1.00 1.00 1.00. 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.261 0.206 1.60 1.200 1.00 1.00 1.00 1.00 0.96 2.00 481.52 1848.19 1.28 59.24 288.00
Length = 7 .0 ft 2 0.257 0.206 1.60 1.200 1.00 1.00 1.00 1.00 0.98 2.00 481.52 1877.10 1.11 59.24 288.00
+D+0.750Lr+0.750L +0.450W➔ 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length= 10.50 ft 2 0.308 0.265 1.60 1.200 1.00 1.00 1.00 1.00 0.96 2.36 568.41 1848.19 1.65 76.30 288.00
Length = 7 .0 ft 2 0.303 0.265 1.60 1.200 1.00 1.00 1.00 1.00 0.98 2.36 568.41 1877.10 1.65 76.30 288.00
+D+0.750L +0.750S+0.450W+ 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96 1.51 362.24 1848.19 1.04 48.33 288.00
Length= 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1877.10 1.04 48.33 288.00
+D+0.750L +0.750S+0.450W+ 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96 1.51 362.24 1848.19 1.04 48.33 288.00
Length= 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1877.10 1.04 48.33 288.00
+D+0.750L +0.750S+0.450W+ 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length= 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96 1.51 362.24 1848.19 1.04 48.33 288.00
Length = 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1877.10 1.04 48.33 288.00
+0.60D+0.60W+0.60H 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.118 0.101 ·1.60 1.200 1.00 1.00 1.00 1.00 0.96 0.90 217.34 1848.19 0.63 29.00 288.00
Length = 7.0 ft 2 0.1 16 0.101 1.60 1.200 1.00 1.00 1.00 1.00 0.98 0.90 217.34 1877.10 0.63 29.00 288.00
+D+0.70E+0.60H 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96 1.51 362.24 1848.19 1.04 48.33 288.00
Length= 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98 1.51 362.24 1877.10 1.04 48.33 288.00
+D+0.750L +0.750S+0.5250E-1 1.200 1.00 1.00 1.00 1.00 0.98 0.00 0.00 0.00 0.00
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RB-2
Project Title:
Engineer:
Project ID:
Project Descr.
Lovelace Engineering, Inc.
Maximum Forces & .Stresses for Load Combinations
Load Combination lli'lax Sli'ess Ralios
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96
Length = 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98
+0+0.750L +0.750S+0.5250E-t 1.200 1.00 1.00 1.00 1.00 0.98
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96
Length = 7.0 ft 2 0.193 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.98
+D+0.750L +0.750S+0.5250E-t 1.200 1.00 1.00 1.00 1.00 0.98
Length = 10.50 ft 2 0.196 0.168 1.60 1.200 1.00 1.00 1.00 1.00 0.96
Length = 7.0 ft 2 0.193 0.1 68 1.60 1.200 1.00 1.00 1.00 1.00 0.98
+0.600+0.70E+H 1.200 1.00 1.00 1.00 1.00 0.98
Length = t0.50 ft 2 .0.118 0.101 1.60 1.200 1.00 1.00 1.00 1.00 0.96
Length = 7 .0 ft 2 0.116 0.101 1.60 1.200 1.00 1.00 1.00 1.00 0.98
Overall Maximum Deflections
BAIG RESIDENCE
A.S.
J22470
V-17
Project File: J22470 OPTION2.ec6
lli'lomen! 'values Sfiear 'values
M fb F'b V fv F'v
1.51 362.24 1848.19 1.04 48.33 288.00
1.51 362.24 18TT.10 1.04 48.33 288.00
0.00 0.00 0.00 0.00
1.51 362.24 1848.19 1:04 48.33 288.00
1.51 362.24 1877.-10 1.04 48.33 288.00
0.00 0.00 0.00 0.00
1.51 362,24 1848.19 1.04 48.33 288.00
1.51 362.24 1877.10 1.04 48.33 288.00
0.00 0.00 0.00 0.00
0.90 217.34 1848.19 0.63 29.00 288.00
0.90 217.34 1877.10 0.63 29.00 288.00
Load Combination Span Max.•-• Dell Location in Span Load Combination Max. •+• Dell Location in Span
+D+Lr+H, LL Comb Run (L •) 1
+D+Lr+H, LL Comb Run (•L) 2
Vertical Reactions
Load Combination
Overall MAX,mum
Overall MINimum
+D+H
+D+L+H, LL Comb Run (*L)
+D+L+H, LL Comb Run (L*)
+D+L +H, LL Comb Run (LL)
+D,+Lr+H, LL Comb Run (*L)
+D+Lr+H, LL Comb Run (L*)
+D+Lr+H, LL Comb Run (LL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L •
+D+0.750L+0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D+0.750Lrt-0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+0+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+0.600+0.60W+0.60H
+D+0.70E+0.60H
-t0+0.750L+0.750S+0:5250E+H, LL Comb
+D+0.750L +0.750S+0.5250E+H, LL Comb
+D+0.750L-t0.750S+0.5250E+H, LL Comb
+0.600+0.705+H
DOnly
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (L*)
Lr Only, LL Comb Run (LL)
HOnly
0.0577 4.927
0.0369 3.872
Support notation : Far left Is #1
Support 1 Support 2 Support 3
0.424 3.320 1.448
0.154 1.439 0.595
0222 1.881 0.759
.0,222 1.881 0.759
0.222 1.881 0.759
0.222 1.881 0.759
0.176. 2.637 1.448
0.421 2.563 0.664
0.376 3.320 1.354
0.222 1.881 0.759
0.188 2.448 1.276
0.372 2.393 0.688
0.337 2.960 1.205
0.222 1.881 0.759
0.222 1.881 0.759
0.222 1.881 0.759
0.222 1.881 0.759
0.188 2.448 1.276
0.372 2.393 0.688
0.337 2.960 1.205
0.222 1.881 0.759
0.222 1.881 0.759
0.222 1.881 0.759
0.133 1.128 0.455
0.222 1.881 0.759
0.222 1.881 0.759
0.222 1.881 0.759
0.222 1.881 0.759
0.133 1.128 0.455
0.222 1.881 0.759
-0.046 0.756 0.690
0.200 0.682 -0.094
0.154 1.439 0.595
0.0000
0.0000
Values in KIPS
0.000
0.000
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-18
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: RB-3
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
.Load Combination: ASCE 7-1·6
Fb + 1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170.0-psi
675.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.1
Completely Unbraced
Fb-
Fc-Prll
Fe-Perp
Fv,
Ft
Ebend-xx 1,600.0 ksi
Eminbend -xx 580.0ksi
Density 31.210 pct
,------------------------------------------------
D 0.15 L 0.12
4x6
Span; 7.501!
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load : D = 0.0250, Lr= 0.020 ksf, Tributary Width = 6.0 ft, (ROOF)
DESIGN SUMMARY
Maximum Bending Stress Ratio = 0.601. 1 Maximum Shear Stress Ratio
Section used for this span 4x6 Section used for this span
fb: Actual = 1,3-10.98psi fv, Actual
Fb: Allowable = 2,161.31psi Fv: Allowable
Load Combination +D+Lr Load Combination
Location of maximum-on span = ·3.750ft Location of-maximum on span
Span # where maximum occurs = Span# 1 Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection 0.111 in Ratio= 813>=360 Span: 1 : Lr Only
Max Upward Transient Deflection 0 in Ratio= 0 <360 n!a
Max Downward Total Deflection 0.253 in Ratio= 355>=240 Span: 1 : +D+Lr
·Max Upward Totaf•Deflection 0 in Ratio = 0 <240 nfa
Maximum Forces & Stresses for Load Combinations
Load Combination l'ii'!ax S[ress.Ralios l'ii'!omen[ IJalues
Segment Length Span# M V Cd CFN C1 Cr Cm C t CL M fb
□Only
·Length = 7.50 ft 1 0.471 0.294 0.90 "1.300 1.00 "1.00 1.00 1.00 0.99 1.08 737.19
+D+Lr 1.300 1.00 1.00 1.00 1.00 0.99
Length = 7 .50 ft 1 0.607 0.377 1.25 1.300 1.00 1.00 1.00 1.00 0.99 1.93 1,310.98
+D+0.7501:.r 1.300 1.00 1.00 1.00 1·.00 0.99
Length = 7.50 fl 1 0.540 0.336 1.25 1.300 1.00 1.00 1.00 1.00 0.99 1.72 1,167.53
+0.60D 1.300 1.00 1.00 1.00 1.00 0.99
Length= 7.50 ft 1 0.161 0.099 1.60 1.300 1.00 1.00 1.00 1.00 0.98 0.65 442.31
Overall Maximum Deflections
Load Combination Span Max. "-" Defl Location in Span Load Combination
+D+Lr 1 0.2529 3.777
=
=
=
=
=
F'b V
0,00 0,00
1563.82 0.58
0.00 0.00
2161.31 1.03 o.oo· 0.00
2161.31 0.92
0.00 0.00
2750.77 0.35
+D+Lr
0.000ft
Span# 1
Sfiear IJalues
fv F'v
0,00 0.00
45.05 153.00
0.00 0.00
80.12 212.50
0.00 0.00
71.35 212.50
0.00 0.00
27.03 272.00
Max."+" Defl Location in Span
0.0000 0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#: KW-06013959, Build:20.21.11 .30
DESCRIPTION: RB-3
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-19
Project File: J22470 OPTION2.ec6
(c) EN RCALC I C 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAx1rnurn
Overall MINirnurn
DOnly
+O+Lr
+O+0.750Lr
+0.600
Lr Only
Support 1 Support 2
1.028 1.028
0.450 0.450
0.578 0.578
1.028 1.028
0.916 0.916
0.347 0.347
0.450 0.450
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-20
I Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FJ-1
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project File: J22470.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
.Load Combination : ASCE 7-16
Fb +
Fb-
900 psi
900psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Douglas Fir-Larch
No.2
Beam is Fully Braced against lateral-torsional buckling
Fc -Prll
Fe -Perp
Fv
Ft
1350 psi
625psi
180psi
575psi
Ebend-xx 1600ksi
Eminbend -xx 580 ksi
Density 31 .21 pcf
Repetitive Member Stress Increase ~,
D(0.018662) l(0.05332) I 9~----------~v---------=="-==:.!-9===~------~*~----------~v
2x12 1
Span= 13.0ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Uniform Load: D = 0.0140, L = 0.040 ksf, Tributary Width = 1.333 ft, (FLOOR)
DESIGN SUMMAR~Y __
fMaximu~ Bending.Stress Ratio ------· ------------
I
. Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
·Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
= -
=
=
0.551. 1
2x12
576.71 psi
1,035.00psi
+D+L
6.500ft
Span# 1
0.121 in Ratio =
0 in Ratio =
0.163 in Ratio =
O in Ratio =
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span# where maximum occurs
1288>=360
0<360
954>=240
C <240
Span: 1 : L Only
n/a
Span: 1 : +D+L
n/a ---------
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios Moment values
Segment Length Span·# M V Cd CFN Ci Cr Cm Ct CL M fb
D Only
Length= 13.0 ft 1 0.161 0.067 0.90 1.000 1.00 1.15 1.00 1.00 1.00 0.39 149.52
+D+L 1.000 1.00 1.15 1.00 1.00 ·1:00
Length = 13.0 ft 1 0.557 0.231 1.00 1.000 1.00 1.15 1.00 1.00 1.00 1.52 576.71
+D+0.750L 1.000 1.00 1.15 1.00 1.00 1.00
Length = 13.0 ft 1 0.363 0.151 1.25 1.000 1.00 1.15 1.00 1.00 1.00 1.24 469.91
+0.60D 1.000 1.00 1.15 1.00 1.00 1.00
Length = 13.0 fl 1 0.054 0.022 1.60 1.000 1.00 1.15 1.00 1.00 1.00 0.24 89.71
Overall Maximum Deflections
Load Combination Span Max.•-• Defl Location in Span Load Combination
+D+L 0.1634 6.547
=
=
=
=
F'b V
0.00 0.00
931 .50 0.12
0.00 0.00
1035.00 0.47
0.00 0.00
1293.75 0.38
0.00 0.00
1656.00 0.07
0.231 : 1
2x12
41.59 psi
180.00 psi
+D+L
13.000 ft
Span # 1
Sfiear Values
fv F'v
0.00 0.00
10.78 162.00
0.00 0.00
41.59 180.00
0.00 0.00
33.89 225.00
0.00 0.00
6.47 288.00
Max. •+• Defl Location in Span
0.0000 0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG 1-<t:::::m.1 .... ,. -_
A.S.
J22470
Project File: J224
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FJ-1
Lovelace Engineering, Inc.
Vertical Reactions Support notation : Far left is #1 Values in KIPS
7Lo'i.a;;;d:;:;C;JJo,mT.bli'in;na;:;;t;;;io;:;;n~ __________ s_u_ppo"n.ilrtl1l1lrS_u_p7'ipo,1rt~2r _____________________ ____
Overall MAX1mum 0.468 0.468 ----
Overall MINimum 0.347 0.347
D Only 0.121 0.121
+D+L 0.468 0.468
+D+0.750L 0.381 0.381
+0.60D 0.073 0.073
L Only 0.347 0.347
--------------
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-22
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID: J22470
Project Descr:
UC#: KW-06013959, Build:20. 1.11.30
DESCRIPTION: FB-1
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per AISC 360-16, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
Analysis Method :Allowable Strength Design
Beam Bracing : Completely Unbraced
Bending Axis : Major Axis Bending
♦ • D(0.09102 L(0.390)
Fy : Steel Yield :
E: Modulus :
D 0.1280
V ♦
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
50.0 ksi
29,000.0 ksi
♦ D(0.1125~L.r(0.090) 0 (2.928) Lr1.~ C:(0.800) D(U /2) L(3.412'_i9'1(-i.O) E(-0.4/0) L_ _ ----.----~D=-=0.=0~91Q.l,.ccL,,.,0=.26=0,__ __ ..---___ I
W14x68
Span = 29.250 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loading
Load for Span Number 1
Uniform load: D = 0.0140, L = 0.040 ksf, Extent= 5.0 --» 21.50 ft, Tributary Width= 6.50 ft, (FLOOR)
Uniform Load : D = 0.0250, Lr= 0.020 ksf, Tributary Width = 4.50 ft, (ROOF)
Uniform Load: D = 0.0140. L = 0.060 ksf, Extent= 5.0 --» 21.50 ft, Tributary Width= 6.50 ft, (DECK)
Uniform Load: D = 0.0160 ksf, Extent= 5.0 -->> 29.250 ft, Tributary Width= 8.0 ft, (EXT. WALL)
Point Load: D = 2.928, Lr= 1.444, L = 0.850 k@ 5.0 ft, (FB-4)
Point Load: D = 1.772, L = 3.412, W = -1.0, E =-0.470 k@21.50 ft, (FB-2)
DESIGN SUMMARY
r-Maximum Bending Stress Ratio =
Section used for this span
Ma :Applied
Mn / Omega : Allowable
Load Combination
Location of maxlmum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.655: 1 ·--Maximum Shear Stress Ratio =
W14x68
133.046 k-ft
203.036 k-ft
+D+L
14.876ft
Span# 1
Section used for this span
Va :Applied
Vn/Omega : Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
0.520 in Ratio= 674 >=360
-0.032 in Ratio= 11 ,109 >=360
Span: 1 : W Only
Span: 1 : L Only
Span: 1 : +D+L 0.985 in Ratio= 356 >=240.
0.000 in Ratio = , <240.0
Design OK
0.138 : 1
W14x68
16.077 k
116.20 k
+D+0.750Lr+0.750L-0.450W
0.000 ft
Span# 1
Maximum Forces & Stresses for Load Combinations
Load Combination l'illax Sfress Ra!,os Summary of fJlomenl 'i7alues Summary of Shear 'i7ah
Segment Length Span# M V Mmax+ Mmax-Ma Max 'Mnx Mnx/Omega Cb Rm Va Max VnxVnx/OmE
DOnly
Dsgn. L= 29.25 ft 0.309 0.073 61.98 61.98 335.46 200.881.121.00 8.47 174.30 1·
+D+L
Dsgn. L = 29.25 ft 0.655 0.137 133.05 133.05 339.07 203.04 1.131.00 15.94 174.30
+D+Lr
Dsgn. L = 29.25 ft 0.376 0.094 75.30 75.30 334.86 200.52 1.111.00 10.98 174.30
+D+0.750Lr+0.750L . -"lO ?~ ft 0.619 0.137 125.18 125.18 337.87 202.32 1.12 1.00 15.96 174.30
1
I
I
I I
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-1
Project Title:
Engineer:
Proj_ect ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-23
Project File: J22470 OPTION2.ec6
(c) ENERCAL INC 1983-2021
Maximum Forces & Stresses for Load Combinations
Load Combination l'ii'lax Sfress Ralios Summary of l'ii'lomenf Values Summary of Sfiear Values
Segment Length Span# M V Mmax+ Mmax-Ma Max Mnx Mm</Omega Cb Rm Va Max VnxVnx/Omega
+0½0.750L
Dsgn. L = 29.25 ft 0.568 0.121 115.27 115.27 338.77 202.86 1.13 1.00 14.07 174.30 116.20
+D+0.60W
Dsgn .. L = .29.25 ft 1 0,296 0.07.1 59.71 59.71 336.97 .201 .78 1.12 1.00 8.31 174.30 116.20
+D-0.60W
Dsgn. L = 29.25 ft 0.321 0.074 64.30 64.30 334.56 200.34 1.111.00 8.63 174.30 116.20
+D+O. 750Lr+0.750L +0.450W
Dsgn. L = 29.25 ft 1 0.609 0.136 123.44 123.44 338.47 202.68 1.13 1.00 15.84 174.30 116.20
+D+0.750Lr+0.750L-0.450W
Dsgn. L = 29.25 ft 1 0.628 0.138 126.93 126.93 337.57 202.14 1.12 1.00 16.08 174.30 116.20
+D+O. 750L +0.450W
Dsgn. L = 29.25 ft 1 0.559 0.120 113.51 113.51 339.07 203.04 1.13 1.00 13.95 174.30 116.20
+D+O. 750L-0.450W
Dsgn. L = 29.25 ft 0.578 0.122 117.04 117.04 338.17 202.50 1.13 1.00 14.19 174.30 116.20
+0.60D+0.60W
Dsgn. L= 29.25 ft 0.173 0.042 34.93 34.93 338.17 202.50 1.13 1.00 4.92 174.30 116.20
+0.60D-0:60W
Dsgn. L= 29.25 ft 1 0.198 0.045 39.53 39.53 333.96 199.98 1.111.00 5.24 174.30 116.20
+1.114D+0.70E
Dsgn. t. = 29.25 ft 0.337 0.080 67.81 67.81 336.37 201'.42 1'.12 1.00· 9.35 1'74.30 116.20
+1.114D-0.70E
Dsgn. L = 29.25 ft 0.350 0.082 70.33 70.33 335.16 200.70 1.121.00 9.52 174.30 116.20
+1.0860+0. 750L +0.5250E
Dsgn. L= 29.25 ft 0.590 0.127 119.61 119.61 338.77 202.86 1.13 1.00 14.73 174.30 116.20
+1.086D+0.750L-0.5250E
Dsgn. L = 29.25 ft 0.600 0.128 121.55 121.55 338.47 202.68 1.13 1.00 14.86 174.30 116.20
+0.4858D+0.70E
Dsgn. L = 29.25 ft 0.143 0.035 28.86 28.86 337.27 201.96 1.12 1.00 4.03 174.30 116.20
+0.4858D-0.70E
Dsgn. L = 29.25 ft 1 0.157 0.036 31.38 31.38 334.56 200.34 1.11 1.00 4.20 174.30 116.20
Overall Maximum Deflections
Load Combination Span Max."·" Def! Location in Span Load Combination Max. "+" Deff Location In Span
+D+L 1 0.9854 14.709 0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination Support 1 Support2
Overall MAXimum 16.0TT 15.132
Overall MINimum -0.125 -0.345
DOnly 8.466 7.620
+D+L 15.942 15.132
+D+Lr 10.980 9.184
+D+O. 750Lr+O. 750L 15.958 14.426
+D+0.750L 14.073 13.254
+D+0.60W 8.307 7.179
+D-0.60W 8.625 8.061
+D+0.750Lr+O. 750L +0.450W 15.839 14.096
+D+0.750Lr+0.750L-0.450W 16.077 14.757
+D+O. 750L +0.450W 13.953 12.923
+D+0.750L-0.450W 14.192 13.585
+0.60D+0.60W 4.921 4.131
+0.60D-0.60W 5.239 5.013
+D+0.70E 8.379 7.379
+D-0.70E 8,55.3 7.862
+D+O. 750L +0.5250E 14.007 13.073
+D+O. 750L-0.5250E 14.138 13.436
+0.60D+0.70E 4.993 4.330
+0.60D-0.70E 5.167 4.814
Lr Only 2.513 1.563
LOnly 7.475 7.512
WOnly -0.265 -0.735
-W 0.265 0.735
" 1?1; .n '.'141'
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Steel Beam
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-1
Vertical Reactions
Load Combination
E Only• -1.0
Support 1
0.125
Support 2
0.345
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-24
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Support notation : Far left is #1 Values in KIPS
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-25
Project File: J22470 OPTION2.ec6
LIC#: KW-06013959, uild:20.21.11.30
DESCRIPTION: FB-2
CODE REFERENCES
Lovelace ngineering, Inc.
