Loading...
HomeMy WebLinkAboutGEMS Environmental Management Services Inc; 2024-09-25; PWS24-2282FAC 00 01 01 TITLE PAGE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 CITY OF CARLSBAD CONTRACT DOCUMENTS FOR: Carlsbad Fleet Fuel Island Upgrade Project No. 4747 PWS24-2282FAC 1635 Faraday Ave, Carlsbad, CA 92008 Email: PWContractAdmin@carlsbadca.gov If Principal is an individual, it is agreed that the death of any such Principal shall not exonerate the Surety from its obligations under this bond. Executed by PRINCIPAL this t)_ \ .... ~ day of Executed by SURETY this _2_6_th ___ day PtU..f)\l.6:t , 20~. of August 20 24. t"c.t:. (\,o\~ PRINCIPAL: kifl't} fµvfft,gJ/J/f(/7/h'A;~ /fl{lf N 1(itittM~ A/rf;y,C&4f -P~ ~:•m-;;z;~ (sigr?twe} /;}_ J(tvt,{Ad(! ~, UJ/iMt/&#o (pri~me here) pii2_ r @/J,I() r (title and organization of signatory) SURETY: Developers Surety and Indemnity Company (name of Surety) 59 Maiden Lane, 43rd Floor, New York, NY 10038 (address of Surety) 212-220-7120 (teleph9ne nu~ber of Surety) ~ By: ~' (signature of Attorney-in-Fact) Lisa M. Lucas, Attorney-in-fact (printed name of Attorney-in-Fact) (attach corporate resolution showing current power of attorney) (Proper notarial acknowledgment of execution by CONTRACTOR and SURETY must be attached.) (President or vice-president and secretary or assistant secretary must sign for corporations. If only 1 officer signs, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering that officer to bind the corporation.) APPROVED AS TO FORM: END OF SECTION 00 6120 FAITHFUL PERFORMANCE AND WARRANTY BOND Document Version: 1.0 Page 55 of 259 Date Printed: August 20, 2024 Current Update: May 2023 00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 56 of 259 00 61 30 OPTIONAL ESCROW AGREEMENT NAME OF PROJECT: Carlsbad Fleet Fuel Island Upgrade NAME OF BIDDER: This Escrow Agreement is made and entered into by and between the City of Carlsbad, Carlsbad, California, 92008 ("Agency"), whose address is ("Contractor") and whose address is ("Escrow Agent"). Agency, Contractor and Escrow Agent agree as follows: 1.Pursuant Public Contract Code Section 22300, Contractor has the option to deposit securities with Escrow Agent as a substitute for retention earnings required to be withheld by Agency pursuant to the construction contract entered into between Agency and Contractor for the Carlsbad Fleet Fuel Island Upgrade in the amount of ___________ dated __________ ("Contract"). Alternatively, on written request of Contractor, Agency shall make payments of the retention earnings directly to Escrow Agent. When the Contractor deposits the securities as a substitute for Contract earnings, Escrow Agent shall notify Agency within 10 Calendar Days of the deposit. The market value of the securities at the time of the substitution shall be at least equal to the cash amount then required to be withheld as retention under the terms of the Contract. Securities shall be held in Agency’s name and shall designate Contractor as the beneficial owner. 2.Agency shall make progress payments to Contractor for those funds which otherwise would be withheld from progress payments pursuant to the Contract provisions, provided that Escrow Agent holds securities in the form and amount specified above. 3.When Agency makes payment of retentions earned directly to Escrow Agent, Escrow Agent shall hold them for the benefit of Contractor until the time that the escrow created under this Escrow Agreement is terminated. The Contractor may direct the investment of the payments into securities. All terms and conditions of this Escrow Agreement and the rights and responsibilities of the parties shall be equally applicable and binding when Agency pays Escrow Agent directly. 4.Contractor shall be responsible for paying all fees for the expenses incurred by Escrow Agent in administering the Escrow Account and all expenses of Agency. These expenses and payment terms shall be determined by Agency, Contractor, and Escrow Agent. 5.The interest earned on the securities or the money market accounts held in escrow and all interest earned on that interest shall be for the sole account of Contractor and shall be subject to withdrawal by Contractor at any time and from time to time without notice to Agency. 6.Contractor shall have the right to withdraw all or any part of the principal in the Escrow Account only by written notice to Escrow Agent accompanied by written authorization from Agency to Escrow Agent that Agency consents to the withdrawal of the amount sought to be withdrawn by Contractor. N/A 00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 57 of 259 7. Agency shall have a right to draw upon the securities in the event of default by the Contractor. Upon 7 Calendar Days' written notice to Escrow Agent from Agency of a default, Escrow Agent shall immediately convert the securities to cash and shall distribute the cash as instructed by Agency. 8. Upon receipt of written notification from the Agency certifying that the Work required by the Contract is final and complete and that Contractor has complied with all requirements and procedures applicable to the Contract, Escrow Agent shall release to Contractor all securities and interest on deposit less escrow fees and charges of Escrow Account. The escrow shall be closed immediately upon disbursement of all moneys and securities on deposit and payments of fees and charges. 9. Escrow Agent shall rely on the written notifications from Agency and Contractor pursuant to Sections (5) to (8), inclusive, of this Escrow Agreement and Agency and Contractor shall hold Escrow Agent harmless from Escrow Agent's release, conversion and disbursement of the securities and interest as set forth above. 10. The names of the persons who are authorized to give written notices or to receive written notice on behalf of Agency and on behalf of Contractor in connection with the foregoing, and exemplars of their respective signatures are as follows: For Agency (Finance Director) Title _________________________________________________________ Name _____________________________________________________________ Signature _____________________________________________________________ Address _____________________________________________________________ For Contractor Title _____________________________________________________________ Name _____________________________________________________________ Signature _____________________________________________________________ N/A 00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 58 of 259 Address _____________________________________________________________ For Escrow Agent Title _____________________________________________________________ Name _____________________________________________________________ Signature _____________________________________________________________ Address _____________________________________________________________ At the time the Escrow Account is opened, Agency and Contractor shall deliver to the Escrow Agent a fully executed counterpart of this Escrow Agreement. IN WITNESS WHEREOF, the parties have executed this Escrow Agreement by their proper officers on the date first set forth above. For Agency Title ______________________________________________________________ Name ______________________________________________________________ Signature ______________________________________________________________ Address ______________________________________________________________ N/A 00 61 30 OPTIONAL ESCROW AGREEMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 59 of 259 For Contractor Title ______________________________________________________________ Name ______________________________________________________________ Signature ______________________________________________________________ Address ______________________________________________________________ For Escrow Agent Title ______________________________________________________________ Name ______________________________________________________________ Signature ______________________________________________________________ Address ______________________________________________________________ APPROVED AS TO FORM: CINDIE K. McMAHON, City Attorney BY: _____________________________ Assistant City Attorney END OF SECTION N/A X January 1, 2024 GEMS ENVIRONMENTAL MANAGEMENT SVCS, INC. 2/28/2025 7635 http://www.arb.ca.gov/doors/compliance_cert1.html California Air Resources Board: Off-Road Diesel-Fueled Fleets Regulation https://ssl.arb.ca.gov/ssldoors/doors_reporting/perm/php/certificate.php 1 of 2 4/30/2024, 12:11 PM Bid No. PWS24-2282FAC Addendum No. 1 CITY OF CARLSBAD Fleet Fuel Island Upgrade Project CONTRACT NO. 4747 PWS24-2282FAC Addendum No. 1 From: No. of Pages: Date: Bid Due Janean Hawney, Contract Administrator Phone: 442-339-2795 janean.hawney@carlsbadca.gov 1635 Faraday Ave Carlsbad, CA 92008 5 (including this page) July 27, 2024 August 14, 2024 - 11:00 a.m. (no change) Notice: This Addendum forms a part of the Contract Documents for the above identified project and modifies portions of the original Contract Documents. Documents not specifically mentioned in this Addendum remain in full force. Contractor must acknowledge receipt of this Addendum with RFP response by submitting signed cover page of issued Addendum. Failure to do so may subject bidder to disqualification. I.Edits and Clarifications to Bid Documents: 1.On Sheet 2, disregard “MN/DOT” reference noted in Paving and Striping Note 1 and Grading and Drainage Note 11. Contractor shall reference CA/DOT specifications and standards for this project. 2.On Sheet 2 for Grading and Drainage Note 17, the referenced Geotech Report states: 8.2. Rigid Pavements We anticipate that the existing rigid Portland Cement Concrete (PCC) pavements overlying the existing USTs are going to be demolished and replaced as part of the project. The replacement PCC pavements should be constructed such that the concrete thickness, reinforcement, and aggregate base material underlayment match the existing PCC pavement sections or consist of 8 inches of 600 pounds per square inch (psi) flexural strength Portland cement concrete reinforced with No. 4 bars, 18-inches on center each way, placed over 4 inches of aggregate base materials, whichever is thicker. We recommend that the upper 12 inches of the subgrade Bid No. PWS24-2282FAC Addendum No. 1 soils along with the aggregate base materials be compacted to a relative compaction of 95 percent relative compaction as evaluated by the current version of ASTM D 1557. 3. On Sheet 2, regarding Sewer Note 2 – Contractor shall submit a permit application and obtain approval to connect to the existing sewer. 4. On Sheet 7, regarding construction Note 8. As noted in the Manufacturer’s Technical Specification Guide, the NDS Dura Slope Trench Drain shall be ADA compliant, minimum 6” width, cast iron grate (Part No. DS-231), Load Class D, grate color black. Refer to Fuel Island TDS NDS 6 inch grate Class D SLOTTED ADA HP LOAD D-231 & 232 061424 and Fuel Island Detail Sheet NDS 6 inch DURA SLOPE Design Worx 062024 documents attached to and made a part of this Addendum No. 1. 5. On Sheet 7, regarding Construction Note 12. Construction of 4” PVC to 8” VCP connection shall be per current City of Carlsbad Engineering Standard Drawings and Specifications; specifically, refer to Standard Dwg. No. S-7 attached to and made a part of this Addendum No. 1. Inspection by city prior to backfill will be required. 6. On Sheet 7, regarding sawcut line. Contractor shall construct a minimum 1’ sawcut at edge of all new pavement, patch back for over-excavation to install forms. DS-093 FLOWDS-097 FLOWDS-097N FLOW DS-094 FLOWDS-095 FLOWDS-096 FLOW DS-094N FLOWDS-100N FLOW DS-098 FLOWDS-102 FLOW DS-099 FLOWDS-100 FLOWDS-101 FLOW DS - 1 0 7 FL O W DS - 1 0 9 N FL O W DS - 1 0 8 FL O W DS - 1 0 6 FL O W DS - 1 0 5 DS - 1 0 6 N FL O W DS - 1 0 9 FL O W DS-090NDS-092 FLOW DS-091 FLOWDS-091N FLOW DS-340 1' - 0 " 25 ' - 6 " 2'-0" 67'-0" DS - 0 9 3 FL O W DS - 0 9 4 FL O W DS - 0 9 5 FL O W DS - 0 9 6 FL O W DS-102 FLOW DS-099 DS-100 FLOWDS-101 FLOWDS-107 FLOWDS-108 FLOW DS-106 FLOW DS-105 FLOWDS-109 FLOWDS-112 FLOW DS-111 FLOW DS-110 FLOWDS-114 FLOW DS - 0 9 0 N DS - 0 9 2 FL O W DS - 0 9 1 FL O W DS-113 FLOW DS-104 FLOW DS-103 FLOW DS-100N FLOW 1'-0" 67'-0" 2'-0" 1' - 0 " 25 ' - 6 " DS-227 END OUTLET outl e tend DS-227 END OUTLET outletend DS-227 END OUTLET outletend DS-224 END CAP DS-224 END CAP DS-224 END CAP DS-224 END CAP DS-224 END CAP DS-340 C.B. W/ # 1243 UNIVERSAL LOCKING OUTLET 4" Ø PIPE - INV 19" 3"Ø PIPE - INV 18.5" DURASLOPE CHANNEL PROFILEDURASLOPE CHANNEL ISOMETRIC VIEWDURASLOPE CHANNEL PLAN VIEW DURASLOPE 90-DEG. FLOW JOINT FOR PRODUCT ASSISTANCE, CONTACT NDS TECHNICAL SERVICE AT techservice@ndspro.com, DESIGN ASSISTANCE- designworx@ndspro.com 851 N. HARVARD AVE. LINDSAY, CA 93247 WWW.NDSPRO.COM 1-800-726-1994 N.T.S. DS - 0 9 6 FL O W DS-093 FLOWoutle tend outletend DS-224 END CAPDS-227 END OUTLET DS-227 END OUTLET DS-224 END CAP RECEIVING CHANNEL ADJACENT CHANNEL NOTE: THE MINIMUM DEPTH FOR THE ADJACENT CHANNELMUST BE A OF A DS-093. THE RECEIVING CHANNEL MUST HAVE A MINIMUM DEPTH OF DS-096 ALL END OUTLET CHANNELS MUST HAVE A 3CHANNEL DIFFERENCE. MATCH UP THESE EDGES TO ALIGN END AND SIDE OF GRATES DS-227 END OUTLET CUT HOLE THROUGHSIDE OF CHANNEL DS-123 SCREWS DS-224 END CAP TRIM EDGE OF DS-224 & CHANNELTO ALLOW CLEARANCE FOR ADJACENT CHANNELWITH DS-227 DS-123 SCREWS APPLY CALK TO OUTSIDE OF JOINTTO PREVENT CONCRETE FROM PENETRATING INTO CHANNEL DURING POUR. RECEIVING CHANNEL ADJACENT CHANNEL 4" MIN. 2" MIN. SECTION AT DURA SLOPE CHANNEL PART # DS-123 SCREWS TO SECURE PROVIDE DURA SLOPE DS-227 END OUTLET TO CHANNEL OPTIONALCONSTRUCTION JOINT DRILL 4 5/8" DIA. HOLE AT SIDE OF CHANNELTO ALLOW FOR DS-227 CONNECTION. EXISTING SOILS ADJACENT DURA SLOPE CHANNEL PART # DS-227 END OUTLET APPLY WATERPROOF SILICON OR ALL-PURPOSE CONSTRUCTION ADHESIVE BETWEEN PART # DS-227 AND CHANNEL RECEIVING CHANNEL SEE INSTALLATION DETAILS FORMINIMUM CONCRETE DIMENSIONS NOTE:THE MINIMUM DEPTH FOR THEADJACENT CHANNEL MUST BE A OF A DS-093. THE RECEIVING CHANNELMUST HAVE A MINIMUM DEPTH OFDS-096 ALL END OUTLET CHANNELS MUSTHAVE A 3 CHANNEL DIFFERENCE. 4" PIPE DS-340 4" PLUMBING CONNECTION N.T.S. DURASLOPE CHANNEL DS-340 C.B.DS-224 END BLOCK OFF.INTERLOCKING JOINT NDS PART # 1243 4" UNIVERSAL LOCKING OUTLET FITTINGS & PIPE MAY VARY. CONCRETE ENCASEMENT MAY VARY PER LOAD CLASS. EXISTING SOILS. DS-093 FLOWDS-097 FLOWDS-097N FLOW DS-094 FLOWDS-095 FLOWDS-096 FLOW DS-094N FLOWDS-100N FLOW DS-098 FLOWDS-102 FLOW DS-099 FLOWDS-100 FLOWDS-101 FLOW DS- 1 0 7 FLO W DS- 1 0 9 N FLO W DS-1 0 8 FLOW DS-1 0 6 FLOWDS-1 0 5 DS-1 0 6 N FLOW DS- 1 0 9 FLOW DS-090NDS-092 FLOW DS-091 FLOWDS-091N FLOW DS-340 DS- 0 9 3 FLO W DS-0 9 4 FLOW DS-0 9 5 FLOW DS- 0 9 6 FLO W DS-102 FLOW DS-099DS-100 FLOWDS-101 FLOWDS-107 FLOWDS-108 FLOW DS-106 FLOW DS-105 FLOWDS-109 FLOWDS-112 FLOW DS-111 FLOW DS-110 FLOWDS-114 FLOW DS-0 9 0 N DS- 0 9 2 FLOW DS-0 9 1 FLOW DS-113 FLOW DS-104 FLOW DS-103 FLOW DS-100N FLOW outletend outletend outletend ND S D E S I G N W O R X DE S I G N W O R X @ N D S P R O . C O M DA T E DR A W N B Y : SH E E T S I Z E : D DR A W I N G S C A L E : N T S SH E E T 1 O F 1 6- 1 7 - 2 0 2 4 AB I G A I L C . DS-091 DS-092 DS-093 DS-094 DS-095 DS-096 DS-097 DS-098 DS-099 DS-100 DS-100N DS-102 DS-103 DS-107 DS-108 DS-109 DS-224 DS-104 DS-106 DS-110 DS-111 DS-112 DS-113 DS-114 1243 DS-123 MATERIALS LIST PART NO.QTY.REC. DS-101 DS-105 GRATES & SCREWS: DS-232 FU E L I S L A N D CI T Y O F C A R L S B A D DS-090N DS-091N DS-094N DS-097N DS-109N DS-106N DS-227 DS-340 1 KEY SITE PLAN 66 BAG(S) NOTES: THE HATCH PATTERN INDICATES CHANNELS THAT NEED TO BE CUT. VERIFY DIMENSIONS BEFORE CUTTING. 6" DURA SLOPE TRENCH DRAIN PLAN AND PROFILE CHANNEL TOTAL : 48 5 1 3 2 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 RE V . # 93 DW G . # : T O - 0 0 4 2 2 9 DS-200H 93 2 2 2 2 2 2 2 2 2 2 2 2 2 2 6.07" 6" 24" 4. 7 " 0.31" 6" 0.75" PROJECT NAME: DURA SLOPE™ GRATE FILE # TS_DS_GRATE_CI-DI SLOTTED_ADA_LOAD D SPECIFICATION: MATERIAL: CAST IRON/DUCTILE IRON — 6” WIDE x 24” LONG x 0.75” HIGH LOAD CLASS C –LOADS OF 176 - 325 PSI, RECOMMENDED FOR HEAVY DUTY PNEUMATIC TIRE FORKLIFTS AND TRACTOR-TRAILERS AT SPEEDS LESS THAN 20 M.P.H., H-20 RATED *LOAD CLASS D (REQUIRES DS-200H DUCTILE IRON FRAME) - LOADS OF 326-575 PSI. RECOMMENDED FOR HEAVY-DUTY HARD TIRE FORKLIFTS AT SPEEDS LESS THAN 20 M.P.H, H-20 RATED REQUIRES (2) FH #1/4-20 x 1-1/2” SCREWS #629 (SUPPLIED WITH CHANNEL) FITS ALL DURA SLOPE CHANNEL SECTIONS AND IN-LINE CATCH BASIN (DS-340) TWO GRATES PER CHANNEL SECTION. Rev: 3/2/2022 CAST IRON/DUCTILE IRON SLOTTED GRATE - LOAD CLASS C, D* FOR PRODUCT ASSISTANCE, CONTACT NDS TECHNICAL SERVICE AT techservice@ndspro.com, DESIGN ASSISTANCE- designworx@ndspro.com 851 N. HARVARD AVE. LINDSAY, CA 93247 WWW.NDSPRO.COM 1-800-726-1994 PART NUMBER (MATERIAL) SIZE SLOT WIDTH LOAD CLASS OPEN AREA FLOW RATE W/ 1/2” HEAD WEIGHT (MATERIAL) ADA HEEL PROOF DS-231(CAST IRON) DS-232 (DUCTILE IRON) 6” x 24” x 0.75” .31” x 4.70” C,D* OPEN AREA—17.23 IN2 / LF FLOW RATE—53 GPM / LF 15.90LB (CI) 15.20LB (DI) YES YES TECHNICAL SPECIFICATION DURA SLOPE™ CAST IRON/DUCTILE IRON SLOTTED GRATE PLAN VIEW SECTION NOTES: CITY OF CARLSBAD SEWER LATERAL (WITH OPTIONAL WYE)S-7 Bid No. PWS24-2282FAC Addendum No. 2 CITY OF CARLSBAD Fleet Fuel Island Upgrade Project CONTRACT NO. 4747 PWS24-2282FAC Addendum No. 2 From: No. of Pages: Date: Bid Due Janean Hawney, Contract Administrator Phone: 442-339-2795 janean.hawney@carlsbadca.gov 1635 Faraday Ave Carlsbad, CA 92008 4 (including this page) July 22, 2024 August 14, 2024 - 11:00 a.m. (no change) Notice: This Addendum forms a part of the Contract Documents for the above identified project and modifies portions of the original Contract Documents. Documents not specifically mentioned in this Addendum remain in full force. Contractor must acknowledge receipt of this Addendum with RFP response by submitting signed cover page of issued Addendum. Failure to do so may subject bidder to disqualification. I.Edits and Clarifications to Bid Documents: 1.The date on Addendum No. 1 has been revised to reflect July June 27, 2024, which was the actual date of release. Bid No. PWS24-2282FAC Addendum No. 2 2. The sign-in sheet from the Mandatory Pre-Bid meeting held on July 17, 2024, at 11 a.m. is attached to this Addendum No. 2. II. Questions & Answers: 1. Will the City of Carlsbad accept a California General Engineering License "A" for the construction of this project and will you require a HAZ Certification by the licensed contractor? Answer: Replace requirement in the bidding documents for General Contractors to have a valid ‘B’ license, with the requirement the General Contractors have a valid California General Engineering License "A" for the construction of this project with a HAZ Certification. 2. Can an alternate fuel dispensing design be substituted for the specified fuel dispensing system? Answer: Contractor to follow the basis of design detailed in the bidding documents. 3. For daily site access during construction, can contractors be issued a pass card? Answer: For site access at gate, contractors are to push buzzer button at gate and staff will open gate. 4. Will water service via hose reels be required at the fuel island? Answer: Water service at fuel island will be required. Former location of water hose reels was shown during walk through. 5. Regarding the fuel monitoring system, is the existing system to be left in place? Answer: The existing fuel monitoring system is out of date with regard to fuel leak detection. The plans and specifications call for this deficiency to be corrected with a pressure monitoring system rather than a vacuum monitoring system. 6. Can existing conduits at the building exterior be reused for low voltage wiring between fuel island and fuel monitoring system? Answer: Contractor to follow the basis of design detailed in the bidding documents. 7. Regarding new conduit to be installed as necessary at electrician room, can this be surface mounted outside of electrical room? Answer: Contractor to follow the basis of design detailed in the bidding documents. Should Contractor’s installation plan deviate from the bid documents, Contractor shall submit plan for proposed conduit routing to city for review and approval prior to proceeding with work. 8. Regarding the pad elevation at the fuel tanks, should this pad be elevated with concrete slope at fuel tank covers to minimize rusting of tank covers? Bid No. PWS24-2282FAC Addendum No. 2 Answer: Contractor to follow the basis of design detailed in the bidding documents, but the city would be interested in reviewing a proposal for this additional work to be done as a change order to the contract with the successful bidder. Bid No. PWS24-2282FAC Addendum No. 3 CITY OF CARLSBAD Fleet Fuel Island Upgrade Project CONTRACT NO. 4747 PWS24-2282FAC Addendum No. 3 From: Janean Hawney, Contract Administrator Phone: 442-339-2795 janean.hawney@carlsbadca.gov 1635 Faraday Ave Carlsbad, CA 92008 No. of Pages: 2 (including this page) Date: August 5, 2024 Bid Due August 14, 2024 - 11:00 a.m. (no change) Notice: This Addendum forms a part of the Contract Documents for the above identified project and modifies portions of the original Contract Documents. Documents not specifically mentioned in this Addendum remain in full force. Contractor must acknowledge receipt of this Addendum with RFP response by submitting signed cover page of issued Addendum. Failure to do so may subject bidder to disqualification. I. Edits and Clarifications to Bid Documents: None II. Questions & Answers: 1. What is the minimum height on the high side of the canopy, and do you want down spout and drains? Answer: The solar canopy should be sloped at a 5-degree angle. With the low end per detail below at 15’ height and a surface length of 24’, the high side of the canopy should be approximately 19.17’ high. No downspouts needed. Bid No. PWS24-2282FAC Addendum No. 3 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 60 of 214 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS INTRODUCTION The specifications contained in this 00 73 00 Agency Supplemental General Provisions take precedence over the specification language contained in the Standard Specifications for Public Works Construction, “The Greenbook,” latest edition and all errata. This specification addresses the unique conditions in Carlsbad that are not addressed in The Greenbook. Therefore, if there is a conflict, these specifications shall control. The Greenbook may be purchased at Bidder’s/Contractor’s local technical bookstore or directly from the publisher. These Supplemental General Provisions are available only for download from the online bidding portal with Contract Documents. The Agency does not provide hard copies. When used in the Contract Documents, statements, or command phrases (active voice and imperative mood) refer to and are directed at the “Bidder” or “Contractor” as applicable. The specifications are written to the “Bidder” before award and the “Contractor” after award. Before award, interpret sentences written in the imperative mood as starting with “The Bidder shall.” Interpret the term “you” as “the Bidder” and interpret the term “your” as “the Bidder’s.” After award, interpret sentences written in the imperative mood starting with “The Contractor shall.” Interpret the term “you” as “the Contractor” and interpret the term “your” as “the Contractor’s.” PART 1 GENERAL PROVISIONS SECTION 1 – GENERAL, TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS GENERAL ADD the following: 1. The word “provide” shall mean “furnish and install,” unless otherwise stated. 2. In reference to Drawings, where words “shown,” “indicated,” “detailed,” “noted,” “scheduled,” or words of similar import are used, it shall be understood that reference is made to the Plans accompanying these provisions, unless stated otherwise. 3. Where the words “equal,” “approved equal,” “equivalent,” and words of similar import are used, it shall be understood such words are followed by the expression “in the opinion of the Engineer,” unless otherwise stated. 4. The word “perform” shall be understood to mean that the Contractor, at its expense, shall “perform all operations and furnish labor, tools and equipment,” and further, “furnish and install materials that are indicated, specified or required” shall be understood to mean that the Contractor, at its expense, shall “furnish and install the Work, complete in place and ready to use, including furnishing of necessary labor, materials, tools, equipment, and transportation.” 5. Where words “directed,” “designated,” “selected,” or words of similar import are used, it shall be understood that the direction, designation, or selection of the Engineer is intended, unless stated otherwise. The word “required” and words of similar import shall 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 61 of 214 be understood to mean “as required to properly complete the Work as required and as approved by the Engineer,” unless stated otherwise. Where the words “approved,” “approval,” “acceptance,” or words of similar import are used, it shall be understood that the approval, acceptance, or similar import of the Engineer is intended. TERMS AND DEFINITIONS Where applicable ADD/REPLACE the following: 1. Agency - The City of Carlsbad or the Carlsbad Municipal Water District, the owner of the Project. 2. Agency Approval - Except where stated in this Contract to the contrary, the phrases “Agency approval,” and “Agency’s written approval” or such similar phrases shall mean approval by the City Manager for the City of Carlsbad or the Executive Manager for the Carlsbad Municipal Water District, which approval shall not be unreasonably withheld. 3. Agency Forces – City of Carlsbad or Carlsbad Municipal Water District employees who perform construction work. 4. Agency Supplement - 00 73 00 Agency Supplemental General Provisions; and 00 74 00 Agency Supplemental Technical Provisions. 5. Allowance (AL) - Payment under Allowance Bid items, denoted as “AL,” shall be based on the actual expenditures and for pre-authorized items of the Work in accordance with the Contract Documents. The unused portions of the Allowances shall revert to the Agency upon acceptance of the Project or Work. 6. Apparent Low Bidder - The Bidder whose Bid having been publicly opened, initially meets the material requirements of the Bid Documents and whose Bid price is the lowest received. 7. Applicable Laws - Laws, statutes, ordinances, rules, orders, and regulations of governmental authorities and courts having jurisdiction over the Project. 8. As-Builts - The CAD drawings prepared from the approved Red-lines for record keeping purposes. 9. Award of Contract (Award) - The date on which the Board or designee executes the Contract. 10. Bid - Any proposal submitted to the Agency in competitive bidding for the construction, alteration, repair, or improvement of any structure, building, road or other improvement of any kind. 11. Board – The officer or body constituting the awarding authority of the Agency, which is the City Council for the City of Carlsbad or the Board of Directors for the Carlsbad Municipal Water District. 12. Business Day - See Working Day. 13. Calendar Day – Every day on the calendar, including weekends and holidays. 14. City - The term “City” or “the City” means, City of Carlsbad. See also Agency. 15. City Council - The legislative body that governs the City of Carlsbad and has the authority to pass ordinances and appropriate funds. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 62 of 214 16. City Engineer - The term “City Engineer” is defined as the Transportation Director, or designee, and is the person authorized to perform the functions of the City Engineer as defined in Government Code Section 66416.5. The City Engineer is the City's "duly authorized officer" for the purposes of Public Contract Code Sections 4107 and 4107.5. 17. City Manager – The appointed official who directs the administration of the City of Carlsbad. 18. Construction Documents - Plans and details, including Plans showing installation of major systems, equipment, fixed furnishings and graphics, the technical specifications and all other technical drawings, schedules, diagrams and specifications, accepted Shop Drawings, Working Drawings, and submittals that are necessary to set forth in detail the requirements for the Project. 19. Construction Manager – The Project Inspector’s immediate supervisor and the Engineer’s designated representative for the first level of appeal for informal dispute resolution. 20. Construction Work - The portion of the Work to construct the Project as set forth in the Contract Documents in conformance with 2-1, “WORK TO BE DONE.” 21. Contract – The written agreement between the Agency and the Contractor covering the Work. 22. Contract Documents - Contract Documents include the following: The signed Contract, Addenda, Notice Inviting Bids, funding agency provisions, Bid including documentation accompanying the Bid and any post-Bid documentation submitted prior to the Notice of Award when attached as an exhibit to the Contract, Bonds, Permits, CEQA documents, Standard Specifications (the “Greenbook”), Agency Supplement, Plans, Standard Plans, Construction Documents, Reference Specifications, and Change Orders. Contract Documents, when applicable, shall also include Site and Coastal development permits, NEPA documents, re-vegetation plans, biological letters or technical reports, habitat mitigation plans, storm water documents, and local, state, and federal resource agency permits. 23. Contract Time - The number of Working Days to complete the Work as specified in the Contract Documents. 24. Contractor – The individual, partnership, corporation, joint venture, or other legal entity having a Contract with the Agency to perform the Work. In the case of Work being done under permit issued by the Agency, the permittee shall be constructed to be the Contractor. The term “prime contractor” shall mean Contractor. 25. Critical Path – In the Construction Schedule, the sequence of activities that represents the longest path through the Project network of activities and the shortest possible Project duration. 26. Days – Days shall mean consecutive calendar days unless otherwise specified in this Contract. 27. Defective Work - Work that does not conform to the Contract Documents. 28. Delay Factor - The Delay Factor may be the basis for compensation for idle equipment time on an excusable delay. The factor has been calculated to include the ownership costs without including operating costs. The Delay Factor recovers all the Contractor’s non- operating costs in an 8-hour day. If payment is made for equipment on an excusable delay, it is limited to 8 hours per day or 40 hours per week maximum. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 63 of 214 29. Deputy City Engineer – The Engineering Manager of the Construction Management & Inspection Division and the Construction Manager’s immediate supervisor and the Engineer’s designated representative for the second level of appeal for informal dispute resolution. 30. Dispute Board – Persons designated by the City Manager of the City of Carlsbad or Executive Manager of the Carlsbad Municipal Water District, to hear and advise the City Manager or Executive Manager on claims submitted by the Contractor. The City Manager for the City of Carlsbad or the Executive Manager for the Carlsbad Municipal Water District is the last appeal level for informal dispute resolution. 31. Drawings - See Plans. 32. D-size Sheet - “D” size paper for engineering design applications refers to 22” x 34” paper. 33. Engineer - The Deputy City Manager, Public Works of the City of Carlsbad acting either directly or through designated representatives and the third level of appeal for informal dispute resolution. 34. Engineer of Record/Design Engineer – A registered Professional Engineer licensed in the State of California who is qualified to act as an agent of a Project Owner or to prepare Plans for facilities to be accepted by the City of Carlsbad or the Carlsbad Municipal Water District. The term includes persons licensed in the State of California as Civil Engineers or Structural Engineers, as well as other licensed professionals like Architects and Landscape Architects. 35. Executive Manager – The appointed official who directs the administration of the Carlsbad Municipal Water District. 36. Field Book - The Agency field maps showing sewer and water facilities. 37. Field Order - A Field Order is a written agreement by the Engineer to compensate the Contractor for work items in accordance with 2-8, “EXTRA WORK” or 2-9, “CHANGED CONDITIONS.” A Field Order does not change the Contract Price or Contract Time or the intent of the Contract. The unused portions of the Field Orders shall revert to the Agency upon acceptance of the Work. 38. Final Environmental Document - The CEQA and/or NEPA document issued for the Project, such as certified environmental impact reports, mitigated negative declarations (MNDs), negative declarations, or exemptions. 39. Final Payment - The last payment for the Contract made to the Contractor, excluding Retention. 40. Fleet & Facilities Project Manager – The Project Manager with the Fleet & Facilities Division and the Construction Manager’s immediate supervisor and designated representative for the second level of appeal for informal dispute resolution. 41. Float – The number of days by which an activity in the Construction Schedule may be delayed from either its earliest start date or earliest completion date without extending the Contract Time (total float). Total float belongs to the Project and to any Party to accommodate changes in the Work or to mitigate the effect of events which may delay completion. 42. Holiday - Holidays observed by the Agency are listed below: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 64 of 214 Holiday Observed On New Year’s Day January 1 Martin Luther King Day 3rd Monday in January Presidents’ Day 3rd Monday in February Memorial Day Last Monday in May Independence Day July 4 Labor Day 1st Monday in September Indigenous Peoples’ Day 2nd Monday in October Veteran’s Day November 11 Thanksgiving Day 4th Thursday/Friday in November Christmas Day December 25 If any Holiday listed falls on a Saturday, the Saturday and the preceding Friday are both legal Holidays. If the Holiday falls on a Sunday, both Sunday and the following Monday shall be legal Holidays. Unless specified otherwise in the Contract Documents or authorized by the Engineer, do not work on Holidays. 43. Minor Bid Item – a single contract item constituting less than 10 percent (10%) of the original Contract Price bid. 44. Normal Working Hours - Unless specified otherwise, Normal Working Hour core periods shall be 7:00 AM to 5:00 PM, Monday through Friday, inclusive. Saturdays, Sundays, and Agency Holidays are excluded. For Traffic Control Permits, Normal Working Hours are defined as 7:00 AM to 3:30 PM, unless specified otherwise. 45. Notice of Completion (NOC) - A document recorded with the County of San Diego to signify that the Work has been completed and accepted by the Agency. 46. Party or Parties - The Agency, the Contractor, or both, their respective permitted successors or assigns, and any other future signatories to the Contract. 47. Plans – The drawings, profiles, cross sections, Standard Plans, working drawings, and shop drawings, or reproductions thereof, approved by the City Engineer, which show the location, character, dimensions or details of the Work. 48. Prime Contractor - See Contractor. 49. Project Inspector – the Engineer’s designated representative for inspection, Contract administration and the first level for informal dispute resolution. 50. Project Site (Site) - Areas where the Work is performed pursuant to the Contract. 51. Public Works Manager – The Public Works Manager of the Fleet & Facilities Division and the Facilities Engineering Project Manager’s immediate supervisor and designated representative for the third level of appeal for informal dispute resolution. 52. Punchlist - A list of items of Work or corrections generated after a Walk-through that is conducted when the Contractor considers that the Work and Services are complete. 53. Quality Control Standards and Procedures - The standards and procedures that are stated in a written manual that can be furnished to the Engineer upon request. The 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 65 of 214 standards and procedures are followed by the Supplier in the production of materials supplied for the Work Site. 54. Red-lines - Plans with annotations of changes made during construction to reflect the actual improvements or facilities built during construction whether concealed or visible. 55. Retention - The amount withheld from the money due to the Contractor in accordance with 7-3.2, “PARTIAL AND FINAL PAYMENT.” 56. Samples - Physical examples of the materials, equipment, or workmanship specified or required and which conform with the standards and specifications in the Contract Documents and by which the Work shall be evaluated. 57. Schedule - A Critical Path Method (CPM) schedule of construction activities and their durations to be performed during the Contract Time and prepared by the Contractor in accordance with 6-1, “CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK,” and accepted by the Engineer. 58. Scope of Work (SOW) - Labor, materials, equipment, facilities, and services required to be performed or provided by the Contractor to complete the entire Project or the various separately identifiable parts of the Project pursuant to the provisions of the Contract Documents. 59. Services - Work performed in connection with the layout, construction, testing, inspection, and commissioning of the Work or administration of the Contract and which may include professional services such as engineering, surveying, construction management and legal services that are required in accordance with the Contract Documents. Services are incidental to the Work. 60. Separate Contractors - Those individuals or entities that have entered into arrangements with the Agency for the provision of labor, materials, or other services in connection with the Project who are not under contract with the Contractor. 61. Supplemental Provisions – See Agency Supplement. 62. Walk-through - The procedure the Agency uses to evaluate the status of the Project and to generate a Punchlist prior to acceptance of the Work. 63. Work – All labor, materials, equipment, tools, and services and other requirements of the Contract Documents as modified by Change Order, whether completed or partially completed, provided or to be provided by Contractor to fulfill Contractor’s obligations. The Work may constitute the whole or a part of the Project. 64. Working Day - Any day within the period between the start of the Contract time as defined in Section 6-1 and the date provided for completion, or upon field acceptance by the Engineer for all work provided for in the Contract, whichever occurs first, other than: • Saturday; • Sunday; • any day designated as a holiday by the Agency; • any other day designated as a holiday in a Master Labor Agreement entered into by the Contractor or on behalf of the Contractor as an eligible member of a contractor association; • any day the Contractor is prevented from working at the beginning of the workday for cause as defined in Section 6-6.1; or 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 66 of 214 • any day the Contractor is prevented from working during the first 5 hours with at least 60 percent of the normal work force for cause as defined in Section 6- 6.1. 65. Work Site - See Project Site (Site). ABBREVIATIONS 1-3.2 Common Usage. ADD the following: AML Approved Material List CADD Computer Aided Design and Drafting CA MUTCD California Manual on Uniform Traffic Control Devices CCT Correlated Color Temperature CEQA California Environmental Quality Act. CFR Code of Federal Regulations CGP Construction General Permit CIPM Cured-In-Place-Manhole CL Centerline CMS Content Management System Database CNC Computer Numerical Control CRI Color Rendering Index CSA Canadian Standards Association DBE Disadvantaged Business Enterprise DCE Data Computer Equipment DG Decomposed Granite DVBE Disabled Veteran Business Enterprise DWT Detectable Warning Tiles EOW Engineer of Work ESL Environmentally Sensitive Lands ESO Electrical Service Orders FRP Fiberglass Reinforced Plastic GFE Good Faith Effort GMT Greenwich Mean Time GPS Global Positioning System IDA International Dark Sky Association IP Ingress Protection LCD Liquid Crystal Display LD Laser Diode LER Luminaire Efficiency Rating MBE Minority Business Enterprise MDFT Minimum Dry Film Thickness MHPA Multiple Habitat Planning Area MH Manhole MIL Military 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 67 of 214 MJ Mechanical Joint M&M Maintenance and Monitoring MMC Mitigation and Monitoring Coordination MOV Metal Oxide Varistor NA Numerical Aperture NC Not Connected, Normally Closed NEPA National Environmental Policy Act of 1969 NEXT Near End Crosstalk NCHRP National Cooperative Highway Research Program NOC Notice of Completion NPDES National Pollutant Discharge Elimination System NTP Notice to Proceed OC On Center ODP Open Drip Proof OFNR Optical Fiber Nonconductive Riser OTDR Optical Time Domain Reflectometer PB Pull Box PCMS Portable Changeable Message Signs PCU Photoelectric Control Unit PEP Plant Establishment Period PIC Polyethylene Insulated Cable PL Property Line RFP Request for Proposal RFI Request for Information RPMS Rubber Polymer Modified Slurry SIC Standard Industry Classification SMS Short Message Service SMTP Simple Mail Transfer Protocol SOW Statement of Work, Scope of Work SOV Schedule of Values SPDT Single Pole Double Throw SSD Surge Suppression Devices TDR Time Domain Reflectometer TEES Transportation Electrical Equipment Specifications TFFN Thermoplastic Flexible Fixture Wire Nylon Jacketed TIG Tungsten Inert Gas UF Underground Feeder UPRR Union Pacific Railroad Company VAC Volts AC VPC Vitrified Polymer Composite WBE Women Business Enterprise 1-3.3 Institutions. ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 68 of 214 AMTRACK American Track National Railroad Passenger Corp. ANSI American National Standards Institute AASHTO American Association of State Highway and Transportation Officials AISC American Institute of Steel Construction ANSI American National Standards Institute API American Petroleum Institute AREA American Railway Engineering Association ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWS American Welding Society AWWA American Water Works Association BNSF Burlington Northern Santa Fe Railway DSD Development Services Department FHWA Federal Highway Administration GRI Geosynthetic Research Institute IPCEA Insulated Power Cable Engineers Association IES Illuminating Engineering Society (Photometric Data) ISO International Organization for Standardization MTS San Diego Metropolitan Transit System NACE National Association of Corrosion Engineers NAFP National Association of Pipe Fabricators NCTD North County Transit District NEMA National Electrical Manufacturers Association NOAA National Oceanic and Atmospheric Administration (Dept. of Commerce) NFPA National Fire Protection Association PCI Prestressed Concrete Institute SANDAG San Diego Association of Governments SD&AE San Diego & Arizona Eastern Railroad SDTI San Diego Trolley, Inc. UL Underwriters’ Laboratories Inc. USGS United States Geological Survey UPRR Union Pacific Railroad Company 1-6 BIDDING AND SUBMISSION OF THE BID 1-6.2 Subcontractor Listing. ADD the following: Each Bidder shall comply with the Chapter of the Public Contract Code including Sections 4100 through 4113. The use of Subcontractors in no way relieves the Contractor of any obligations or responsibilities under the Contract. The following excerpts or summaries of some of the requirements of this Chapter are included below for information: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 69 of 214 The Bidder shall set forth in the Bid, as provided in Section 4104: “(a) The name and location of the place of business of each Subcontractor who will perform Work or Labor or render service to the prime Contractor in or about the construction of the Work or improvements, or a Subcontractor licensed by the State of California who, under Subcontract to the prime Contractor, specially fabricates and installs a portion of the Work or improvement according to detailed Drawings contained in the Plans and Specifications, in an amount in excess of one-half of 1 percent of the prime Contractor’s total Bid, or, in the case of Bids or offers for the construction of streets or highways, including bridges, in excess of one-half of 1 percent of the prime Contractor’s total Bid or ten thousand dollars ($10,000), whichever is greater.” “(b) The portion of the Work which will be done by each such Subcontractor under this act. The prime Contractor shall list only one Subcontractor for each such portion as is defined by the prime Contractor in his Bid.” If the Contractor fails to specify a Subcontractor or specifies more than one Subcontractor for the same portion of the Work to be performed under the Contract (in excess of one-half of 1 percent of the Contractor’s total Bid), the Contractor shall be qualified to perform that portion itself, and shall perform that portion itself, except as otherwise provided in the Code. As provided in Section 4107, no Contractor whose Bid is accepted shall substitute any person as Subcontractor in place of the Subcontractor listed in the original Bid, except for causes and by procedures established in Section 4107.5. This section provides procedures to correct a clerical error in the listing of a Subcontractor. Section 4110 provides that a Contractor violating any of the provisions of the Chapter violates the Contract and the Board may exercise the option either to cancel the Contract or assess the Contractor a penalty in an amount of not more than 10 percent of the Subcontract involved, after a public hearing. 1-7 AWARD AND EXECUTION OF THE CONTRACT 1-7.1 General. DELETE in its entirety and SUBSTITUTE with the following: 1-7.1 Standard Contract Provisions. 1-7.1.1 Successor’s Obligations. All grants, covenants, provisions and claims, rights, powers, privileges and abilities contained in the Contract Documents shall be read and held as made by and with, and granted to and imposed upon, the Contractor, the Agency, and the Contractor’s and the Agency’s respective heirs, executors, administrators, successors, and assigns. 1-7.1.2 Waiver of Legal Rights. 1. The Agency’s failure to insist, in any 1 or more instances, upon the performance of any provision of the Contract, or to exercise any right therein, shall not be construed as a waiver or relinquishment of such provisions or rights. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 70 of 214 2. Any waiver of any breach of the Contract shall not be held to be a waiver of any other or subsequent breach. 3. Any waiver the Agency issues to any provision of the Contract shall only be effective if it is agreed upon in writing by the Agency and if it is specific to the matter concerned. 1-7.1.3 Requests for Information (RFI). 1. Inquiries from the Contractor seeking clarification of the requirements of the Contract Documents shall be submitted in writing to the Agency as a Request for Information (RFI). 1-7.1.4 Assignment to Awarding Body. 1. In accordance with subdivision (b) of Public Contract Code Section 7103.5, the Contractor and the Contractor’s Subcontractors shall conform to the following requirements: a. In entering into a public works contract or a subcontract to supply goods, services, or materials pursuant to a public works contract, the Contractor or the Contractor’s Subcontractor offer and agree to assign to the awarding body all rights, title, and interest in and to all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. Sec. 15) or under the Cartwright Act (Business and Professions Code Section 16700 et seq.) arising from purchases of goods, services, or materials pursuant to the public works contract or the subcontract. b. This assignment shall be made and become effective at the time the awarding body tenders to the Contractor, without further acknowledgment by the Parties. 1-7.2 Contract Bonds. ADD the following: 1. Before execution of the Contract, the Bidder shall file surety bonds with the Agency to be approved by the Board in the amounts and for the purposes noted below. Bonds issued by a Surety, who is authorized to issue bonds in California, and whose bonding limitation shown in the circular is enough to provide bonds in the amount required by the Contract shall be deemed approved unless specifically rejected by the Agency. Bonds from all other sureties shall be accompanied by all documents enumerated in Code of Civil Procedure Section 995.660 (a). The Bidder shall pay all bond premiums, costs, and incidentals. 2. Each bond shall incorporate, by reference, the Contract and be signed by both the Bidder and Surety and the signature of the authorized agent of the Surety shall be notarized. 3. The faithful performance/warranty bond will be reduced to 25 percent of the original amount 30 Calendar Days after recordation of the Notice of Completion and will remain in full force and effect for the 1-year warranty period and until all warranty repairs are completed to the satisfaction of the Engineer. The bond to secure payment of laborers and materials suppliers shall be released 6 months plus 30 Calendar Days after recordation of the Notice of Completion if all claims have been paid. 4. All bonds are to be placed with a Surety insurance carrier admitted and authorized to transact the business of insurance in California and whose assets exceed its liabilities in an amount 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 71 of 214 equal to or in excess of the amount of the bond. The bonds are to contain the following documents: a. An original, or a certified copy, of the unrevoked appointment, power of attorney, bylaws, or other instrument entitling or authorizing the person who executed the bond to do so. b. A certified copy of the certificate of authority of the insurer issued by the insurance commissioner. 5. If the Bid is accepted, the Agency may require a financial statement of the assets and liabilities of the Surety for the quarter calendar year preceding the date of the execution of the bond. The financial statement shall be made by an officer’s certificate as defined in Corporations Code Section 173. In the case of a foreign Surety, the financial statement may be verified by the oath of the principal officer or manager residing within the United States. 6. If the Surety on any bond furnished by the Contractor is declared bankrupt, becomes insolvent, or its right to do business is terminated in any state where any part of the Project is located, immediately notify the Engineer; and immediately substitute another bond and Surety acceptable to the Agency. 7. The Contractor shall require the Surety to mail its standard “Bond Status” form to the Agency. ADD 1-7.2.1 Payment. 1. If enumerated in the Contract Documents, the Bid item for “Bonds (Payment and Performance)” includes full compensation for actual costs of payment and performance bonds. The Contractor may submit a request for payment of actual invoiced costs up to the Bid amount, but not to exceed 2.5% of the Contract Price, no less than 10 Working Days after the award of the Contract. 2. If enumerated in the Contract Documents, if the Bid item for “Bonds (Payment and Performance)” exceeds actual invoiced costs, any such differential amount up to the Bid amount shall be paid as a part of the Final Payment. SECTION 2 – SCOPE OF THE WORK 2-1 WORK TO BE DONE ADD the following: 1. Where approval or acceptance by the Agency is required, only a general approval is required. However, such approval does not relieve the Contractor from the Contractor’s responsibility for complying with all applicable laws, codes, and best industry practices. Contractor has its obligation to fulfill all conditions of the Contract. 2. In accordance with the provisions of California Law, the Contractor shall possess or require the Contractor’s Subcontractor(s) to possess valid appropriate license(s) for the Work being performed as conveyed in the Bidding Documents. 2-2 PERMITS DELETE in its entirety and SUBSTITUTE with the following: 2-2 PERMITS, FEES, AND NOTICES 1. The Contractor shall obtain and pay for all business taxes, business licenses, permits, and fees required for constructing the Project and licenses and inspections necessary for the 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 72 of 214 proper execution and completion of the Work, unless specified otherwise in the Contract Documents. a. Resource Agency Permits. [insert when applicable] b. To the extent that there is a change in the type or cost of any of such permits, fees, licenses, or inspection occurring after Award of Contract, there shall be an equitable adjustment in the Contract Price on account of such change under the Extra Work provisions. c. The Contractor shall comply with and give notices required by applicable laws. The Contractor is not entitled to damages or additional payment for delays attributable to the acquisition of permits. d. The Contractor shall pay the Agency for regulatory fees, fines, or penalties imposed on the Agency arising from the Contractor’s failure to complete the Work in accordance with the Contract Documents. 2. Contractor shall not begin work until all permit’s incidental to the Work are obtained. This includes, and is not limited to, encroachment, right-of-way, grading and building permits necessary to perform Work for this Contract on Agency property, streets, or other rights- of-way. Permits for night work, overload, blasting, demolition, and disposal of all materials removed from the Project are also Contractor’s responsibility. 3. The Contractor shall obtain and pay for all permits for the disposal of all materials removed from the Project. The cost of the permit(s) shall be included in the price Bid for the appropriate Bid item and the Agency shall not pay additional compensation for Contractor to obtain such permits. 4. Permits shall be maintained in valid status until acceptance of the Work by the Agency. 2-2.1 Building Permits. 1. The Contractor shall obtain the required building permits from Agency’s permitting departments. Any prior approval obtained for the Plans shall not in any way waive this requirement. 2. Request inspections in accordance with the building codes in effect on the permitted Plans and by City’s Development Services Department, Building Division or Construction Management and Inspection Department. Any Work performed without the benefit of the required permit and subsequent inspection shall be removed and replaced at the discretion of the City Building Inspector at no additional cost. 3. The payment for procuring Building Permits shall be included in the Allowance Bid item for “Building Permits.” If no such Bid item is included in the Bid Schedule, payment shall be included in the various Bid items and no additional payment shall be made. For this project, the building permit is on file for the contractor to pick up from the City’s Development Services Department. 2-2.2 Caltrans Encroachment Permit. 1. Unless specified otherwise, the Agency has applied for the Caltrans Encroachment Permit. a. The Contractor shall pay for and secure the permit prior to construction. b. The Contractor shall arrange and pay for inspection as required by Caltrans. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 73 of 214 2. The Contractor is solely responsible for permit processing delays to the Contract Time that result from incomplete or inaccurate information provided by the Contractor to the Agency or Caltrans. 3. When applicable, the payment for procuring Caltrans Encroachment Permits including any inspection fees shall be included in the allowance Bid item for “Caltrans Encroachment Permit.” If no such Bid item is included in the Bid schedule, payment shall be included in the various Bid items and no additional payment shall be made. 2-3 RIGHT-OF-WAY ADD the following: 1. The Contractor shall coordinate access to private property with the property owners and the timing of accessing private property when the Agency has already obtained rights of entry. Unless otherwise provided, the Contractor shall coordinate, pay for, and assume all responsibility for acquiring using, and disposing of additional work areas and facilities temporarily required. The Contractor shall indemnify and hold the Agency harmless from all claims for damages caused by such actions. The Contractor shall protect any private and public improvements. 2-4 COOPERATION AND COLLATERAL WORK ADD the following: 1. The Contractor shall coordinate and cooperate with all the utility companies during the relocation or construction of their lines. The Contractor may be granted a time extension if, in the opinion of the Engineer, a delay is caused by the utility company. No additional compensation will be made to the Contractor for any such delay. 2. If work to be performed by the Agency or its separate Contractors is not shown or specified in the Contract Documents, the Engineer shall notify the Contractor in writing 10 Working Days prior to the start of such work and make available Plans or Specifications for work to be performed by others that may be pertinent to Contractor’s Work. If Contractor determines that the work to be performed by the Agency or its separate Contractors may interfere with or cause damage or delays to Contractor’s Work, notify the Engineer in writing within 3 Working Days of the Engineer’s notice. The Contractor shall diligently pursue with the Engineer resolution of potential conflicts with the work of others. 3. The Contractor shall prepare and submit to the Engineer for approval a plan and schedule to integrate the work of Contractor or its Subcontractors, Agency or the work of others. The plan shall conform to the tasks identified in the Construction Schedule and identify additional tasks as necessary and the sequencing of interrelated activities. 2-5 THE CONTRACTOR’S EQUIPMENT AND FACILITIES 2-5.2 Temporary Utility Services. ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 74 of 214 1. The Contractor shall furnish, install, maintain, and remove all temporary utility services, such as light, power, electrical, gas, and water, at its own expense for construction and maintenance activities until acceptance of Work. These include piping, wiring, lamps, and other equipment necessary for the Work. 2. The Contractor shall obtain a construction meter for water used for the construction, testing, disinfection and flushing of new water or sewer facilities, vegetation establishment and maintenance, site maintenance, landscaping, cleanup, and all other work requiring water. The Contractor shall contact the water agency that serves the Project Site for requirements. 3. The Contractor shall pay all costs of temporary light, power and water including hookup, service, meter, and any, and all, other charges, deposits and/or fees. The costs shall be considered incidental to the items of Work that they are associated with and no additional payment will be made for them. 2-6 CHANGES REQUESTED BY THE CONTRACTOR ADD the following: 1. Any plan or method of work suggested to the Contractor by the Agency, but not specified or required by the Contract or Change Order, which is adopted or followed by the Contractor in whole or in part shall be done at the Contractor’s sole risk and responsibility. 2. The Contract Price is not subject to adjustment for any type of tax increases after the Award. ADD the following: 2-6.1 Cost Reduction Proposal. 1. The Contractor may submit to the Engineer in writing, proposals for modifying the Plans, Specifications, or other requirements of the Contract for the sole purpose of reducing the total cost of construction. 2. The cost reduction proposal shall not impair, in any manner, the essential functions or characteristics of the Project such as service life, economy of operation, ease of maintenance, quality, desired appearance, or design and safety standards. 3. The following information must be included in the cost reduction proposal: a. A description of both the existing Contract requirements for performing the Work and the proposed changes. b. An itemization of the Contract requirements that shall be changed if the proposal is adopted. c. A detailed estimate of the cost of performing the Work under the existing Contract and under the proposed change. d. A statement of the time within which the Engineer shall act on the cost reduction proposal. e. The Contract items of Work affected by the proposed changes, including any quantity variation attributable thereto. 4. This subsection does not require the Engineer to consider any cost reduction proposal. The Agency shall not be liable to the Contractor for not approving or acting upon any cost reduction proposal the Contractor submitted nor for any delays to the Work attributable to the cost reduction proposal. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 75 of 214 5. If a cost reduction proposal is similar to the information included in the Contract Documents or adopted by the Agency after the advertisement and prior to Award of the Contract, the Engineer will not accept such proposal and reserves the right to make such changes without compensation to the Contractor under the provisions of this subsection. 6. The Contractor shall continue to perform the Work in accordance with the requirements of the Contract until a Change Order incorporating the cost reduction proposal has been issued. 7. The Engineer is the sole judge of the acceptability of a cost reduction proposal and the estimated net savings. In determining the estimated net savings, the Agency has the right to disregard the Contract Bid prices if, in the judgment of the Engineer, such prices do not represent a fair measure of the value of the Work to be performed or to be deleted. 8. The Agency reserves the right to require the Contractor to share in the Agency’s costs of investigating the Contractor’s cost reduction proposal. When this is required, the Contractor shall indicate the Contractor’s acceptance in writing allowing the Agency to deduct amounts payable to the Contractor. 9. If the Engineer accepts the Contractor’s cost reduction proposal in whole or in part, the Engineer shall issue a Change Order to incorporate the changes in the Plans and Specifications which are necessary to permit the cost reduction proposal or such part of it as has been accepted to be put into effect. If the Engineer’s approval is conditional, the Change Order shall include any conditions upon which the Engineer’s approval is based. 10. The Change Order also includes the estimated net savings in the cost of performing the Work due to the accepted cost reduction proposal and provides that the Contract cost be adjusted by crediting the Agency with 50% of estimated net savings amount. 11. The Contract Time shall not be extended by the acceptance of the cost reduction proposal and the performance of the Work unless specified otherwise in the Change Order. 12. The amount specified as payable to the Contractor in the Change Order is full compensation for the cost reduction proposal and the performance of the Work. 13. The Agency expressly reserves the right to adopt a cost reduction proposal for general use on contracts administered by the Agency when it determines that the proposal is suitable for application to other contracts. When an accepted cost reduction proposal is adopted for general use, only the Contractor who first submitted such proposal shall be eligible for compensation subject to this subsection, and in that case, only for contracts awarded prior to submission of the accepted cost reduction proposal. 14. The cost reduction proposals identical or similar to previously submitted proposals shall be eligible for consideration and compensation under the provisions of this subsection if the identical or similar previously submitted proposals were not adopted for general application to other contracts administered by the Agency. 15. Subject to the provisions contained in the Contract, the Agency or any other public agency shall have the right to use all or any part of any submitted cost reduction proposal without obligation or compensation of any kind to the Contractor. 16. The Contractor shall bear all costs to revise bonds for the Project to include the cost reduction incentive proposal work. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 76 of 214 2-7 CHANGES INITIATED BY THE AGENCY 2-7.1 General. ADD the following: 1. The Agency may change the Plans, Specifications, character of the Work, or quantity of Work provided the total arithmetic dollar value of all such changes, both additive and deductive, does not exceed 25 percent of the Contract Price. Should it become necessary to exceed this limitation, the change shall be by written supplemental agreement between the Contractor and Agency, unless both parties agree to proceed with the change by Change Order. 2. Change Orders shall be in writing and state the dollar value of the change or established method of payment, any adjustment in Contract Time of completion, and when negotiated prices are involved, and shall provide for the Contractor’s signature indicating acceptance. 3. Unless expressly set forth in writing in a Change Order signed by the Agency and the Contractor, changes initiated by the Agency shall not be construed as the Agency directing the Contractor’s mean-and-methods in the execution of the Work. 2-7.2 Payment- Contract Unit Prices - not used. 2-7.3 Payment – Increases of More than 50 Percent. 1. Should the actual quantity of an item of Work covered by a Contract Unit Price and constructed in conformance with the Plans and Specifications, exceed the Bid quantity by more than 50 percent, payment for the quantity in excess of 150 percent of the Bid quantity will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 2-8. The Extra Work per Section 2-8, basis of payment, shall not include fixed costs. Fixed costs shall be deemed to have been recovered by the Contractor through payment for 150 percent of the Bid quantity at the Contract Unit Price. 2-7.4 Payment – Decreases of More than 50 Percent Should the actual quantity of an item of Work covered by a Contract Unit Price, and constructed in conformance with the Plans and Specifications, be less than 50 percent of the Bid quantity, an adjustment in payment will not be made unless so requested in writing by the Contractor. If the Contractor so requests, payment will be made on the basis of an adjustment in the Contract Unit Price mutually agreed to by the Contractor and the Agency, or at the option of the Engineer, on the basis of Extra Work per Section 2-8; however, in no case will payment be less than would be made for the actual quantity at the Contract Unit Price nor more than would be made for 50 percent of the Bid quantity at the Contract Unit Price. 2-7.5 Stipulated Unit Prices – not used. 2-7.6 Agreed Prices. Agreed Prices are prices for new or unforeseen Work, or adjustments in Contract Unit Prices per Section 2-7.2, established by mutual agreement between the Contractor and the Agency. If mutual agreement cannot be reached, the Engineer may direct the Contractor to proceed on the 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 77 of 214 basis of Extra Work in accordance with Section 2-8, except as otherwise specified in Sections 2- 7.3 and 2-7.4. 2-7.7 Schedule of Values. Before construction, Contractor shall provide a schedule of values for all lump-sum Bid items that shall be used for the purpose of progress payments. The prices shall be valid for the purpose of Change Orders to the Project. 2-7.8 Eliminated Items. Should any Bid item be eliminated in its entirety, payment will be made to the Contractor for its actual costs incurred in connection with the eliminated item prior to notification in writing from the Engineer so stating its elimination. If material conforming to the Plans and Specifications is ordered by the Contractor for use in the eliminated item prior to the date of notification of elimination by the Engineer, and if the order for that material cannot be canceled, payment will be made to the Contractor for the actual cost of the material. In this case, the material shall become the property of the Agency. Payment will be made to the Contractor for its actual costs for any further handling. If the material is returnable, the material shall be returned, and payment will be made to the Contractor for the actual cost of charges made by the supplier for returning the material and for handling by the Contractor. Actual costs, as used in this Agency Supplement, shall be computed on the basis of Extra Work per Section 2-8. 2-8 EXTRA WORK ADD the following: 1. New or unforeseen Work will be classified as “Extra Work” when the Engineer determines that it is not covered by Contract Unit Prices or stipulated unit prices. 2. Any request by the Contractor for Extra Work shall be in writing to the Engineer and shall include itemized estimates and in accordance with Section 7-4. The Contractor shall fully itemize the Extra Work cost estimates such as labor and payroll costs, quantities, crew composition, production rates, material costs, Subcontractor and Supplier costs, equipment costs, supplemental costs, and time impact. 