CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59
Dgv(!Jlopment Services
Building Division
1635 Faraday Avenue
760-602-2719
www.car/sbadca.gov
APPLICABLE TO NEW CONS RUCTION, RESIDENTIAL ADDITIONS AND ALTERATIONS OVER $6OK
VALUATION AND COMMERCIAL ADDITIONS AND ALTERATIONS OVER $200K. You are required to list
materials that will be reused, recycled or disposed from your project. If you have questions about the recycling
requirement or completing this form, please contact Republic Services at (760) 332-6464, a certified C&D recycler, or
the Carlsbad Building Division at (442) 339-2719 Please note: Unless you are self-hauling, Republic Services or approved
haulers must be used for all construction projects within the City of Carlsbad.
PART 1 Complete and submit this form when applying for a Building Permit. Note: Permits will not be issued
Applicant Information
Permit No. CBR2023-2643 Bemus Kitchen Renovation Project Title
ProjectAddress2719 Llama Court, Carlsbad, CA 92009 APN 215-420-08-00
Applicant Name Hamilton Greg Contractor ~ Architect □ Other □
Last First
ApplicantAddress 9924 Blossom Valley Road
Phone 619 520-2600 E-mail Address pacsungreg@hotmail.com
Applicant Mailing Address
(if different than project address)
Project Type
(check all that apply}:
Residential ~ Commercial □
Brief Description Kitchen renovation and wall removal
Public Building □
Project Size 1 ,452 Estimated Cost of Project $_1_0_0_, 0_0_0 ____________ _
(square footage)
Please check the appropriate box:
j 11'1 I plan on using REPUBLIC SERVICES roll-off bin(s) for all materials and will provide all receipts after construction.
D I plan on using a City Approved hauler and will provide all receipts at the final occupancy inspection.
D This is a proposed LEED certified project. I plan on separating materials on site in conjunction with Republic.
Acknowledgement: I certify under penalty of perjury under the laws of the State of California that the information
provided in and with this form pertains to construction and demolition debris generated only from the project listed
in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the
best of my knowledge and belief.
Print Name Gre Hamilton Signature /2 ~ Date 6/13/2023
Page 1 of4 Rev. 2.10.21
PART 1 Complete, obtain signature, and submit this form when applying for a Building Permit. Note: Permits will
not be issued without a completed Construction Waste Management Plan.
DEBRIS RECYCLING ESTIMATE:
SECTION A Permit No. CSR 2023-2643 Project Title Bemus Kitchen Renovation
Project Address 2719 Llama Court, Carlsbad, CA 920029 APN 215-420-08-00
Applicant Name_H_a_m_il_to_n __________ G_r_e-=.g _____ Phone (619) 520-2600
Last First
SECTION B Complete the following table with estimated waste tonnage to be generated by your project.
This is your plan for construction waste management. Changes can be made on the final recycle report.
Goal: the diversion rate shall be 65% by weights of debris.
Material Type
Complete this line of the table only if B
only using WASTE MANAGEMENT
roll-off bins.
Mixed C&D Debris
Parking lot Asphalt & Concrete
Brick/ Masonry/ Tile
Mixed Inert Debris
Cabinets, Doors, Fixtures,
Windows (circle all that apply)
Carpet
Carpet Padding/ Foam
Cardboard
Ceiling Tile (acoustic)
Drywall (used, new, scrap)
Landscape Debris (brush, trees,
stumps, etc.) No dirt.
Unpainted Wood & Pallets
Concrete Roofing Materials
Scrap Metal
Stucco
Other:
TOTAL
SECTION C
Estimated
Waste Quantity
(tons)
8
A B C
Place a ( ✓) check
next to items to be
reused or salvaged
Place a(✓) check next
to items to be
recycled
Place a ( ✓) check next
to items to be
disposed at landfill
To meet 65% Diversion Requirement (estimate) x 0.65 = 5.2 tons ---------------------8 .A Total Estimated Waste from above
Contractor/Owner Signatu,e~ ____ Date
Minimum Required Diversion
Page 2 of 4 Rev. 711120
PART 2 Complete before final inspection, obtain WASTE MANAGEMENT signature, and return with receipts prior to final
building approval.
DEBRIS RECYCLING REPORT {ACTUAL):
Acknowledgement
I certify under penalty of perjury under the laws of the State of California t hat the information provided in and with this
form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have
reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge
and belief.
Permit No. C.e,yL-z.0--z..3 --Z.Co-4.3
Address '2.7\G\ LLAMA C..T
PrintName G~~ ~~~\\...,o,-.J
Date -Z.O z.4-
Use this Final Log below to track loads of materials as they leave the job site.