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
Load Combination ASCE 7-16
Fb + 3,100.0psi
3,100.0psi
3,000.0psi
E: Modulus of Elasticity
Fb-Ebend-xx 2,000.0ksi
Fc-Prll
Fe-Perp
Fv
Eminbend -xx 1,036.83ksi
Wood Species
Wood Grade
Beam Bracing
.
y .
Boise Cascade
Versa Lam 3100
Completely Unbraced
.
Ft
0(0.018862~ L(0.07998)
0(0 018662) Lt0 05332) .
DI0.128\
' 0<0.077) L(0.33) .
5.25xl1.25
Span= 12.750 II
··-
750.0psi
285.0 psi
2,100.0psi
• -r
.
Density
-
'
41.760pcf
--. 1.489) .
I
-
Applied Loads Service loads entered. Load Factors will be applied for calculations
Beam self weight calculated and added to loads
Uniform Load: D = 0.0140, L = 0.060 ksf, Tributary Width = 5.50 ft, (DECK)
Uniform Load: D = 0.0160 ksf, Tributary Width= 8.0 ft, (EXT. WALL)
Point Load : D = 0.4010, L = 1.558 k @9.0 ft, (DB-1)
Uniform Load : D = 0.0140, L = 0.040 ksf, Tributary Width= 1.333 ft, (FLOOR)
Uniform Load : D = 0.0140, L = 0.060 ksf, Tributary Width= 1.333 ft, (DECK)
Point Load: W = 3.184, E = 1.489 k@8.50 ft, (SHEAR WALL ABOVE)
Point Load: W = -3.184, E = -1.489 k@ 12.50 ft, (SHEAR WALL ABOVE)
DESIGN SUMMARY __
!Maximum Bending Stress Ratio I Section used for this span
fb: Actual
Fb: Allowable
Load Combination
=
=
=
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
=
=
0.663 1
5.25x11.25
2,014.34 psi
3,040.18psi
+D+L
7.166ft
Span# 1
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.296 in Ratio=
-0.153 in Ratio=
0.439 in Ratio =
-0.009 in Ratio =
Maximum Forces & Stresses for Load Combinations
Load Combination Max S!ress Ra!1os
Segment Length Span# M V Cd CFN Ci Cr
D Only
517 >=360
997>=360
348>=240
17881 >=240
Cm Ct
Span: 1 : L Only
Span: 1 : -W
Span: 1 : +D+L
Span: 1 : +0.60D-0.60W
fJlomen! IJalues
CL M fb
=
=
=
=
=
F'b
0.00
Length ::: 12. 750 ft 1 0.239 0.192 0.90 1.000 1.00 1.00 1.00 1.00 0.98 6.05 655.67 2743.11
+D+L 1.000 1.00 1.00 1.00 1.00 0.98 0.00
Length = 12. 750 ft 1 0.663 0.534 1.00 1.000 1.00 1.00 1.00 1.00 0.98 18.59 2,014.34 3040.18
+D+0.750L 1.000 1.00 1.00 1.00 1.00 0.98 0.00
Length = 12.750 ft 1 0.444 0.355 1.25 1.000 1.00 1.00 1.00 1.00 0.97 15.45 1,674.29 3773.20
+D+0.60W 1.000 1.00 1.00 1.00 1.00 0.97 0,00
•iiil·hl•J;
0.534 : 1
5.25x11.25
152.14·psl
285.00 psi
+D+L
12.750ft
Span# 1
Sliear IJalues
V fv F'v
0.00 0.00 0.00
1.94 49.20 256.50
0.00 0.00 0.00
5.99 152.14 285.00
0.00 0.00 0.00
4.98 126.40 356.25
0.00 0.00 0.00
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-26
Project File: J22470 OPTION2.ec6
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-2
Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
Maximum Forces & Stresses for Load Combinations
Load Combination l'v'!ax S!ress Ral1os l'v'!omenl 17alues SFiear 17alues
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb F'b V fv F'v
Length = 12.750 ft 1 0.245 0.177 1.60 1.000 1.00 1.00 1.00 1.00 0.96 10.78 1,167.90 4770.24 3.18 80.65 456.00
+D-0.60W 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length = 12.750 ft 1 0.060 0.141 1.60 1.000 1.00 1.00 1.00 1.00 0.96 2.65 287.13 4770.24 2.54 64.42 456.00
+D+0. 750L +0.450W 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0:00 0.00
Length = 12.750 ft 1 0.428 0.323 1.60 1.000 1.00 1.00 1.00 1.00 0.96 18.83 2,039.90 4770.24 5.79 147.07 456.00
+D+0.750L-0.450W 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length = 12.750 ft 1 0.282 0.302 1.60 1.000 1.00 1.00 1.00 1.00 0.96 12.41 1,344.76 4770.24 5.43 137.82 456.00
+0.60D+0.60W 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length= 12.750 ft 1 0.193 0.135 1.60 1.000 1.00 1.00 1.00 1.00 0.96 8.50 920.75 4770.24 2.43 61.71 456.00
+0.60D-0.60W 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length = 12.750 ft 1 0.038 0.098 1.60 1.000 1.00 1.00 1.00 1.00 0.96 1.66 180.40 4770.24 1.76 44.74 456.00
+1.1 14D+0.70E 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Leng_th = 12.750 ft 1 0.208 0.156 1.60 1.000 1.00 1.00 1.00 1.00 0.96 9.16 992.60 4770.24 2.79 70.93 456.00
+1.114D-0.70E 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length = 12.750 ft 1 0.107 0.138 1.60 1.000 1.00 1.00 1.00 1.00 0.96 4.69 508.61 4770.24 2.49 63.12 456.00
+1.086D+0.750L +0.5250E 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length= 12.750 ft 1 0.404 0.307 1.60 1.000 1.00 1.00 1.00 1.00 0.96 17.76 1,924.87 4770.24 5.50 139.78 456.00
+1.086D+0.750L-0.5250E 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length = 12.750 ft 1 0.324 0.300 1.60 1.000 1.00 1.00 1.00 1.00 0.96 14.27 1,546.20 4770.24 5.39 136.84 456.00
+0.48580+0. ?OE 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length= 12.750 ft 1 0.126 0.090 1.60 1.000 1.00 1.00 1.00 1.00 0.96 5.54 600.23 4770.24 1.62 41.17 456.00
+0.48580-0. 70E 1.000 1.00 1.00 1.00 1.00 0.96 0.00 0.00 0.00 0.00
Length = 12750 ft 1 0.026 ·0.011 1.60 1.000 1.00 1.00 1.00 ·1.00 0:96 1.13 122.47 4770.24 1.27 32.20 456.00
Overall Maximum Deflections
Load Combination Span Max. "-" Defl Location in Span Load Combination Max. "+" Defl Location in Span
+D+L 0.4393 6.515 0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAX1mum
Overall MINimum
DOnly
+D+L
+D+0.750L
+D+0.60W
+D-0.60W
+D+0.750L +0.450W
+D+0.750L-0.450W
+0.60D+0.60W
+0.60D-0.60W
+D+0.70E
+D-0.70E
+D+0.750L +0.5250E
+D+0.750L-0.5250E
+0.60D+0.70E
+0.60D-0. ?OE
L Only
WOnly
-W
EOnly
E Only• -1.0
Support 1 Support 2
5.184 5.990
-0.999 0.467
1.772 1.937
5.184
4.331
2.371
1.173
4.780
3.881
1.663
0.464
2.099
1.445
4.576
4.086
1.390
0.736
3.412
0.999
-0.999
0.467
-0.467
5.990
4.977
1.338
2.536
4.528
5.427
0.563
1.762
1.610
2.264
4.732
5.222
0.835
1.489
4.053
-0.999
0.999
-0.467
0.467
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Tille:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-27
Project File: J22470 OPTION2.ec6
L C#: KW-06013959, Build: 0.21.11.30
DESCRIPTION: FB-3
Lovelace Engineering, Inc. (c) ENERCALC INC 1983--2021
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Wood Species
Wood Grade
Beam Bracing
Boise Cascade
Versa Lam 3100
Completely Unbraced
Fb +
Fb-
Fc -Prll
Fe • Perp
Fv
Ft
3,100.0 psi
3,100.0 psi
3,000.0psi
750.0psi
285.0psl
2,100.0psi
E : Modulus of Elasticity
Ebend-xx 2,000.0 ksi
Eminbend • xx 1,036.83ksi
Density 41.760pcf
D 0.08 7 I
I
3.5x11.25 ' ) A
Span =8.0 rt
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0160 ksf, Tributary Width= 5.0 ft, (EXT. WALL)
DESIGN SUMMARY
!Maxim~;; Bending Stress Ratio
j Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.044 1
3.5x11.25
118.87psi
2,707.01psi
DOnly
4.000ft
Span# 1
O in Ratio =
0 in Ratio=
0.010 in Ratio=
O in Ratio-=
Maximum Forces & Stresses for Load Combinations
Load Combination lli'lax S[ress Ra[1os
Segment Length Span# M V Cd CFN Ci Cr
D Only
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
0 <360
0 <360
9408>=240
()<240
Cm Ct
n/a
n/a
Span: 1 : D Only
n/a
lli'lomen! 'i7alues
CL M fb
= 0.054 : 1
3.5x11.25
= 13-.93 psi
= 256.50psi
DOnly
= 0.000ft
= Span# 1
Sfiear 'i7alues
F'b V fv F'v
0.00 0.00 0.00 0.00
Length= 8.0 ft 1 0.044 0.054 0.90 1.000 1.00 1.00 1.00 1.00 0.97 0:73 118.87 2707.01 0.37 13.93 256.50
+0.60D
Length ::: 8.0 ft 1 0.016 0.018
Overall Maximum Deflections
Load Combination
D-Only
Vertical Reactions
Load Combination
Overall MAX1mum
Overall MINimum
Span
1.000 1.00 1.00 1.00 1.00 0.97
1.60 1.000 1.00 1.00 1.00 1.00 0.92 0.44
Max."." Deft Location in Span Load Combination
0.0102 4.029
Support notation : Far left is #1
Support 1 Support 2
0.366 0.366
0.219 0.219
71.32
0.00 0.00 0.00 0.00
4555.64 0.22 8.36 456.00
Max. •+• Dell Location in Span
0.0000
Values in KIPS
0.000
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-3
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J22470
V-28
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
DOnly
+0.60D
Support 1 Support 2
0.366 0.366
0.219 0.219
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-29
Project File: J22470 OPTION2.ec6
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-4
Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
-Load Combination: ASCE 7-16
Fb+
Fb-
3,100.0psi
3,100.0 psi
3,000.0 psi
E : Modulus of Elasticity
Ebend-xx 2,000.0 ksi
Fc -Prll
Fe-Perp
Fv
Eminbend -xx 1,036.83 ksi
Wood Species
Wood Grade
Beam Bracing
Boise Cascade
Versa Lam 3100
Completely Unbraced
ljl(1.62){.i(1.48j
~
l
Ft
0(0.0\8662J Lt0.05332)
0(0.0186624 l (0.07998)
010.128\
750.0psi
285.0psi
2,100.0psi
0(0.1625J lr(0.13)
Density 41.760pcf
~ 3.Sx11.25 ~
Span= 12.750 ft
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load : D = 0.0160 ksf, Tributary Width = 8.0 ft, (EXT. WALL)
Uniform Load: D = 0.0250, Lr= 0.020 ksf, Extent= 3.750 --» 12.750 ft, Tributary Width= 6.50 ft, (ROOF)
Uniform Load: D = 0.0140, L = 0.060 ksf, Tributary Width= 1.333 ft, (DECK)
Uniform Load : D = 0.0140, L = 0.040 ksf, Tributary Width = 1.333 ft, (FLOOR)
Point Load : D = 1.820, Lr= 1.460 k @ 3. 750 ft, (RB-2)
DESIGN SUMMARY I Maximum Bending Stress Ratio I Section used for this span I fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.754 1
3;5x11.25
2,589.68psi
3,436.87psi
+D+0.750Lr+0.750L
5.026ft
Span# 1
0.179 in Ratio=
O in Ratio =
0.556 in Ratio =
O in Ratio =
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios
Segment Length Span# M V Cd CFN Cj Cr
DOnly
Length = 12.750 ft 1 0.620 0.435 0.90 1.000 1.00 1.00
+D+L 1.000 1.00 1.00
Length= 12.750 ft 1 0.714 0.505 1.00 1.000 1·.00 1.00
+D+Lr 1.000 1.00 1.00
Length= 12.750 ft 1 0.726 0.467 1.25 1.000 1.00 1.00
+D+0.750Lr+0.750L 1.000 1.00 1.00
Length= 12.750 ft 1 0.754 0.497 1.25 1.000 1.00 1.00
+D+0.750L 1.000 1.00 1.00
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Span: 1 : Lr Only
n/a
=
=
=
=
=
855>=360
0 <360
275 >=240
0 <240
Span: 1 : +D+0.750Lr+0.750L
nla
Momeni Values
Cm Ct CL M fb F'b
0.00
1.00 1.00 0.94 10.03 1,629.86 2629.59
1.00 1.00 0.94 0.00
1.00 1.00 0.93 12.65 2,056.71 2881.81
1.00 1.00 0.93 0.00
1.00 1.00 0.89 15.34 2,494.10 3436.87
1.00 1.00 0.89 0.00
1.00 1.00 0.89 15.93 2,589.68 3436.87
1.00 1.00 0.89 0.00
0.505 : 1
3.5x11.25
143.90psi
285.00psi
+D+L
0.000ft
Span# 1
Sfiear Values
V fv F'v
0.00 0.00 0.00
2.93 111.53 256.50
0.00 0.00 0.00
3.78 143.90 285.00
0.00 0.00 0.00
4.37 166.52 356.25
0.00 0.00 0.00
4.65 177.05 356.25
0.00 0.00 0.00
Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-30
Project File: J22470 OPTION2.ec6
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-4
Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
Maximum Forces & Stresses for Load Combinations
Load Combination Max S!ress Ra!1os 11.llomen! 17alues
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb
Length = 12.750 ft 1 0.604 0.414 1.15 1.000 1.00 1.00 1.00 1.00 0.91 11.99 1,949.23
+0.60D 1.000 1.00 1.00 1.00 1.00 0.91
Length= 12.750 ft 1 0.246 0.147 1.60 1.000 1.00 1.00 1.00 1.00 0.80 6.02 977.92
Overall Maximum Deflections
Load Combination Span Max. "-" Defl Location in Span Load Combination
0.5562 6.189 +D+0.750Lr.+0.750L
Vertical Reactions Support notation : Far left is #1
Load Combination
Overafl MAX1mum
Overall MINimum
DOnly
+D+L
+D+Lr
+D+0.750Lr+0.750L
+D+0.750L
+0.60D
Lr Only
LOnly
Support 1 Support 2
4.648 4.136
0.850 0.850
2.928 2.608
3.777 3.458
4.371 3.795
4.648 4.136
3.565 3.246
1.757 1.565
1.444 1.186
0.850 0.850
Sfiear 17alues
F'b V fv F'v
3229.66 3.56 135.81 327.75
0.00 0.00 0.00 0.00
3978.52 1.76 66.92 456.00
Max. "+" Defl Location in Span
0.0000 0.000
Values in KIPS
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-33
Project File: J224 70.ec6 I Wood Beam
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: (E) BEAM 2
Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
CODE REFERENCES
Calculations per NDS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set : ASCE 7-16
Material Properties
Analysis Method : Allowable Stress Design
Load Combination: ASCE 7-16
Fb +
Fb-
1,350.0 psi
1,350.0 psi
925.0psi
625.0psi
170,0 psi
675.0psi
E : Modulus of Elasticity
Ebend-xx 11600.0 ksi
Fc -Prll
Fe-Perp
Fv
Eminbend -xx 580.0ksi
I
Wood Species
Wood Grade
Beam Bracing
i I !
Douglas Fir-Larch
No.1
Completely Unbraced
L---. ---------
Ft
0.128 ..,
0 0.1875 Lr'0.15
0(0.1625 Lr 0.13 ..,
6x12
Span= 11.50ft
Density
-----------
31.210pcf
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Uniform Load: D = 0.0250, Lr= 0.020 ksf, Tributary Width = 6.50 ft, (ROOF)
Uniform Load : D = 0.0250, Lr = 0.020 ksf, Tributary Width= 7.50 ft, (ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width= 8.0 ft, (EXT. WALL)
9:-1;_S/GN SUMMARY ________________________ _
;Maximum Bending Stress Ratio = 0.760 1 Maximum Shear Stress Ratio =
Section used for this span 6x12
fb: Actual = 1,262.80psi
-Fb: Allowable
Load Combination
Location of maximum on span
Span # where· maximum occurs
=
=
1,661.90psi
+D+Lr
5.750ft
= Span# 1
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
0.099 in
O in
0.274 in
O in
Ratio =
Ratio=
Ratio=
Ratio=
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios
Segment Length Span # M V Cd CFN
DOnly
Length = 11.50 ft 1
+D+Lr
Length = 11.50 ft
+D+0.750Lr
Length = 11.50 ft 1
+0.600
Length = 11.50 ft 1
0.669 0.438 0.90 1.000
1.000
0.760 0.495 1.25 1.000
1.000
0.691 0.450 1.25 1.000
1.000
0.228 0.148 1.60 1.000
1.00 1.00
1'.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
1.00 1.00
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1388>=360
0 <360
503>=240
0 <240
Span: 1 : Lr Only
nla
Span: 1 : +D+Lr
nla
Momeni Values
M fb
1.00 1.00 0.99 8.13 804.61
1.00 1.00 0.99
1.00 1.00 0.98 12.76 1,262.80
1.00 1.00 0.98
1.00 1.00 0.98 11.60 1,148.25
1.00 1.00 0.98
1.00 1.00 0.98 4.88 482.77
=
=
=
=
F'b
0.00
1202.65
0.00
1661.90
0.00
1661.90
0.00
2114.75
V
0.00
2.83
0.00
4.44
0.00
4.03
0.00
1.70
0.495 : 1
6x12
105.23 psi
212.50 psi
+D+Lr
0.000ft
Span# 1
I I
__ _I
Sfiear Values
fv F'v
0.00 0.00
67.05 153.00
0.00 0.00
105.23 212.50
0.00 0.00
95.69 212.50
0.00 0.00
40.23 272.00
I Wood Beam
Lovelace Engineering, Inc.