2-9 CHANGED CONDITIONS ADD the following: The Contractor shall promptly notify the Engineer of the following Work Site conditions (“Changed Conditions”), in writing, upon their discovery and before they are disturbed: 1. Subsurface or latent physical conditions differing materially from those represented in the Contract; 2. Unknown physical conditions of an unusual nature differing materially from those ordinarily encountered and generally recognized as inherent in work of the character being performed; and 3. Material differing from that represented in the Contract which the Contractor believes may be hazardous waste, as defined in Health and Safety Code Section 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 78 of 214 25117, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law. The Engineer will promptly investigate conditions which appear to be Changed Conditions. If the Engineer determines that conditions are Changed Conditions and they will materially affect performance time, the Contractor, upon submitting a written request, will be granted an extension of time subject to Section 6-4.2. If the Engineer determines that the conditions do not justify an adjustment in compensation, the Contractor will be notified in writing. This notice will also advise the Contractor of its obligation to notify the Engineer in writing if the Contractor disagrees. The Contractor’s failure to give notice of Changed Conditions promptly upon their discovery and before they are disturbed shall constitute a waiver of all claims in connection with them. 1. The Contractor shall not be entitled to the payment of any additional compensation for any act, or failure to act, by the Engineer, including failure or refusal to issue a Change Order, or for the occurrence of any event or other cause, unless the Contractor shall have first given the Engineer written notice of potential claim as specified in this Section 2-9. Compliance with this section shall not be required as a prerequisite to notice provisions in Section 6-4.2(4) Extensions of Time, nor to any claim that is based on differences in measurement or errors of computation as to Contract quantities. 2. The Contractor shall provide the Agency with a written document containing a description of the particular circumstances giving rise to the potential claim, the reasons for which the Contractor believes additional compensation may be due and the nature of any and all costs involved within 20 Working Days of the date of service of the written notice of potential claim for Changed Conditions. Verbal notifications will not be accepted. 3. The potential claim shall include the following certification relative to the California False Claims Act, Government Code Sections 12650-12656. “The undersigned certifies that the above statements are made in full awareness of the California False Claims Act, Government Code Sections 12650-12656. The undersigned further understands and agrees that this potential claim, unless resolved, must be restated as a claim in response to the Agency’s proposed final estimate for it to be further considered.” By: Title: Date: Company Name: 4. The Contractor’s estimate of costs may be updated when actual costs are known. The Contractor shall submit proof of its actual costs to the Engineer within 20 Working Days after 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 79 of 214 the affected Work is completed. Failure to do so shall be cause to deny any later-filed claim regarding a potential claim described in this Section 2-9. 5. The intent of this Section 2-9 is to have differences between the parties arising under the Contract brought to the attention of the Engineer at the earliest possible time so that such matters can be settled, if possible, or other appropriate action promptly taken. 2-10 DISPUTED WORK ADD 2-10.1 Claims. 1. A Claim is a written demand by the Contractor that seeks an adjustment in the Contract Price, Contract Time, or other relief associated with a dispute arising under or relating to the Contract, including a breach of any Contract provision. A voucher, invoice, or other routine request for payment is not a Claim. 2. A Claim shall conform to these specifications and may be considered after the Agency has previously denied a request by the Contractor for a Change Order seeking the demanded relief. 3. The Contractor shall submit a Claim to the Engineer if a dispute occurs that arises from or relates to the Contract. The Claim shall seek all relief to which the Contractor asserts the Contractor is entitled as a result of the event(s) giving rise to the dispute. The Contractor’s failure to process a Claim in accordance with these specifications shall constitute a waiver of all relief associated with the dispute. Claims are subject to 6-10, “Right to Audit.” 4. The Contractor shall continue to perform the Services and Work and shall maintain the Schedule during any dispute proceedings. The Engineer will continue to make payments for undisputed Services and Work. 5. The Agency’s Claims process specified in the Agency Supplement shall not relieve the Contractor of the Contractor’s statutory obligations to present Claims prior to any action under the Government Code. 6. Except for those final payment items disputed in the written statement required in Section 7-3.2, all Claims of any dollar amount shall be submitted in a written statement by the Contractor no later than the date of receipt of the final payment estimate. Those final payment items disputed in the written statement required in Section 7-3.2 shall be submitted no later than 30 Calendar Days after receipt of the Final Payment estimate. No Claim will be considered that was not included in this written statement, nor will any Claim be allowed for which written notice or protest is required under any provision of this Contract, including Sections 2-9 Changed Conditions, 2-10 Disputed Work, 4-1(22) Protection, 6-4.4 Written Notice and Report, or 6-4.2(4) Extensions of Time, unless the Contractor has complied with notice or protest requirements. 7. The Engineer will consider Contractor’s filed Claims, which must be detailed enough so the Engineer can determine the basis and amount of the Claims. Contractor shall provide the Engineer additional information to determine the facts or contentions involved in a Claim if requested by the Engineer. If additional information is needed, Contractor must provide Engineer with this information within a reasonable time of being asked for additional information. Failure to submit such information and details will be sufficient cause for denying the Claims. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 80 of 214 8. Payment for Claims shall be processed by the next payment application of their resolution for those Claims approved by the Engineer. The Contractor shall proceed with informal dispute resolution under Section 2-10, Disputed Work, for those Claims remaining in dispute. 2-10.1.1 Initiation of Claim. 1. A Claim is a written demand by the Contractor that seeks an adjustment in the Contract Price, Contract Time, or other relief associated with a dispute arising under or relating to the Contract, including a breach of any provision of the Contract. A voucher, invoice, payment application or other routine request for payment is not a Claim. A Claim shall conform to these specifications and may be considered after the City has previously denied a request from the Contractor for a Change Order seeking the demanded relief. The Contractor shall, consistent with 2-10.1.2, give the Agency written notice of Claim prior to commencing any Disputed Work. Failure to give the notice shall constitute a waiver of all Claims in connection with the Disputed Work. If the Contractor and the Agency are unable to reach agreement on Disputed Work, the Agency may direct the Contractor to proceed with the Work and such direction shall not be construed as the Agency directing the Contractor’s mean-and-methods in the execution of the Work. After the Agency has rejected a Change Order request and prior to proceeding with dispute resolution pursuant to the Public Contract Code, applicable provisions of which are specified below, the Contractor shall attempt to resolve all disputes informally through the following dispute resolution chain of command: For claims with a monetary value of $50,000 or less: i. Project Inspector ii. Fleet and Facilities Project Manager iii. Public Works Manager For claims with a monetary value greater than $50,000: iv. Project Inspector v. Fleet and Facilities Project Manager vi. Public Works Manager vii. City Engineer viii. City Manager or Executive Manager 2. Consistent with Section 2-10.1.2, the Contractor shall submit a complete report within 20 Working Days after completion of the Disputed Work stating its position on the Claim, the contractual basis for the Claim, along with all documentation supporting the costs, Contract Time, and all other evidentiary materials. At each level of Claim or appeal of Claim the Agency will, within 10 Working Days of receipt of the Claim or appeal of Claim, review the Contractor’s report and respond with a position, request additional information or request that the Contractor meet and present its report. When additional information or a meeting is requested the Agency will provide its position within 10 Working Days of receipt of the additional information or Contractor’s presentation of its report. The Contractor may appeal each level’s position up to the Deputy City Engineer/Engineering Manager for claims less than $50,000 and/or up to the City Manager for the City of Carlsbad or Executive Manager for the Carlsbad Municipal Water District for claims greater than $50,000 after which the Contractor may proceed under the provisions of the Public Contract Code. The Agency’s failure to state 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 81 of 214 a position or otherwise respond to a Claim within the timeframes set forth above shall be deemed a rejection of the Claim by the Agency. 3. The authority within the dispute resolution chain of command is limited to recommending a resolution to a Claim to the City Manager for the City of Carlsbad or Executive Manager for the Carlsbad Municipal Water District. Actual approval of the Claim is subject to the Change Order provisions in the Contract. 4. Any remaining Claims not resolved by the informal dispute resolution process described above shall be resolved in accordance with Public Contract Code Section 9204, the relevant portion of which is included below: (d)(1)(A) Upon receipt of a Claim pursuant to this section, the public entity to which the Claim applies shall conduct a reasonable review of the Claim and, within a period not to exceed 45 days, shall provide the Claimant a written statement identifying what portion of the Claim is disputed and what portion is undisputed. Upon receipt of a Claim, a public entity and a Contractor may, by mutual agreement, extend the time period provided in this subdivision. (B) The Claimant shall furnish reasonable documentation to support the Claim. (C) If the public entity needs approval from its governing body to provide the Claimant a written statement identifying the disputed portion and the undisputed portion of the Claim, and the governing body does not meet within the 45 days or within the mutually agreed to extension of time following receipt of a Claim sent by registered mail or certified mail, return receipt requested, the public entity shall have up to three days following the next duly publicly noticed meeting of the governing body after the 45-day period, or extension, expires to provide the Claimant a written statement identifying the disputed portion and the undisputed portion. (D) Any payment due on an undisputed portion of the Claim shall be processed and made within 60 days after the public entity issues its written statement. If the public entity fails to issue a written statement, paragraph (3) shall apply. (2)(A) If the Claimant disputes the public entity's written response, or if the public entity fails to respond to a Claim issued pursuant to this section within the time prescribed, the Claimant may demand in writing an informal conference to meet and confer for settlement of the issues in dispute. Upon receipt of a demand in writing sent by registered mail or certified mail, return receipt requested, the public entity shall schedule a meet and confer conference within 30 days for settlement of the dispute. (B) Within 10 business days following the conclusion of the meet and confer conference, if the Claim or any portion of the Claim remains in dispute, the public entity shall provide the Claimant a written statement identifying the portion of the Claim that remains in dispute and the portion that is undisputed. Any payment due on an undisputed portion of the Claim shall be processed and made within 60 days 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 82 of 214 after the public entity issues its written statement. Any disputed portion of the Claim, as identified by the Contractor in writing, shall be submitted to nonbinding mediation, with the public entity and the Claimant sharing the associated costs equally. The public entity and Claimant shall mutually agree to a mediator within 10 business days after the disputed portion of the Claim has been identified in writing. If the parties cannot agree upon a mediator, each party shall select a mediator and those mediators shall select a qualified neutral third party to mediate with regard to the disputed portion of the Claim. Each party shall bear the fees and costs charged by its respective mediator in connection with the selection of the neutral mediator. If mediation is unsuccessful, the parts of the Claim remaining in dispute shall be subject to applicable procedures outside this section. (C) For purposes of this section, mediation includes any nonbinding process, including, but not limited to, neutral evaluation or a dispute review board, in which an independent third party or board assists the parties in dispute resolution through negotiation or by issuance of an evaluation. Any mediation utilized shall conform to the timeframes in this section. (D) Unless otherwise agreed to by the public entity and the Contractor in writing, the mediation conducted pursuant to this section shall excuse any further obligation under Section 20104.4 to mediate after litigation has been commenced. (E) This section does not preclude a public entity from requiring arbitration of disputes under private arbitration or the Public Works Contract Arbitration Program if mediation under this section does not resolve the parties' dispute. (3) Failure by the public entity to respond to a Claim from a Contractor within the time periods described in this subdivision or to otherwise meet the time requirements of this section shall result in the Claim being deemed rejected in its entirety. A Claim that is denied by reason of the public entity's failure to have responded to a Claim, or its failure to otherwise meet the time requirements of this section, shall not constitute an adverse finding with regard to the merits of the Claim or the responsibility or qualifications of the Claimant. (4) Amounts not paid in a timely manner as required by this section shall bear interest at 7 percent per annum. (5) If a Subcontractor or a lower tier Subcontractor lacks legal standing to assert a Claim against a public entity because privity of Contract does not exist, the Contractor may present to the public entity a Claim on behalf of a Subcontractor or lower tier Subcontractor. A Subcontractor may request in writing, either on their own behalf or on behalf of a lower tier Subcontractor, that the Contractor present a Claim for work which was performed by the Subcontractor or by a lower tier Subcontractor on behalf of the Subcontractor. The Subcontractor requesting that the Claim be presented to 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 83 of 214 the public entity shall furnish reasonable documentation to support the Claim. Within 45 days of receipt of this written request, the Contractor shall notify the Subcontractor in writing as to whether the Contractor presented the Claim to the public entity and, if the original Contractor did not present the Claim, provide the Subcontractor with a statement of the reasons for not having done so. (e) The text of this section or a summary of it shall be set forth in the Plans or Specifications for any Public Works Project that may give rise to a Claim under this section. (f) A waiver of the rights granted by this section is void and contrary to public policy, provided, however, that (1) upon receipt of a Claim, the parties may mutually agree to waive, in writing, mediation and proceed directly to the commencement of a civil action or binding arbitration, as applicable; and (2) a public entity may prescribe reasonable Change Order, Claim, and dispute resolution procedures and requirements in addition to the provisions of this section, so long as the contractual provisions do not conflict with or otherwise impair the timeframes and procedures set forth in this section. (g) This section applies to contracts entered into on or after January 1, 2017. (h) Nothing in this section shall impose liability upon a public entity that makes loans or grants available through a competitive application process, for the failure of an awardee to meet its contractual obligations. (i) This section shall remain in effect only until January 1, 2027, and as of that date is repealed, unless a later enacted statute that is enacted before January 1, 2027, deletes, or extends that date. In addition, all Claims by Contractor for $375,000 or less shall be resolved in accordance with the procedures in the Public Contract Code Section 20104 et seq., applicable provisions of which are included below: 20104.2 For any Claim subject to this article, the following requirements apply: (a) The Claim shall be in writing and include the documents necessary to substantiate the Claim. Claims must be filed on or before the date of final payment. Nothing in this subdivision is intended to extend the time limit or supersede notice requirements otherwise provided by contract for the filing of Claims. (b)(1) For Claims of less than fifty thousand dollars ($50,000), the local agency shall respond in writing to any written Claim within 45 days of receipt of the Claim, or may request, in writing, within 30 days of receipt of the Claim, any additional 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 84 of 214 documentation supporting the Claim or relating to defenses to the Claim the local agency may have against the Claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the Claimant. (3) The local agency's written response to the Claim, as further documented, shall be submitted to the Claimant within 15 days after receipt of the further documentation or within a period of time no greater than that taken by the Claimant in producing the additional information, whichever is greater. (c)(1) For Claims of over fifty thousand dollars ($50,000) and less than or equal to three hundred seventy-five thousand dollars ($375,000), the local agency shall respond in writing to all written Claims within 60 days of receipt of the Claim, or may request, in writing, within 30 days of receipt of the Claim, any additional documentation supporting the Claim or relating to defenses to the Claim the local agency may have against the Claimant. (2) If additional information is thereafter required, it shall be requested and provided pursuant to this subdivision, upon mutual agreement of the local agency and the Claimant. (3) The local agency's written response to the Claim, as further documented, shall be submitted to the Claimant within 30 days after receipt of the further documentation, or within a period of time no greater than that taken by the Claimant in producing the additional information or requested documentation, whichever is greater. (d) If the Claimant disputes the local agency's written response, or the local agency fails to respond within the time prescribed, the Claimant may so notify the local agency, in writing, either within 15 days of receipt of the local agency's response or within 15 days of the local agency's failure to respond within the time prescribed, respectively, and demand an informal conference to meet and confer for settlement of the issues in dispute. Upon a demand, the local agency shall schedule a meet and confer conference within 30 days for settlement of the dispute. (e) Following the meet and confer conference, if the Claim or any portion remains in dispute, the Claimant may file a Claim as provided in Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. For purposes of those provisions, the running of the period of time within which a Claim must be filed shall be tolled from the time the Claimant submits his or her written Claim pursuant to subdivision (a) until the time that Claim is denied as a result of the meet and confer process, including any period of time utilized by the meet and confer process. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 85 of 214 (f) This article does not apply to tort Claims and nothing in this article is intended nor shall be construed to change the time periods for filing tort Claims or actions specified by Chapter 1 (commencing with Section 900) and Chapter 2 (commencing with Section 910) of Part 3 of Division 3.6 of Title 1 of the Government Code. 20104.4 The following procedures are established for all civil actions filed to resolve Claims subject to this article: (a) Within 60 days, but no earlier than 30 days, following the filing or responsive pleadings, the court shall submit the matter to nonbinding mediation unless waived by mutual stipulation of both parties. The mediation process shall provide for the selection within 15 days by both parties of a disinterested third person as mediator, shall be commenced within 30 days of the submittal, and shall be concluded within 15 days from the commencement of the mediation unless a time requirement is extended upon a good cause showing to the court or by stipulation of both parties. If the parties fail to select a mediator within the 15-day period, any party may petition the court to appoint the mediator. (b)(1) If the matter remains in dispute, the case shall be submitted to judicial arbitration pursuant to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, notwithstanding Section 1141.11 of that code. The Civil Discovery Act (Title 4 (commencing with Section 2016.010) of Part 4 of the Code of Civil Procedure) shall apply to any proceeding brought under this subdivision consistent with the rules pertaining to judicial arbitration. (2) Notwithstanding any other provision of law, upon stipulation of the parties, arbitrators appointed for purposes of this article shall be experienced in construction law, and, upon stipulation of the parties, mediators and arbitrators shall be paid necessary and reasonable hourly rates of pay not to exceed their customary rate, and such fees and expenses shall be paid equally by the parties, except in the case of arbitration where the arbitrator, for good cause, determines a different division. In no event shall these fees or expenses be paid by state or county funds. (3) In addition to Chapter 2.5 (commencing with Section 1141.10) of Title 3 of Part 3 of the Code of Civil Procedure, any party who after receiving an arbitration award requests a trial de novo but does not obtain a more favorable judgment shall, in addition to payment of costs and fees under that chapter, pay the attorney's fees of the other party arising out of the trial de novo. (b) The court may, upon request by any party, order any witnesses to participate in the mediation or arbitration process. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 86 of 214 20104.6 Payment on undisputed portion of Claim; interest on arbitration awards or judgments: (a) No local agency shall fail to pay money as to any portion of a Claim which is undisputed except as otherwise provided in the Contract. (b) In any suit filed under Section 20104.4, the local agency shall pay interest at the legal rate on any arbitration award or judgment. The interest shall begin to accrue on the date the suit is filed in a court of law. 5. Although not to be construed as proceeding under Extra Work provisions, the Contractor shall keep and furnish records of disputed Work in accordance with Section 2-10. 2-10.1.2 Claim Certification Submittal. 1. If the Contractor’s Claim seeks an increase in the Contract Price, the Contract Time, or both, submit with the Claim an affidavit certifying the following: a. The Claim is made in good faith and covers all costs and delays to which the Contractor is entitled as a result of the event(s) giving rise to the Claim. b. The amount Claimed accurately reflects the adjustments in the Contract Price, the Contract Time, or both to which the Contractor believes the Contractor is entitled. c. All supporting costs and pricing data are current, accurate, and complete to the best of the Contractor’s knowledge. The Contractor shall supply a cost breakdown per item of Work. d. The Contractor shall ensure that the affidavit is executed by an official who has the authority to legally bind the Contractor. 2-10.1.3 Agency’s Final Determination. 1. If the Contractor disagrees with the City Manager or Executive Manager’s final determination, as described in 2-10.1.1(1-2), Contractor must notify the Engineer in writing of the Contractor’s objection within 15 Working Days after receipt of the written determination and file a “Request for Mediation” in accordance with 2-10.2, “Dispute Resolution Process.” 2. Failure to give notice of objection within the 15 Working Days period shall waive the Contractor’s right to pursue the Claim. 2-10.1.6 Mandatory Assistance. 1. If a third-party dispute, litigation, or both, arises out of or relates in any way to the Services provided under the Contract, upon the Agency’s request, the Contractor shall assist in resolving the dispute or litigation. The Contractor’s assistance includes, but is not limited to the following: a. Providing requested documents in a timely manner. b. Providing professional consultations. c. Attending mediations, arbitrations, depositions, trials, or any event related to the dispute resolution and litigation. 2-10.1.6.1 Compensation for Mandatory Assistance. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 87 of 214 1. The Agency will reimburse the Contractor for reasonable fees and expenses incurred by the Contractor for any required assistance rendered in accordance with 2-10.1.6, “Mandatory Assistance” as Extra Work. 2. The Engineer will determine whether these fees and expenses were necessary due to the Contractor’s conduct or failure to act. 3. If the Engineer determines that the basis of the dispute or litigation in which these fees and expenses were incurred were the result of the Contractor’s conduct or the Contractor’s failure to act in part or in whole, the Contractor shall reimburse the Agency for any payments made for these fees and expenses. Reimbursement may be through any legal means necessary, including the Agency’s withholding of the Contractor’s payment. ADD 2-10.2 Dispute Resolution Process 2-10.2.1 Mandatory Non-binding Mediation. 1. If a dispute arises out of or relates to the Contract, or the breach of it, and if the dispute cannot be settled through those procedures described in Section 2-10.1.1, the parties must attempt to settle the dispute in an amicable manner, using mandatory mediation under the Construction Industry Mediation Rules of the American Arbitration Association before having recourse in a court of law. 2. To initiate mediation, the initiating party shall serve a Request for Mediation at the American Arbitration Association (AAA). 2-10.2.2 Mandatory Mediation Costs. 1. The expenses of witnesses for either side shall be paid by the party producing such witnesses. All other expenses of the mediation, including required traveling and other expenses of the mediator and the cost of any proofs or expert advice produced at the direct request of the mediator, shall be borne equally by the parties, unless they agree otherwise. 2-10.2.3 Selection of Mediator. 1. A single mediator, knowledgeable in construction aspects and acceptable to both parties, shall be used to mediate the dispute. 2. If AAA is used, the initiating party shall concurrently file with AAA a “Request for Mediation” along with the appropriate fees, a copy of requested mediators marked in preference order, and a preference for available dates. 3. If AAA is selected to coordinate the mediation (Administrator), within 10 Working Days from the receipt of the initiating party’s Request for Mediation, the opposing party shall file the following: a. A copy of the list of the preferred mediators listed in preference order after striking any mediators to which they have any objection. b. A preference for available dates. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 88 of 214 c. Appropriate fees. 4. If the parties cannot agree on a mediator, then each party shall select a mediator and those mediators shall select the neutral third party to mediate the matter. 2-10.2.4 Conduct of Mediation Sessions. 1. Mediation hearings shall be conducted in an informal manner and discovery shall not be allowed. 2. Discussions, statements, or admissions shall be confidential to the proceedings and shall not be used for any other purpose regarding the party’s legal position. The parties may agree to exchange any information they deem necessary. 3. Both parties shall have an authorized representative attend the mediation. Each representative shall have the authority to recommend entering into a settlement. Either party may have attorney(s), witnesses, or expert(s) present. Either party may request a list of witnesses and notifications of whether attorney(s) shall be present. 4. Any resulting agreements from mediation shall be documented in writing. Mediation results and documents, by themselves, shall be “non-binding” and inadmissible for any purpose in any legal proceeding, unless such admission is otherwise agreed upon in writing by both parties. Mediators shall not be subject to any subpoena or liability and their actions shall not be subject to discovery. ADD 2-10.3 Governing Law & Forum for Litigation. 1. This Contract shall be governed by and construed in accordance with the laws of the State of California. Any lawsuits, at law or in equity, between the parties arising out of this Contract shall be filed in a court of competent jurisdiction in the County of San Diego. With respect to venue, the parties agree that this Contract is made in and will be performed in the County of San Diego. The parties waive all provisions of law providing for a change of venue in these proceedings to any other county. ADD 2-10.4 Pre-judgment Interest. 1. The parties stipulate that if a judgment is entered against a party for breaching this Contract, the pre-judgment interest shall be 2% per annum. SECTION 3 – CONTROL OF THE WORK 3-2 SELF-PERFORMANCE ADD the following: 1. If Contractor fails to satisfy the provisions requiring the Contractor to complete Work amounting to at least 50 percent of the Contract price with its own organization unless stipulated otherwise in the Contract Documents, the Agency may at its sole discretion elect to cancel the Contract or deduct an amount equal to 10 percent of the value of the Work 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 89 of 214 performed in excess of 50 percent of the Contract Price by other than the Contractor’s own organization. The Board shall be the sole body for determination of a violation of these provisions. In any proceedings under this section, the Contractor, or prime Contractor, shall be entitled to a public hearing before the Board and shall be notified 10 Calendar Days in advance of the time and location of the hearing. The determination of the Board shall be final. 3-3 SUBCONTRACTORS ADD the following: 1. The Contractor shall incorporate these Specifications in the Contractor’s subcontracts for the work being performed by the Contractor’s Subcontractor. 2. The Contractor shall obtain or require that each Subcontractor obtains insurance policies in accordance with 5-4, “INSURANCE” which shall be kept in full force and effect for the duration of the Contract and in any attached supplemental agreements. 3. In any dispute between the Contractor and the Contractor’s Subcontractors, the Agency shall not be made a party to any judicial or administrative proceeding to resolve the dispute. 4. The Contractor shall ensure that the Contractor’s Subcontractors are appropriately licensed for the duration of the work that is performed under the Subcontracts in accordance with 2- 1, “WORK TO BE DONE.” If a Subcontractor is not properly licensed, the Contractor shall cease payment to the Subcontractor for all work performed when the Subcontractor was not properly licensed. The Contractor shall return to the Agency any payment the Contractor made to a Subcontractor for work performed when the Subcontractor was not licensed. 5. Subcontractors shall be considered employees of the Contractor, and the Contractor shall be responsible for their work. 6. Where the Contract Documents require that a particular product be installed or applied by an applicator approved by the manufacturer, ensure the Subcontractor or Supplier employed for such work is approved by the manufacturer. 7. Before the work of any Subcontractor is started, the Contractor shall submit to the Engineer for approval a written statement showing the Work to be subcontracted giving the name and business of each Subcontractor and description and value of each portion of the Work to be so subcontracted. This submittal will confirm the Subcontractor’s commitments in the Bid. 3-4 AUTHORITY OF THE ENGINEER ADD the following: 1. The Engineer shall be the single point of contact and shall be included in all communications between Contractor and any Agency representative. 3-5 INSPECTION ADD the following: 1. Contractor shall make available to the Engineer accurate books and accounting records regarding all its activities. Contractor shall contractually require all Subcontractors to this Contract to do the same. The Engineer shall have access to the Contractor’s, and any Subcontractors documents described in this Section 3-5(1) within San Diego County. The 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 90 of 214 Engineer shall have the right to monitor, assess, and evaluate Contractor’s and its Subcontractor’s performance pursuant to this Contract. The Engineer’s monitoring, assessments, and evaluations will include, but shall not be limited to, audits, inspection of premises, reports, contracts, subcontracts and interviews of Contractor’s staff and the staff of all Subcontractors to this Contract. Upon reasonable advance notice, Contractor shall make available to the Engineer for examination, all of its, and all Subcontractors to this Contract, records with respect to all matters covered by this Contract. Contractor shall also permit the Engineer to audit, examine, copy and make excerpts or transcripts from such data and records, and to make audits of all invoices, materials, payrolls, records of personnel, and other data relating to all matters covered by this Contract. Any inspection described in this Section 3-5(1) shall occur as often as the Engineer deems necessary and during normal business hours. However, any such inspection shall not unreasonably interfere with Contractor’s ongoing business operations. Contractor and all Subcontractors to this Contract shall maintain such data and records for as long as may be required by applicable laws and regulations. 2. The Agency may utilize consultants to assist the Engineer during construction in observing the Contractor’s performance. The consultant shall be the Agency’s Representative on the Site assisting the Engineer and must not be confused with a building inspector with the Agency or with a Special Inspector. 3. The Agency may utilize a Special Inspector for inspection of specialty work and materials, whose costs the Agency will pay for unless the Contractor fails inspection. If inspections or tests reveal non-compliance with the requirements of the Contract Documents, the Contractor shall pay for all corrective measures deemed necessary by the Engineer and also pay the cost of the Agency’s subsequent re-inspection and re-testing. 4. Inspections required by codes or ordinances are the Contractor’s responsibility. 5. The Contractor’s quality control testing and inspections are the Contractor’s responsibility. Contractor shall coordinate and schedule all inspections and tests. The Contractor shall give the Engineer notice of tests and inspections made by others. At least 5 Working Days of notice shall be given for offsite inspections. The Contractor shall wait until the Engineer has responded and agreed to Contractor’s schedule before scheduling test or inspections. 6. The Agency shall schedule any inspections and tests as the Agency deems necessary to ensure the Work is accomplished in accordance with the requirements of the Contract Documents (other than inspections for work performed in accordance with a permit). The Contractor is responsible for the inspection of all Work performed in accordance with the Contract Documents. 7. Contractor shall provide access in accordance with Cal-OSHA Standards as necessary. 8. Contractor shall remove and replace any items of Work performed without the required permit or inspection. For required subsequent inspection, the Contractor shall remove and replace Work at the discretion of Engineer at no additional cost to the Agency. Inspection of the Work does not relieve the Contractor of full compliance with the Contract Documents. 9. Contractor shall not conceal the Work prior to inspection, testing, or approval required by the Contract Documents, the Engineer’s prior written request, or by other agencies. If any item of Work is done prior to obtaining the required approvals when requested by the Engineer, Contractor shall expose the Work for inspection, testing, and/or approval. Upon 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 91 of 214 successful completion of the inspection, testing, or approval, the Contractor shall proceed with the Work. The Contractor shall bear all direct and indirect costs and damages of such uncovering and re-covering and shall not be entitled to an increase in the Contract Price or the Contract Time, unless the Contractor has given the Engineer and any other affected agencies written notice of the Contractor’s intention to cover the Work and the Engineer has not acted in response to such notice. 10. When specified, Contractor shall make arrangements for tests, inspections, and approvals with an independent testing laboratory or entity acceptable to the Engineer, or with the appropriate public authority. The payment for such tests, inspections, and approvals are included in the Contract Price. 11. Unless specified otherwise, the Contractor shall pay the cost of inspections and tests. If inspections or tests reveal non-compliance with the requirements of the Contract Documents, the Contractor shall bear the cost of corrective measures deemed necessary by the Engineer and the cost of the Agency’s subsequent re-inspection and re-testing. 12. The Contractor shall, at no charge to the Agency, provide copies of all records in the Contractor’s or Subcontractor’s possession pertaining to the Work that the Engineer may request. 13. Contractor agrees to maintain and/or make available, to the Engineer, within San Diego County, accurate books, and accounting records relative to all its activities and to contractually require all Subcontractors to this Contract to do the same. The Engineer shall have the right to monitor, assess, and evaluate Contractor’s and its Subcontractors performance pursuant to this Contract, the monitoring, assessments, and evaluations to include, but not be limited to, audits, inspection of premises, reports, contracts, subcontracts and interviews of Contractor’s staff and the staff of all Subcontractors to this Contract. At any time during normal business hours and as often as the Engineer may deem necessary, upon reasonable advance notice, Contractor shall make available to the Engineer for examination, all of its, and all of its Subcontractors’ records with respect to all matters covered by this Contract and will permit the Engineer to audit, examine, copy and make excerpts or transcripts from such data and records, and to make audits of all invoices, materials, payrolls, records of personnel, and other data relating to all matters covered by this Contract. However, any such activities shall be carried out in a manner so as to not unreasonably interfere with Contractor’s ongoing business operations. Contractor and all Subcontractors to this Contract shall maintain such data and records for as long as may be required by applicable laws and regulations. 3-6 THE CONTRACTOR’S REPRESENTATIVE ADD the following: 1. Both the representative and alternative representative shall be the Contractor’s employees and shall not be assigned to a Subcontractor unless otherwise approved by the Agency in writing. 2. The Contractor’s Project team shall attend scheduled construction meetings as required by the Engineer. If any of Contractor’s staff cannot attend, the Contractor shall notify the Engineer a minimum of 24 hours in advance, prior to the start of the scheduled meeting. If 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 92 of 214 the Contractor does not provide the required notification, the Contractor shall pay for the costs of the Agency’s staff, consultants, or both that attended. The Contractor shall be charged a minimum of 2 hours of the attendee’s time. 3. The payment for the Contractor’s attendance at Project meetings is included in the Contract Price. The Engineer shall deduct costs assessed to the Contractor for not attending the meetings from the monthly progress payment via Change Order. 3-7 CONTRACT DOCUMENTS 3-7.1 General. ADD the following: 1. Specifications and Plans are divided into groups by engineering discipline for the Agency’s convenience. These divisions are not for the purpose of apportioning the Work or responsibility for the Work among Subcontractors and Suppliers. 2. The Contractor shall supply any Work that may reasonably be inferred from the Specifications or Plans as being required to produce the intended result whether or not it is specifically called for, at no additional cost to the Agency. 3. If referenced documents have been discontinued or updated by the issuing organization, the replacement documents issued or otherwise identified by that organization shall be used or, if there are no replacement documents, the last version of the document before it was discontinued. 4. Scaled dimensions on Contract Documents are approximate. Before ordering materials or commencing the Work, the Contractor shall measure the Site for proper size and fit and verify dimensions and quantities by taking measurements in the field. The Contractor shall be responsible for their accuracy. 5. The Contractor shall verify any conditions affecting the cost of the Work through a reasonable examination of the Work Site prior to submitting the Bid. 6. Existing improvements visible at the Work Site, for which no specific disposition is made on the Plans, but which interfere with the completion of the Work, shall be removed, and disposed of by the Contractor. 7. The Plans, Specifications, and other Contract Documents shall govern the Work. The Contract Documents are intended to be complementary and cooperative. Anything specified in the Specifications and not shown on the Plans or shown on the Plans and not specified in the Specifications, shall be as though shown on or specified in both. 8. The Plans shall be supplemented by such working drawings and shop drawings as are necessary to adequately control the Work. 9. The Contractor shall ascertain the existence of any conditions affecting the cost of the Work through a reasonable examination of the Work Site prior to submitting the Bid. 10. Existing improvements visible at the Work Site, for which no specific disposition is made on the Plans, but which interfere with the completion of the Work, shall be removed, and disposed of by the Contractor. 11. The Contractor shall, upon discovering any error or omission in the Plans or Specifications, immediately call it to the attention of the Engineer. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 93 of 214 3-7.2 Precedence of the Contract Documents. DELETE in its entirety and REPLACE with the following: 1. If there is a conflict between any of the Contract Documents, the document highest in the order of precedence, and most recent in edition, shall control. The order of precedence, from highest to lowest, shall be as follows: a. Permits (issued by jurisdictional regulatory agencies including environmental documents). b. Change Orders and supplemental agreements; whichever occurs last. c. Contract Addenda, whichever occurs last. d. The signed written Contract. e. Bid/Proposal. f. Project Plans. g. Technical Specifications. h. Standard Drawings. i. Agency Supplemental General Provisions (Section 00 73 00). j. Agency Supplemental Technical Provisions (Section 00 74 00). k. Standard Plans i. City of Carlsbad Standard Drawings. ii. Carlsbad Municipal Water District Standard Drawings. iii. City of Carlsbad modifications to the San Diego Area Regional Standard Drawings. iv. Traffic Signal Design Guidelines and Standards. v. State of California Department of Transportation Standard Plans. vi. California Manual on Uniform Traffic Control Devices (CA MUTCD). l. “Greenbook” (Standard Specifications for Public Works Construction). m. Reference Specifications. 2. When additional small business/minority/women-owned/veteran or other special requirements by funding sources are included in the Contract Documents, the funding source’s requirements shall govern. a. With reference to the Drawings, the order of precedence shall be as follows: Figures govern over scaled dimensions. b. Detail Drawings govern over general Drawings. c. Addenda and Change Order Drawings govern over Plans. d. Plans govern over Standard Drawings. 3. When a conflict exists between the ADA requirements of Title 24, and the Agency Supplemental Provisions, the most restrictive requirement shall be followed. ADD: 3-7.3 Red-lines and Record Documents. 3-7.3.1 General. 1. The Contractor shall, at no charge to the Agency, provide copies of all records in the Contractor’s or Subcontractor’s possession pertaining to the Work that the Engineer may request. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 94 of 214 2. The Contractor shall keep the Red-lines current with entries checked by the Engineer before the Work is covered. Contractor’s failure to update and deliver Red-lines information monthly to the Engineer for review and approval may result in the withholding of monthly progress payments. 3. The Contractor shall note the source identification, such as RFI numbers and Change Order numbers, as required identifying the source of the change to the Contract Documents. 4. The Contractor shall deliver the Red-lines to the Engineer upon completion of the Construction Work. 5. The Contractor shall legibly annotate a full-size set of Plans daily, in red ink, to record additions, deletions or changes to the Work and changes in location, elevation or character of the Work not otherwise shown or noted in the Contract Documents. This “redline” set of drawings shall be kept on the Job Site, shall be used only as a record set, and shall be delivered to the Engineer within 10 Calendar Days of completion of the Work. Contractor shall immediately give written notice of any conflicts between these documents to the Engineer. 6. As-built information shall represent field measurements, approved Shop Drawings, Working Drawings, samples, product data, and other pertinent data discovered during the performance of the Work. The Contractor shall note the source of the change such as RFI or Change Order numbers, as required. The Contractor shall clearly record additions or changes in the Work and depth of underground facilities by dimensioning from 2, known, fixed points. 7. Payment for Record Drawings and Documents shall be included in the various Bid items and no additional payment will be made therefore. 3-7.3.2 Asset Specific Red-lines. 1. Irrigation System Red-lines: Not Used. 2. Re-vegetation Red-lines: Not Used 3. Utility Red-lines: Utility Red-lines shall show any changes from the Plan for the following: a. Horizontal and vertical bends b. Changes in pipe material or pressure class c. Isolation valves d. Insulating joints e. Blow off valves by stationing and offsets. f. Air vacuum valves by stationing and offsets. g. Water and recycled water meter boxes replaced. h. Water sampling stations i. Cathodic test stations j. Locations of all sewer laterals and cleanouts. k. Items abandoned in place following dewatering operation. 4. Building/Structure Red-lines: Building Red-lines shall show any changes from the Plans for the following: a. Location by dimension and the depth by elevation of underground lines, valves, plugged tees, and capped ends. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 95 of 214 b. By dimension or scale Plans, wiring, conduits, and pull boxes as installed. c. Information necessary to maintain and service concealed items of Work. d. Dimensional changes to the Drawings. e. Revisions to details shown on the Drawings. f. Depths of foundations below the first floor. g. Locations and depths of underground utilities. h. Revisions to the routing of piping and conduits. i. Revisions to electrical circuitry. j. Actual equipment locations. k. Duct size and routing. l. Locations of concealed internal utilities. m. Changes made by Change Orders. n. Details not shown on original Plans. 5. Traffic Signals and Street Lighting: Not Used 6. Slurry Seal and Asphalt Concrete Overlay: a. The Contractor shall clearly record on the forms the Agency provides in MS Excel format the actual dates and quantity of each Bid item applied to each street segment and comments regarding each segment and record reasons if no work is performed. 7. Fiber Optic and Wi-Fi Device Red-lines: Fiber Optic and Wi-Fi Device Red-lines shall clearly record by dimension from 2 known fixed points and by depth of underground facilities all deviations, modifications, and changes in the Work. Records, deviations, modifications, and changes on the day the Work is performed shall reflect the actual Work location and shall be marked in red at the scale of the Plan sheet on which they are recorded. Red- lines shall show the equipment locations and associated information for the following: a. Locations and depths of underground utilities. b. Revisions to the routing of piping and conduits. c. Actual equipment locations. d. Pull Boxes. e. Electrical Meter, including meter address. f. Items abandoned in place. 3-7.3.3 Payment. 1. The payment for Red-lines Drawings shall be included in the Contract Price. ADD 3-7.4 Measurement and Dimensions. 1. Scaled dimensions are approximate. Before ordering materials or commencing the Work, the Contractor shall measure the Site for proper size and fit and verify dimensions and quantities by taking measurements in the field. Contractor shall be responsible for their accuracy. 3-8 SUBMITTALS 3-8.2 Working Drawings ADD the following: 1. Working Drawings shall be submitted electronically to the Agency. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 96 of 214 DELETE Table 3-8.2 in its entirety and REPLACE with following: Item Section/ Drawing No. Title Subject 1 3-12.5.2 Sewage Bypass and Pumping Plan Sanitary Sewers 2 3-12.8.2 Dewatering Plan Water Pollution Control 3 5-7.2.2 Shoring Plan Safety 4 300-3.2 Cofferdams Structure Excavation & Backfill 5 303-1.6.1 General Falsework 6 303-1.7.1 General Placing Reinforcement 7 303-3.1 General Prestressed Concrete Construction 8 304-1.1.2 Falsework Plans Structural Steel 9 306-8.8 SDW- 154* Valves, Hydrants, and Appurtenances Water Valve Bypass Details for Mainlines 16-Inch and Larger 10 306-8.8.3 Thrust Blocks and Anchor Blocks Unless specified otherwise, design of all size water main thrust blocks and anchor blocks 11 307-1.1 General Jacking Operations 12 307-2.1 General Tunneling Operations 13 308-3 Submittals Microtunneling 14 601-2.1.2 Engineered Traffic Control Plan (TCP) Temporary Traffic Control for Construction and Maintenance Work Zones 15 1001-3 Storm Water Pollution Prevention Plan (SWPPP) Water Pollution Control 16 1001-4 Water Pollution Control Plan (WPCP) Water Pollution Control * Note: The distance dimensions shown between the bypass pipes and the mainlines are subject to change to field conditions. Items listed in Table 3-8.2, except for items 1, 2 and, 5, (if applicable to this project) shall be prepared by a Civil or Structural Engineer registered by the State of California. Item 15 shall be prepared by a Qualified SWPPP Developer (QSD) in accordance with 1001 3, “Storm Water Pollution Prevention Plan (SWPPP).” Item 16 shall be prepared in accordance with 1001-4, “Water Pollution Control Plan (WPCP).” 3-8.3 Shop Drawings. As relevant to project ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 97 of 214 1. Shop Drawings shall be submitted electronically to the Agency. 2. Additional Shop Drawings may be required by the Special Provisions. DELETE Table 3-8.3 in its entirety and REPLACE with following: TABLE 3-8.3 Item Subsection Title Subject 1 207-2.5 Joints Reinforced Concrete Pipe 2 207-8.4 Joints Vitrified Clay Pipe 3 209-2.2.2 Shop Drawings Steel Pipe and Fittings 4 216-1 General Precast Reinforced Concrete Box 5 218-1 General Precast Vault 6 304-1.1.1 Shop Drawings Structural Steel 7 304-2.1 General Metal Hand Railings 3-8.4 Supporting Information. ADD the following: 1. The Contractor shall submit samples of the materials with cut sheets of the products. The Contractor shall organize cut sheets for review and approval by the Engineer prior to use on the Project and identify deviation from any of the specified material clearly, including cut sheets and samples of both the specified material and basis for the substitution. Included should be the Agency’s Project Name, Project Number, and the Engineer’s name, Contractor Name, and Submittal Number and clearly indicate the specific product to be used. 2. When photos of material are required, they shall be clear in resolution, identify the specific item for review, and shall indicate the name of the item, source, and date taken. The material shown in the photo shall be currently available for use on the Project. 3. For landscaping and irrigation materials, the Contractor shall submit samples and test results to the Engineer within 15 Working Days of the Notice to Proceed. 4. Test sections (“Mock ups”) of materials as required in the Special Provisions shall be accepted by the Engineer before proceeding with the Work. 5. The Contractor shall provide and keep up-to-date a complete “As-Built” record set of blue- line prints, which shall be corrected in red daily and show every change from the original Drawings and Specifications and the exact “As-Built” locations, sizes and kinds of equipment, underground piping, valves, and all other Work not visible at surface grade. Prints for this purpose may be obtained from the Agency at cost. This set of Drawings shall be kept on the job and shall be used only as a Record Set and shall be delivered to the Engineer within 10 Calendar Days of completion of the Work. Payment for performing the Work required by Section 2-5.4 shall be included in the various Bid items and no additional payment will be made therefore. 3-8.6 Manufacturer’s Operation, Maintenance, and Warranty Instructions. To sentence (1), DELETE in its entirety and SUBSTITUTE with the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 98 of 214 For each pre-manufactured product covered by a manufacturer’s warranty, Contractor shall submit 1 electronic copy and 3 bound original or legal copies prior to acceptance of the Contract. 3-9 SUBSURFACE DATA DELETE in its entirety and SUBSTITUTE with the following: 3-9 TECHNICAL STUDIES AND SUBSURFACE DATA 1. If reports of explorations and tests of Site conditions are referenced in the Contract Documents, Contractor is encouraged to inspect the Site, acquire, and review these reports, and take other necessary steps to thoroughly familiarize oneself with the Site conditions. If a review of the documents and Site inspection indicate an obstruction or utility conflict with the proposed work, immediately notify the Engineer. 2. Subsurface data shall include geotechnical reports, groundwater elevations, soil analyses and characterization, and other information included or referenced in the Special Provisions and shall apply only at the location of the test holes and to the depths indicated. 3. Contractor is encouraged to review subsurface data, examine the Site and assess the Site conditions pertaining to the Work. If a review of the documents and Site inspection indicate an obstruction or utility conflict with the proposed work, immediately notify the Engineer. 4. Soil test reports for test holes which have been drilled are available for review at the office of the Engineer. Additional exploration may be performed at Contractor’s own expense. 5. The indicated groundwater elevation is that which existed on the date specified in the data. It shall be Contractor’s responsibility to determine and allow for the groundwater elevation on the date the Work is performed. A difference in groundwater elevation between what is shown in soil boring logs and what is encountered during construction shall not be considered as a basis for Extra Work in accordance with 2-8, “Extra Work.” 3-10 SURVEYING 3-10.1 General. ADD the following: 1. The Engineer or Surveyor shall request a right of entry to perform survey services on sewer mains and manholes from City of Carlsbad, wastewater@carlsbadca.gov or call 442-339- 2722, 7 Calendar Days prior to the start of survey services. 2. The Contractor shall hire and pay for the services of a licensed Surveyor (“Surveyor”) to perform all work necessary for establishing control, construction staking, records research and all other surveying work necessary to construct the Work, provide surveying services as required in the Contract and provide surveying, drafting and other professional services required to satisfy the requirements of the Land Surveyors Act. Surveyor shall be resident on the Site during all surveying operations and shall personally supervise and certify the surveying work. 3. All surveying data submittals shall conform to the requirements of Section 3.8, “Submittals.” The Contractor shall submit grade sheets to the Engineer before commencing work in the 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 99 of 214 area affected by the grade sheets. The Contractor shall submit field notes for all required surveying to the Engineer within 10 Calendar Days of performing the survey. All surveying field notes, grade sheets and survey calculations shall be submitted electronically. The field notes, calculations and supporting data shall be clear and complete. Supporting data shall include all maps, affidavits, plats, field notes from earlier surveys and all other evidence used by the Surveyor to determine the location of the monuments set. The field notes and calculations will be labeled with name of the Surveyor, the party chief, the field crewmembers and the author of the field notes or calculations. They shall be annotated with the date of observation or calculation, be numbered with consecutive page numbers and shall be readable without resort to any electronic aid, computer program or documentation for any computer program. The field notes shall be prepared in conformance with the Caltrans “Surveys Manual.” The Contractor shall have a Record of Survey prepared by the Surveyor and file it in conformance with Business and Professions Code Sections 8700-8805 when the Surveyor performs any surveying that such map is required under Business and Professions Code Section 8762 and whenever the Surveyor shall establish, set or construct any permanent survey monument. SDRS drawing M-10 A, B, C type monuments, bolts, spikes, leaded tacks and nails (when set in concrete), iron pipes, reinforcing steel and all monuments and marks that are at, or accessory to, property corners and street centerlines are permanent survey monuments. The Record of Survey shall show all monuments set, control monuments used, the basis of bearings and all other data needed to determine the procedure of survey and the degree of accuracy attained by the field surveying including the unadjusted ratio of closure. The unadjusted ratio of closure shall not exceed 1 part in 40,000. The Record of Survey shall show the location and justification of location of all permanent monuments set and their relation to the street right-of-way. Record(s) of Survey(s) shall be submitted for the Engineer’s review and approval before submittal to the County Surveyor and before submittal to the County Recorder. 4. Payment for Work performed to satisfy the requirements shall be included in the actual Bid items requiring the survey work and no additional payment will be made. Extension of unit prices for Extra Work shall include full compensation for attendant survey work and no additional payment will be made. Payment for the replacement of disturbed monuments and the filing of Records of Survey and/or corner records, including filing fees, shall be incidental to the Work necessitating the disturbance of the monuments and no additional payment will be made. 3-12 CONTRACT INFORMATION SIGNS ADD the following: Signs shall not be posted until approved by the Engineer. The Contractor shall complete and submit a Review for Sign Permit (form P-11), available at: Permits, Applications & Forms | Carlsbad, CA (carlsbadca.gov) 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 100 of 214 3-12 WORK SITE MAINTENANCE 3-12.1 General. ADD the following: 1. Maintain Site improvements including any temporary facilities, equipment, or other materials. Remove graffiti encountered on the Site within 24 hours. See also SECTION 400 - PROTECTION AND RESTORATION. 2. As a condition of Final Payment, the Contractor shall submit a signed and notarized affidavit stating that all brush, trash, debris, and surplus materials resulting from this Project have been disposed of in a legal manner. The cost of disposal is the Contractor’s responsibility. 3. The Contractor shall provide and maintain enclosed toilets for the use of their employees. Toilets must be kept in a neat and sanitary condition and ensure that they comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps. The cost of such is the Contractor’s responsibility. 4. If required in the Special Provisions, the Contractor shall provide and maintain enclosed toilets for the use of the Agency’s and Contractor’s officers, employees, or agents. Toilets must be kept in a neat and sanitary condition and ensure that they comply with all applicable laws, ordinances, and regulations pertaining to public health and sanitation of dwellings and camps. The cost of such is the Contractor’s responsibility. 5. The Contractor shall maintain drainage within and through the work areas. Earth dams will not be permitted in paved areas. Temporary dams of sandbags, asphaltic concrete, or other acceptable material will be permitted, when necessary, by the SWPPP and/ or BMP plan. Such dams shall be removed from the Site as soon as their use is no longer necessary. 6. Work Site maintenance shall be conducted on non-workdays when increased levels of maintenance are deemed necessary, in the opinion of the Engineer, to preserve the health safety or welfare of the public and or to comply with applicable regulations. 7. Disposal of all rubbish and surplus materials is incidental to Work Site maintenance. Disposal shall be made off the Site and shall be in accordance with: a. Local codes and ordinances that govern locations and methods of disposal. b. All applicable safety laws. c. Requirements of Subpart H, Section 1926.252 of the OSHA Safety and Health Standards for Construction. 8. Work Site maintenance is considered incidental to the items of work that they are associated with and no additional payment will be made. 9. Cleanup and Dust Control. Throughout all phases of construction, including suspension of the Work, and until the final acceptance, the Contractor shall keep the Site clean and free from rubbish and debris. The Contractor shall also abate dust nuisance by cleaning, sweeping, and sprinkling with water, or other means as necessary. The use of water resulting in mud on public streets will not be permitted as a substitute for sweeping or other methods. 3-12.2 Air Pollution Control. ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 101 of 214 1. Contractor shall carry out effective measures whenever and as often as necessary to prevent Contractor’s operation from producing dust in amounts damaging to property, cultivated vegetation, domestic animals, or causing a nuisance to persons living or occupying buildings in the vicinity. Contractor shall be responsible for any damage resulting from any dust originating from Contractor’s operations. The dust abatement measures shall be continued until Contractor is relieved of further responsibility by the Engineer. 2. Contractor shall adhere to Air Pollution Control District County of San Diego regulations for equipment used on the Job Site. 3-12.3 Noise Control. ADD the following: 1. All internal combustion engines used in the Work shall be equipped with mufflers in good repair and are subject to the City Noise Control Ordinance, Carlsbad Municipal Code Chapter 8.48. 3-12.4 Storage of Equipment and Materials. 3-12.4.1 General. ADD the following: 1. Equipment and material storage shall be confined to areas approved by the Engineer. Disposal of all rubbish and surplus materials shall be at the Contractor’s expense. 2. The Contractor shall order, purchase, transport, coordinate delivery, accept delivery, confirm the quantity and quality received, prepare storage area(s), store, handle, protect, move, relocate, remove and dispose excess of all materials used to accomplish the Work. 3. Materials shall be delivered to the Work Site only during Working Hours, and shall be accompanied by bills of lading that shall clearly state for each delivery: the name of the Contractor as consignee, the Project name and number, address of delivery and name of consignor and a description of the material(s) shipped. 4. Prior to storage of any materials which have been shipped to or by the Contractor to any location within the City’s boundaries the Contractor shall provide the Engineer a copy of lease agreements for each property where such materials are stored. The lease agreement shall clearly state the term of the lease, the description of materials allowed to be stored and shall provide for the removal of the materials and restoration of the storage site within the time allowed for the Work. 5. All such storage shall conform to all laws and ordinances that may pertain to the materials stored and to preparation of the storage site and the location of the site on which the materials are stored. Storage of hazardous wastes, construction equipment material, and parking and fueling of equipment shall not occur in biologically sensitive areas. 6. Loss, damage or deterioration of all stored materials shall be the Contractor’s responsibility. Conformance to the requirements of this section, both within and outside the limits of work is a part of the Work. The Engineer shall have the right to verify the suitability of materials and their proper storage at any time during the Work. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 102 of 214 7. The Contractor shall furnish and maintain in good condition all equipment and facilities as required for the proper execution and inspection of the Work. Such equipment and facilities shall meet all requirements of applicable ordinances and laws. 8. Restore the storage area to an equal or better condition as deemed necessary by the Engineer and at no additional cost to the Agency. 10. When required by the Engineer, the Contractor shall furnish and operate a self-loading motor sweeper with spray nozzles at least once each Working Day for the purpose of keeping paved areas acceptably clean wherever construction, including restoration, is incomplete. 11. Materials and equipment shall be removed from the Site as soon as they are no longer necessary. Before the final inspection, the Site shall be cleared of equipment, unused materials, and rubbish so as to present a satisfactory clean and neat appearance. All cleanup costs shall be included in the Contractor’s Bid. 12. Care shall be taken to prevent spillage on haul routes. Any such spillage shall be removed immediately, and the area cleaned. 13. Excess excavation material from catch basins or similar structures shall be removed from the Site immediately. Sufficient material may remain for use as backfill if permitted by the Specifications. Forms and form lumber shall be removed from the Site as soon as practicable after stripping. 14. Failure of the Contractor to comply with the Engineer’s cleanup orders may result in an order to suspend Work until the condition is corrected. No additional compensation will be allowed because of such suspension. 15. Cleanup and dust control required in the Contract shall also be executed on weekends and other non-Working Days when needed to preserve the health safety or welfare of the public. The Contractor shall conduct effective cleanup and dust control throughout the duration of the Contract. The Engineer may require increased levels of cleanup and dust control that, in his/her sole discretion, are necessary to preserve the health, safety and welfare of the public. Cleanup and dust control shall be considered incidental to the items of Work that they are associated with and no additional payment will be made for them. 16. Vermin Control. At the time of acceptance, structures entirely constructed under the Contract shall be free of rodents, insects, vermin, and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the Work within the Contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations. 17. Temporary Light, Power, and Water. The Contractor shall furnish, install, maintain, and remove all temporary light, power, and water at its own expense. These include piping, wiring, lamps, and other equipment necessary for the Work. The Contractor shall not draw water from any fire hydrant (except to extinguish a fire), without obtaining permission from the water agency concerned. The Contractor shall obtain a construction meter for water used for the construction, plant establishment, maintenance, cleanup, testing and all other work requiring water related to this Contract. The Contractor shall contact the appropriate water agency for requirements. The Contractor shall pay all costs of temporary light, power and water including hookup, service, meter and any, and all, other charges, deposits and/or fees 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 103 of 214 for them. These costs shall be considered incidental to the items of Work that they are associated with and no additional payment will be made for them. 3-12.4.2 Storage in Public Streets. DELETE in its entirety and SUBSTITUTE with the following: 1. Construction materials shall not be stored in streets, roads, or highways for more than 5 Calendar Days after unloading. All materials not installed or used in construction within 5 Calendar Days after unloading shall be stored at a location approved by the Engineer. 