□□SAVE RECEIPTS□□
Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken.
Additional Project Log pages are available if necessary. Use City Conversion Table to convert volume to tons.
A B C
Date Material Type Actual Amt Actual Amt Actual Amt Destination Facility
Reused or Recycled Disposed in (Name, Address, Phone)
Salvaged Landfill
Examp}e: Palomar Transfer Station, 5960 El
01/05/2018 Concrete (broken) 5 tons Camino Real
-(760) 603-0153
co~~ -o-3 .<P9 ~O~f:::.£, ,12:.A-..J~
DE't-'\O 0Eul -o-
□TOTAL
I
Diversion Rate Achieved __ ~_,_7..,_4_._____,I __ Cf_~_~_( ---=----=IP-""-5_%
Total of columns A + B T/f columns A + B + C DIVERSION
~65%
~65%0
Contractor/Owner Signature ~~ Date 5' /20 /z4
Attach the following documentation to this Report: Return completed form and documentation to:
• Original recycling weight tickets, landfill weight tickets City of Carlsbad
• Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor)
• Any other relevant information to support Recycling Report 1635 Faraday Avenue
Carlsbad, CA 92008
City of Carlsbad
RECORD COPY MAY 21 2024
BUILDING DIVISION Rev. 51612022
C cityof
Carlsbad
CONSTRUCTION WASTE
MANAGEMENT PLAN
B-59 part 2
Development Services
Building Division
1635 Faraday Avenue
442-339-2719
www.carlsbadca.gov
Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1
of the 2019 California Green Building Standards requires at least 65% of non-hazardous construction debris is recycled and/or
salvaged for reuse.
NEXT STEPS:
STEP 1. Before the project -
a. Review your CWMP completed prior to permit issuance. (copy is attached to your job card) This plan demonstrates how
you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Waste
Management or Self Haul.
STEP 2 -During the Project
a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where
materials were taken.
b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are
(at a minimum) 65% of the waste generated by your project
STEP 3 -After the Project
a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit the
fully completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table.
b. Provide the ORR and receipts to your building inspector.
FOR MORE INFORMATION:
NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to
collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working
with the City's franchised hauler, Waste Management, one cumulative project receipt is acceptable. However, it is the Applicant's
responsibility to confirm that the bins are collected for C&D Recycling.
1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper
storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible.
2. Waste Management Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The
commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and
create receipt(s), to demonstrate the project has met a 65% diversion rate or greater.
3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with, the City's exclusive
franchised waste hauler, to develop a more specific CWMP. This plan may include using additional roll-off bins for
particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible.
4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies,
etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from
a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to
http://www.sandiego.gov/environmental-services/recycling/cd/index.shtml.
5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded
from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated
Recycling Facility.
Rev. 5/612022
ti!~ ~EPUBLIC· ~V SERVICES
5960 El Camino Real
Carlsbad CA 92008
Customer Service (760)332-6464
RepubllcServices.com/Support
Important Information
Account Number
Invoice Number
Invoice Date
Past Due on 08/31/23
Payments/Adjustments
Current Invoice Charges
3-0661-1003920
0661 -000395642
August 31, 2023
$187.11
$0.00
$807.27
Please remit your payment to Republic Services #661,
PO Box 78829 Phoenix AZ 85062-8829 or utilize
www.republicservices.com/pay-bill; please do not use the
Carlsbad return address on this invoice for payments
Total Amount Due
$994.38
Payment Due Date
Past Due
CURRENT INVOICE CHARGES
Description Reference Quantity Unit Price
Greg Hamllton 2719 Llama Ct CSA S012512178
Carlsbad, CA Contract: 9661001 (C20)
1 Waste Container 40 Cu Yd, On Call Service Construction/Demolition Debris
Disposal/Recycling 08/10 2584703 5.9200Tons
Receipt Number 24326
Pickup Service 08/10 Greg Hamilton 1.0000 $292.81
Receipt Number 24326
Rental 08/01-08/09 $187.11
CURRENT INVOICE CHARGES, Due by September 30, 2023
Simple account access at your fingertips.
Download the Republic Services app or visit
RepublicServices.com today.
Past Due 30 Days
$187.11
60 Days
$0.00
--
90+ Days
$0.00
t:/!~ REPUBLIC'
• .., SERVICES Total Amount Due
Payment Due Date
Amount
$459.10
$292.81
$55.36
$807.27
$994.38
Past Due
11960 El Camino Real
Carlsbad CA 92008
Please Return This
Portion With Payment Account Number 3-0661-1003920
Total Enclosed
Return Service Requested
l11111l11I I 111 • 111l11111111lll11111111111•ll1111111II I 11111 I 111 l1
GREG HAMIL TON -HAMIL TON WOODW
~ 9924 BLOSSOM VALLEY RD 5 i EL CAJON CA 92021-2203 N -• Ill .