10509Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: (E) BEAM 2
Overall Maximum Deflections
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
Load Combination Span Max. "-" Defl Location in Span Load Combination
+D+Lr 0.2739 5.792
BAIG RESIDENCE
A.S.
J22470
V-34
Project File: J22470.ec6
(c) ENERCALC INC 1983-2021
Max. "+" Defl Location in Span
0.0000 0.000
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAX1mum
Overall MINimum
DOnly
+D+Lr
+D+0.750Lr
+0.60D
Lr Only
Support 1 Support 2
4.437 4.437
1.610 1.610
2.827 2.827
4.437 4.437
4.035 4.035
1.696 1.696
1.610 1.610
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-35
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-5
Lovelace Engineering, Inc.
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
J22470
Project File: J22470 OPTION2.ec6
(c) ENERCALC INC 1983-2021
Material Properties
Analysis Method : Allowable Stress Design
-Load Combination: ASCE 7-16
Fb +
Fb-
3,100.0 psi
3,100.0 psi
3,000.0psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
Boise Cascade
Versa Lam 3100
Completely Unbraced
L ·--------·-
7x18
Span = 18.50 ft
Fc -Prll
Fe-Perp
Fv
Ft
750.0psi
285.0psi
2,100.0 psi
Ebend-xx 2,000.0ksi
Eminbend -xx 1,036.83 ksi
Density 41.760pcf
7x18
Span =3.0 ft
_____ l
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Beam self weight calculated and added to loads
Load for Span Number 1
Point Load : D = 2.608, Lr= 1.186, L = 0.850 k@ 5.0 ft, (FB-4)
Uniform Load: D = 0.0140, L = 0.040 ksf, Extent= 4.750 --» 18.50 ft, Tributary Width= 12.50 ft, (FLOOR)
Uniform Load: D = 0.0140, L = 0.060 ksf, Extent= 4.750 --» 18.50 ft, Tributary Width= 6.50 ft, (DECK)
Uniform Load: D = 0.0070 ksf, Extent= 9.0 --» 18.50 ft, Tributary Width= 8.0 ft, (INT. WALL)
Point Load : D = 2.827, Lr= 1.610 k@ 4.750 ft, ((E) BEAM 2)
Point Load : W = 3.747, E = 4.067 k@ 9.50 ft, (SHEAR WALL ABOVE)
Load for Span Number 2
Point Load : D = 1.937, L = 4.053, W = -1.0, E = -0.470 k@ 3.0 ft, (FB-2)
Uniform Load: D = 0.0140, L = 0.060 ksf, Tributary Width= 6.50 ft, (DECK)
Uniform Load: D = 0.0140, L = 0.040 ksf, Tributary Width= 12.50 ft, (FLOOR)
Uniform Load : D = 0.0070 ksf, Tributary Width = 8.0 ft, (INT. WALL)
Point Load : D = 2.461, Lr= 1.380 k@ 3.0 ft, ((E) BEAM 1)
Point Load : D = 0.370 k @ 3.0 ft, (FB-3)
Point Load: W = -3.747, E::; -4.067 k@ 2.750 ft, (SHEAR WALL ABOVE)
DESIGN SUMMe;,Ac..:.:R,_,__Y..._ ____________________ _ I Maximum Bending Stress Ratio
Section used for this span
fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
= 0.573 1
7x18
= 1,725.21 psi
= 3,011.65psi
+D+L +H, LL Comb Run (L*)
= 7.855ft
= Span# 1
Maximum Shear Stress Ratio
Section used for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Span: 2 : E Only• -1 .0
::; 0.590 : 1
7x18
= 168.05psi
= 285.00psi
+D+L +H, LL Comb Run (LL)
::; 18.500ft
::; Span# 1
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
0.135 in Ratio =
-0.165 in Ratio=
0.537 in Ratio =
-0.238 in Ratio=
532>=3.60
434>=360
413>=240
302>=240
Span: 2 : L Only, LL Comb Run (L•)
Max Upward Total Deflection
Span: 2: +D+0.750Lr+0.750L-0.450W+H, LL Comb Run
Span: 2: +D+0.750Lr+0.750L +0.450W+H, LL Comb Run
Project Title: BAIG RESIDENCE V-36 Engineer: AS.
Lovelace Engineering, Inc. Project ID: J22470
10509 Vista Sorrento Pkwy, Ste. 102 Project Descr:
San Diego, CA 92121
Project File: J22470 OPTION2.ec6
LIC#: KW-06013959, Build:20.21.11.30 Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
DESCRIPTION: FB-5
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios ll.llomen! 17alues Sfiear 17alues
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb F'b V fv F'v
+D+H 0.00 0.00 0.00 0.00
Length = 18. 50 ft 1 0.276 0.271 0.90 1.000 1.00 1.00 1.00 1.00 0.98 23.67 751.45 2721.70 5.84 69.57 256.50 Length = 3.0 ft 2 0.182 0.271 0.90 1.000 1.00 1.00 1.00 1.00 1.00 15.92 505.32 2780.98 5.84 69.57 256.50
+D+L +H, LL Comb Run (*L) 1.-000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0,00 0.00
Length = 18.50 ft 1 0.338 0.525 1.00 1.000 1.00 1.00 1.00 1.00 0.97 32.08 1,018.46 3011.65 12.57 149.60 285.00 Length = 3.0 ft 2 0.330 0.525 1.00 1.000 1.00 1.00 1.00 1.00 1.00 32.08 1,018.46 3088.80 12.57 149.60 285.00 +D+L+H, LL Comb Run (L*) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.573 0.553 1.00 1.000 1.00 1.00 1.00 1.00 0.97 54.34 1,725.21 3011.65 13.24 157.65 285.00
Length = 3.0 ft 2 0.164 0.553 1.00 1.000 1.00 1.00 1.00 1.00 1.00 15.92 505.32 3088.80 5.84 157.65 285.00 +D+L+H, LL Comb Run (LL) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.504 0.590 1.00 1.000 1.00 1.00 1.00 1.00 0.97 47.81 1,517.85 3011.65 14.12 168.05 285.00
Length = 3.0 ft 2 0.330 0.590 1.00 1.000 1.00 1.00 1.00 1.00 1.00 32.08 1,018.46 3088.80 12.57 168.05 285.00 +D+Lr+H, LL Comb Run (*L) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.192 0.241 1.25 1.000 1.00 1.00 1.00 1.00 0.96 22.54 715.47 3718.76 7.22 86.00 356.25
Length = 3.0 ft 2 0.165 0.241 1.25 1.000 1.00 1.00 1.00 1.00 1.00 20.06 636.74 3857.21 7.22 86.00 356.25
+D+Lr+H, LL Comb Run (L *) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.286 0.235 1.25 1.000 1.00 1.00 1.00 1.00 0.96 33.53 1,064.51 3718.76 7.04 83.81 356.25
Length = 3.0 ft 2 0.131 0.235 1.25 1.000 1.00 1.00 1.00 1.00 1.00 15.92 505.32 3857.21 5.84 83.81 356.25 +D+Lr+H, LL Comb Run (LL) 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length= 18.50 ft 1 0.277 0.241 1.25 1.000 1.00 1.00 1.00 1.00 0.96 32.42 1,029.27 3718.76 7.22 86.00 356.25 Length = 3.0 ft 2 0.165 0.241 1.25 1.000 1.00 1.00 1.00 1.00 1.00 20.06 636.74 3857.21 7.22 86.00 356.25
+D+S+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.218 0.212 1.15 1.000 1.00 1.00 1.00 1.00 0.96 23.67 751.45 3439.30 5.84 69.57 327.75 Length = 3.0 ft 2 0.142 0.212 1.15 1.000 1.00 1.00 1.00 1.00 1.00 15.92 505.32 3550.04 5.84 69.57 327.75 +D+0.750Lr+0.750L+H, LL Cc 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.266 0.398 1.25 1.000 1.00 1.00 1.00 1.00 0.96 31.15 988.74 3718.76 11.92 141.92 356.25
Length = 3.0 ft 2 0.256 0.398 1.25 1.000 1.00 1.00 1.00 1.00 1.00 31.15 988.74 3857.21 11 .92 141.92 356.25 +D+0.750Lr+0.750L+H, LL Cc 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.446 0.395 1.25 1,000 1.00 1.00 1.00 1:00 0.96 52.20 1,657.23 3718.76 11.81 140.63 356.25
Length = 3.0 ft 2 0.131 0.395 1.25 1.000 1.00 1.00 1.00 1.00 1.00 15.92 505.32 3857.21 5.84 140.63 356.25 +D+0.750Lr+0.750L+H, LL Cc 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length= 18-.50ft 1 0.400 0.422 1.25 1.000 1.00 1.00 1.00 1.00 0.96 46.90 1,488.80 3718.76 12.64 150.43 356.25 Length = 3.0 ft 2 0.256 0.422 1.25 1.000 1.00 1.00 1.00 1.00 1.00 31.15 988.74 3857.21 11.92 150.43 356.25
+D+0.750L+0.750S+H, LL Co1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.259 0.395 1.15 1.000 1.00 1.00 1.00 1.00 0.96 28.04 890.17 3439.30 10.89 129.59 327.75 Length = 3.0 ft 2 0.251 0.395 1.15 1.000 1.00 1.00 1.00 1.00 1.00 28.04 890.17 3550.04 10.89 129.59 327.75
+D+0.750L+0.750S+H, LL Co1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.424 0.409 1.15 1.000 1.00 1.00 1.00 1.00 0.96 45.9.6 1,459.01 3439.30 11.26. 134.08 327.75.
Length = 3.0 ft 2 0.142 0.409 1.15 1.000 1.00 1.00 1.00 1.00 1.00 15.92 505.32 3550.04 5.84 134.08 327.75 +D+0.750L+0.750S+H, LL Co1 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.381 0.433 1.15 1.000 1.00 1.00 1.00 1.00 0.96 41.31 1,311.27 3439.30 11.92 141.88 327.75 Length = 3.0 ft 2 0.251 0.433 1.15 1.000 1.00 1.00 1.00 1.00 1.00 28.04 890.17 3550.04 10.89 141.88 327.75 +O+0.60W+H 1.000 1.00 1.00 1.00 1.00 1.00 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.222 0.170 1.60 1.000 1.00 1.00 1.00 1.00 0.94 32.45 1,030.16 4650.51 6.50 77.42 456.00
Length = 3.0 ft 2 0.051 0.170 1.60 1.000 1.00 1.00 1.00 1.00 0.99 7.93 251 .90 4930.17 4.25 77.42 456.00 +D-0.60W+H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.163 0.227 1.60 1.000 1.00 1.00 1.00 1.00 0.94 23.90 758.73 4650.51 8.69 103.47 456.00 Length = 3.0 ft 2 0.154 0.227 1.60 1.000 1.00 1.00 1.00 1.00 0.99 23.90 758.73 4930.17 8.69 103.47 456.00
+D+0. 750Lr+0.750L +0.450W➔ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00 Length= 18.50 ft 1 0.173 0.255 1.60 1.000 1.00 1.00 1.00 1.00 0.94 25.30 803.02 4650.51 9.78 116.48 456.00 Length = 3.0 ft 2 0.162 0.255 1.60 1.000 1.00 1.00 1.00 1.00 0.99 25.16 798.68 4930.17 9.78 116.48 456.00 +D+0.750Lr+O. 750L +0.450W➔ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.415 0.323 1.60 1.000 1.00 1.00 1.00 1.00 0.94 60.74 1,928.18 4650.51 12.36 147.08 456.00 Length = 3.0 ~ 2 0.064 0.323 1:60 1.000 1.00 1.00 1.00 1.00 0.99 9.93 315.25 4930.17 4.40 147.08 456.00 +D+0.750Lr+0.750L+0.450W➔ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.372 0.344 1.60 1.000 1.00 1.00 1.00 1.00 0.94 54.46 1,728.90 4650.51 13.18 156.88 456,00 Length = 3.0 ft 2 0.162 0.344 1.60 1.000 1.00 1.00 1.00 1.00 0.99 25.16 798.68 4930.17 9.78 156.88 456.00 +D+0. 750Lr+O. 750L-0.450W+ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00 Length = 18.50 ft 1 0.253 0.367 1.60 1.000 1.00 1.00 1.00 1.00 0.94 37.13 1,178.80 4650.51 14.06 167.35 456.00
Project Title: BAIG RESIDENCE V-37 Engineer: A.S.
Lovelace Engineering, Inc. Project ID: J22470
10509 Vista Sorrento Pkwy, Ste. 102 Project Descr:
San Diego, CA 92121
Project File: J22470 OPTION2.ec6
UC#: KW-06013959, Build:20.21.11.30 Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
DESCRIPTION: FB-5
Maximum Forces & Stresses for Load Combinations
Load Combination Max Stress Ratios Momenf 'i7alues Sfiear 'i7alues
Segment Length Span# M V Cd CFN Ci Cr Cm C t CL M fb F'b V fv F'v
Length = 3.0 ft 2 0.239 0.367 1.60 1.000 1.00 1.00 1.00 1.00 0.99 37.13 1,178.80 4930.17 14.06 167.35 456.00
+D+0.750Lr+0.750L-0.450W+ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length= 18.50 ft 1 0.307 0.294 1.60 1.000 1.00 1.00 1.00 1.00 0.94 45.02 1,429.17 4650.51 11.27 134.17 456.00
Length = 3.0 ft 2 0.141 0.294 1.60 LOCO 1.00 1.00 1.00 1.00 0.99 21.90 695.38 4930.17 7.98 134.17 456.00
+O+O. 750Lr+O. 750L-0.450W+ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft . 1 0.278 0.367 1.60 1.000 1.00 1.00 1.00 1.00 0.94 40.66 1,290.78 4650.51 14.06 167.35 456.00
Length = 3.0 ft 2 0.239 0.367 1.60 1.000 1.00 1.00 1.00 1.00 0.99 37.13 1,178.80 4930.17 14.06 167.35 456.00
+O+O. 750L +0.750S+0.450W+ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.178 0.228 1.60 1.000 1.00 1.00 1.00 1.00 0.94 26.14 830.00 4650.51 8.75 104.16 456.00
Length = 3.0 ft 2 0.142 0.228 1.60 1.000 1.00 1.00 1.00 1.00 0.99 22.05 700.11 4930.17 8.75 104.16 456.00
+0+0.750L +0.750S+0.450W+ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.376 0.308 1.60 1.000 1.00 1.00 1.00 1.00 0.94 55.14 1,750.51 4650.51 11.80 140.53 456.00
Length = 3.0 ft 2 0.064 0.308 1.60 1.000 1.00 1.00 1.00 1.00 0.99 9.93 315.25 4930.17 4.40 140.53 456.00
+O+O. 750L +O. 750S+0.450W+ 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.339 0.325 1.60 1.000 1.00 1.00 1.00 1.00 0.94 49.72 1,578.29 4650.51 12.46 148.33 456.00
Length = 3.0 ft 2 0.142 0.325 1.60 1.000 1.00 1.00 1.00 1.00 0.99 22.05 700.11 4930.17 8.75 148.33 456.00
+O+O. 750L +0.750S-0.450W+I 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.232 0.340 1.60 1.000 1.00 1.00 1.00 1.00 0.94 34.03 1,080.23 4650.51 13.02 155.02 456.00
Length = 3.0 ft 2 0.219 0.340 1.60 1.000 1.00 1.00 1.00 1.00 0.99 34.03 1,080.23 4930.17 13.02 155.02 456.00
+D+O. 750L +0.750S-0.450W+I 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.260 0.280 1.60 1.000 1.00 1.00 1.00 1.00 0.94 38.12 1,210.28 4650.51 10.72 127.62 456.00
Length = 3.0 ft 2 0.141 0.280 1.60 1.000 1.00 1.00 1.00 1.00 0.99 21.90 695.38 4930.17 7.98 127.62 456.00
+D+0.750L +0.750S-0.450W+I 1.000 1.00 1.00 1.00 • 1.00 0.99 0.00 0.00 0.00 0.00
Length= 18.50 ft 1 0.234 0.340 1.60 1.000 1.00 1.00 1.00 1.00 0.94 34.24 1,087.13 4650.51 13.02 155.02 456.00
Length = 3.0 ft 2 0.219 0.340 1.60 1.000 1.00 1.00 1.00 1.00 0.99 34.03 1,080.23 4930.17 13.02 155.02 456.00
+0.600+0.60W+0.60H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.170 0.118 1.60 1.000 1.00 1.00 1.00 1.00 0.94 24.95 792.16 4650.51 4.51 53.71 456.00
Length = 3.0 ft 2 0.010 0.118 1.60 1.000 1.00 1.00 1.00 1.00 0.99 1.57 49.77 4930.17 2.31 53.71 456.00
+0.60D-0.60W+0.60H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.120 0.166 1.60 1.000 1.00 1.00 1.00 1.00 0.94 17.53 556.60 4650.51 6.35 75.65 456.00
Length = 3.0 ft 2 0.113 0.166 1.60 1.000 1.00 1.00 1.00 1.00 0.99 17.53 556.60 4930.17 6.35 75.65 456.00
+1.114D+0.70E+0.60H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.256 0.193 1.60 1.000 1.00 1.00 1.00 1.00 0.94 37.45 1,188.74 4650.51 7.41 88.19 456.00
Length = 3.0 ft 2 0.057 0.193 1.60 1.000 1.00 1.00 1.00 1.00 0.99 8.92 283.17 4930.17 5:08 88.19 456.00
+1.1140-0.70E+.0.60H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.181 0.253 1.60 1.000 1.00 1.00 1.00 1.00 0.94 26.55 842.91 4650.51 9.69 115.32 456.00
Length = 3.0 ft 2 0.171 0.253 1.60 1.000 1.00 1.00 1.00 1.00 0.99 26.55 842.91 4930.17 9.69 115.32 456.00
+1.0860+0. 750L +O. 750S+0.5: 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.201 0.235 1.60 1.000 1.00 1.00 1.00 1.00 0.94 29.45 934.94 4650.51 9.00 107.20 456.00
Length = 3.0 ft 2 0.147 0.235 1.60 1.000 1.00 1.00 1.00 1.00 0.99 22.79 723.56 4930.17 9.00 107.20 456.00
+1.0860+0. 750L +O. 750S+0.5: 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.403 0.325 1.60 1.000 1.00 1.00 1.00 1.00 0.94 58.96 1,871.85 4650.51 12.46 148.30 456.00
Length = 3.0 ft 2 0.069 0.325 1.60 1.000 1.00 1.00 1.00 1.00 0.99 10.67 338.71 4930.17 5.02 148.30 456.00
+1.0860+0. 750L +O. 750S+0.5: 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.365 0.342 1.60 1.000 1.00 1.00 1.00 1.00 0.94 53.47 1,697.40 4650.51 13.11 156.11 456.00
Length = 3.0 ft 2 0.147 0.342 1.60 1.000 1.00 1.00 1.00 1.00 0.99 22.79 723.56 4930.17 9.00 156.11 456.00
+1.0860 +0. 750L +0.750S-0.52 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.246 0.359 1.60 1.000 1.00 1.00 1.00 1.00 0.94 36.02 1,143.37 4650.51 13.77 163.91 456.00
Length = 3.0 ft 2 0.232 0.359 1.60 1.000 1.00 1.00 1.00 1.00 0.99 36.02 1,143.37 4930.17 13.77 163.91 456.00
+1.0860+0. 750L +O. 750S-0.5L 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.263 0.287 1.60 1.000 1.00 1.00 1.00 1.00 0.94 38.54 1,223.53 4650.51 10.98 130.71 456.00
Length = 3. 0 ft 2 0.154 0.287 1.60 1.000 1.00 1.00 1.00 1.00 0.99 23.89 758.51 4930.17 8.73 130.71 456.00
+1 .0860+0. 750L +O. 750S-0.5L 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length = 18.50 ft 1 0.246 0.359 1.60 1.000 1.00 1.00 1.00 1.00 0.94 36.02 1,143.37 4650.51 13.77 163.91 456.00
Length = 3.0 ft 2 0.232 0.359 1.60 1.000 1.00 1.00 1.00 1.00 0.99 36.02 1,143.37 4930.17 13.77 163.91 456.00
+0.4858D+0.70E+H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Length= 18.50 ft 1 0.179 0.112 1.60 1.000 1.00 1.00 1.00 1.00 0.94 26.15 830.23 4650.51 4.28 50.95 456.00
Length = 3.0 ft 2 0.007 0.112 1.60 1.000 1.00 1.00 1.00 1.00 0.99 1.08 34.41 4930 .17 2.03 50.95 456.00
+0.48580-0.70E+H 1.000 1.00 1.00 1.00 1.00 0.99 0.00 0.00 0.00 0.00
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project Title:
Engineer:
Project ID:
Project Descr:
BAIG RESIDENCE
A.S.