2. Construction equipment shall not be stored at the Work Site before its actual use nor for more than 5 Calendar Days after it is no longer needed. Time necessary for repair or assembly of equipment may be authorized by the Engineer. 3. Excavated material, except that which is to be used as backfill in the adjacent trench, shall not be stored in public streets unless otherwise permitted. Immediately after placing backfill, all excess material shall be removed. 4. The Contractor shall not store equipment for traffic control in right of way. ADD 3-12.4.3 Storage and Staging Areas. 1. Storage and staging areas are the Contractor’s responsibility. If the Plans designate a staging location within the Project or in close proximity, the Contractor may utilize such area for their use. The storage and staging areas shall be as close as possible to the Site. Contractor is responsible for obtaining any permits, leases, or any other items necessary to obtain staging areas. 2. Storage of hazardous wastes, construction equipment material, and parking and fueling of equipment shall not be allowed in the MHPA or other biologically sensitive areas. Ensure the fueling of vehicles occurs only within designated staging areas using appropriate catch basins and devices. 3. Return the storage and staging area and the adjacent area to an equal or better condition as deemed necessary by the Engineer, at no additional cost to the Agency. 4. The Contractor shall provide the Engineer a copy of the lease agreement for any property to be used for the storage of materials or equipment prior to delivery or storage of any materials or equipment. Each lease agreement shall clearly state the term of the lease and a description of the materials or equipment allowed to be stored and shall provide for the removal of the materials or equipment and restoration of the storage site within the time allowed for the Work. 5. Construction equipment shall not be stored at the Work Site before its actual use on the Work nor for more than 5 Calendar Days after it is no longer needed. Time necessary for repair or assembly of equipment may be authorized by the Engineer. 3-12.6 Water Pollution Controls 3-12.6.2 Best Management Practices (BMPs). ADD the following: 1. Contractor shall submit a BMP plan as a submittal to the Agency. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 104 of 214 3-12.6.3 Storm Water Pollution Prevention Plan (SWPPP) Not Used. 3-12.6.5 Payment. DELETE in its entirety and SUBSTITUTE with the following: 1. Unless otherwise specified, payment for water pollution control, including implementation and maintenance of BMPs, shall be considered as included in the Contract Unit Price for each item in the Bid. Payment for dewatering shall be as specified in the Special Provisions. ADD 3-12.7 Vermin Control. 1. The Site and structures constructed under the Contract shall be kept free of rodents, insects, vermin, and pests. Necessary extermination work shall be arranged and paid for by the Contractor as part of the Work within the Contract time and shall be performed by a licensed exterminator in accordance with requirements of governing authorities. The Contractor shall be liable for injury to persons or property and responsible for the elimination of offensive odors resulting from extermination operations. 3-13 COMPLETION, ACCEPTANCE, AND WARRANTY 3-13.1 Completion. DELETE in its entirety and SUBSTITUTE with the following: 1. The Contractor shall comply with the following prior to requesting a Pre-Final inspection of the Work and filing of a written assertion that the Work has been completed: a. Provide completed and signed redline drawings and record documents including installation, maintenance and operation instructions, manuals and/or tools for installed equipment. b. Provide and properly label all keys for existing facilities or new permanent work. c. Provide all items specified to be supplied as extra stock and spare parts. Wrap, seal, or place in a container all items as necessary to allow for storage by the Agency for future use. Verify the specified quantities. d. Provide all final Special Inspection reports and certifications required by equipment manufacturers to demonstrate compliance with applicable codes and standards. e. Obtain any required certifications from the Engineer of Record for permanent BMPs. f. Comply with all requirements of permits issued by jurisdictional agencies. g. Remove temporary facilities from the Site. h. Thoroughly clean the Site and remove all mark-outs and construction staking. 2. The Agency Inspector will schedule the Pre-Final inspection within 5 Working Days of receipt of the Contractor’s request. The Inspector will generate a list of deficiencies (Punchlist) within 5 Working Days after the Pre-Final inspection. 3. The Contractor shall have 30 Working Days to correct the deficiencies and provide a written response to each Punchlist item. The Inspector will review the corrective work within 5 Working Days of receipt of the Contractor’s written response to each Punchlist item. Any outstanding deficiencies will be considered incomplete Work and the Punchlist will be 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 105 of 214 returned to Contractor. Full payment will not be made for any Bid item with outstanding deficiencies and a Final Inspection will not be scheduled until all deficiencies are completed to the satisfaction of the Inspector. 4. The Contractor shall submit a request for Final Inspection which shall include a written assertion that the Work has been completed in accordance with the Contract Documents and a written response describing the corrective Work completed for all punch list items identified in the Pre-Final inspection(s). The request for Final Inspection will not be considered without the Contractor’s written response to the punch list items. The Inspector will schedule the Final Inspection within 10 Working Days of receipt of the Contractor’s request and invitees will include the Construction Manager, Engineer and representatives from agencies or utility companies having jurisdiction over the Work. The Contractor’s attendance is mandatory. 5. If, in the Engineer’s judgment, the Work has been completed in accordance with the Contract Documents, the Engineer will set forth in writing the date the Work was completed. This will be the date when the Contractor is relieved from responsibility to protect and maintain the Work, and to which liquidated damages will be computed. ADD 3-13.1.1 Requirements Before Requesting a Walk-through. 1. The following items are required prior to requesting a Walk-through: a. Remove temporary facilities from the Site. b. Thoroughly cleaning the Site and removing all mark outs and construction staking. c. Provide completed and signed Red-lines in accordance with Contract Document requirements. d. Provide all material and equipment maintenance and operation instructions and/or manuals. e. Provide all tools which are a permanent part of the equipment installed in the Project. f. Provide and properly identify all keys for construction and all keys for permanent work. g. Provide all final Special Inspection reports required by the applicable building code. h. Provide all items specified to be supplied as extra stock. Wrap, seal, or place in a container all items as necessary to allow for storage by the Agency for future use. Verify the specified quantities. i. Ensure that all specified equal opportunity (if applicable) and certified wage rate documentations covering the Contract Time have been submitted. j. Provide the spare parts for the proposed irrigation system as specified in the Special Provisions. 2. Contractor shall notify the Engineer to arrange a final inspection of permanent BMPs installed and shall obtain the completed, signed, and stamped DS-563 Form 30 Calendar Days prior to the issuance of the Notice of Completion. ADD 3-13.1.2 Walk-through and Punchlist Procedure. 1. When Contractor considers that the Work and Services are complete, notify the Engineer in writing that the Project is complete and request that the Contractor and the Engineer perform 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 106 of 214 a Walk-through for the generation of a Punchlist. Contractor shall notify the Engineer at least 7 Working Days in advance of the Walk-through. 2. The Engineer will first determine if the Project is ready for a Walk-through by verifying whether the Contractor have completed all items as required by 3-13.1.1, “Requirements Before Requesting a Walk-through.” 3. If the Work includes sewer and storm drain installations, the inspection shall include televising in accordance with the requirements in the Contract Documents. 4. The Engineer shall facilitate the Walk-through. 5. Contractor shall make Plans, specifications, and technical data, such as submittals and equipment manuals, available at the Site for the Walk-through attendees. 6. The Engineer will provide the Contractor with the Punchlist within 15 Working Days after the date of the Walk-through and submit it to the Contractor. The Agency shall not provide a preliminary Punchlist. 7. If the Engineer finds that the Project is not substantially complete as defined in the Contract, the Engineer will terminate the Walk-through and notify the Contractor in writing. 8. If, at any time during the Engineer’s evaluation of the corrective Work required by the Punchlist, the Engineer discovers that additional corrective Work is required, the Engineer may include that corrective Work in the Punchlist. Contractor shall remain solely responsible for the Project Site until the Project is completely operational, all Punchlist items have been corrected, and all operation and maintenance manuals have been accepted by the Agency. 9. The Engineer shall meet with the Contractor until all Punchlist items are corrected. If Contractor takes longer than 30 Working Days to complete the corrective Work, the Project shall be subject to re-evaluation. 10. Upon acceptance of the Work, Contractor shall assemble and deliver to the Engineer all records, documents, warranties, material certifications, bonds, guarantees, maintenance and service agreements, and maintenance and operating manuals. Written warranties, except manufacturer’s standard printed warranties, shall be on a letterhead addressed to the Contractor. Warranties shall be submitted in the format described in this section, modified as approved by the Agency, to suit the conditions pertaining to the warranty. 3-13.2 Acceptance DELETE in its entirety and SUBSTITUTE with the following: 1. Acceptance of the Work will occur after all the requirements of the Contract Documents have been fulfilled. If, in the Engineer’s judgment, the Contractor has fully performed the Contract, the Engineer will recommend to the City Manager for the City of Carlsbad or Executive Manager for the Carlsbad Municipal Water District that the Contractor’s performance of the Contract be accepted. Upon such certification by the Engineer, the City Manager or Executive Manager may accept the Work. Upon the acceptance of the Work by the City Manager or Executive Manager, a “Notice of Completion” will be filed in the office of the San Diego County Recorder. The date of recordation shall be the date of acceptance of the Work. 2. Once the “Notice of Completion” has been recorded, the Engineer will release the retention. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 107 of 214 3-13.3 Warranty. DELETE in its entirety and SUBSTITUTE with the following: 1. Contractor shall warranty and repair all defective materials and workmanship for a period of 1 year. This warranty period shall start on the date the Work was recorded by the “Notice of Completion” unless the Agency has beneficial use of the Project (excluding water, sewer, and storm drain projects). In addition, Contractor shall warranty the Work against all latent and patent defects for a period of 10 years. 2. The warranty period for specific items covered under manufacturers’ or suppliers’ warranties shall commence on the date they are placed into service at the direction of or as approved by the Engineer in writing. 3. All warranties, express or implied, from Subcontractors, manufacturers, or suppliers, of any tier, for the materials furnished and work performed shall be assigned, in writing, to the Agency, and shall be delivered to the Engineer prior to the acceptance of the Contractor’s performance of the Contract. 4. Replace or repair defective materials and workmanship in a manner satisfactory to the Engineer after notice to do so from the Engineer and within the time specified in the notice. If Contractor fails to make such replacements or repairs within the time specified in the notice, the Agency may perform the replacement or repairs at Contractor’s expense. If Contractor fails to reimburse the Agency for the actual costs, Contractor’s Surety shall be liable for the cost. 5. The warranty period shall be extended with respect to portions of the Work corrected under warranty. Items that shall be warrantied free from defective workmanship and materials for a period longer than 1 year are as follows: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 108 of 214 Specified Item Minimum Warranty Period Detectable Warning Tile Construction 3 Years of Manufacturer’s Warranty All Work Under SECTION 500 – PIPELINE REHABILITATION 3 Years Fiber Optic Interconnect Cables 2 Years Luminaires1 10 Years of Manufacturer’s Warranty LED Signal Modules 3 Years of Manufacturer’s Warranty 1 Provide documentation verifying that the induction luminaire models being offered for the Project are covered by the 10-year warranty. 6. Contractor shall provide the Agency a copy of the manufacturer’s warranty for private sewer pumps, including the alarm panel and all other accessories. a. Contractor shall involve the manufacturer in the installation and startup as needed to secure any extended warranty required. b. This section is not intended to limit any manufacturer’s warranty which provides the Agency with greater warranty rights than set forth in this section or the Contract Documents. c. The warranty shall include all components. The form of the warranty shall be approved by the Engineer in accordance with 3-13.3.2, “Warranty Format Requirements.” 7. If, during the warranty period, any item of the Work is found to be Defective Work, Contractor shall correct it promptly after receipt of written notice from the Agency to do so. The warranty period shall be extended with respect to portions of the Work corrected as part of the warranty requirements. ADD 3-13.3.1 Defective Work. 1. If the Engineer finds any part of the Work, to be defective or not in compliance with the Contract Documents, the Contractor shall correct the Defective Work in accordance with the Engineer’s written instructions and within the specified time limits. 2. The Engineer may order Contractor to stop all or part of the Project if, upon notice, Contractor fails to immediately correct the Defective Work in conformance with the Contract Documents. The Contractor bears all direct and indirect costs and damages that result from the Agency’s Stop Work notice. 3. The Engineer may determine in its sole discretion to accept Defective Work instead of having the Contractor correct the Defective Work. However, the Contractor will still be financially responsible for the Defective Work. The Engineer shall issue a deductive Change Order and will incorporate the necessary revisions in the Contract Documents for the Defective Work, the diminished value to the Project, or for the cost to repair the Defective Work. 4. If the Contractor fails to correct Defective Work within the specified time limits, the Engineer may correct the Contractor’s Defective Work. The Agency has the right to correct any 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 109 of 214 Defective Work without notice in the event of an emergency. Contractor shall bear all direct and indirect costs of the Defective Work that the Agency corrects. 5. When undertaking remedial action under this section, the Agency may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor’s Work and or services, and incorporate into the Project all materials and equipment stored at the Site or for which the Agency has paid but Contractor has stored elsewhere. 6. For Building Projects which require a certificate of occupancy, not including sewer and water facilities, if the Contractor fails to correct the Defective Work listed on the Agency’s Punchlist within 30 Working Days in accordance with 6-1.1, “Construction Schedule,” the Contractor shall reimburse the Agency for all costs to provide inspection services required to monitor the Contractor’s Work beyond the 30 Working Days. The Agency shall bill the Contractor for the additional inspection at the Agency’s established rates. 7. If the Contractor completes the Project or portions of the Project prior to NOC, the Contractor shall preserve equipment by developing and implementing a preventive maintenance program in compliance with manufacturer’s recommendations. ADD 3-13.3.2 Warranty Format Requirements. 1. Written warranties, except manufacturer’s standard printed warranties, shall be on the Contractor’s and Contractor’s agents’, material suppliers’, installers’, or manufacturers’ own letterhead, addressed to and for the Agency’s benefit. Submit warranties in the format described in this section, modified as approved by Engineer to suit the conditions pertaining to the warranty. 2. The Contractor shall obtain warranties, executed in triplicate by responsible Subcontractors and Suppliers, within 10 Working Days after completion of the applicable item of Work. Except for items put into use with the Engineer’s permission with date mutually agreed upon in writing, ensure that the beginning time of the warranty is the Project completion date. 3. The Contractor shall verify that the documents are in proper form, contain full information, and are notarized. 4. The Contractor shall verify that warranties are signed by both the Contractor and the appropriate party. 5. The Contractor shall provide warranties to the Engineer with a neatly typed table of contents, identifying each warranty with the number and title of the applicable specification section requiring the warranty and the name of the product or work item. 6. The Contractor shall separate each warranty with index tab sheets keyed to the table of contents listing. Provide complete information using separate typed sheets as necessary. The information shall include a list of Subcontractors and Suppliers with the name, address, and telephone number of the responsible principals. 3-13.3.3 Long-Term Warranty Contract (LTWC). 1. If specified in the Special Provisions and when a LTWC is included in the Contract Documents, the Contractor shall execute and submit the supplemental agreement for the extended Project warranty (the LTWC covering the workmanship and materials). 2. The first 3 years of warranty protection after installation shall be secured by the faithful performance and payment bonds in accordance with 1-7.2, “Contract Bonds.” 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 110 of 214 3. At the conclusion of the initial 3-year bonded warranty period, an “n”-year subsequent manufacturer’s warranty for labor and materials shall commence and run concurrently with the LTWC, where “n” is the number of additional years beyond the initial 3 years as specified in the Special Provisions. Alternatively, and with respect to the 3-year bonded warranty, the Contractor may submit a 2-year bond followed by 1-year bond. If the alternate option is selected, the 1-year bond shall be submitted to the Agency at least 90 Calendar Days before the expiration of the original 2-year bond. Contractor shall clearly inform the Contract Specialist of the option selected. The protection provided shall not be for less than 3 + “n” years continuously. 4. The manufacturer’s warranty for parts and labor shall secure performance of the LTWC by the Contractor. Additional security in the form of bonds for both the LTWC and the manufacturer’s extended “n”-year warranty (in years 4 and on following Acceptance) for labor and materials may, but is not required to be, provided per the compensation provisions of the LTWC. 5. The manufacturer warranty shall extend to performance of the LTWC by the Contractor, including without limitation the performance of periodic inspections, preparation of periodic reports, and performance of repairs or replacements including parts and labor. If the manufacturer warranty does not expressly extend to the LTWC or is qualified in any way to exclude warranty of the performance of the LTWC by the Contractor, the surety bond shall be provided for the LTWC in accordance with 1-7.2, “Contract Bonds.” 6. If the Contractor is unable to obtain a bond which extends the “n”-year term of the LTWC, to obtain a manufacturer warranty or both which clearly and unambiguously extends to secure performance of the LTWC by the Contractor for the “n”- year term, the Agency shall accept either form of security provided that at least 1 of these forms is provided before award. 7. Provision of the manufacturer’s warranty, bonds, or both as specified is a pre-condition to award of the Contract. 8. Refer to the LTWC for additional information. The provisions of 3-3, “SUBCONTRACTORS” shall not apply to LTWC. ADD 3-14 PARTNERING 1. Contractor may request the formation of a formal partnering relationship (Partnering) by submitting a request in writing to the Engineer after approval of the Contract. If Contractor’s request for Partnering is approved by the Engineer, scheduling of a Partnering workshop, selecting the Partnering facilitator and workshop, selecting the Partnering facilitator and workshop site, and other administrative details shall be as agreed to by both Parties. 2. The establishment of a Partnering shall not change or modify the terms and conditions of the Contract and shall not relieve either party of the legal requirements of the Contract. 3. The goals of Partnering include the following: a. The Engineer and Contractor’s representatives, including Contractor’s Subcontractors, actively working together as partners. b. Avoidance of destructive confrontation and litigation among the parties. c. Mutual understanding on how the Work is to be conducted. d. Establishment of mutual key results to facilitate Project success. e. Establishment of an atmosphere of teamwork, trust, and open communication. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 111 of 214 3-14.1 Payment. 1. The payment for providing a facilitator and a workshop site shall be borne equally by the Agency and Contractor. Contractor shall pay in advance all compensation for the costs of the facilitator and for the costs of obtaining the workshop site. 2. Unless a Bid item has been provided for “Partnering,” the Agency’s share of such costs shall be reimbursed to Contractor as Extra Work. Markups shall not be added. Other costs associated with the Partnering relationship shall be borne separately by the party incurring the costs. ADD 3-15 PUBLIC CONVENIENCE 1. The Contractor shall provide and maintain safe and adequate pedestrian and vehicular access to fire hydrants; hospitals; police and fire stations; commercial and industrial establishments including churches, schools and parking lots; service stations; public transportation; pedestrian crossing; motels and establishments of similar nature. Access shall be continuous and unobstructed unless otherwise approved by the Engineer. 2. The Contractor shall provide access for emergency vehicles and mail delivery and trash collection services. The trash hauling schedule can be obtained by contacting Republic Services at Customer Support | Republic Services. 3. During paving operations, the Contractor shall provide paved parking within 800 feet of the affected residences or businesses unless otherwise approved by the Engineer. 4. The Contractor shall provide notification 72 hours prior to the start of construction in the public right-of-way that affects vehicular traffic, parking, or pedestrian routes. For a full street closure, all residences and/or businesses on the affected street or alley shall be notified. For partial street closures or for curb, sidewalk or driveway repairs, the residences and/or businesses directly affected by the Work shall be notified. The notice shall: a. Be written and hand delivered. b. State the date and time the Work will begin and its anticipated duration. c. Provide a brief description of the Work and simple instructions to the home or business owner on actions to facilitate the construction. d. List 2 telephone numbers to obtain additional information. One number shall be the Contractor’s permanent office or field office and the other number shall be a 24-hour number answered by someone who is knowledgeable about the Project. An answering machine shall not be connected to either number. e. For residences, be prepared on 65-lb. brightly colored card stock or equivalent durability with contrasting, 12-point font or larger printing; pre-cut in a manner for hanging on a doorknob; and minimum size of 3-1/2 inches wide by 8-1/2 inches long (refer to the appendices for an example). f. Be approved by the Engineer prior to distribution. 5. The Contractor shall post “No Parking” signs 72 hours in advance of the Work. The signs shall state the date and time of parking restriction for a duration not to exceed the time necessary to complete the Work at that location. If the Work is delayed or rescheduled, the signs shall be removed and re-posted 72 hours in advance of the rescheduled Work. 6. Payment for public convenience shall be considered as included in the Contract Price for each item in the Bid and no additional payment will be made. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 112 of 214 ADD 3-16 SITE ACTIVITIES BY THE AGENCY OR SEPARATE CONTRACTORS 3-16.1 The Agency’s Right to Award Separate Contracts. 1. The Agency reserves the right to perform work or operations outside the Scope of Work of the Contract related to the Project with Agency Forces, Separate Contractors, or both. If work to be performed by another party was not noted in the Contract, the Agency shall give written notice to Contractor 10 Working Days prior to the start of any Work. If Contractor determines that the work being performed by the Agency or others may interfere with or cause damage to Work being performed by Contractor, notify the Engineer in writing within 3 Working Days of the Engineer’s notice. 3-16.2 Integration of the Work with Separate Contractors. 1. When specified in the Contract Documents, prepare a plan to integrate the work performed by Separate Contractors, Agency Forces, or both with the performance of the Work and submit the plan to the Engineer for approval. The plan shall be fair and reasonable for Contractor and the Separate Contractors. Work with Separate Contractors to reach an agreement for the prepared plan. Arrange the performance of the work so that the Work and the work of the Separate Contractors are, to the extent applicable, properly integrated and jointed in a manner that avoids any damage to the Work or to the work of the Separate Contractors. 3-16.3 Coordination. 1. Coordinate Contractor’s activities and the Schedule with the activities and schedules of the Separate Contractors and make any revisions to the Schedule deemed necessary to avoid any disruption to the Work or to the work of the Separate Contractors. 3-16.4 Use of Site. 1. Provide the Agency and the Separate Contractors reasonable opportunities for the storage of materials and equipment and performance of their work. Connect and coordinate work and operations with the work and operations of the Agency and the Separate Contractors as required by the Contract Documents. 2. Coordinate traffic control with the Separate Contractors for other projects and minimize the impact to the community. Prior to the start of construction, submit Contractor’s plan for coordination. 3-16.5 Deficiency in Work of Separate Contractors. 1. If part of Contractor’s Work depends on proper execution or results upon construction or operations by the Agency or a Separate Contractor, prior to proceeding with that portion of the Work, promptly report to the Separate Contractor and the Engineer any apparent discrepancies or defects in construction that would render it unsuitable for proper execution and results. Use good faith efforts to resolve any such discrepancies or defects or any related disagreements. Contractor’s failure to report constitutes Contractor’s acceptance of the Work of Separate Contractors as fit, proper, and coordinated with the Work. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 113 of 214 3-16.6 Payment. 1. Payment for reporting deficiencies, coordinating, and resolving discrepancies shall be included in the Contract Price. SECTION 4 – CONTROL OF MATERIALS 4-1 PROTECTION ADD the following: 1. The Contractor shall repair or replace any equipment and materials in the event of vandalism, damage, or theft at no additional cost to the Agency. 2. The Contractor shall be responsible for the protection of public and private property adjacent to the Work and shall exercise due caution to avoid damage to such property. 3. All costs to the Contractor for protecting, removing, and restoring existing improvements shall be included in the Bid. 4. The Agency and affected utility companies have, by a search of known records, endeavored to locate and indicate on the Plans, all utilities which exist within the limits of the Work. However, the accuracy and/or completeness of the nature, size and/or location of utilities indicated on the Plans is not guaranteed. 5. The Contractor shall determine the location and depth of all utilities, including service connections, which have been marked by the respective owners and which may affect or be affected by its operations. If no pay item is provided in the Contract for this Work, full compensation for such Work shall be considered as included in the prices Bid for other items of Work. 6. The Contractor shall not interrupt the service function or disturb the support of any utility without authority from the owner or order from the Agency. All valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff. 7. Where protection is required to ensure support of utilities located as shown on the Plans or in accordance with Section 5-1, the Contractor shall, unless otherwise provided, furnish, and place the necessary protection at its expense. 8. Upon learning of the existence and location of any utility omitted from or shown incorrectly on the Plans, the Contractor shall immediately notify the Engineer in writing. When authorized by the Engineer, support or protection of the utility will be paid for. 9. The Contractor shall immediately notify the Engineer and the utility owner if any utility is disturbed or damaged. The Contractor shall bear the costs of repair or replacement of any utility damaged if located. 10. When placing concrete around or contiguous to any non-metallic utility installation, the Contractor shall at its expense: a. Furnish and install a 2-inch cushion of expansion joint material or other similar resilient material; or b. Provide a sleeve or other opening which will result in a 2-inch minimum-clear annular space between the concrete and the utility; or c. Provide other acceptable means to prevent embedment in or bonding to the concrete. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 114 of 214 11. Where concrete is used for backfill or for structures which would result in embedment, or partial embedment, of a metallic utility installation; or where the coating, bedding or other cathodic protection system is exposed or damaged by the Contractor’s operations, the Contractor shall notify the Engineer and arrange to secure the advice of the affected utility owner regarding the procedures required to maintain or restore the integrity of the system. 12. Unless otherwise specified, the Contractor shall remove all interfering portions of utilities shown on the Plans or indicated in the Bid documents as “abandoned” or “to be abandoned in place.” Before starting removal operations, the Contractor shall ascertain from the Agency whether the abandonment is complete, and the costs involved in the removal and disposal shall be included in the Bid for the items of Work necessitating such removals. 13. When feasible, the owner is responsible for utilities within the area affected by the Work will complete their necessary installations, relocations, repairs, or replacements before commencement of Work by the Contractor. When the Plans or Specifications indicate that a utility installation is to be relocated, altered, or constructed by others, the Agency will conduct all negotiations with the owners and work will be done at no cost to the Contractor, except for manhole frame and cover sets to be brought to grade as provided in the Contract Documents. Utilities which are relocated to avoid interference shall be protected in their position and the cost of such protection shall be included in the Bid for the items of Work necessitating such relocation. 14. After award of the Contract, portions of utilities which are found to interfere with the Work will be relocated, altered, or reconstructed by the owners, or the Engineer may order changes in the Work to avoid interference. Such changes will be paid. 15. When the Plans or Specifications provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such Work shall be included in the Bid for the items of Work necessitating such Work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs. 16. The utility owner will relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements. When directed by the Engineer, the Contractor shall arrange for the relocation of service connections as necessary between the meter and property line, or between a meter and the limits of temporary construction or slope easements. The relocation of such service connections will be paid and will include the restoration of all existing improvements which may be affected by the relocation. The Contractor may agree with the owner of any utility to disconnect and reconnect interfering service connections. The Agency will not be involved in any such agreement. 17. Contractor shall coordinate the Work with utility agencies and companies. Prior to the installation of any and all utility structures within the limits of work by any utility agency or company, or its contractor, the Contractor shall place all curb or curb and gutter that is a part of the Work and adjacent to the location where such utility structures are shown on the Plans and are noted as being located, relocated or are otherwise shown as installed by others. In order to minimize delays to the Contractor caused by the failure of other parties to relocate utilities that interfere with the construction, the Contractor, upon the Engineer’s approval, may be permitted to temporarily omit the portion of Work affected by the utility. If such temporary omission is approved by the Engineer, the Contractor shall place survey or other 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 115 of 214 physical control markers sufficient to locate the curb or curb and gutter to the satisfaction of the utility agency or company. Such temporary omission shall be for the Contractor’s convenience and no additional compensation will be allowed therefore or for additional work, materials or delay associated with the temporary omission. The portion thus omitted shall be constructed by the Contractor immediately following the relocation of the utility involved unless otherwise directed by the Engineer. 18. The Contractor shall notify the Engineer of its Construction Schedule insofar as it affects the protection, removal, or relocation of utilities. The notification shall be included as a part of the Construction Schedule. The Contractor shall notify the Engineer in writing of any subsequent changes in the Construction Schedule which will affect the time available for protection, removal, or relocation of utilities. 19. The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, noted, and completed. 20. The Contractor may be given an extension of time for unforeseen delays attributable to unreasonably protracted interference by utilities in performing the Work correctly shown on the Plans. 21. The Agency will assume responsibility for the timely removal, relocation, or protection of existing main or trunkline utility facilities within the area affected by the Work if such utilities are not identified in the Contract Documents. The Contractor will not be assessed liquidated damages for any delay caused by failure of Agency to provide for the timely removal, relocation, or protection of such existing facilities. 22. The Contractor will be compensated for damages incurred due to delays for which the Agency is responsible or for delays attributable to interferences, relocations, or alterations not covered by the Contract Documents. These damages for delay will be determined by the Engineer. The Agency shall not be liable for damages which could have been avoided by the judicious handling of forces, equipment, or plant. These avoidable damages will be determined by the Engineer. The Engineer may grant Contractor an extension of time for damages due to delay. 23. When necessary, the Contractor shall so conduct its operations as to permit access to the Work Site and provide time for utility work to be accomplished during the progress of the Work. 4-2 INSPECTION 4-2.1 General ADD the following: 1. All costs of inspection at the source, including salaries and mileage costs, shall be paid by the Contractor. 2. Materials typically accepted by Certificate of Compliance shall not require inspection at the source unless specified in the Contract Documents. For a list of these items or materials, Contractor may refer to the Summary of Work. 3. Location changes to the source of materials requiring inspection without the required 24- hour notification may result in non-compliant material subject to rejection. Contractor shall be responsible for staff charges resulting from last minute changes or cancellations once staff 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 116 of 214 has been deployed. The Engineer shall issue a deductive Field Order for a minimum of 2 hours of staff time to reimburse the Agency for misdirected staff charges. The Contractor shall be notified in writing of the additional staff charges incurred. 4. Steel pipe in sizes larger than 18 inches shall require inspection at the source of production. 5. Vitrified clay and cast-iron pipe in all sizes are acceptable upon submittal of a Certificate of Compliance, subject to sampling and testing by the Agency. 6. Agency staff or a qualified inspection agency approved by the Engineer shall witness all welding, lining, coating, and testing. Contractor shall incur additional inspection costs outlined in 4-2.3, “Inspection of Items Not Locally Produced.” 7. All parts of production (including but not limited to product fabrication, welding, testing, lining, and coating of straight pieces and specials) shall be performed or produced in the United States. 8. Welding and all testing shall be performed by certified welders and testing staff with credentials traceable in the United States. 9. The Contractor shall provide the Engineer free and safe access to any and all parts of Work at any time. Such free and safe access shall include means of safe access and egress, ventilation, lighting, shoring, dewatering and all elements pertaining to the safety of persons as contained in the California Code of Regulations, Title 8, Industrial Relations, Chapter 4, Division of Industrial Safety, Subchapter 4, Construction Safety Orders and such other safety regulations as may apply. Contractor shall furnish Engineer with such information as may be necessary to keep the Engineer fully informed regarding progress and manner of work and character of materials. Inspection or testing of the whole or any portion of the Work or materials incorporated in the Work shall not relieve Contractor from any obligation to fulfill this Contract. 4-2.3 Inspection of Items Not Locally Produced ADD the following: 1. The Engineer may elect Agency staff or Consultants to perform inspection of an out-of-town manufacturers. The Contractor shall incur additional inspection costs of the Engineer including lodging, meals, and incidental expenses based on Federal Per Diem Rates, along with travel and car rental expenses. If the manufacturing plant operates a double shift, a double shift shall be figured in the inspection costs. a. At the option of the Engineer, full time inspection shall continue for the length of the manufacturing period. If the manufacturing period will exceed 3 consecutive weeks, Contractor shall incur additional inspection expenses of the Engineer’s supervisor for a trip of 2 Working Days to the site per month. b. When the Engineer elects Agency staff or Consultants to perform out-of-town inspections, the wages of staff employed by the Agency shall not be part of the additional inspection expenses paid by Contractor. c. Federal Per Diem Rates can be determined at the location below: https://www.gsa.gov/portal/content/104877 2. Specialty Testing of Foreign Materials. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 117 of 214 a. Materials that are manufactured, produced, or fabricated outside of the United States shall be delivered to a distribution point in California, unless otherwise specified. Quality Control and related testing shall be performed to all applicable specified US standards. Manufacturer’s testing and staff certification shall be traceable to a United States regulatory agency. Retain the materials for a sufficient period of time to permit inspection, sampling, and testing. The Contractor shall not be entitled to an extension of time for acts or events occurring outside of, at point of entry, or during transport to the United States, unless the extension is acceptable to the Engineer. ADD 4-2.4 Specialty Inspection Paid for by the Contractor 1. Contractor shall employ and pay for the services of a qualified inspection agency to perform specialty inspection services if required by the Contract Documents. 2. The payment for the specialty inspection service Work shall be included under the Bid item for “Specialty Inspection Paid For By the Contractor.” 3. When an Allowance Bid item for “Specialty Testing Under the Direction of the Engineer” is provided, Contractor shall employ and pay for the services of a qualified third-party independent laboratory to perform the required testing. Contractor shall be reimbursed for the cost of testing under this Bid item. 4. Contractor shall be reimbursed for the cost of specialty inspections when an Allowance Bid item is included in the Bid otherwise the cost is the responsibility of the Contractor if the manufacturer requires a specialty inspection service. 4-3 TESTING ADD the following: 1. Except as specified in these Special Provisions, the Agency will bear the cost of testing of locally produced materials and/or on-site workmanship where the results of such tests meet or exceed the requirements indicated in the Standard Specifications, Technical Specification, and any Supplemental Provisions. The cost of all other tests shall be borne by the Contractor. 2. At the option of the Engineer, the source of supply of each of the materials shall be approved by the Engineer before the delivery is started. All materials proposed for use may be inspected or tested at any time during their preparation and use. If, after incorporating such materials into the Work, it is found that sources of supply that have been approved do not furnish a uniform product, or if the product from any source proves unacceptable at any time, the Contractor shall furnish approved material from other approved sources. If any product proves unacceptable after improper storage, handling or for any other reason it shall be rejected, not incorporated into the Work and shall be removed from the Project Site all at the Contractor’s expense. 3. Compaction tests may be made by the Engineer and all costs for tests that meet or exceed the requirements of the specifications shall be borne by the Agency. The tests may be made at any place along the Work as deemed necessary by the Engineer. The costs of any retests made necessary by noncompliance with the specifications shall be borne by the Contractor. 4-4 TRADE NAMES ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 118 of 214 1. Whenever materials or equipment are indicated in the Contract Documents by using the name of a proprietary item or the name of a particular supplier, the naming of the item is intended to establish the type, function, and quality required. 2. Unless stated otherwise, materials or equipment of other suppliers may be accepted if sufficient information is submitted to the Engineer for review to determine whether the material or equipment proposed is equivalent or equal to that named. 3. For reviews prior to Bid: a. The Engineer shall respond to Contractor’s substitution proposal by the last date for issuing an Addendum for the Contract. If the Engineer fails to respond to Contractor’s substitution proposal before the Bid due date, the substitution proposal shall be deemed denied. b. Contractor may bring forward a substitution proposal after Award that was denied based on the Engineer’s failure to respond by submitting a Cost Reduction Proposal in accordance with 2-6.1, “Cost Reduction Proposal.” 4. Include the following information in the request for substitution: a. Whether or not acceptance of the substitute for use in the Work shall require a change in any of the Contract Documents to adopt the design to the proposed substitute. b. Whether or not incorporation or use of the substitute in connection with the Work is subject to the payment of any license fee or royalty. c. All variations of the proposed substitute from the items originally specified shall be identified. d. Available maintenance, repair, and replacement service requirements. The manufacturer shall have a local service agency within 50 miles (80.5 km) of the Site which maintains properly trained personnel and adequate spare parts and is able to respond and complete repairs within 24 hours. e. Certifications from the manufacturer or service provider that the proposed substitute shall perform the intended function adequately under the expected service conditions, achieve the results called for by the general design, and be similar and of equal substance to that indicated. 5. There is no guaranteed time frame for the Engineer’s review of the substitution requests. Any lack of action on the Engineer’s side within Contractor’s requested time does not constitute acceptance of the substitution. 6. If, in the opinion of the Engineer, substitute items are determined to be unsatisfactory in performance, appearance, durability, compatibility with existing equipment or systems, availability of repair parts and suitability of application, the Contractor shall remove the substituted item and replace it with the originally specified item at no cost to the Agency. 7. The burden of proof as to the type, function, and quality of any such substitute product, material or equipment shall be upon Contractor. The Engineer may require at Contractor’s expense additional data about the proposed substitute. 8. Acceptance by the Engineer of a substitute item does not relieve Contractor of the responsibility for full compliance with the Contract Documents. If the Engineer takes no exceptions to the proposed substitution, it shall not relieve Contractor from Contractor’s responsibility to the efficiency, sufficiency, quality, and performance of the substitute 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 119 of 214 material or equipment in the same manner and degree as the material and equipment specified by name. 9. The Bid submittal shall be based on the material and equipment specified by name in the Contract. If the proposal is rejected by the Engineer, Contractor shall not be entitled to either an extension in Contract Time, an increase in the Contract Price, or both. 10. As applicable, no Shop Drawing or Working Drawing submittals shall be made for a substitute item nor shall any substitute item be ordered, installed, or utilized without the Engineer’s prior written approval. 11. The Contractor is responsible for the satisfactory performance of substituted items. If, in the sole opinion of the Engineer, the substitution is determined to be unsatisfactory in performance, appearance, durability, compatibility with associated items, availability of repair parts and suitability of application the Contractor shall remove the substituted item and replace it with the originally specified item at no cost to the Agency. 4-5 WEIGHING AND METERING EQUIPMENT REPLACE the first paragraph with the following: All scales and metering equipment used for proportioning materials shall be inspected for accuracy and certified within the past 12 months by the State of California Bureau of Weights and Measures, by the County Director or Sealer of Weights and Measures, or by a scale mechanic registered with or licensed by the County. SECTION 5 – LEGAL RELATIONS AND RESPONSIBILITIES 5-1 LAWS AND REGULATIONS ADD the following: 1. The Contractor shall strictly adhere to the provisions of the Labor Code regarding minimum wages; the 8-hour day and 40-hour week; overtime; Saturday, Sunday, and holiday work; and prohibitions against discrimination, harassment, and retaliation. The Contractor shall forfeit to the Agency the penalties prescribed in the Labor Code for violations. 2. Each worker shall be paid subsistence and travel as required by the collective bargaining agreement on file with the State of California Department of Industrial Relations. 3. The Contractor’s attention is directed to Labor Code Section 1776 which imposes responsibility upon the Contractor for the maintenance, certification, and availability for inspection of such records for all persons employed by the Contractor or Subcontractor in connection with the Project. The Contractor shall agree through the Contract to comply with this Section and the remaining provisions of the Labor Code. 4. Municipal ordinances that affect this Work include Chapter 11.06. Excavation and Grading. If this notice specifies locations or possible materials, such as borrow pits or gravel beds, for use in the proposed construction Project which would be subject to Fish and Game Code Section 1601 or 1603, the conditions established in Fish and Game Code Section 1601 et seq. shall become conditions of the Contract. 5-3.3 Payroll Records. ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 120 of 214 1. The Contractor and its Subcontractors shall maintain and furnish to the Agency, at a designated time, a certified copy of each weekly payroll reflecting the wages containing all of Contractor’s and Subcontractors’ employees engaged in the Work and a statement of compliance signed under penalty of perjury. 5-3.4 Hours of Labor ADD the following: 1. Unless otherwise approved in writing by the Engineer, the hours of work shall be between the hours of 7:00 AM and 4:00 PM on Mondays through Fridays, excluding Agency holidays. The Contractor shall obtain the written approval of the Engineer if the Contractor desires to work outside these hours or at any time during weekends and/or holidays. This written permission must be obtained at least 48 hours prior to such work. The Engineer may approve work outside the stated hours and/or days when, in his/her sole opinion, such work conducted by the Contractor is beneficial to the best interests of the Agency. The Contractor shall pay the inspection costs of such work. 2. The Contractor shall incorporate the dates, areas and types of work prohibited in this section in the Construction Schedule. No additional payment, adjustment of bid prices or adjustment of contract time of completion will be allowed as a consequence of the prohibition of work being performed within the dates, areas and/or types of work prohibited in this section. 5-4 INSURANCE 5-4.1 General. ADD the following: 1. Contractor shall procure and maintain for the duration of the Contract insurance against claims for injuries to persons or damage to property which may arise from or in connection with the performance of the Work by the Contractor, his or her agents, representatives, employees or Subcontractors. The insurance shall meet the City’s policy for insurance as stated in City Council Policy No. 70. a. Coverages and Limits: Contractor shall maintain the types of coverages and minimum limits specified in these Agency Supplemental General Provisions (00 73 00): i. Commercial General Liability (CGL) Insurance: Insurance written on an “occurrence” basis, including products-completed operations, personal & advertising injury, with limits no less than $2,000,000 per occurrence. If a general aggregate limit applies, either the general aggregate limit shall apply separately to this project/location or the general aggregate limit shall be twice the120equireed occurrence limit. ii. Business Automobile Liability Insurance: $2,000,000 combined single limit per accident for bodily injury and property damage. In addition, the auto policy must cover any vehicle used in the performance of the Contract, used onsite or offsite, whether owned, non-owned or hired, and whether scheduled or non-scheduled. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 121 of 214 iii. Workers’ Compensation and Employers’ Liability Insurance: Workers’ compensation limits as required by the Labor Code and Employers’ Liability limits of $1,000,000 per incident. Workers’ compensation offered by the State Compensation Insurance Fund is acceptable to the City. b. Additional Provisions: Contractor shall ensure that the policies of insurance required under this Contract with the exception of Workers’ Compensation and Business Automobile Liability Insurance contain, or are endorsed to contain, the following provisions. i. The Agency, its officials, employees and volunteers must be covered as additional insured as respects: liability arising out of activities performed by or on behalf of the Contractor; products and completed operations of the Contractor; premises owned, leased, hired or borrowed by the Contractor. The coverage shall contain no special limitations on the scope of protection afforded to the Agency, its officials, employees or volunteers. All additional insured endorsements must be evidenced using separate documents attached to the certificate of insurance; 1 for each company affording general liability, and employers’ liability coverage. ii. The Contractor’s insurance coverage shall be primary insurance as respects the Agency, its officials, employees and volunteers. Any insurance or self- insurance maintained by the Agency, its officials, employees or volunteers shall be in excess of the Contractor’s insurance and shall not contribute with it. iii. Any failure to comply with reporting provisions of the policies shall not affect coverage provided to the Agency, its officials, employees or volunteers. iv. Coverage shall state that the Contractor’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability. c. Notice of Cancellation. Each insurance policy required by this Contract shall be endorsed to state that coverage shall not be nonrenewed, suspended, voided, canceled, or reduced in coverage or limits except after 10 Calendar Days’ prior written notice has been sent to the Agency by certified mail, return receipt requested. d. Deductibles and Self-Insured Retention (S.I.R.) Levels. Any deductibles or self- insured retention levels must be declared to and approved by the Agency. At the option of the Agency, either: the insurer shall reduce or eliminate such deductibles or self-insured retention levels as respects the Agency, its officials and employees; or the Contractor shall procure a bond guaranteeing payment of losses and related investigation, claim administration and defense expenses. e. Waiver of Subrogation. All policies of insurance required under this Contract shall contain a waiver of all rights of subrogation the insurer may have or may acquire against the Agency or any of its officials or employees. f. Subcontractors. Contractor shall include all Subcontractors as insured under its policies or shall furnish separate certificates and endorsements for each Subcontractor. Coverages for Subcontractors shall be subject to all of the requirements stated in these Agency Supplemental General Provisions (00 73 00). 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 122 of 214 g. Acceptability of Insurers. Insurance must be placed with insurers that have a rating in Best’s Key Rating Guide of at least A-:VII. Insurers must also be authorized to transact the business of insurance by the State of California Insurance Commissioner as admitted carriers as evidenced by a listing in the official publication of the Department of Insurance of the State of California and/or under the standards specified by City Council Policy No. 70. h. Verification of Coverage. Contractor shall furnish the Agency with certificates of insurance and original endorsements affecting coverage required by this clause. The certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. The certificates and endorsements are to be in forms approved by the Agency and are to be received and approved by the Agency before the Contract is executed by the Agency. i. Coverage and Limits. Contractor will maintain the types of coverage and minimum limits indicated below unless the Risk Manager or City Manager or Executive Manager approves a lower amount. These minimum amounts of coverage will not constitute any limitations or cap on Contractor’s indemnification obligations under this Contract. Agency, its officers, agents, and employees make no representation that the limits of the insurance specified to be carried by Contractor pursuant to this Contract are adequate to protect Contractor. If Contractor believes that any required insurance coverage is inadequate, Contractor will obtain such additional insurance coverage, as Contractor deems adequate, at Contractor’s sole expense. The full limits available to the named insured shall also be available and applicable to the Agency as an additional insured. j. Cost of Insurance. The Cost of all insurance required under this Contract shall be included in the Contractor’s Bid. 5-6 PATENTS FEES AND ROYALTIES. DELETE in its entirety and SUBSTITUTE with the following: 1. Contractor shall pay, at no additional cost to the Agency, all applicable royalties and license fees arising from the Work. Contractor shall indemnify and defend all claims and lawsuits for infringement of patent, trademark, and copyright against the Agency and shall hold the Agency harmless from any loss. 5-7 SAFETY 5-7.1.1 General. ADD the following: 1. When conducting grading or excavation, place Contractor’s name and emergency telephone number adjacent to the Work at intervals and locations approved by the Engineer. The method of posting shall be approved by the Engineer. 2. The Contractor shall respond and initiate corrective action in accordance with OSHA and within 24 hours of the notice of the nonconforming Work that poses an imminent threat to person or property. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 123 of 214 3. The Contractor shall erect and properly maintain at all times, as required by the conditions and progress of the Work, all necessary safeguards for the protection of workers and public, and shall use danger signs warning against hazards created by such features of construction as protruding nails, hoists, well holes, and falling materials. ADD: 5-7.1.3 Health and Safety Plan (HSP). 1. The Contractor is ultimately responsible for the health and safety of Contractor’s employees. These specifications shall not be construed to limit Contractor’s liability nor to assume that the Agency, its employees, or designees shall assume any of Contractor’s liability associated with Site safety considerations. 2. Contractor shall have a HSP in effect at least 1 week prior to the commencement of the Work. The HSP shall comply with all OSHA and other applicable requirements. 3. The HSP shall specifically address procedures and protocols that shall be followed to monitor for or respond to the presence of hazardous atmosphere, possibility for engulfment, gasses due to organic soils or proximity to landfills, exposure to hazardous products such as may be released when grinding, cutting, or torching galvanized or painted surfaces or asbestos containing materials, contaminated soil, and groundwater. Identify response actions that shall be taken when these conditions are encountered. 4. The Agency shall not assume any role in determining the adequacy of the HSP on Contractor’s behalf. 5-7.3 Use of Explosives. ADD the following: 1. Explosives may be used only when authorized in writing by the Engineer. The Contractor shall prepare and submit an application for blasting permit to the City of Carlsbad Engineering Department and comply with the City’s blasting policy. 5-7.7 Security and Protective Devices. 5-7.7.1 General. DELETE in its entirety and SUBSTITUTE with the following: 1. Security and protective devices shall consist of fencing, railing, steel plates, or other devices for the protection of workers or the public from hazards posed by open excavations or any work in progress. Security and protective devices shall remain in place until the Work is accepted. 2. Unless otherwise specified, no separate or additional payment will be made for security and protective devices. Payment shall be included in the Contract price for the various Bid items requiring such devices. ADD: 5-7.7.3 Playground Safety. Not Used 5-7.7.2 Security Fencing 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 124 of 214 1. The payment for security fencing Work for open excavations shall be included in the Contract Price. 5-7.8 Steel Plate Covers 5-7.8.1 General. ADD the following: 1. The Contractor shall protect transverse or longitudinal cuts, voids, trenches, holes, and excavations in the right-of-way that cannot be properly completed within 1 Working Day by adequately designed barricades and structural steel plates (plates) that shall support legal vehicle loads in such a way as to preserve unobstructed traffic flow. 2. For trench widths exceeding those in Table 5-7.8.2, a structural design shall be prepared by a California registered civil or structural engineer regularly engaged in the design of shoring systems. 3. The Contractor shall secure approval in advance from authorities concerning the use of any bridging proposed on the Work. 4. The Contractor shall shore the trench adequately to support the bridging and traffic loads. 5. The Contractor shall design plates for HS 20-44 truck loading in accordance with Caltrans Bridge Design Specifications Manual and evaluate soil conditions and ensure that the plate extends enough beyond the trench walls to support traffic loads. 6. The Contractor shall use the plates skid-resistant with a nominal COF of 0.35 as determined by California Test Method 342. If a different test method is used, the Contractor may utilize standard test plates with known coefficients of friction available from each Caltrans District Materials Engineer to correlate skid resistance results to California Test Method 342. 7. Plates shall provide complete coverage to prevent any person, bicycle, motorcycle, or motor vehicle from being endangered due to plate movement causing separations or gaps. 8. Alternative installation methods may be submitted in accordance with 3-8, “SUBMITTALS” for the Engineer’s approval. 9. Contractor shall install signage and postings with a 2 inch (50.8 mm) minimum letter height indicating the steel plate cover load limit, the Company’s name, and a 24-hour emergency contact phone number. See 601-1, “GENERAL.” 10. Contractor is responsible for the maintenance of the plates, shoring, and asphalt concrete ramps or any other approved device used to secure the plates. Contractor shall immediately mobilize necessary personnel and equipment after being notified by the Engineer, the Agency, or a member of the public of a repair needed for such items as plate movements, noise, anchors, and asphalt ramps. Failure to respond to the emergency request within 2 hours shall be grounds for the Agency to perform necessary repairs that shall be invoiced at the actual cost including overhead or $500 per incident, whichever is greater. Failure may also result in a “Stop Work” notice. 11. When plates are removed, Contractor shall repair any damage to the pavement with fine graded asphalt concrete mix or slurry seal satisfactory to the Engineer. 12. The pavement shall be cold planed to a depth equal to the thickness of the plate and to a width and length equal to the dimensions of the plate. The cold milling shall produce a flat surface that the plate shall rest on with no horizontal or vertical movement. Horizontal gaps 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 125 of 214 between the unmilled pavement and the plate shall not exceed 25 mm (1 “) and shall be filled with elastomeric sealant material which may, at the contractor’s option, be mixed with no more that 50%, by volume, of Type I aggregate conforming to the requirements of tables 203- 5.2 and 203-5.3. ADD 5-8 INDEMNIFICATION AND HOLD HARMLESS AGREEMENT 1. Contractor agrees to defend, indemnify, and hold harmless Agency, its affiliated and subsidiary entities, and its elected and appointed officials, officers, directors, managers, employees and agents (“Indemnified Parties”) from and against all claims asserted, liability established, or judgments for damages or injuries to any person or property, including to Contractor’s officers, employees, agents, or subcontractors, arising directly or indirectly out of the Work, which arise from, are connected with, or are caused or claimed to be caused by the acts or omissions of Contractor, its officers, employees, agents or subcontractors. Contractor’s duty to defend, indemnify, and hold harmless shall not include any claims or liabilities arising from the sole negligence or sole willful misconduct of the Indemnified Parties. Contractor further agrees that its duty to defend includes all attorney fees and costs associated with enforcement of this indemnification provision, defense of any claims arising from this Contract, and, where a conflict of interest exists or may exist between Contractor and Agency, the reasonable value of attorney fees and costs if Agency chooses, at its own election, to conduct its own defense or participate in its own defense of any claim related to this Contract. 2. Contractor shall also defend and indemnify the Indemnified Parties against any challenges to the Award of the Contract to Contractor, and Contractor will pay all costs, including defense costs for the Agency. Defense costs include the cost of separate counsel for the Indemnified Parties, if the Indemnified Parties request separate counsel. 3. Contractor shall also defend and indemnify the Indemnified Parties against any challenges to the Award of the Contract to Contractor, arising in whole or in part from alleged inaccuracies or misrepresentation by the Contractor, whether intentional or otherwise, and Contractor will pay all costs, including defense costs for the Agency. Defense costs include the cost of separate counsel for the Indemnified Parties, if the Indemnified Parties request separate counsel. 4. Contractor shall defend, indemnify, protect and hold the Indemnified Parties harmless from and against any dispute between Contractor and Contractor’s Subcontractors if the Indemnified Parties are made a party to any judicial or administrative proceeding. ADD 5-9 CONFLICT OF INTEREST 1. Establish and make known to Contractor’s employees appropriate safeguards to prohibit employees from using their positions for a purpose that is or gives the appearance of being motivated by desire for private gain for themselves or others and particularly those with whom they have family, business, or other relationships. Project personnel shall not accept gratuities or any other favors from Subcontractors or potential Subcontractors. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 126 of 214 2. Contractor is subject to all federal, state, and local conflict of interest laws, regulations, and policies applicable to public contracts and procurement practices (Government Code Sections 1090 et. seq. and 81000 et. seq., the Agency’s Ordinances, and the City of Carlsbad Municipal Code). If, in performing the Work, Contractor makes or participates in a “governmental decision” in accordance with Title 2, Section 18701, subdivision (a)(2) of the California Code of Regulations, or performs the same or substantially all the same duties for Agency that would otherwise be performed by an Agency employee holding a position specified in the Agency’s conflict of interest code, Contractor shall be subject to a conflict of interest code requiring the completion of 1 or more statements of economic interests disclosing Contractor’s relevant financial interests. 3. Statements of economic interests shall be made on Fair Political Practices Commission Form 700 and filed with the City of Carlsbad’s City Clerk. Contractor shall file a Form 700 (Assuming Office Statement) within 30 Calendar Days of the Agency’s written determination that Contractor shall be subject to a conflict of interest code and file a Form 700 (Annual Statement) on or before April 1st disclosing any financial interests held during the previous calendar year for which Contractor was subject to a conflict of interest code. 4. If the Agency requires Contractor to file a statement of economic interests as a result of the Work performed, Contractor shall be considered an “Agency Official” for conflict of interest purposes, including the prohibition against lobbying the Agency for 1 year following the expiration or termination of the Contract. 5. Contractor’s personnel employed on the Project shall not accept gratuities or any other favors from any Subcontractors or potential Subcontractors. Contractor shall not recommend or specify any product, supplier, or other Contractor with whom Contractor has a direct or indirect financial or organizational interest or relationship that would violate conflict of interest laws, regulations, or policies. 