Invoice Number 0661-000395642
Make Checks Payable To:
1•111111'11 •11111• 1111 I I 111 I 11 • 11 I h 11 I 11 I• 111111 Ill 11 II I I I I II I I I
REPUBLIC SERVICES #661
PO BOX 78829
PHOENIX AZ 85062-8829
3066110039200000000395642000080727 □□□0994384
~R~ REPUBLIC •
• .., SERVICES
f N N • .... .... . .. ., . Na :; . ... N -N ... .. -..... .... ·: ND ~ ..
UNDERSTANDING YOUR BILL
Visit RepublicServices.com/MyBill
UNDERSTANDING OUR RATES, CHARGES, AND FEES
Visit Repubhcservices.com/customer-support/fee-disclosures
Responsible Party
All waste services are managed, performed, and billed for by individual operating subsidiaries of
Republic Services, Inc. Republic Services, Inc. itself does not perform any waste services, nor does
it contract for such services. The operating entity providing your waste service is identified on your
Invoice. Accordingly, all obligations to you, including providing quality service and billing you for
service, rests with the operating entity identified on your invoice.
Residential Customers
If you are a residential customer receiving service without a signed customer service agreement,
your service is subject to and governed by the Service Terms for Residential Customers located at
Repubhcservices.com/customer-support/residential-service-term§ which include a CLASS ACTION
WAIVER and ARBITRATION CLAUSE, and our right to charge you a container removal fee upon
termination of service, among other terms. These terms are subject to change so please review
them upon receipt of your invoice. If you do not have access to a computer, you may request that a
copy be mailed to you by calling Customer Service at the number on the front of this invoice.
Please note that some or all of the Service Terms for Residential Customers may not apply if your
services are subject to terms mandated by a governmental entity in your locality.
Check Processing
When you provide a check as payment, you authorize us to use information from your check to
make a one-time electronic fund transfer from your account. When we make an electronic transfer,
funds may be withdrawn from your account the same day we receive your payment or check and
you will not receive your check back from your financial Institution.
Cancellation & Payment Polley
Unless prohibited by applicable law, regulation, or franchise or other agreement: (1) we reserve the
right to require that payment for services be made only by check, credit card or money order; and
(2) If service is canceled during a billing cycle, you will remain responsible for all charges, fees and
taxes through the end of the billing cycle. You will not be entitled to proration of billing or a refund
for the period between the notice of termination and the end of the current billing cycle.
Understanding Our Rates, Charges and Fees
If you are receiving service without a signed customer service agreement, please visit
RepublicServices.com/Fees to review the financial terms and conditions relating to your service. If
you are receiving service pursuant to a written contract, but have questions relating to any charges
or fees, RepublicServices.com/Fees provides a detailed description of our most common charges
and fees. If you do not have access to a computer, you may request that a copy be mailed to you
by calling Customer Service at the number on the front of this Invoice.
Please fill out the form below If your billing address has changed and return this portion of your
statement to us using the envelope enclosed. Thank youl
BILLING ADDRESS CHANGE
Address
City State I Zip Code
Phone Alternate Phone
I
IMPORTANT
INFORMATION
(Continued from Page 1)
Per the Franchise agreement between
the city of Carlsbad and Republic
Services, rates effective July 1, 2023
will be Increased by at least 5%
compared to 2022. For more details,
please visit
republlcservlces.com/munlclpallty/carlsb
ad-ca
■
' • TRANSFER
CAMINO REAL
LSBAD, CA 92008
(760)603-0153
000999 -CASH AND CHECK CUSTOMER
ADDRESS carlsbad, CA 92008
Contract: RESIDENTIAL-Yr. 2
GROSS 18,580 Scale In
TARE 11,200 Scale Out
NET 7,380
Tracking Qty: 0.00
Qty
3.69
Unit Description
TN MSW
54 Ticket#: 2607023
Weighmaster: macaral
In: October 02, 2023
Out: October 02, 2023
Vehicle: CD
Ref: 18, 580-250cc
BOL:
INBOUND
CASH
Rate Extension
$96.28 $355.27
Tax
$0.00
Origin: CARLSBAD 100%
Signature:
Total
Paid
Change
.EDIT CARD-SCALE
2:10 pm
2:28 pm
Total
$355.27
$355.27
$355.27
$0.00
V