J22470
V-38
Project File: J22470 OPTION2.ec6
LIC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-5
Lovelace Engineering, Inc. (c) ENERCALC INC 1983-2021
Maximum Forces & Stresses for Load Combinations
Load Combination l'Jlax Sfress Raflos l'illomenf IJalues Sfiear IJalues
Segment Length Span# M V Cd CFN Ci Cr Cm Ct CL M fb F'b V fv F'v
Length = 18.50 ft 1 0.113 0.157 1.60 1.000 1.00 1.00 1.00 1.00 0.94 16.55 525.33 4650.51 6.01 71.60 456.00
Length = 3.0 ft 2 0.107 0.157 1.60 1.000 1.00 1.00 1.00 1.00 0.99 16.55 525.33 4930.17 6.01 71.60 456.00
Overall Maximum Deflections
Load Combination Span Max."-" Defl Location in Span Load Combination Max. "+" Dell Location in Span
0.0000 0.000 +D+0.750Lr+0.750L+0.450W+H, l 1
2
0.5371
0.0000
8.992
8.992 +D+0.750Lr+0.750L+0.450W+H, l -0.2384 3.000
Vertical Reactions
Load Combination
Overall MAXimum
Overall MINimum
+D+H
+D+L+H, LL Comb Run (*L)
+D+L +H, LL Comb Run (L *)
+D+L +H, LL Comb Run (LL)
+D+Lr+H, LL Comb Run (*L)
+D+Lr+H, LL Comb Run (L •)
+D+Lr+H, LL Comb Run (LL)
+D+S+H
+D+0.750Lr+0.750L+H, LL Comb Run(*
+D+0.750Lr+0.750L+H, LL Comb Run (L
+D+O. 750Lr+O. 750L +H, LL Comb Run (L
+D+0.750L+0.750S+H, LL Comb Run (*L
+D+0.750L+0.750S+H, LL Comb Run (L*
+D+0.750L +0.750S+H, LL Comb Run (LL
+D+0.60W+H
+D-0.60W+H
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L+0.450W+H, LL Comb
+D+0.750Lr+0.750L-0.450W+H, LL Comb
+D+0.750Lr+0.750L-0.450W+H, LL Comb
+D+0.750Lr+0.750L-0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S+0.450W+H, LL Comb
+D+0.750L +0.750S+0.450W+H, LL Comb
+D+0.750L+0.750S-0.450W+H, LL Comb
+D+0.750L+0.750S-0.450W+H, LL Comb
+D+0.750L+0.750S-0.450W+H, LL Comb
+0.60D+0.60W+0.60H
+0.60D-0.60W+0.60H
+D+0.70E+0.60H
+D-0.70E+0.60H
+D+0.750L+0.750S+0.5250E+H, LL Comb
+D+0.750L +0.750S+0.5250E+H, LL Comb
+D+0.750L +0.750S+0.5250E+H, LL Comb
+D+0.750L +0.750S-0.5250E+H, LL Comb
+D+0.750L +0.750S-0.5250E+H, LL Comb
+D+0.750L +0.750S-0.5250E+H, LL Comb
+0.60D+0.70E+H
+0.60D-O. 70E+H
D Only
Lr Only, LL Comb Run (*L)
Lr Only, LL Comb Run (L')
Lr Only, LL Comb Run (LL)
L Only, LL Comb Run (*L)
L Only, LL Comb Run (L *)
L Only, LL Comb Run (LL)
Support notation : Far left is #1 Values in KIPS
Support 1 Support 2 Support 3
11.544 26.683
-2.659 3.129
4.978 11.166
4.104 18.763
10.146 19.086
9.272 26.683
4.754 12.770
7 .040 11.900
6.816 13.504
4.978 11.166
4.155 18.067
10.400 17.657
9.577 24.557
4.322 16.864
8.854 17.106
8.198 22.804
6.503 9.041
3.452 13.292
5.298 16.473
11.544 16.063
10.721 22.963
3.011 19.661
9.256 19.250
8.433 26.151
5.466 15.270
9.998 15.512
9.342 21.210
3.178 18.458
7.710 18.700
7.054 24.398
4.512 4.575
1.461 8.825
6.839 8.976
3.1 16 13.357
5.719 15.221
10.250 15.463
9.595 21.161
2.926 18.507
7.458 18.749
6.802 24.447
4.848 4.509
1.125 8.890
4.978 11.166
-0.224 1.604
2.062 0.734
1.838 2.338
-0.874 7.597
5.168 7.920
4.294 15.516
Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
LIC# : KW-06013959, Build:20.21.11.30
DESCRIPTION: FB-5
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAIG RESIDENCE
A.S.
J2247O
V-39
Project File: J22470 OPTION2.ec6
(c) NERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
WOnly
-W
EOnly
E Only* -1.0
HOnly
Support 1 Support 2 Support 3
2.542 -3.542
-2.542 3.542
2.659 -3.129
-2.659 3.129
L-1
~ LOVELACE BAIG RESIDENCE A.S.
ENGINEERING TNT DESIGN BUILD 11/18/2022
STRUCTURAL t NG/NE.ERI NG 5'ERVICES J22470 Page:
SEISMIC WEIGHT
Level 2 ROOF Typical Plate Ht. {ft.) 8
Element Type Dead Load (psf) Area (sf) Weight
Diaphragm ROOF I 25 2100 52500
Diaphragm I 0
Diaphragm 0
Dead Load (psf) Length (ft.) Weight
Wall EXTERIOR
I
16 200 25600
Wall INTERIOR 7 171 9576
Wall 0
Dead Load (lbs.) Weight
Misc./ Concentrated 0
Total Weight (lbs.) 87676 Seismic Weight (lbs.) 70088
Level 1 FLOOR Typical Plate Ht. (ft.) 9
Element Type Dead Load (psf) Area (sf) Weight
Diaphragm FLOOR 14 1500 21000
Diaphragm DECK 0
Diaphragm ROOF 25 1400 35000
Dead Load (psf) Length (ft.) Weight
Wall EXTERIOR 16 250 36000
Wall INTERIOR 7 150 9450
Wall 0
Dead Load (lbs.) Weight
I Misc./ Concentrated I 0
Total 101450 Seismic Weight 96313
AME11CAN SOC!ffi' OF ClVII. El'.'G!Nffi\S
Address:
2055 Chestnut Ave
Carlsbad, California
92008
. ',.
Jd
u, '·
I • •
., ,., ... ,
, .. ,···
,., ., ,. '
Wind
Results:
Wind Speed
10-year MRI
25-year MRI
50-year MRI
100-year MRI
Data Source:
Date Accessed:
L-2
ASCE 7 Hazards Report
Standard: ASCE/SEI 7-16
Risk Category: II
Soil Class: D -Default (see
Section 11.4.3)
• I
96Vmph
66 Vmph
72 Vmph
77Vmph
82 Vmph
.' ·'
'I .1,\
Latitude: 33.16163
Longitude: -117.324815
Elevation: 243.59 ft (NAVO 88)
1 .. r,.\I!
'I'..
ASCE/SEI 7-16, Fig. 26.5-1B and Figs. CC.2-1-CC.2-4, and Section 26.5.2
Mon Nov 14 2022
,,,u '
Value provided is 3-second gust wind speeds at 33 ft above ground for Exposure C Category, based on linear
interpolation between contours. Wind speeds are interpolated in accordance with the 7-16 Standard. Wind speeds
correspond to approximately a 7% probability of exceedance in 50 years (annual exceedance probability=
0.00143, MRI = 700 years).
Site is not in a hurricane-prone region as defined in ASCE/SEI 7-16 Section 26.2.
https://asce 7hazardtool .online/ Page 1 of 3 Mon Nov 14 2022
AJ'1tll!CAN SOC!EIY ~F CIVIi. ENG!,/f.l:11S
Seismic
Site Soil Class: D -Default (see Section 11.4.3)
Results:
1.02
0.372
1.2
F.: N/A
SMs 1.224
S 01
TL :
PGA:
PGAM:
FPGA
N/A
8
0.447
0.537
1.2
SMt N/A le : 1
Sos 0.816 Cv : 1.304
Ground motion hazard analysis may be required. See ASCE/SEI 7-16 Section 11.4.8.
Data Accessed: Mon Nov 14 2022
Date Source: usGs Seismic Design Maps
https:/lasce 7hazardtool.online/ Page 2 of 3
L-3
Mon Nov 14 2022
I~ LOVELACE ~ ENGINEERING
STRUCTU~AL CNCINCCRIN~ ~CRV ICC5
Overall Ht.
20.5
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
SEISMIC BASE SHEAR 11
Period Calculation
System Ct
All Other Systems 0.02
X
0.75
Ts= 0.586 s 1.5* Ts= 0.878941176
Level
2
1
Ta.= C::h:i Ta= 0.193 s
TL= 8 s
Base Shear
System R Omega Cd
Wood Shear Walls
Site Class: CO
SOS=~
SDl = 0.478
Sl = I 0.372 J
6.5 2.5
Vertical Distribution
•w~.h;
G: = c~•xv C:vx= n , k
~i=1 "'·thi
ht. (ft.) wx(lbs.) hx k
1
11 70088 20.5 1
9.5 96313 9.5 1
20.5 ft.
Cs =
W=
V=
4.5 1.0
0.126
166.401 k
20.89 k
Total Base Shear
wx*hx"k Cvx
1436804 0.61094385
914973.5 0.38905615
2351777.5
l I
I
A.S.
11/18/2022
Page:
per ASCE 7, Fig. 22-14
per ASCE 712.8.1.1
Fx
k
12.8 k
8.1 k
L-4
I~ LOVELACE PROJECT : BAIGRESIDENCE
~ ENGINEERING CLIENT: TNT DESIGN BUILD
,, •• , .... , ,.,,. """"'" ,..,.,., JOB NO.: J22470 DATE:
Wind Analysis for Low-rise Building, Based on 2018 IBC/ASCE 7-16
INPUT DATA
Exposure category (B, c or D, ASCE 7-16 26.7.3)
Importance factor (ASCE 7-16 Table 1.5-2)
Basic wind speed (ASCE 7-16 26.5.1 or 2018 IBC)
Topographic factor (ASCE 7-16 26.8 & Table 26.8-1)
Building height to eave
Building height to ridge
Building length
Building width, including overhangs
Overhang sloped width
C
lw = 1.00 for all Category
V = 96 mph, (154.50 kph)
K,, = 1 Flat
he = 17 ft, (5.18 m)
h, = 25 ft, (7. 62 m)
L = 67.5 ft, (20.57 m)
B = 53 ft, (16.15 m)
1.5 ft, (0.46 m)
PAGE:
DESIGN BY : AS
REVIEW BY:
Effective area of components (or Solar Panel area) 12 tt2, <= Overhang? (Yes or No) No
1.12 m2)
DESIGN SUMMARY
Max horizontal force normal to building lengtti, L, face
Max horizontal force normal to building length, B, face
Max total horizontal torsional load
22.31 kips, (99 kN), SD level (LRFD level), Typ.
17.81 kips, (79 kN)
Max total upward force
ANALYSIS
Velocity pressure
qh = 0.00256 Kz Kzt K.t Ko V2
154.12 ft-kips, (209 kN·m)
59.71 l<ips, (266 kN)
18.21 pst
where: % = velocity pressure at mean roof height, h. (Eq. 26.10-1 page 268)
K2 = velocity pressure exposure coefficient evaluated at height, h, (Tab. 26.10-1, pg 268)
Kd = wind directionality factor. (Tab. 26.6-1, for building, page 266)
h = mean roof height
0.91
0.85
21.00 fl
L-5
K0 = ground elevation factor. (1.0 per Sec. 26.9, page 268) < 60 ft, [Satisfactory)
~---<_M_ln~(_L~, B), [Satisfactory)
(ASCE 7-16 26.2.1)
(ASC~ 7-16 26.2.2)
Design pressures for MWFRS
p = qh ((G Cpt )-(G Cpl )]
where: p = pressure in appropriate zone. (Eq. 28.3-1, page 311). Pm1n = 16 psf (ASCE 7-16 28.3.4)
G Cp r = product of gust effect factor and external pressure coefficient, see table below. (Fig. 28.3-1, page 312 & 313)
G Cp 1 = product of gust effect factor and internal pressure coefficient.Cf ab. 26.13--1, Enclosed Building, page 271)
= 0.18 or -0.18
a= width of edge strips, Fig 28.3-1, page 312, MAX[ MIN(0.1B, 0.1L, 0.4h), MIN(0.048, 0.04L), 3] = 5.30 ft
Net Pressures (psf), Basic Load Cases Net Pressures (psf), Torsional Load Cases
Roof angfe El" = 16.80 Roof angle 0 = 0.00 Roof an lie 0 = 1"6.80
Surface Net Pressure wllh Net Pressure with GCpr (+GCpi) (-GC0 i) GCpr (+GC0 i) (-GC0i)
Surface GCpr Net Pressure with
(+GC01) (-GC01 )
1 0.50 5.87 12.42 -0.45 -11.47 ·4.92 1T 0.50 1.47 3.11
2 -0.69 -15.84 -9.29 -0.69 -15.84 -9.29 2T -0.69 -3.96 -2.32
3 -0.46 -11.59 -5.04 -0.37 -10.01 -3.46 3T -0.46 -2.90 -1.26
4 -0.40 -10.56 -4.01 -0.45 -11 .47 -4.92 4T -0.40 -2.64 -1 .00
5 0.40 4.01 10.56 Roof an Jle e = 0.00
6 -0.29 -8.56 -2.00
1E 0.76 10.55 17.1 1 -0.48 -12.02 -5.46
Surface GCpr Net Pressure with
(+GC01) (-GCpi)
2E -1.07 -22.76 -16.21 -1.07 -22.76 -16.21 5T 0.40 1.00 2.64
3E -0.66 -15.22 -8.66 -0.53 -12.93 -6.37 6T -0.29 -2.14 -0.50
4E -0.60 -14.12 -7.56 -0.48 -12.02 -5.46
5E 0.61 7.83 14.39
6E -0.43 -11.11 -4.55
Load Case A (Transverse) Load Case B (Longitudinal) Load Cose A (Transverse) Load Case B (Longitudinal)
Basic Load Cases Torsional Load Coses
L-6
Basic Load Case A (Transverse Direction) Basic Load Case B Longitudinal Direction)
Area Pressure (kl with Area Pressure (kl with Surface {ft') (+GC01) (-GC01) Surface (tt') (+GC0i) (-GC01 )
1 967 5.68 12.02 Poverhang = -12.75 psf 2 1575 -24.95 -14.63
2 1575 -24.95 -14.63 (ASCE 7-16 28.3.3) 3 1575 -15.77 -5.45
3 1575 -18.26 -7.93 5 924 3.70 9.76
4 967 -10.22 -3.88 6 924 -7.91 -1.85
1E 180 1.90 3.08 2E 293 -6.68 -4.76
2E 293 -6.68 -4.76 3E 293 -3.79 -1.87
3E 293 -4.47 -2.54 SE 189 1.48 2.71
4E 180 -2.54 -1.36 6E 189 -2.10 -0.86
~ Horiz. 17.76 17.76 ~ Horiz. 15.19 15.19
Vert. -52.03 -28.58 Vert. -39.58 -17.44
Min.wind Horlz. 22.68 22.68 Min. wind Horlz. 17.81 17.81
28.4.4 Vert. -57.24 -57.24 28.4.4 Vert. -57.24 -57.24
Torsional Load Case A (Transverse Direction) Torsional Load Case B (Longitudinal Direction)
Area Pressure (kl with Torsion lft-kl Area Pressure lk) with Torsion (ft-kl Surface (ft') (+GC01) (-GC01) (+GC01) (-GC0i) Surface (tt') (+GC01) (-GC01) (+GC0i) (-GC0i)
1 394 2.31 4.89 33 70 2 1575 -24.95 -14.63 -19 -11
2 641 -10.15 -5.95 -42 -24 3 1575 -15.77 -5.45 12 4
3 641 -7.43 -3.23 31 13 5 368 1.47 3.88 15 39
4 394 -4.16 -1.58 59 22 6 368 -3.15 -0.74 32 7
1E 180 1.90 3.08 54 88 2E 293 -6.68 -4.76 60 43
2E 293 -6.68 -4.76 -55 -39 3E 293 -3.79 -1.87 -34 -17
3E 293 -4.47 -2.54 37 21 SE 189 1.48 2.71 35 65
4E 180 -2.54 -1.36 72 39 6E 189 -2.10 -0.86 50 20
1T 574 0.84 1.78 -14 -30 5T 557 0,56 1.47 -7 -18
2T 934 -3.70 -2.17 18 11 6T 557 -1.19 -0.28 -15 -3
3T 934 -2.71 -1.18 -13 -6 Total Horlz. Torsional Load, Mr 128.9 128.9
4T 574 -1.52 -0.57 -26 -10
Total Horiz. Torsional Load, Mr 154 154
Design pressures for components and cladding --.1r----7t ~r2~k kt1"-;3!