6. If Contractor violates any conflict of interest laws or any of these conflict of interest provisions, the violation shall be grounds for immediate termination of this Contract. Further, the violation subjects Contractor to liability to the Agency for all damages sustained as a result of the violation. ADD the following: 5-10 ELECTRONIC COMMUNICATION 1. When specified in the Contract Documents, Contractor shall post all communications addressed to the Engineer concerning construction including RFIs, submittals, daily logs, and transmittals to the Project management website established for the Project. The Contractor shall maintain a list of scheduled activities including planned and actual execution dates for all major construction activities and milestones defined in the approved Schedule. The Contractor shall review and act on all communications addressed to the Contractor in the Project management website. A user’s guide to the Project management system may be available on the City’s website and shall be provided to Contractor at the Pre-construction Meeting. 2. The payment for electronic communications shall be included in the Contract Price. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 127 of 214 ADD the following: 5-11 STATUTORY REFERENCES 1. All references in these Agency Supplemental General Provisions (00 73 00) to any statute, rule or regulation are to the statute, rule or regulation as amended, modified, supplemented, or replaced from time to time by the corresponding legislative or regulatory body. SECTION 6 – PROSECUTION AND PROGRESS OF THE WORK 6-1 CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK ADD the following: 1. A Payment for the Construction Schedule shall be included in the Contract Price and no separate payment will be made, therefore. 6-2 PROSECUTION OF WORK ADD the following: 1. As soon as possible under the provisions of the Specifications, the Contractor shall backfill all excavations and restores to usefulness all improvements existing prior to the start of the Work. 2. When a Subcontractor fails to prosecute a portion of the Work in a manner satisfactory to the Agency, Contractor shall remove such Subcontractor immediately upon written request of the Agency and shall request approval of a replacement Subcontractor to perform the Work in accordance with the Subletting and Subcontracting Fair Practices Act (Pub. Contract Code, § 4100 et seq.) at no added cost to the Agency. ADD the following: 6-2.1 Order of Work. 1. The Contractor shall incorporate the requirements of the city, utility companies or agencies having jurisdiction over the Work in accordance with 2-4 Cooperation and Collateral Work, including any phasing requirements identified on the Plans or Special Provisions. 2. If construction and demolition operations are within an active public space, the Contractor shall submit a phasing plan to the Engineer to accommodate accessibility to the public and Agency staff. Phasing plan must be approved before Work starts. Phasing plan will be considered part of the mobilization Bid item and shall include any revisions or implementation of the Plan. ADD the following: 6-2.2 Moratoriums. 1. When moratorium periods are specified in the Special Provisions, Contractor shall stop Work and completely demobilize all construction related activity, equipment, and materials within the stated limits prior to the beginning of the moratorium periods at no additional cost to the Agency. The Contractor shall complete any Work that has been started prior to the start of the moratorium. 2. Contractor shall restore and clean the Site prior to each moratorium. The Contractor shall not leave equipment, materials, or traffic control on the Site during the moratorium periods. Trenches shall be backfilled during moratorium periods. Temporary resurfacing or steel plate covers over trenches shall not be used. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 128 of 214 3. The payment for complying with moratorium requirements shall be included in the Contract Bid. Contractor shall not be entitled to any additional costs for repeated mobilization and demobilization to continue the Work after the moratorium periods. 6-3 TIME OF COMPLETION 6-3.1 General. ADD the following: 1. Unless otherwise specified in the Contract, the time of completion of the Contract shall be expressed in both Calendar and Working Days. 2. The number of Working Days specified for the walk-through, preparation, and the completion of Punchlist items until acceptance shall be included in the stipulated Contract Time. 3. For pipeline Projects, the following shall be included in the stipulated Contract Time: a. Complete each street segment within 15 Working Days from the day the slurry seal or asphalt overlay is placed. Each completed segment shall include other incidental Work items (weed abatement, damaged asphalt pavement replacement, asphalt patching, resurfacing, striping, markings, raised pavement markers, and inlet markers). b. Where shutdowns of 16-inch and larger pipes are required, there is a shutdown moratorium from May until October. The Contractor shall plan and schedule Work accordingly. No additional payment or Working Days will be granted for delays due to the moratorium. 4. When specified in the Contract Documents, the PEP is included in the stipulated Contract Time and shall begin with the acceptance of the installation of the vegetation plan in accordance with Part 8 – LANDSCAPING AND IRRIGATION. 5. The Contractor shall obtain the written approval of the Engineer to perform any Work outside of normal Work hours. This approval must be obtained at least 48 hours prior to commencement of such Work. The Contractor shall pay any additional costs for inspection or testing of such Work. 6. Work that is required by the Engineer to occur outside of normal Work hours will be identified in the Special Provisions. 7. The Contractor shall not perform Work during moratoriums per 6-2.2 or during any periods of restriction identified in agency permits or Project environmental documents and shall include all such schedule constraints in the Construction Schedule. 8. No additional payment or adjustment of Bid item prices or adjustment of Contract Time will be made for the Contractor’s inability to work outside of normal Work hours if Contractor’s request is denied by the Engineer or during prohibited periods. 9. Contractor’s schedule shall plan for a minimum of 2 weeks after final walk-through to receive a final punch list from the Agency. Punch list items can be worked on during this 2-week period. 6-4 DELAYS AND EXTENSIONS OF TIME 6-4.1 General. ADD the following: 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 129 of 214 1. The Agency shall only grant an extension of time if the Extra Work or unforeseen condition impacts the Project’s critical path. All requests for an extension in Contract Time for any Extra Work or unforeseen event shall be demonstrated by using the CPM. No other scheduling method shall be used to calculate the Project’s schedule. 6-4.2 Extensions of Time. DELETE in its entirety and SUBSTITUTE with the following: 1. The Contract Time shall be modified only by Change Order. 2. Contractor shall immediately submit to the Agency a written request for a Change Order to modify the Contract Time, but in no event later than 1 Working Day after the occurrence and discovery of the events giving rise to the request. Contractor shall include in Contractor’s request a general description of the basis for and the estimated length of any extension and submit supporting data, including a time impact analysis setting forth the claimed Critical Path impacts to the Construction Schedule consistent with Section 1.14 (Change Orders, Delays, and Extensions of Time). 3. The Engineer shall not grant an extension of Contract Time unless Contractor demonstrates, through an analysis of the critical path, the following: a. The event causing the delay impacted the activities along the Project’s critical path. b. The increases in the time to perform all or part of the Project beyond the Contract Time arose from unforeseeable causes beyond Contractor’s control and without Contractor’s fault or negligence. c. All Project float has been used. 4. The Engineer shall issue a weekly document that stipulates the Contract Time. If Contractor does not agree with this document, Contractor shall submit to the Engineer for review a written protest supporting Contractor’s objections to the document within 15 Working Days after receipt of the weekly document. Contractor’s failure to file a timely protest shall constitute Contractor’s acceptance of the Engineer’s weekly document. a. Contractor’s protest will be considered a claim for time extension and shall be subject to 2-10.1, “Claims.” 6-4.4 Written Notice and Report. DELETE in its entirety and SUBSTITUTE with the following: 1. Contractor’s failure to file with the Engineer a written request and report of cause within 24 hours will be considered grounds for refusal by the Agency to consider such request. 2. The Contractor shall provide written notice to the Engineer within 2 hours after the beginning of the delay, or when the Contractor has placed any workers or equipment on standby for any reason that the Contractor has determined to be caused by the Agency or by any organization that the Agency may otherwise be obligated by. The Contractor shall provide continuing daily written notice to the Engineer, each Working Day, throughout the duration of such period of delay. The initial and continuing written notices shall include the classification of each worker and supervisor and the make and model of all equipment placed on standby, the cumulative duration of the standby, the Contractor’s opinion of the cause of the delay and a cogent 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 130 of 214 explanation of why the Contractor could not avoid the delay by reasonable means. Should the Contractor fail to provide the notice(s) required by this section the Contractor agrees that no delay has occurred and that it will not submit any claim(s) therefore. 3. The request for payment or extension must be made at least 15 Calendar Days prior to the specified completion date. Failure by the Contractor to provide notices and reports as specified in the Contract will be considered grounds for refusal by the Agency to consider such request. 6-6 SUSPENSION OF THE WORK 6-6.1 General. ADD the following: 1. The Agency reserves the right to shut down any trenching operation if Contractor is not proceeding within a reasonable period of time to restore the pavement and Site cleanup. A reasonable period of time is considered to be 5 to 10 Working Days after backfilling any 1 block, approximately 600 feet, of pipeline. The Engineer shall determine the period of time allowed which shall not be subject to dispute. 2. During periods when the Work is suspended, Contractor shall be prepared for any emergency Work that shall be supervised by Contractor’s representative. 3. Trenching operations are subject to suspension if the Contractor does not comply with the requirements for the maximum length of open trench specified in 306-3.5. 6-7 TERMINATION OF THE CONTRACT FOR DEFAULT 6-7.1 General. DELETE in its entirety and SUBSTITUTE with the following: 1. Prior to the Acceptance of the Work, Contractor shall be found in default of the Contract if: a. Contractor becomes insolvent, assign Contractor’s assets for the benefit of Contractor’s creditors, are unable to pay Contractor’s debts as they become due, or are otherwise financially unable to complete the Work. b. Contractor abandons the Work by failing to report to the Site and by failing to diligently execute the Work to completion. c. Contractor disregards written instruction from the Engineer or materially violates provisions of the Contract Documents. d. Contractor fails to execute the Work according to the Schedule approved by the Engineer. e. Contractor disregards laws or regulations of any public body having jurisdiction. f. Contractor commits continuous or repeated violations of regulatory or statutory safety requirements. g. Contractor fails to notify the Engineer upon discovery of items of Native American, Archaeological, or Paleontological interests. 2. Notices and other written communications regarding default between the Contractor, the Agency, and the Surety shall be transmitted in accordance with 5- 2, “SPECIAL NOTICES.” 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 131 of 214 6-8 TERMINATION OF THE CONTRACT FOR CONVENIENCE. DELETE in its entirety and SUBSTITUTE with the following: 1. At any time, the Agency may at its sole discretion terminate this Contract in whole or in part. If the Agency decides to terminate this Contract for convenience, the Agency shall issue a written notice of termination for convenience in accordance with 5-2, “SPECIAL NOTICES.” Upon receipt of this notice, Contractor shall immediately proceed as follows: a. Stop Work immediately or in accordance with the Notice of Termination. b. Notify Subcontractors and Suppliers to immediately cease their Work and place no further subcontracts for materials, services, or facilities except as necessary to complete any authorized continued portion of the Contract. c. Terminate all subcontracts to the extent that they relate to the Work terminated. d. With approval by the Engineer, settle all outstanding obligations arising from the termination of subcontracts. This approval shall be final for the purposes of this section. e. As directed by the Engineer, transfer and deliver completed or partially completed drawings, plans, calculations, specifications, and any other documents and records that, if the Contract had been completed, would be required to be furnished to the Agency. f. Complete the performance of the Work not terminated. g. Take all necessary steps and actions to minimize all costs to the Agency as a result of the termination. h. Take any action that may be necessary or that the Engineer may direct for the protection and preservation of the property related to the Contract that is in Contractor’s possession and in which the Agency has or may acquire an interest. 6-8.1 Termination Cost. 1. The Agency shall determine and pay Contractor the fair and reasonable amounts for Contractor’s termination cost as follows: a. The Contract Price for completed services accepted by the Engineer not previously paid or adjusted for any saving of freight and other charges. b. The fair and reasonable cost of settling and paying termination settlements for terminated subcontracts that are chargeable to the terminated portion of the Contract. c. The Agency shall pay Contractor a prorated amount of profit for Work that Contractor performed. The Agency shall not pay for lost profit on Work that was not performed by Contractor. 6-8.2 Termination Settlement. 1. After termination, Contractor shall submit a final termination settlement proposal to the Engineer no later than 3 months from the effective date of termination, unless extended in writing by the Engineer. 2. If Contractor fails to submit the proposal within the time allowed, the Agency may determine and pay the fair and reasonable amount that may be due Contractor as a result of the 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 132 of 214 termination. If Contractor does not agree that the amount determined by the Engineer is fair and reasonable, Contractor must notify the Engineer within 30 Calendar Days of receipt of payment. 6-8.3 Determination of Amount Due the Contractor. 1. In determining the amount due Contractor, the Agency shall deduct the following: a. The fair value of property destroyed, lost, stolen, or damaged that has become undeliverable to the Agency. b. Any claim which the Agency has against Contractor under the Contract. 6-8.4 Records and Documents Relating to Termination. 1. The Engineer will file an Agreement of Mutual Rescission of Contract with the Board. Once the Agreement is executed and a Notice of Completion is recorded, retention can be released. 2. Unless otherwise specified or required by statute, Contractor shall maintain all records and documents relating to the terminated portion of the Contract for 3 years after final settlement. This includes all books and other evidence bearing on Contractor’s costs, expenses, and settlement under the Contract. Contractor shall make these records and documents available to the Agency, at Contractor’s office, at all reasonable times, without any direct charge. If approved by the Engineer, Contractor may maintain photographs, microphotographs, and other authentic reproductions instead of original records and documents. 6-8.5 The Agency’s Right to Terminate or Suspend for Loss of Project Funds. 1. The Agency may terminate or suspend the Contract at its sole discretion if the State of California or its agents render the funds being used to fund this Project unavailable. If the Agency chooses to suspend the Contract, that suspension shall last until funds are identified and approved by the Board, whichever is appropriate, to be used to complete this Project. If the Agency elects under this provision to terminate the Contract, then neither Party is entitled to compensation from the other Party for any costs arising from such termination. The Agency may also elect to terminate after invoking a suspension under this provision. 6-9 LIQUIDATED DAMAGES DELETE in its entirety and SUBSTITUTE with the following: 1. Contractor’s failure to complete the Work within the time allowed shall result in damages being sustained by the Agency. Such damages are, and shall continue to be, impracticable and extremely difficult to determine. For each consecutive Working Day in excess of the time specified for the completion of the Work, as adjusted in accordance with 6-4, “DELAYS AND EXTENSIONS OF TIME,” Contractor shall pay to the Agency, or have withheld from monies due it, the sum described in the table below, along with any other damages that may be sustained by the Agency during the Project, unless otherwise specified in the Special Provisions. 2. The execution of the Contract shall constitute agreement between Contractor and the Agency that the liquidated damage amount described in the table below is the value of the damage caused by Contractor’s failure to complete the Work within the allotted time. Such sum shall 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 133 of 214 not be construed as a penalty and may be deducted from Contractor’s payments if such delay occurs. Contract Value Liquidated Damage Daily Amount Less than $100,000 $1,000 $100,000 and more $2,500 3. Any progress payments made to Contractor after the specified completion date shall not constitute a waiver of payment for damages sustained by the Agency under this section. ADD the following: 6-10 RIGHT TO AUDIT 6-10.1 General. 1. The Agency retains the right to review, audit, reasonably access Contractor’s and all Contractor’s Subcontractor’s premises to review and audit Contractor’s compliance with the provisions of the Contract. This includes the right to inspect, photocopy, and retain copies, outside of Contractor’s premises, of all records with appropriate safeguards if such retention is deemed necessary by the Agency in its sole discretion. The Agency will keep this information in strictest confidence. 2. Contractor shall include the Agency’s right to audit in its subcontracts and ensure that these specifications are binding upon all Subcontractors. 6-10.2 Audit. 1. The right to audit includes the right to examine any and all books, records, documents, and any other evidence of procedures and practices that the Agency determines is necessary to discover and verify that Contractor are in compliance with all requirements under the Contract. 2. If there is a claim for additional compensation or for changes in Work, the right to audit also includes the right to verify all direct and indirect costs which are claimed to have been incurred, anticipated to be incurred, or for which a claim for additional compensation or for changes in the Work have been submitted. 3. Contractor shall maintain complete and accurate records in accordance with generally accepted accounting practices in the construction industry. Contractor shall also make available to the Engineer for review and audit all Project-related accounting records and documents and any other financial data. Upon the Engineer’s request, Contractor shall submit exact duplicates of originals of all requested records to the Engineer. 6-10.3 Compliance Required Before Mediation and Litigation. 1. As a condition precedent to proceeding with mandatory mediation and further litigation under 2-10.2, “Dispute Resolution Process” Contractor shall comply with the audit specifications within 60 Calendar Days of the Engineer’s notice to review and audit compliance. See 5-2, “SPECIAL NOTICES.” 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 134 of 214 6-10.4 Access to Records on Federally Funded Projects. 1. Contractor shall retain all records, books, papers, and documents directly pertinent to the Contract for a minimum of 5 years after the Agency makes final payments and all other pending matters are closed and shall allow access to those records to the Agency, the Federal grantor agency, the Comptroller General of the United States, or any duly authorized representatives. SECTION 7 – MEASUREMENT AND PAYMENT Units of Measurement. The system of measure for this contract shall be the U.S. Standard Measures. 7-2 LUMP SUM WORK ADD the following: 7-2.1 Schedule of Values (SOV). 1. Submit a SOV for the lump sum Bid items of the Work to the Engineer for review and approval at the pre-construction meeting. The total value for the work described in the contract documents shall be shown in the SOV with category totals reflective of those values presented in Section 00 41 00 BID FORM, Bid Schedule A in the contract. 2. The SOV shall: a. Subdivide the Work into its respective parts. b. Include values for all items comprising the Work. c. Serve as the basis for monthly progress payments. 3. The Engineer is the sole judge of acceptable numbers, details, and description of values established. If, in the opinion of the Engineer, a greater number of SOV items than proposed by Contractor is necessary, add the additional items identified by the Engineer. When requested by the Engineer, provide substantiating data in support of the SOV. 4. The Contractor shall incorporate the SOV into the cost loading function of the Schedule in accordance with 6-1, “CONSTRUCTION SCHEDULE AND COMMENCEMENT OF THE WORK.” Monthly progress payment amounts for Lump Sum items shall be determined from the monthly updates of the Schedule activities. 5. The Contractor shall develop the SOV independently but simultaneously with the development of the Schedule activities and logic. Incorporate phase funding impacts, if applicable, into the Schedule. 6. The Contractor shall break down the Work not specifically included in the Bid as necessary for establishment of cost and Schedule activity. 7. Following acceptance of the SOV, the Contractor shall incorporate the changes (if any) into the cost loading portion of the Schedule. Where coordination of the Schedule and the SOV requires changes made to 1 or both documents, the Contractor shall propose changes to the SOV and to the Schedule activities to satisfy the Schedule cost loading requirements. 8. The Contractor shall update and submit these listings in conjunction with the Schedule monthly submittals. 9. The Contractor shall incorporate issued Change Orders or Field Orders in the Schedule into the SOV as single units identified by the Change Order or Field Order number. 10. Changes to the Schedule which add activities not included in the original Schedule but included in the original Work (schedule omissions) shall have values assigned as accepted by 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 135 of 214 the Engineer. Other activity values shall be reduced to provide equal value adjustment increases for added activities as accepted by the Engineer. 11. In the event that the Contractor and the Engineer agree to make adjustments to the original SOV because of inequities discovered in the original accepted SOV, increases and equal decreases to values for activities may be made. 12. The payment for the preparation of the SOV shall be included in the Contract Price. 7-3 PAYMENT 7-3.1 General. To paragraph (8), DELETE in its entirety and SUBSTITUTE with the following: If, within the time fixed by law, a properly executed notice to stop payment is filed with the Agency, due to the Contractor’s failure to pay for labor or materials used in the Work, all money plus 25 percent due for such labor or materials will be withheld from payment in accordance with applicable laws. At the expiration of 30 Calendar Days from the date of recording the NOC, the amount deducted from the final estimate and retained by the Agency shall be paid to Contractor except such amounts as are required by law to be withheld by properly executed and filed notices to stop payment. ADD the following: 1. Unless specified otherwise, the Contract Price includes use, consumer, and other taxes mandated by applicable legal requirements. The Contract Price is not subject to adjustment for tax increases. 2. As provided in California Public Contract Code Section 7105, if the Contract is not financed by revenue bonds, Contractor is not responsible for the cost of repairing or restoring damage to the Project when damage was proximately caused by an Act of God, in excess of 5% of the Contract Price, if the following occur: a. The damaged portion of the Project was built in accordance with the Contract requirements. b. There are no insurance requirements in the Contract for the damages. 3. Guarantee periods shall not be affected by any payment but shall commence on the date of recordation of the Notice of Completion. 7-3.2 Partial and Final Payment. To paragraph (5), DELETE in its entirety and SUBSTITUTE with the following: Pursuant to Public Contract Code Section 22300, Contractor shall have the option, at Contractor’s expense, to substitute for any money withheld by the Agency, securities equivalent to the amount being withheld. Securities eligible for such substitution are bank or savings and loans certificates of deposit or such securities which are eligible for investment pursuant to Government Code Section 16430. As to any such security or securities so substituted for monies withheld, Contractor shall be the beneficial owner of same and shall receive any accrued interest. Such security shall, at Contractor’s request and expense, be deposited with the Agency or with a 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 136 of 214 State or Federally Chartered bank as the escrow agent who shall pay such monies to Contractor upon notification by the Engineer that payment can be made. Such notification shall be given at the expiration of 30 Calendar Days from the date of NOC, or as prescribed by law, provided however, that there shall be a continued retention of the necessary securities to cover such amounts as are required by law to be withheld by properly executed and filed notices to stop payment, or as may be authorized by the Contract to be further retained. ADD the following: 1. After final inspection, the Engineer will make a Final Payment Estimate and process a corresponding payment. This estimate will be in writing and shall be for the total amount owed the Contractor as determined by the Engineer and shall be itemized by the Contract Bid item and Change Order item with quantities and payment amounts and shall show all deductions made or to be made for prior payments and amounts to be deducted under provisions of the Contract. All prior estimates and progress payments shall be subject to correction in the Final Payment Estimate. The Contractor shall have 30 Calendar Days from receipt of the Final Payment Estimate to make a written statement disputing any Bid item or Change Order item quantity or payment amount. The Contractor shall provide all documentation at the time of submitting the statement supporting its position. Should the Contractor fail to submit the statement and supporting documentation within the time specified, the Contractor acknowledges that full and final payment has been made for all Contract Bid items and Change Order items. If the Contractor submits a written statement with supporting documents within 30 Calendar Days from receipt of the Final Payment Estimate, the Engineer will review the disputed item within 30 Calendar Days and make any appropriate adjustments on the Final Payment. Remaining disputed quantities or amounts not approved by the Engineer will be subject to resolution as specified in Section 2-10.1.1, Initiation of Claim. The written statement filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of the disputed items. The Engineer will consider the merits of the Contractor’s claims. It will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying payment for the disputed items. 2. Final Payment and release of Retention shall be paid after Contractor submits the following: a. An affidavit that payrolls and bills for materials, equipment, and other indebtedness connected with the Work for which the Agency or the Agency’s property might be responsible for or encumbered by. Fewer amounts withheld by the Agency shall have been paid for or otherwise satisfied. b. A certificate evidencing that insurances required by the Contract Documents shall remain in force after Final Payment is currently in effect and shall not be canceled or 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 137 of 214 allowed to expire until at least a 30 Calendar Days prior written notice has been given to the Engineer. c. Consent of Surety to Final Payment. d. If required by the Engineer, other data establishing payment or satisfaction of obligations such as receipts, releases and waivers of liens, claims, and security interests or encumbrances arising out of the Contract Documents. If a Subcontractor refuses to furnish a release or waiver required by the Agency, Contractor may furnish a bond satisfactory to the Engineer to indemnify the Agency against such lien. e. If required in the Contract Documents, the successful completion and submittal of the required reports such as construction demolition, waste recycling, and hydrostatic discharge reports. f. Required documentation, record drawings, operations manuals, test reports, warranty documentation, and UL labels shall be submitted before requesting the release of retention. ADD the following: 7-3.2.1 Application for Progress Payment. 1. By the 5th day of each month, sign, fill out, and submit to the Engineer a partial payment estimate that identifies acceptable Work performed during the previous month, or since the last partial payment estimate was submitted. If requested by the Engineer, provide such additional data as may be required to support the payment estimate. Such data may include submission of signed field orders and satisfactory evidence of payment for equipment, materials, and labor, including payments to Subcontractors and Suppliers. 2. For application for progress payments, Contractor shall use the format required by the Agency. An electronic copy of the invoice form is available from the Engineer upon request. Progress payments shall be signed, and the date of the invoice shall be the date that the invoice is submitted. 3. The Agency shall not pay progress or partial payments until Contractor submits to the Engineer an updated Schedule. It is solely the Contractor’s responsibility to prepare and submit the Schedule updates. 4. Disputed or incorrect applications shall be returned to the Contractor within 7 Calendar Days with documentation describing the reason for the rejection of the payment request. ADD the following: 7-3.2.2 Amount of Progress Payments. 1. If an undisputed and properly submitted application for payment is received by the Engineer, the Agency shall pay Contractor within 30 Calendar Days after the Engineer receives the application for Payment consistent with Public Contract Code Section 20104.50. The Agency shall pay Contractor for the Work performed, including the payment for offsite stored materials per section 7-3.3.1.2, through the period covered by the application for payment if the payment amount before Retention does not exceed the percentage of completion of the Work as set forth in the SOV. ADD the following: 7-3.2.2.1 Progress Payment for Pipelines. Not Used 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 138 of 214 ADD the following: 7-3.2.3 Waiver of Claims at Final Payment. 1. Contractor’s acceptance of Final Payment constitutes a waiver of affirmative claims by Contractor, except those previously made in writing and identified as unsettled at the time of Final Payment, which are expressly reserved by Contractor from operation of its Release of Claims pursuant to Public Contract Code Section 7100 or other Applicable Law. ADD the following: 7-3.2.4 Withholding of Payment and Back Charge. 1. The Engineer may withhold payment for any of the following reasons: a. Defective or incomplete Work. b. Stop notices, wage orders, or other withholdings required by Applicable Law. c. Contractor’s failure to comply with 5-3.3, “Payroll Records” and the Contractor Registration and Electronic Reporting System requirements of the Contract Documents. d. Failure to submit monthly Construction Schedule updates. 2. The Engineer may back charge the Contractor for any of the following reasons: a. Defective or incorrect Work not remedied. b. Damage to Agency property or a third party’s property that was caused by Contractor. c. Liquidated Damages. d. Non-attendance at meetings without prior cancellation notice. e. Failed inspections or re-inspections paid by the Agency. 7-3.3 Delivered Materials DELETE in its entirety and SUBSTITUTE with the following: 1. The cost of materials and equipment delivered but not incorporated into the Work will not be included in the progress estimate. ADD the following: 7-3.3.1 Payment for Stored Materials on Site. ADD the following: 7-3.3.1.1 General. 1. When authorized, Contractor may request payment for materials and equipment which has not been incorporated into the Work but will be at a later date and will be delivered and stored at the Project Site. 2. The material shall meet the Contract requirements and the material’s required test results and certifications shall be filed with the Engineer. 3. Only non-perishable materials for major items of Work or Materials Subject to Price Adjustment shall be considered for payment for on-site storage. However, each individual item has a value of more than 1% of the Contract Price and shall become a permanent part of the Work. 4. Materials cost shall be evidenced by the manufacturer’s paid invoice bearing the statement that Contractor has paid all invoices in full. 5. The payments for the stored materials shall not exceed the invoice price or 60% of the Bid prices for the pay items into which the materials are to be incorporated, whichever is less, unless otherwise approved by the Engineer. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 139 of 214 6. Apply for the payment for materials stored on a form provided by the Engineer and attach documentation to show the following: a. The amount paid on the invoice (or other record of production cost) for the stored items. b. The dollar amount of the material incorporated into each of the various Work items for the month. c. The amount that should be retained for stored materials. d. That Contractor has received the materials and equipment free and are clear of all liens, charges, secured interests, and encumbrances. e. That the materials and equipment are covered by the appropriate property insurance in accordance with the insurance provisions and other arrangements that protect the Agency’s interest. 7. Contractor shall provide the Engineer, upon request and prior to any partial payment, documentation which transfers full legal title to such materials to the Agency conditional only upon receipt of the Final Payment. Such transfer of title or any partial payment shall not constitute acceptance by the Agency of the materials nor shall it void the right to reject materials subsequently found to be unsatisfactory in accordance with SECTION 4 – CONTROL OF MATERIALS. This shall also not relieve Contractor of any obligation arising under the Contract Documents. 8. The payments for materials on-site are subject to retention as set forth in 7-3.2, “Partial and Final Payment.” 9. Contractor shall assume all risks associated with the loss or damage to the stored products for which payment has or has not been received. 10. Equipment and materials shall be stored in accordance with manufacturer’s recommendations. The stored products shall be in a form ready for installation. The Agency shall not pay for raw materials or parts and pieces of equipment. 11. Any and all surplus materials that are not incorporated in the Work shall become Contractor’s property at no additional cost to the Agency. 12. Unless specifically provided in the Contract, payment for the materials on hand shall not be included when determining the percentage of Work completed. 13. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available and delivered to the job site in the quantities involved, plus sales tax, freight, and delivery. The Agency reserves the right to approve materials and sources of supply, or to supply materials to the Contractor if necessary, for the progress of the Work. No markup shall be applied to any material provided by the Agency. ADD the following: 7-3.3.1.2 Payment for Stored Materials Offsite. 1. The payment of materials and equipment delivered and stored offsite shall be contingent upon Contractor’s compliance with the storage and protective maintenance requirements set forth in the Contract Documents and all other requirements necessary to preserve equipment warranties for the benefit of the Agency. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 140 of 214 2. The Agency reserves the right to refuse approval for the payment of any equipment or materials suitably stored offsite in its sole discretion, regardless of whether all conditions in the Contract Documents have been met. 3. Partial payment may be made for products eligible for offsite delivery and storage only upon Contractor’s presentation of a bill of sale, a paid invoice, or an affidavit certifying that the material is received by the Contractor free and clear of all liens, encumbrances, and secured interest of any kind including offsite delivery. 4. Partial payment for products delivered and stored offsite shall be contingent upon Contractor’s compliance with the storage and protective maintenance requirements set forth in the Contract Documents and all other requirements necessary to preserve equipment warranties for the benefit of the Agency. 5. The cost of materials and equipment delivered but not incorporated into the Work will not be included in the progress estimate. 6. Costs associated with the delivery to and storage at an offsite facility shall be at Contractor’s expense regardless of the Engineer’s approval to deliver and store the materials. 7. Contractor shall provide written evidence to the Engineer of having made arrangements for unrestricted access by the Agency and the Agency’s authorized representatives to the materials wherever stored, including provisions for the Agency to take control and possession of such materials at any time and without restriction. Contractor shall furnish the Engineer a permit of entry, from the owner of the property, for at least 6 months after the NOC has been filed. The permit of entry shall contain information similar to the following: PERMIT OF ENTRY: Permission is granted to the Agency and its designated employees or agents to enter upon the property described in this permit for a period of not less than 6 months after the NOC has been filed for the Carlsbad Fleet Fuel Island Upgrade for the purpose of removing materials for which advance materials on hand payment has been made to (Contractor’s Name). The property is owned by (Owner’s Name) and is described as follows: (Address and Description of Property). (Include signature(s) and date(s) for owner and lessee or purchaser, and, if appropriate, attach a copy of a warehouse receipt or contract for storage. 8. The material shall be clearly marked and identified as being specifically fabricated, produced, and reserved for use on the Project. The Contractor shall provide payment documentation for the materials. 7-3.4 Mobilization. ADD the following: 1. Mobilization consists of Work necessary for the movement of personnel, equipment, supplies, and incidentals to and from the Site; for establishment of all offices, buildings, storage yards, and other facilities necessary for the Work; and for all other Work and operations which shall be performed prior to beginning the Work and after completion of the Work on the various Contract items on the Site. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 141 of 214 2. Contractor shall properly design the Project parameters to incorporate construction mobility for moving on and off the Site in a manner that limits disturbance to the surrounding residences, businesses, and any other citizens. This includes the designated staging areas, loading areas, and assemblage areas. Contractor shall consider and address access rights of the public at all times. Prepare a mobilization plan that shall describe and govern Contractor’s mobilization activities. 3. When a Bid item has been provided for “Mobilization,” payment for mobilization Work shall be distributed equally over the first 2 progress payments up to the Bid amount of the “Mobilization” Bid item but shall not exceed 3% of the Contract Price. If Contractor’s Bid item for “Mobilization” exceeds 3% of the Contract Price, then anything above 3% of the Contract Price shall be paid as a part of the Final Payment. 4. The complete dismantling and removal of all of Contractor’s properties, temporary facilities, equipment, materials, construction wastes, and personnel at the Site referred to as demobilization is included in the payment for mobilization, unless there is a Bid item for demobilization. 5. If a separate Bid item has not been provided for mobilization, the payment for mobilization is included in the Contract Price. 7-3.5 Contract Unit Prices Not Used 7-3.5.1 General. ADD the following: 7-3.9 Field Orders. Not Used ADD the following: 7-3.10 Compensation Adjustments for Price Index Fluctuations. 1. Unless otherwise specified, the provisions of this section apply only to the paving asphalt used in the following: a. Asphalt Concrete Pavement b. Asphalt Pavement Repair c. Scheduled and Unscheduled Base Repair d. Slurry Seal or any other asphalt emulsion 2. The compensation for paving asphalt shall be increased or decreased for paving asphalt price fluctuations in accordance with 7-3.11 “Compensation Adjustments for Price Index Fluctuations” in the Caltrans Standard Specifications. 3. The adjustment in compensation shall also be subject to the following: a. Show the provided compensation adjustments separately on payment estimates. Contractor is liable to the Agency for decreased compensation adjustments and the Engineer may deduct the amount from moneys payable or that may become payable to Contractor. b. In the event of an overrun of Contract Time, adjustment in compensation for asphalt binder included in estimates during the overrun period shall be determined using the California Statewide Crude Oil Price Index in effect on the first business day of the month within the pay period in which the overrun began. c. In the event that the companies discontinue posting their prices for a field, the Engineer shall determine an index from the remaining posted prices. The Agency 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 142 of 214 reserves the right to include in the index determination the posted prices of additional fields. 4. Contractor may opt out of the payment adjustments for price index fluctuations when specified in the Contract Documents by submitting a letter with the Bid. 7-4 PAYMENT FOR EXTRA WORK 7-4.1 General. ADD the following: 1. With every request for payment, Contractor shall submit to the Engineer a breakdown showing monthly and cumulative amounts of the Work performed under the Change Order by Contractor and Contractor’s Subcontractors. The reporting format shall be approved by the Engineer. 2. When the price for the Extra Work cannot be agreed upon, the Agency will pay for the Extra Work based on the accumulation of costs. 7-4.2 Basis for Establishing Costs. 7-4.2.1 Labor. ADD the following: 1. The costs of labor will be the actual cost for wages of workers performing the Extra Work at the time the Extra Work is done, plus employer payments of payroll taxes, workers compensation insurance, liability insurance, health and welfare, pension, vacation, apprenticeship funds, and other direct costs, resulting from federal, state, or local laws, as well as assessments or benefits required by lawful collective bargaining agreements. 2. The use of a labor classification which would increase the Extra Work cost will not be permitted unless the Contractor establishes the necessity for such additional costs. Labor costs for equipment operators and helpers shall be reported only when such costs are not included in the invoice for equipment rental. The labor cost for foremen shall be proportionate to all their assigned work and only that applicable to Extra Work will be paid. 3. Nondirect labor costs, including superintendence, shall be considered part of the markup of Section 7-4.2.1(1). 4. The Agency reserves the right to request the following: a. Financial records of salaries for an employee. b. Wage rates/Certified Payroll. c. Bonuses and deductions. 5. Contractor shall list the labor rates of its personnel and Subcontractors who work on the Project. The payment for payroll records is included in the Contract Price. 6. If Contractor’s proposal for Extra Work is based upon services and Work to be performed outside Normal Working Hours, the labor charges associated with the Extra Work shall consist of straight time wages and burdens plus the appropriate overtime or shift premium with no additional burdens, such as fringe benefits, on the premium portion. 7-4.2.2 Tool and Equipment Rental. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 143 of 214 DELETE in its entirety and SUBSTITUTE with the following: 1. No payment shall be made for the use of tools which have a replacement value of $200 or less. 2. Regardless of ownership, the rates and delay factors to be used in determining equipment rental costs shall not exceed those listed in the latest edition of the Caltrans publication entitled “Labor Surcharge and Equipment Rental Rates” preceding the date the Work is accomplished. The latest edition of the Caltrans publication is available at www.dot.ca.gov. The delay factors therein shall be used as multipliers of the rental rates for determining the value of costs for delay to the Contractor and Subcontractors, if any. The labor surcharge rates published therein are not a part of this Contract. 3. Contractor shall be entitled to a rental rate adjustment when Contractor can substantiate that the rental rates prevailing locally exceed the published rates by more than 15%. For equipment not listed in the Caltrans publication, rental rates shall not exceed listed rates prevailing locally at equipment rental agencies or distributors at the time the Work is performed. 4. Whenever possible, Extra Work shall be accomplished using equipment available on Site or owned by Contractor. If a specific piece of equipment shall be rented to be used exclusively for the Extra Work, the rental rate shall be the invoiced rate. The rental rates paid shall include the cost of fuel, oil, lubrication, supplies, small tools, necessary attachments, repairs and maintenance of any kind, depreciation, storage, insurance, and all incidentals. Necessary loading and transportation costs for equipment used on the Extra Work shall be included. 5. If rental equipment is not being used or used intermittently and could be returned to its rental source rather than holding it at the Work Site, the Contractor shall return the equipment at no expense to the Agency unless Contractor elects to keep it at the Work Site at Contractor’s expense. 6. The reported rental time for equipment already at the Work Site shall be the duration of its use on the Extra Work. This time shall begin when equipment is first used on Extra Work, plus the time required to move it from its previous site and back or from its previous site to a closer site. 7. All equipment shall be acceptable to the Engineer, in good working condition, and suitable for the purpose for which it is to be used. 7-4.2.3 Materials. The cost of materials reported shall be at invoice or lowest current price at which such materials are locally available and delivered to the job Site in the quantities involved, plus sales tax, freight, and delivery. The Agency reserves the right to approve materials and sources of supply, or to supply materials to the Contractor if necessary, for the progress of the Work. No markup shall be applied to any material provided by the Agency. 7-4.2.4 Invoices. Vendors’ invoices for material, equipment rental and other expenditures shall be submitted with the request for payment. If the request for payment is not substantiated by invoices or other 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 144 of 214 documentation, the Agency may establish the cost of the item involved at the lowest price which was current at the time of the report. 7-4.3 Markup. 7-4.3.1 Work by the Contractor. DELETE in its entirety and REPLACE with the following: The following percentages shall be added to the Contractor’s costs and shall constitute the markup for all overhead and profits: Labor 20 Materials 15 Equipment Rental 15 Other Items and Expenditures 15 To the sum of the costs and markups provided for in this section, 1% shall be added as compensation for bonding. 7-4.3.2 Work by a Subcontractor. DELETE in its entirety and REPLACE with the following: When all or any part of the Extra Work is performed by a Subcontractor, the markup established in 7-4.3.1 shall be applied to the Subcontractor’s actual cost of such Work. A markup of 10 percent on the first $5,000 of the subcontracted portion of the Extra Work and a markup of 5 percent on Work added in excess of $5,000 of the subcontracted portion of the Extra Work may be added by the Contractor. 7-4.4 Daily Reports. ADD the following: Payment for Extra Work will not be made until such time that the Contractor submits completed daily reports and all supporting documents to the Engineer. When the price for the Extra Work cannot be agreed upon, the Contractor shall submit a daily report to the Engineer on forms approved by the Agency. Included are applicable delivery tickets, listing all labor, materials, and equipment involved for that day, and other services and expenditures when authorized. Payment for Extra Work will not be made until such time that the Contractor submits completed daily reports and all supporting documents to the Engineer. Failure to submit the daily report by the close of the next Working Day may waive any rights for that day. An attempt shall be made to reconcile the report daily, and it shall be signed by the Engineer and the Contractor. In the event of disagreement, pertinent notes shall be entered by each party to explain points which cannot be resolved immediately. Each party shall retain a signed copy of the report. Reports by Subcontractors or others shall be submitted through the Contractor. 00 73 00 AGENCY SUPPLEMENTAL GENERAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 145 of 214 The report shall: 1. Show names of workers, classifications, and hours worked. 2. Describe and list quantities of materials used. 3. Show type of equipment, size, identification number, and hours of operation, including loading and transportation, if applicable. 4. Describe other services and expenditures in such detail as the Agency may require. SECTION 8 – FACILITIES FOR AGENCY PERSONNEL – Not Used END OF SECTION 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 146 of 214 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS INTRODUCTION The Specifications contained in this 00 7400 Agency Supplemental Technical Provisions take precedence over the specification language contained in the Standard Specifications for Public Works Construction, "The Greenbook" latest edition and all errata. This specification addresses the unique conditions in Carlsbad that are not addressed in The Greenbook. Therefore, if there is a conflict, these Specifications shall control. The Greenbook may be purchased at Bidder/Contractors local technical bookstore or directly from the publisher. These Agency Supplemental General Provisions are available only for download from the online bidding portal with Contract Documents. The Agency does not provide hard copies. When used in the Contract Documents, statements or command phrases (active voice and imperative mood) refer to and are directed at the “Bidder” or “Contractor” as applicable. The Specifications are written to the “Bidder” before award and the “Contractor” after award. Before award, interpret sentences written in the imperative mood as starting with “The Bidder shall.” Interpret the term “you” as “the Bidder” and interpret the term “your” as “the Bidder’s.” After award, interpret sentences written in the imperative mood starting with “The Contractor shall.” Interpret the term “you” as “the Contractor” and interpret the term “your” as “the Contractor’s. PART 2 CONSTRUCTION MATERIALS SECTION 200 – ROCK MATERIALS 200-2 UNTREATED BASE MATERIALS 200-2.1 General. ADD the following: 1. Aggregate base shall be Crushed Aggregate Base per Greenbook Section 200-2 and as specified in this section. 200-2.2 Crushed Aggregate Base. 200-2.2.1 General. ADD the following: Crushed Aggregate Base shall be free from organic matter and other deleterious substances and shall be of such nature that it can be compacted readily under watering and rolling to form a firm, stable base. 1. The aggregate shall not be treated with lime, cement or other chemical material before tests are performed. 2. Samples for testing shall represent every 500 cubic yards or one day's production, whichever is smaller. If the results of the aggregate grading tests do not meet the requirements for Percentage Passing Sieve as specified in Table 200-2.2.2 but meet the Quality Requirements as specified in Table 200-2.2.3, placement of the aggregate base may be continued for the remainder of that day. However, another day's Work may not be started until test results 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 147 of 214 indicate to the satisfaction of the Engineer that the next material to be used in the Work will comply with the requirements specified for Percentage Passing Sieve. 3. If the results of both the aggregate grading and Sand Equivalent tests do not meet the requirements of Section 200-2.2, the aggregate base which is represented by these tests shall be removed. However, if requested by the Contractor, and approved at the sole discretion of the Engineer, the aggregate base may remain in place and the Contractor shall pay to the Agency $50 per cubic yard for such aggregate base left in place. The Agency may deduct this amount from any moneys due, or that may be come due, to the Contractor under the Contract. SECTION 203 – BITUMINOUS MATERIALS 203-1 PAVING ASPHALT. 203-1.3 Test Reports and Certification. DELETE in its entirety and REPLACE with the following: 1. Paving asphalt shall be supplied by Caltrans or other State Department of Transportation approved vendors unless otherwise specified in the Special Provisions. At delivery time, the supplying vendor shall deliver to the purchaser a certified copy of the test report. This report shall indicate the vendor's name, grade of paving asphalt delivered, date/ time and point of delivery, quantity delivered, ticket number, purchase order number, and results of specified tests. The certified test report and the testing required in connection with the report shall be submitted in accordance with 3-8.4. 2. Final acceptance of the material will be dependent upon the determination by the Engineer that the material involved conforms to the Specifications. 203-5 SLURRY SEAL. 203-5.2 Mix Design. DELETE the last paragraph and REPLACE with the following: 1. When a mix design is more than 30 Calendar Days old, it shall be supplemented with a Certificate of Compliance that states the combined aggregate gradation is within ± 3 percent of the referenced mix design based on a 30-day moving average or the average of a minimum of 10 of the most current laboratory results, whichever is greater. A mix design shall be reformulated if it is more than 6 months old or whenever the combined aggregate gradation changes from that in the previously submitted mix design by ± 3 percentage points on any sieve size shown in Table 203-5.3.2. If the source of any aggregate or emulsified asphalt is changed, or the mix design or supporting laboratory reports are over 6 months old, a new mix design shall be submitted. 203-6 ASPHALT CONCRETE. 203-6.1 General. DELETE in its entirety and REPLACE with the following: 1. Asphalt concrete shall be the product of mixing mineral aggregate and up to 20 percent RAP with asphalt binder at a central mixing plant. 2. When specified in the Special Provisions, asphalt concrete may contain greater than 20 percent RAP or be produced using a WMA technology. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 148 of 214 3. Asphalt concrete containing any modified paving asphalt or WMA technology or WMA additive shall not include more than 15 percent RAP. 4. Unless otherwise specified in the Special Provisions or shown on the Plans, asphalt concrete mixtures shall conform to 203-6.4. 203-6.2.5.4 Testing. DELETE the fourth sentence and REPLACE with the following: 1. When using greater than 20 percent RAP, the following additional tests shall be performed: 203-6.3 Job Mix Formula (JMF) and Mix Designs. 203-6.3.1 General. DELETE in its entirety and REPLACE with the following: 1. The Contractor shall submit in accordance with 3-8.4 a JMF that summarizes each asphalt concrete mix design for each class and grade of asphalt concrete required to construct the Work. Supporting information for the WMA technology and/or recycling agent, if included in a mixture, shall also be submitted. 2. The JMF shall identify the source and the individual grading of each material used to produce the mix design (including the percentage and individual gradation of any manufactured or natural sands), the combined gradation, the OBC, void content, RAP percentage, RAP gradation, RAP binder content, stability value, plant identification, mix number, WMA technology, and the source and performance grade of the paving asphalt. The mix design test data represented by the JMF shall be submitted to the Engineer with the JMF. 3. When greater than 20 percent RAP is to be included in a mixture, a mix design shall be submitted. The submittal shall include supporting information showing the viscosity of the individual binders (both the virgin paving asphalt grade and that of the binder recovered from the RAP); and the amount of recycling agent, if any, and the blended final viscosity in accordance with AASHTO M323. 4. For all mixtures, the asphalt binder content shall be defined as the total bituminous material present in the mix consisting of the blend of virgin paving asphalt, residual paving asphalt from RAP, and recycling agent. 5. When a mix design is more than 30 Calendar Days old, the JMF must indicate that the combined gradation is ± 3 percent from the referenced mix design based on a 30-day moving average or a minimum of the 10 most current results. If the combined aggregate gradation is not within ± 3 percentage points of the gradation shown on the referenced mix design on any sieve, if the source of any aggregate is changed, the performance grade or source of paving asphalt is changed, the grade or source of any other component of asphalt concrete is changed, or the mix design is over 1 year old, a new mix design shall be prepared and a new JMF shall be submitted to the Engineer for approval. 6. Asphalt concrete shall be class C2-PG 64-28PM and PG 76-22PM. No more than 15% RAP shall be allowed in any AC mix. 203-6.3.2 Hveem Mix Design Method. DELETE the fourth paragraph and REPLACE with the following: 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 149 of 214 1. Unless viscosity and blending charts developed in accordance with AASHTO M323 show otherwise, mix designs for mixtures containing more than 20 percent RAP shall drop the high temperature requirement of the virgin paving asphalt by one performance grade and drop the low temperature requirement by a minimum of one performance grade, e.g., a specified "PG 64-1O" shall become a "PG 58-22 or "PG 58-16." 203-6.4.1 Class and Grade. DELETE letters b) and d) and REPLACE with the following: b) "R0" if the mixture does not contain RAP, e.g., "C2-PG 64-10-R0." d) "WMA" if the mixture uses a warm mix asphalt technology, e.g., "C2-PG 64-10- WMA" 203-6.4.4 Composition and Grading. ADD the following: 1. Evaluation of asphalt concrete shall be determined from samples of final asphalt concrete material. In addition to evaluation of the final asphalt material, samples of aggregate, RAP, and asphalt binder will be taken for testing. In case of dispute between the Contractor and the Agency, the Engineer has the authority to request core samples for analysis from the placed asphalt concrete for any of the acceptance criteria, at the locations determined by the Engineer. All samples shall be taken in accordance with California Test 125, and the following table: Sampling Location Asphalt Concrete • Trucks, or • Mat behind the paver Aggregate • Cold feed belts, or • Hot bins prior to addition of asphalt binder RAP • RAP system, or • RAP feed belts Asphalt Binder • Asphalt binder supplier, or • Storage tanks at the plant during production 2. When behind the paver or core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for the required testing. 3. When using core samples, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results. 4. Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot. 5. Table 203-6.4.4, design criteria, shall be modified per the following table, the gradation shall stay the same: 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 150 of 214 Table 203-6.4.4 – Modified (Design Criteria) Sieve Size Percentage Passing Sieves A B C1 C2 D1 D2 E F Dense Coarse Dense Medium Coarse Coarse Medium Dense Medium Coarse Fine Dense Fine Extra Fine Channel Liner 1-1/2” (37.5 mm) 100 1” (25 mm) 90-100 100 ¾” (19.0 mm) 78-90 87-100 100 100 ½” (12.5 mm) 64-78 70-87 90-100 95-100 100 100 3/8” (9.5 mm) 54-68 55-76 72-88 72-88 90-100 95-100 100 100 No. 4 (4.75 mm) 34-48 35-52 40-54 46-60 40-54 58-72 65-85 95-100 No. 8 (2.36 mm) 25-35 22-40 18-34 28-42 20-32 34-48 45-65 70-84 No. 30 (600 µm) 12-22 8-24 8-20 15-27 6-18 18-32 22-38 36-50 No.50 (300 µm) 8-16 5-18 4-14 10-20 2-12 13-23 16-28 23-35 No. 200 (75 µm) 3-6 0-7 1-6 2-7 0-5 2-9 6-12 6-12 Asphalt Binder % 4.5-6.0 4.7-6.5 5.0-6.5 5.0-6.5 5.3-7.0 5.3-7.0 6.0-8.0 8.0-10.0 Hveem Stability “S Value” (min.) 37 37 35 35 32 32 Air Voids1 4% 4% 4% 4% 4% 4% 203-6.5.1 Class and Grade. DELETE the list and REPLACE with the following: a) No suffix if the mixture contains RAP in an amount up to 20 percent. b) "R0" if the mixture does not contain RAP, e.g., "III-C2-PG 64-10-R0." c) "R" and the percentage of RAP if the mixture contains greater than 20 percent, e.g. "III-C2-PG 64-I0-R25." d) "WMA" if the mixture uses a warm mix asphalt technology, e.g., "III-C2-PG 64-10- WMA." 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 151 of 214 203-6.5.4 Table. DELETE in its entirety and REPLACE with the following: CLASS B2 B3 Sieve Size Individual Test Result Moving Average Individual Test Result Moving Average 1" (25.0 mm) 100 100 100 100 3/4" (19.0 mm) 87-100 90-100 90-100 95-100 3/8" (9.5 mm) 50-80 60-75 60-84 65-80 No. 4 (4.75 mm) 30-60 40-55 40-60 45-60 No. 8 (2.36 mm) 22-44 27-40 24-50 30-45 No. 30 (600 µm) 8-26 12-22 11-29 15-25 No. 200 (75 µm) 1-8 3-6 1-9 3-7 Asphalt Binder % Air Voids % 4.8-6.5 4% 4.8-6.5 4% CLASS C2 C3 Sieve Size Individual Test Result Moving Average Individual Test Result Moving Average 3/4" (19.0 mm) 100 100 100 100 1/2" (12.5 mm) 89 -100 95 -100 89 -100 95 - 100 3/8" (9.5 mm) 70-94 75-90 74 -100 80-95 No. 4 (4.75 mm) 44-72 50-67 50- 78 55-72 No. 8 (2.36 mm) 30-54 35-50 32-60 38-55 No. 30 (600 µm) 10-34 15 - 30 14 - 38 18 - 33 No. 200 (75 µm) 2-10 4-7 2-10 4-8 Asphalt Binder % Air Voids % 5.0 - 6.8 4% 5.0 - 7.0 4% CLASS D F Sieve Sizes Combined Average Combined Average 1/2" (12.5 mm) 3/8" (9.5 mm) 100 95-100 - 100 No. 4 (4.75 mm) 65-85 95-100 No. 8 (2.36 mm) 50-70 70-80 No. 30 (600 µm) 28-40 35-50 No. 200 (75 µm) 5-14 7-16 Asphalt Binder % Air Voids 6.0-8.0 4% 8.0-10.0 203-6.8 Storage. DELETE in its entirety and REPLACE with the following: 1. Storage of asphalt concrete shall not be allowed. Asphalt concrete shall be transferred from the mixer by a method that does not cause segregation. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 152 of 214 203-6.10 Sampling. DELETE in its entirety and REPLACE with the following: 1. Aggregate samples for batch plants shall be taken from the hot bins. Aggregate samples for dryer-drum plants shall be taken in advance of the dryer-drum using devices conforming to 203-6.7.4.2. 2. Evaluation and acceptance of asphalt concrete shall be determined from samples of final asphalt concrete material. In addition to evaluation of the final asphalt material, samples of aggregate, RAP, and asphalt binder shall be taken for testing. In case of dispute between the Contractor and the Agency, the Engineer has the authority to request core samples for analysis from the placed asphalt concrete for any of the acceptance criteria, at the locations determined by the Engineer. All samples shall be taken in accordance with California Test 125, and the following table: TABLE 203-6.10 Sampling Location Asphalt Concrete • Trucks, or • Mat behind the paver Aggregate • Cold feed belts, or • Hot bins prior to addition of asphalt binder RAP • RAP system, or • RAP feed belts Asphalt Binder • Asphalt binder supplier, or • Storage tanks at the plant during production 3. When behind the paver or core samples of asphalt concrete are to be used for evaluation, sufficient size samples shall be taken to ensure representative and adequate quantity of material for the required testing. 4. When using core samples, the samples must be properly prepared to safeguard against influx of outside contaminates and so that the cut surfaces do not influence the test results. 5. Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot. 203-6.11 Acceptance. DELETE in its entirety and REPLACE with the following: 1. Acceptance of asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Table 203-6.4.4. Air void values shall be between 2% and 6%. The asphalt binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula. 2. Acceptance of Type III asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Tables 203-6.5.4 (A) and 203-6.5.4 (B). Air void values shall be between 2% and 6%. The asphalt 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 153 of 214 binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula. 3. Should plant gradation test results be unavailable and allowed by the Engineer, gradation may be determined in accordance with ASTM D2172 or by AASHTO T 308 with adherence to the aggregate correction factor therein. In the case of a continued dispute, final acceptance of plant produced mixtures may be based upon binder content, stability and air void values. 4. When dissimilar surface course mix characteristics are the result of production and delivery from multiple plants, the Engineer may require production and delivery from only 1 plant during any 1 day of production, unless approved by the Engineer. 203-11 ASPHALT RUBBER HOT MIX (ARHM). 203-11.3 Composition and Grading. Delete row 10 of TABLE 203-11.3 and REPLACE with the following: 1. Asphalt Rubber Binder, % by Weight of Dry Aggregate1|7.5-8.5 | 7.5-8.8 | 7.8-9 ADD 203-11.10 Acceptance. 1. Acceptance of asphalt rubber hot mixes will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Table 203-11.3. Air void values shall be within +/- 2 percent of the targeted value at the optimum binder content (OBC) shown on the respective job mix formula. The asphalt binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula. 203-13 CRUMB RUBER MODIFIED ASPHALT CONCRETE GAP GRADED (CRUMAC-GG). 203-13.4 Mix Designs. Delete the last sentence and REPLACE with the following: 1. Once the total percent of paving asphalt and CRM is determined by the mix design, the production tolerance for the combined materials shall be ± 0.4 percent as determined by California Test 382. 203-14 TIRE RUBBER MODIFIED ASPHALT CONCRETE (TRMAC). 203-14.9 Acceptance. DELETE in its entirety and REPLACE with the following: 1. Acceptance of dense-graded mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability values shown in Table 203-6.4.4. Air void values shall be between 2% and 6%. The asphalt binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula. 2. Acceptance of gap-graded mixes will be based upon conformance to the gradation, air voids, and minimum stability requirements shown in Table 203-11.3. Air void values shall be within +/- 2 percent of the targeted value at the OBC shown on the respective job mix formula. Acceptance of gap-graded mixes will also be based upon conformance to the asphalt binder content shown in Table 203-14.4.4. The asphalt binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 154 of 214 3. Should plant gradation test results be unavailable and allowed by the Engineer, gradation may be determined in accordance with ASTM D2172 or by AASHTO T 308 with adherence to the aggregate correction factor therein. In the case of a continued dispute, final acceptance of plant produced mixtures may be based upon binder content, stability, and air void values. 