p == qh[ (G c0) -(G c0dJ I r--, I I I I I
5 I 5 I I .,__ I I I I I I
where: p = pressure on component. (Eq. 30.3-1 , pg 334) 0 °""f 15 5 11.""~~ 2 I 1 I 1 I I 2.i-12,-2,1 -12,
a I I I I I • I I • I
Pm1n = 16.00 psf (ASCE 7-16 30.2.2) I I I I I,§ I I ,§ I
0 I L---'--+-I I I I
G C0 = external pressure coefficient L.L---;;-,;:'J; 3.6h f-1---l-fr'7n"°!.i; Walls .6h ;i. 2n Jr ~ see table below. (ASCE 7-16 30.3.2)
8= 16.80 0 Roof fh,;• Roof 8>7"
Effective Zone 1 Zone 1' Zone 2 Zone2e Zone 2n Zone 21
Area (fr) GCp -GCp GCp -GCp GCp -GCp GCp -GCp GCp -GCp GCp -GCp
Comp. 12 0.52 -2.00 ----0.52 -2.00 0.52 -2.89 0.52 -2.89
Effective Zone 3 Zone le Zone 3, Zone 4 Zone &
Area (fr) GCp -GCp GCp -GCp GCp -GCp GCp -GCp GCp -GCp
12 --0.52 -2.89 0.52 -3.46 0.99 -1 .09 0.99 -1.37
Zone1 Zone 1' Zone 2 Zone 2& Zone 2n Zone2r
Comp. & Cladding Positive Negative ~iuve Ncgatlvrt Poslt/W: N~alm Po,/rlve Negal/ve Postrlve Negative Posit/tu: Neaarlll•
Pressure 16.00 -39.70 16.00 -39.70 16.00 -55.84 16.00 -55.84
(psf) Zone 3 Zone le Zone 3r Zone, Zone«;
Po~tlve lffgallve ~-N~•Uv,: ~-~•Im Po:sltlVft N~atlve Po•ltlve Negatln (The Max Pressure
16.00 -55.84 16.00 -66.23 21.23 -23.05 21.23 -28.26 66.23 psf)
l-7
~ BAIG RESIDENCE A.S. LOVELACE TNT DESIGN BUILD 11/18/2022 ENGINEERING
STRVCTVRAL fNOlrlEE.RlH SER\'/C~!,. J22470 Page:
LATERAL STORY FORCES II
Seismic
Level Fx (lbs.) Diaphragm Area (sf) ASD Story Load (psf)
0 0,7
2 12762 2100 0.7 4.3
1 8127 2900 0.7 2.0
Wind
Direction N-S A-D
Force = 17.81 k Pressure = 17.4 psf
Level Ht. length area Trib. Ht. ASO diaph. load
Ridge/Parapet 6.5 36.5 237.25 3.25 0.6 plf
2 8.5 36.5 310.25 10.75 0.6 112 plf
1 9,5 50 475 9 0,6 94 plf
1022.5 sf
Direction E-W 1-6
Force = 22.31 k Pressure= 14.9 psf
Level Ht. length area Trib. Ht. ASD diaph. Load
Ridge/Parapet 6.5 57 370.5 3.25 0.6 plf
2 8,5 57 484.5 10.75 0.6 96 plf
1 9.5 67.5 641.2:5 9 O.& 81 plf
1496.25 sf
I I I I I I I
I I I I I I I
1~ LOVELACE ~ ENGINEERING
STRUCTURAL. ENC1NEERt NC SERVICES
BAIG RESIDENCE
TNT DESIGN BUILD
122470
level Name
Level#
Lateral Line
ROOF
2
D
Direction
N-S
A.S.
11/18/2022
Page:
WOOD SHEARWALL ANALYSIS & DESIGN II
Area
j
1
2
3
4
SEISMIC LOAD
sos = 0.816
p = 1.0
Story Load 4.3
SF Factor
220 1.0
Total/2 = Seismic Load
psf
Load (lbs}
"11
Load Type L Worst Case
Load (plf} 112
Length L (ft.)
Load L (lbs.) 0
468 lbs. Total/2 = Wind Load
ADDITIONAL SEISMIC LOAD ADDITIONAL WIND LOAD
Line
Segment
L
H
H/L Ratio
Load Ratio
Load E
Adj. Load E
LoadW
Adj. LoadW
Unit Shear E
Unit Shear w·
OTM E
OTMW
Waif Weight
Wall UOL
Unit. DL
Concen. OL
COL loc.
OLMoment
DLMorn. E
DLMorn. W
Net OT E
NetOTW
Uplift E
Add. UpllftE
UpliftW
Add. Uplift W
Tot. Uplift E
Tot. Uplift W
HOii
Load (lbs.) Offset Factor
Total Add. Load
Total Seismic Load-=
l
13
8
0.6
LOO
468
955
682
36
52
Max Shear
3744
7640
16
128
14
11999
5829
7199
·2085
440
-160
34
-160.
34 •
52
Adjust. Load
0
-468 lbs.
SHEAR
PLF I USE#
OVERTURNING
UPLIFT
• -No HD required, by inspection
•• -See Perforated/ Force-Transfer Shearwall calculation
Line Load (lbs.)
Total Wind Load~
1 Shear Wall
WIND LOAD
Load Type R
Load (plf)
Length R (ft.)
Load R (lbs.)
955 lbs.
Offset Factor Adjust. Load
Total Add. Load 0
955 -lbs.
Worst Case
112
17
1910
Total Shear
Length (ft.)
13
lbs.
lbs.
lbs.
lbs.
plf
plf
Capacity= 260 pit
#-ft.
#-ft.
psf
plf
plf
lbs.
ft.
#-ft.
#-ft.
#-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
L-8
Byl\ttio
CSC1306...3
I~ LOVELACE
II""" ~ ENGINEERI G
STP.UCT\.IRAL :"NCINE!=RINC SERVICES
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
level Name
Level#
Lateral Line
ROOF
2
E
Direction
N-S
A.S.
11/18/2022
Page:
WOOD SHEARWALLANALYSIS & DESIGN 11
Area
1
2
3
4
SEISMIC LOAD
sos = 0.816
p = 1.0
Story Load 4.3
SF Factor
245 1.0
Total/2 = Seismic load
psf
Load (lbs)
1M11
Load Type L Worst Case
Load (plf) 112
length L (ft.) 17
Load L(lbs.) 1910
521 lbs. Totaf/2 = Wind load
ADDITIONAL SEISMIC LOAD ADDITIONAL WIND LOAD
line
Segment
L
H
H/L·Ratio
Load Ratio
load E
Adj. load E
loadW
Adj.loadW
Unit Shear E
UnitShearW
OTM E
OTMW
Wall Weight
Wall UDL
Unif. DL
Concen. DL
CDL loc.
DLMoment
DLMom. E
DLMom.W
Net OTE
NetOTW
Uplift E
Add. Uplift E
UpliftW
Add. Uplift W
Tot. Uplift E
Tot. Uplift W
HD#
l~ad (lbs.) Offset Factor
Total Add. load
Total Seismic Load =
1
5
8
1.6
1.00
521
955
682
104
136
Max Shear
4169
7640
16
128
1600
777
960
3392
6680
678
1336
678
1336
11
136
Adjust. Load
0
521 lbs.
SHEAR
PLF USE#
OVERTURNING
UPLIFT
• -No HD required, by inspection
•• -See Perforated/ Force-Transfer Shearwall calculation
line Load (lbs.)
Total Wind Load =
1 Sh~arWall
WIND LOAD
Load Type R
Load (plf)
Length R (ft.)
load R (lbs.)
955 lbs.
Offset Factor Adj,ust. Load
Total Add. Load 0
955 lbs.
Worst Case
112
0
Total Shear
length (ft.)
5
lbs.
lbs.
lbs.
lbs.
plf
plf
Capacity = 260 plf
#-ft.
#-ft.
psr
plf
plf
lbs.
ft.
#-ft.
#-ft.
#-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
L-9
PvR1Uo
(8(2306.3
na:: LOVELACE
.....-~ ENGINEERING
STRUCTURAL ENCIN EER INC SERVIC!S
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
level Name
level#
lateral Line
ROOF
2
0-E
Direction
N-S
A.S.
11/18/2022
Page:
WOOD SHEARWALL ANALYSIS & DESIGN II
Area
j
1
2
3
4
SEISMIC LOAD
sos = 0.816
p = 1.0
Story load 4.3
SF Factor
1870 1.0
Total/2 = Seismic load
psf
load (lbs)
'"ll
3978 lbs.
ADDITIONAL SEISMIC LOAD
Line
Segment
L
H
H/L·Ratio
load Ratio
Load E
Adj. load E
LoadW
Adj. LoadW
Unit Shear E
UnitShearW
OTME
OTMW
Wall Weight
WallUOL
Unif. DL
Concen·. DL
COL loc.
DLMoment
DLMom. E
DLMom.W
NetOTE
NetOTW
Uplift E
Add. Uplift E
Uplift W
Add. UpliftW
Tot. Uplift E
Tot. Uplift W
HD#
load (lbs.) Offset Factor .Adjust. load _
Total Add. Load 0
Total Seismic Load = 3978 lbs.
SHEAR
1
Max Shear ·a PLF I USEII
OVERTURNING
UPLIFT
• • No HD required, by Inspection
•• -See Perforated/ Force-Transfer Shearwall calculation
load Type l Worst Case
load (plf) 112
length l (ft.) 26
load Lllbs.} 2921
Total/2 = Wind load
ADDITIONAL WIND LOAD
Line load (lbs.)
Total Wind Load =
1 Shear Wall
WIND LOAD
load Type R
load (plf)
length R (ft.)
Load R (lbs.)
241S lbs.
.Offset Factor Adjust. Load
Total Add. Load
2415 lbs.
0
Worst Case
112
17
1910
Total Shear
length (ft.)
0
lbs.
lbs.
lbs.
lbs.
plf
pit
Capacity= 260 plf
#-ft.
#-ft.
psf
plf
plf
lbs.
ft.
#-ft.
#-ft.
#-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
L-10
8yR1t10
CBCDOli.3
II~ LOVELACE
1....--. ENGINEERING
STP.UC.T URAL EN CINEERI N C SERVICES
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
level Name
Level#
lateral Line
ROOF
2
E-E
Direction
A.S.
11/18/2022
Page:
WOOD-SHEARWALL ANALYSIS & DESIGN II
SEISMIC LOAD
Area
1
2
3
4
sos= 0.816
p =: 1.0
Story load 4.3
SF Factor
500 1.0
Total/2 = Seismic load
ADDITIONAL SEISMIC LOAD
Line
Segment
L
H
H/L-Ratio
Load Ratio
Load E
Adj. load E
LoadW
Adj. LoadW
Unit Shear E
UnitShearW
load (lbs.) Offset Factor
Total Add. Load
Total Seismic Load =
1
Max Shear 0
psf
load (lbs)
"'ii
1064 lbs.
.Adjust. load .
0
1064 lbs.
SHEAR
PLF I USE#
Load Type L Worst Case
Load (plf] 112
Length L (ft.) 21
Load L(lbs.) 2359
Total/2 = Wind load
ADDITIONAL WIND LOAD
line Load {lbs.)
Total Wind Load =
1 Shear Wall
OVERTURNING
OTM E
OTMW
Wall Weight
WallUDL
Unif. DL
Concen.DL
CDL loc.
DLMoment
DLMom. E
DLMom. W
NetOTE
NetOTW
Uplift E
Add. Uplift E
Uplift W
Add. UpliftW
Tot. Uplift E
Tot. Uplift W
HD It
UPLIFT
• -No HD required, ·by inspection
•• -See Perforated/ Force-Transfer Shearwall calculation
WIND LOAD
Load Type R
Load (plf)
Length R (ft.)
Load R (lbs.)
1180 lbs.
.Offset Factor Adjust. Load
Total Add. Load 0
1180 lbs.
Worst Case
112
0
Total Shear
length (ft.)
0
lbs.
lbs.
lbs.
lbs.
plf
plf
Capacity = 260 plf
ti-ft.
#-ft.
psf
plf
plf
lbs.
ft.
/I-ft.
#-ft.
It-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
'lbs.
lbs.
L-11
avR1tfo
CBC2306.l
If~ LOVELACE ~ ENGINEERING
STRUCTURAt... ENCI N EER INC SERVICES
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
l evel Name
level#
lateral line
ROOF
2
6
Direction
"E-W
A.S.
11/18/2022
Page:
WOOD SHEARWALL ANALYSIS & DES.I.GN II
Area
1
2
3
4
SEISMIC LOAD
sos = 0,816
p = 1.0
Story Load 4.3
SF Factor
220 1.0
1386 1.0
Total/2 = Seismic Load
psf
load (lbs)
936 Load Type l Worst Case
5896 Load (pit) 96
0 Length L (ft.) 13
0 Load L (lbs.) 1250
3416 lbs, Total/2 = Wind load
ADDITIONAL SEISMIC LOAD ADDfflONAL WIND LOAD
Line
Segment
L
H
H/L Ratio
load Ratio
Load E
Ad]. load E
LoadW
AdJ.loadW
Unit Shear E
UnitShearW
OTME
OTMW
Wall Weight
Wall UDL
Unif. Dl
Concen. DL
COL loc.
DLMoment
DLMom.E
DlMom.W
Net OTE
NetOTW
Uplift E
Add. Uplift E •
Uplift W
Add. UpliftW
Tot. Uplift E
Tot. Uplift W
HD#
Load (lbs.) Offset Factor
Total Add. load
Total Seismic Load =
1
12
11
0.9
1.00
3416
2452
1752
285
146
Max Shear
37577
26977
16
176
84
18720
9093
11232
28483
15745
2374
1312
2374
1312
11
285
Adjust. load
0
3416 lbs.
SHEAR
PLF I USE#
OVERTURNING
UPLIFT
• -.No HD required, by Inspection
•• -See Perforated / Force-Transfer Shearwall calculation
line Load (lbs.)
Total Wind Load =
2 Shear Wall
WIND LOAD
Load Type R
load (plf)
length R (ft.)
Load R (lbs.)
2452 lbs.
Offset Factor Adjust. Load
Total Add. Load 0
-2452 lbs.
Worst Case
96
38
3655
Total Shear
length (ft.)
12
lbs.
lbs.
lbs.
lbs.
plf
fplf
Capacity= 350 plf
#-ft.
#-ft.
psf
plf
plf
lbs.
ft.
#-ft.
#-ft.
#-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs,
lbs.
L-12
8yR11Uo
CBC2306.l
I;;: LOVELACE
...-~ ENGINEERING
STAucrUR/1.L cr ... c;1NE!'Rln<:i SERVIC~~
BAIG RESJDENCE
TNT DESIGN BUILD
J22470
level Name
Level II
Lateral Line
ROOF
2
8
Direction
E-W
A.S.
11/18/2022
Page:
WOOD SHEAR-WALL ANALYSIS & DESIGN 11-
Area
1
2
3
4
SEISMIC LOAD
sos = 0.816
p = 1.0
Story load 4.3
SF Factor
220 1.0
Total/2 = Seismic Load
psf
load (lbs)
"ll Load Type l Worst Case
Load (pl!) 96
Length L (ft.)
Load l {lbs.) 0
468 lbs. Total/2 = Wind Load
ADDITIONAL SEISMIC LOAD ADDITIONAL WIND LOAD
Une Load (lbs.) Offset Factor Adjust. Load line load (lbs.)
Total Add. Load 0
Total Seismic load c 46a lbs. Total Wind load =
SHEAR
Segment 1 2
L 4 4
H B 8
H/L Ratio 2.0 2.0
Load Ratio 0.50 a.so
Load E 234 234
Adj. Load E
LoadW 313 313
Adj. loadW 223 223
Unit Shear E 58 58
Unit ShearW 56 56
Max Shear 58 PLF I USE/I 1 Shear Wall
OVERTURNING
OTME 1872 1872
OTMW 2501 2501
Wall Weight 16 16
WallUDL 128 us
Unit. DL 84 84
Concen. DL
CDL Joe.
DLMoment 1696 1696
DLMom. E 824 824
DLMom. W 1018 1018
Net OT E 1048 1048
NetOTW 1483 1483
UPLIFT
Uplift E 262 262
Add. Upllft E
Uplift W 371 371
Add. Uplift W
Tot. Uplift E 262 262"
Tot. Uplift W 371 371
HOii .. .. . -No HO required, by lnspectlon
•••See Perforated/ Force-Transfer Shearwall calculation
WIND LOAD
load Type R Worst Case
load (plf) 96
length R (ft.) 13
Load R (lbs.) USO
625 lbs.
Offset Factor Adjust. Load
Total Add. Load 0
625 lbs.
Total Shear
Length {ft.]
8
lbs.
lbs.
lbs.
lbs.
plf
pit
Capacity = 260 plf
11--ft.
11-ft.
psf
plf
pit
lbs.
ft
II-ft.
#-ft.
#-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs .
L-13
[flyfltbo
CBCllOli,l
I~ LOVELACE ~ ENGII-IEERING
srnucrur.AL EIICINEEOINC s~n v1CES
Shear E
Segment Adj. Shear E
Adjust. Shear E
ShearW
Adjust. Shear W
H above 1.25
H opening 2.5
H below 4.25
Total Height 8
l' LI
V(lbo,J
IT(~
OVERTURNING
OTM E 3744
OTMW 5001
Wall Weight 16
Wall UOL 128
Uniform DL 84
DLMoment 27136
Dl Moment E 13182
DLMomentW 16282
Net OT E -9438
NetOTW -11281
468
0
468
625
447
L1 ft.
ft.
ft.
ft.
ft.
\U
I
I
I
I
I
I
lb.-ft.
b.-ft.
psf
plf
plf
b.•ft,
b.•ft.
b.-ft.
b.-ft.
b.-ft.
4.0
BAIG RESIDENCE
TNT DESIGN BUILD
]22470
Level Name
Level#
Lateral Line
ROOF
2
8
Direction
E-W
FORCE TRANSFER SHEAR WALL 11
W(lt.
8.0
V
Strap Force 1
v'
Strap Force 2
L2
SHEAR
Net shear to segments, non-adjusted for segment ratio
Segment-adjusted shear per NDS 4.3.4
adjusted for overall H/L ratio of Force-Transfer Shear Wall
Net shear to segments, non-adjusted per CBC 2306.3
Adjusted shear value per CBC 2306.3
Overall
l2 (It. H/lRatio
4.0 0.5
E w Maximum
29 28 plf Strap Force 117
117
58
117
Shear 58
lU I bs.
56. plf I Use CSlG
Use# 1
112 I bs.
v,._, u_[lll_J_[_ITJLJ_O
-;-'lP&f,
vcl-J
[] lJI II 11 □DJ
-;-r,;1rT ---.,,,. (p,ltJ
v,._,
--------;--,;;w------wo•.tpj;:;-
UPLIFT
Uplift E
Add. Uplift E
UpliftW
Add. Uplift W
Tot. Uplift E
Tot. Uplift W
HDII
-590
-705
-590
-705
•
I
I
I
I
I
I
bs.
bs.
bs.
bs.
bs.
bs .
--·
L-1 4
A.S.
11/18/2022
Page:
lbs.
pit
strap
Shear Wall
v • VIL
,,,. • V'A'Ll'-JJ
I
ll9f"1 • V • t.....W-4'Y'•LZI
91'"..2 • -v • w't.14.LU + (V,t.2J
~~ LOVELACE I~ ENGINEERING
STRUCTURAL ENC1NEER1NC SERVICES
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
level Name
Level#
lateral Line
FLOOR
1
B
Direction
N-S
A.S.
11/18/2022
Page:
WOOD SHEARWALL ANALYSIS & DESIGN
Area
1
2
3
4
SEISMIC LOAD
SDS = 0.816
p = 1.0
Story Load 2.0
SF Factor
300
I
1.0
1.0
Total/2 = Seismic load
psf
Load (lbs)
"!I
Load Type l A -D
Load (plf) 94
length L {ft.)
Load L (lbs.) 0
294 lbs. Total/2 = Wind Load
ADDITIONAL SEISMIC LOAD ADDITIONAL WIND LOAD
Line Load (lbs.) Offset Factor Adjust. load Line Load (lbs.)
Total Add. load 0
Total Seismic load = 2-!14 lbs_ Total Wind Load =
SHEAR
Segment 1 2
L 3 3
H 9 9
H/L Ratio 3.0 3.0
Load Ratio o.so o.so
Load E 147 147
Adj. load E 221 221
LoadW 235 235
Adj.loadW 168 168
Unit Shear E 74 74
Unit Shear W • 56 56
Max Shear 74 PlF I USE# 1 Shear Wall
OVERTURNING
OTM E 1324 1324
OTMW 2116 2116
Wall Weight · 16 16
Wall UDL 144 144
Unif. DL
Concen. OL
COL loc.
DL Moment 648 648
DLMom. E 315 315
DLMom. W 389 389
Net OT E 1009 1009
NetOTW 1727 1727
UPLIFT
Uplift E 336 336
Add. Uplift E
UpliftW 576 576
Add. Uplift W
Tot. Uplift~ 336 336
Tot. UpliftW 576 576
HD# •• ••
* -No HD required, by Inspection
•• -See Perforated/ Force-Transfer Shearwall calculation
WIND LOAD
Load Type R A-0
Load {plf) 94
Length R (ft.) 10
Load R (lbs.) 941
470 lbs.
Offset Factor Adjust. Load
Total Add. load 0
470 lbs.
Total Shear
length (ft.)
6
lbs.
lbs.
lbs.
lbs.
plf
IPlf
Capacity= 260 plf
#-ft.
#-ft.
psf
plf
plf
lbs.
ft.
#-ft.
#-ft.
#-ft.
II-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs .
L-15
!lyAallo
CBC 23063
I~ LOVELACE ~ ENGINEERING
STRUCTUnAL ENC INEEAINC SEnVICES
Shear E 294
Segment Adj. Shear E 441
Adjust. Shear E 294
Shearw 470
Adjust. Shear W 336
Ll ft.)
3.0
H above 2.25 ft.
H opening 6.75 ft.
H below 0 ft.
Total Height 9 ft.
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
Level Name
Level II
Lateral Line
FLOOR
1
·e
FORCE TRANS.FER SHEAR WALL 11
W(ft.)
5.0
V
Strap Force 1
v'
Strap Force 2
SHEAR
Net shear to segments, non-adjusted for segment ratio
Segment-a djusted shear per NDS 4.3.4
adjusted for overall H/L ratio of Force-Transfer Shear Wall
Net shear to segments, non-adjusted per CBC 2306.3
Adjusted shear value per CBC 2306.3
L2 (ft.)
3.0
E
27
67
49
67
Total
Length (ft.)
11
w
31
76
56.
76
Perforated
Len h ft)
6
plf
I bs.
plf
I bs.
I
Overall
H/L Ratio
0.8
Strap Force
Shear
Use
Us.a#
LI W· L2
Direction
N-S
Maximum
76
56
CS16
1
V(~ I I I I I I I I I I I I--'-'--'-_ _.
OVERTURNING
OTME
OTMW
Wall Weight
Wall UDL
Uniform DL
DL Moment
DL Moment E
DLMomentW
Net OT E
NetOTW
2648
4233
16
144
8712
4232
5227
-1584
-995
I
I
·I
I
I
lb.-ft.
lb.-ft.
psf
plf
plf
b.-ft.
b.-ft.
b.-ft.
b.-ft.
b.-ft.
V(~
II II
---~;;,----~,,-
UPLIFT
Uplift E
Add. Uplift E
UpliftW
Add. Uplift W
Tot. Uplift E
Tot. UpliftW
HD#
-144
-90
-144
-90
•
I
I
I
I
I
I
bs.
bs.
bs.
bs.
bs.
bs.
__ ,
L-16
A.S.
11/18/2022
Page:
lbs.
plf
strap
Shear Wall
v • VIL
V • Vl<LhL.2>
1-
n~ LOVELACE
ll, E N G I N EE R 11-1 G
STRUC TURAL !NCINE!RINC SERV1c.::s
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
level Name
Level #
Lateral Line
FLOOR
1
C
Direction
N-S
A.S.
11/18/2022
Page:
WOOD SHEARWALL ANALYSIS & DESIGN 11
Area
1
2
3
4
SEISMIC LOAD
sos= 0.816
p = 1.0
Story Load 2.0
SF Factor
2789 1.0
Total/2 = Seismic Load
psf
load (lbs)
~11
2736 lbs.
ADDITIONAL SEISMIC LOAD
line
D
0-E
E
Segment
L
H
H/L Ratio
Load Ratio
Load E
Adj. load E
LoadW
Adj. LoadW
Unlt5hear E
Unit ShearW
Load (lbs.) Offset ~actor .Adjust. load .
468 l 468
3978 l 3978
S21 0.3 156
Total Add. Load 4602
Total Seismic Load = 7338 lbs.
1
28
11
0.4
1.00
7338
6055
4325
262
154
Max Shear 262 PLF
Load Type L Worst Case
Load (plfJ 94
Length L (ft.) 21
Load L (lbs.) 1975
Total/2 = Wind Load
ADDITIONAL WINO LOAD
line Load (lbs.)
D 955
D-E 2415
E 955
Total Wind Load =
SHEAR
USE# 2 Shear Wall
OVERTURNING
OTM E
OTMW
Wall Weight
Wall UDL
Unlf. DL
Concen.OL
COL loc.
DL Moment
DL Mom. E
DLMom. W
Net OT E
NetOTW
Uplift E
Add. Uplift E
Uplift W
Add. UpllftW
Tot. Uplift E
Tot. UpliftW
HD#
80714
66609
10
110
100
4900
7
116620
56649
69972
24064
-3363
859
-120
859
-120
1
• -No HD required, by Inspection
UPLIFT
•• -See Perforated/ force-Transfer Shearwall calculation
WINO LOAD
Load Type R
load (plf)
length R (ft.)
Load R (lbs.)
2398 lbs.
Offset Factor Adjust. Load
1 955
1 2415
0.3 286
Total Add. Load 3657
6055 lbs.
Worst Case
94
30
2822
Total Shear
Length (ft.)
28
lbs.
lbs.
lbs.
lbs.
plf
pit
Capacity= 350 plf
#-ft.
#-ft
psf
plf
plf
lbs.
ft.
#-ft.
#-ft.
IHt.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
L-17
ls.vlll:■tlo
CBC:1306.'3
-~ LOVELACE ~ ENGINEERING
STRVC TV RAL. CNC INEERINC SEAv1c:.s
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
Level Name
Level#
Lateral Line
FLOOR
1
F
Direction
fil-S
A.S.
11/18/2022
Page:
WOOD SHEARWALLANALYSIS & DESIGN II
Area
1
2
3
4
SEISMIC LOAD
SDS = 0.816
p = 1.0
Story Load 2.0
SF Factor
1120 1.0
Total/2 = Seismic Load
psf
load (lbs)
"'ii
1099 lbs.
ADDITIONAL SEISMIC LOAD
Line
E
D
E-E
D-E
Segment
l
H
H/1.:Ratio
Load Ratio
Load E
Adj. load E
LoadW
Adj, loadW
Unit Shear E
UnitShearW
OTME
OTMW
Wall Weight
WallUDL
Unif. Dl
Concen.DL
COlloc.
DLMoment
DLMom, E
DLMom. W
Net OTE
Net OTW
Uplift E
Add. Uplift E
UpliftW
Add. Uplift W
Tot. Uplift E
Tot. Uplift W
HD#
Load (lbs.) Offset.Factor
521 1
468 0.2
1064 1
3978 0.25
Total Add. load
Total Seismic Load =
1
20
11
0.6
1.00
3TT1
4340
3100
189
155
Max Shear
41484
4TT43
16
176
7000
9
96450
46852
57870
-5368
-10127
-268
-506
-268
·506
189
Adjust. Load .
521
94
1064
994
2673
3TT1 lbs.
SHEAR
PLF I USE#
OVERTURNING
UPLIFT
• -·No HD required, by inspection
**·See Perforated/ Force-Transfer Shearwall calculation
Load Type L
Load (plf)
Length L (ft.)
Load L (lbs.)
Total/2:
Worst Case
94
30
2822
Wind load
ADDITIONAL WIND LOAD
Line Load {lbs.)
E 955
D 955
E-E 1180
D-E 2415
Total Wind Load =
1 Shear Wall
WIND LOAD
Load Type R
Load (plfj
Length R (ft.l
Load R (lbs.]
1411 lbs.
Offset Factor Adjust. Load
1 955
0.2 191
1 1180
0.25 604
Total Add. load 2929
4340 lbs.
Worst Case
94
0
Total Shear
length (ft.)
20
lbs.
lbs.
lbs.
lbs.
plf
plf
Capacity = 260 plf
fl-ft.
#-ft.
psf
plf
plf
lbs,
ft.
fl-ft.
#-ft.
#-ft.
#-ft.
#-ft.
lbs,
lbs.
lbs.
lbs.
lbs.
lbs.
L-18
.BvR•th>
CBC 2306.3
ll~ LOVELACE
1, """ ENGINEERING
STRUCTUr:1At.. ENC tNEfR1MC .SERVICC.S
BAIG RESIDENCE
TNT DESIGN BUILD
J2"2470
level Name
level#
lateral line
FLOOR
1
4
Direction
A.S.
11/18/2022
Page:
WOOD SHEARWALL ANALYSIS & DESJGN 11-
Area
2
3
4
SEISMIC LOAD
sos = 0.816
p= 1.0
Story load 2.0
SF Factor
2740
I
1.0
Total/2 = Seismic Load
psf
load (lbs)
"'!I
2688 lbs.
Load Type L
load (pit)
Length L (ft.)
Load L (lbs.)
Total/2 =
1-6
81
33
2657
Wind Load
WIND LOAD
Load Type R
Load (plf)
Length R (ft.)
Load R (lbs.)
2657 lbs.
1 -6
81
33
2657
ADDITIONAL SEISMIC LOAD i:A:::D:D:::IT::i:IO::::N:::A:::l::i:W;i:l:::N:D:L:Oi::A::::0=::;=====:;======1
Load (lbs.) Offset Factor Adjust. load line load (lbs.) Offset Factor Adjust. Load line
6 3416 1.00 3416 6 2452 1.0 2452
2867 1587
8 468 0.26 122 8 625 0.3 163
2867 1587
Total Add. Load 3538 Total Add. Load 2615
Total Seismic load = -6225 lbs. Total Wind load = -5272 ·lbs.
SHEAR
1 Segment Total Shear
length (ft.)
20 L W
H
H/L Ratio
Load Ratio
Load E
Adj. load E
LoadW
Adj.loadW
Unit Shear E
Unit Shear W
OTM E
OTMW
Wall Weight
Wall UDL
Unif. DL
Concen. DL
COL loc.
DL Moment
DLMom. E
DLMom. W
Net OTE
NetOTW
Uplift E
Add. Uplift E
Uplift W
Add. Uplift W
Tot. Uplift E
Tot. Uplift W
HD#
9
0.5
1.00
6225
5272
3766
311
188
Max Shear
56028
47448
7
63
70
26600
12921
15960
43107
31488
2155
1574
2155
1574
l
311 PLF
• • No HD required, by Inspection
I USE#
OVERTURNING
UPLIFT
0 • See Perforated/ Force-Transfer Shearwall calculation
lbs.
lbs.
lbs.
lbs.
plf
plf
2 Shear Wall Capacity= 350 plf
#-ft.
#-ft.
psf
plf
plf
lbs.
ft.
It-ft.
II-ft.
II-ft.
#-ft.
#-ft.
lbs.
lbs.
lbs.
lbs.
lbs.
lbs.
L-19
By R;atlo
CBC2306.3
I~ LOVELACE V ENGINEERING
STP.V CTU AAL ENCINCERI NG SERV IC::S
BAIG RESIDENCE
TNT DESIGN BUILD
J22470
level Name
level II
lateral Line
FLOOR
1
·9
Direction
MANUFACTURED SHEARWALL ANALYSIS & DESIGN
Area
SEISMIC LOAD
SDS = 0.816
p = 1.0
Story Load 2.0
SF Factor load (lbs)
1 1360
I
1.0 '~11 Load Type L Worst Case
2 Load (plf) 81
3 Length L (ft.)
4 Load L (lbs.) 0
Total/2 = Seismic load 1334 lbs. Total/2= Wind Load
ADDITIONAL SEISMIC LOAD ADDITIONAL WIND LOAD
line Load (lbs.) Offset Factor Adjust. load Line Load (lbs.)
8 468 1.00 468 8 625
6 3416 0.36 1230 6 2452
2867 1587
2867 1587
Total Add. Load 1698
Total Seismic Load = 3032 lbs. Total Wind Load =
Segment
l
H
Allow. Load E
Drift E
Allow. LoadW
DriftW
Load Ratio E
load RatioW
Shear E
ShearW
1
1.5
9
2575
0.4S
323S
0.60
0.50
0.50
1516
1418
SHEAR
2
1.5
9
2575
0.45
3235
0.60
0.50
0.50
1516
1418 ____ ..._ ___ ......, ____________ .._ ____ ..._ ___ _.
Max Ratio 0.59 < 1.0
OVERTURNING
lbs.
in.
lbs.
in.
lbs.
lbs.
13643 13643 OTM E #-ft.
12764 12764 OTMW #-ft.
16 16 t--W_a_ll_W_e_ig-:h-t-+------t------t------;------+------tpsf
144 144 Wall UDL plf
Unif. DL plf
Concen. DL lbs.
ffil~~ ~
DL Moment 162 162 II-ft.
Dl Mom. E 79 79 #-ft.
DL Mom. W 97 97 ff-ft. t---N-e-t .,..OT-,-E--11---l-3_5..,.64--;---l-,3..,.5..,.64,---+-----+-------1,-------f#-ft.
Net OT W 12667 12667 #-ft. ~---~------~----------~------------
UPLIFT
Uplift E 9043 9043 lbs.
Add. Uplift E • lbs.
Uplift W 8445 8445 lbs.
Add. Uplift W lbs. -----·-•-----· --·---------·-Total Uplift E 9043 9043 lbs.
Total Uplift W 8445 8445 lbs.
t-"""'!H'!!O~#-~~W'!!S'!'!W'!!'H'!"-~AB!!'l!-+""!'!W'!'!!S'!'!W'!!'H-'!"A'!"B!!'l!-1-----+----~i----...
WIND LOAD
Load Type R
Load (plf}
length R (ft.}
Load R (lbs.)
13i9 lbs.
Offset Factor Adjust. Load
1.00 625
0.36 883
Total Add. load 1508
2837 ·lbs.
STIFFNESS
Segment Stiffness E
1 2.22
2 2.22
Total 4.44
CAPACITY
Segment E
1 1
2 1
II
A.S.
11/18/2022
Page:
Worst Case
81
33
2657
Stiffness W
1.67
1.67
3.33
w
0
0
L-20
L-21
JOB J2241Q LOVELACE
E GI EE ING SHEETNO. __________ OF ______ _
CALCUlATEOBY _______ A_.S_._ DATE _____ _
STRUCTURAL ENGINEERING SERVICES CHECKEOBY __________ DATE _____ _
10509 Vista Sorrento Parkway, Suite 102, San Diego, CA 92121
phone858.535.9111 • fax858.535.1989 • www.lovelaceeng.com SCALE _________________ _
SEISMIC BEAM CALCULATIONS
0 SEISMIC, BEAM (FB-5)
OTM (E) = 34161 lb-ft
OTM (H) = 26°'11 lb-ft
Total Hall Length = 12 ft
Seismic. Load = (OTM (E)) I (THL *0.7) = 4061 lb
Hind Load = (OTM (H)) I (THL *0.6) = 3141 lb
Loads Applied on Seismic. Beam,
E= 4061 lb
H = 3141 lb
□SEISMIC BEAM (FB-2)
0TM (E) = 4169 lb-ft
0TM (W) = 1640 lb-ft
Total Hall Length = 4 ft
Selsmlc.. Load = (OTM (E)) I (THL *0.7) = 14B9 lb
H ind Load = (OTM (H)) I (THL *Ob) = 3184 lb
Loads Applied on Seismic. Beam,
E= 1489 lb
H = 3184 lb
L-25
LOVELACE
JOB _____ .... _ -· -···· ____________ _
SHEET NO. OF ________ _
CALCULATED BY ________ _ DATE _______ _
STRUCTURAL ENGINEERI NG SERV I CES CHECKED BY DATE _______ _
SCALE _____________ _
"P=-z.o~ ...
M = 20..:, • ( 41 -z.") .... f>c./oc. 11:,. 1,.J i
L.j1.." JAAX
n PRnnltr.T?l\7
~ LOVEL/\C s:8AIGRESIDENCE
ENGINEER IN ;NT DESIGN BULLO
STPUCTUAA L :NC IN::EA l'\:C SE.f)VICES 122470
Level Name
Level#
Lateral Line
FLOOR
1 Direction
SEISMIC BEAM REACTIONS II
I FB-5 I
Unfactored Reactions
Left Right
D 4980 11170
L 5170 15520
E 2660 -3130
Factored Reactions
Combination Left Right
5 10203.9152 6968.5608
6 12775.4364 19658.9206
8 7074.0848 -51.5608
s 893.9152 17923.5608
6 5792.9364 27875.1706
8 -2235.9152 10903.4392
Maximum Reactions
Downforce
Uplift
I
Left
12775.4364
-2235.9152
Right
27875.1706
-51.5608
Unfactored Reactions
Left
D
l
E
Factored Reactions
Combination Left
5 0
6 0
8 0
5 0
6 0
8 0
Maximum Reactions
Downforce
Uplift
Left
0
0
Right
Right
0
0
0
0
0
0
Right
0
0
ASCE 7 12.4.3.2
FB-2 I Unfactored Reactions
Left Right
D 1770 1940
L 3410 4050
E 1000 -1000
Factored Reactions
Combination left Right
5 3722.2048 411.6256"
6 5791.6536 3831.2192
8 2609.7952 -807.6256
5 222.2048 3911.6256
6 3166.6536 6456.2192
8 -890.2048 2692.3744
Maximum Reactions
Left Right
Downforce 5791.6536 6456.2192
Uplift -890.2048 -807.6256
Unfactored Reactions
D
L
E
Left
Factored Reactions
Combination Left
5 0
6 0
8 0
5 0
6 0
8 0
Maximum Reactions
Left
Downforce 0
Uplift 0
Right
Right
0
0
0
0
0
0
Right
0
0
A.S.
11/lB/2022.