4. When dissimilar surface course mix characteristics are the result of production and delivery from multiple plants, the Engineer may require production and delivery from only 1 plant during any 1 day of production, unless approved by the Engineer. 203-16 Polymer Modified Asphalt Concrete (PMAC). 203-16.1 General. DELETE in its entirety and REPLACE with the following: 1. PMAC shall be the product of mixing mineral aggregate and up to 15% RAP with polymer modified paving asphalt at a central mixing plant. 203-16.3 Job Mix Formulas and Mix Designs. ADD the following: 1. Contractor shall submit for approval an asphalt concrete mix design per Greenbook Section 203-6.3. The asphalt concrete mix design method shall be Hveem with the optimal binder content determined by California Test 367. The mix design shall conform to Greenbook Table 203-6.4.4 for gradation, and the above MODIFIED (DESIGN CRITERIA) table. 203-16.4.3 Composition and Grading. DELETE in its entirety and REPLACE with the following: 1. Composition and grading shall conform to 203-6.4.4. 203-16.9 Acceptance. DELETE in its entirety and REPLACE with the following: 1. Acceptance of asphalt concrete mixtures will be based upon conformance to the gradation, asphalt binder content, air voids, and minimum stability requirements shown in Table 203- 6.4.4. Air void values shall be between 2% and 6%. The asphalt binder content shall be within +/- 0.4 percent of the OBC shown on the respective job mix formula. 2. Material samples of the asphalt concrete shall be on a lot basis. A standard lot shall be equal to 1 day’s production or 750 tons, whichever is smaller. The samples and testing results shall be representative of their entire sample lot. 3. Should plant gradation test results be unavailable and allowed by the Engineer, gradation may be determined in accordance with ASTM D2172 or by AASHTO T 308 with adherence to the aggregate correction factor therein. In the case of a continued dispute, final acceptance of plant produced mixtures may be based upon binder content, stability, and air void values. 4. When dissimilar surface course mix characteristics are the result of production and delivery from multiple plants, the Engineer may require production and delivery from only 1 plant during any 1 day of production, unless approved by the Engineer. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 155 of 214 SECTION 206 – MISCELLANEOUS METAL ITEMS – Not Used ADD the following: 206-8 LIGHT GAGE STEEL TUBING AND CONNECTORS. Not Used ADD 206-9 PORTABLE CHANGEABLE MESSAGE SIGN. Not Used SECTION 207 – GRAVITY PIPE – Not Used SECTION 209 – PRESSURE PIPE. Not Used 209-2 STEEL PIPE AND FITTINGS. Not used 209-7 PIPELINE IDENTIFICATION. 209-7.2 Requirements. DELETE in its entirety and replace with the following: 1. Pipeline identification shall conform to the following: TABLE 209-7.2 Function Type Materials/Method Pipe Contents Identification Pipe Color (Plastic Pipe or Polywrap) Blue for Potable Water. Purple for Recycled Water. Green for Sewage. AND Stenciling Stenciling marked on pipe in contrasting color to background color of pipe stating: “POTABLE WATER,” “CAUTION RECYCLED WATER – DO NOT DRINK” or ”CAUTION SEWER” as appropriate. 5/8” (16 mm) high letters. Repeated at 1 foot (300 mm) intervals. OR Identification Tape Polyethylene tape 6” (150 mm) wide and 4 mils (100 µm) minimum thickness with 2” (50 mm) high letters stating: “POTABLE WATER,” “CAUTION RECYCLED WATER – DO NOT DRINK” or “CAUTION SEWER” as appropriate. For pipe > 12” (300 mm) diameter, use 12” (300 mm) wide tape. Color – Blue with black or white letters for potable water, Purple with black or white letters for recycled water, Green with black or white letters for sewage. Attached to top of pipe with adhesive tape. Pipe Warning and Locating Warning and Locating Tape Polyethylene tape 6” (150 mm) wide and 4 mils (100 µm) minimum thickness with 2” (50 mm) high letters stating: “CAUTION: WATERLINE BURIED BELOW,” “CAUTION: RECLAIMED WATERLINE BURIED BELOW – DO NOT DRINK,” or “CAUTION: SEWER BURIED BELOW” as appropriate. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 156 of 214 Function Type Materials/Method For pipe > 12” (300 mm) diameter, use 12” (300 mm) wide tape. Color – blue with black or white letters for potable water, Purple with black or white letters for recycled water, Green with black or white letters for sewage. Place in pipe trench 18” (450 mm) above pipe. Tape shall contain metallic strip that can be registered by magnetic field locating device. OR Locating Wire In lieu of installing metallic warning tape; non-metallic warning tape 18” (450 mm) above pipe and 10-guage copper wire attached to top of pipe and accessibly terminated may be used. SECTION 211 – MATERIAL TESTS 211-3 INFILTRATION CAPACITY TEST. 211-3.4 Infiltration Capacity. DELETE in its entirety and REPLACE with the following: 1. Infiltration Capacity shall be calculated as follows: a) The formula for U.S. Standard Measures shall be: IC=(V)(3,326,400)/( )(d1)(d2)(t) inches per hour. b) The formula for SI Units shall be: IC=(V)(14.4Xl 06)/( )( d1 1)(d2)( t) cm per hour. Where: IC is Infiltration Capacity V is the volume of water in gallons or liters d1 and d2 are the dimensions that were determined in part 211-3.3  is approximately 3.14159 211-6 RAP CORRECTION FACTOR. 211-6.1 General. DELETE in its entirety and REPLACE with the following: 1. A RAP correction factor must be determined for asphalt concrete mixtures containing greater than 20 percent RAP. The RAP correction factor shall be determined in accordance with Caltrans Lab Procedure LP-9 dated May 22, 2006. This factor shall be used in determining the combined gradation of the virgin aggregates and RAP. SECTION 212 – WATER AND SEWER SYSTEM VALVES AND APPURTENANCES. Not Used 212-3 PIPE HANGERS AND SUPPORTS, CASINGS SPACERS, AND WALL PENETRATIONS. 212-3.4 Rubber Annular Hydrostatic Sealing Devices. 212-3.4.1 General. DELETE the last sentence and REPLACE with the following: 1. The sealing device shall be capable of sealing a minimum hydrostatic pressure of 20 psi. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 157 of 214 212-5 VALVES. 212-5.5.1.2 Materials. DELETE TABLE 212-5.5.1.2 in its entirety and REPLACE with the following: TABLE 212-5.5.1.2 Item Option Reference Specification/Requirements Body and Cover Ductile Iron or ASTM A536 Grade 65-45-12. Body and Cover for Pressures over 250 psi (1.7 MPa) Ductile Iron ASTM A536 Grade 65-45-12. Disc and Disc Arm Ductile Iron ASTM A536 Grade 65-45-12. Seat SAE Type 316 Stainless Steel ASTMA276. Pivot Shaft SAE Type 316 Stainless Steel ASTMA276. 212-10 SERVICE LATERALS, METERS, AND METER BOXES. 212-10.3 Corporation Stops, Angle Meter Valves, Service Saddles and Other Service Materials. DELETE the last sentence of the first paragraph and REPLACE with the following: 1. Unless otherwise shown on the Plans or specified in the Special Provisions, service saddles and corporation stop inlets shall be threaded per NPT tapered per ANSI B1.20.1. ADD the following: 212-13 TRACER WIRE FOR NON-METALLIC PIPE. 212-13.1 General. 1. Tracer wire shall conform to the following: a) Conductor: Minimum 10 AWG, copper clad steel or solid copper (direct burial) or 8 AWG, copper clad steel (directional drilling), rated for 30 volts. b) Break load: minimum 600-lb (direct burial); 2,500-lb (directional drilling) c) Insulation: High Molecular Weight Polyethylene (HMWPE), minimum 30-mil (direct burial); 45-mil (directional drilling). Color per the APWA uniform color code. d) Splices and connectors: For direct burial only, moisture displacement and corrosion proof, direct bury splice kits, UL rated for 600 volts. SECTION 216 – PRECAST REINFORCED CONCRETE BOX 216-4 TESTING REQUIREMENTS. 216-4.2.2 Acceptance. DELETE the first paragraph and REPLACE with the following: 1. When the average compressive strength of all cylinders tested is equal to or greater than the specified compressive strength of the PCC, and not more than 10 percent of the cylinders tested have an average compressive strength less than 90 percent of the specified compressive strength, and no cylinder tested has a compressive strength less than 85 percent of the specified compressive strength, the lot will be accepted. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 158 of 214 SECTION 217 – BEDDING AND BACKFILL MATERIALS 217-1 BEDDING MATERIAL. 217-1.1 General. ADD the following: 1. Bedding for pressure pipe of any material shall conform with the City of Carlsbad Engineering Standards, Volumes 2 and 3. 217-1.2 Bedding Material for Plastic Pipe. DELETE the second paragraph and REPLACE with the following: 1. For HDPE, PVC solid wall, and PE solid wall pipe in gravity applications, the bedding material shall be crushed rock conforming to the requirements shown in Table 217-1.2 unless otherwise specified or shown on the Plans. 217-2 TRENCH BACKFILL. 217-2.1 General. DELETE TABLE 217-2.1 and replace with the following: TABLE 217-2.1 Zone Zone Limits Maximum Rock Size (greatest dimension) Sand Equivalent (Excluding Rock) Backfill Zone From subgrade to 12” (300 mm) above top of pipe or conduit 4” (150 mm) Not less than 20 unless otherwise shown on the Plans or specified in the Special Provisions. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 159 of 214 PART 3 CONSTRUCTION METHODS SECTION 300 – EARTHWORK 300-1 CLEANING AND GRUBBING. DELETE 300-1.2 Root Pruning and Tree Trimming. 300-1.3 Measurement. DELETE in its entirety and REPLACE with the following: 1. Clearing and grubbing, if measured for payment, will be measured by the acre or lump sum. 300-1.4 Payment. DELETE the second sentence. SECTION 302 - ROADWAY SURFACING ADD the following: 302-1 GENERAL. 302-1.1 Vegetation Treatment. 1. The Contractor shall treat all vegetation within the limits of the paved area to be surfaced with an herbicide that complies with the City’s Integrated Pest Management program. Herbicide shall be applied at least 2 Working Days prior to surfacing the street. Allowance for the 2-day period shall be shown in the schedule required per section 6-1. Payment for pavement surfacing shall include tree trimming and herbicide treatment of the areas to be surfaced and no extra payment will be made for tree trimming and herbicide treatment. 302-1.2 Coordination. 1. The Contractor shall schedule the Work so as to prevent damage by all traffic. The Contractor shall not schedule Work so as to conflict with trash pickup. The trash hauling schedule can be obtained by calling Republic Services at (760) 332-6464. At least 2 weeks prior to Work, Contractor shall send, by first class mail, notification letters to all property addresses within 500-feet of the Work. Obtaining the appropriate addresses shall be the Contractor’s responsibility. A sample letter may be provided by the Agency to be used as an example. The letter should provide the name of the Contractor and a 24-hour phone number for residents to call if they have any issues or questions. 2. During operations, the Contractor’s schedule for resurfacing shall be designed to provide residents and business owners sufficient paved parking within an 800-foot distance from their homes or businesses. 3. Seventy-two hours prior to the start of any construction in the public right-of-way that affects vehicular traffic and/or parking or pedestrian routes, the Contractor shall give written notification of the impending disruption. For a full street closure, all residences and/or businesses on the affected street or alley shall be notified. For partial street closures, or curb, sidewalk and driveway repairs, the residences and/or businesses directly affected by the Work shall be notified. 4. The Contractor shall deliver the notification which shall state the date and time the Work will begin and its anticipated duration. The notification shall list 2 telephone numbers that may be called to obtain additional information. One number shall be the Contractor’s permanent office or field office and the other number shall be a 24-hour number answered by a 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 160 of 214 representative of the Contractor who is knowledgeable about the Project. At least 1 of the phone numbers shall be in the (760) area code. An answering machine shall not be connected to either number. The notification shall also give a brief description of the Work and simple instructions to the home or business owner on what they need to do to facilitate the construction. The Contractor shall submit the contents of the notification to the Engineer for approval. Notices shall not be distributed until approved by the Engineer. 5. For door hangers, the notification shall be pre-cut in a manner that enables it to be affixed to a doorknob without adhesives. It shall be a minimum size of 3-1/2 inches by 8-1/2 inches and shall be brightly colored with contrasting printing. The material shall be equivalent in strength and durability to 65 lb. card stock. The printing on the notice shall be no smaller than 12 point. The precut notices shall be as shown on the example provided in Appendix “A,” with the day of the week circled and appropriate information specific to the Work inserted at the locations indicated in the italicized font. 6. The preparation, materials, printing, delivery and distribution of the letters, door hangers and notifications shall be included in the contract price Bid for Traffic Control and the Contractor will not be entitled to any additional compensation for printing and distributing these notices. 302-2 CHIP SEAL. 302-2.6.2 Polymer Modified Emulsified Asphalt. DELETE the first paragraph and replace with the following: 1. Polymer modified emulsified asphalt shall be applied when the ambient temperature is between 60°F and 105°F (16°C and 41°C), and the roadway pavement surface temperature is a minimum of 55°F (13°C); or as specified by the Engineer. 302-2.6.3 Modified Paving Asphalt. DELETE the first paragraph and replace with the following: 1. Modified paving asphalt shall be applied when the atmospheric temperature is 65°F (18°F) or above and the existing pavement surface temperature is 80°F (27°C) or above; or as specified by the Engineer. 302-5 ASPHALT CONCRETE PAVEMENT. ADD the following: 302-5.8 Manholes and Other Structures. 1. When placing the overlay, the Contractor shall pave over appurtenances in the roadway which includes sanitary and storm access covers, water valve boxes, air vents, sewer dead end boxes and survey monument boxes. Each appurtenance shall be treated or covered to prevent adhesion of the overlay. Each appurtenance shall be located immediately after the overlay is placed and shall be thoroughly cleaned of any and all construction debris which may have entered due to the Contractor’s operation. The Contractor shall adjust all CMWD water valve boxes per CMWD Standard Drawing No. W11 or CMWD Standard Drawing No. W13. All City of Carlsbad sanitary sewer access covers shall be adjusted per CMWD Drawing No. S1. All storm sewer access covers shall be adjusted per SDRSD D-10. Riser rings or extensions shall not be used for the adjustment of these appurtenances. 2. Raising and adjusting to grade all City-owned or CMWD-owned appurtenances in the roadway shall be paid for at the Contract Unit Price per each as shown in the Bid. Such price 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 161 of 214 shall constitute full compensation for all labor, materials, and equipment necessary for completing the Work as described in these Specifications and Plans. Other agencies will be responsible for their own appurtenances. 302-8 SEALCOAT FOR MISCELLANEOUS AREAS. 302-8.2.1 General. DELETE the second paragraph and REPLACE with the following: 1. Sealcoat material shall be diluted using clean, potable water in an amount not to exceed 20 percent of the total volume. 302-8.2.2. Spreading. DELETE the first paragraph and REPLACE with the following: 1. Sealcoat shall be applied when the atmospheric temperature is greater than 55°F (13°C) and if rain is not forecast for the period of 24 hours after application; or as specified by the Engineer. SECTION 307 – JACKING AND TUNNELING 307-1 JACKING OPERATIONS. 307-1.3 Jacking Steel Casing. DELETE the first paragraph and REPLACE with the following: 1. Unless otherwise shown on the Plans, the size and wall thickness of the casing to be jacked shall be at the Contractor's option, except that the casing thickness shall be not less than 3/8 inch (9.5 mm) and the casing and jacking operation shall meet all other requirements of the agency with permit jurisdiction of the installation. The Contractor shall be responsible for the sufficiency of the casing. SECTION 308 – MICROTUNNELING 308-6 SUBSURFACE CONDITIONS. 308-6.2 Microtunneling Requested by the Contractor. DELETE in its entirety and REPLACE with the following: 1. When microtunneling is proposed by the Contractor as an alternative to the specified methods of conduit installation, the Contractor shall obtain copies of the information and reports listed in 3-9 and 308-6.3 and shall conduct independent investigations as necessary to substantiate the basis for the Contractor’s proposal and submit in accordance with 3-8. Microtunneling operations must be approved by the Engineer prior to the start of microtunneling work. SECTION 314 – TRAFFIC STRIPING, CURB AND PAVEMENT MARKINGS, AND PAVEMENT MARKERS 314-2 REMOVAL OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314-2.1 General. DELETE in its entirety and REPLACE with the following: 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 162 of 214 1. The Contractor shall remove by wet grinding all existing or temporary traffic markings and lines that may confuse the public. When temporary detour striping or markings are no longer required, they shall be removed prior to painting the new traffic stripes or markings. 2. The Contractor shall remove all existing markings and striping, either permanent or temporary, which are to be abandoned, obliterated or that conflict with the Plans by wet grinding methods. Removal of striping by high velocity water jet may be permitted when there is neither potential of the water and detritus from the high velocity water jetting to damage vehicles or private property nor to flow from the street into any storm drain or water course and when approved by the Engineer. 3. The Contractor shall vacuum all water and detritus resulting from high velocity water jet striping removal from the pavement immediately after the water jetting and shall not allow such materials to flow in the gutter, enter the storm drain system or to leave the pavement surface. Surface variation limitations for high velocity water jet striping removal shall be the same as for grinding. 4. The Contractor shall not use dry or wet sandblasting in any areas. Alternate methods of paint removal require prior approval of the Engineer. Obliteration of traffic striping with black paint, light emulsion oil or any other masking method other than a minimum 30mm (0.10’) thick asphalt concrete overlay is not permitted. 314-2.2 and 314-2.3 Replace as follows: 314-2.2 Measurement and Payment 1. Removal of traffic striping and curb and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping. 314-3 REMOVAL OF PAVEMENT MARKERS. 314-3.2 and 314-3.3 Replace as follows: 314-3.2 Measurement and Payment 1. Removal of pavement markers as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping. 314-4 APPLICATION OF TRAFFIC STRIPING AND CURB AND PAVEMENT MARKINGS. 314-4.3.6 and 314-4.3.7 Replace as follows: 314-4.3.6 Measurement and Payment 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 163 of 214 1. Final and temporary traffic striping, curb markings and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping. 314-4.4.5 and 314-4.4.6 Replace as follows: 314-4.4.5 Measurement and Payment 1. Thermoplastic traffic striping and pavement markings as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping. 314-5 PAVEMENT MARKERS. 314-5.6 and 314-5.7 Replace as follows: 314-5.6 Measurement and Payment 1. Pavement markers as shown on the Plans and required by the Specifications shall be included in the lump-sum price Bid for temporary and final traffic striping, and no additional compensation will be allowed, therefore. Reapplication of temporary stripes and markings shall be repainted at the Contractor's expense, and no additional compensation will be allowed for the repainting. The lump sum Bid shall include all labor, tools, equipment, materials, and incidentals for doing all Work in installing the final and temporary traffic striping. PART 4 EXISTING IMPROVEMENTS SECTION 400 – PROTECTION AND RESTORATION 400-2 PERMANENT SURVEY MARKERS. ADD the following: 1. The Contractor shall not cover or disturb permanent survey monuments or benchmarks without the consent of the Engineer. Where the Engineer concurs, in writing, with the Contractor that protecting an existing monument in place is impractical, the Contractor shall employ a licensed land surveyor or a registered civil engineer authorized to practice land surveying within the State of California (“Surveyor”) to establish the location of the monument before it is disturbed. The Contractor shall have the monument replaced by the Surveyor no later than 30 Calendar Days after construction at the site of the replacement is completed. The Surveyor shall file corner record(s) as required by Business and Professions Code Sections 8772 and 8773 et seq.. 2. When a change is made in the finished elevation of the pavement of any roadway in which a permanent survey monument is located, the Contractor shall adjust the monument frame 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 164 of 214 and cover to the new grade within 7 Calendar Days of paving unless the Engineer shall approve otherwise. Monument frames and covers shall be protected during street sealing or painting projects or be cleaned to the satisfaction of the Engineer. SECTION 401 – REMOVAL 401-2 ASPHALT CONCRETE PAVEMENT. DELETE in its entirety and REPLACE with the following: 1. Asphalt concrete pavement shall be removed to clean, straight lines. Removal performed by cold milling shall conform to 404. Adjacent AC/AB sawcut and removal associated with concrete construction shall be full depth and a minimum width of 12 inches from face of concrete edge and continue along the concrete scheduled for removal. Removal and disposal of adjoining AC/AB section shall be incidental to the removal of concrete structure Bid item per this Section. Replacement of adjoining AC/AB section shall be incidental to replacement of the concrete 401-3 CONCRETE AND MASONRY IMPROVEMENTS. 401-3.2 Concrete Curb, Walk, Gutters, Cross Gutters, Curb Ramps, Driveway and Alley Intersections. DELETE in its entirety and REPLACE with the following: 1. Concrete shall be removed to neatly sawed edges with saw cuts made through the entire thickness. Concrete sidewalk or driveway to be removed shall be neatly sawed in straight lines either parallel to the curb or at right angles to the alignment of the sidewalk. No section to be replaced shall be smaller than 30 inches (750 mm) in either length or width. All existing concrete shall be removed to the nearest joint. Concrete shall be removed to neatly sawed edges with saw cuts made to a depth deep enough to produce a clean straight break without loosening, cracking or damaging adjoining improvements. Curb and gutter shall be sawed on a neat line at right angles to the curb face. PCC and all other material unsuitable for use as fill, as determined by the Engineer, shall be removed from the right-of- way and disposed of by the Contractor at a site of his own choice and shall pay all costs incidental to the disposal. ADD the following: 401-3.2.1 Adjacent Asphalt Concrete (AC/AB) Sawcut and Removal. 1. Adjacent AC/AB sawcut and removal associated with concrete construction shall be full depth and a minimum width of 12 inches from face of concrete edge and continue along the concrete scheduled for removal. Removal and disposal of adjoining AC/AB section shall be incidental to the removal of concrete structure Bid item per this Section. Replacement of adjoining AC/AB section shall be incidental to replacement of the concrete as specified in Section 303-5. SECTION 402 – UTILITIES 402-1 LOCATION. 402-1.1 General. DELETE the first paragraph and REPLACE with the following: 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 165 of 214 1. Known utilities and their respective owners are shown on the Plans or specified in the Special Provisions and their locations are based on available records. The accuracy and/or completeness of the utilities shown on the Plans is not guaranteed and actual locations must be confirmed by potholing. Where underground utilities are shown on the Plans, the Contractor shall assume every property parcel will be served by a service connection for each type of utility. INSERT, after the first sentence of the third paragraph, the following: Subsurface installations shall be located at least 5 Working Days and at least 500 feet in advance of any construction heading and the results reported in written form to the Engineer. AMEND letter d) to read as follows: d) horizontal location with reference to Project stationing. 402-2 PROTECTION. DELETE the first 3 paragraphs and REPLACE with the following: 1. The Contractor shall not interrupt the service function or disturb the support of any utility without authority from the utility owner or direction from the Engineer. Valves, switches, vaults, and meters shall be maintained readily accessible for emergency shutoff. Excavation of soils providing support to pressure pipeline thrust blocks may require isolation and de- pressurization of the pipeline prior to the installation of support devices and the Contractor shall coordinate such Work with the utility owner. 2. Where a vertical separation distance of 12 inches cannot be attained between a proposed utility and an existing utility greater than 4 inches in diameter, place a 1-inch thick neoprene or silicone pad with Shore A durometer hardness of 50 to 70 (ASTM D2240) in contact with the top of the lower utility and backfill with Portland cement concrete sand conforming to 203-1.5.5 to 3 inches above the bottom of the upper utility. The width of the pad shall be equal to the width of the trench and the length shall extend 1 foot beyond the outer limits of the existing utility. 3. Where protection is required to ensure support of utilities located as shown on the Plans or in accordance with 402-1, the Contractor shall, unless otherwise specified, furnish and place the necessary protection at its expense. 4. Upon learning of the existence and location of any utility omitted from the Plans, the Contractor shall immediately notify the Engineer in writing. When authorized by the Engineer, support or protection of the utility will be paid for as provided in 7-3 or 7-4. 402-4 RELOCATION. DELETE paragraphs 3 and 4 and REPLACE with the following: 1. When the Plans or Special Provisions provide for the Contractor to alter, relocate, or reconstruct a utility, all costs for such Work, including temporary utility service, shall be included in the Bid for the items of Work necessitating such Work. Temporary or permanent relocation or alteration of utilities requested by the Contractor for its convenience shall be its responsibility and it shall make all arrangements and bear all costs. 2. The Contractor will relocate service connections as necessary within the limits of the Work or within temporary construction or slope easements in accordance with the procedures and upon the approval of the utility owner. When directed by the Engineer, the Contractor shall 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 166 of 214 arrange for the relocation of service connections as necessary between the meter and property line, or between a meter and the limits of temporary construction or slope easements. Payment for the relocation of such service connections shall be in accordance with 7-3 unless otherwise specified in the Bid. Payment will include disconnection of existing service connections from the utility main, capping or plugging existing outlets on the utility main, abandoning the service connection, and the restoration of all existing improvements which may be affected by the service connection relocation. The Contractor may agree with the owner of any utility to disconnect and reconnect private interfering service connections. Unless otherwise specified in the Bid, disconnection and reconnection of private services will be outside of the scope of the Work and the Agency will not be involved in any such agreement. 402-5 DELAYS DUE TO UTILITY CONFLICTS. DELETE paragraphs 1 through 4 and REPLACE with the following: 1. The Contractor shall notify the Engineer of its Construction Schedule insofar as it affects the protection, removal, or relocation of utilities. The notification shall be included as a part of the Construction Schedule in accordance with 6-1 which shall be revised upon the completion of utility potholing and evaluation for potential utility conflicts. The Contractor shall notify the Engineer in writing of any subsequent changes in the Construction Schedule which will affect the time available for protection, removal, or relocation of utilities. 2. The Contractor will not be entitled to damages or additional payment for delays attributable to utility relocations or alterations if correctly located, noted, and completed in accordance with 402-1. 3. The Contractor may be given an extension of time for unforeseen delays attributable to unreasonably protracted interference by utilities in performing Work correctly shown on the Plans. 4. The Agency will determine the scope of Work for the removal, relocation, or protection of existing main or trunk line utility facilities within the area affected by the Work if such utilities are not identified in the Contract Documents. The Contractor will not be assessed liquidated damages for any delay caused by the removal, relocation, or protection of such existing facilities. 402-6 COOPERATION. DELETE in its entirety and REPLACE with the following: 1. When necessary, the Contractor shall so conduct its operations as to permit access to the Work Site by the Agency or the utility owner and provide time for utility Work to be accomplished during the progress of the Work. SECTION 403 - MANHOLE ADJUSTMENT AND RECONSTRUCTION 403-1 GENERAL. DELETE in its entirety and REPLACE with the following: 1. Wet utility (water, recycled water, sewer and storm drain) manhole and vault frames and covers and valve box frames and covers within an area to be paved or graded shall be set to finish grade by the Contractor. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 167 of 214 2. The Contractor shall remove all debris from the interior of manholes and vaults and shall clean all foreign material from the top of the frames and covers. 403-3 MANHOLES IN ASPHALT CONCRETE PAVEMENT. DELETE in its entirety and REPLACE with the following: 1. Wet utility structures extending 2 inches (50 mm) or more above the new subgrade shall be lowered by the Contractor to the new subgrade before construction of the pavement section. Other structures shall be lowered by their owners unless otherwise specified or shown on the Plans. Structures projecting less than 2 inches (50 mm) above the subgrade may be surveyed and covered for construction of the pavement section and later adjusted to grade. The top of reset manholes and other structures shall conform to the smoothness requirement specified in 302-5.6.2. 2. All structures from which manhole frames and covers have been removed to facilitate pavement section construction shall be temporarily covered with a steel plate by the Contractor. When this procedure is impractical, such as for large vaults, or special structures, remodeling or reconstruction shall be completed to finish permanent surface prior to paving operations. 3. The Contractor shall notify utility owners at least 21 Calendar Days in advance of the need to commence Work required prior to paving operations and again for Work required after paving operations. If the Engineer determines the utility owner will not complete adjustment of its facilities within 10 Working Days of the completion of the surface course of pavement, the facilities will be adjusted by their owner under a separate procedure established by the Agency. 4. After the pavement has been completed, the necessary portions of the subgrade, base, and pavement shall be neatly removed, the structure built up, and the manhole or vault frame or valve box set to within 1-1/2 inches (37.5 mm) of finish pavement surface with concrete pavement conforming to 201-1 and 302-6. The Contractor shall fill the remaining 1-1/2 inches (37.5 mm) with the asphalt concrete surface course mixture. This material shall be placed and compacted to conform to the appearance, grade, density and smoothness of the surrounding pavement. 403-4 MEASUREMENT. DELETE in its entirety and REPLACE with the following: 1. Manhole, vault or valve box adjustment and reconstruction of the type specified will be measured by each. 403-5 PAYMENT. DELETE in its entirety and REPLACE with the following: 1. Payment for adjusting manhole or vault frames and covers to grade, where the difference between the lowest point of manhole or vault frame removal and final elevation of the top of the frame is less than 15 inches (375 mm) or where the adjustment is accomplished by adjustment rings only, will be made at the Contract Unit Price for adjusting each manhole or vault frame. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 168 of 214 2. Payment for setting manhole or vault frames and covers to grade, where the difference between the lowest point of manhole or vault frame removal and the final elevation of the top of the frame is 15 inches (375 mm) or more, will be made at the Contract Unit Price for reconstructing each manhole. 3. Payment for adjusting valve boxes to grade will be made at the Contract Unit Price for adjusting each valve box regardless of the height of the adjustment. SECTION 404 – COLD MILLING 404-12 PAYMENT. ADD the following: No extra payment will be made for milling or disposing of geotextile, geogrid, or pavement fabric. PART 5 PIPELINE SYSTEM REHABILITATION SECTION 500 – PIPELINE REHABILITATION 500-1 GENERAL. DELETE in its entirety and REPLACE with the following: 1. Pipeline rehabilitation shall include all labor, materials, equipment and services and shall consist of cleaning, preliminary inspection, sewage bypass and pumping, service lateral identification, point repairs, lining, end seals, and service connection re-establishment. 2. Pipe rehabilitation shall be conducted in the host pipe per the manufacturer’s recommendations and the Contractor’s approved Performance Work Statement, applicable ASTM standards and as specified in this part. 3. The Contractor shall be responsible for confirming the locations of all active branch service connections prior to pipe rehabilitation and shall conduct dye tests to verify abandoned services as necessary. In the event the status of a service connection cannot be determined, the Agency will make the final decision prior to installation of the liner. Only service connections determined to be active shall be reinstated by the Contractor. 4. All materials furnished as part of the Work shall be marked with detailed product information and shall be accompanied by test reports certifying that the material conforms to the requirements stated in this part. Materials shall be certified by the manufacturer for the specified purpose. 5. Materials shall be stored in a manner specified or approved by the manufacturer to avoid damage. Damage includes, but is not limited to, gouging, abrasion, flattening, cutting, puncturing or UV degradation. On site storage locations shall be approved by the Agency. 6. The Agency reserves the right to inspect all or portions of the completed Work at any time during the warranty period. Any defect that is discovered during the warranty period which may materially affect the integrity, strength, function and/or operation of the pipe shall be repaired and/or replaced by the Contractor in accordance with the Contract Documents at no additional cost to the Agency. The Contractor shall provide a warranty for the repair for a period of 1 year following the date of repair. 500-2 SUBMITTALS. AMEND letter j) to read as follows: 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 169 of 214 j) The proposed grouting method, locations and procedures. ADD the following: 500-2.1 CIPP Product Submittal. 1. Provide manufacturer’s data, descriptions and physical properties of all product components including: a. Certification from the manufacturer that the product has been successfully installed in at least 300,000 lineal feet of pipe in municipal wastewater collection systems and verifying that the chemical resistance of the CIPP meets the Contract requirements. b. Fabric tube consisting of felts and reinforcing materials and the nominal void volume in the felt fabric that will be filled with resin. c. Raw resin data and flexible membrane (coating) material and the methods and procedures to be implemented for curing and repairs. d. Shipping, storage and handling recommendations for all components of the CIPP system. e. Safety Data Sheets (SDS) for all materials. ADD the following: 500-2.1.1 Design Calculations. 1. Submit engineering design calculations conforming with Appendix X1 of ASTM F1216. Calculations for liner thickness shall be performed by a qualified Professional Engineer and based on the most severe line condition for each pipe size which shall apply to all other sections to be lined unless otherwise approved by the Engineer. Submit calculations for the quantity of resin required to completely saturate the tube. 2. Design of the CIPP shall be based on the prism load using the outside diameter of the CIPP in the calculations. The CIPP design shall assume no bonding to the original pipe. An analysis of design criteria and calculations for the liner thickness shall be submitted to the Engineer for approval. The CIPP design shall be based on the following: a. Corrosion resistance to the typical chemicals found in municipal sewage systems as defined in the referenced and applicable ASTM standards. b. Service life: 50 years c. Design safety factor: 2.0 d. Long-term modulus of elasticity: maximum of 50 percent of initial flexural modulus unless substantiated by third-party test data e. Ovality: 2 percent or as measured by field inspection f. Constrained Soil Modulus: per AASHTO LRFD Section 12 and AWWA Manual M45 g. Dead load: 120 lb./cu. ft. (minimum) or per geotechnical report h. Live load: AASHTO HS-20 (minimum) or railroad, if applicable. Include impact factors when depth of cover is less than 5 feet for vehicle loads or less than 10 feet for railroad. i. Other loads: based on local conditions such as hydrostatic pressure or surcharge loads ADD the following: 500-2.2 Performance Work Statement. 1. The Contractor shall submit a PWS which clearly defines the liner product installation in conformance with these requirements. Unless otherwise specified, the PWS shall at a minimum contain the following: 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 170 of 214 a) A description of the proposed pipe rehabilitation technology including a detailed plan for identifying all active service connections and maintaining service to each connection during mainline pipe rehabilitation, unless otherwise approved by the Engineer. b) Verification from the manufacturer of the rehabilitation process or system that the installer is authorized or certified to install the proposed product. The Contractor shall provide verification of training for all personnel directly involved with installation. c) A statement of the Contractors experience in pipe rehabilitation involving pipe of similar size, length and configuration as proposed for the Work and conducted within the past 5 years and substantiated with verifiable project references. d) A listing of the superintendent, foreman and lead crew personnel experienced with the pipe rehabilitation technology proposed for the Work with demonstrated competency and experience in CCTV inspection, all phases of liner installation and service reconnections. Personnel replaced during the performance of the Work shall have similar, verifiable experience as the personnel originally submitted for the Project. e) A detailed installation plan describing all preparation work, traffic control, cleaning operations, pre-installation CCTV inspections, bypass pumping, tube wet-out procedure, liner installation procedures, method of curing, temperature monitoring methods and procedures, service reconnection, grouting, final CCTV inspection, warranties and all incidental work or services necessary for a complete installation. Identify and describe the tools and equipment which will be redundant on the Job Site in the event of equipment malfunction. Describe the mitigation procedures to be implemented in the event of key equipment failure or significant groundwater infiltration during the installation process or for removal of blockages that may be encountered during the pipe cleaning process. f) A detailed installation schedule conforming to the requirements of the Contract. ADD the following: 500-2.3 Quality Control Plan. 1. The QCP shall include: a) A detailed discussion of the proposed quality controls to be performed by the Contractor. b) Defined responsibilities of the Contractor’s personnel. c) Proposed methods for product performance controls, including the methods and frequency of product sampling, testing in both raw material form and cured product form, and repair of test locations in the pipe liner. d) Specific repair or replacement procedures approved by the system manufacturer for potential defects that may occur in the installed liner. The plan shall define defects that will not affect the operation and long-term life of the product, repairable defects and the repair procedures, and unrepairable defects and procedures for removal and replacement of the liner. e) Inspection forms and guidelines for quality control inspections in accordance with the standards specified and submitted with the QCP. Furnish a check list of key elements of the installation criteria to ensure that quality control and testing are performed in accordance with the Contract Documents. 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 171 of 214 f) Proposed frequency of meetings to discuss performance and product test results with the Agency. 2. For Projects involving more than 2,000 linear feet of CIPP, the Contractor shall schedule and provide, at no cost to the Agency, 2 Working Days of training by the CIPP system manufacture for the Agency’s inspector prior to liner installation. Training shall include field instruction and all key aspects of visual inspection and sampling procedures. ADD the following: 500-2.4 As-Built Records. 1. Submit 1 set of Plans annotated with the as-built information and identification of Work performed and other records acceptable to the Engineer prior to final acceptance of the Work by the Agency. 2. As-built drawings and records shall include all necessary information as outlined in the PWS or as agreed to by the Agency. Records shall include pre and post inspection video; locations of obstructions, groundwater or other conditions encountered; locations of test coupons and service connections; liner type and thickness; and temperature and/or light train sensor data from data loggers. The records shall be updated by the Contractor as the Work progresses, shall be clearly legible and shall indicate the locations of the Work performed each day. 500-3 CLEANING AND PRELIMINARY INSPECTION. 500-3.1 General. ADD the following: 1. The Contractor shall either plug or install a flow bypass pumping system to properly clean the host pipe and shall utilize cleaning equipment and procedures that will not damage the pipe. The Contractor shall repair any damage to the pipe resulting from the cleaning operations as approved by the Engineer and at no additional cost to the Agency. 2. Upon the completion of pipe cleaning, the Contractor shall verify the inside pipe diameter, length and site conditions of each pipe segment and include the data collected in the pipe rehabilitation design. 500-3.4 Closed Circuit Television (CCTV) Inspection. DELETE the first paragraph and REPLACE with the following: 1. Prior to rehabilitation, a post-cleaning CCTV inspection shall be performed by PACP certified personnel trained in locating breaks, obstacles and service connections using CCTV. The Contractor shall submit the post-cleaning video for review prior to installation of the CIPP and for later reference by the Agency. Video inspections shall be recorded on a digital storage device. All original digital recordings, log sheets, and reports shall be submitted to the Engineer and will become the property of the Agency. 500-4 PIPELINE POINT REPAIR AND/OR REPLACEMENT. 500-4.6 Measurement. DELETE in its entirety and REPLACE with the following: 1. Pipeline point repair/replacement will be measured along the longitudinal axis between the ends of the pipeline point repair and/or replacement completed and shall not include the inside dimensions of structures 00 74 00 AGENCY SUPPLEMENTAL TECHNICAL PROVISIONS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 172 of 214 500-4.7 Payment. DELETE the first sentence and REPLACE with the following: 1. The Contract Unit Price per linear foot (m) or lump sum for pipeline point repair and/or replacement shall include furnishing and installing all fittings, connections, seals, and special Work shown on the Plans or required in the Specifications. 500-5 LINING. Not Used 500-6 END SEALS. Not Used 500-8 SERVICE CONNECTION RE-ESTABLISHMENT. Not Used 500-11 MEASUREMENT. Not Used 500-12 PAYMENT. Not Used SECTION 502 – MANHOLE AND STRUCTURE REHABILITATION 502-2 SUBMITTALS. DELETE items c) & d) and REPLACE with the following: c) Certificate of Compliance for each type of liner and its component materials with the referenced standards. d) For structural lining systems, submit calculations for structural loading and wall thickness design signed and sealed by a Professional Engineer. 502-4 REPAIR, RESURFACING, AND ACTIVE INFILTRATION ELIMINATION. 502-4.2 Repair. DELETE in its entirety and REPLACE with the following: 1. Prior to installation, patching or localized repairs shall be performed using rapid setting polymer repair mortars or other approved materials compatible with the lining system and intended for use in corrosive environments in municipal wastewater systems. Repair mortars shall be used to fill surface irregularities and voids and for repair of deteriorated or cracked surfaces in the host structure to a uniform surface. The edges of concrete surfaces shall be keyed or chamfered to avoid thin, tapered edges in the repair mortar. Manufacturer's specifications shall be followed when performing repairs, material handling, mixing, installation and curing. 2. Materials shall consist of rapid setting mixtures of polymer resins or cementitious materials, monocrystalline quartz aggregates, and activators or accelerating agents. Material shall not contain chlorides or metallic particles. Repair mortars shall have a minimum bond strength of 1,600 psi when tested to substrate failure per ASTM C882. 3. Non-resinous, cementitious repair mortar used in manhole base rehabilitation shall be top- coated with a polyurethane and epoxy lining per 502-5.3 or epoxy lining per 502-5.4. 502-5 LINING SYSTEMS. Not Used END OF SECTION 01 11 00 SUMMARY OF WORK Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 173 of 259 SECTION 2 01 11 00 SUMMARY OF WORK PART 1 GENERAL 1.01 WORK COVERED BY CONTRACT DOCUMENTS a. The Contractor shall perform Work and furnish materials, labor, tools, equipment or services that may be reasonably inferred as being required to produce the intended result, whether specifically called for in the Contract Documents, at no additional cost to the Agency. b. Visible, existing improvements for which no specific disposition is made on the Plans, but which interfere with the Work, shall be removed, and disposed of by the Contractor with the prior approval of the Engineer. c. The completed Work will provide the Agency with a code compliant fuel island, as more fully described in the Drawings and the technical specifications. Provide all labor, material and equipment for the following: List the main elements in the Project, e.g. 1. Selective demolition of existing pavement, dispensers and electrical systems; 2. removal and disposal of existing fuel tanks; 3. assistance with soil testing by others; 4. preparation of fuel tank pits and foundations; 5. installation of all footings, pads and installation of new fuel tanks; 6. shoring, excavation, and dewatering, trenching as needed; 7. new electrical and plumbing work as indicated; 8. construction of new fuel island as indicated; 9. conduit and trench work as necessary for services to Maintenance Building and Electrical room/panel(s); 10. installation of new fuel dispensers; 11. installation of new canopy; 12. restoration of surrounding pavement (concrete and asphalt); 13. other improvements as indicated. d. Location of the Project is 2480 Impala Drive, Carlsbad. e. Work also includes: e.g., compliance with environmental requirements, cooperation with city’s construction manager, furnishing standby power equipment, and/or standby pumping equipment as needed to ensure continuous utility needs throughout the construction period; maintaining safe Work area throughout the construction period; traffic control if/as needed; and obtaining all permits needed to perform the indicated Work. 1.05 WORK BY OTHERS a. Construction work will be underway at the adjacent Fleet Maintenance Building under separate contract. This work may require occasional cooperation for access to adjacent work areas. 01 11 00 SUMMARY OF WORK Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 174 of 259 1.06 WORK BY OWNER a. The City will be using drive lanes adjacent to Fuel Island throughout construction duration. Trench to Maintenance Building may require plating for City access across it. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 01 11 20 MEASUREMENT AND PAYMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 175 of 259 01 11 20 MEASUREMENT AND PAYMENT PART 1 GENERAL 1.01 SCOPE a. The Contract Price shall cover all Work required by the Contract Documents. All costs in connection with the proper and successful completion of the Work, including furnishing all materials, equipment, supplies, and appurtenances; providing all construction plant, equipment, and tools; and performing all necessary labor and supervision to fully complete the Work, shall be included in the unit and lump sum Bid prices. All Work not specifically set forth as a pay item in the Bid Form shall be considered a subsidiary obligation of Contractor and all costs in connection the Work shall be included in the Bid prices. b. Payment for each Bid Item shall be made in accordance with Sections 7-2 and 7-3 of the Agency Supplemental General Provisions and the Bid. All Work shown or described in the Contract Documents and necessary for the functioning of installed equipment or constructed facilities and the repair or replacement of damaged existing improvements in accordance with the Contract Documents shall be considered as included in the Bid Items. 1.02 BID ITEMS a. Items listed on the Bid Schedule in Section 00 41 00 Bid Form shall be billed on a monthly basis. 1.03 SUBMITTALS a. Informational Submittals: 1. Schedule of Values: Submit on Agency’s form. 2. Schedule of Estimated Progress Payments: i. Submit with initially acceptable Schedule of Values. ii. Submit adjustments thereto with Application for Payment. 3. Application for Payment. 4. Final Application for Payment. 1.04 CASH ALLOWANCES – Not Used. 1.05 SCHEDULE OF VALUES (SOV) a. Upon request of the Construction Manager, the Contractor shall provide documentation to support the accuracy of the SOV. b. The Contractor shall prepare and submit to the Engineer for review a SOV within the time specified in the Contract Documents. c. When requested by the Engineer, the SOV shall divide each lump sum Bid item into its respective activities as listed in the Construction Schedule, and the sum of the costs apportioned to the activities comprising the Bid item shall equal the Bid item price. The Contractor shall add additional detail to the SOV when, in the opinion of the Engineer, such detail is necessary to represent the basis for payment. The Contractor shall submit to the Engineer a corrected Schedule of Values within 10 Calendar Days of the Engineer’s request. 01 11 20 MEASUREMENT AND PAYMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 176 of 259 d. The Contractor shall make adjustments to the approved SOV to account for Change Orders or Extra Work. The SOV entries for adjustments so made shall be approved by the Engineer. e. The Contractor shall submit a revised SOV with each payment request. f. Payment for the preparation of or revisions to the SOV shall be included in the Contract Price and no additional payment will be made therefor. g. Lump Sum Work: 1. Must reflect specified cash and contingency allowances and alternates, as applicable. 2. List bonds and insurance premiums, mobilization, demobilization, preliminary and detailed progress schedule preparation, equipment testing, facility startup, and Contract closeout separately. i. Mobilization includes, at minimum, items identified in Section 01 50 00, Temporary Facilities and Controls. ii. Include item(s) for monthly progress schedule update and maintenance of Construction Manager’s trailer. 3. Break down by Division 02 through 49 with appropriate subdivision of each specification for each Project facility. h. An unbalanced or front-end loaded schedule will not be acceptable. i. Summation of the complete SOV representing all the Work shall equal the Contract Price. j. The Contractor shall submit SOV electronically in a spreadsheet format compatible with latest version of MS Excel. 1.06 SCHEDULE OF ESTIMATED PROGRESS PAYMENTS a. Show estimated payment requests throughout Contract Times aggregating initial Contract Price. b. Base estimated progress payments on initially acceptable progress schedule. Adjust to reflect subsequent adjustments in progress schedule and Contract Price as reflected by modifications to the Contract Documents. 1.07 APPLICATION FOR PAYMENT a. Transmittal Summary Form: Attach 1 Summary Form with each detailed Application for Payment for each schedule and include Request for Payment of Materials and Equipment on Hand as applicable. Execute certification by authorized officer of Contractor. b. Use city Application for Payment Form provided by Construction Manager. c. Provide separate form for each schedule as applicable. d. Include accepted Schedule of Values for each schedule or portion of lump sum Work. 01 11 20 MEASUREMENT AND PAYMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 177 of 259 e. Include separate line item for each Change Order and Work Change Directive executed prior to date of submission. Provide further breakdown of such as requested by Construction Manager. f. Preparation: 1. Round values to nearest dollar. 2. Submit Application for Payment, including a Transmittal Summary Form and detailed Application for Payment Form(s) for each schedule as applicable, a listing of materials on hand for each schedule as applicable, and such supporting data as may be requested by Construction Manager. 1.08 PAYMENT a. Transmittal Summary Form: Attach 1 Summary Form with each detailed Application for Payment for each schedule and include Request for Payment of Materials and Equipment on Hand as applicable. Execute certification by authorized officer of Contractor. b. Each month, the Engineer will make an approximate measurement of the Work performed to the closure date as basis for making monthly progress payments. The estimated value will be based on Contract Unit Prices, completed Change Order Work. Progress payments shall be made no later than 30 Calendar Days after the closure date. Five Working Days following the closure date, the Engineer shall complete the detailed progress pay estimate and submit it to the Contractor for the Contractor’s information. Should the Contractor assert that additional payment is due, the Contractor shall within 10 Calendar Days of receipt of the progress estimate, submit a supplemental payment request to the Engineer with adequate justification supporting the amount of supplemental payment request. Upon receipt of the supplemental payment request, the Engineer shall, as soon as practicable after receipt, determine whether the supplemental payment request is a proper payment request. If the Engineer determines that the supplemental payment request is not proper, then the request shall be returned to the Contractor as soon as practicable, but not later than 7 Calendar Days after receipt. The returned request shall be accompanied by a document setting forth in writing the reasons why the supplemental payment request was not proper. Consistent with Public Contract Code Section 20104.50, the Agency shall make payments within 30 Calendar Days after receipt of an undisputed and properly submitted supplemental payment request from the Contractor. If payment of the undisputed supplemental payment request is not made within 30 Calendar Days after receipt by the Engineer, then the Agency shall pay interest to the Contractor equivalent to the legal rate set forth in subdivision (a) of Code of Civil Procedure Code Section 685.010. c. After final inspection, the Engineer will make a Final Payment Estimate and process a corresponding payment. This estimate will be in writing and shall be for the total amount owed the Contractor as determined by the Engineer and shall be itemized by the Contract Bid item and Change Order item with quantities and payment amounts and shall show all deductions made or to be made for prior payments and amounts to be deducted under 01 11 20 MEASUREMENT AND PAYMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 178 of 259 provisions of the Contract. All prior estimates and progress payments shall be subject to correction in the Final Payment Estimate. d. The Contractor shall have 30 Calendar Days from receipt of the Final Payment Estimate to make a written statement disputing any Bid item or Change Order item quantity or payment amount. The Contractor shall provide all documentation at the time of submitting the statement supporting its position. Should the Contractor fail to submit the statement and supporting documentation within the time specified, the Contractor acknowledges that full and final payment has been made for all Contract Bid items and Change Order items. e. If the Contractor submits a written statement with documentation in the aforementioned time, the Engineer will review the disputed item within 30 Calendar Days and make any appropriate adjustments on the Final Payment. Remaining disputed quantities or amounts not approved by the Engineer will be subject to resolution as specified in Section 2-10, Disputed Work. f. The written statement filed by the Contractor shall be in sufficient detail to enable the Engineer to ascertain the basis and amount of the disputed items. The Engineer will consider the merits of the Contractor’s claims. It will be the responsibility of the Contractor to furnish within a reasonable time such further information and details as may be required by the Engineer to determine the facts or contentions involved in its claims. Failure to submit such information and details will be sufficient cause for denying payment for the disputed items. 1.09 MOBILIZATION AND EXCAVATION a. Payment for mobilization and preparatory Work will be made at the stipulated lump-sum price in the Bid Schedule, and includes full compensation for furnishing all insurance, bonds, licenses, labor, materials, utilities, tools, equipment and incidentals, and for doing all the Work involved in mobilization and preparatory Work and operations, including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidental to preparing to conduct Work on and off the Project Site and other offsite facilities necessary for Work on the Project; for all other facilities, sureties, Work and operations which must be performed or costs incurred prior to beginning Work on various Contract items on or off the Project Site, excepting those specifically paid for under separate sections of these Specifications. The Contractor agrees that the stipulated lump sum amount is sufficient for Mobilization and Preparatory Work, as described in this section, and that the Contractor shall have no right to additional compensation for Mobilization and Preparatory Work. b. Progress payments for mobilization and preparatory Work will be made as follows: For the first progress payment (after the issuance of the Notice to Proceed), 40% of the amount Bid for mobilization and preparatory Work will be allowed. For the second progress payment, an additional 60% of the amount Bid for mobilization and preparatory Work will be allowed. The total value shall not exceed 3% of the Contract Price. If the Bid 01 11 20 MEASUREMENT AND PAYMENT Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 179 of 259 item for Mobilization and Preparatory Work exceeds 3% of the Contract Price, the portion above 3% of the Contract Price shall be paid as a part of the Final Payment. c. Structure Excavation. All excavation work required for structures, shall be considered to be a subsidiary obligation of Contractor and the cost of such excavation shall be included in the prices bid for the structures and included on the Bid Form. 1.14 MISCELLANEOUS CONCRETE a. All concrete which is required in connection with manholes or structures, pavement or sidewalk replacement, and other pay items shall be included in the lump sum or unit price Bid for the pay item. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 01 31 00 PROJECT MANAGEMENT AND COORDINATION Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 180 of 259 01 31 00 PROJECT MANAGEMENT AND COORDINATION PART 1 CONSTRUCTION MANAGEMENT SOFTWARE 1.01 PROCORE PROJECT MANAGEMENT AND COLLABORATION SYSTEM d. This project will utilize the Owner’s Procore (www.procore.com) online project management and document control platform. The intent of utilizing Procore is to reduce cost and schedule risk, improve quality and safety, and maintain a healthy team dynamic by improving information flow, reducing non-productive activities, reducing rework and decreasing turnaround times. The Contractor is required to create a free web-based Procore user account(s) and utilize web-based training / tutorials (as needed) to become familiar with the system. Unless the Engineer approves otherwise, the Contractor shall process all project documents through Procore because this platform will be used to submit, track, distribute and collaborate on project. If unfamiliar or not otherwise trained with Procore, Contractor and applicable team members shall complete a free training certification course located at http://learn.procore.com/procore-certification- subcontractor. The Contractor is responsible for attaining their own Procore support, as needed, either through the online training or reaching out to the Procore support team. It will be the responsibility of the Contractor to regularly check Procore and review updated documents as they are added. There will be no cost to the Contractor for use of Procore. It is recommended that the Contractor provide mobile access for Windows, iOS located at https://apps.apple.com/us/app/procore-construction-management/id374930542 or Android devices located at https://play.google.com/store/apps/details?id=com.procore.activities with the Procore App installed to at least one on-site individual to provide real-time access to current posted drawings, specifications, RFIs, submittals, schedules, change orders, project documents, as well as any deficient observations or punch list items. Providing mobile access will improve communication, efficiency, and productivity for all parties. The use of Procore for project management does not relieve the contractor of any other requirements as may be specified in the contract documents. END OF SECTION 01 32 00 SUBMITTALS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 181 of 214 01 32 00 SUBMITTALS PART 1 GENERAL 1.01 GENERAL a. Each submittal shall be consecutively numbered. Resubmittals shall be labeled with the original submittal number followed by an ascending alphabetical designation (e.g., ‘4-A’ would indicate the first resubmittal of the fourth submittal). Each submittal shall be accompanied by a letter of transmittal on the Contractor’s letterhead which shall contain the following: 1. Agency Project title and Contract number. 2. Specification section number(s) pertaining to material submitted for review. 3. Submittal number. 4. Description of the contents of the submittal. 5. Identification of any deviation from the Contract Documents on the transmittal and by redline on the shop or working Drawings. 6. Contractor’s certification statement. 7. Printed name and signature of submitter, title and date. b. The Contractor shall place the following certification statements on all submittals and shall subscribe to one of the following: "I certify that the materials, equipment or construction procedure(s) contained in this submittal meet all requirements shown or specified in the Contract Documents with no exceptions.” Or "I certify that the materials, equipment or construction procedure(s) contained in this submittal meet all requirements shown or specified in the Contract Documents, except for the following deviation(s):” c. Shop Drawings and engineering data (submittals) covering all equipment and all fabricated components and building materials which will become a permanent part of the Goods and Special Services under this Contract shall be submitted to Engineer for review, as required. Submittals shall verify compliance with the Contract Documents, and shall include Drawings and descriptive information in sufficient detail to show the kind, size, arrangement, and the operation of component materials and devices; the external connections, anchorages, and supports required; the performance characteristics; and dimensions needed for installation and correlation with other materials and equipment. d. Each submittal shall cover items from only one section of the specification unless the item consists of components from several sources. Contractor shall submit a complete initial submittal including all components. When an item consists of components from several sources, Contractor's initial submittal shall be complete including all components. e. All submittals, regardless of origin, shall be approved by Contractor and clearly identified with the name and number of this Contract, Contractor's name, and references to 01 32 00 SUBMITTALS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 182 of 214 applicable specification paragraphs and Contract Drawings. Each copy of all submittals, regardless of origin, shall be stamped or affixed with an approval statement of Contractor. Each submittal shall indicate the intended use of the item in the Goods and Special Services. When catalog pages are submitted, applicable items shall be clearly identified and inapplicable data crossed out. The current revision, issue number, and date shall be indicated on all Drawings and other descriptive data. f. Contractor shall be solely responsible for the completeness of each submittal. Contractor’s stamp or affixed approval statement of a submittal is a representation to Engineer that Contractor accepts sole responsibility for determining and verifying all quantities, dimensions, field construction criteria, materials, catalog numbers, and similar data, and that Contractor has reviewed and coordinated each submittal with the requirements of the Goods and Special Services and the Contract Documents. g. All deviations from the Contract Documents shall be identified as deviations on each submittal and shall be tabulated in Contractor's letter of transmittal using Figure P-01300- 2. Such submittals shall, as pertinent to the deviation, indicate essential details of all changes proposed by Contractor (including modifications to other facilities that may be a result of the deviation) and all required piping and wiring diagrams. h. The Contractor shall submit shop Drawings electronically. All submittals shall be made with the selected method, and the Contractor shall inform the Engineer by letter 1 week after award of the Contract, which method has been selected. Submittals made by any method other than that selected by the Contractor, will be returned without review. i. Submittal documents shall be in black and white unless color is required for the review of the submittal. All electronic files shall be in PDF as generated by Adobe Acrobat Professional latest version. The PDF file(s) shall be fully indexed using the Table of Contents, searchable with thumbnails generated. PDF images must be at a readable resolution. For most documents, they should be scanned or generated at 300 dots per inch (dpi). Optical Character Recognition (OCR) capture must be performed on these images so that text can be searched, selected and copied from the generated PDF file. The PDF documents shall have a bookmark created in the navigation frame for each major entry (“Section” or “Chapter”) in the Table of Contents. Thumbnails shall be generated for each page or graphic in the PDF file. The opening view for each PDF document shall be as follows: 1. Initial View: Bookmarks and Page 2. Magnification: Fit In Window 3. The file shall open to the Contractor’s transmittal letter, with bookmarks to the left. The first bookmark shall be linked to the Table of Contents. PDF document properties shall include the submittal number for the document title and the Contractor’s name for the author. j. Electronic submittal file sizes shall be limited to 10 MB. When multiple files are required for a submittal the least number of files possible shall be created. 01 32 00 SUBMITTALS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 183 of 214 k. The Contractor shall post submittals and retrieve the Engineer’s submittal review comments through the Engineer’s (Consulting Engineer’s) Project website accessible through the Internet. Instruction on procedures for posting and retrieving submittals will be provided after award of the Contract. l. Facsimiles (fax) will not be acceptable. Engineer will not accept submittals from anyone but Contractor. Submittals shall be consecutively numbered in direct sequence of submittal and without division by subcontracts or trades. 