Page:
L-23
ov ACE SHEETNQ. ___________ _
CALCULATED av __________ _ DATE ________ _
STAUCTURAL ENGINEEA IN G SEAVIC E S CHECKED BY ___________ _ DATE ________ _
SCALE-------------------------
Z. l"i/' .,._( '5 l >l) { 'J,00.·f-") ·$ ,;;..,,,_ tt,1-·.•,,;,... 1€D • ---
t t ., , / ''.tt' -.• , .. '.i -~\:
~ ·..:s.-. ,c.-~··-.(" • 1 £...1 ~
iP
0<> 1,..,-r'.) f,..J I 3/t1 . .1 •• l I 1·1 (. I<::. I
-----,.---l. •.-.. -.. ---~=
)
·r
i ' t ,-,.
;> fv1 ::: ( I ;;, I I)'( l ")
-::-~:, li t> If-! , t'
)
( ( 1-C--,. ', )
,;__(<'_•(.,:_ II /4
/ <t .,.. rt-/:? ,, ~ 1,
l
\, >t I j giJ_ 1(<-'j ~• _ ll °1-"
t t,. I • c:; F .'-' ,.4 fl, . T";ii ~;it ,-"1 ·""--·, ...... ''" TBv<;. •s: wo~•-• r's.
1;-,
r•<.~f':l, l'I. ·•~.,{
,, ;
,1-., _( '-::... '1 ~,.,., r·
c..~
2 11..~c, ,, •1-...
0 • l-(1.,j C• •• "
C t. ,I-;, J ,O )
/ (,,_ 1 l \-' ,.·.,,t.y J \ \ f.,-1f / f(\!:t:JL:• I'.\/
'I
I
I " ';,-. i'
LOVE
, I I .. '1
ACE
STRUCTURAL ENGINEERING SERVICES
I /-zj cp t.. 1\ c;:.., .Sc ¢f:= -' J
-,f'<-u . .o>"'-1 ==-"? 7" 5" :#, / 11-...i ,:-,-c 1~-P
L-24
JOB _______________________ _
SHEET NO. ___________ _ OF ________ _
CALCULATED BY _________ _ DATE ________ _
CHECKED BY __________ _ DATE ________ _
SCALE------------------------
.j--.
Q
I
{,/_<;.e" : (2-) 1/7..,'' c{> >" ? 11 ,·.-~"·'&, Lt-lcc"l S:c.~ , ... _,. (.,., ,-..., )
~--P~ ,,.,_.--n, e>P-A-TrA·.c .-f_!: ''':_""' .C6:: :_:.::_'~-% ""'1'<-x)
.-.. LOVELACE JOB _.
"" SHEET NO. F-1 E GI NEERING AS. CALCULATED BY
STRUCTURAL ENGINEER ING SERVICES
CHECKED BY
10509 Vista Sorrento Parkway, Suite 102, San Diego, CA 92121
phone 858.535.9111 • fax 858.535.1989 • www.lovelaceeng.com SCALE
FOUNDATION DESIGN
ALLOHABLE BEARING PRESSURE, q= 1500 PSF (PER DESIGN CRITERIA)
CONTlt,llOUS PERIMETER t 6EA-R1Ne ~ FOOTtN6S:
LOCATION, MAX CONTINUOUS FOOTING
W1 = MAX LOAD = 1815 PLF
HIDTH REQ'D= (H,/q x 12) = l&11f'soo x 12 = 15 IN
jUSE, 15 II HIDE X 18 II DEEP HITH 2 # 4 TOP 4 BOTTOM l
LOCATION:
H,= = PLF
HIDTH REQ'D= (H1/q x 12) = = IN
!USE, II WIDE X II DEEP HITH TOP 4 BOTTOM I
LOCATION:
H,= = PLF
WIDTH i<EQ'D= (W1/q x 12) = = IN
jUSE: "WIDE X II DEEP WITH # TOP 4 BOTTOM I
OF
DATE
DATE
ISOLATED SPREAD FOOTIN65: ( 2-STORY CONT. FTG. POINT LOADS )
MA-RK,iE.=12_
P= CONT. FTG. CAPACITY (MIDWALU
Areq'd = P/q x 144= 56.25.tsaa x 144
USE: IZI PER PAD FOOTING SCHEDULE
= 5625 LBS
= 540 SQ IN
~;;t:~ G-~-!2__,;~=~ .... :-:-=-~.;.._:_l:_,__:4..e...:-:-:-A-L_L_) _____ :_33_2_l!_'_~IN m;::~y]
MARK: (f-3) 15"x21"=315fn2
P= 18" x 18" x 18" DEEP PAD FTG. CAPACITY
Areq'd = P/q x 144= 3315A'soo x 144
USE: IZI PER PAD FOOTING SCHEDULE
= 3315 LBS
= 324 SQ IN
18"xl8"=324in2
LOVELACE
ENGi EERI G
ST R U CTU R A L E NG INEE RI N G S E RV I C ES
10509 Vista Sorrento Parkway, Suite 102, San Diego, CA 92121
JOB __________________ _
F-2 SHEET NO. __________ OF ______ _
CALCULATED BY _______ A_.S_._ DATE _____ _
CHECKEDBY __________ DATE _____ _
phone 858.535.911 1 • fax 858.535.1 989 • www.lovelaceeng.com SCALE _________________ _
FOUNDATION DESIGN
ALLOWABLE BEARIN6 PRESSURE, q= 1500 PSF (PER DESl6N CRITERIA)
I50LA TED SPREAD FOOTIN65:
MARK, (F-4)
P= 2411 x 24" SG. PAD FTG. CAPAGITY = 6000 LBS
Areq'd = P/q x 144= _60_00.....,¾,-50_0 ~x-'----'-I4..,_4~ ________ =_5_"1_6_SQ IN 24"x24"=516in2
USE, ~ PER PAD FOOTIN6 SCHEDULE
MARK, (F-5)
P= 3011 x 30" SQ. PAD FTG. CAPACITY = Cf3"15 LBS
Areq:d = P/q x 144= _"l_:3_J~~s~a-o~x~l~4~4 _________ = _Cf_0_0 _SQ IN 30"x30"='l001n2
USE: ~ PER PAD FOOTING SCHEDULE
MARK, (F-6)
P= :3611 x 3611 SQ. PAD FTG. CAPACITY = 13500 LBS
Areq'd = P/q x 144= _1_35_0-'9f,_s_o_o~x~l4-'-4~ ________ =_12_6_Cf_SQ IN 36"x36"=12'l61n2
USE, @) PER PAD FOOTING SCHEDULE
MARK, (F-1)
P= 4211 x 42" SG. PAD FTG. CAPACITY = 18315 LBS
Areq'd = P/q x 144= _1_8315__,_,%~so .... o........,_,X'-l,_44'---'-________ =_1_1_6_4_SQ IN 42"x42"=1164in2
USE, (£1 PER PAD FOOTING SCHEDULE
MA"RK, (F -8)
P= 48" x 48" SG. PAD FTG. CAPACITY =24-000LBS
Areq'd = P/q x 144= _240 __ oa~¾i-sa~a~x~l4~4~ _______ =_2_3_0_4SQ IN 4B"x48"=2304in2
USE: ([] PER PAD FOOTIN6 SCHEDULE
Project Title:
Engineer:
BAIG RESIDENCE
A.S. V-31
/wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
Project ID:
Project Descr:
LIC#: KW-06013959, Build:20.21.11.30 Lovelace Engineering, Inc.
DESCRIPTION: (E) BEAM 1
CODE REFERENCES
Calculations per NOS 2018, IBC 2018, CBC 2019, ASCE 7-16
Load Combination Set: ASCE 7-16
Material Properties
J22470
Project FIie: J22470.ec6
(c) ENERCALC INC 1983-2021
Analysis Method : Allowable Stress Design
-Load Combination : ASCE 7-16
Fb +
Fb-
1350psi
1350 psi
925psi
625psl
170 psi
675 psi
E : Modulus of Elasticity
Wood Species
Wood Grade
Beam Bracing
J
Douglas Fir-Larch
No.1
Completely Unbraced
Fc • Prll
Fe -Perp
Fv
Ft
00.128 • 0 0.1875 Lr!0.15
0(0.1125 Lr 0.09
Span= 11.50 ft
Ebend-xx 1600ksi
Eminbend -xx 580 ksi
Density 31.21 pcf
V
V
1
·-----------------------------------------__ I ---
Applied Loads Service loads entered. Load Factors will be applied for calculations.
Uniform Load : D = 0.0250, Lr= 0.020 ksf, Tributary Width= 4.50 ft, (ROOF)
Uniform Load : D = 0.0250, Lr = 0.020 ksf, Tributary Width = 7.50 ft, (ROOF)
Uniform Load : D = 0.0160 ksf, Tributary Width= 8.0 ft, (EXT. WALL)
DESIGN SUMMARY
!Maximum Bending Stress Ratio
1 • • Section used for this span
1 fb: Actual
Fb: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
Maximum Deflection
Max Downward Transient Deflection
Max Upward Transient Deflection
Max Downward Total Deflection
Max Upward Total Deflection
=
=
=
=
=
0.658 1
6x12·
1,093.09psi
1,661 .90psi
+D+Lr
5.750ft
Span# 1
0.085 in Ratio =
0 in Ratio==
0.237 in Ratio ==
0 in Ratio =
Maximum Shear Stress Ratio
Section used-for this span
fv: Actual
Fv: Allowable
Load Combination
Location of maximum on span
Span # where maximum occurs
1620>=360
0<360
582>=240
0 <240
Span: 1 : Lr Only
n/a
Span: 1 : +D+Lr
n/a
Maximum Forces & Stresses for Load Combinations
Load Combination l'v'lax S!ress Ral1os Momeni 'values
Segment Length Span# M V Cd CFN C j Cr Cm C t CL M fb
DOnly
Length = 11.50 ft 1 0.582 0.381 0.90 1.000 1.00 1.00 1.00 1.00 0.99 7.08 700.36
+D+Lr 1.000 1.00 1.00 1.00 1.00 0.99
Length = 11 .50 ft t 0.658 0.429 1.25 1.000 1.00 1.00 1.00 t.00 0.98 11.04 1,093.09
+D+0.750Lr 1.000 1.00 1.00 1.00 1.00 0.98
Length = 11 .50 ft 1 0.599 0.390 1.25 1.000 1.00 1.00 1.00 1.00 0.98 10.05 994.91
+0.600 1.000 1.00 1.00 1.00 1.00 0.98
Length = 11 .50 ft 1 0.199 0.129 1.60 1.000 1.00 1.00 1.00 1.00 0.98 4.25 420.22
Overall Maximum Deflections
Load Combination Span Max."." Def! Location in Span Load Combination
+D+Lr 1 0.2371 5.792
=
=
=
=
=
F'b
0.00
1202.65
0.00
1661.90
0.00
1661.90
0.00
2114.75
•JMM,C-H
V
0.00
2.46
0.00
3.84
0.00
3.50
0.00
1.48
0.429 : 1
6x12
91 .09 psi
212.50 psi
+D+Lr
0.000ft
Span# 1
Sfiear 'values
fv F'v
0.00 0.00
58.36 153.00
0.00 0.00
91.09 212.50
0.00 0.00
82.91 212.50
0.00 0.00
35.02 272.00
Max."+" Def! Location in Span
0.0000 0.000
I Wood Beam
Lovelace Engineering, Inc.
10509 Vista Sorrento Pkwy, Ste. 102
San Diego, CA 92121
UC#: KW-06013959, Build:20.21.11.30
DESCRIPTION: (E) BEAM i
Project Title:
Engineer:
Project ID:
Project Descr:
Lovelace Engineering, Inc.
BAfG RESIDENCE
A.S.
J22470
V-32
Project File: J22470.ec6
{c) ENERCALC INC 1983-2021
Vertical Reactions Support notation : Far left is #1 Values in KIPS
Load Combination
Overall MAX1mum
Overall MINimum
DOnly
+D+Lr
+D+0.750Lr
+0.60D
Lr Only
Support 1 Support 2
3.841 3.841
1.380 1.380·
2.461 2.461
3.841 3.841
3.496 3.496
1.477 1.477
1.380 1.380
STORM WATER COMPLIANCE FORM
TIER 1 CONSTRUCTION SWPPP CB CBR2022-4630
E-29 SW -
STORM WATER POLLUTION PREVENTION NOTES BEST MANAGEMENT PRACTICES (BMP) SELECTION TABLE
Erosion Control Sediment Control BMPs Tracking Non-Storm Water Waste Management and Materials
1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE BMPs Control BMPs Management BMPs Pollution Control BMPs
AVAILABLE ON SITE TO FACILITATE RAPID INSTALLATION C:
OF EROSION AND SEDIMENT CONTROL BMPs WHEN RAIN C: C: 0 --0 0 :.::; C: C: "Cl :.::; :.::; C, 0 C1) "Cl C1) ,:, IS EMINENT. Cl) C: u u C: C: C, E C E C: -0 ::, ::, 0 ,5 ·c: .9-0 0 -0 E QJ ... ... :.::; ... >, QJ C1)
THE OWNER/CONTRACTOR SHALL RESTORE ALL EROSION ::::lE "Cl Cl) 0, ... --C: "-::, C, en 2. C: C1) ... C: C1) E Cl) Cl) Cl) 0 ·;:: cr ... 0 C: QJ
C, a. Cl) ·c: C: Cl) C: > ... w QJ 0 0 -Best Management Practice* ~ .5 Ocj 0 (Il ·o. ... 0 C1) 0 ... (!) C1) .::: C: :;:; 3::..., Cl)
CONTROL DEVICES TO WORKING ORDER TO THE SATISFACTION Cl) :ii: U) ... C1) 0 C u ... u QJ -v Ql 0 -o-..c. .5 ._ E U) i "Cl U) ::::E C: C1) C: C: 3:: C: (BMP) Description ➔ U) u QJ V'l QJ .!!! C, C1) O> (Il ·a c: O"I C: "Cl (/) C Cl :::::, QJ +'C1) Cl) C1) C1) OF THE CITY INSPECTOR AFTER EACH RUN-OFF PRODUCING C1) "5 ~ C1) 0 0 0 :I= C: ... 0 ~~ "Cl >, 0 Cl) C: C 0 O> > ~ E ::, E QJ E ... u -0 ~ :.::; C: 0 (Il V') ·-O> Cl·-u QJ Co QJ
RAINFALL. ::::lE Cl c, 0 C C1) a:: E 0 -N Cll ~ 0 u c,+:: QJ ~.5 c v c 'o. .,__ 3:: QJ 0 C1) -Q) X ..c: g QJ ..... ::, ..0 E~ '-= U) '-= :I= .... -JS ·-C, ·;: a.. 0 C') "Cl O> QJ 0, QJ ,:, C1) u... E .x ... 1 C1) ::, ·-Q) ·-,:, Cll"u CO u C: ... 0 .x ... "Cl 0 ao be -u ,:, ........ ..0 ... ..0 0 -~i 0 ·-0 cu ... 2 u --0 0 -·-a. ,5 C1) C1) C1) u C: -0 -..... 0 =C '5 § N C: C C: THE OWNER/CONTRACTOR SHALL INSTALL ADDITIONAL EROSION ... 0 0 .... 0 00 0 C, .Eo .c QJ 0 3. Q) 0 0 ... !75 C1) ..c. ..0 ... ~o 0 -... in ..5 0 ... 0 QJ_ o...., 0 -a. 0 oo oo (!) 3:: WO tii V') (...) ~ (!) V>> (/) (/) a.. (/) a::: 3:: a.. a..o a.. >u :::!! (/) :::!! (/) V'lU (/) ::::lE :::r: ::::E U::::!E
CONTROL MEASURES AS MAY BE REQUIRED BY THE CITY
INSPECTOR DUE TO INCOMPLETE GRADING OPERATIONS OR CASQA Designation ➔ r--co 0, -"<t-co 0 N I"') r--co ..-N I"') "<t-I.() IC> 00 -..-I"') IO IC> r---..-..-
I I I I I I I I I I I I I I I I I I I I I I I I I UNFORESEEN CIRCUMSTANCES WHICH MAY ARISE. u (..) u (..) w w w w w w w w I= I= V') (/) (/) (/) j j i i i i i Construction Activity w w w w (/) (/) (/) (/) (/) (/) (/) (/) z z z z
4. ALL REMOVABLE PROTECTIVE DEVICES SHALL BE IN PLACE Grading/Soil Disturbance
AT THE END OF EACH WORKING DAY WHEN THE FIVE (5) x Trenchina/Excavation X X
DAY RAIN PROBABILITY FORECAST EXCEEDS FORTY PECENT Stockpiling
( 40%). SILT AND OTHER DEBRIS SHALL BE REMOVED AFTER Drillina/Borina
EACH RAINFALL. Concrete/ Asphalt Sowcuttina
5. ALL GRAVEL BAGS SHALL CONTAIN 3/4 INCH MINIMUM Concrete Flatwork
x Paving X X AGGREGATE. Conduit/Pioe Installation
6. ADEQUATE EROSION AND SEDIMENT CONTROL AND PERIMETER x Stucco/Mortar Work X
PROTECTION BEST MANAGEMENT PRACTICE MEASURES MUST x Waste Disposal X X
BE INSTALLED ANO MAINTAINED. x Staging/Lay Down Area X X
Eauioment Maintenance and Fuelina
7. THE CITY INSPECTOR SHALL HAVE THE AUTHORITY TO ALTER Hazardous Substance Use/Storaae
THIS PLAN DURING OR BEFORE CONSTRUCTION AS NEEDED Dewotering
TO ENSURE COMPLIANCE WITH CITY STORM WATER QUALITY Site Access Across Dirt
REGULATIONS. Other (list):
Instructions:
1. Check the box to the left of all applicable construction activity ( first column) expected to occur during construction.
2. Located along the top of the BMP Tobie is a list of BMP's with it's corresllonding California Stormwater Quality Association (CASQA) designation number. Choose one
or more BMPs you intend to use during construction from the list. Check he box where the chosen activity row intersects with the BMP column.
3. Refer to the CASQA construction handbook for information and details of the chosen BMPs and how to apply them to the project.
OWNER'S CERTIFICATE:
I UNDERSTAND AND ACKNOWLEDGE THAT I MUST: (1) IMPLEMENT
BEST MANAGEMENT PRACTICES (BMPS) DURING CONSTRUCTION PROJECT INFORMATION ACTIVITIES TO THE MAXIMUM EXTENT PRACTICABLE TO AVOID
Site Address: J.Q ;-; c.1:idnvtd= .Ave,, THE MOBILIZATION OF POLLUTANTS SUCH AS SEDIMENT AND TO SHOW THE LOCATIONS OF ALL CHOSEN BMPs ABOVE AVOID THE EXPOSURE OF STORM WATER TO CONSTRUCTION
RELATED POLLUTANTS; AND (2) ADHERE TO, AND AT ALL TIMES, ON THE PROJECTS SITE PLAN/EROSION CONTROL PLAN. Assessor's Parcel Number: J05-J-..~t'-I:1-00
COMPLY WITH THIS CITY APPROVED TIER 1 CONSTRUCTION SWPPP SEE THE REVERSE SIDE OF THIS SHEET FOR A SAMPLE THROUGHOUT THE DURATION OF THE CONSTRUCTION ACTIVITIES EROSION CONTROL PLAN. Emergency Contact:
To...mtLri
.
UNTIL THE CONSTRUCTION WORK IS COMPLETE AND APPROVED Nome: Avner-
BY THE CITY OF CARLSBAD.
24 Hour Phone: Zftz.a-ii9-5ll-45 Samuel Duron
OWNER(S)/OWNER'S AGENT NAME (PRINT)
Construction Threat to Storm Water Quality
S~Vt,MA11,, 3/22/2023 (Check Box)
OWNER(S)/OWNER'S AGENT NAME (SIGNATURE) DATE 0 MEDIUM ~LOW
E-29 Page 1 of 1 REV 02/16
,.
( City of
Carlsbad
PURPOSE
CLIMATE ACTION PLAN
CONSISTENCY CHECKLIST
B-50
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
This checklist is intended to help building permit applicants identify which Climate Action Plan (CAP) ordinance requirements
apply to their project. This completed checklist (B-50) and summary (B-55) must be included with the building permit
application. The Carlsbad Municipal Code (CMC) can be referenced during completion of this document by clicking on
the provided links to each municipal code section.
NOTE: The following type of pennits are not required to fill out this form
❖ Patio I ❖ Decks I ❖ PME (w/o panel upgrade) I ❖ Pool
Consultation with a certified Energy Consultant is encouraged to assist in filling out this document. ropriate
certification includes, but is not limited to: Licensed, practicing Architect, Engineer, or Contractor fami li ith Energy
compliance, IECC/HERS Compliance Specialist, ICC G8 Energy Code Specialist, RESNET HERS rater ce certified
ICC Residential Energy Inspector/Plans Examiner, ICC Commercial Energy Inspector and/or Plans Examiner, ..,...,....,.""' Lgreen
Inspector/Plans Examiner, or Green Building Residential Plan Examiner.
If an item in the checklist is deemed to be not applicable to a project, or is less than the minimum required , or~ance,
check NIA and provide an explanation or code section describing the exception. "--''
Details on CAP ordinance requirements are available at each section by clicking on the municipal code li nk provided. The
project plans must show all details as stated in the applicable Carlsbad Municipal Code (CMC) and/or Energy Code and
Green Code sections .
.... ,.-,,....,.,.......,.,,.,,,...-,...,..........,..,,--,-...,......,-,-..,,,,.,-.,,.-----,------,,-----,------------,---,--,-----,----:--::-----,
Project Name/Building
Permit No.:
Appficationlnformation
Property AddresS/APN: 2055 Chestnut Ave Carlsbad CA 92008
Applicant Name/Co.: Samuel Duron, TNT Design & Build
Applicant Address: 3142 Tiger Run Ct #108 Carlsbad, CA 92010
Contact Phone: 760 975 4869 Contact Email: samuel@tntdnb.com
Contact information of person completing this checklist (if different than above):
Name:
Company
name/address:
Applicant Signature:
B-50
Contact Phone: 760 975 4869
Contact Email:
s~ DU/1.,(J"}'f.,, Date: 12/13/2022
Page 1 of 7 Revised 04/21
Use the table below to determine which sections of the Ordinance checklist are applicable to your project. For
alterations and additions to existing buildings, attach a Permit Valuation breakdown on a separate sheet.
Building Permit Va luation (BPV) $ breakdown_l_0_3'-,1_2_5_.6_2 ___ _
Construction Type
I!] Residential
□ New construction
' I ~ Additions Jnd alterations:
□ BPV < $60,000
~ BPV ~ $60,000
□ Electrical service panel upgrade only
□ BPV ~ $200,000
D Nonresidential
□ New construction
□ Alterations:
□ BPV ~ $200,000 or additions~ 1,000
square feet
□ BPV 2: $1,000,000
□ ~ 2,000 sq. ft. new roof addition
Checklist Item
Complete Section(s) Notes:
A high-rise residential building is 4 or more stories, including a
Low-rise High-rise mixed-use building in which at least 20% of its conditioned floor
area is residential use
2A*, 3A*, 18, 28, *Includes detached, newly constructed ADU 4A*, 38,4A
N/A N/A All residential additions and alterations
1A, 4A 4A 1-2 family dwellings and townhouses with attached garages
only.
*Multi-family dwellings only where interior finishes are removed
1A, 4A* 1B,4A* and significant site work and upgrades to structural and
mechanical, electrical, and/or plumbing systems are proposed
1B, 2B, 3B, 4B and 5
18, 5
1B,2B,5 Building alterations of~ 75% existing gross floor area
2B,5 1 B also applies if BPV ~ $200,000
Check the appropriate boxes, explain all not applicable and exception items, and provide supporting calculations and documentation as necessary.
1. Energy Efficiency
Please refer to Carlsbad Municipal Code (CMC) 18.21.155 and 18.30.190,and the California Green Building Standards Code (CALGreen) for more
information. Appropriate details and notes must be placed on the plans according to selections chosen in the design.
A. Ii] Residential addition or alteration 2:$60,000 building permitvaluation. □ N/A __________ _
Details of selection chosen below must be placed on the plans referencing CM C
18.30.190.
□ Exception: Home energy score?: 7
(attach certification)
Year Built Single-family Requirements Multi-family Requirements
□ Before 1978 Select one option :
□ Ductsealing □ Attic insulation □Cool roof □ Attic insulation
□ 1978 andlater Select one option:
□ Lighting package □ Water heating Package
l!!!J Between1978and 1991 Select one option:
□ Ductsealing □ Attic insulation □Cool roof
□ 1992 and later Select one option:
□ Lighting package □ Water heating package
U pdatcd 4/16/202 l 3
B. D Nonresidential* new construction or alterations~ $200,000 building permit valuation,
or additions~ 1,000 square feet. See CMC 18.21.155and CALGreen AppendixA5 D N/A
AS.203.1.1 Choose one: 0 .1 Outdoorlighting D .2 Restaurant service water heating (CEC 140.5)
D .3 Warehouse dock seal doors. D .4 Daylight design PAFs D .5 Exhaust air heat recovery □ N/A
A5.203.1.2.1 Choose one: D .95 Energy budget (Projects with indoor lighting OR mechanical)
D .90 Energy budget (Projects with indoorlightingANDmechanical) □ N/A
A5.211.1...,.. D On-site renewable energy:
D N/A
AS.211.3,... □Green power: (If offered by local utility provider, 50% minimum renewable sources)
□ NIA
A5.212.1 D Elevators and escalators: (Project with more than one elevatorortwo escalators)
□ N/A
A5.213.1 D Steel framing: (Provide details on plans for options 1-4 chosen)
□ N/A _________ _
* Includes hotels/motels and high-rise residential buildings
* For alterations~$ 1,000,000 BPV and affecting> 75% existing grossfloorarea. OR alterationsthatadd 2,000 sq uarefeetofnew roof addition: comply
with CMC 18.30.130 (section 2B below) instead.
2. Photovoltaic Systems
A. D Residential new construction (for low-rise residential building permit applications submitted after 1/1/20). Refer to 2019 California
Energy Code section 150.1(c)14 for requirements. If project includes installation of an electric heat pump water heater pursuant to
CAP section 38 below (low-rise residential Water Heating), increase system size by .3kWdc if PV offset option is selected.
Floor Plan ID (use addifional CFA #d.u. Calculated kWdc*
sheets if necessary)
Total System Size:
kWdc = (CFAx.572) I 1,000 + (1 .15 x #d.u.)
*Fonnula calculation where CFA = conditional floor area, #du = number of dwellings per plan type
If proposed system size is less than calculated size, please explain.
kWdc
Exception
D
□
D
D
B. 0 Nonresidential new construction or alterations ~$1,000,000 BPV AND affecting ~75% existing floor area, OR addition that increases
roof area by ~,000 square feet Please refer to CMC 18.30.130 when completing this section. *Note: This section also applies to
high-rise residential and hotel/motel buildings.
Choose one of the following methods:
□ Gross Floor Area (GFA}Method
GFA:
D If< 10,000s.f. Enter:5kWdc
Min. System Size:
D If~ 1 O,OOOs.f. calculate: 15 kW de x (GFA/10,000) **
kWdc
**Round building size factor to nearest tenth, and round system size to nearest whole number.
Updated 4/ I 6/2021 4
D Time-Dependent Valuation Method
AnnualTDV Energyuse:*** ______ x .80= Min. system size: ______ kWdc
...... Attach calculation documentation using modeling software approved by the California Energy Commission.
3. Water Heating
A D Residential and hotel/motel new construction. Refer to CMC 18.30.170 when completing this section.
Provide complete details on the plans.
D For systems serving individual dwelling units choose one system:
D Heat pump water heater AND Compact hot water distribution AND Drain water heat recovery (low-rise
residential only)
D Heat pump water heater AND PV system .3 kWdc larger than required in CMC 18.30.130 (high rise
residential hotel/motel) or CA Energy Code section 150.1 (c) 14 (low-rise residential)
D Heat pump water heater meeting NEEA Advanced Water Heating Specification Tier 3 or higher
D Solar water heating system that is either .60 solar savings fraction or 40 s.f. solar collectors
D Exception:
D For systems serving multiple dwelling units, install a central water-heating system with ALL of the following:
D Gas or propane water heating system
D Recirculation system per CMC 18.30.150(8) (h igh-rise residential, hotel/motel) or CMC 18.30.170(8) (low-
rise residential)
D Solar water heating system that is either:
□ .20 solar savings fraction
D .15 solar savings fraction, plus drain water heat recovery
D Exception:
B. D Nonresidential new construction. Refer to CMC 18.30.150 when completing this section. Provide
complete details on the plans.
D Water heating system derives at least 40% of its energy from one of the following (attach documentation):
D Solar-thermal D Photovoltaics D Recovered energy
D Water heating system is (choose one):
D Heat pump water heater
D Electric resistance water heater(s)
□Solar water heating system with .40 solar savings fraction
D Exception:
It may be necessary to supplement the co mpleted checklist with supporting materials, calculations or certifications, to
demonstrate full compliance with CAP ordinance requirements. For example, projects that propose or require a
performance approach to comply with energy-related measures will need to attach to this checklist separate calculations
and documentation as specified by the ordinances.
Updated 4/ 16/21 5
4. Electric Vehicle Charging
A ~ Residential New construction and major alterations*
Please refer to CMC 18.21.140 when completing this section.
~ One and two-family residential dwelling or townhouse with attached garage:
□ One EVSE Ready parking space required □Exception: No electrical panel upgrade
□ Multi-family residential· □ Exception •
Total Parking Spaces EVSE Spaces
Proposed EVSE (10% of total) I Installed (50% ofEVSE) Other "Ready" I Other "Capable"
I I
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearest whole number) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
*Major alterations are: (1 )for one and two-family dwellings and townhouses with attached garages, alterations have a building permit
valuation~$60,000 or include an electrical service panel upgrade; (2) for multifamily dwellings (three units or more without attached
garages), alterations have a building permit valuation~ $200,000, interior finishes are removed and significantsite work and upgrades to
structural and mechanical, electrical, and/or plumbing systems are proposed.
'ADU exceptions for EV Ready space (no EV ready space required when):
(1) The accessory dwelling unit is located within one-half mile of public transit.
(2) The accessory dwelling unit is located within an architecturally and historically significant historic district.
(3) The accessory dwelling unit is part of the proposed or existing primary residence or an accessory structure.
(4) When on-street parking permits are required but not offered to the occupant of the accessory dwelling unit.
(5) When there is a car share vehicle located within one block of the accessory dwelling unit.
B. D Nonresidential new construction (includes hotels/motels) □ Exception: _____________ _
Please refer to CMC 18.21.150 when completing this section
Total Parking Spaces
Proposed EVSE (10% of total) I Installed (50% of EVSE) I Other "Ready" I Other "Capable"
I I I
Calculation· Refer to the table below·
Total Number of Parking Spaces provided Number of required EV Spaces Number of required EVSE Installed Spaces
D 0-9 1 1
D 10-25 2 1
D 26-50 4 2
D 51-75 6 3
□ 76-100 9 5
D 101-150 12 6
D 151-200 17 9
D 201 andover 10 percent of total 50 percent of Required EV Spaces
Calculations: Total EVSE spaces= .10 x Total parking spaces proposed (rounded up to nearestwholenumber) EVSE Installed = Total EVSE
Spaces x .50 (rounded up to nearest whole number) EVSE other may be "Ready" or "Capable"
Updated 4i l 6/2021 6
5. □Transportation Demand Management (TDM): Nonresidential ONLY
An approved Transportation Demand Management (TOM) Plan is required for all nonresidential projects that meet a threshold of employee-generated ADT.
City staff will use the table below based on yoursubmitted plans to determinewhetherornoryourpermit requires a TDM plan. lfTDM isapplicableto your
permit, staff will contact the applicantto develop a site-specific TOM plan based on the permit details.
Acknowledgment:
Employee ADT Estimation for Various Commercial Uses
Office (all)2 20
Restaurant 11
Retaib 8
Industrial 4
Manufacturing 4
Warehousing 4
, Unless otherwise noted, rates estimated from /TE Trip
Generation Manual, 10thEdition
13
11
4.5
3.5
3
2 For all office uses, use SAN DAG rate of 20 ADT/1 ,000 sf to
calculate employee ADT
3 Retail uses include shopping center, variety store, supermarket,
gyms, pharmacy, etc.
Other commercial uses may be subject to special
consideration
Sample caicy!atjons;
Office: 20,450 sf
1. 20,450 sf/ 1000 x 20 = 409 Employee ADT
Retail: 9,334 sf
1. First 1,000 sf= 8 ADT
2. 9,334 sf -1,000 sf= 8,334 sf
3. (8,334 sf/ 1,000 x 4.5) + 8 = 46 Employee ADT
I acknowledge that the plans submitted may be subject to the City of Carlsbad's Transportation Demand Management Ordinance. I agree to be contacted should
my permit require a TOM plan and understand that an approved TOM plan is a condition of permit issuance.
ApplicantSignature: Date: 1211312022
Person other than Applicant to be contacted for TOM compliance (if applicable):
Name(Printed):. __________________ _ Phone Number:. _____ _
Email Address: ____________________ _
Updated 4/ l 6/202 1 7
Building Permit Finaled
Revision Permit
Print Date: 09/10/2024
Job Address: 2055 CHESTNUT AVE, CARLSBAD, CA 92008-2716
Permit No:
Status:
(city of
Carlsbad
PREV2024-0026
Closed -Finaled
Permit Type: BLDG-Permit Revision Work Cla ss: Residential Permit Revision
Parcel II: 2052603400 Track #:
Valuation: $0.00 Lot#:
Occupancy Group:
#of Dwelling Units:
Bedrooms:
Bathrooms:
Occupant Load:
Code Edition:
Sprinkled:
Project Title:
Project#:
Plan#:
Construction Type:
Orig. Plan Check#:
Plan Check #:
Description: BAIG: INTERIOR CHANGE TO REMODELED GUEST BEDROOM
Applicant:
TNT DESIGN AND BUILD INC
SAMUEL DU RON
3142 TIGER RUN CT, # 108
CARLSBAD, CA 92010-6706
FEE
BUILDING PLAN CHECK REVISION ADMIN FEE
THIRD PARTY REVIEW -Consultant Cost (BLDG)
Property Owner:
CO-OWNERS NABIL BAIG AND AMINA LODHI
2055 CHESTNUT AVE
CARLSBAD, CA 92008-2716
Total Fees: $155.00 Total Payments To Date: $155.00
Building Division
Applied: 02/21/2024
Issued: 03/12/2024
Finaled Close Out: 09/10/2024
Final Inspection:
INSPECTOR:
Contractor:
TNT DESIGN AND BUILD INC
3142 TIGER RUN CT, # STE 108
CARLSBAD, CA 92010-6693
(760) 363-5584
Balance Due:
AMOUNT
$35.00
$120.00
$0.00
Page 1 of 1
1635 Faraday Avenue, Carlsbad CA 92008-7314 I 442-339-2719 I 760-602-8560 f I www.carlsbadca.gov
... ( City of
Carlsbad
PLAN CHECK REVISION OR
DEFERRED SUBMITTAL
APPLICATION
B-15
(byCityStaffJ
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www .ca rlsbad ca .gov
Original Plan Check Number Cl3" 'J.,(J.:n..,,-4~ 3 CJ a.:.P.:.:la;:,:,n.:..R:.:,:e;;.:v:.:,;is:.:,:io:::.:,n.:..:..:N~u.:..:,m.:.::b~e:.:..r~~~=~~~==.11
Project Address l0 55 Chdtu1A: A:vt,, l4rt5fo'ld , U , J..O 0$ r ,
General Scope of Revision/Deferred Submittal: t~ftrior CkJA111,J&, tz? V't,l'lf/JJe/eJ
g,i1e ~ f3 t-J(o(J~
CONTACT INFORMATION:
Name S~u1MA.IA fJ<A,Y-ti1, Phone 1'-C 1/75 4~k9
Address 3 l 4 J.. T iJA,t' R l,{ n &r •taz
Email Address .5t\Y)].Ut, l @J,vrltli (. LJ) WI
Fax.,__ _______ _
Zip <fJ.0 0
Original plans prepared by an architect or engineer, revisions must be signed & stamped by that
person.
1 . Elements revised: 51 Plans D Calculations D Soils D Energy D Other
2.
Describe revisions in detail
4. Does this revision, in any way, alter the exterior of the project? OYes
5. Does this revision add ANY new floor area(s)? Oves
6. Does this revision affect any fire related issues? Oves
7. Is this a full set replacement (all sheets)? Oves
£S'Signature~,-€)~~~------------Date
3.
List page/s) where each
revision is shown
A .
A-4.0
l-0 ~ A-l-I
(ljNo
~
No
No
[ll' No
L/J..0/lQ}A
l63s Faraday Avenue, Carlsbad, CA 92008 .etr 760-602-2719 fax: 760-602-8558 !sil!!i"-lli..!,<""-'--"'-~===~
www.carlsbadca.gov
True North
COMPLIANCE SERVICES
February 29, 2024
City of Carlsbad
Community Development Department -Building Division
1635 Faraday Ave.
City of Carlsbad -FINAL REVIEW
City Pennit No: PREV2024-0026
True North No.: 24-018-157
Carlsbad, CA 92008
Plan Review: Remodel and Addition to SFR
Address: 2055 Chestnut Ave
Applicant Name: Samuel Duron
Applicant Email: samuel@gmail.com
OCCUPANCY AND BUILDING SUMMARY:
Occupancy Groups: R-3
Occupant Load: NI A
Type of Construction: V-B
Sprinklers: No
Stories: 2
Area of Work (sq. ft.): Remodel: 1214 sq. ft. Deck: 206 sq-ft Garage: 249 sq-ft
The plans have been reviewed for coordination with the permit application.
Valuation: Confirmed
Scope of Work: Confirmed
Floor Area: Confirmed
Attn: Building & Safety Department,
True North Compliance Services, Inc. has completed the final review of the following documents for the project
referenced above on behalf of the City of Carlsbad:
l. Drawings: Electronic copy dated January 15, 2024, by TNT Design & Build.
The 2019 California Building, Mechanical, Plumbing, and Electrical Codes (i .. e., 2018 IBC, UMC, UPC, and 2017
NEC, as amended by the State of California), 2019 California Green Building Standards Code, 2019 California
Existing Building Code, and 2019 California Energy Code, as applicable, were used as the basis of our review.
Please note that our review has been completed and we have no further comments.
We have enclosed the above noted documents bearing our review stamps for your use. Please call if you have any
questions or if we can be of further assistance.
Sincerely,
True North Compliance Services
Review By: Richard Moreno -Plans Examiner
True North Compliance Services, Inc.
15375 Barranca Pkwy, Suite A202, Irvine, CA 92618
T / 562. 733.8030