1.02 ENGINEER’S REVIEW OF SUBMITTALS a. Engineer's review of submittals covers only general conformity to the Drawings and Specifications, external connections, and dimensions that affect the layout; it does not indicate thorough review of all dimensions, quantities, and details of the material, equipment, device, or item covered. Engineer's review shall not relieve Contractor of sole responsibility for errors, omissions, or deviations in the Drawings and data, nor of Contractor's sole responsibility for compliance with the Contract Documents. b. Engineer's submittal review period shall be 21 consecutive Calendar Days and shall commence on the first Calendar Day following receipt of the submittal or resubmittal in Engineer's office. The time required to mail the submittal or resubmittal back to Contractor shall not be considered a part of the submittal review period. c. When the Drawings and data are returned with review status "NOT ACCEPTABLE" or "RETURNED FOR CORRECTION," the corrections shall be made as instructed by Engineer. If submittals are made in hard copy, 5 corrected copies shall be resubmitted. If submittals are made electronically, the corrected Drawings and data shall be resubmitted through the Project website. Resubmittals by facsimile or e-mail will not be accepted. When the Drawings and data are returned with review status "EXCEPTIONS NOTED," "NO EXCEPTIONS NOTED," or "RECORD COPY," no additional copies need be furnished unless specifically requested by Engineer. 1.03 RESUBMITTAL OF DRAWINGS AND DATA a. Contractor shall accept full responsibility for the completeness of each resubmittal. Contractor shall verify that all corrected data and additional information previously requested by Engineer are provided on the resubmittal. b. When corrected copies are resubmitted, Contractor shall direct specific attention to all revisions in writing and shall list separately any revisions made other than those called for by Engineer on previous submittals. Requirements specified for initial submittals shall also apply to resubmittals. Resubmittals shall bear the number of the first submittal followed by a letter (A, B, etc.) or a unique identification that indicates the initial submittal and correct sequence of each resubmittal. c. If more than 1 resubmittal is required because of failure of Contractor to provide all previously requested corrected data or additional information, Contractor shall reimburse Agency for the charges of Engineer for review of the additional resubmittals. 01 32 00 SUBMITTALS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 184 of 214 This does not include initial submittal data such as shop tests and field tests that are submitted after initial submittal. d. Resubmittals shall be made within 30 Calendar Days of the date of the letter returning the material to be modified or corrected, unless within 14 Calendar Days Contractor submits an acceptable request for an extension of the stipulated time period, listing the reasons the resubmittal cannot be completed within that time. e. The need for more than 1 resubmittal, or any other delay in obtaining Engineer's review of submittals, will not entitle Contractor to extension of the Contract Times unless delay of the Work is the direct result of a change in the Work authorized by a Change Order or failure of Engineer to review and return any submittal to Contractor within the specified review period. 1.04 COLOR SELECTION a. Contractor shall submit samples of colors and finishes for all accepted products before Engineer will coordinate the selection of colors and finishes with Agency. Engineer will prepare a schedule of finishes that include the colors and finishes selected for both manufactured products and for surfaces to be field painted or finished and will furnish this schedule to Contractor within 60 Calendar Days after the date of acceptance of the last color or finish sample. 1.05 OPERATION AND MAINTENANCE DATA AND MANUALS a. Adequate operation and maintenance information shall be supplied for all equipment requiring maintenance or other attention. The equipment supplier shall prepare a Project specific operation and maintenance manual for each type of equipment indicated in the individual equipment sections or the equipment schedule. b. Parts lists and operating and maintenance instructions shall be furnished for other equipment not listed in the individual equipment sections or the equipment schedule. c. Operation and maintenance manuals shall include the following: 1. Equipment function, normal operating characteristics, and limiting conditions. 2. Assembly, installation, alignment, adjustment, and checking instructions. 3. Operating instructions for startup, routine and normal operation, regulation and control, shutdown, and emergency conditions. 4. Lubrication and maintenance instructions. 5. Guide to troubleshooting. 6. Parts lists and predicted life of parts subject to wear. 7. Outline, cross section, and assembly drawings; engineering data; and wiring diagrams. 8. Test data and performance curves, where applicable. d. The operation and maintenance manuals shall be in addition to any instructions or parts lists packed with or attached to the equipment when delivered, or which may be required by Contractor. 01 32 00 SUBMITTALS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 185 of 214 e. Manuals shall be submitted in electronic format to the Engineer prior to the date of shipment of the equipment. The manuals shall be submitted, and the Engineer’s review comments retrieved, through the Project website accessible through the Internet. Instruction on procedures for posting and retrieving O&M submittals and review comments will be provided after award of the Contract. When the O&M manuals are reviewed "RETURNED FOR CORRECTION,” the corrections shall be made as instructed by the Engineer or Consulting Engineer, and corrected manuals resubmitted to the Engineer or Consulting Engineer. Delivery of the final O&M shall be made 30 Calendar Days prior to placing the equipment in operation. f. All material shall be marked with Project identification, and inapplicable information shall be marked out or deleted. g. Shipment of equipment will not be considered complete until all required manuals and data have been received. 1.07 ELECTRONIC OPERATIONS AND MAINTENANCE MANUALS a. Electronic manuals shall be in Adobe Acrobat’s PDF and shall be prepared at a resolution between 300 and 600 dpi, depending on document type. OCR capture shall be performed on these documents. OCR settings shall be performed with the “original image with hidden text” option in Adobe Acrobat Exchange. b. File size shall be limited to 10 MB. When multiple files are required the least number of files possible shall be created. File names shall be in the format OMXXXXX-YYYZ-V.pdf, where XXXXX is the 5-digit number corresponding to the specification section, YYY is a 3- digit O&M manual number, e.g., 001, Z is the letter signifying a resubmittal, A, B, C, etc, and V is a number used only when more than one 10 MB file is required for an O&M manual. c. Documents prepared in PDF format shall be processed as follows: d. Pages shall be searchable (processed for optical character recognition) and indexed when multiple files are required. 1. Of material to update the manual provided by the manufacturer. Pages shall be rotated for viewing in proper orientation. 2. A bookmark shall be provided in the navigation frame for each entry in the Table of Contents. 3. Embedded thumbnails shall be generated for each completed PDF file. 4. The opening view for PDF files shall be as follows: 5. Initial View: Bookmarks and Page 6. Page Number: Title Page (usually Page 1) 7. Magnification: Set to Fit in Window 8. Page: Single Page 9. Where the bookmark structure is longer than 1 page, the bookmarks shall be collapsed to show the chapter headings only. 01 32 00 SUBMITTALS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 186 of 214 10. When multiple files are required the first file of the series (the parent file) shall list every major topic in the Table of Contents. The parent file shall also include minor headings bookmarked based on the Table of Contents. Major headings, whose content is contained in subsequent files (children) shall be linked to be called from the parent to the specific location in the child file. The child file shall contain bookmark entries for both major and minor headings contained in the child file. The first bookmark of any child file shall link back to the parent file and shall read as follows "Return to the Equipment Name Table of Contents," e.g., Return to the Polymer Feed System Table of Contents. 11. Drawings shall be bookmarked individually. 12. Files shall be delivered without security settings to permit editing, insertion and deletion. 1.08 LABELING a. As a minimum, the following information shall be included on all final O&M manual materials: Equipment name and/or O&M title spelled out in complete words. Project Name. Agency Project/Contract Number. Specification Section Number. Example: “Section 15 55 00” Manufacturer’s name. File Name and Date. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 187 of 214 01 33 00 CONSTRUCTION PROGRESS SCHEDULE PART 1 GENERAL 1.01 PROGRESS SCHEDULE a. A Progress Schedule shall be used to control the Work and to provide a definitive basis for determining Project progress. The Progress Schedule shall be prepared, maintained and updated by the Contractor and historical dates agreed monthly with the Engineer. The Contractor shall submit a preliminary Progress Schedule and a Progress Schedule for acceptance by the Engineer. These schedules shall be the Contractor’s working schedules and shall be used to plan, organize and execute the Work, record and report actual performance and progress, and show how the Contractor plans to complete all remaining Work as of the end of each progress report period. b. The Progress Schedule shall comprise all the detailed construction-related activities using the CPM. The Progress Schedule shall provide sufficient detail and clarity to reflect the intricacies and interdependencies of activities so the Contractor can plan, schedule, monitor, control and report on the progress of its work. In addition, it shall provide the Engineer and Agency a tool to monitor and follow the progress for all phases of the Work. c. The Contractor shall perform Work and furnish materials, labor, tools, equipment or services that may be reasonably inferred as being required to produce the intended result, whether specifically called for in the Contract Documents, at no additional cost to the Agency. d. Visible, existing improvements for which no specific disposition is made on the Plans, but which interfere with the Work, shall be removed and disposed of by the Contractor with the prior approval of the Engineer. 1.02 PRE-CONSTRUCTION SCHEDULING CONFERENCE a. The Engineer will conduct a pre-construction scheduling conference with the Contractor to review requirements for the schedules including [SOV] [cost-loading] and schedule configuration. The conference shall be conducted sufficiently early to allow the Contractor to submit the preliminary Progress Schedule within 10 Calendar Days of the Effective Date of the Contract. b. At this meeting, the Contractor shall explain in detail the procedure to be used to develop the schedule activity cost-loading or SOV and cash flow. This procedure is subject to the review and acceptance of the Engineer. 1.03 PRELIMINARY PROGRESS SCHEDULE a. Following the pre-construction scheduling conference but within 10 Calendar Days of the Effective Date of the Contract, the Contractor shall submit a preliminary Progress Schedule for review by the Engineer. The preliminary Progress Schedule shall show detailed construction-related activities for the first 60 Calendar Days of the Project. The remainder of the Contract activities shall be shown as summary bars within the milestones of the Work. If the Engineer has comments on the preliminary Progress 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 188 of 214 Schedule, Contractor shall make the necessary changes and resubmit it within 10 Calendar Days. No progress payments will be made during the period specified above for the preliminary Progress Schedule until the preliminary Progress Schedule has been accepted by the Engineer. b. The preliminary Progress Schedule shall: 1. Illustrate a feasible schedule for completion of the Work within the time and milestones specified. 2. Provide an elementary example of the schedule in the format to be used for the Progress Schedule. 3. Include the activity code structure as described in paragraph 1.18 ACTIVITY CODES. 1.04 PROGRESS SCHEDULE a. The Progress Schedule comprises all the construction-related activities for the Work and shall show the order in which the Contractor proposes to carry out the Work. Contractor shall include milestones, coordination necessitated by limited access and available work areas, and the availability and use of the labor force, material and equipment. Contractor shall use the Progress Schedule to plan, schedule and coordinate the Work including activities of Subcontractors, equipment vendors, and suppliers. b. The Progress Schedule shall be to the level of detail acceptable to the Engineer, and shall include the following: 1. Organization and structural breakdown of the Project; 2. Milestones and completion dates; 3. Type of Work to be performed and the labor trades involved; 4. Purchase, manufacture and delivery activities for major materials and equipment; 5. Preparation, submittal, and acceptance of shop drawings and material samples; 6. Deliveries of Agency-furnished equipment and/or materials; 7. Acceptances required by regulatory agencies and/or other third parties; 8. Assignment of responsibility for each activity; 9. Access requirements to Work areas; 10. Identification of interfaces and dependencies with preceding, concurrent and follow on Contractors; 11. Tests, submittal of test reports and acceptance of test results; 12. Planning for phased or total acceptance by Agency; including start up and commissioning; 13. Identification of any labor force, material and equipment restrictions. 14. Sequence of construction to maintain plant operations; 15. Planned outages. c. The activities included in the Progress Schedule shall be defined in Working Days. Durations shall be based on the labor (crafts), equipment, and materials required to perform each activity on a normal workday basis. Activity durations shall be 20 Working Days or less except in the case of non-construction activities such as procurement of 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 189 of 214 materials, delivery of equipment, and concrete curing. All durations shall be the result of definitive labor force and resource planning by Contractor to perform the Work, in consideration of contractually defined on Site Work conditions and Contractor’s planned means and methods. d. When the Progress Schedule is accepted by the Engineer, the Engineer will save a copy of the Progress Schedule as the baseline schedule and will use it for analysis of Contractor’s progress. e. The Contractor shall update the Progress Schedule monthly. 1.05 ELECTRONIC PROGRESS SCHEDULE FORMAT AND REPORTING a. The Progress Schedule shall be created using Primavera P6 scheduling software. Contractor shall use Engineer’s file-naming format throughout the Project. 1. Electronic schedule files shall be saved with .XML or .XER file extensions. 2. Primavera Project Manager settings for “Baseline Type” shall be used in the following manner: i. Select <None> as the baseline type for the Preliminary Schedule Submittal. ii. Once the Preliminary and Project Schedule are accepted, the baseline type shall be named <Initial Plan>. iii. Each subsequent Project Schedule update shall set the baseline type to <Last Performance Update>. 3. The data date for schedule calculation in the preliminary Progress Schedule and Progress Schedule shall be set as the date of the Notice to Proceed unless otherwise specified by the Engineer. 1.06 COST LOADING a. Except for manufacturer lead-time, each Progress Schedule activity that has an actual cost shall have a cost value assigned to it. Equipment or material delivery activities bearing cost shall be separate activities. Each activity’s assigned cost shall consist of all costs associated with that activity including all Project management, superintendence, overhead and profit costs. The sum of all activity costs shall be equal to the current Contract value at all times, including approved Change Orders. The Contractor shall certify that the costs are not unbalanced and that the value assigned to each activity represents the Contractor’s total cost to perform that activity. b. If the Engineer or Agency determines cost data does not meet the requirements for a balanced bid breakdown, the Contractor shall submit documentation substantiating any cost allocation questioned. Cost allocations will be considered unbalanced if activity on the Progress Schedule has been assigned a disproportionate allocation of direct costs, overhead and profit. If documentation of the cost data does not, in the opinion of the Engineer substantiate cost allocations, the Progress Schedule will be returned to the Contractor for action. c. Unit Price items required to be paid on a unit cost basis as identified in the Bid Form and the Measurement and Payment section shall be incorporated into the Progress Schedule 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 190 of 214 and measured and updated as specified in this part and as specified in the Measurement and Payment section. d. The Contractor shall produce Cash Flow Projection reports and graphics from the Primavera application. e. Cost-loaded data shall be the basis for monthly payment applications and shall be included with monthly updates of the Progress Schedule. 1.07 RESOURCE LOADING a. The Contractor shall build a resource (labor force) library within Primavera and assign resources to each applicable Progress Schedule activity. Resource-loading shall determine the activity duration based on the assigned resource. The Contractor shall submit a resource analysis report produced from Primavera in the form of a series of graphics showing the principal trades. The report shall show the number of worker-days of effort for each month over the life of the Contract. The labor force requirements forecast shall be updated monthly and shall include the actual labor force used by trade as of the current report period and the labor force required to complete the Work. 1.08 COORDINATING PROGRESS SCHEDULE WITH OTHER CONTRACT SCHEDULES a. Where Work is to be performed under this Contract concurrently with or contingent upon work performed on the same facilities or area under other contracts, the Progress Schedule shall be coordinated with the schedules of the other contracts. Agency will provide the schedules of other contracts for preparation and updating of the Progress Schedule. Contractor shall revise the Progress Schedule as required by changes in schedules of other contracts. b. In case of interference between the operations of different Contractors, the Agency will determine the work priority of each Contractor and the sequence of work necessary to expedite the completion of the entire Project. In all such cases, the decision of Agency shall be accepted as final. 1.09 SUBMITTALS a. The Progress Schedule and associated reports shall be submitted to the Engineer for acceptance within the period of the preliminary Progress Schedule specified in 1.05(3). If the Progress Schedule is not submitted, no progress payments will be made after the due date until the Progress Schedule has been submitted. b. Printouts and electronic layouts required as part of the Progress Schedule submittal and monthly updates are as follows: 1. Summary Schedule: 1-page milestone and summary schedule, sorted by total float, early-start, early-finish; 2. Detailed Project Schedule: organized by WBS or area of Work; sorted by total float, early-start, early-finish; 3. Critical Path Schedule: sorted based on the total float, early-start, early-finish; 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 191 of 214 4. 60-Calendar-Day Look Ahead Schedule: sorted by total float, early-start, early- finish; 5. Activities in Progress: organized by WBS or area of Work; sorted by total float, early-start, early-finish; 6. Cash Flow Trending Report: presented in an S-Curve format based on original planned early start and late start forecasted expenditures. In addition, the historical actual data point(s) are to be graphed within the S-Curve graphic report; 7. Monthly payment projections; 8. Out-of-sequence Report: tabular report showing Work performed out-of- sequence. c. Contractor shall submit additional layouts if directed by Engineer. d. The submittal shall include the following: 1. Narrative report summarizing the Contract milestones, Critical Path, Project approach including phasing or use of crews, significant submittal and fabrication items, coordination or interface requirements, Agency-provided items, and list of Subcontractors and vendors. 2. Graphic reports including Critical Path report (longest path), summary schedule report, total float report by early-start early-finish, look-ahead report grouped by work breakdown structure or Project phasing, and cash flow projection. Cash flow projections include estimated cumulative cost curves based on early and late start dates and projection of monthly payments over the life of the Project. 1.10 MONTHLY SCHEDULE UPDATES a. Monthly Progress Schedule updates shall be submitted for the duration of the Contract on a date agreed to by the Agency, Engineer, and Contractor. If monthly Progress Schedule updates are not submitted by the due date, progress payments will be withheld until the required information is submitted. b. The updated schedule shall be reviewed each month in a meeting with Engineer to verify: 1. Actual start dates, 2. Actual completion dates, 3. Activity percent completion, 4. Revised logic (as-built and projected) and changes in activity durations, cost assigned, 5. Cost influence of Change Orders, if any, 6. Revisions due to extension of time. c. Prior to each meeting, Contractor shall prepare a complete and accurate report of current procurement and construction progress through the end of the update period, and a depiction of how Contractor plans to continue the Work to meet all Contract completion dates. All network changes and status data agreed to during each update meeting shall 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 192 of 214 be considered as accepted by both parties unless written notice of any exceptions is given within 5 Calendar Days after the meeting. d. For major network changes that cannot be agreed to during an updating meeting, Contractor shall submit the proposed changes for Engineer’s acceptance prior to inserting such changes into the network. Submittals may be in the form of marked up networks, fragnets, or schedule abstracts, provided they are submitted with a letter of transmittal. A fragnet is defined as a sequence of new activities and/or activity revisions that are proposed to be added to the existing schedule to demonstrate how Project events have an impact on the schedule. 1.11 DATA DATE a. The data date is the re-settable date in P6 that serves as the end of a reporting period. The reporting period will be recorded on a monthly basis, e.g., January 1st through January 31st with the 31st as the data date. If required for coordination purposes by the Agency, the Engineer will provide specific data dates to be used by the Contractor. 1.12 REVIEW PROCESS a. Engineer will review Contractor’s preliminary Progress Schedule and full Progress Schedule submittals within 15 Calendar Days after receipt of all required information. b. At the request of Agency or Engineer, Contractor shall participate in any meetings necessary to reach a mutual agreement and acceptance of the preliminary Progress Schedule, Progress Schedules, or Cash Flow Projections. c. If any of the required submittals are returned to Contractor for corrections or revisions, they shall be resubmitted within 10 Calendar Days after the return mailing date. Resubmittals shall include all information and media included in the first submittal. Review and response by Engineer will be given within 10 Calendar Days after receipt of each resubmittal. d. Schedules shall show Contract completion of the Work on the Contract completion date and with zero or positive total float even if the Contractor plans to finish early. In no event shall acceptance of the schedule be a basis for a claim for delay against Agency or Engineer by Contractor for an early finish. A Progress Schedule containing activities with negative float or that extend beyond the Contract completion date will not be acceptable. e. Acceptance of the Progress Schedule by Engineer does not relieve Contractor of responsibility for accomplishing the Work by the Contract completion date. Omissions and errors in the accepted Progress Schedule shall not relieve the Contractor of obligations under the Contract. Acceptance by Engineer in no way makes Engineer or Agency an ensurer of the Schedule's success or liable for time or cost overruns. Engineer and Agency disclaim any obligation or liability by reason of acceptance of the Progress Schedule by the Engineer. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 193 of 214 1.13 RESPONSIBILITY OF SCHEDULE COMPLIANCE a. Whenever it becomes apparent from the current Progress Schedule that the Critical Path is delayed and the Contract completion date will not be met, Contractor shall mitigate the delay by taking some or all of the following actions at no additional cost to Agency. 1. Increase construction labor force in such quantities and crafts as will bring the Project back on schedule within the completion dates and milestones. 2. Increase the number of working hours per shift, shifts per day, Working Days per week, and the amount of construction equipment, or any combination of the foregoing, to substantially eliminate the backlog of Work. 3. Re-schedule activities to achieve maximum practical concurrence of activities and to comply with the schedule date(s). b. Within 10 Calendar Days of the Engineer’s request, Contractor shall submit a recovery schedule and written statement of the steps intended to remove or arrest the delay to the Critical Path in the schedule. If the Contractor fails to submit the required information or should fail to take measures acceptable to the Engineer, the Engineer with Agency concurrence may direct Contractor to increase labor force, equipment and scheduled Work hours to remove or arrest the delay to the Critical Path and the Contractor shall promptly provide such level of effort at no additional cost to Agency. c. In the event Contractor fails to follow the updated or revised recovery schedule, Agency may elect to withhold progress payments until Contractor complies with the revised schedule. d. Should Contractor’s efforts not remove or arrest the delay to the Critical Path of the accepted schedule, then Agency shall be entitled to supplement Contractor’s workforce and equipment to remove and arrest any delay, and shall be entitled to deduct all costs and expenses associated with the supplemental workforce and equipment from payments due to the Contractor. If insufficient Contract funds remain, Agency may recover such funds from Contractor and its Surety. 1.14 CHANGE ORDERS, DELAYS, AND EXTENSIONS OF TIME a. When Change Orders or delays are experienced by Contractor and Contractor requests an extension of time, Contractor shall submit a written time impact analysis to the Engineer illustrating the influence of each change or delay to the current Contract Schedule completion date. Each time impact analysis shall include a fragment incorporating the Change Order or delay into the Progress Schedule to demonstrate how Contractor was delayed. b. Each time impact analysis shall demonstrate the estimated time impact based on the events of the change or the delay; the date the change was given to Contractor or the delay incurred, the status of construction at that point in time, and the event time computation of all activities affected by the change or delay. The event times used in the analysis shall be those included in the latest update of the Progress Schedule or as adjusted for the events of delay. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 194 of 214 c. An electronic copy shall be submitted within 7 Calendar Days of delay occurrence or direction to proceed with a change is given to Contractor. No time extensions will be considered if the time impact analysis is not submitted within the specified time. d. The Engineer will review Contractor’s time impact analysis. Contractor shall furnish such justification and supporting evidence as the Engineer deems necessary to determine whether Contractor is entitled to an extension of time. Engineer’s review of each time impact analysis will be made within 5 Working Days of receipt of the time impact analysis and additional information as required by the Engineer, unless subsequent meetings and negotiations are necessary. e. The Contract completion time will be adjusted only for causes specified in paragraph 15. Time extensions will be granted only to the extent that equitable time adjustments for the activity or activities affected exceed the total or remaining float along the Critical Path at the time of actual delay. Delays in activities which are not on the Critical Path and do not affect Contract completion dates, will not be considered for an extension of time. 1.15 CAUSES FOR EXTENSIONS OF TIME a. Additional positive total float in the Progress Schedule generated by efficiencies of Agency or Contractor is a shared commodity to be reasonably used by either party, and belongs exclusively to the Project. The Contractor is not entitled to any additional compensation for completion of the Project prior to expiration of the Contract Times. b. Agency-Initiated Changes. Agency initiated changes to the Contract Work that absorb float time will not be considered for an extension of time. Agency-initiated changes that affect the Critical Path of the Progress Schedule shall be grounds for extending or shortening completion dates. Use of float time for Contractor initiated changes will require Agency’s concurrence. Contractor’s changes, however, shall give way to Agency- initiated changes competing for the same float time. c. Outside Contractor’s Control. Events outside of the Contractor’s control that affect the Critical Path of the Progress Schedule will be considered for an extension or reduction of the Contract Times. d. Weather Delays. Engineer will obtain weather data during construction from a reputable source and will maintain weather records. 1. Engineer will determine Contractor’s entitlement to an extension of the Contract Time as a result of weather delays. Extensions of time will be granted at the discretion of the Engineer for circumstances not covered by the flow chart. 2. Any weather-related extension of Contract Time shall be non-compensable. Efficiencies gained as a result of favorable weather within a calendar month, where the number of days of normally anticipated weather days is less than expected, shall contribute to the Project float and shall not affect the Contract Times. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 195 of 214 3. Application for a weather-related extension of time shall be submitted to the Engineer, and shall state the extension requested and be supported by the relevant weather data. 1.16 AS-BUILT SCHEDULE a. As a condition precedent to release of final payment, the last update to the Progress Schedule submitted shall be identified by the Contractor as the “As-Built Schedule.” The “As-Built Schedule” shall reflect the exact manner in which the Project was actually constructed (including actual start and completion dates, activities, sequences, and logic) and shall be signed and certified by the Contractor’s Project manager. 1.17 SCHEDULE SOFTWARE SETTINGS AND RESTRICTIONS a. Contractor shall consult with Engineer for acceptable Primavera Project Manager software settings and restrictions. The following shall apply unless otherwise directed by the Engineer. 1. Schedule Options: i. Shall be defined only to “Use expected finish dates”; ii. Scheduling progressed activities to be set to “Use only retained logic,” not progress override option; iii. Critical Path activities defined as Total Float less than or equal to zero; iv. Calculating start-to-start lag from “early start” dates; and computing total float as “finish float = late finish – early finish”; v. Calendar to be set for scheduling relationship lag as “Predecessor Activity Calendar.” 2. Activity progress shall be shown using Remaining Duration. Date format shall be DDMMYY. 3. Default activity type shall be set to “Independent Task.” 4. Date/time activity constraint(s), other than those required by the Contract, will not be allowed unless accepted by Engineer. Contractor shall identify proposed constraints and explain the constraint purpose in the Narrative Report. 5. Lags shall not be used in the creation of an activity that will perform the same function, e.g., concrete cure time. Lag durations contained in the Project Schedule shall not have a negative value. Contractor shall identify any lag proposed and explain the purpose of the lag in the Narrative Report. 6. Actual Start and Finish dates shall not be automatically updated by default mechanism that may be included in the CPM scheduling software system. Actual Start and Actual Finish dates on the CPM schedule shall be updated by actual Work progression. 1.18 ACTIVITY CODES a. The Primavera (P6) activity codes and WBS to be confirmed or revised by the Engineer are listed below. Confirmation or revision of the activity codes and WBS will be provided to the Contractor within 3 Working Days of the Effective Date of the Contract. Use of the Engineer prescribed activity codes and WBS is mandatory. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 196 of 214 b. “Project Codes” as defined by Primavera P6 is reserved for the Agency. Only “Activity Codes” at Project Level will be permitted for Contractor use. Activity Code Code Value Description Phase 0005 Construction Phase Construction Phase A BC D E Milestones Administrative Submittals Construction Activities Closeout Phase Submittals SUB R&A F&D Submittals Review & Approve Fabricate & Deliver Other Codes to be prescribed by Engineer or requested by Contractor for Project specific criteria. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 197 of 214 1.19 ACTIVITY RELATIONSHIPS a. Relationships between activities shall be identified with the following information: 1. Predecessor and successor activity ID. 2. Relationship types: i. FS Finish to start ii. SS Start to start iii. FF Finish to finish iv. SF Start to finish – This relationship is not allowed, unless authorized by Engineer. 1.20 PROJECT CALENDARS a. Project Calendars shall use Working Days and Calendar Days as the planning unit for the schedule. Use of Global Calendars is reserved for Agency. Each calendar shall be set to start on Mondays with holidays in accordance with Agency policy. The following calendars shall be used for each activity except as otherwise accepted by Engineer: 1. 5-Day x 8 Hour Workweek (with holidays) shall be used for 5-day 40-hour workweek activities: Monday through Friday. All holidays and non-work days shall be assigned to this calendar. This calendar shall be used for all normal work activities, submittals, and fabricate and delivery activities. This calendar shall be the default calendar for the Project unless otherwise specified. 2. 5-Day x 10-Hour Workweek (with holidays) shall be used for 5-day 50-hour workweek activities: Monday through Friday. All holidays and non-work days shall be assigned to this calendar. 3. 6-Day x 10-Hour Workweek (with holidays) shall be used for 6-day 60-hour workweek activities. Monday through Saturday. All holiday and non-work days shall be assigned to this calendar. 4. 7-Day Calendar (no holidays) shall be used for 7-day workweek activities. No non- work days shall be entered into this calendar. 5. Additional Calendars may be assigned depending on need. However, Contractor shall consult with the Engineer before other calendars are entered and/or used in the Project schedule. b. The workday to calendar day correlation shall be based on a single shift and 5-day work week with adequate allowance for holidays, adverse weather, and all other special requirements of the Work. Contractor may, at his option, propose alternate baseline calendars to allow a second shift and/or a single shift on Saturdays subject to the concurrence and acceptance of Agency. Under no circumstances will a schedule be accepted which allows regularly scheduled Work on Sundays. 1.21 FLOAT a. Contractor shall not use float suppression techniques, including preferential sequencing (arranging Critical Path through activities more susceptible to Agency caused delay); lag logic restraints; zero total or free float constraints; extended activity times; or imposing constraint dates other than as required by the Contract. Float suppression will be cause 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 198 of 214 for rejection of the preliminary Progress Schedule or full Progress Schedule and its updates. 1.22 MANDATORY MILESTONES a. The Contract duration shall be equal to the time period between the Notice to Proceed and the completion milestone. The following milestones are mandatory. 1. Project Award Milestone 2. Notice to Proceed Milestone 3. Substantial Completion is [Insert number and type (i.e., Working or Calendar)] days from Notice to Proceed 4. Completion is [Insert number and type i.e., Working or Calendar] days from Notice to Proceed b. The following additional milestones are to be considered and incorporated into the Progress Schedule in accordance with the Contract terms, if applicable. 1. Permit constraints 2. Facility shut down or outage milestone requirements 3. Applicable phasing milestones 4. Other milestones deemed appropriate by the Engineer. PART 2 EXECUTION 2-1.1 Preconstruction Meeting After, or upon, notification of Contract award, the Engineer will set the time and location for the Preconstruction Meeting. Attendance of the Contractor’s management personnel responsible for the management, administration, and execution of the Project is mandatory for the meeting to be convened. Failure of the Contractor to have the Contractor’s responsible Project personnel attend the Preconstruction Meeting will be grounds for default by Contractor per Supplemental General Provisions Section 6-7. No separate payment will be made for the Contractor’s attendance at the meeting. The Notice to Proceed will only be issued on or after the completion of the Preconstruction Meeting. 2-1.2 Preparation and Review of the Baseline Construction Schedule The Contractor shall prepare the Baseline Construction Schedule as a CPM Schedule in the precedence diagram method (activity-on-node) format. The Baseline Construction Schedule shall depict a workable plan showing the sequence, duration, and interdependence of all activities required to represent the complete performance of all Project Work as well as periods where Work is precluded. The Baseline Construction Schedule shall begin with the projected date of issuance of the Notice to Proceed and conclude with the date of final completion per the Contract duration. The Baseline Construction Schedule shall include detail of all Project phasing, staging, and sequencing, including all milestones necessary to define beginning and ending of each phase or stage. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 199 of 214 2-1.2.1 Time-Scaled Network Diagram As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a complete time-scaled network diagram showing all of the activities, logic relationships, and milestones comprising the schedule. 2-1.2.2 Tabular Listing As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a tabular listing of all of the activities, showing for each activity the identification number, the description, the duration, the early start, the early finish, the late start, the late finish, the total float, and all predecessor and successor activities for the activity described. 2-1.2.3 Bar Chart As a part of the Baseline Construction Schedule the Contractor shall prepare and submit to the Engineer a chart showing individual tasks and their durations arranged with the tasks on the vertical axis and duration on the horizontal axis. The bar chart shall use differing texture patterns or distinctive line types to show the Critical Path. 2-1.2.4 Schedule Software The Contractor shall use commercially available software equal to the Windows 2000 compatible “Suretrak” program by Primavera or “Project” program by Microsoft Corporation to prepare the Baseline Construction Schedule and all updates thereto. The Contractor shall submit to the Agency a digital file with all network information contained on it, in a format readable by a Microsoft Windows 2000 system. The Agency will use a “Suretrak,” “Project” or equal software program for review of the Contractor’s schedule. Should the Contractor elect to use a scheduling program other than the “Suretrak” program by Primavera or “Project” program by Microsoft Corporation, the Contractor shall provide the Engineer 3 copies of the substituted program that are fully licensed to the Agency and 32 class hours of on-site training by the program publisher for up to 8 Agency staff members. The classes shall be presented on Mondays through Thursdays, inclusive, between the hours of 8:00 a.m. and 5:00 p.m. The on-site training shall be held at 1635 Faraday Avenue, Carlsbad, California. The dates and times of the on-site training shall be submitted to the Engineer for approval 5 Working Days before the start of the on-site training. The on-site training shall be completed prior to the submittal of the first Baseline Construction Schedule. 2-1.2.5 Schedule Activities Except for submittal activities, activity durations shall not be shorter than 1 Working Day nor longer than 15 Working Days, unless specifically and individually allowed by the Engineer. The Baseline Construction Schedule shall include between 100 and 500 activities, including submittals, interfaces between utility companies and other agencies, Project milestones and equipment and material deliveries. The number of activities will be sufficient, in the judgment of the Engineer, to communicate the Contractor’s plan for Project execution, to accurately describe the Project Work, and to allow monitoring and evaluation of progress and of time impacts. Each 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 200 of 214 activity’s description shall accurately define the work planned for the activity and each activity shall have recognizable beginning and end points. 2-1.2.6 Float Float or slack time within the schedule is available without charge or compensation to whatever party or contingency first exhausts it. 2-1.2.7 Restraints to Activities Any submittals, utility interfaces, or any furnishing of Agency supplied materials, equipment, or services, which may impact any activity’s construction shall be shown as a restraint to those activities. Time periods to accommodate the review and correction of submittals shall be included in the schedule. 2-1.2.8 Late Completion A Baseline Construction Schedule showing a Project duration longer than the specified Contract duration will not be acceptable and will be grounds for determination of default by Contractor, per Agency Supplemental General Provisions Section 6-4. 2-1.2.9 Early Completion The Baseline Construction Schedule will show the Contractor’s plan to support and maintain the Project for the entire contractual time span of the Project. Should the Contractor propose a Project duration shorter than Contract duration, a complete Baseline Construction Schedule must be submitted, reflecting the shorter duration, in complete accordance with all schedule requirements of Agency Supplemental General Provisions Section 6-1. The Engineer may choose to accept the Contractor’s proposal of a Project duration shorter than the duration specified; provided the Agency is satisfied the shortened Baseline Construction Schedule is reasonable and the Agency and all other entities, public and private, which interface with the Project are able to support the provisions of the shortened Baseline Construction Schedule. The Agency’s acceptance of a shortened duration Project will be confirmed through the execution of a Contract Change Order revising the Project duration and implementing all contractual requirements including liquidated damages in accordance with the revised duration. 2-1.2.10 Engineer’s Review The Construction Schedule is subject to the review of the Engineer. The Engineer’s determination that the Baseline Construction Schedule proposed by the Contractor complies with the requirements of these supplemental provisions shall be a condition precedent to issuance of the Notice to Proceed by the Engineer. If the Engineer determines that the Construction Schedule does not meet the requirements of these specifications the Contractor shall correct the Construction Schedule to meet these specifications and resubmit it to the Engineer. Failure of the Contractor to obtain the Engineer’s determination that the initial Construction Schedule proposed by the Contractor complies with the requirements of these supplemental provisions within 30 Working Days after the date of the Preconstruction Meeting shall be grounds for termination of the Contract per Agency Supplemental General Provisions Section 6-4. Days used 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 201 of 214 by the Engineer to review the initial Construction Schedule will not be included in the 30 Working Days. The Engineer will review and return to the Contractor, with any comments, the Baseline Construction Schedule within 15 Working Days of submittal. The Baseline Construction Schedule will be returned marked as per Sections 2-1.2.10.1 through 2-1.2.10.3. 2-1.2.10.1 “Accepted” The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed, and will receive payment for the schedule in accordance with Section 2-1.8.1. 2-1.2.10.2 “Accepted with Comments” The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed. The Contractor must resubmit the schedule incorporating the comments prior to receipt of payment per Section 2-1.8.1. 2-1.2.10.3 “Not Accepted” The Contractor must resubmit the schedule incorporating the corrections and changes of the comments prior to receipt of payment per Section 2-1.8.1. The Notice to Proceed will not be issued by the Engineer if the changes of the comments are not submitted as required and marked “Accepted” or “Accepted with Comments” by the Engineer. The Contractor, at the sole option of the Engineer, may be considered as having defaulted the Contract under the provisions of Supplemental General Provisions Section 2-7 TERMINATION OF THE CONTRACT FOR DEFAULT if the changes of the comments are not submitted as required and marked “Accepted” by the Engineer. 2-1.3 Preparation of Schedule Updates and Revisions The Contractor shall meet with the Engineer during the last week of each month to agree upon each activity’s schedule status and shall submit monthly updates of the Baseline Construction Schedule confirming the agreements no later than the fifth Working Day of the following month. The monthly update will be submitted on hard (paper) copy and electronic media conforming to Section 6-1.3.3 Electronic Media per the submittal requirements of Section 1.05 (Electronic Progress Schedule Format and Reporting) and will include each item and element of Sections 2- 1.2 through 2-1.2.9 and 2-1.3.1 through 2-1.3.7. 2-1.3.1 Actual Activity Dates The actual dates each activity was started and/or completed during the month. After first reporting an actual date, the Contractor shall not change that actual date in later updates without specific notification to the Engineer with the update. 2-1.3.2 Activity Percent Complete For each activity underway at the end of the month, the Contractor shall report the percentage determined by the Engineer as complete for the activity. 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 202 of 214 2-1.3.3 Electronic Media The electronic schedule data file shall be labeled with the Project name and number, the Contractor’s name and the date of preparation of the schedule. The schedule data shall be readable by the software specified in Section 6-1.2.4 “Schedule Software” and shall be free of file locking, encryption or any other protocol that would impede full access of all data stored on it. 2-1.3.4 List of Changes A list of all changes made to the activities or to the interconnecting logic, with an explanation for each change. 2-1.3.5 Change Orders Each monthly update will include the addition of the network revisions reflecting the Change Orders approved in the previous month. The network revisions will be as agreed upon during the review and acceptance of the Contractor’s Change Orders. 2-1.3.6 Bar Chart Each monthly update will include a chart showing individual tasks and their durations arranged with the tasks on the vertical axis and duration on the horizontal axis. The bar chart shall use differing texture patterns or distinctive line types to show the Critical Path. 2-1.4 Engineer’s Review of Updated Construction Schedule The Engineer will review and return the Updated Construction Schedule to the Contractor, with any comments, within 5 Working Days of submittal. The Updated Construction Schedule will be returned marked as per Sections 6-1.4.1 through 6-1.4.3. Any Updated Construction Schedule marked “Accepted with Comments” or “Not Accepted” by the Engineer will be returned to the Contractor for correction. Upon resubmittal the Engineer will review and return the resubmitted Updated Construction Schedule to the Contractor, with any comments, within 5 Working Days. Failure of the Contractor to submit a monthly Updated Construction Schedule will invoke the same consequences as the Engineer returning a monthly Updated Construction Schedule marked “Not Accepted.” 2-1.4.1 “Accepted” The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed, and will receive payment for the schedule in accordance with Section 2-1.8.1. 2-1.4.2 “Accepted with Comments” The Contractor may proceed with the Project Work upon issuance of the Notice to Proceed. The Contractor must resubmit the schedule incorporating the comments prior to receipt of payment per Section 2-1.8.1. 2-1.4.3 “Not Accepted” The Contractor must resubmit the Updated Construction Schedule to the Engineer incorporating the corrections and changes noted in the Engineer’s comments prior to receipt of payment per Section 6-1.8.2. The Contractor, at the sole option of the Engineer, may be considered as having 01 33 00 CONSTRUCTION PROGRESS SCHEDULE Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 203 of 214 defaulted the Contract under the provisions of Agency Supplemental General Provisions Section 6-7 TERMINATION OF THE CONTRACT FOR DEFAULT if the changes of the comments are not submitted and marked “Accepted” by the Engineer before the last day of the month in which the Updated Construction Schedule is due. If the Contractor fails to submit the corrected Updated Construction Schedule as required the Contractor may elect to proceed with the Project at its own risk. Should the Contractor elect not to proceed with the Project, any resulting delay, impact, or disruption to the Project will be the Contractor’s responsibility. 2-1.5 Late Completion or Milestone Dates Should the Schedule Update indicate a completion or contractually required milestone date later than the properly adjusted Contract or milestone duration, the Agency may withhold liquidated damages for the number of Calendar Days late. Should a subsequent “Accepted” Schedule Update remove all or a portion of the delay, all or the allocated portion of the previously held liquidated damages shall be released in the monthly payment to the Contractor immediately following the “Accepted” schedule. 2-1.6 Interim Revisions Should the actual or projected progress of the Work become substantially different from that depicted in the Project Schedule, independently of and prior to the next monthly update, the Contractor will submit a revised Baseline Construction Schedule, with a list and explanation of each change made to the schedule. The Revised Construction Schedule will be submitted per the submittal requirements of Section 1.05 (Electronic Progress Schedule Format and Reporting) and per the schedule review and acceptance requirements of Agency Supplemental General Provisions Section 6-1, including but not limited to the acceptance and payment provisions. As used in this section “substantially different” means a time variance greater than 5 percent of the number of Calendar Days of duration for the Project. 2-1.7 Final Schedule Update The Contractor shall prepare and submit a Final Schedule Update when 100% of the Construction Work is completed. The Contractor’s Final Schedule Update must accurately represent the actual dates for all activities. The Final Schedule Update shall be prepared and reviewed per Sections 6- 1.3. Preparation of Schedule Updates and Revisions and 6-1.4 Engineer’s Review of Updated Construction Schedule. Acceptance of the Final Schedule Update is required for completion of the Project and release of any and all funds retained per Section 9-3.2. 2-1.8 Measurement and Payment for Construction Schedule The Contractor’s preparation, revision and maintenance of the Construction Schedule are incidental to the Work and no separate payment will be made for them. END OF SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 204 of 214 01 41 26 PERMIT REQUIREMENTS PART 1 GENERAL 1.01 WORK COVERED BY CONTRACT DOCUMENTS a. The Contractor is responsible to obtain all local, state and federal permits and licenses required to perform the Work. Payment for obtaining and complying with permits and licenses including, but not limited to, general construction permits, building permits, grading permits, encroachment permits, haul route permits, excavation permits, drilling permits, water discharge permits, temporary easements, licenses, inspection fees, and Federal, State and local taxes shall be borne by the Contractor and shall be included in prices Bid for Work for which such costs are appurtenant. b. The Contractor shall obtain and pay for all costs incurred for permits necessitated by its operations such as, but not limited to, permits required for sewage bypass pumping or discharge; Night Work; overload; blasting or demolition or for any permit related to the operation of equipment used in such Work. c. The Contractor shall obtain and pay for all permits for the disposal of all waste or surplus materials removed from the Project. The cost of the permit(s) shall be included in the price for the Bid items requiring the permits and no additional compensation will be allowed for them. d. The Contractor shall provide a copy of the permit or license to the Agency prior to performing the Work requiring the permit or license. e. Contractor shall pay for all fees applicable to Contractor’s operations. f. Contractor shall not begin Work until all permits applicable to the Work are obtained. Permits shall be maintained in valid status until acceptance of the Work by the Agency. g. The Contractor shall pay all business taxes or license fees that are required for the Work. 1. To the extent that there is a change in the type or cost of any permits, fees, licenses, or inspections after Contract award, there shall be an equitable adjustment in the Contract Price on account of such change under the Extra Work provisions. 2. The Contractor shall comply with and give notices required by Applicable Laws. The Contractor is not entitled to damages or additional payment for delays attributable to the acquisition of permits. 3. The Contractor shall pay the Agency for regulatory fees, fines, or penalties imposed on the Agency arising from the Contractor’s failure to complete the Work in accordance with the Contract Documents. h. The Contractor shall obtain, pay for, and comply with required permits, licenses, work permits, and authorizations from appropriate agencies, including the following: 1. Licenses i. Before submitting Bids, Contractors shall be licensed in accordance with provisions of Chapter 9, Division 3, of the Business and Professions Code. 01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 205 of 214 ii. City of Carlsbad Business License. 2. State and Federal permits i. Excavation and Dirt Moving Permit from Cal/OSHA ii. Safety permit from California Division of Industrial Safety iii. NPDES General Permit for Storm Water Discharges Associated with Construction and Land Disturbance Activities (LUP Type 2) iv. NPDES Permit for discharge of hydrostatic test water and potable water 3. Other permits (if/as necessary) i. City Haul Route Permit ii. Traffic Control Plan Permit iii. Grading Permit iv. Right of Way Permit v. Oversize Load Permit vi. Blasting Permit vii. Written authorization from private property owners for property utilized for staging. i. The Agency will obtain for the Contractor, the following: 1. Building Permit 2. Air Pollution Control District, Authority to Construct 3. County Department of Health Permit 1.02 HAUL ROUTE PERMIT a. The Contractor shall prepare a Project specific haul route plan detailing the streets intended for use in delivery of materials and import and export of soil. Contractor will be limited to the routes approved by the City of Carlsbad according to the approved haul route plan contained in the permit. 1.03 TRAFFIC CONTROL PLANS a. The Contractor shall prepare Project specific traffic control plans, and haul route plan and use such plans to obtain a traffic control permit from the City of Carlsbad Development Services Department. 1.04 RAILROAD – Not Used 1.05 STORMWATER POLLUTION PREVENTION PLAN (SWPPP)/ GENERAL PERMIT PROJECTS LESS THAN ONE ACRE (TIER 1 and TIER 2 or Maintenance ONLY Projects that may be over an acre) A. Water Pollution Prevention. The Contractor shall plan for and implement temporary construction BMPs to mitigate the water quality impacts of land disturbance and non- storm water discharges related to construction activities in accordance the Agency’s current Municipal Stormwater Permit and Carlsbad Municipal Code Chapter 15.12. BMPs are the schedules of activities, prohibitions of practices, maintenance procedures and other management practices employed during construction activities to prevent or reduce pollution of bodies of water protected by the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and the state Porter-Cologne Water Quality Control Act (Water Code, § 01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 206 of 214 13000 et seq.), which include oceans, lagoons, lakes, streams and other sensitive water bodies and water courses. Construction BMPs also include physical devices and structural construction control measures designed to prevent soil erosion from occurring on the Work Site, or that are designed to prevent sediment from leaving the Work Site, both of which are referred to hereafter as “Water Pollution.” BMPs are also intended to protect the health, safety and welfare of the public and to prevent damage to adjoining public and private property resulting from construction activities. B. Pollution prevention practices and the minimum BMPs are required during all 12 months of the year. BMPs and other erosion control practices must be implemented as the most important “first line of defense.” The Agency has adopted the CASQA ‘Stormwater Best Management Practices Handbook: Construction,’ latest edition, as its preferred source for adopting construction BMPs. All BMPs must correspond to the BMP Fact Sheets included in the CASQA Construction Handbook. With the approval of the Engineer, or designee, the Agency may accept comparable BMPs from reputable alternative sources. As used in this section, “Engineer” shall have the same meaning as “Construction Manager.” C. The Contractor shall utilize the Agency’s Tier 1 or Tier 2 SWPPP templates and include all applicable elements provided in the template. The SWPPP templates are available on the Agency’s website at [PROJECT ENGINEER insert website address here]. Tier 1 and Tier 2 SWPPP templates include standard storm water prevention construction notes, a Project information block, a Storm Water Compliance Statement, Agency approval block and a BMP Checklist Table. The BMP Checklist Table is intended to help the Contractor select appropriate BMPs best suited to the Project and the Work. Additionally, the SWPPP shall include a Site plan showing the proposed Project Site and depicting the areas of proposed construction and proposed locations of construction BMPs. The Tier 1 and Tier 2 SWPPP plans shall be submitted as additional sheets to the construction plan set. D. The Engineer may require Contractor to adopt additional BMPs if the Engineer determines the selected BMP(s) are ineffective or incapable of preventing Water Pollution from escaping the Work site. Tier 1 and Tier 2 SWPPPs must be combined with proper and timely installation of the BMPs, thorough and frequent inspections, maintenance, and documentation. The Contractor shall ensure that the selected BMPs are appropriately incorporated into the Site design and, if required by the Engineer, must employ a qualified professional to ensure proper installation and maintenance of the BMPs. E. The Engineer may suspend the Work, consistent with Supplemental General Provisions Section 6-6, at the Contractor’s cost, that create Water Pollution or otherwise violate water quality standards required by the federal Clean Water Act (33 U.S.C. § 1251 et seq.) and the state Porter-Cologne Water Quality Control Act (Water Code, § 13000 et seq.) if the Engineer determines that the Contractor has failed to satisfy all requirements of this section. If the Contractor violates any provisions of this subsection, or if Water Pollution occurs in the Work Site for any reason, the Contractor shall immediately notify the Engineer. 01 50 00 TEMPORARY FACILITIES AND CONTROLS Date Printed: June 3, 2024 Document Version: 1.0 Current Update: May 2023 Page 207 of 214 F. The Contractor shall immediately notify the Agency if there is a non-stormwater discharge to the storm drain conveyance system resulting from the Work or Project-related activities. In addition, the Contractor shall, within 24 hours, submit a written report to the Engineer describing the incident and corrective actions taken. If for any reason the Engineer detects Water Pollution, before notification by the Contractor, this written report shall also include an explanation of why the Contractor had not timely notified the Engineer. G. Implementation Costs. Preparation, implementation and management of Water Pollution prevention activities are incidental to the items of Work and Agency shall not make additional payment to Contractor for these costs. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION (NOT USED) END OF SECTION 00 01 01 TITLE PAGE Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 CITY OF CARLSBAD Agency Technical Specifications for Fleet Fuel Island Upgrade Project No. 4747 PWS24-2282FAC 1635 Faraday Ave, Carlsbad, CA 92008 Email: PWContractAdmin@carlsbadca.gov Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 2 of 26 Table of Contents 02 41 00 DEMOLITION ............................................................................................................ 3 DIVISION 10 SPECIALTIES ........................................................................................................... 11 10 14 00 SIGNAGE ................................................................................................................ 11 DIVISION 26 ELECTRICAL ............................................................................................................ 13 DIVISION 33 UTILITIES ................................................................................................................ 15 33 52 10 FUELING SYSTEM ................................................................................................... 15 Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 3 of 26 DIVISION 02 – DEMOLITION AND STRUCTURE REMOVAL 02 41 00 DEMOLITION PART 1 GENERAL 1.1 SUMMARY OF WORK: REMOVE EXISTING FUEL SYSTEM The Contractor shall furnish all labor, material, tools, transportation and equipment necessary to remove and dispose of the three (3) existing Underground Storage Tanks (UST)s, and associated equipment. Removal items include: A. Remove and store Fuel Management System B. Remove existing dispensers, piping, hoses, pumps, sensors, and consoles. C. Saw-cut concrete for removal of existing tanks (2) 20,000-gallons, (1) 12,000-gallons. D. Remove and dispose of concrete. Removal of possible dead man anchors. E. Remove island curbs. F. Notify Agency of suspected contaminated soil, so that soil analysis may be performed to determine if remediation work is required. G. Remove and dispose of existing wiring as per Project Plans. H. Remove tank monitoring system and provide control unit to Agency. I. Remove and dispose of tanks along with ancillary equipment, provide certificates of destruction to Agency for tanks. J. Remove light poles and bollards. K. Cut and cap water pipeline to island. Work includes safe removal and disposal of residual fuel in tanks, piping and dispensers. The Contractor may be required to manage petroleum contaminated soil if encountered. 1.2 ENVIRONMENTAL This section specifies requirements for the environmental and tank assessment, permitting, removal and disposal of the UST(s) and is intended to supplement the construction/installation specifications. Generally, the work shall include, but not be limited to: A. Characterize (any testing that may be required by a disposal facility), containerize, remove, and properly dispose of residual fuels from the designated tanks and appurtenant piping. B. Clean, remove, and dispose of USTs, and appurtenant piping for the tanks. The work shall include the removal and proper disposal of fuel and residual in the tanks and associated piping between the tanks and the fuel island. Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 4 of 26 C. Perform all sampling and testing required to properly profile the material for waste disposal. This shall also include all testing required by the disposal or recycling facility. D. All costs for the testing shall be borne by the Contractor. E. Coordinate work with the Agency by providing a weekly look ahead schedule for anticipated work, including sampling, removal notifications, and manifests and/or Bills of Lading for all contaminated materials removed from the Site. F. Comply with the Contractor’s submitted Health and Safety Plan. 1.3 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.4 DEFINITIONS A. API: American Petroleum Institute. B. CARB: California Air Resources Board C. CCR: California Code of Regulations D. CUPA: Certified Unified Program Agencies E. FRP: Fiberglass-Reinforced Plastic F. HASP: Health and Safety Plan. G. ICC: International Code Council H. LEL: Lower Explosive Limit I. NFPA: National Fire Protection Association J. OSHA: Occupational Safety and Health Administration. K. PEI: A. Petroleum Equipment Installation Institute L. PID: Photoionization Detector M. PSI: Pounds per square inch N. SDCAPCD: San Diego County Air Pollution Control District O. USA: Underground Service Alert P. UST: Underground Storage Tank. 1.5 ACTION SUBMITTALS A. Licenses / Certifications The Contractor must submit the names of an A, B, C-36, or C-61 license for UST removal with the HAZ - Hazardous Substance Removal Certification and a designated onsite foreman, certified as an UST installers/ decommissioner, meeting the minimum requirements for installations must be listed. The foreman must be always onsite while Work takes place. Workers must be under the direct supervision of an individual physically present at the work site who meets the following requirements: Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 5 of 26 1. The individual has been adequately trained as evidenced by a current certificate of training issued by the manufacturer(s) of the underground storage tank system components. 2. The individual shall possess a current underground storage tank system installation/retrofitting certificate from the International Code Council (ICC). 3. The individual shall be licensed with State of California ICC U1 -UST Install Retrofit and ICC U2 UST decommissioning. B. Notifications: 1. The Contractor shall Notify the Agency 30-days before the start of work to ensure the Agency has submitted proper notifications to the San Diego County Environmental health and Quality, San Diego County Air Pollution Control District (SDCAPCD), and the CUPA. 2. Three days before any excavation, the Contractor Shall notify Underground Service Alert (USA) DigAlert by calling 811 and obtaining proper clearance. In addition, the Contractor shall hire a Private Utility Locator to mark out electrical, gas, septic, water, communications, and drainage lines on the municipal property. 3. If evidence of contamination is encountered/observed (including but not limited to: organic vapor measuring equipment readings; visual staining/discoloration; and olfactory indicators) during the removal activities, the Contractor will notify the Agency immediately. C. Demolition Plan: The Contractor shall prepare a UST demolition plan for review with the Agency to confirm means and methods for demolition. The plan shall include procedures and schedule for the following: 1. A detailed operations schedule (dates and hours of work). 2. A description of the project approach covering methods for excavation, staging, sampling, analysis, removal, lifting, transportation and disposal of all waste. 3. Description of soil removal methods to be employed, including excavation protection. 4. Description of the waste segregation and staging methods to be used for soils, sludges, concrete, polyethylene sheeting, and spent personal protective equipment (PPE). 5. Methods to be used for cleaning the tank and piping. Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 6 of 26 6. Identification of all laboratories, waste transporters, and disposal facilities. 7. Description of methods to be employed to prevent impact to storm water from staged petroleum-contaminated soil, if encountered. 8. The Excavated Materials Disposal Plan shall include a listing (name, address, contact) of all transportation and disposal facilities to be utilized with appropriate permits/registrations for all materials removed, including, but not limited to tank, piping, concrete pad, tank contents including sludges, wash water, contaminated soil and groundwater, and used PPE. Written confirmation shall be submitted from each of the disposal or recycling facilities indicating that they will accept the specific waste stream (tank, piping, sludges, etc.) to be removed as part of this work. 9. Prepare Project Health and Safety Plan. 1.6 QUALITY ASSURANCE A. Hazard Communication Standard: The Contractor performing Work for the Agency shall comply with OSHA Hazard Communication Standard 29 CFR Part 1910.1200 and 29 CFR 1926.1101 Section (d)(1) Multi-Employer Work-Site as applicable. In order to provide a safe and healthy environment to all site occupants, the Agency requires the following: 1. For each chemical product used on the site, the Contractor shall provide a copy of the Safety Data Sheet (SDS) to the Agency. 2. Report to the Engineer all spills and personnel exposures occurring in the course of Work on site. The Contractor will be responsible for all spills, personnel exposures, and will bear the cost of cleanup. When reporting a spill, the Contractor shall supply the following information: • Substance(s) spilled • Quantity of spill • Personal injury involved • Exact location of spill • Containment procedures initiated • Anticipated clean up and disposal procedures • Disposal location of spill residue • Assistance required Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 7 of 26 • Narrative summarizing all communication with Local, State, and Federal offices and media contacts with their names and telephone numbers or addresses The Contractor shall take immediate action to clean up the spill unless directed otherwise by the Agency. B. UST Removal Guidance and References: 1. PEI: Publication RP1700 - Recommended Practices for the Closure of Underground Storage Tank and Shop-Fabricated Aboveground Storage Tank Systems. 2. API: 1604 Closure of Underground Petroleum Storage Tanks. 3. API: 2003 Protection Against Ignitions Arising Out of Static, and Stray Currents 4. API: 2015 Requirements for Safe Entry and Cleaning of Petroleum Storage Tanks 5. NFPA 30, Flammable and Combustible Liquids Code/ NFPA 30A, Motor Fuel Dispensing Facilities and Repair Code 6. NFPA 70, National Electric Code (NEC) 7. U.S. Dept of Labor, Occupational Safety and Health Administration (OSHA) 29 CFR 1910.206, Flammable and Combustible Liquids 29 CFR 1910.106, Personal Protective Equipment 8. California Code of Regulations (CCR) Title 22 CCR Hazardous Waste Regulation 9. San Diego Regional Water Board: CCR Title 23 State of California Water Resource Control Board’s Title 23 UST Tank Regulations 10. CCR Title 24 California Building Standards Code 11. State Water Resources Control Board (SWRCB) i. National Pollutant Discharge Elimination System (NPDES) California Storm Water BMP Handbook for Construction, Development, and Industrial and Commercial. 12. State Water Resources Control Board (SWRCB) National Pollutant Discharge Elimination System (NPDES) 13. San Diego Department of Environmental Health and Quality (DEHQ) 14. San Diego County Air Pollution Control District; California Air Resources Board (CARB) Rules and Regulations Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 8 of 26 15. 2022 California Fire Code i. Unidocs: UN-001 UST Closure ii. UN-002 Sump Closure All work specified herein shall conform to or exceed the requirements of the above referenced codes, regulations, and; provided, that whenever the provisions of said publications are in conflict with the requirements specified herein, the stringent requirement shall apply. The Contractor is responsibility to conform with State of California Water Resource Board, CUPA, SDAPCD, and CARB requirements for UST removal and installation. This includes the Hazardous Waste Tank Closure Form. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION 1.1 GENERAL: Provide suitable personnel, material and equipment to clean and remove the fuel piping and tanks and all sludge and liquids that may be in the piping and tanks prior to removal. Take all necessary precautions during removal of the tanks to prevent spills or damage to utilities adjacent to the area. A. Project Security: Construction fencing shall be erected before any construction work, excavation or other site preparation begins. The design of all construction fencing must meet current OSHA standards. Fencing needs to be installed to prevent public access to any construction sites/areas. When fencing is required, it will surround the entire construction activity and be kept in place throughout the construction activity and not removed until the need has ceased and the area made safe. The construction fencing will be reviewed and accepted by the Engineer a minimum of one week prior to its installation. A site logistic plans for fencing shall be submitted by the Contractor. Depending upon the need for protection, construction fencing can be 48” or 60” high. It is not acceptable to place “construction tape” or hazard cones around excavations. B. Locate and clearly mark all subsurface utilities in the area of excavation. Conduct activities to minimize interference with, and to protect the existing surfaces of, adjacent structures and utilities. Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 9 of 26 C. Perform tank removal in a manner that will minimize dust, noise, and other nuisance and maintain haul routes for disposal of material clean and free of debris. D. Stockpile: Soil backfill material shall be stored on site for reuse. Stockpiles shall be kept 5 feet beyond the limits of the excavation. Unsatisfactory soil, per the Geotechnical Report and Engineer, shall be kept separately from reuse soil. Stockpiles shall be kept in a neat and well drained condition. Always consider drainage. 1.2 TANK AND PIPING LIQUID REMOVAL: A. All electrical, water, gas, and other utility services to the demo area shall be de-energized prior to removal of the UST. (Lock-Out-Tag-Out). A. Bond equipment to UST and ground tank to a separate ground when purging tank with compressed air or inert gas under pressure. Purge product lines with nitrogen back to the tank to remove excess fuel in pipelines. Remove all products to their lowest draw- off point. Per SDCAPCD all product in piping to be drained back to the USTs and that the residual free product remaining in the USTs is less than 1/1000 the volume of the original tank size. B. Use a vacuum truck to remove liquid residuals from the UST. Ensure proper grounding. Direct vacuum exhaust away from possible ignition sources. C. Perform final cleaning by triple water rinse of UST with detergent (Simple Green) at 15 psi. Collect liquid with vacuum truck each rinse cycle. 1.3 UST TANK AND PIPING REMOVAL A. Remove UST ancillary equipment (pump turbine, UST sensors, and drop tubes). B. Flammable vapors shall be removed from the USTs by displacement with inert gas. The vapors shall be made inert by adding solid carbon dioxide, (dry ice), in the amount of 1.5 pounds per 100 gallons of tank capacity. The dry ice shall be crushed and distributed evenly over the greatest possible area to ensure rapid sublimation. All available tank openings shall be open to the atmosphere during this procedure to ensure rapid dissipation of the dry ice. C. To evaluate the effectiveness of the dry ice procedure, the Contractor shall use a suitably calibrated instrument to determine if the resultant vapor mixture within the tanks exceeds ten percent of the Lower Explosive Limit (LEL). Readings shall be taken throughout the USTs depth wherever access is possible. If the vapors within the tanks exceed ten percent of the LEL, the displacement procedure shall be repeated followed by a recheck of the LEL until the vapors are less than 10 percent of the LEL. D. Dig down to expose upper half of USTs. During excavation, exercise extreme caution in order to maintain the integrity of the UST. Division 02 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 10 of 26 E. Place excavated contaminated soil material on minimum 6-mil thickness polyethylene in a separate stockpile and protect pending sampling results for appropriate disposal, as hazardous/non-hazardous waste. F. Disconnect suction, inlet, gauge and all other tank fixtures, except the vent line. G. Temporarily plug all tank openings, complete the excavation, and remove the tank, placing it in a secure location. Tank must be blocked to prevent movement. H. Excavate to uncover existing piping associated with the tank. Using no sparking tools, remove tank, hold down straps and dead men, and piping without causing major damage to the tank or piping. Excavate to uncover existing piping associated with the tank. 1.4 UST TANK AND PIPING DISPOSAL A. The Contractor shall submit a lifting plan (lifting plan should be reviewed and approved by a qualified individual) for the UST removal for approval by the Engineer. B. Each UST should be secured onto a truck or vehicle and transported to a certified tank disposal facility, in accordance with all applicable federal, state, and local regulations. The Contractor shall prepare the proper manifests or bills of lading. The facility has an active Environmental Protection Agency (EPA) identification. All waste generated must be shipped under the EPA ID. Waste handlers and haulers shall have proper CA, DOT, and EPA hazardous waste IDs for possible hazardous waste that may be generated during the UST removal. C. The Agency is responsible for soil and groundwater sampling collected per Title 23 CCR 2672 (d) and witnessed by San Diego County Department of Environmental Health and Quality representative. Laboratory sampling will be submitted to a Certified California Testing Laboratory under proper chain of custody. Closure reports shall follow Title 23 requirements. Assist the Agency with the Unified Program Consolidated Form Hazardous Waste Hazardous Waste Tank Closure Certification form, and coordinate and cooperate with the Agency for the required sampling and testing to be performed. END OF SECTION Division 10 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 11 of 26 DIVISION 10 – SPECIALTIES 10 14 00 Signage PART 1 GENERAL 1.1 SIGN COMMUNICATIONS FOR FUEL SYSTEMS 1.2 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.3 DEFINITIONS A. ANSI: American National Standards Institute B. NFPA: National Fire Protection Agency 1.4 QUALITY ASSURANCE Signage shall follow ANSI Z535.4-2023: Product Safety Signs And Labels standards. PART 2 PRODUCTS (NOT USED) PART 3 EXECUTION 1.1 SIGN COMMUNICATIONS FOR FUEL SYSTEMS Signage: See Project Plans. Shall consist of weather resistant stickers or silk-screened aluminum. Signage to include but not limited to: A. Warning Signs shall be conspicuously posted in dispensing area and shall incorporate the following or equivalent wording: a. It is unlawful and dangerous to dispense fuel into unapproved containers. b. No smoking c. Stop motor. d. No filling of portable containers in or on motor vehicle e. Place container on ground before filling. f. Discharge your static electricity before fueling by touching a metal surface away from the nozzle. g. Do not re-enter your vehicle while fueling. h. Do not allow individuals under licensed age to use the pump. B. “EMERGENCY STOP BUTTON” sign will be prominently displayed and mounted at the emergency stop buttons. C. Fire Extinguishers – Fire extinguishers will have heavy duty covers with “FIRE EXTINGUISHER” signs clearly posted on the covers. D. Lettering on the “NO SMOKING” signs will be white and minimum of 2” in height on a red background. Division 10 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 12 of 26 E. Lettering on the “FLAMMABLE” signs will be white and minimum of 3” in height on a red background. F. Lettering on the “EMERGENCY STOP BUTTON” and “OVERFILL ALARM” signs will be white and minimum of 2” in height on a red background. G. Emergency Phone signage (see Division 26 00 00 Section 9) END OF SECTION Division 26 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 13 of 26 DIVISION 26 – ELECTRICAL 26 00 00 Electrical PART 1 GENERAL 1.1 SUMMARY OF WORK: INSTALLATION OF ELECTRICAL EQUIPMENT 1.2 RELATED DOCUMENTS A. Electrical Specifications are presented in the Project Plans. 1.3 DEFINITIONS A. GRC: Galvanized Rigid Conduit B. PVC: Polyvinyl Chloride. C. RMC: Ridge Metal Conduit PART 2 PRODUCTS 1.1 Conduit: Conduit used for this project shall be installed as per Project Plans. All underground conduits shall be PVC with the last segment and transition from underground elbows being PVC coated GRC. All above grade conduit shall be GRC. A. Rigid steel conduit (GRC) and fittings i. Hot dipped galvanized with interior surface coated with baked enamel. ii. Or fittings shall be threaded type with material to match conduit. B. Liquidtight Flexible Conduit and Fittings i. Flexible metal conduit with a PVC jacket. ii. Fittings shall be steel compression type watertight. C. PVC Plastic Conduit and Fittings i. Heavy wall polyvinyl chloride, Schedule 40. ii. Fittings shall be solvent weld type of same material and manufacturer as the conduit. D. Conduit Supports i. Conduit clamps and supports shall be steel or malleable iron with galvanized coating. ii. Use of drive in wood or plumber’s perforated is prohibited. 1.2 Conductors: A. The cable shall be suitable for the intended application and shall be manufactured consistent with the best commercial practice. PART 3 EXECUTION A. Tank Monitoring and Leak Detection: The Contractor will provide and install (1) new Veeder Root TLS 450 console. Division 26 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 14 of 26 A. Tank monitoring and leak detection shall be installed in dedicated low voltage communication conduit. B. Cable shall be shielded type per manufactures recommendations. C. Wiring to tank level probe elements to be installed using shielded twisted pair conductor with drain in ¾” conduit. D. Wiring to tank probes and sensors to be installed using shielded cables such as Beldon 88760, 8760, or 8770 in ¾” conduit or other equivalent brand. E. Install all probe and sensor modules with tank probes and liquid sensors per Veed Root instruction manual. F. All wiring to be installed per Veed Root instruction manual and manufactures specifications. G. Audible / visual overfill alarms must be installed and configured to alarm at 90% capacity. H. Place all conduit and electrical for future PLLD (electronic leak detection). B. Fuel Control System: Veeder Root TLS 450l System is to be utilized. The following outlines the general electrical requirements. The Contractor is responsible for verifying and complying with the specific installation requirements for the equipment. A. The FE Petro system will need to be wired back to dispenser control system. i. Install a 20-amp, 120 Volt, 1-phase circuit for AC power to Fuel management unit from building. ii. All conduits associated with the FE Petro system to be PVC conduits. With last 5ft GRC. iii. Install all wiring to dispenser per FE Petro instruction manual. iv. Telephone line using Cat6 cable to be installed to the FE Petro unit from the electrical room located in the building. v. Install pulse outputs to FE Petro using Belden 8771 conductor or equivalent in ¾” GRC conduits as required. C. Emergency Disconnect Switches: A. Emergency disconnect switches shall be installed per Project Plans. B. Switches shall be clearly identified for their designated purpose. C. Disconnecting switches in the fueling area shall remove power to the submersible pumps and dispensers. END OF SECTION Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 15 of 26 DIVISION 33 – UTILITIES 33 52 10 Fueling System 1.1 SUMMARY OF WORK: INSTALLATION OF NEW UST FUEL SYSTEM A. Provide new Underground Storage Tank (UST) piping, and dispenser systems in accordance with the Project Plans, and the manufacturer’s written instructions, checklists, and warranty requirements for each system component. UST systems include the products, equipment, and systems identified in this section. Components to be installed includes: 1. Install new Veeder Root TLS 450 tank monitoring system. 2. Verify underground utilities. Improve if required. 3. Install two new 20,000-gallon FRP USTs. 4. Install one new 12,000-gallon FRP UST. 5. Install double wall FRP piping from tanks to dispenser island. 6. Install fuel management and leak detection systems. 7. Install new vent rack system. 8. Install new dispenser island with UDCs, Bollards, and dispensers. 9. Install new Canopy. 10. Install new storm water sloped trench drains and oil water separator. 11. Connect new 4” sch 40 PVC sewer pipe to existing VCP sewer pipe connector. 12. Finish concrete and asphalt work per drawings. 13. Install Safety signage at dispenser island and emergency shutoffs. B. Provide all bedding material as specified on the drawings and these specifications. 1.2 RELATED DOCUMENTS A. Project Plans and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. 1.3 DEFINITIONS A. API: American Petroleum Institute. B. CARB: California Air Resources Board C. CCR: California Code of Regulations D. CUPA: Certified Unified Program Agencies E. ELD: Enhanced Leak Detection F. FRP: Fiberglass-Reinforced Plastic G. HASP: Health and Safety Plan. H. ICC: International Code Council I. LEL: Lower Explosive Limit J. NFPA: National Fire Protection Association K. OSHA: Occupational Safety and Health Administration. L. PEI: A. Petroleum Equipment Installation Institute Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 16 of 26 M. PID: Photoionization Detector N. PSI: Pounds per square inch O. SDCAPCD: San Diego County Air Pollution Control District P. STP: Submersible turbine pumps Q. UDC: Under Dispenser Container R. USA: Underground Service Alert S. UST: Underground Storage Tank. 1.4 ACTION SUBMITTALS A. Submit drawings for fabrication and installation of all system components. Include fully dimensioned layout of all piping, equipment and all associated connection details. Coordinate shop drawings with work of other trades. B. Certifications of training from all specified UST and FRP piping manufacturers and all required licenses for underground tank installations installers. C. Primary and secondary tanks shall also be pressure/vacuum tested by the tank manufacturer. Results shall be submitted to the Agency. D. The Contractor shall submit a lifting plan (lifting plan should be reviewed and approved by a qualified individual) for the UST removal for approval by Engineer. E. Product Data: Submit all catalog data and other descriptive literature to fully substantiate the conformance with specifications of equipment and materials submitted. Mark product data to indicate exactly those items that are to be provided and cross out unrelated or non- applicable items. In addition, submit the manufacturer’s detailed installations instruction on all equipment and materials submitted. 1.5 QUALITY ASSURANCE Installation of all systems shall be performed by a Contractor who is a licensed installer for underground tank systems. The Contractor shall be certified by the tank manufacturer as a trained fiberglass piping and tank installer. The Contractor shall install compatible components and shall perform all modifications necessary for the proper operation and guarantee of the equipment. If any of the work or equipment fails to meet the Contract Requirements or to function properly, the defects shall be rectified at the Contractor's own expense by readjusting, or by removing and replacing the faulty work or equipment until, under test, the requirements are met. Equipment and installation necessary to accomplish the work specified herein shall comply with the latest revisions of the applicable federal, state, and local codes and regulations concerning underground or aboveground fuel storage and dispensing systems including but not limited to the following: Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 17 of 26 A. American Petroleum Institute (API) 1615b- Installation of underground storage tanks. B. Petroleum Equipment Installation Institute (PEI) i Publication RP 100 - Recommended Practices for Installation of Underground Liquid Storage Systems ii Publication RP 300 - Recommended Practices for Installation and Testing of Vapor Recovery Systems iii Publication RP 500 – Recommended Practices for Inspection and Maintenance of Motor Fuel Dispensing Equipment iv Publication RP 1200 – Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities C. Underwriters Laboratories, Inc. (UL) i UL-1316 FRP Underground Tanks for Flammable and Combustible Liquids ii UL-971 FRP Nonmetallic Underground Piping For Flammable Liquids iii UL-2039 Flexible Connector Piping for Flammable and Combustible Liquids iv UL-330 A&B Hose and Hose Assemblies for Use with Dispensing Devices v UL-87 A&B Power-Operated Dispensing Devices vi UL 567 A&B Standard for Emergency Breakaway Fittings, Swivel Connectors and Pipe- Connection D. National Fire Protection Association (NFPA) i NFPA 30, Flammable and Combustible Liquids Code ii NFPA 30A, Motor Fuel Dispensing Facilities and Repair Code iii NFPA 70, National Electric Code (NEC) E. U.S. Dept of Labor, Occupational Safety and Health Administration (OSHA) i 29 CFR 1910.206, Flammable and Combustible Liquids ii 29 CFR 1910.106, Personal Protective Equipment F. California Code of Regulations (CCR) Title 22 CCR Hazardous Waste Regulation G. San Diego Regional Water Board: CCR Title 23 State of California Water Resource Control Board’s Title 23 UST Tank Regulations H. State Water Resource Control Board LG 161-5 Enhanced Leak Detection I. CCR Title 24 California Building Standards Code J. San Diego Department of Environmental Health and Quality (DEHQ) K. San Diego County Air Pollution Control District; California Air Resources Board (CARB) Rules and Regulations Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 18 of 26 L. 2022 California Fire Code i Unidocs: UN-001 UST Closure ii UN-002 Sump Closure All work specified herein shall conform to or exceed the requirements of the above referenced codes, regulations and standards; provided, that whenever the provisions of said publications are in conflict with the requirements specified herein, the stringent requirement shall apply. PART 2 PRODUCTS 2.1 EQUIPMENT AND MATERIALS: All equipment and materials covered by the other referenced specifications shall be subject to acceptance through the manufacturer’s certification of compliance with the applicable specifications, when requested by the Agency. 2.2 CERTIFICATION: Manufacturer’s certifications shall not relieve the Contractor of the Contractor’s responsibility to provide materials in accordance with these specifications and acceptable to the Agency. Materials supplied and/or installed that do not materially comply with these specifications shall be removed, when directed by the Agency and replaced with materials which do comply with these specifications, at the sole cost of the Contractor. 2.3 UNDERGROUND TANKS FOR STORAGE OF PETROLEUM A. Fiberglass reinforced plastic (FRP) tanks shall be as manufactured by Xerxes, CSI or equal: 1. Install tanks in strict conformance with manufacturer’s instructions. The Contractor shall be trained by the tank manufacturer for installation of the tanks. 2. Primary and secondary tanks shall be vacuum tested by the tank manufacturer to assure structural integrity. Results shall be provided to the Agency. The UST may be shipped with brine monitoring solution. Verify the condition and level of the brine monitoring solution per manufactures instructions. 3. Tanks shall be double wall construction for containment of leaks with interstitial space between primary (internal) and secondary (external) tank walls to allow for free flow of all leaked product from the primary tank. The interstitial space shall also allow for filling with a brine solution as a hydrostatic leak detection monitoring device with a monitoring fitting and reservoir in the secondary tank wall. Fabricate tanks in conformance with UL-1316 FRP Underground Tanks for Flammable and Combustible Liquids. Primary and secondary tanks shall be constructed and tested at the factory and in the field at 5 psi pressure with 5 to 1 safety factor with no loss in pressure for 24 hours. Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 19 of 26 4. Tank penetrations shown on drawings shall be reviewed for accuracy. Manways shall include a gasket suitable for the material contained within the tank and stainless- steel bolts, nuts and washers. 2.4 PIPING A. Fiberglass Pressurized piping shall be 3” over 2” NOV -A.O. Smith Red Thread fiberglass pipe. Fiberglass piping shall be labeled with a UL 971 markings. Joining shall be bell and spigot tapered adhesive bonded joint with two-part epoxy adhesive for primary product piping system. Adhesives shall be a two-part amine cured epoxy in use for a period of at least 5 years. They will be 100% methanol and ethanol compatible. The glue will have a cure temperature of 4-6 hours at 50 degrees. Secondary containment fittings shall be clamshell wing nut bolted fittings for. Secondary containment piping and fittings shall be one pipe size larger than primary product piping and fittings. Both primary and secondary containment piping shall be sloped to drain back to tank at slopes indicated on drawings. Primary piping systems shall be rated at 150 psi working pressure (-60 to 150 degrees F). Secondary containment piping system shall be 5 psi working pressure. B. Ridge Piping: Black steel piping ASTM A53 shall be Schedule 40 in sumps and schedule 80 for vent stacks. All aboveground piping shall be painted. Full port ball valve with swivel flex connector shall be installed at the submersible pumps to allow for system isolation and testing. Directional check valves shall be installed in each of the diesel STP sumps. The Contractor’s installation technician shall hold a current manufactures training certificate for the piping material. C. Flexible Piping: In Sumps and UDC applications: Stainless steel UL 2039 flex connectors. Emergency shut-off valves with swivel flex connectors shall be installed at the dispensers. All piping runs shall be continuous, whereby there shall be no fittings or piping connections, for either the primary or secondary containment pipe which are not visible or accessible from the above ground surface. The secondary containment system shall provide water tight containment of the primary piping. Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 20 of 26 2.5 UNDERGROUND TANKS ANCILLARY EQUIPMENT A. Monitoring System Tank Monitoring System (No Substitutions) – The new system will be the Veeder Root monitoring system to be located in the cabinet per Project Plans. The controller consists of inventory management, static leak detection, alarms, delivery function, TCP/IP, USB interface; POS interface, and comes complete with two output relays and one input relay to include: 1. Sump sensors non discriminating: Veeder Root VR 791390-208. 2. Mini Hydrostatic Sensor: Veeder Root VR-791380-301. 3. Pump electronic Line leak detector. Veeder Root 848480-001. 4. ATG, tank level magnetostrictive probe: Veeder Root 846390-109. 5. Tank Level Float Kit: Veeder Root 846400-001. 6. Vacuum sensor kit: Veeder Root VR-330020-180. 7. Interstitial Liquid Sensor. Veeder Root VR-794390-303 8. Mini Hydrostatic sensor. Veeder Root VR-794380-304. B. Cap and Adapters – Fill cap to be OPW 634TT, fill adapter to be OPW 61SA swivel adapter, vapor cap to be OPW 1711T, vapor adapter to be OPW 61VSA swivel adapter or equivalent for clamp and adapters. C. Spill Protection – Shall consist of OPW Fibrelite MP with Drain double-wall 5-gallon spill bucket Valve and Cast Iron Base or equal on the fill and on the vapor recovery riser. Product connection with OPW Swivel Adaptors. D. Overfill Drop Tube – Drop tube to be OPW 61T-SS with OPW 71SO overfill prevention valve or equal. E. Manhole Covers & Lids – STP manhole cover to be composite bolt down and meet or exceed Highway Specification-20 (H20). F. Piping STP Sump: G. Under Dispenser Containment (UDC): 1. UDC by Bravo: Double wall brine filled with Fiberglass test boot. 2. Shall be installed in 6” raised island 3. Equipped with a liquid sensors 4. Detection of liquid in these containment vessels shall positively shut down the submersible turbine pump 5. Shear Valve: Gas & Diesel: OPW OPW-10BHMP-5830. Shear Vapor OPW OP60-VSP- 100. 6. Pressure/Vacuum Vent Caps to be OPW 623V or similar to meet NESHAP requirement for >100,000 gal/mo. H. Submersible Turbine Pump (STP) Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 21 of 26 1. Diesel STPs shall be FE Petro 2hp (STP200-VL2) with electronic line leak detection and prepped for PLLD or equal equipment. 2. Unleaded STPs shall be FE Petro 2hp (STP200-VL2) with electronic line leak detection and prepped for PLLD or equal equipment. I. Venting 1. Carbon canister for vapor polishing. Veeder Root. Electronic vapor sensor. 2. Unleaded pressure vacuum vent by OPW. Diesel rain guard cap by OPW. 3. Vent Riser Containment Sump: Bravo FR-3X2-T Brine 4. Flex connectors by Flexing FFEZ20X24. J. Dispensers The unleaded and diesel dispensers are single product single hose minimum Gasboy Atlas 1+0 Dispensers. 1. Unleaded hose 12-foot Coaxial balance whip hose from Continental. Diesel hose 8-foot from Continental. 2. Unleaded ERVR Nozzle by VST. Diesel nozzle by Huskey. 3. This dispenser shall be configured and wired to work with the fuel management system. 4. The dispenser shall be equipped with all hoses, nozzles, swivels, breakaways and filters. PART 3 EXECUTION 1.1 GENERAL: All aspects of this system shall be installed in accordance with the equipment manufacture specifications. Monitor quality control over suppliers, manufacturers, products, services, site conditions, and workmanship to produce Work of specified quality. Coordinate all work through the Engineer. Follow fabrication/manufacturer’s instructions. Install fuel system with anchorage devices designed to withstand stresses, vibration, physical distortion, and disfigurement. Discrepancies should be brought to the attention of the Engineer and resolved prior to proceeding. Specified standards are considered minimum quality for the Work. Follow higher standards where applicable and appropriate. 1.2 Quality Control Testing & Inspection – Quality testing shall be performed by the Contractor at their expense unless otherwise noted and shall include but not be limited to: A. New fuel system testing. B. Concrete testing during new fuel system installation provided by Agency. C. All testing will be performed in accordance with applicable standards, regulations and manufactures recommended procedures. D. All testing shall be witnessed by the applicable agencies and the Engineer. Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 22 of 26 E. Documentation of all testing shall be provided to the Agency upon completion. 1.3 UNDERGROUND STORAGE TANKS: All testing will be performed in accordance with the State of California Title 23 Storage Tank Regulations and manufactures recommended procedures. The USTs shall be manufactured by Xerxes or CSI double wall fiberglass 20,000-gallon and 12,000-gallon tanks with the Truchek brine system or equal. USTs shall include fiberglass attached collars for sumps. The USTs shall have double walled sumps (42”) for STP and fill/Vapor ports with watertight flat sealed multiport covers. A. Excavation Preparation: Preparation of the excavation for the USTs shall follow recommendations from the “Geotechnical Evaluation Carlsbad Underground Storage Tank (UST) Replacement” Ninyo & Moore, 2021. B. Excavation for tanks shall be large enough to provide a minimum clearance of 12 inches between the ends and sides of tanks and the sides of the excavation. Tanks shall be at least 12 inches apart. C. Settlement Notes: Settlement may cause tank distortion and subsequent system failure. Excavation and backfill material specifications must be followed. If any movement or settlement or distortion occurs, it will be presumed that the Contractor has not followed proper installation techniques. The Contractor shall immediately undertake at their expense any necessary corrective actions required to mitigate the problem and replace damaged parts. D. Place 12-inches bedding material smooth and level over excavation floor prior to placement of the USTS. The USTs must be set level. Place 12-inch backfill material evenly around tank after the USTs are set. Ensure backfill is placed around ribs with no voids. E. Unloading and placement of the USTs in the excavations shall be conducted per the lifting plan. When using multiple lifting lugs sling should never exceed 60 degrees. Do not wrap chains or cables around the tank for lifting. F. Tank shall be sloped according to the Project Plans. If the USTs are sloped the brine reservoir should be at the high end. G. Place backfill material evenly on opposite sides of the tank so that the tank does not shift. H. Test the USTs by enhanced leak detection methods per manufactures instructions. Do not add monitoring fluid until after the tank burial is complete. I. Measure tank defection prior to placement of reinforced concrete cover placement. 1.4 TANK APPURTENANCES A. General: Tank appurtenances shall be as shown on Project Plans and specified below. Appurtenances shall be Underwriters Laboratories (UL) listed for underground storage Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 23 of 26 of petroleum products. All appurtenances exposed to the earth in final installation shall, where practical, be shop installed, tested and painted/coated with the same coating going on the tanks before shipment to the site. B. UST Sumps Shall be constructed of double wall fiberglass. Sumps shall be constructed with a water tight manway lid and equipped with a liquid sensor. Concrete penetrations for the pump turbines and fill ports shall be constructed as follows. 1. Concrete around port covers shall slope two (2) percent away from lids to shed precipitation. 2. The underside of the frame must be adequately supported by concrete. 3. Install FL Series frame flush with concrete or 1/16" below grade (to allow for traffic clearance). 1.5 TANK PIPING INSTALLATION: A. All fiberglass piping shall be installed and supported in pea gravel, in accordance with the Manufacturer's recommendations, applicable codes, and as shown on the Project Plans. B. All fill, suction, return, vent, and diesel discharge lines shall be sloped towards the storage tank at minimum 1 inch per 8 feet of pipe, or as approved by the Engineer. The Contractor shall set the tanks to provide sufficient slope to the tanks. C. Vent Pipes: Each tank shall be provided with a separate vent pipe. It shall not be less than 2 inches in diameter and shall run from the tank to the outer air and terminate at a height greater than the fill pipe opening and 12 feet above the roof of any adjacent building in a non-hazardous location. All outside exposed vent pipes shall be Sch. 80 galvanized steel. D. All pipes and valves, except where otherwise indicated, shall be arranged so as to be easily accessible for maintenance and repairs. No change in the general arrangement indicated on the Project Plans will be allowed unless approved by the Engineer. Where lengths of pipe are finally assembled, the fittings shall be in correct alignment without forcing them into position. E. All pipes shall be cut accurately. Deformed or damaged pipe shall in no case be used. All bends shall be made with standard elbows and fittings. All threads shall be cleaned thoroughly and covered with suitable joint compound before joints are made. Every piece of pipe, valve, and fitting which is part of the pipe work shall be cleaned thoroughly before and, whenever possible, after installation. 1.6 TANK & PIPING TESTING: A. Each tank containment sump assembly shall be tested in accordance with the manufacturer’s testing equipment and methods to verify the integrity of the sump Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 24 of 26 assembly. This test shall demonstrate that the sump assembly, including all piping and conduit entry boots, the tank manway, and the manhole cover and frame assembly, is watertight. Each containment sump assembly shall be tested in the presence of the Engineer at different stages of installation to verify the integrity of the sump assembly. This test shall be performed on each sump assembly after installation of piping and conduit, after placement of backfill, and when tank top slab is installed and installation is complete. If a sump assembly fails this test, the Contractor shall take appropriate steps, at his own expense, to correct the installation until he can demonstrate that the sump is watertight. B. Primary product, vent and vapor piping shall be pressure and soap tested at 70 psi for one hour 24 hours after curing in front of third-party inspector. C. Secondary product, vent and vapor piping shall be pressure and soap tested at 5 psi operating pressure 24 hours after curing in front of third-party inspector. D. The STP sump, under dispenser containment, and spill bucket shall be hydro tested in accordance with state regulations. Only mechanical repairs shall be permitted. E. Third-Party verification of Brine in UDCs, vent boxes, turbine and fill sumps F. Perform Enhanced Leak Detection (ELD) Pretest per the State Water Resource Board guidance LG-161-5. ELD is a test method that ascertains the integrity of an underground storage tank (UST). ELD must be permed by a certified third-party inspector, and must be capable of detecting both a vapor or liquid release at a rate of at least 0.005-gallons per hour. Qualified individuals must have the proper California Contractors License listed in Section 02 41 00-DEMOLITION, 1.5 and possess all manufacturers’ certificates of training for those equipment on which they are working on. Any failures must be reported to the Agency immediately. 1.7 INSPECTION AND REPORTING A. During the installation of the fueling systems the Contractor shall coordinate the required inspections to be witnessed by State agencies including the CUPA or the local fire department. Including but not limited to the following points during the project: 1. When ELD testing is performed 2. When the piping is pressure/soap tested 3. When the containment/sumps are hydro tested 4. Just prior to commissioning for service for final inspection of the entire functioning system 5. Perform Enhanced Leak Detection (ELD) Final Testing 6. The systems shall not be commissioned for service until a written authorization has been received from CUPA and the local fire department. 7. Thirty (30) day registration update after installation with CUPA. Division 33 Date Printed: September 4, 2024 Document Version: 1.0 Current Update: February 2024 Page 25 of 26 B. The Engineer must be notified 72 hours prior to each scheduled inspection. Prior to commissioning the systems for service, all systems shall be function tested and shall include but not be limited to: 1. Emergency stop and resets. 2. Liquid sensors in transition sumps and under dispenser containment 3. Mechanical Leak Detectors. 4. Confirm hydraulic continuity during startup to dispensers. 5. Audible / Visual overfill alarms. 6. Function test of all liquid sensors. Results of this function testing shall be documented and presented to the Agency prior to placing the system into service. 1.8 DEMONSTRATION AND TRAINING A. Train Agency’s personnel on procedures and schedules related to start-up and shutdown, troubleshooting, servicing, and preventive maintenance. B. Representatives of equipment suppliers for the tank monitoring system shall provide necessary training and technical support to the Agency so that the Agency may properly operate and maintain the system. END OF SECTION END OF SPECIFICATIONS Cabling guidelines for Low Voltage and Data PWS24-2282FAC Please have vendors / contractors adhere to these standards for City of Carlsbad cable installation 1 – No Zip ties. Zip ties are wasteful and not environmentally friendly. Velcro / Hook and Loop cable management to be used in normal installs. 2 - CAT6 - 23-24 awg only. Blue jacket is preferred for indoor use however supply chain may cause use of another color. For outdoor installation, black OSP is standard. 3 – all terminations T568B only on Rj-45 Cat6 jacks. No modular plug ends to be used unless approved for application 4 – all terminations to be housed in appropriate surface box or wall plate at station side. MDF / IDf side to be terminated on patch panel. 5 – Labelling of cables - both ends required. 6 – all cable installations to be tested with OTDR with results provided to City in digital format. 7 – each drop to have “jet line” or nylon pull string / rope installed with run. If multiple cables are run in same path then only one jet line is required. 8 – Wiremold will not be used unless it is an extenuating circumstance. Geotechnical Evaluation Carlsbad Underground Storage Tank (UST) Replacement 2480 Impala Drive Carlsbad, California Kimley-Horn & Associates 401 B Street, Suite 600 | San Diego, California 92101 March 26, 2021 | Project No. 109168002 Geotechnical | Environmental | Construction Inspection & Testing | Forensic Engineering & Expert Witness Geophysics | Engineering Geology | Laboratory Testing | Industrial Hygiene | Occupational Safety | Air Quality | GIS 5710 Ruffin Road | San Diego, California 92123 | p. 858.576.1000 | www.ninyoandmoore.com Geotechnical Evaluation Carlsbad Underground Storage Tank (UST) Replacement 2480 Impala Drive Carlsbad, California Mr. Peter Ritchey Kimley-Horn & Associates 401 B Street, Suite 600 | San Diego, California 92101 March 26, 2021 | Project No. 109168002 Bridgette R. Hassett, PE Senior Staff Engineer Christina A. Tretinjak, PG, CEG Senior Project Geologist Jeffrey T. Kent, PE, GE Principal Engineer BRH/CAT/JTK/gg Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 i CONTENTS 1 INTRODUCTION 1 2 SCOPE OF SERVICES 1 3 SITE AND PROJECT DESCRIPTION 1 4 SUBSURFACE EXPLORATION 2 5 GEOTECHNICAL LABORATORY TESTING 2 6 SUBSURFACE CONDITIONS 2 6.1.Site Geology 3 6.1.1. Pavement Section 3 6.1.2. Fill 3 6.1.3. Lusardi Formation 3 6.1.4. Granitic Rock 3 6.2. Groundwater 4 7 CONCLUSIONS 4 8 RECOMMENDATIONS 5 8.1.Earthwork 5 8.1.1. Site Preparation 5 8.1.2. Excavation Characteristics 5 8.1.3. Temporary Excavations and Shoring 6 8.1.4. Bedding Material and Modulus of Soil Reaction (E’) 7 8.1.5. Pipe and Tank Zone Backfill 7 8.1.6. Utility Trench Zone Backfill 8 8.2.Rigid Pavements 9 9 PRE-CONSTRUCTION CONFERENCE 9 10 PLAN REVIEW AND CONSTRUCTION OBSERVATION 9 11 LIMITATIONS 10 12 REFERENCES 11 Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 ii FIGURES 1 – Site Location 2 – Boring Location 3 – Geology 4 – Lateral Earth Pressures for Braced Excavation APPENDICES A – Boring Log B – Geotechnical Laboratory Testing Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 1 1 INTRODUCTION In accordance with your authorization, we have performed a geotechnical evaluation for the proposed removal and replacement of three underground fuel storage tanks (USTs) at the City of Carlsbad’s Fleet Services & Repair Facility located at 2480 Impala Drive in Carlsbad, California (Figure 1). This report presents the results of our field exploration and laboratory testing as well as our conclusions regarding the geotechnical conditions at the site and our recommendations for the proposed tank removals and replacements. 2 SCOPE OF SERVICES Our scope of services included the following: •Reviewing background information, including geologic maps, groundwater data, and available published and in-house geotechnical literature pertaining to the site. •Performing a site reconnaissance to observe the existing site conditions and to mark out the boring location for utility clearance by Underground Service Alert (USA). •Coordinating with a private utility locating company to assist in the clearance of our boring location for the potential presence of underground utilities. •Performing a subsurface exploration consisting of the drilling, sampling, and logging of one small-diameter boring (B-1) using a truck-mounted drill rig equipped with 8-inch diameter, hollow stem augers. The boring extended to a depth of approximately 19.8 feet. Bulk and in- place samples were obtained at selected intervals from the boring. The soil samples were transported to our in-house geotechnical laboratory for testing. •Performing geotechnical laboratory testing on representative samples to evaluate their pertinent soil characteristics and design parameters. •Compiling and performing an engineering analysis of the information obtained from our background review, subsurface exploration, and laboratory testing. •Preparing this geotechnical report presenting our findings, conclusions, and geotechnical recommendations for the project. 3 SITE AND PROJECT DESCRIPTION The project includes the proposed removal of two 20,000-gallon gasoline tanks and one 12,000-gallon diesel tank at the City of Carlsbad’s Fleet Services & Repair Facility located at 2480 Impala Drive in Carlsbad, California (Figure 1). The existing tanks are to be replaced with three new tanks of roughly the same size and in roughly the same footprint. The existing tanks are located within a flat, paved area of the facility. The ground surface elevation at the UST locations is approximately 367 feet above mean sea level (MSL). Based on our Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 2 review of drawings provided, we understand that the tanks are cylindrical in shape (Ruhnau McGavin Ruhnau/Associates, 1985). However, tank depths and dimensions are not provided on the drawings. Following the replacement of the USTs, we understand that the ground surface and pavements are to be replaced. 4 SUBSURFACE EXPLORATION Our subsurface exploration was conducted on February 23, 2021 and included the drilling, logging, and sampling of one small-diameter boring (B-1). The purpose of the boring was to evaluate subsurface conditions and to collect soil samples for laboratory testing. Prior to commencing the subsurface exploration, USA was notified and a private utility locator was utilized to clear our work location of underground utility conflicts. The boring was drilled to a depth of approximately 19.8 feet using a truck-mounted drill rig equipped with 8-inch diameter hollow-stem augers. Ninyo & Moore personnel logged the exploration in general accordance with the Unified Soil Classification System (USCS) and ASTM International (ASTM) Test Method D 2488 by observing cuttings and drive samples. Representative bulk and in-place soil samples were collected at selected depths from within the exploratory boring and transported to our in-house geotechnical laboratory for analysis. The approximate location of the exploration is presented on Figure 2. The log of the boring is presented in Appendix A. 5 GEOTECHNICAL LABORATORY TESTING Geotechnical laboratory testing was performed on representative soil samples collected from our subsurface exploration. Testing included an evaluation of in-situ dry density and moisture content along with shear strength. The results of the in-situ dry density and moisture content tests are presented on the boring log in Appendix A. The results of the shear strength test and a description of the test methods used are presented in Appendix B. 6 SUBSURFACE CONDITIONS Our findings regarding regional and site geology, including groundwater conditions, at the site are provided in the following sections. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 3 6.1. Site Geology The site is mapped as being underlain by the Lusardi Formation (Kennedy and Tan, 2007; Figure 3). Geologic units encountered during our subsurface exploration included fill, materials of the Lusardi Formation, and granitic rock. Generalized descriptions of the earth units encountered during our subsurface exploration and mapped at the site are provided in the subsequent sections. Additional descriptions of the subsurface units are provided on the boring log in Appendix A. 6.1.1. Pavement Section A pavement section was encountered in boring B-1 at the ground surface and consisted of approximately 3 inches of asphalt concrete (AC) underlain by approximately 6 inches of aggregate base material. Variations in pavement section thicknesses and subgrade materials may be encountered in other areas of the project. 6.1.2. Fill Fill soils were encountered below the pavement section in boring B-1. The fill materials extended to a depth of approximately 3 feet. These materials generally consisted of yellowish brown, moist, medium dense, silty fine to coarse sand with gravel. Documentation of the placement and compaction of existing fill was not available for our review, however, we expect that the fill was placed as backfill of the excavation resulting from tank installation. 6.1.3. Lusardi Formation Materials of the Lusardi Formation were encountered beneath the fill materials in boring B-1 and extended to a depth of approximately 17 feet. The materials of the Lusardi Formation generally consisted of yellowish brown, moist, weakly to strongly cemented, clayey fine- to coarse-grained sandstone. Scattered gravel and cobbles were encountered within the materials of the Lusardi Formation. 6.1.4. Granitic Rock Granitic rock was encountered beneath the Lusardi Formation in boring B-1 and extended to the depth explored. As encountered, the granitic rock was generally light gray, moist, slightly weathered, and coarse-grained. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 4 6.2. Groundwater Groundwater was not encountered in our exploratory borings at the site. Based on review of topographic and geologic data in the site vicinity, groundwater is anticipated at depths greater than 50 feet. However, perched water may be encountered at shallower depths such as the contact between fill and formational materials, as well as within existing utility trench backfill materials, as they tend to act as conduits for perched water. Fluctuations in the level of groundwater may occur due to variations in ground surface topography, subsurface stratification, rainfall, irrigation practices, and other factors, which may not have been evident at the time of our field evaluation. 7 CONCLUSIONS Based on our geotechnical evaluation, it is our opinion that the proposed UST removal and replacement is feasible from a geotechnical standpoint, provided the following recommendations are incorporated into the design and construction of the project. Geotechnical considerations and conclusions include the following: • The site is generally underlain by fill materials, materials of the Lusardi Formation, and granitic rock. • Groundwater was not encountered in our boring. However, perched water may be encountered at shallower depths such as the contact between fill and formational materials, as well as within existing utility trench backfill materials. Fluctuations in the level of groundwater may occur due to variations in ground surface topography, subsurface stratification, rainfall, irrigation practices, and other factors which may not have been evident at the time of our field evaluation. • Excavations within the fill materials are generally considered feasible with heavy-duty earthmoving equipment in good working order. • Difficult excavating should be anticipated within the Lusardi Formation and granitic rock due to the presence of cobbles and boulders, and the potential for strongly cemented zones and/or concretions. Such conditions may require the use of heavy ripping and rock breaking. • Materials derived from onsite excavations are generally considered suitable for reuse as general compacted backfill, provided they are processed to remove oversized materials and meet the recommendations provided herein. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 5 8 RECOMMENDATIONS Based on the results of our subsurface evaluation and our understanding of the proposed construction, we present the following general geotechnical recommendations relative to the proposal UST removal and replacement at the site. The proposed site improvements should be constructed in accordance with the requirements of the applicable governing agencies. 8.1. Earthwork In general, earthwork should be performed in accordance with the recommendations presented in this report. Ninyo & Moore should be contacted for questions regarding the recommendations or guidelines presented herein. 8.1.1. Site Preparation Prior to performing excavations or other earthwork, the site should be cleared of trash and debris. Existing utilities should be relocated and protected from damage by construction activities. Materials generated from the demolition and clearing operations should be removed from the project site and disposed of at a legal dump site. 8.1.2. Excavation Characteristics Based on our exploratory boring, along with a review of geologic background materials, we anticipate that excavation of the fill soils may generally be accomplished with heavy-duty grading equipment in good operating condition. However, based on our borings and experience, cobbles and strongly cemented zones should be anticipated within the materials of the Lusardi Formation, and unweathered rock and corestones should be anticipated in the granitic rock. We expect that excavations extending into materials of the Lusardi Formation and granitic rock will encounter very difficult excavation conditions, and the contractor should be prepared to utilize heavy ripping and rock breaking. Excavations extending into portions of the Lusardi Formation will generate oversize material and additional processing and handling of these materials, including screening or rock picking, should be anticipated. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 6 8.1.3. Temporary Excavations and Shoring For temporary excavations, we recommend that the following Occupational Safety and Health Administration (OSHA) soil classifications be used: Fill Type C Lusardi Formation and Granitic Rock Type B Upon making the excavations, the soil classifications and excavation performance should be evaluated in the field by the geotechnical consultant in accordance with the OSHA regulations. Temporary excavations should be constructed in accordance with OSHA recommendations. For trenches or other excavations, OSHA requirements regarding personnel safety should be met using appropriate shoring (including trench boxes) or by laying back the slopes to no steeper than 1.5:1 (horizontal to vertical) in fill and to no steeper than 1:1 (horizontal to vertical) in materials of the Lusardi Formation and in granitic rock. Onsite safety of personnel is the responsibility of the contractor. In areas with limited space for construction, where temporary excavations may not be laid back at the recommended slope inclination, a shoring system may be incorporated to support the excavation sidewalls and protect existing utilities during construction. A shoring system with bracing should be designed using the magnitude and distribution of lateral earth pressures presented on Figure 4. The recommended design earth pressures are based on the assumptions that: (a) the shoring system is constructed without raising the ground surface elevation behind the shoring, (b) there are no surcharge loads, such as soil stockpiles, construction materials, or vehicular traffic, and (c) no loads act above a 1:1 plane extending up and back from the base of the shoring system. For shoring subjected to the above-mentioned surcharge loads, the contractor should include the effect of these loads on lateral earth pressures acting on the shoring wall. Settlement of the ground surface may occur behind the shoring wall during excavation. The amount of settlement depends on the type of shoring system, the quality of contractor’s workmanship, and soil conditions. Settlement may cause distress to adjacent structures, if present. To reduce the potential for distress to adjacent structures, we recommend that the shoring system be designed to limit the ground settlement behind the shoring to ½ inch or less. Possible causes of settlement that should be addressed include excavation for construction, construction vibrations, and removal of the support system. We recommend that the potential settlement distress be evaluated carefully by the contractor prior to construction. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 7 The contractor should retain a qualified and experienced engineer to design the shoring system. The shoring parameters presented in this report are for preliminary design purposes and the contractor should evaluate the adequacy of these parameters and make appropriate modifications for their design. We recommend that the contractor take appropriate measures to protect workers. OSHA requirements pertaining to worker safety should be observed. We further recommend that the construction methods provided herein be carefully evaluated by a qualified specialty contractor prior to commencement of the construction. 8.1.4. Bedding Material and Modulus of Soil Reaction (E’) We recommend that the new tanks and utility pipes be supported on 6 inches or more of granular bedding material. Granular tank bedding should be provided to distribute vertical loads around the tank. Bedding material and compaction requirements should be in accordance with this report. Tank bedding typically consists of graded aggregate with a coefficient of uniformity of three or more. The modulus of soil reaction (E') is used to characterize the stiffness of soil backfill placed at the sides of buried flexible tanks for the purpose of evaluating deflection caused by the weight of the backfill over the tank (Hartley and Duncan, 1987). A soil reaction modulus of 1,600 pounds per square inch (psi) may be used for an excavation depth of up to about 5 feet when backfilled with granular soil compacted to a relative compaction of 90 percent as evaluated by the ASTM D 1557. A soil reaction modulus of 2,200 psi may be used for excavation depths of more than 5 feet when backfilled with granular soil compacted to a relative compaction of 90 percent as evaluated by the ASTM D 1557. 8.1.5. Pipe and Tank Zone Backfill The pipe and tank zone backfill should be placed on top of the pipe bedding material and extend to 1 foot or more above the top of the pipe in accordance with the recent edition of the Standard Specifications for Public Works Construction (“Greenbook”). Pipe and tank zone backfill should have a Sand Equivalent (SE) of 30 or more and be placed around the sides and top of the pipe. Silts and clays should not be used as pipe or tank zone backfill. Special care should be taken not to allow voids beneath and around the pipe or tank. Compaction of the pipe and tank zone backfill should proceed up both sides of the pipe or tank. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 8 It has been our experience that the voids within a crushed rock material are sufficiently large to allow fines to migrate into the voids, thereby creating the potential for sinkholes and depressions to develop at the ground surface. If open graded gravel is utilized as pipe and tank zone backfill, this material should be separated from the adjacent excavation sidewalls and overlying trench zone backfill with a geosynthetic filter fabric. 8.1.6. Utility Trench Zone Backfill In general, the existing onsite materials are considered suitable for reuse as utility trench zone backfill material, provided that oversize materials (i.e., materials with dimensions in excess of those outlined herein) are crushed, screened, or removed from the soil mass prior to reuse. Backfill material should be free of trash, debris or other deleterious materials. Material for use as backfill should not contain rocks or lumps greater than approximately 3 inches in size. Imported fill material, if used, should generally be granular soils with a very low to low expansion potential (i.e., an EI of 20 or less). Import fill material should also be non-corrosive in accordance with the Caltrans amended (2019) AASHTO (2017) corrosion criteria. Non-corrosive soils are soils that possess an electrical resistivity more than 1,100 ohm-centimeter (ohm-cm), a chloride content less than 500 parts per million (ppm), less than 0.15 percent sulfates, and a pH greater than 5.5. Materials for use as fill should be evaluated by Ninyo & Moore’s representative prior to filling or importing. Trench zone backfill should be moisture-conditioned to generally at or slightly above the laboratory optimum. Trench zone backfill should be compacted to a relative compaction of 90 percent as evaluated by ASTM D 1557, except for the upper 12 inches of the backfill beneath vehicular pavements that should be compacted to a relative compaction of 95 percent as evaluated by ASTM D 1557. Lift thickness for backfill will depend on the type of compaction equipment utilized, but fill should generally be placed in lifts not exceeding 8 inches in loose thickness. Special care should be exercised to avoid damaging the pipe or tanks during compaction of the backfill. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 9 8.2. Rigid Pavements We anticipate that the existing rigid Portland Cement Concrete (PCC) pavements overlying the existing USTs are going to be demolished and replaced as part of the project. The replacement PCC pavements should be constructed such that the concrete thickness, reinforcement, and aggregate base material underlayment match the existing PCC pavement sections or consist of 8 inches of 600 pounds per square inch (psi) flexural strength Portland cement concrete reinforced with No. 4 bars, 18-inches on center, placed over 4 inches of aggregate base materials, whichever is thicker. We recommend that the upper 12 inches of the subgrade soils along with the aggregate base materials be compacted to a relative compaction of 95 percent relative compaction as evaluated by the current version of ASTM D 1557. 9 PRE-CONSTRUCTION CONFERENCE We recommend that a pre-construction meeting be held prior to commencement of grading. The owner or his representative, the agency representatives, the architect, the civil engineer, Ninyo & Moore, and the contractor should attend to discuss the plans, the project, and the proposed construction schedule. 10 PLAN REVIEW AND CONSTRUCTION OBSERVATION The conclusions and recommendations presented in this report are based on analysis of observed conditions in widely spaced exploratory borings. If conditions are found to vary from those described in this report, Ninyo & Moore should be notified, and additional recommendations will be provided upon request. Ninyo & Moore should review the final project drawings and specifications prior to the commencement of construction. Ninyo & Moore should perform the needed observation and testing services during construction operations. The recommendations provided in this report are based on the assumption that Ninyo & Moore will provide geotechnical observation and testing services during construction. In the event that it is decided not to utilize the services of Ninyo & Moore during construction, we request that the selected consultant provide the client and Ninyo & Moore with a letter indicating that they fully understand Ninyo & Moore’s recommendations, and that they are in full agreement with the design parameters and recommendations contained in this report. Construction of proposed improvements should be performed by qualified subcontractors utilizing appropriate techniques and construction materials. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 10 11 LIMITATIONS The field evaluation, laboratory testing, and geotechnical analyses presented in this report have been conducted in general accordance with current practice and the standard of care exercised by geotechnical consultants performing similar tasks in the project area. No warranty, expressed or implied, is made regarding the conclusions, recommendations, and opinions presented in this report. There is no evaluation detailed enough to reveal every subsurface condition. Variations may exist and conditions not observed or described in this report may be encountered during construction. Uncertainties relative to subsurface conditions can be reduced through additional subsurface exploration. Additional subsurface evaluation will be performed upon request. Please also note that our evaluation was limited to assessment of the geotechnical aspects of the project, and did not include evaluation of structural issues, environmental concerns, or the presence of hazardous materials. This document is intended to be used only in its entirety. No portion of the document, by itself, is designed to completely represent any aspect of the project described herein. Ninyo & Moore should be contacted if the reader requires additional information or has questions regarding the content, interpretations presented, or completeness of this document. This report is intended for design purposes only. It does not provide sufficient data to prepare an accurate bid by contractors. It is suggested that the bidders and their geotechnical consultant per- form an independent evaluation of the subsurface conditions in the project areas. The independent evaluations may include, but not be limited to, review of other geotechnical reports prepared for the adjacent areas, site reconnaissance, and additional exploration and laboratory testing. Our conclusions, recommendations, and opinions are based on an analysis of the observed site conditions. If geotechnical conditions different from those described in this report are encountered, our office should be notified, and additional recommendations, if warranted, will be provided upon request. It should be understood that the conditions of a site could change with time as a result of natural processes or the activities of man at the subject site or nearby sites. In addition, changes to the applicable laws, regulations, codes, and standards of practice may occur due to government action or the broadening of knowledge. The findings of this report may, therefore, be invalidated over time, in part or in whole, by changes over which Ninyo & Moore has no control. This report is intended exclusively for use by the client. Any use or reuse of the findings, conclusions, and/or recommendations of this report by parties other than the client is undertaken at said parties’ sole risk. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 11 12 REFERENCES American Association of State Highway and Transportation Officials (AASHTO), 2017, AASHTO LRFD Bridge Design Specifications, 8th Edition: dated September. Building News, 2018, “Greenbook,” Standard Specifications for Public Works Construction: BNI Publications. California Building Standards Commission, 2019, California Building Code (CBC): California Code of Regulations, Title 24, Part 2, Volumes 1 and 2. California Department of Transportation (Caltrans), 2019, California Amendments to the AASHTO LRFD Bridge Design Specifications (2017 Eighth Edition): dated April. Google Earth, 2021, https://www.google.com/earth/. Harden, D.R., 2004, California Geology, 2nd ed.: Prentice Hall, Inc. Hartley, J.D., and Duncan, J.M., 1987, E’ and Its Variation with Depth: American Society of Civil Engineers (ASCE), Journal of Transportation Engineering, Vol. 113, No. 5: dated September. Kennedy, M.P and Tan, S.S., 2007, Geologic Map of the Oceanside 30’ x 60’ Quadrangle, California, California Geological Survey, Regional Geologic Map Series, Map No. 2, Scale 1:100,000. Ninyo & Moore, In-house Proprietary Data. Norris, R. M. and Webb, R. W., 1990, Geology of California, Second Edition: John Wiley & Sons, Inc. Ruhnau McGavin Ruhnau/Associates, 1985, City of Carlsbad Public Safety & Service Center, Bid Set, Sheet P-6: dated April 1. Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 FIGURES SITE " !o 0 1,500 3,000 FEET MAP INDEX San DiegoCounty 1_109168002_SL.mxd 3/15/2021 AOB NOTE: DIRECTIONS, DIMENSIONS AND LOCATIONS ARE APPROXIMATE. | SOURCE: ESRI WORLD TOPO, 2021 SITE LOCATIONFIGURE 1 109168002 | 3/21 CARLSBAD UST REPLACEMENT 2480 IMPALA DRIVE, CARLSBAD, CALIFORNIA @A ORION WAY IMPALA DRIVE ORION STREET LEGEND UST LOCATION 2_109168002_BL.mxd 3/26/2021 AOB NOTE: DIRECTIONS, DIMENSIONS AND LOCATIONS ARE APPROXIMATE. | SOURCE: GOOGLE EARTH, 2021 BORING LOCATION FIGURE 2 !o 0 80 160 FEET @A B-1 TD=19.8 BORING TD=TOTAL DEPTH IN FEET B-1 TD=19.8 109168002 | 3/21 CARLSBAD UST REPLACEMENT 2480 IMPALA DRIVE, CARLSBAD, CALIFORNIA 3_109168002_G.mxd 3/15/2021 AOB FIGURE 3 !o 0 2,000 4,000 FEET GEOLOGY REFERENCE: KENNEDY, M.P., TAN, S.S., 2007, GEOLOGIC MAP OF THE OCEANSIDE 30 X 60-MINUTEQUADRANGLE, CALIFORNIA SITE " NOTE: DIRECTIONS, DIMENSIONS AND LOCATIONS ARE APPROXIMATE. LEGEND_____________________________________ 109168002 | 3/21 CARLSBAD UST REPLACEMENT 2480 IMPALA DRIVE, CARLSBAD, CALIFORNIA Geotechnical & Environmental Sciences Consultants FIGURE 4 CARLSBAD UST REPLACEMENT 2480 IMPALA DRIVE, CARLSBAD, CALIFORNIA 109168002 I 3/21 LATERAL EARTH PRESSURES FOR BRACED EXCAVATION pP D H CONSTRUCTION MATERIALS ARE NOT INCLUDED 5.SURCHARGES FROM EXCAVATED SOIL OR 4.ASSUMES GROUNDWATER IS NOT PRESENT 3.PASSIVE LATERAL EARTH PRESSURE, P P = 450D psf 2. P = 120 psf CONSTRUCTION TRAFFIC INDUCED SURCHARGE PRESSURE, P 1. P = 27H psf APPARENT LATERAL EARTH PRESSURE, P Pa Ps GROUND SURFACE a a s s p p 6.H AND D ARE IN FEET + SHORING BRACES NOTES: NOT TO SCALE 10 9 1 6 8 0 0 2 D E T A I L F I G U R E S . D W G A O B Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 APPENDIX A Boring Log Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 APPENDIX A BORING LOG Field Procedure for the Collection of Disturbed Samples Disturbed soil samples were obtained in the field using the following methods. Bulk Samples Bulk samples of representative earth materials were obtained from the exploratory boring. The samples were bagged and transported to the laboratory for testing. The Standard Penetration Test (SPT) Sampler Disturbed drive samples of earth materials were obtained by means of a Standard Penetration Test sampler. The sampler is composed of a split barrel with an external diameter of 2 inches and an unlined internal diameter of 13/8 inches. The sampler was driven into the ground 12 to 18 inches with a 140-pound hammer free-falling from a height of 30 inches in general accordance with ASTM D 1586. The blow counts were recorded for every 6 inches of penetration; the blow counts reported on the logs are those for the last 12 inches of penetration. Soil samples were observed and removed from the sampler, bagged, sealed and transported to the laboratory for testing. Field Procedure for the Collection of Relatively Undisturbed Samples Relatively undisturbed soil samples were obtained in the field using the following method. The Modified Split-Barrel Drive Sampler The sampler, with an external diameter of 3 inches, was lined with 1-inch long, thin brass rings with inside diameters of approximately 2.4 inches. The sample barrel was driven into the ground with the weight of a hammer in general accordance with ASTM D 3550. The driving weight was permitted to fall freely. The approximate length of the fall, the weight of the hammer, and the number of blows per foot of driving are presented on the boring log as an index to the relative resistance of the materials sampled. The samples were removed from the sample barrel in the brass rings, sealed, and transported to the laboratory for testing. Soil Classification Chart Per ASTM D 2488 Primary Divisions Secondary Divisions Group Symbol Group Name COARSE- GRAINED SOILS more than 50% retained on No. 200 sieve GRAVEL more than 50% of coarse fraction retained on No. 4 sieve CLEAN GRAVEL less than 5% fines GW well-graded GRAVEL GP poorly graded GRAVEL GRAVEL with DUAL CLASSIFICATIONS 5% to 12% fines GW-GM well-graded GRAVEL with silt GP-GM poorly graded GRAVEL with silt GW-GC well-graded GRAVEL with clay GP-GC poorly graded GRAVEL with GRAVEL with FINES more than 12% fines GM silty GRAVEL GC clayey GRAVEL GC-GM silty, clayey GRAVEL SAND 50% or more of coarse fraction passes No. 4 sieve CLEAN SAND less than 5% fines SW well-graded SAND SP poorly graded SAND SAND with DUAL CLASSIFICATIONS 5% to 12% fines SW-SM well-graded SAND with silt SP-SM poorly graded SAND with silt SW-SC well-graded SAND with clay SP-SC poorly graded SAND with clay SAND with FINES more than 12% fines SM silty SAND SC clayey SAND SC-SM silty, clayey SAND FINE- GRAINED SOILS 50% or more passes No. 200 sieve SILT and CLAY liquid limit less than 50% INORGANIC CL lean CLAY ML SILT CL-ML silty CLAY ORGANIC OL (PI > 4)organic CLAY OL (PI < 4)organic SILT SILT and CLAY liquid limit 50% or more INORGANIC CH fat CLAY MH elastic SILT ORGANIC OH (plots on or above “A”-line)organic CLAY OH (plots below “A”-line)organic SILT Highly Organic Soils PT Peat USCS METHOD OF SOIL CLASSIFICATION Apparent Density - Coarse-Grained Soil Apparent Density Spooling Cable or Cathead Automatic Trip Hammer SPT (blows/foot) Modified Split Barrel (blows/foot) SPT (blows/foot) Modified Split Barrel (blows/foot) Very Loose < 4 < 8 < 3 < 5 Loose 5 - 10 9 - 21 4 - 7 6 - 14 Medium Dense 11 - 30 22 - 63 8 - 20 15 - 42 Dense 31 - 50 64 - 105 21 - 33 43 - 70 Very Dense > 50 > 105 > 33 > 70 Consistency - Fine-Grained Soil Consis-tency Spooling Cable or Cathead Automatic Trip Hammer SPT (blows/foot) Modified Split Barrel (blows/foot) SPT (blows/foot) Modified Split Barrel (blows/foot) Very Soft < 2 < 3 < 1 < 2 Soft 2 - 4 3 - 5 1 - 3 2 - 3 Firm 5 - 8 6 - 10 4 - 5 4 - 6 Stiff 9 - 15 11 - 20 6 - 10 7 - 13 Very Stiff 16 - 30 21 - 39 11 - 20 14 - 26 Hard > 30 > 39 > 20 > 26 LIQUID LIMIT (LL), % PL A S T I C I T Y I N D E X ( P I ) , % 0 10 107 4 20 30 40 50 60 70 0 20 30 40 50 60 70 80 90 100 MH or OH ML or OLCL - ML Plasticity Chart Grain Size Description Sieve Size Grain Size Approximate Size Boulders > 12”> 12”Larger than basketball-sized Cobbles 3 - 12”3 - 12”Fist-sized to basketball-sized Gravel Coarse 3/4 - 3”3/4 - 3”Thumb-sized to fist-sized Fine #4 - 3/4”0.19 - 0.75”Pea-sized to thumb-sized Sand Coarse #10 - #4 0.079 - 0.19”Rock-salt-sized to pea-sized Medium #40 - #10 0.017 - 0.079”Sugar-sized to rock-salt-sized Fine #200 - #40 0.0029 - 0.017”Flour-sized to sugar-sized Fines Passing #200 < 0.0029”Flour-sized and smaller CH or OH CL or OL 0 5 10 15 20 XX/XX SM CL Bulk sample. Modified split-barrel drive sampler. No recovery with modified split-barrel drive sampler. Sample retained by others. Standard Penetration Test (SPT). No recovery with a SPT. Shelby tube sample. Distance pushed in inches/length of sample recovered in inches. No recovery with Shelby tube sampler. Continuous Push Sample. Seepage. Groundwater encountered during drilling. Groundwater measured after drilling. MAJOR MATERIAL TYPE (SOIL): Solid line denotes unit change. Dashed line denotes material change. Attitudes: Strike/Dipb: Bedding c: Contactj: Joint f: FractureF: Fault cs: Clay Seams: Shear bss: Basal Slide Surfacesf: Shear Fracture sz: Shear Zonesbs: Shear Bedding Surface The total depth line is a solid line that is drawn at the bottom of the boring. BORING LOG Explanation of Boring Log Symbols PROJECT NO.DATE FIGURE DE P T H ( f e e t ) Bu l k SA M P L E S Dr i v e n BL O W S / F O O T MO I S T U R E ( % ) DR Y D E N S I T Y ( P C F ) SY M B O L CL A S S I F I C A T I O N U. S . C . S . BORING LOG EXPLANATION SHEET Updated Nov. 2011 BORING LOG 20 0 10 20 30 40 50/4" 50/6"50/6" 50/3" 85/9" 9.4 122.9 GW SM ASPHALT CONCRETE:Approximately 3 inches thick. BASE:Gray, moist, medium dense, well graded to coarse sandy GRAVEL. FILL:Yellowish brown, moist, medium dense, silty fine to coarse SAND with gravel; scattered gravel up to 2 inches in diameter; scattered clay nodules (brown, moist, soft).@ 1.5':" No gravel.@ 3': Clayey; scattered gravel. LUSARDI FORMATION:Yellowish brown, moist, moderately to weakly cemented, clayey fine- to coarse-grained SANDSTONE; scattered gravel.Strongly cemented (difficult drilling). No gravel. Difficult drilling. Possible cobble. Difficult drilling. GRANITIC ROCK:Light gray, moist, slightly weathered, coarse-grained GRANITIC ROCK; possible boulder. Total Depth = 19.8 feet. Groundwater not encountered during drilling. Backfilled and patched shortly after drilling on 2/23/21. Note: Groundwater, though not encountered at the time of drilling, may rise to a higher level due to seasonal variations in precipitation and several other factors as discussed in the report. The ground elevation shown above is an estimation only. It is based on our interpretations of published maps and other documents reviewed for the purposes of this evaluation. It is not sufficiently accurate for preparing construction bids and design documents. FIGURE A- 1 CARLSBAD UST REMOVAL 2480 IMPALA DRIVE, CARLSBAD, CALIFORNIA 109168002 |3/21 DE P T H ( f e e t ) Bu l k SA M P L E S Dr i v e n BL O W S / F O O T MO I S T U R E ( % ) DR Y D E N S I T Y ( P C F ) SY M B O L CL A S S I F I C A T I O N U. S . C . S . DESCRIPTION/INTERPRETATION DATE DRILLED 2/23/21 BORING NO.B-1 GROUND ELEVATION 367'  (MSL)SHEET 1 OF METHOD OF DRILLING 8" Diameter Hollow Stem Auger (CME-75) (Baja Exploration) DRIVE WEIGHT 140 lbs. (Auto-Trip)DROP 30" SAMPLED BY KWK LOGGED BY KWK REVIEWED BY CAT 1 Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 APPENDIX B Geotechnical Laboratory Testing Ninyo & Moore | 2480 Impala Drive, Carlsbad, California | 109168002 | March 26, 2021 APPENDIX B GEOTECHNICAL LABORATORY TESTING Classification Soils were visually and texturally classified in accordance with the Unified Soil Classification System (USCS) in general accordance with ASTM D 2488. Soil classifications are indicated on the logs of the exploratory borings and infiltration test borings in Appendix A. In-Place Moisture and Density Tests The moisture content and dry density of a relatively undisturbed sample obtained from the exploratory boring were evaluated in general accordance with ASTM D 2937. The test results are presented on the log of the exploratory boring in Appendix A. Direct Shear Test A direct shear test was performed on a relatively undisturbed sample in general accordance with ASTM D 3080 to evaluate the shear strength characteristics of the selected material. The sample was inundated during shearing to represent adverse field conditions. The results are shown on Figure B-1. 5.0-5.8Clayey SANDSTONE B-1 Peak Cohesion (psf) Friction Angle (degrees)Soil Type Formation32 46 320 Formation Description Symbol Sample Location 320 Depth (ft) Shear Strength PERFORMED IN GENERAL ACCORDANCE WITH ASTM D 3080 Clayey SANDSTONE X Ultimate5.0-5.8B-1 0 1000 2000 3000 4000 5000 0 1000 2000 3000 4000 5000 SH E A R S T R E S S ( P S F ) NORMAL STRESS (PSF) FIGURE B-1 DIRECT SHEAR TEST RESULTS CARLSBAD UST REPLACEMENT 2480 IMPALA DRIVE, CARLSBAD, CALIFORNIA 109168002 | 3/21 109168002_DIRECT SHEAR B-1 @ 5.0-5.8 5710 Ruffin Road | San Diego, California 92123 | p. 858.576.1000 ARIZONA | CALIFORNIA | COLORADO | NEVADA | TEXAS | UTAH ninyoandmoore.com 1 COVER SHEET 2A NOTES 2B NOTES 3A SITE PLAN - DEMOLITION 3B SITE PLAN - CONSTRUCTION 4A FUEL ISLAND DETAIL - DEMOLITION 4B FUEL ISLAND DETAIL - CONSTRUCTION 5 STRUCTURAL NOTES 6 STRUCTURAL PLANS 7 STRUCTURAL SECTIONS 8 STRUCTURAL DETAILS 9 LEGEND, ABBREVIATIONS AND GENERAL NOTES 10 SITE DEMO PLAN - ELECTRICAL 11 SITE PLAN - ELECTRICAL 12 SCHEDULES, DIAGRAM & PARTIAL FLOOR PLAN 13 ELECTRICAL DETAILS 14 TITLE 24 DOCUMENTATION 15 TITLE 24 DOCUMENTATION 16 NOTES - ELECTRICAL No. 67652 18 NOTES - PLUMBING 19 SITE PLAN - PLUMBING 20 PIPING & UDC DETAILS 21 CARBON CANISTER DETAILS 22 VENT BOX DETAIL 23 87 REGULAR STP DETAIL 24 87 REGULAR FILL SUMP DETAIL 25 DIESEL STP SUMP DETAIL 26 DIESEL FILL SUMP DETAIL 27 20,000 GALLON TANK DETAIL 28 12,000 GALLON TANK DETAIL 29 DISPENSER DETAILS 30 ADA COMPLIANCE DETAILS 31 TANK HOLE DETAIL 32 VACUUM ZONES & SENSOR LAYOUT 33 BUOYANCY CALCULATIONS FUEL ISLAND DETAIL - CONSTRUCTION CONSTRUCTION PLANS FOR UNDERGROUND STORAGE TANK REMOVAL AND REPLACEMENT PROJECT NO. 4747 CITY OF CARLSBAD CARLSBAD, CA CITY COUNCIL KEITH BLACKBURN - MAYOR PRIYA BHAT-PATEL - MAYOR PRO TEM MELANIE BURKHOLDER - COUNCIL MEMBER TERESA ACOSTA - COUNCIL MEMBER CAROLYN LUNA- COUNCIL MEMBER SCOTT CHADWICK - CITY MANAGER PAZ GOMEZ - DEPUTY CITY MANAGER VICINITY MAP N.T.S. 1 "DECLARATION OF RESPONSIBLE CHARGE" KIMLEY-HORN AND ASSOCIATES, INC. 401 B STREET, SUITE 600 SAN DIEGO, CA 92101 619-234-9411 DATEPETER B. RITCHEY R.C.E. C67652, EXP. 06-30-2025 ABBREVIATIONS VERTICAL CONTROL: (NGVD29) BASIS OF COORDINATES: (NAD83) STATION 105 NORTHING 1999466.124 EASTING 6241021.960 108 1996667.594 6248033.709 GRID BEARING BETWEEN STATION 108 AND STATION 105 = N 68°14'31" W. DESCRIPTION BENCHMARK ELEVATION 246.43' THE BASIS OF COORDINATES FOR THIS SURVEY IS THE NORTH AMERICAN DATUM OF 1983 (NAD 83) CALIFORNIA STATE PLANE COORDINATE SYSTEM OF 1983 (CCS83) ZONE 6 (EPOCH 1991.35) BASED LOCALLY UPON THE FOLLOWING FIRST ORDER CONTROL POINTS PER RECORD OF SURVEY 17271: ELEVATIONS SHOWN HEREON ARE IN TERMS OF THE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD29) BASED LOCALLY UPON THE FOLLOWING CITY OF CARLSBAD BENCHMARK: A 2.5" BRASS DISK STAMPED "LS 6215" IN A DRAINAGE INLET AT THE NORTH SIDE OF PALMER WAY 100' EASTERLY OF COUGAR DRIVE. A 2.5" BRASS DISK STAMPED "LS 6215" IN SIDEWALK AT THE NORTHEAST CORNER OF THE CANNON ROAD BRIDGE OVER AGUA HEDIONDA CREEK. MAPPING ANGLE AT STATION 108 = -00°33'46.974" CONTROL POINT 108 PER ROS 17271 SUPPLEMENTAL CONTROL: AS ESTABLISHED FOR THIS PROJECT NOTE: SUPPLEMENTAL CONTROL POINTS WERE ESTABLISHED HORIZONTALLY BY RTK GPS SURVEY WITH REDUNDANCY AND VERTICALLY BY EITHER RTK GPS OR TRIG. POINT NO. 1003 NORTHING 1995833.65 EASTING 6250339.29 DESCRIPTION CP MAG ELEVATION 367.90' 1004 1995721.20 6250663.16 CP MAG365.76' PROJECT SITE 9/18/2023 2480 IMPALA DRIVE, CARLSBAD, CA 92010 STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION (GREENBOOK), 2018 EDITION SAN DIEGO REGIONAL STANDARD DRAWINGS, 2018 EDITION CALIFORNIA BUILDING CODE (CBC), 2022 EDITION CALIFORNIA FIRE CODE (CFC), 2022 EDITION CALIFORNIA PLUMBING CODE (CPC), 2022 EDITION CALIFORNIA MECHANICAL CODE (CMC), 2019 EDITION 2022 CALIFORNIA ELECTRICAL CODE, CALIFORNIA CODE OF REGULATIONS TITLE 24 - PART 3 2020 NATIONAL ELECTRICAL CODE, CHAPTER 5 - ARTICLE 514 2021 NFPA 30 & 30A FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE GEOTECHNICAL REPORT BY NINYO & MOORE DATED MARCH 26, 2021 ADDENDUM TO GEOTECHNICAL REPORT - CANOPY RECOMMENDATIONS DATED JULY 6, 2021 DESCRIPTION STANDARD SPECIFICATIONS: 17 NOTES - ELECTRICAL 9/30/25 361 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 2A2A UST REMOVAL AND REPLACEMENT GENERAL CONSTRUCTION NOTES 1.CITY OF CARLSBAD PROJECT DOCUMENTS AND TECHNICAL SPECIFICATIONS ARE TO BE FOLLOWED FOR ALL WORK PERFORMED AT THIS SITE. 2.ALL CONSTRUCTION WORK SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL ADOPTED BUILDING CODES AND SUPPLEMENTARY ORDINANCES. 3.BIDDER MUST HOLD A VALID CALIFORNIA STATE CONTRACTOR'S LICENSE IN AT LEAST ONE OF THE FOLLOWING CLASSIFICATIONS: A, C-36, OR C-61, WITH HAZARDOUS SUBSTANCE CERTIFICATE ISSUED BY THE STATE. PRIOR TO STARTING WORK THE CONTRACTOR SHALL PROVIDE A COPY OF THEIR CSLB LICENSE, ICC CERTIFICATIONS AND MANUFACTURER'S TRAINING CERTIFICATIONS. 4.ENVIRONMENTAL PROTECTION AGENCY NUMBERS AND/OR STATE GENERATOR I.D. NUMBERS SHALL BE OBTAINED FROM CITY OF CARLSBAD. ALL PERMITS, INSPECTION REPORTS, AND MANIFESTS SHALL BE COPIED AND SENT TO CITY OF CARLSBAD'S ENGINEER. 5.CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE PRIOR TO COMMENCING WORK AND NOTIFY CITY OF CARLSBAD'S REPRESENTATIVE OF ANY DISCREPANCIES BETWEEN SITE CONDITIONS AND INFORMATION SHOWN ON THE DRAWINGS. ALL CONDITIONS AFFECTING THE WORK OF THIS CONTRACT SHALL BE VERIFIED AT THE PROJECT SITE, NOTING ALL UNUSUAL CONDITIONS NOT SPECIFICALLY SHOWN OR DESCRIBED IN THE SPECIFICATIONS, AND THE CONTRACTOR SHALL PROVIDE THE SAME IN THEIR PROPOSALS. 6.REMOVAL AND DISPOSAL OF CONTAMINATED SOIL IS NOT ANTICIPATED FOR THIS SITE. IF CONTAMINATED SOIL IS ENCOUNTERED DURING EXCAVATION, THE DISPOSAL OF THE CONTAMINATED SOIL SHALL BE DEALT WITH AS EXTRA WORK. 7.STOCKPILING OF EXCAVATED MATERIAL IS PERMITTED TO BE STORED ONSITE WITHIN THE CONSTRUCTION AREA. STOCKPILED SOILS SHOULD BE SEPARATED BASED ON SOIL TYPE. (I.E. GRAVEL, CLEAN FILL DIRT, CONTAMINATED SOIL, ETC). SEE STORM WATER NOTES FOR REQUIRED COVERAGE REQUIREMENTS. 8.ALL MATERIALS AND EQUIPMENT REMOVED, EXCEPT WHERE NOTED, SHALL BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH APPLICABLE CODES AND ORDINANCES. 9.CONTRACTOR SHALL COORDINATE ALL WORK WITH THE FACILITY MANAGER, FACILITIES PERSONNEL AND/OR REPRESENTATIVE. 10.CONTRACTOR SHALL FOLLOW THE MOST CURRENT EDITION OF THE COUNTY OF SAN DIEGO SITE ASSESSMENT AND MITIGATION MANUAL FOR GUIDANCE IN TANK REMOVALS AND ENCOUNTERING CONTAMINATED SOIL. 11.CONTRACTOR SHALL HAVE A QUALIFIED SUPERINTENDENT ON THE JOB SITE DURING THE ENTIRE DURATION OF THE PROJECT TO COORDINATE AND SUPERVISE ALL PHASES OF THE PROJECT. THE SUPERINTENDENT SHALL KEEP CITY OF CARLSBAD'S REPRESENTATIVE ADVISED OF THE JOB STATUS, PROGRESS, AND ANY PROBLEMS. 12.CONTRACTOR TO PROVIDE TEMPORARY CONSTRUCTION FENCING AROUND THE PROJECT SITE. THE LOCATION OF THE FENCING SHALL BE DETERMINED IN THE FIELD AND COORDINATED WITH CITY OF CARLSBAD'S REPRESENTATIVES TO NOT BLOCK ACCESS TO THE SITE'S VARIOUS FACILITIES. IF EXCAVATION/TRENCHING IS REQUIRED OUTSIDE OF THE CONSTRUCTION FENCING, STEEL PLATES OR TEMPORARY ASPHALT COLD MIX SHALL BE USED TO CAP THE TRENCH AFTER WORK HOURS. 13.CONTRACTOR TO CONTINUALLY INSPECT THE CONSTRUCTION AREA TO KEEP PREMISES AS NEAT AS POSSIBLE DURING CONSTRUCTION AND ASSURE CITY OF CARLSBAD'S FACILITIES ARE DISTURBED AS LITTLE AS POSSIBLE. 14.ANY INDIVIDUAL(S) INSTALLING UNDERGROUND STORAGE TANK SYSTEM COMPONENTS SHALL MEET THE FOLLOWING REQUIREMENTS, OR WORK UNDER THE DIRECT SUPERVISION OF AN INDIVIDUAL PHYSICALLY PRESENT AT THE WORK SITE WHO MEETS THE FOLLOWING REQUIREMENTS: A.THE INDIVIDUAL HAS BEEN ADEQUATELY TRAINED AS EVIDENCED BY A CURRENT CERTIFICATE OF TRAINING ISSUED BY THE MANUFACTURER(S) OF THE UNDERGROUND STORAGE TANK SYSTEM COMPONENTS. B.THE INDIVIDUAL SHALL POSSESS A CURRENT UNDERGROUND STORAGE TANK SYSTEM INSTALLATION/RETROFITTING CERTIFICATE FROM THE INTERNATIONAL CODE COUNCIL (ICC). 15.ALL NEW INSTALLATIONS OF PIPING, FITTINGS AND COMPONENTS MUST COMPLY WITH THE REVISED UL 971 STANDARD. PIPING MANUFACTURERS ARE REQUIRED BY UL TO MARK THE DATE OF MANUFACTURE ON THE PIPING AT 10-FOOT INTERVALS, AND ON FITTINGS OR FITTING BULK PACKAGING. THEREFORE, THE DATE OF MANUFACTURE MUST BE ON OR AFTER JULY 1, 2005. CONTACT YOUR PIPING MANUFACTURER TO ENSURE THAT YOUR NEW PIPING SYSTEM IS ORDERED CORRECTLY. 16.THE UNDERGROUND STORAGE TANK SYSTEM(S) SHALL BE COMPATIBLE WITH THE PRODUCT TO BE STORED. 17.THE TANK CONSTRUCTION/TESTING SHALL BE IN ACCORDANCE WITH NATIONALLY RECOGNIZED CODES. 18.ALL CONTINUOUS MONITORING EQUIPMENT SHALL BE ON THE STATE'S APPROVED EQUIPMENT LIST AND ALL EQUIPMENT SHALL BE APPROVED FOR USE WITH THE CONTINUOUS MONITORING SYSTEM. 19.ALL UNDERGROUND STORAGE TANK (UST) EQUIPMENT SHALL MEET VOLUNTARY CONSENSUS STANDARDS. 20.ALL MATERIALS TO BE USED (PIPING, SEALANT, ADHESIVE, RESINS, ETC.) SHALL BE COMPATIBLE AND USED NATIONALLY RECOGNIZED CODES. 21.ALL MATERIALS SHALL BE INSTALLED AS PER MANUFACTURERS' SPECIFICATIONS. 22.THE ELECTRICAL SUPPLY WIRING FOR THE CONTINUOUS MONITORING SYSTEM SHALL BE HARDWIRED TO THE JUNCTION/BREAKER BOX. 23.ALL SENSORS WILL BE PROPERLY MOUNTED AT THE LOW POINT IN THE SUMPS AND SECURED TO PREVENT TAMPERING USING MOUNTING KITS OR SLEEVES. 24.THE CONTRACTOR SHALL ENSURE THAT ALL FILLS AND MONITORING WELLS ARE PROPERLY LABELED. 25.THE CONTRACTOR SHALL ENSURE THAT THE EMERGENCY SHUT-OFF SWITCH IS OPERATIONAL AND INSTALLED IN ACCORDANCE WITH CBC #514.11/514.13/514.16. NOTE: ALL ELECTRICAL AND ALL LOW VOLTAGE, DATA RECEIPT MACHINES TO SHUT OFF DURING MAINTENANCE WITH THE EMERGENCY SHUTOFF SWITCH. 26.THE CONTRACTOR SHALL ENSURE THAT ON-LINE LEAK DETECTORS ARE INSTALLED ON TURBINES AND ARE OPERATIONAL. ALL LEAK DETECTORS SHALL BE PROPERLY TESTED IN LINE BY A CERTIFIED THIRD PARTY TECHNICIAN PROVIDED BY THE CITY. 27.AS PER AB 1702, BEFORE THE UNDERGROUND STORAGE TANK IS PLACED IN USE, THE UST SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE METHODS IN HEALTH & SAFETY CODE 25290.1(J) TO DEMONSTRATE THAT THE TANK IS PRODUCT TIGHT. ACCORDING TO THE STATE WATER RESOURCES CONTROL BOARD (SWRCB), ENHANCED LEAK DETECTION (EDL) IS THE ONLY APPROVED TEST METHOD AT THIS TIME. THE UST WILL BE TESTED AFTER INSTALLATION BY A CERTIFIED THIRD PARTY TESTER PROVIDED BY THE AGENCY, BEFORE IT IS PLACED INTO USE ELD. IF THE RESULTS OF POST-INSTALLATION TESTING INDICATE THAT THE UST SYSTEM IS LEAKING LIQUID OR VAPOR, THE CONTRACTOR MUST TAKE APPROPRIATE ACTIONS TO CORRECT THE LEAKAGE, AND THE SYSTEM WILL BE RETESTED USING ELD, UNTIL THE SYSTEM IS NO LONGER LEAKING LIQUID OR VAPOR. APPROVAL TO OPERATE WILL NOT BE GIVEN UNTIL THE UST SYSTEM HAS A PASSING ELD TEST. 28.OPERATIONAL SENSORS IN INTERSTICES AND SUMP(S)/POSITIVE SHUT-DOWN DEMONSTRATED IF REQUIRED: THE CITY THIRD PARTY INSPECTOR SHALL WITNESS A PROPERLY CERTIFIED TECHNICIAN TEST ALL SENSORS TO ENSURE THEY INDICATE AN AUDIBLE AND VISUAL ALARM. IF REQUIRED, POSITIVE SHUT-DOWN, AND FAIL-SAFE, OF THE TURBINE SHALL ALSO BE DEMONSTRATED FOR APPLICABLE SENSORS. ALL SENSORS SHALL PERFORM AS PER MANUFACTURER'S SPECIFICATIONS AND THE STANDARDS OF LG-113. LG-113 CAN BE FOUND AT HTTP://WWW.WATERBOARDS.CA.GOV/WATER_ISSUES/PROGRAMS/UST/LEAK_PREVENTION/LG113/ 29.ELECTRONIC MONITOR SECURED/ACCESSIBLE TO OPERATOR AND OPERATIONAL: ENSURE THE MONITORING PANEL IS HARDWIRED THROUGH CONDUIT TO THE JUNCTION/BREAKER BOX. ENSURE SENSOR ALARMS ARE ABLE TO BE DETECTED BY THE OPERATOR. THE MONITORING PANEL SHALL BE FULLY OPERATIONAL AS PER MANUFACTURER'S SPECIFICATIONS, WITH AUDIBLE AND VISUAL ALARMS, AND A PRINTER, IF REQUIRED. 30.ALL SENSORS WILL DETECT THE EARLIEST POSSIBLE RELEASE: ANNULAR SPACE SENSORS MUST BE PROPERLY INSTALLED (FOR STEEL TANKS, WIRE MUST BE MEASURED TO ENSURE IT IS LONG ENOUGH FOR THE EARLIEST POSSIBLE DETECTION OF A RELEASE). ENSURE ALL SUMP AND DISPENSER CONTAINMENT SENSORS ARE INSTALLED AT THE LOWEST POINT, IN A LOCATION TO DETECT THE EARLIEST POSSIBLE RELEASE AND FIRMLY SECURED TO PREVENT TAMPERING. 31.CONTINUOUS MONITORING DEVICE CERTIFICATION SUBMITTED: THE CONTINUOUS MONITORING DEVICE CERTIFICATION, INCLUDING THE ON-LINE LEAK DETECTOR TESTS AND VACUUM SENSOR CERTIFICATION, WITH THE PRINT-OUT FROM THE ALARM PANEL ATTACHED, SHALL BE SUBMITTED ON THE STATE OF CALIFORNIA FORMS FOUND AT: HTTP://WWW.WATERBOARDS.CA.GOV/WATER_ISSUES/PROGRAMS/UST/FORMS/DOCS/MCF.PDF AND HTTP://WWW.WATERBOARDS.CA.GOV/WATER_ISSUES/PROGRAMS/UST/FORMS/DOCS/163_1ELECFORM.DOC IN ORDER TO COMPLETE THE FINAL INSPECTION. 32.ALL MONITORING EQUIPMENT COMPONENTS HAVE TAG/STICKER AFFIXED BY LICENSED TECHNICIAN: ENSURE THE CERTIFIED TECHNICIAN HAS AFFIXED PROPER TAGS AND/ OR STICKERS ON ALL MONITORING EQUIPMENT COMPONENTS, INCLUDING THE PANEL AND EACH SENSOR. EXISTING UTILITY NOTES KIMLEY-HORN AND ASSOCIATES ASSUMES NO RESPONSIBILITY FOR EXISTING UTILITY LOCATIONS AND ELEVATIONS. THE UTILITIES SHOWN ON THIS DRAWING HAVE BEEN PLOTTED FROM THE BEST AVAILABLE INFORMATION. IT IS, HOWEVER, THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE LOCATION AND ELEVATION OF ALL UTILITIES PRIOR TO THE COMMENCEMENT OF ANY CONSTRUCTION. CONTRACTOR TO FIELD VERIFY ALL EXISTING SITE CONDITIONS PRIOR TO CONSTRUCTION. IF A CONFLICT EXISTS BETWEEN WHAT IS SHOWN ON THESE DRAWINGS AND WHAT EXISTS IN THE FIELD REQUIRING DESIGN CHANGES IN ORDER FOR CONSTRUCTION TO PROCEED, NOTIFY THE ENGINEER IMMEDIATELY. 1.BACKFILL UTILITY TRENCHING PER SECTION 8.1.6 OF GEOTECHNICAL REPORT PREPARED BY NINYO & MOORE DATED MARCH 26, 2021. PER THE REPORT, TRENCH ZONE BACKFILL IS TO BE COMPACTED TO A RELATIVE COMPACTION OF 90 PERCENT AS EVALUATED BY ASTM D 1557, EXCEPT FOR THE UPPER 12 INCHES OF THE BACKFILL BENEATH VEHICULAR PAVEMENT WHICH IS TO BE COMPACTED TO A RELATIVE COMPACTION OF 95 PERCENT AS EVALUATED BY ASTM D 1557. 2.ALL PIPING RUNS SHALL SLOPE AT A MIN. OF 1/8 INCH PER FOOT BACK TO TANK. STORMWATER & EROSION CONTROL CONSTRUCTION NOTES 1.THIS PROJECT SHALL COMPLY WITH ALL REQUIREMENTS OF THE STATE PERMIT: CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD, SAN DIEGO REGION, ORDER NO. 2001.01 NPDES NO. CAS010875 HTTP://WWW.SWRCB.CA.GOV/RWQCB9/PROGRAMS/SD_STORMWATER.HTML 2.SUFFICIENT BMPS MUST BE INSTALLED TO PREVENT SILT, MUD, OR OTHER CONSTRUCTION DEBRIS FROM BEING TRACKED INTO ADJACENT STREET(S) OR STORM WATER CONVEYANCE SYSTEMS DUE TO CONSTRUCTION VEHICLES OR ANY OTHER CONSTRUCTION ACTIVITY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANING ANY SUCH DEBRIS THAT MAY BE IN THE STREET AT THE END OF EACH WORKDAY OR AFTER A STORM EVENT THAT CAUSES A BREECH IN THE INSTALLED CONSTRUCTION BMPS. 3.ALL STOCKPILES OF UNCOMPACTED SOIL AND/OR BUILDING MATERIALS THAT ARE INTENDED TO BE LEFT UNPROTECTED FOR A PERIOD GREATER THAN SEVEN (7) CALENDAR DAYS ARE TO BE PROVIDED WITH EROSION AND SEDIMENT CONTROLS. ALL STOCKPILES ARE TO BE PROTECTED EACH DAY WHEN THE PROBABILITY OF RAIN IS 50% OR GREATER. 4.THE STORAGE OF ANY CONSTRUCTION MATERIALS OR EQUIPMENT MUST BE PROTECTED AGAINST ANY POTENTIAL RELEASE OF POLLUTANTS INTO THE ENVIRONMENT. 5.ALL EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED IN WORKING ORDER AT ALL TIMES. 6.IT IS RECOMMENDED THAT THE CONTRACTOR SCHEDULE ALL SOIL DISTURBING ACTIVITIES DURING THE DRY SEASON. 7.A CONCRETE WASHOUT MUST BE PROVIDED ONSITE PRIOR TO POURING ANY CONCRETE IMPROVEMENTS. 8.ALL STOCKPILED CONTAMINATED SOIL MUST BE HAULED AWAY TO AN APPROVED DISPOSAL SITE WITHIN 72 HOURS PER THE DEHQ PERMIT. 9.CONTRACTOR SHALL COORDINATE WITH THE CITY OF CARLSBAD PROJECT MANAGER, ENGINEER, AND FACILITIES PERSONNEL FOR SITE ACCESS, CONSTRUCTION SCHEDULE, AND EQUIPMENT STAGING. CONTRACTOR SHALL FENCE WORK AREA TO PROTECT CITY OF CARLSBAD STAFF DURING CONSTRUCTION ACTIVITY. 10.CONTRACTOR SHALL RESTORE THE SITE TO ITS ORIGINAL CONDITION UPON COMPLETION OF ALL WORK. ALL IMPROVEMENTS INTERFERING WITH DEMOLITION AND/OR INSTALLATION ACTIVITIES, SHALL BE REMOVED, AND REPLACED IN-KIND. 11.CONTRACTOR IS RESPONSIBLE FOR CONTROLLING THE RELEASE OF ANY/ALL DUST AND POLLUTANTS (BMP'S). 12.PRIOR TO COMMENCING DEMOLITION A SECURITY FENCE WITH PRIVACY SCREEN SHALL SURROUND ALL DEMOLITION AREAS. 13.GRAVEL-FILLED BAGS AND STRAW WATTLES SHALL BE PLACED AROUND THE PERIMETER OF THE PROPERTY AGAINST THE SECURITY FENCE. 14.COVER ANY TEMPORARY GRAVEL STOCKPILES WITH A TARP. 15.COVER ALL ON SITE STORM DRAINS IN THE CONSTRUCTION AREA. PAVING AND STRIPING NOTES 1.ALL PAVING, CONSTRUCTION, MATERIALS, AND WORKMANSHIP WITHIN JURISDICTION'S RIGHT-OF-WAY SHALL BE IN ACCORDANCE WITH LOCAL OR COUNTY SPECIFICATIONS AND STANDARDS (LATEST EDITION) OR MN/DOT SPECIFICATIONS AND STANDARDS (LATEST EDITION) IF NOT COVERED BY LOCAL OR COUNTY REGULATIONS. 2.ALL SIGNS, PAVEMENT MARKINGS, AND OTHER TRAFFIC CONTROL DEVICES SHALL CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (M.U.T.C.D) AND CITY STANDARDS. 3.CONTRACTOR SHALL FURNISH ALL PAVEMENT MARKINGS FOR FIRE LANES, ROADWAY LANES, PARKING STALLS, ACCESSIBLE PARKING SYMBOLS, ACCESS AISLES, STOP BARS AND SIGNS, AND MISCELLANEOUS STRIPING WITHIN THE PARKING LOT AS SHOWN ON THE PLANS. 4.ALL EXPANSION JOINTS SHALL EXTEND THROUGH THE CURB. 5.THE MINIMUM LENGTH OF OFFSET JOINTS AT RADIUS POINTS SHALL BE 2 FEET. 6.ALL JOINTS, INCLUDING EXPANSION JOINTS WITH REMOVABLE TACK STRIPS, SHALL BE SEALED WITH JOINT SEALANT. 7.THE MATERIALS AND PROPERTIES OF ALL CONCRETE SHALL MEET THE APPLICABLE REQUIREMENTS IN THE A.C.I. (AMERICAN CONCRETE INSTITUTE) MANUAL OF CONCRETE PRACTICE. 8.CONTRACTOR SHALL APPLY A SECOND COATING OVER ALL PAVEMENT MARKINGS PRIOR TO ACCEPTANCE BY OWNER FOLLOWED BY A COAT OF GLASS BEADS AS APPLICABLE PER THE PROJECT DOCUMENTS. 9.ANY EXISTING PAVEMENT, CURBS AND/OR SIDEWALKS DAMAGED OR REMOVED WILL BE REPAIRED BY THE CONTRACTOR AT HIS EXPENSE TO THE SATISFACTION OF THE ENGINEER AND OWNER. 10.BEFORE PLACING PAVEMENT, CONTRACTOR SHALL VERIFY SUITABLE ACCESSIBLE ROUTES (PER A.D.A). GRADING FOR ALL SIDEWALKS AND ACCESSIBLE ROUTES INCLUDING CROSSING DRIVEWAYS SHALL CONFORM TO CURRENT ADA STATE/NATIONAL STANDARDS. IN NO CASE SHALL ACCESSIBLE RAMP SLOPES EXCEED 1 VERTICAL TO 12 HORIZONTAL. IN NO CASE SHALL SIDEWALK CROSS SLOPES EXCEED 2% . IN NO CASE SHALL LONGITUDINAL SIDEWALK SLOPES EXCEED 5%. IN NO CASE SHALL ACCESSIBLE PARKING STALLS OR AISLES EXCEED 2% (1.5% TARGET) IN ALL DIRECTIONS. SIDEWALK ACCESS TO EXTERNAL BUILDING DOORS AND GATES SHALL BE ADA COMPLIANT. CONTRACTOR SHALL NOTIFY ENGINEER IMMEDIATELY IF ADA CRITERIA CANNOT BE MET IN ANY LOCATION PRIOR TO PAVING. NO CONTRACTOR CHANGE ORDERS WILL BE ACCEPTED FOR A.D.A COMPLIANCE ISSUES. 11. MAXIMUM JOINT SPACING IS TWICE THE DEPTH OF THE CONCRETE PAVEMENT IN FEET. GRADING AND DRAINAGE NOTES 1.GENERAL CONTRACTOR AND ALL SUBCONTRACTORS SHALL VERIFY THE SUITABILITY OF ALL EXISTING AND PROPOSED SITE CONDITIONS INCLUDING GRADES AND DIMENSIONS BEFORE START OF CONSTRUCTION. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY OF ANY DISCREPANCIES. 2.THE CONTRACTOR SHALL GRADE THE SITE TO THE ELEVATIONS INDICATED AND SHALL ADJUST BMP'S AS NECESSARY AND REGRADE WASHOUTS WHERE THEY OCCUR AFTER EVERY RAINFALL UNTIL A GRASS STAND IS WELL ESTABLISHED OR ADEQUATE STABILIZATION OCCURS. 3.CONTRACTOR SHALL ENSURE THERE IS POSITIVE DRAINAGE FROM THE PROPOSED BUILDINGS SO THAT SURFACE RUNOFF WILL DRAIN BY GRAVITY TO NEW OR EXISTING DRAINAGE OUTLETS. CONTRACTOR SHALL ENSURE NO PONDING OCCURS IN PAVED AREAS AND SHALL NOTIFY ENGINEER IF ANY GRADING DISCREPANCIES ARE FOUND IN THE EXISTING AND PROPOSED GRADES PRIOR TO PLACEMENT OF PAVEMENT OR UTILITIES. 4.CONTRACTOR SHALL PROTECT ALL MANHOLE COVERS, VALVE COVERS, VAULT LIDS, FIRE HYDRANTS, POWER POLES, GUY WIRES, AND TELEPHONE BOXES THAT ARE TO REMAIN IN PLACE AND UNDISTURBED DURING CONSTRUCTION. EXISTING CASTINGS AND STRUCTURES TO REMAIN SHALL BE ADJUSTED TO MATCH THE PROPOSED FINISHED GRADES. 5.BACKFILL FOR UTILITY LINES SHALL BE PLACED PER DETAILS, STANDARDS, AND SPECIFICATIONS SO THAT THE UTILITY WILL BE STABLE. WHERE UTILITY LINES CROSS THE PARKING LOT, THE TOP 6 INCHES SHALL BE COMPACTED SIMILARLY TO THE REMAINDER OF THE LOT. UTILITY DITCHES SHALL BE VISUALLY INSPECTED DURING THE EXCAVATION PROCESS TO ENSURE THAT UNDESIRABLE FILL IS NOT USED. 6.CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND REPLACEMENT OF 4" OF TOPSOIL AT COMPLETION OF WORK. ALL UNPAVED AREAS IN EXISTING RIGHTS-OF-WAY DISTURBED BY CONSTRUCTION SHALL BE REGRADED AND SODDED. 7.AFTER PLACEMENT OF SUBGRADE AND PRIOR TO PLACEMENT OF PAVEMENT, CONTRACTOR SHALL TEST AND OBSERVE PAVEMENT AREAS FOR EVIDENCE OF PONDING. ALL AREAS SHALL ADEQUATELY DRAIN TOWARDS THE INTENDED STRUCTURE TO CONVEY STORM RUNOFF. CONTRACTOR SHALL IMMEDIATELY NOTIFY OWNER AND ENGINEER IF ANY DISCREPANCIES ARE DISCOVERED. 8.WHERE EXISTING PAVEMENT IS INDICATED TO BE REMOVED AND REPLACED, THE CONTRACTOR SHALL SAW CUT FULL DEPTH FOR A SMOOTH AND STRAIGHT JOINT AND REPLACE THE PAVEMENT WITH THE SAME TYPE AND DEPTH OF MATERIAL AS EXISTING OR AS INDICATED. 9.THE CONTRACTOR SHALL INSTALL PROTECTION OVER ALL DRAINAGE STRUCTURES FOR THE DURATION OF CONSTRUCTION AND UNTIL ACCEPTANCE OF THE PROJECT BY THE OWNER. ALL DRAINAGE STRUCTURES SHALL BE CLEANED OF DEBRIS AS REQUIRED DURING AND AT THE END OF CONSTRUCTION TO PROVIDE POSITIVE DRAINAGE FLOWS. 10.IF DEWATERING IS REQUIRED, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE REQUIRED PERMITS. THE CONTRACTOR IS TO COORDINATE WITH THE OWNER AND THE DESIGN ENGINEER PRIOR TO ANY EXCAVATION. 11.FIELD DENSITY TESTS SHALL BE TAKEN AT INTERVALS IN ACCORDANCE WITH THE LOCAL JURISDICTIONAL AGENCY OR TO MN/DOT STANDARDS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 12.ALL SLOPES AND AREAS DISTURBED BY CONSTRUCTION SHALL BE GRADED AS PER PLANS. THE AREAS SHALL THEN BE SODDED OR SEEDED AS SPECIFIED IN THE PLANS, FERTILIZED, MULCHED, WATERED AND MAINTAINED UNTIL HARDY GRASS GROWTH IS ESTABLISHED IN ALL AREAS. ANY AREAS DISTURBED FOR ANY REASON PRIOR TO FINAL ACCEPTANCE OF THE JOB SHALL BE CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER. ALL EARTHEN AREAS WILL BE SODDED OR SEEDED AND MULCHED AS SHOWN ON THE LANDSCAPING PLAN. 13.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONTROL OF DUST AND DIRT RISING AND SCATTERING IN THE AIR DURING CONSTRUCTION AND SHALL PROVIDE WATER SPRINKLING OR OTHER SUITABLE METHODS OF CONTROL. THE CONTRACTOR SHALL COMPLY WITH ALL GOVERNING REGULATIONS PERTAINING TO ENVIRONMENTAL PROTECTION. 14.SOD, WHERE CALLED FOR, MUST BE INSTALLED AND MAINTAINED ON EXPOSED SLOPES WITHIN 48 HOURS OF COMPLETING FINAL GRADING, AND AT ANY OTHER TIME AS NECESSARY, TO PREVENT EROSION, SEDIMENTATION OR TURBID DISCHARGES. 15.THE CONTRACTOR SHALL ENSURE THAT LANDSCAPE ISLAND PLANTING AREAS AND OTHER PLANTING AREAS ARE NOT COMPACTED AND DO NOT CONTAIN ROAD BASE MATERIALS. THE CONTRACTOR SHALL ALSO EXCAVATE AND REMOVE ALL UNDESIRABLE MATERIAL FROM ALL AREAS ON THE SITE TO BE PLANTED AND PROPERLY DISPOSED OF IN A LEGAL MANNER. 16.THE CONTRACTOR SHALL INSTALL ALL UNDERGROUND STORM WATER PIPING PER MANUFACTURER'S RECOMMENDATIONS AND CITY SPECIFICATION. 17.ALL CONCRETE/ASPHALT SHALL BE INSTALLED PER GEOTECH REPORT, CITY OF CARLSBAD AND CALTRANS SPECIFICATIONS. 18.SPOT ELEVATIONS ARE TO FLOWLINE OF CURB UNLESS OTHERWISE NOTED. 19.LIMITS OF CONSTRUCTION ARE TO THE PROPERTY LINE UNLESS OTHERWISE SPECIFIED ON THE PLAN. 20.IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN ACTUAL FIELD CONDITIONS AND CONSTRUCTION DOCUMENTS. 21.THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, AND SHALL REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT OCCUR DURING CONSTRUCTION WITHOUT COMPENSATION. 22.BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. 23.ALL PROPOSED GRADES ONSITE SHALL BE 3:1 OR FLATTER UNLESS OTHERWISE INDICATED ON THE PLANS. ANY TEMPORARY OR PREEMINENT SLOPES STEEPER THAN 4:1 REQUIRE EROSION AND SEDIMENT CONTROL BLANKET. 24.ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. 25.CONTRACTOR SHALL ENSURE MINIMUM GRADES ARE MET WITHIN PAVED AREAS, 1.2% FOR ASPHALT PAVING AND 0.6% FOR CONCRETE PAVING. WATER STORM SEWER & SANITARY SEWER NOTES 1.THE CONTRACTOR SHALL CONSTRUCT GRAVITY SEWER LATERALS, MANHOLES, GRAVITY SEWER LINES, AND DOMESTIC WATER AND FIRE PROTECTION SYSTEM AS SHOWN ON THESE PLANS. THE CONTRACTOR SHALL FURNISH ALL NECESSARY MATERIALS, EQUIPMENT, MACHINERY, TOOLS, MEANS OF TRANSPORTATION AND LABOR NECESSARY TO COMPLETE THE WORK IN FULL AND COMPLETE ACCORDANCE WITH THE SHOWN, DESCRIBED AND REASONABLY INTENDED REQUIREMENTS OF THE CONTRACT DOCUMENTS AND JURISDICTIONAL AGENCY REQUIREMENTS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 2.ALL EXISTING UNDERGROUND UTILITY LOCATIONS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS FOR UTILITY LOCATION AND COORDINATION IN ACCORDANCE WITH THE NOTES CONTAINED IN THE GENERAL CONSTRUCTION SECTION OF THIS SHEET. 3.THE CONTRACTOR SHALL RESTORE ALL DISTURBED VEGETATION IN KIND, UNLESS SHOWN OTHERWISE. 4.DEFLECTION OF PIPE JOINTS AND CURVATURE OF PIPE SHALL NOT EXCEED THE MANUFACTURER'S SPECIFICATIONS. SECURELY CLOSE ALL OPEN ENDS OF PIPE AND FITTINGS WITH A WATERTIGHT PLUG WHEN WORK IS NOT IN PROGRESS. THE INTERIOR OF ALL PIPES SHALL BE CLEAN AND JOINT SURFACES WIPED CLEAN AND DRY AFTER THE PIPE HAS BEEN LOWERED INTO THE TRENCH. VALVES SHALL BE PLUMB AND LOCATED ACCORDING TO THE PLANS. 5.ALL PIPE AND FITTINGS SHALL BE CAREFULLY STORED FOLLOWING MANUFACTURER'S RECOMMENDATIONS. CARE SHALL BE TAKEN TO AVOID DAMAGE TO THE COATING OR LINING IN ANY D.I. PIPE FITTINGS. ANY PIPE OR FITTING WHICH IS DAMAGED OR WHICH HAS FLAWS OR IMPERFECTIONS WHICH, IN THE OPINION OF THE ENGINEER OR OWNER, RENDERS IT UNFIT FOR USE, SHALL NOT BE USED. ANY PIPE NOT SATISFACTORY FOR USE SHALL BE CLEARLY MARKED AND IMMEDIATELY REMOVED FROM THE JOB SITE, AND SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE. 6.WATER FOR FIRE FIGHTING SHALL BE MADE AVAILABLE FOR USE BY THE CONTRACTOR PRIOR TO COMBUSTIBLES BEING BROUGHT ON SITE. 7.ALL UTILITY AND STORM DRAIN TRENCHES LOCATED UNDER AREAS TO RECEIVE PAVING SHALL BE COMPLETELY BACK FILLED IN ACCORDANCE WITH THE GOVERNING JURISDICTIONAL AGENCY'S SPECIFICATIONS. IN THE EVENT THAT THE CONTRACT DOCUMENTS AND THE JURISDICTIONAL AGENCY REQUIREMENTS ARE NOT IN AGREEMENT, THE MOST STRINGENT SHALL GOVERN. 8.UNDERGROUND LINES SHALL BE SURVEYED BY A STATE OF CA PROFESSIONAL LAND SURVEYOR PRIOR TO BACK FILLING. 9.CONTRACTOR SHALL PERFORM, AT HIS OWN EXPENSE, ANY AND ALL TESTS REQUIRED BY THE SPECIFICATIONS AND/OR ANY AGENCY HAVING JURISDICTION. THESE TESTS MAY INCLUDE, BUT MAY NOT BE LIMITED TO, INFILTRATION AND EXFILTRATION, TELEVISION INSPECTION AND A MANDREL TEST ON GRAVITY SEWER. A COPY OF THE TEST RESULTS SHALL BE PROVIDED TO THE UTILITY PROVIDER, OWNER AND JURISDICTIONAL AGENCY AS REQUIRED. 10.CONTRACTOR SHALL PROVIDE FOR A MINIMUM HORIZONTAL CLEARANCE OF 10' AND A VERTICAL CLEARANCE OF 18" BETWEEN WATER AND SANITARY SEWER MANHOLES AND LINES. 11.IF ANY EXISTING STRUCTURES TO REMAIN ARE DAMAGED DURING CONSTRUCTION IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO REPAIR AND/OR REPLACE THE EXISTING STRUCTURE AS NECESSARY TO RETURN IT TO EXISTING CONDITIONS OR BETTER. 12.ALL STORM PIPE ENTERING STRUCTURES SHALL BE GROUTED TO ASSURE CONNECTION AT STRUCTURE IS WATERTIGHT UNLESS OTHERWISE STATED BY CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS. 13.UNLESS OTHERWISE STATED IN CITY AND STATE DESIGN STANDARDS AND SPECIFICATIONS, ALL STORM SEWER MANHOLES IN PAVED AREAS SHALL BE FLUSH WITH PAVEMENT, AND SHALL HAVE TRAFFIC BEARING RING & COVERS. MANHOLES IN UNPAVED AREAS SHALL BE 6" ABOVE FINISH GRADE. LIDS SHALL BE LABELED "STORM SEWER". EXISTING CASTINGS AND STRUCTURES WITHIN PROJECT LIMITS SHALL BE ADJUSTED TO MEET THESE CONDITIONS AND THE PROPOSED FINISHED GRADE. 14.TOPOGRAPHIC INFORMATION IS TAKEN FROM A TOPOGRAPHIC SURVEY BY LAND SURVEYORS. IF THE CONTRACTOR DOES NOT ACCEPT EXISTING TOPOGRAPHY AS SHOWN ON THE PLANS, WITHOUT EXCEPTION, THEN THE CONTRACTOR SHALL SUPPLY, AT THEIR EXPENSE, A TOPOGRAPHIC SURVEY BY A REGISTERED LAND SURVEYOR TO THE OWNER FOR REVIEW. 15.CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. 16.ALL STORM STRUCTURES SHALL HAVE A SMOOTH UNIFORM POURED MORTAR FROM INVERT IN TO INVERT OUT. 17.ROOF DRAINS SHALL BE CONNECTED TO STORM SEWER BY PREFABRICATED WYES OR AT STORM STRUCTURES. ROOF DRAINS AND TRUCK WELL DRAIN SHALL RUN AT A MINIMUM 1% SLOPE, UNLESS NOTED OTHERWISE, AND TIE IN AT THE CENTERLINE OF THE STORM MAIN. 18.ALL ROOF AND SANITARY SEWER DRAINS SHALL BE INSULATED IF 7' OF COVER CANNOT BE PROVIDED. 19.THE CONTRACTOR SHALL PROTECT EXISTING UNDERGROUND UTILITIES AND APPURTENANCES THAT ARE TO REMAIN FROM DAMAGE DURING CONSTRUCTION OPERATIONS. 20.THE LOCATION OF EXISTING UTILITIES, STORM DRAINAGE STRUCTURES AND OTHER ABOVE AND BELOW-GRADE IMPROVEMENTS ARE APPROXIMATE AS SHOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE THE EXACT LOCATION, SIZE AND INVERT ELEVATIONS OF EACH PRIOR TO THE START OF CONSTRUCTION. 21.A MINIMUM OF 5' SEPARATION IS REQUIRED BETWEEN UTILITIES AND TREES UNLESS A ROOT BARRIER IS UTILIZED. 22.GAS, PHONE AND ELECTRIC SERVICES SHOWN FOR INFORMATIONAL PURPOSES ONLY. DRY UTILITY COMPANIES MAY ALTER THE DESIGN LAYOUT DURING THEIR REVIEW. CONTRACTOR TO COORDINATE FINAL DESIGN AND INSTALLATION WITH UTILITY COMPANIES. 23.COORDINATE UTILITY INSTALLATION WITH IRRIGATION DESIGN AND INSTALLATION. 24.ALL DIMENSIONS ARE TO FLOW LINE OF CURB UNLESS OTHERWISE NOTED. PERIMETER WALL DIMENSIONS ARE TO INSIDE WALL FACE. REFERENCE ARCHITECTURAL PLANS FOR EXACT WALL WIDTH AND SPECIFICATIONS. 25.REFERENCE ARCHITECTURAL PLANS (BY OTHERS). FOR EXACT BUILDING DIMENSIONS, AND MATERIALS SPECIFICATIONS. 26.REFERENCE M.E.P. PLANS (BY OTHERS) FOR MECHANICAL EQUIPMENT DIMENSIONS AND SPECIFICATIONS. 27.CONTRACTOR SHALL REFERENCE STRUCTURAL PLANS (BY OTHERS) FOR MECHANICAL EQUIPMENT DIMENSIONS AND PAD PREPARATION SPECIFICATIONS. 28. CONTRACTOR SHALL REFERENCE M.E.P PLANS (BY OTHERS) FOR LIGHT POLE WIRING. UST REMOVAL AND REPLACEMENT GENERAL CONSTRUCTION NOTES CONT. 33.ALL SYSTEM COMPONENTS THAT ARE OR MAY BE EXPOSED TO PRODUCT SHALL HAVE COMPATIBILITY STATEMENTS SUBMITTED. 34.CONTRACTOR SHALL VISIT JOB SITE PRIOR TO BIDDING AND SHALL VERIFY CONDITIONS PRIOR TO COMMENCING WORK. CONTRACTOR SHALL PERFORM A UTILITY SURVEY OF THE PLANNED UST EXCAVATION AND NOTIFY UNDERGROUND SERVICE ALERT (USA), DIAL 811, OF THE PLANNED UST EXCAVATION. 35.THE CITY PROJECT MANAGER AND ENGINEER OF RECORD SHALL BE CONTACTED IMMEDIATELY IF THERE ARE ANY DISCREPANCIES WITH THE PROJECT PLANS AND SPECIFICATIONS THAT MAY IMPACT THE WORK. 36.CONTRACTOR TO FOLLOW THE CITY OF CARLSBAD FIRE DEPARTMENT AND THE COUNTY OF SAN DIEGO S.A.M. MANUAL (LATEST EDITION) SPECIFICATIONS FOR THE HANDLING AND DISPOSAL OF CONTAMINATED SOIL AND THE UNDERGROUND STORAGE TANK. DISPOSAL DOCUMENTS SHALL BE COPIED AND SENT TO THE CITY OF CARLSBAD PROJECT MANAGER. 37.CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED IMPROVEMENTS (INCLUDING CONCRETE, ASPHALT, CURBS, GUTTERS, FENCING, ETC.) OUTSIDE THE LIMITS OF WORK, TO MATCH THE ORIGINAL PRE-CONSTRUCTION CONDITIONS AND SHALL REPAIR OR REPLACE ALL DAMAGED IMPROVEMENTS WITHIN THE LIMITS OF WORK AT NO ADDITIONAL COST TO THE CITY OF CARLSBAD. 38.ALL OTHER EXISTING CONSTRUCTION AT THIS SITE NOT AFFECTED BY WORK SHOWN ON THIS PLAN IS TO REMAIN UNLESS OTHERWISE DIRECTED BY THE CITY REPRESENTATIVE. 39.WORK SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL AGENCY INSPECTIONS. 40.A LICENSED FUELING CONTRACTOR SHALL PURGE ALL FUEL & VAPOR FROM THE FUELING SYSTEM PRIOR TO ANY DEMOLITION COMMENCING. 41.ALL WORK PRODUCING EXCESSIVE NOISE OR FUMES TO BE COORDINATED WITH CARLSBAD PROJECT MANAGER. 42.WHERE SOIL IS DISTURBED SOIL SAMPLING IS REQUIRED BY A CALIFORNIA LICENSED GEOLOGIST PER CRITERIA OF THE SAN DIEGO COUNTY ENVIRONMENTAL HEALTH DEPARTMENT. CONRTACTOR IS TO ASSIST IN COORDINATING TESTING AND RESULTS. THE CITY (AGENCY) TO PROVIDE SOIL SAMPLING AND TESTING. 43.ALL REMOVAL AND DISPOSAL SHALL BE DONE IN AN ORDERLY AND SAFE MANNER AND SHALL MINIMIZE DISTURBANCES TO EXISTING CONDITIONS. 44.PROPERLY TERMINATE ALL EXISTING PLUMBING & ELECTRICAL ITEMS ABANDONED AND/OR TEMPORARILY REMOVED DURING DEMOLITION 2 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 2BB2BB FUEL ISLAND NOTES 1.INSTALL NEW DOUBLE WALL TURBINE AND FILL SUMPS ON ALL THREE TANKS AS PER PLANS. 2.INSTALL NEW F. E. PETRO SUBMERSIBLE TURBINE PUMPS. 3.INSTALL NEW A.O. SMITH FIBERGLASS PENETRATION FITTINGS ON PRODUCT, VENT AND VAPOR PIPING IN TURBINE AND FILL SUMPS AS PER PLANS. NOTE: ALL A.O. SMITH PENETRATION FITTINGS TO BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. 4.INSTALL NEW FLEXING 18" X 2" BRAIDED-STEEL FLEX-PIPING SECTIONS FOR PRODUCT LINES IN TURBINE SUMPS, VENT AND VAPOR LINES IN FILL SUMPS. 5.INSTALL THREE (3) NEW BRAVO DISPENSER UDCS TO MATCH FOOTPRINT WITH NEW GASBOY DISPENSERS. 6.INSTALL NEW OPW IMPACT SHUTOFF VALVES FOR PRODUCT LINES IN UDCS. 7.INSTALL NEW OPW IMPACT SHUTOFF VALVES FOR VAPOR LINES IN UDCS. 8.INSTALL NEW FLEXING 24" X 1½" BRAIDED-STEEL FLEX-PIPING SECTIONS FOR PRODUCT AND VAPOR LINES IN UDCS. 9.INSTALL NEW A.O. SMITH FIBERGLASS PENETRATION FITTINGS IN UDCS FOR PRODUCT AND VAPOR PIPING AS REQUIRED. NOTE: ALL A.O. SMITH PENETRATION FITTINGS TO BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. 10.INSTALL NEW BRAVO VENT SUMP, RACK AND RISERS AS SHOWN ON PLOT PLAN. 11.INSTALL NEW A.O. SMITH FIBERGLASS PENETRATION FITTINGS IN VENT SUMP FOR VENT PIPING AS REQUIRED. NOTE: ALL A.O. SMITH PENETRATION FITTINGS TO BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. 12.INSTALL NEW FLEXING 24" X 2" BRAIDED-STEEL FLEX-PIPING SECTIONS FOR VENT LINES IN VENT BOX. 13.INSTALL NEW BRAVO ¾" AND 1" FIBERGLASS PENETRATION FITTINGS ON ELECTRICAL CONDUIT IN TURBINE AND FILL SUMPS AS PER PLANS. NOTE: ALL ELECTRICAL PENETRATION FITTINGS TO BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. 14.INSTALL NEW A.O. SMITH DOUBLE WALL FIBERGLASS PIPE FOR PRODUCT, VENT AND VAPOR LINES AS REQUIRED. ALL PIPING RUNS SHALL SLOPE AT A MIN. OF 1/8 INCH PER FOOT BACK TO TANK. NOTE: ALL A.O. SMITH PIPE AND FITTINGS TO BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. 15.INSTALL NEW DISPENSER ISLANDS (SET FRAMES). 16.INSTALL NEW BOLLARDS AROUND VENT RACK AND VENT PIPES PER SHEET 29 AND AS SHOWN ON SHEET 3B. BOLLARDS TO BE MINIMUM 4"-DIAMETER SCHEDULE 40 GALVANIZED PIPE, CONCRETE FILLED, NOT LESS THAN 36" ABOVE GRADE AND NOT LESS THAN 36" BELOW GRADE INTO A CONCRETE BASE OF MINIMUM 15" DIAMETER, SPACED NOT LESS THAN 36" FROM VENT RACK AND NOT MORE THAN 48" APART. 17.INSTALL BOLLARDS AT THE CORNERS OF THE FUEL ISLAND AS SHOWN ON SHEET 29 AND 3B 18.INSTALL THREE (3) NEW GASBOY ATLAS SINGLE PRODUCT DISPENSERS. 19.INSTALL VAPOR PRESSURE SENSOR IN DISPENSER CLOSEST TO USTS (DISPENSER 1/2). NOTE: VAPOR PRESSURE SENSOR TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 20.INSTALL VAPOR FLOW METER IN EACH DISPENSER (2 TOTAL). NOTE: VAPOR FLOW METERS TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 21.INSTALL NEW PHASE II HEALY (EVR) HOSES, BREAKAWAYS AND NOZZLES. 22.INSTALL VEEDER-ROOT 794380-208 SUMP SENSORS IN ALL DISPENSER UDC SUMPS, VENT BOX, TURBINE AND FILL SUMPS. NOTE: SENSORS TO BE SET FOR POSITIVE SHUTDOWN OF TURBINES. 23.INSTALL VEEDER-ROOT 794380-304 HYDROSTATIC SUMP SENSORS IN ALL DISPENSER UDC SUMPS, VENT BOX, UST TURBINE AND FILL SUMPS. NOTE: SENSORS TO BE SET FOR POSITIVE SHUTDOWN OF TURBINES. 24.INSTALL VEEDER-ROOT 794380-303 HYDROSTATIC SUMP SENSORS IN ALL TANK ANNULARS. NOTE: SENSORS TO BE SET FOR POSITIVE SHUTDOWN OF TURBINES. 25.INSTALL VEEDER-ROOT VACUUM SENSOR KITS ON ALL PRODUCT, VAPOR & VENT LINES IN SEPARATE ZONES AS NOTED. VACUUM SENSOR KIT #1 - LOCATION 87 MAIN TURBINE SUMP. ZONE #1 - 87 MAIN PRODUCT LINE. ZONE #2 - 87 MAIN VENT LINE. ZONE #3 - VAPOR RETURN LINE. VACUUM SENSOR KIT #2 - LOCATION - 87 SECONDARY TURBINE SUMP. ZONE #4 - 87 PRODUCT LINES. ZONE #5 - 87 VENT LINES. 26.INSTALL A VEEDER ROOT CARBON CANISTER ON VENT RACK. 27.INSTALL 2A:10B:C FIRE EXTINGUISHER WITHIN 25' TO 70' OF DISPENSERS. FUEL ISLAND INSPECTION CITY SHALL HIRE A THIRD PARTY VEEDER ROOT CERTIFIED INSPECTOR TO BE PRESENT AND/OR PERFORM THE FOLLOWING: 28.PERFORM ENHANCED LEAK DETECTION (TRACER TEST). 29.PERFORM VEEDER-ROOT 450+ MONITORING CERTIFICATION. NOTE: CERTIFICATION TO BE WITNESSED BY INSPECTOR. 30.PERFORM APCD LEAK DECAY, BLOCKAGE, AND VOLUME OVER LIQUID TESTS. NOTE: APCD TESTS TO BE DONE BY INSPECTOR. 31.CONTRACTOR TO PERFORM FINAL INSPECTION IN FRONT OF THIRD PART INSPECTOR. 32.CALIBRATE DISPENSERS. NOTE: CALIBRATION TO BE DONE BY THE CONTRACTOR IN FRONT OF THIRD PARTY INSPECTOR. 33.PRESSURE-TEST PRODUCT, VENT AND VAPOR PRIMARY LINES AS REQUIRED TO 70 PSI FOR ONE HOUR IN FRONT OF THIRD PARTY INSPECTOR. 34.PRESSURE-TEST PRODUCT, VENT AND VAPOR SECONDARY LINES AS REQUIRED TO 5 PSI FOR ONE HOUR IN FRONT OF THIRD PARTY INSPECTOR. 35.ADD BRINE TO ALL UDCS, VENT BOX, TURBINE AND FILL SUMPS AS PER MANUFACTURER'S INSTRUCTIONS. BRINE TO BE CHECKED BY THIRD PARTY INSPECTOR. FUEL ISLAND CONSTRUCTION NOTES 36.EXCAVATE TANK HOLE AS NEEDED FOR NEW CONTAINMENT SOLUTIONS TANKS. 37.PLACE TWO NEW CONTAINMENT SOLUTIONS 20,000-GALLON TANKS AND ONE CONTAINMENT SOLUTIONS 12,000-GALLON TANK WITH BRINE FILLED INTERSTITIAL SPACE IN EXCAVATED AREA. NOTE: TANKS TO BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. NOTE: CONTRACTOR TO PROVIDE A COPY OF FACTORY TANK SET CHECK SHEET TO INSPECTOR DOCUMENTING ALL REQUIRED PROCEDURES HAVE BEEN FOLLOWED. 38.CHECK TANKS FOR SLOPE (TANK TO BE SET LEVEL). 39.CHECK TANKS FOR PROPER VERTICAL DEFLECTION LIMITS. 40.UDCS, BOXES, AND SUMPS WITH WET ANNULARS TO BE FITTED WITH DUAL SECONDARY ACCESS VALVES TO ALLOW FOR ACCURATE FILLING AND PROOF OF COMMUNICATION IN THE ANNULAR SPACE. 41.BACKFILL ALL PROJECT TRENCHING PER SECTION 8.1.6 OF GEOTECHNICAL REPORT PREPARED BY NINYO & MOORE DATED MARCH 26, 2021. PER THE REPORT, TRENCH ZONE BACKFILL IS TO BE COMPACTED TO A RELATIVE COMPACTION OF 90 PERCENT AS EVALUATED BY ASTM D 1557, EXCEPT FOR THE UPPER 12 INCHES OF THE BACKFILL BENEATH VEHICULAR PAVEMENT WHICH IS TO BE COMPACTED TO A RELATIVE COMPACTION OF 95 PERCENT AS EVALUATED BY ASTM D 1557. 42.PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. TYPICAL OWNER/ENGINEER OBSERVATIONS CONTRACTOR SHALL NOTIFY OWNER AND/OR ENGINEER 48 HOURS IN ADVANCE OF THE FOLLOWING ACTIVITIES: ··PRE-CONSTRUCTION MEETING, ··SUBGRADE PREPARATION, ··BASE INSTALLATION ··ASPHALT INSTALLATION, ··UNDERGROUND PIPING AND UTILITIES INSTALLATION, ··INSTALLATION OF STRUCTURES, ··CHECK VALVES, HYDRANTS, METERS, ETC., ··SIDEWALK INSTALLATION, ··CONNECTIONS TO WATER AND SEWER MAINS, ··TESTS OF UTILITIES 1.THE TANK INSTALLATION SHALL BE INSPECTED BY THE COUNTY AND THIRD PARTY INSPECTOR AT FOUR (4) SEPARATE CONSTRUCTION PHASES (SEE FUEL ISLAND INSPECTION): A.AT TANK SET TO ENSURE TANKS ARE INSTALLED PROPERLY AND LEVEL B.DURING PRIMARY PIPING NFPA 30 TESTING (HYDROSTATIC OR PNEUMATIC TESTING OF LINES FOR 30 MINUTES). C.INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING IN ACCORDANCE WITH MANUFACTURER'S GUIDELINES. D.AT THE FINAL INSPECTION, INCLUDING ALL PORTIONS OF THE LEAK DETECTION SYSTEM. 2.THE CONTRACTOR IS RESPONSIBLE TO CONTACT THE CARLSBAD FIRE DEPARTMENT (CFD) & SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT (SDAPCD) A MINIMUM OF 5 WORKING DAYS PRIOR TO REPAIRS TO THE UST SYSTEM AND ALL SITE INSPECTIONS SHALL BE SCHEDULED A MINIMUM OF 5 WORKING DAYS IN ADVANCE OF REQUESTED DATE. 3.THE CONTRACTOR IS RESPONCIBLE TO CONTACT SAN DIEGO COUNTY AIR POLLUTION CONTROL DISTRICT AND THE CARLSBAD FIRE DEPARTMENT TO ENSURE THEY WITNESS ALL TESTING OF FUEL TANKS, PIPELINES, EMERGENCY SHUT-OFF, FUEL AND PUMPS, ETC. 4.WORK SHALL COMPLY WITH ALL LOCAL, STATE AND FEDERAL CODES AND REGULATIONS, CONTRACTOR IS RESPONSIBLE FOR SCHEDULING ALL AGENCY INSPECTIONS. GENERAL NOTES 1.A LICENSED FUELING CONTRACTOR SHALL PURGE ALL FUEL & VAPOR FROM THE FUELING SYSTEM PRIOR TO ANY DEMOLITION COMMENCING. 2.PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE 3.CONCRETE IS TO BE TREATED WITH TYPE 2 WHITE PIGMENTED CONCRETE CURING COMPOUND, APPLIED ACCORDING TO MANUFACTURE'S RECOMMENDATIONS, CONSISTENT WITH ASTM STANDARD SPEC C309. 4.REMOVE, SCARIFY, AND RE-COMPACT TO 95% RELATIVE DENSITY A MINIMUM OF 12 INCHES BELOW THE CONCRETE PAVEMENT SECTION. 5.CONTRACTOR SHALL REPAIR OR REPLACE ALL DAMAGED IMPROVEMENTS (INCLUDING CONCRETE, ASPHALT, CURBS, GUTTERS, FENCING, ETC.) OUTSIDE THE LIMITS OF WORK, TO MATCH THE ORIGINAL PRE-CONSTRUCTION CONDITIONS AND SHALL REPAIR OR REPLACE ALL DAMAGED IMPROVEMENTS WITHIN THE LIMITS OF WORK AT NO ADDITIONAL COST TO THE CITY OF CARLSBAD. 6.ALL OTHER EXISTING CONSTRUCTION AT THIS SITE NOT AFFECTED BY WORK SHOWN ON THIS PLAN IS TO REMAIN UNLESS OTHERWISE DIRECTED BY THE CITY REPRESENTATIVE. 7.ALL WORK PRODUCING EXCESSIVE NOISE OR FUMES TO BE COORDINATED WITH CARLSBAD PROJECT MANAGER. 8.ALL REMOVAL AND DISPOSAL SHALL BE DONE IN AN ORDERLY AND SAFE MANNER AND SHALL MINIMIZE DISTURBANCES TO EXISTING CONDITIONS. 9.PROPERLY TERMINATE ALL EXISTING PLUMBING & ELECTRICAL ITEMS ABANDONED AND/OR TEMPORARILY REMOVED DURING DEMOLITION. 10.AS BUILTS: IN THE EVENT A CHANGE IS MADE DURING CONSTRUCTION THAT DEVIATES FROM THE ORIGINAL APPROVED PLANS, REVISED PLANS ("AS BUILTS") SHALL BE SUBMITTED AND APPROVED IN ORDER TO COMPLETE THE FINAL INSPECTION. 3 36 9/30/25 32 5 32 5 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 S S S S W W S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W S S S S W SD SD SD SD W W 36 5 . 9 6 CE N T E R OF D O O R 365.99 CENTER OF DOOR VARIOUS SIZED MANHOLES (TYPICAL) HOSE VAULT FUEL PUMP FUEL PUMP FUEL PUMP HOSE VAULT PUMP CONTROL CABINETGP GP GP GP WATER PIPELINES WATER SPIGOT WATER METER WATER METER E WATER METER GAS METER SEWER MANHOLE SEWER CLEANOUT UNKNOWN HANDHOLE DI DI DI AD E E E TRAP AD DI DI PAINT STRIPING PAINT STRIPING STRIP DRAIN STRIP DRAIN STRIP DRAIN STRIP DRAIN C/L FENCE C/L FENCE AC BERM CONC WA L L CONC WAL L CONC WA L L CONC WA L L CONC WA L L CONC WA L L CONC WAL L CONC CUR B CONC SWALE CONC SWALE BUILDING CONC CUR B & GUTTER CONC CUR B & GUTTER CURB INLET CURB INLET CURB INLET CONC C U R B & GU T T E R AC AC AC AC AC AC AC AC AC CONC CONC CONC CONC CONC CONC CURB CONC CURB & GUTTER CONC 369.0 368.5 368. 0 367.5 367.0 366.5 366.0 365.5 365.0 36 5 . 5 36 5 . 0 366 . 0 365 . 5 36 5 . 0 365 . 5365. 0 365.5 3 6 6 . 0 3 6 6 . 0 365.5 365.0 366 . 0 36 6 . 5 36 7 . 0 36 7 . 5 1004 1003 000 0 0 0 0 000 0 0 0 0 000 0 000 0 UST TO BE REMOVED (APPROX.) FIBERGLASS 20,000 GALLON (UNDERGROUND; UNLEADED) APPROX. EXCAVATION LIMITS EXISTING DISPENSER MANAGEMENT CONSOLE TO BE REMOVED AND STORED FOR FUTURE RECONNECTION UST TO BE REMOVED AND REPLACED (APPROX.) TWO FIBERGLASS 20,000 GALLON AND ONE FIBERGLASS 12,000 GALLON (UNDERGROUND; DIESEL) SEE SHEET 24 AND 25 FOR DETAILS PROPOSED CANOPY COLUMN SEE SHEET 6 EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE TO BE STORED DURING CONSTRUCTION AND RECONNECTED PROPOSED CANOPY COLUMN SEE SHEET 6 PROPOSED CANOPY FINISHED GRADE CONTRACTOR TO FIELD VERIFY AND CONSTRUCT A TRENCH FOR UNDERGROUND PIPING AND UTILITIES PER DETAIL 2 ON SHEET 13 TO EXISTING BUILDING CONTRACTOR TO FIELD VERIFY THE EXACT LOCATION AND DEPTH OF UNDERGROUND PIPING AND UTILITIES IN THE IMMEDIATE VICINITY OF CONSTRUCTION ACTIVITIES. SEE SHEET 12 FOR MORE INFORMATION CONTRACTOR TO FIELD VERIFY DEPTH AND LOCATION OF EXISTING ELECTRICAL UTILITY EXISTING EMERGENCY SHUTOFF VALVE TO REMAIN (BUILDING INTERIOR) EXISTING EMERGENCY SHUTOFF VALVE TO REMAIN CONTRACTOR TO FIELD VERIFY AND CONSTRUCT A TRENCH PER DETAIL 2 ON SHEET 13 TO ELECTRICAL ROOM CATCH BASIN INLET PROTECTION. SEE DETAIL ON THIS SHEET. CATCH BASIN INLET PROTECTION. SEE DETAIL ON THIS SHEET. CURB INLET INLET PROTECTION. SEE DETAIL ON THIS SHEET. CURB INLET INLET PROTECTION. SEE DETAIL ON THIS SHEET. UST TO BE REMOVED (APPROX.) FIBERGLASS 20,000 GALLON (UNDERGROUND; UNLEADED) UST TO BE REMOVED (APPROX.) FIBERGLASS 12,000 GALLON (UNDERGROUND; DIESEL) REMOVE FUEL DISPENSER REMOVE FUEL DISPENSER CONTRACTOR TO REMOVE EXISTING BOLLARDS EXISTING FUEL TANK MANAGEMENT SYSTEM TO BE REMOVED (SYSTEM TO BE REPLACED, SEE SHEET 3B) NORTH 0 GRAPHIC SCALE IN FEET 20 10 20 40 0000 0 00 0 00 0 SCALE: N.T.S CURB INLET PROTECTION (SE-10) SCALE: N.T.S GRAVEL BAGGING DETAILCATCH BASIN/AREA DRAIN LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 3A APPROX. EXCAVATION LIMITS CONCRETE REMOVAL ASPHALT REMOVAL DRAINAGE INLET COVER INSTALL GRAVEL BAGS 13 FULL AT EACH END.UNDER-SEAL GASKET FILTER HEIGHT - 2" "L" SHAPED BRACKETS VARIABLE HEIGHT PINS 18" MIN SECTION NOTES: 1.GRAVEL BAG MATERIAL: POLYPROPYLENE, POLYETHYLENE OR POLYMIDE WOVEN FABRIC, MINIMUM UNIT WEIGHT 4 OUNCES PER SQUARE YARD, MULLEN BURST STRENGTH EXCEEDING 300 PSI AND ULTRAVIOLET STABILITY EXCEEDING 70% 2.GRAVEL BAG SHALL BE FILLED WITH 3/4" ROCK OR 1/4" PEA GRAVEL. 3.PLACE SEVERAL LAYERS OF SAND BAGS (12" MINIMUM HIGH) OVERLAPPING THE BAGS AND PACKING THEM TIGHTLY TOGETHER. 4.LEAVE GAP OF ONE BAG ON THE TOP ROW TO SERVE AS A SPILLWAY. 5.PLACE WIRE MESH OVER AND 1' (MINIMUM) BEYOND THE INLET STRUCTURE. 6.PLACE FILTER FABRIC OVER WIRE MESH. FILTER FABRIC SHALL BE MANUFACTURED FROM UV RESISTANT POLYPROPYLENE, NYLON, POLYESTER, OR ETHYLENE FABRIC WITH AN EQUIVALENT OPENING SIZE NOT GREATER THAN 20 SIEVE AND WITH A MINIMUM FLOW RATE OF 40 GALLONS/MINUTE/SQ. FT. 7.INSPECT BARRIERS AND REMOVE SEDIMENT AFTER EACH STORM EVENT. DROP INLET W/ GRATE GRAVEL BAG FILLED WITH COARSE GRAVEL 4" PVC PIPE FOR DRAINAGE ROW OF GRAVEL FILLED BAGS (18" MINIMUM WIDTH) & 2 BAGS MINIMUM HEIGHT 4" PVC PIPE FOR DRAINAGE 3 BAGS HEIGHT MIN FILTER FABRIC ONE INSPECTION IS REQUIRED AT THE TIME OF THE SYSTEM REMOVAL. PRIOR TO THE REMOVAL AND THE INSPECTORS ARRIVAL ON SITE, THE UST SYSTEM INCLUDING THE PIPING MUST BE EXPOSED TO ALLOW PROPER INSPECTION AND IDENTIFICATION OF SAMPLING POINTS. THE TANKS MUST BE TRIPLE RINSED/DECONTAMINATED AND THE LOWER EXPLOSIVE LIMIT (LEL) MUST BE 20% OR LESS AS DETERMINED BY A CALIBRATED COMBUSTIBLE GAS INSTRUMENT (CGI). THE WASTE (RINSEATE AND SLUDGE-BOTTOM WASTE) MUST BE TRANSPORTED BY A LICENSED HAZARDOUS WASTE HAULER (THE WASTE HAULER MUST PROVIDE A MANIFEST NUMBER FOR THE INSPECTORS PAPER WORK). DEH INSPECTION REQUIREMENTS 1.IT IS UNDERSTOOD THE CONTRACTOR WILL EMPTY AND CLEAN THE USTS PRIOR TO THE START OF THIS PROJECT. CONTRACTOR SHALL VERIFY THAT TANKS ARE EMPTY. 2.CONTRACTOR SHALL REMOVE (1) EXISTING 12,000 GALLON AND (2) EXISTING 20,000 GALLON UNDERGROUND FUEL TANKS AND ALL APPLICABLE UNDERGROUND PIPING. THE TANKS PREVIOUSLY STORED MOTOR FUELS. PRODUCT PIPING MUST BE INERTED AND LEFT IN PLACE FOR DEPARTMENT OF ENVIRONMENTAL HEALTH AND QUALITY INSPECTION PRIOR TO REMOVAL. ALL PIPING AND USTS MUST BE REMOVED AT THE SAME TIME. FAILURE TO DO SO WILL RESULT IN A RE-INSPECTION AND RE-INSPECTION FEE. CONTRACTOR SHALL PROVIDE A DESIGNED SHORING SYSTEM WITH BRACING PER GEOTECHNICAL RECOMMENDATIONS. 3.CONTRACTOR SHALL REMOVE THE USTS AND COLLECT SOIL SAMPLES FROM (1) THE BASE OF THE EXCAVATION, (2) ALONG THE PIPING RUNS AS DIRECTED BY DEPARTMENT OF ENVIRONMENTAL HEALTH AND QUALITY INSPECTOR, AND (3) STOCKPILE OF OVERBURDEN SOIL UNDER THE DISCRETION OF THE DEPARTMENT OF ENVIRONMENTAL HEALTH AND CARLSBAD FIRE DEPARTMENT INSPECTORS. THE DEPARTMENT OF ENVIRONMENTAL HEALTH AND QUALITY INSPECTOR SHALL IDENTIFY SPECIFIC SAMPLING LOCATIONS AT THE TIME OF REMOVAL. CONTRACTOR SHALL DISPOSE OF THE DECONTAMINATED USTS AS A NON HAZARDOUS WASTE. 4.PRIOR TO REMOVAL, ALL TANKS AND PIPING MUST BE PROPERLY PURGED OF ALL VAPORS. UST REMOVAL NOTES 4 36 9/30/25 PVC 18" MIN. 15 16 16 5 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 S S S S W W S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W S S S S W SD SD SD SD W W 36 5 . 9 6 CE N T E R OF D O O R 365.99 CENTER OF DOOR VARIOUS SIZED MANHOLES (TYPICAL) HOSE VAULT FUEL PUMP FUEL PUMP FUEL PUMP HOSE VAULT PUMP CONTROL CABINETGP GP GP GP WATER PIPELINES WATER SPIGOT WATER METER WATER METER E WATER METER GAS METER SEWER MANHOLE SEWER CLEANOUT UNKNOWN HANDHOLE DI DI DI AD E E E TRAP AD DI DI PAINT STRIPING PAINT STRIPING STRIP DRAIN STRIP DRAIN STRIP DRAIN STRIP DRAIN C/L FENCE C/L FENCE AC BERM CONC WA L L CONC WAL L CONC WA L L CONC WA L L CONC WA L L CONC WA L L CONC WAL L CONC CUR B CONC SWALE CONC SWALE BUILDING CONC CUR B & GUTTER CONC CUR B & GUTTER CURB INLET CURB INLET CURB INLET CONC C U R B & GU T T E R AC AC AC AC AC AC AC AC AC CONC CONC CONC CONC CONC CONC CURB CONC CURB & GUTTER CONC 369.0 368.5 368. 0 367.5 367.0 366.5 366.0 365.5 365.0 36 5 . 5 36 5 . 0 366 . 0 365 . 5 36 5 . 0 365 . 5365. 0 365.5 3 6 6 . 0 3 6 6 . 0 365.5 365.0 366 . 0 36 6 . 5 36 7 . 0 36 7 . 5 1004 1003 APPROX. EXCAVATION LIMITS PROPOSED FUEL ISLAND CANOPY. SEE SHEET 6 FOR DETAILS PROPOSED CANOPY COLUMN SEE SHEET 6 PROPOSED CANOPY COLUMN. SEE SHEET 6 REPLACE FUEL DISPENSER. SEE SHEET 26 PROPOSED CANOPY COLUMN. SEE SHEET 6 UST TO BE REMOVED AND REPLACED (APPROX.) TWO FIBERGLASS 20,000 GALLON AND ONE FIBERGLASS 12,000 GALLON (UNDERGROUND; DIESEL) SEE SHEET 24 AND 25 FOR DETAILS PROPOSED CANOPY COLUMN SEE SHEET 6 EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE TO BE STORED DURING CONSTRUCTION AND RECONNECTED PROPOSED CANOPY COLUMN SEE SHEET 6 PROPOSED CANOPY FINISHED GRADE A A CONTRACTOR TO FIELD VERIFY AND CONSTRUCT A TRENCH FOR UNDERGROUND PIPING AND UTILITIES PER DETAIL 2 ON SHEET 13 TO EXISTING BUILDING CONTRACTOR TO FIELD VERIFY THE EXACT LOCATION AND DEPTH OF UNDERGROUND PIPING AND UTILITIES IN THE IMMEDIATE VICINITY OF CONSTRUCTION ACTIVITIES. SEE SHEET 12 FOR MORE INFORMATION CONTRACTOR TO FIELD VERIFY AND CONSTRUCT A TRENCH PER DETAIL 2 ON SHEET 13 TO ELECTRICAL ROOM CONTRACTOR TO FIELD VERIFY SEWER CONNECTION INSTALL XERXES 20,000 GALLON UST. SEE SHEET 27 FOR DETAILS. INSTALL XERXES 20,000 GALLON UST. SEE SHEET 27 FOR DETAILS. INSTALL XERXES 12,000 GALLON UST. SEE SHEET 28 FOR DETAILS. REPLACE FUEL DISPENSER. SEE SHEET 26 CONSTRUCT 6" IN DIAMETER CONCRETE FILLED STEEL BOLLARDS, SPACED 4 FEET BETWEEN POSTS ON CENTER, SET AT 3 FEET DEEP IN CONCRETE FOOTING AT A MINIMUM OF 18" DIAMETER, SET WITH TOP OF THE POSTS 4 FEET ABOVE GROUND AND LOCATED 3 FEET FROM THE PROTECTED OBJECT. (TYP.) INSTALL NEW VEEDER-ROOT TLS 450PLUS CONSOLE FUEL TANK MANAGEMENT SYSTEM FG:(365.57) UST TO BE REMOVED AND REPLACED (APPROX.) TWO FIBERGLASS 20,000 GALLON AND ONE FIBERGLASS 12,000 GALLON (UNDERGROUND; DIESEL) SEE SHEET 24 AND 25 FOR DETAILS PROPOSED CANOPY COLUMN SEE SHEET 6 EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE TO BE STORED DURING CONSTRUCTION AND RECONNECTED PROPOSED CANOPY COLUMN SEE SHEET 6 PROPOSED CANOPY FINISHED GRADE NORTH 0 GRAPHIC SCALE IN FEET 20 10 20 40 LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 ONE INSPECTION IS REQUIRED AT THE TIME OF THE SYSTEM REMOVAL. PRIOR TO THE REMOVAL AND THE INSPECTORS ARRIVAL ON SITE, THE UST SYSTEM INCLUDING THE PIPING MUST BE EXPOSED TO ALLOW PROPER INSPECTION AND IDENTIFICATION OF SAMPLING POINTS. THE TANKS MUST BE TRIPLE RINSED/DECONTAMINATED AND THE LOWER EXPLOSIVE LIMIT (LEL) MUST BE 20% OR LESS AS DETERMINED BY A CALIBRATED COMBUSTIBLE GAS INSTRUMENT (CGI). THE WASTE (RINSEATE AND SLUDGE-BOTTOM WASTE) MUST BE TRANSPORTED BY A LICENSED HAZARDOUS WASTE HAULER (THE WASTE HAULER MUST PROVIDE A MANIFEST NUMBER FOR THE INSPECTORS PAPER WORK). DEH INSPECTION REQUIREMENTS 1. IT IS UNDERSTOOD THE CONTRACTOR WILL EMPTY AND CLEAN THE USTS PRIOR TO THE START OF THIS PROJECT. CONTRACTOR SHALL VERIFY THAT TANKS ARE EMPTY. 2. CONTRACTOR SHALL REMOVE (1) EXISTING 12,000 GALLON AND (2) EXISTING 20,000 GALLON UNDERGROUND FUEL TANKS AND ALL APPLICABLE UNDERGROUND PIPING. THE TANKS PREVIOUSLY STORED MOTOR FUELS. PRODUCT PIPING MUST BE INERTED AND LEFT IN PLACE FOR DEPARTMENT OF ENVIRONMENTAL HEALTH AND QUALITY INSPECTION PRIOR TO REMOVAL. ALL PIPING AND USTS MUST BE REMOVED AT THE SAME TIME. FAILURE TO DO SO WILL RESULT IN A RE-INSPECTION AND RE-INSPECTION FEE. CONTRACTOR SHALL PROVIDE A DESIGNED SHORING SYSTEM WITH BRACING PER GEOTECHNICAL RECOMMENDATIONS. 3. CONTRACTOR SHALL REMOVE THE USTS AND COLLECT SOIL SAMPLES FROM (1) THE BASE OF THE EXCAVATION, (2) ALONG THE PIPING RUNS AS DIRECTED BY DEPARTMENT OF ENVIRONMENTAL HEALTH AND QUALITY INSPECTOR, AND (3) STOCKPILE OF OVERBURDEN SOIL UNDER THE DISCRETION OF THE DEPARTMENT OF ENVIRONMENTAL HEALTH AND CARLSBAD FIRE DEPARTMENT INSPECTORS. THE DEPARTMENT OF ENVIRONMENTAL HEALTH AND QUALITY INSPECTOR SHALL IDENTIFY SPECIFIC SAMPLING LOCATIONS AT THE TIME OF REMOVAL. CONTRACTOR SHALL DISPOSE OF THE DECONTAMINATED USTS AS A NON HAZARDOUS WASTE. 4. PRIOR TO REMOVAL, ALL TANKS AND PIPING MUST BE PROPERLY PURGED OF ALL VAPORS. UST REMOVAL NOTES 3B APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY SECTION A-A DETAIL N.T.S. CONCRETE RERPLACEMENT ASPHALT REPLACEMENT 9/30/25 36 9 9 29 29 9 9 16 15 16 30 30 31 9 9 27 AND 28 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W 3 3 2 1 6 4 4 5 5 5 7 32 8 8 9 9 22.0' 6 25 . 3 ' 16 . 0 ' 24 . 5 ' 15 . 1 ' 109.0' 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 NORTH EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE TO BE STORED DURING CONSTRUCTION AND RECONNECTED REMOVE AND PROPERLY DISPOSE EXISTING LIGHT POLE REMOVE AND PROPERLY DISPOSE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE AND PROPERLY DISPOSE EXISTING FUEL DISPENSER CONTRACTOR TO REMOVE EXISTING BOLLARDS. CONTRACTOR TO CUT AND CAP EXISTING WATER LINE. REMOVE EXISTING CONCRETE PAVEMENT. REMOVE EXISTING ASPHALT PAVEMENT. DEMOLITION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 4A APPROX. EXCAVATION LIMITS CONCRETE REMOVAL ASPHALT REMOVAL 6 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 S S S S S S S S S S S S S S S S S S S S S S S S W W W W W W W W W W W W W W W W W W W W W W 3 1 5 2 5 1 3 1 2 2 4 4 6 7 FS (366.73) FS (366.72) FS (366.13) FS (365.98)FS (365.61) FS (365.74) FS (365.66) FS (365.50) FS (365.67) FS (365.89) FS 366.40 FS 366.40 FS 366.40 FS 366.40 TG 366.39 TG 366.39 INV 364.39 TG 366.39 TG 366.39 FS 366.51 FS 366.51 FS 366.51 FS 366.51 TG 366.39 TG 366.39 TG 366.39 TG 366.39 FS 366.40 FS 366.40 FS 366.40 FS 366.40 INV 364.33 INV 364.16 8" INV (356.5±) 12 LF @ 61%11 113 LF @ 2% 10 10 1. 0 % 1. 0 % 1.0%1.0% 1.0% 1. 0 % 1.0% 1. 0 % 9 8 8 8 8 1. 5 % 1. 5 % 1.5% FS (366.53) 12 FS (366.72) 13 13 13 13 NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 11 12 13 INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL ON SHEET 26 CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 TELEPHONE MOUNTED ON CANOPY COLUMN. CONTRACTOR TO COORDINATE WITH CITY STAFF FOR EXACT LOCATION, TELEPHONE TYPE, AND CONNECTION. CONTRACTOR TO INSTALL 2A:10B:C FIRE EXTINGUISHER INSTALL 6" WIDE NDS DURA SLOPE TRENCH DRAIN. INSTALL STRIEM OT-500 POLYETHYLENE OIL SEPARATOR (562 GALLON). CONSTRUCT ASPHALT PAVEMENT SECTION TO MATCH EXISTING SECTION. CONSTRUCT 4" SCH 40 PVC SANITARY SEWER PIPE. SLOPE AND LENGTH PER PLAN CONSTRUCT PVC TO VCP CONNECTION. CONSTRUCT 6" IN DIAMETER CONCRETE FILLED STEEL BOLLARDS, SPACED 4 FEET BETWEEN POSTS ON CENTER, SET AT 3 FEET DEEP IN CONCRETE FOOTING AT A MINIMUM OF 18" DIAMETER, SET WITH TOP OF THE POSTS 4 FEET ABOVE GROUND AND LOCATED 3 FEET FROM THE PROTECTED OBJECT. CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 4B APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY NOTES: 1.CONCRETE SHALL BE 4000 PSI. 2.ISOLATION JOINTS SHALL BE PLACED ONLY AS SPECIFIED 3.CONTRACTION JOINTS CONSISTING OF 1" DEEP SCORES SHALL BE PLACED AT 15' INTERVALS O.C. 4.WHERE A WALK IS ADJACENT TO THE CURB THE JOINTS SHALL ALIGN WITH JOINTS IN THE WALK.SUBGRADE COMPACTION PER GEOTECHNICAL REPORT BY NINYO & MOORE DATED MARCH 26, 2021 1/2" R FINISHED GRADE PER SECTION A-A DETAIL ON SHEET 3A 6" CONCRETE CURB N.T.S. PROPOSED PAVEMENT PER SECTION A-A DETAIL ON SHEET 3A CONCRETE RERPLACEMENT ASPHALT REPLACEMENT GRADE BREAK 7 36 9/30/25 29 9 9 4 4 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 12 ' CANOPY LIMITS CANOPY LIMITS 12 ' CONSTRUCT 4" PVC TO 8" VCP CONNECTION. REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION (REF. CBC 1705.3) TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION REFERENCED STANDARDa CBC REFERENCE 1. Inspect reinforcement, including prestressing tendons, and verify placement.-X ACI 318: Ch. 20, 25.2, 25.3, 26.6.1-26.6.3 1908.4000 2. Reinforcing bar welding: a.Verify weldability of reinforcing bars other than ASTM A706; b. Inspect single-pass fillet welds, maximum 516"; and c. Inspect all other welds. - N/A N/A N/A AWS D1.4 ACI 318: 17.8.2 - 3. Inspect anchors cast in concrete.-N/A ACI 318: 17.8.2 - 4. Inspect anchors post-installed in hardened concrete members.b a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension loads. b. Mechanical anchors and adhesive anchors not defined in 4.a. N/A N/A ACI 318: 17.8.2.4 ACI 318: 17.8.2 - 5. Verify the use of required design mix.-X ACI 318: Ch. 19, 26.4.3, 26.4.4 1904.1, 1904.2, 1908.2, 1908.3 6. Prior to concrete placement, fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete. X - ASTM C172 ASTM C31 ACI 318: 26.5, 26.12 1908.1000 7. Inspect concrete and shotcrete placement for proper application techniques.X -ACI 318: 26.5 1908.6000, 1908.7000, 1908.8000 8. Verify maintenance of specified curing temperature and techniques.-X ACI 318: 26.5.3-26.5.5 1908.9000 9. Inspect prestressed concrete for: a.Application of prestressing forces; and b. Grouting of bonded prestressing tendons. N/A N/A - - ACI 318:26.10 - 10. Inspect erection of precast concrete members -N/A ACI 318: 26.9 - 11. Verify in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs. -N/A ACI 318: 26.11.2 - 12. Inspect formwork for shape, location and dimensions of the concrete member being formed.-X ACI 318: 26.11.1.2(b)- REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS (REF. CBC 1705.6) TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION 1. Verify materials below shallow foundations are adequate to achieve the design bearing capacity.-X 2. Verify excavations are extended to proper depth and have reached proper material.-X 3. Perform classification and testing of compacted fill materials.-X 4. Verify use of proper materials, densities and lift thicknesses during placement and compaction of compacted fill.X - 5. Prior to placement of compacted fill, inspect subgrade and verify that site has bee prepared properly -X REQUIRED SPECIAL INSPECTIONS AND TESTS OF CAST-IN-PLACE DEEP FOUNDATION ELEMENTS (REF. CBC 1705.8) TYPE CONTINUOUS SPECIAL INSPECTION PERIODIC SPECIAL INSPECTION 1. Inspect drilling operations and maintain complete and accurate records for each element.X - 2. Verify placement locations and plumbness, confirm element diameters, bell diameters (if applicable), lengths, embedment into bedrock (if applicable) and adequate end-bearing strata capacity. Record concrete or grout volumes. X - 3. For concrete elements, perform tests and additional special inspections in accordance with Section 1705.3.-- 5 STRUCTURAL GENERAL NOTES 1.0 DESIGN DATA 1.01 BUILDING CODE - CALIFORNIA BUILDING CODE 2019 1.02 DESIGN LOADS A.ROOF LOADS LIVE LOAD (L.L.)20 PSF DEAD LOAD (DESIGN D.L.)10 PSF (7 PSF ALLOWANCE FOR FUTURE SOLAR PV) NET WIND UPLIFT 11 PSF (ASD) BASED ON C&C WIND LOADS B.WIND LOAD BASIC WIND SPEED (3-SECOND GUST)96 MPH OCCUPANCY CATEGORY II EXPOSURE C BUILDING ENCLOSURE CLASSIFICATION OPEN BUILDING INTERNAL PRESSURE COEFFICIENT, GCPI +/- 0 C.EARTHQUAKE DESIGN DATA RISK CATEGORY II IMPORTANCE FACTOR 1.0 SITE CLASS D - DEFAULT PER ASCE 7 SECTION 11.4.3 SPECTRAL RESPONSE ACCELERATION SS 0.948 SPECTRAL RESPONSE ACCELERATION S1 0.348 SPECTRAL RESPONSE COEFFICIENTS SDS 0.758 SPECTRAL RESPONSE COEFFICIENTS SD1 0.464 SEISMIC DESIGN CATEGORY D STEEL CANTILEVER SYSTEM: BASIC SEISMIC-FORCE-RESISTING SYSTEM STEEL ORDINARY CANTILEVER COLUMN SYSTEM ANALYSIS PROCEDURE EQUIVALENT LATERAL FORCE SEISMIC RESPONSE MODIFICATION FACTOR R 1.25 SEISMIC RESPONSE COEFFICIENTS CS 0.606 DESIGN BASE SHEAR 16 K (STRENGTH) 2.0 DIMENSIONS 2.01 BEFORE STARTING WORK, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS ON THE SITE, AND REPORT ANY DISCREPANCIES IMMEDIATELY TO THE ENGINEER. 2.02 THE CONTRACTOR, BEFORE STARTING ANY WORK, SHALL CHECK ALL DIMENSIONS GIVEN ON THE STRUCTURAL DRAWINGS, RELATING TO GRID LINES, COLUMN AND WALL LOCATIONS, STRUCTURAL AND FINISHED FLOOR ELEVATIONS, MEMBER SIZES, ETC. IF ANY DISCREPANCY IS NOTICED, IT SHALL BE IMMEDIATELY BROUGHT TO THE ATTENTION OF THE ENGINEER, AND WORK SHALL NOT COMMENCE UNTIL INSTRUCTIONS ARE RECEIVED FROM THE ENGINEER. 2.03 THE CONTRACTOR SHALL REFER TO THE ENGINEER FOR INSTRUCTIONS FOR ANY DIMENSION NOT GIVEN ON OR OBTAINABLE FROM THE DRAWINGS. THE CONTRACTOR SHALL NOT USE SCALE TO OBTAIN OR VERIFY ANY DIMENSION SHOWN ON THESE DRAWINGS. 3.0 DOCUMENTS AND LIMITATIONS 3.01 THIS STRUCTURAL DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, ARE INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. 3.02 IT IS UNDERSTOOD THAT THE STRUCTURAL ENGINEER OF RECORD MAKES NO WARRANTY, EITHER EXPRESSED OR IMPLIED, AS TO FINDINGS, DESIGNS, RECOMMENDATIONS, SPECIFICATIONS, OPINION, OR PROFESSIONAL ADVICE, EXCEPT THAT THESE INSTRUMENTS OF SERVICE HAVE BEEN PREPARED IN ACCORDANCE WITH THE CURRENT GENERALLY ACCEPTED PROFESSIONAL ENGINEERING PRACTICES. 3.03 ALL NON-STRUCTURAL ELEMENTS INDICATED ON THE STRUCTURAL DRAWINGS HAVE BEEN SHOWN IN GENERAL RELATIONSHIP TO0 THE STRUCTURAL ELEMENTS. ACCORDINGLY, THEY SHALL NOT BE ASSUMED TO BE ACCURATE AND REFERENCE MUST BE MADE TO THE APPROPRIATE CONSULTANT(S) PLANS AND SPECIFICATIONS. 4.0 CONSTRUCTION SAFETY 4.01 IT IS UNDERSTOOD THAT THE CONTRACTOR IS SOLELY RESPONSIBLE FOR INITIATING, MAINTAINING, AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK ON THE PROJECT. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS FOR THE SAFETY OF THE PERSONS AND PROTECT THEM AGAINST INJURY. LIKEWISE, THE CONTRACTOR SHALL PROTECT ALL PROPERTY AGAINST DAMAGE AND LOSS. 4.02 THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES, REGULATIONS, AND ORDERS OF ANY PUBLIC BODY HAVING JURISDICTION FOR THE SAFETY OF PERSONS AND PROPERTY. 4.03 THE CONTRACTOR'S DUTIES AND RESPONSIBILITIES FOR THE SAFETY AND PROTECTION OF THE WORK SHALL CONTINUE UNTIL SUCH TIME AS THE WORK IS SATISFACTORILY COMPLETED, AND THE ENGINEER HAS ISSUED A NOTICE TO THAT EFFECT TO THE OWNER AND THE CONTRACTOR. 4.04 ALL STRUCTURAL MEMBERS SHOWN HEREIN HAVE BEEN DESIGNED FOR THE FINAL DESIGN LOADS PROVIDED IN THIS DOCUMENT IN THE FINAL ERECTED CONDITION SHOWN HEREIN. THE CONTRACTOR IS RESPONSIBLE FOR CONDITIONS ENCOUNTERED DURING ERECTION AND HANDLING, AND NECESSARY TEMPORARY BRACING AND SHORING. SHORING AND BRACING SHALL BE DESIGNED TO PRECLUDE ANY STRUCTURAL ELEMENT FROM BEING OVERSTRESSED AT ANY POINT DURING CONSTRUCTION. 4.05 THE GENERAL CONTRACTOR IS RESPONSIBLE FOR MAINTAINING CONSTRUCTION MEANS AND METHODS THAT WILL NOT IMPACT ADJACENT INFRASTRUCTURE. 5.0 SHOP DRAWINGS 5.01 REVIEW OF SHOP DRAWINGS BY THE ENGINEER IS LIMITED TO COMPLIANCE OF THE COMPLETED STRUCTURE WITH THE DESIGN CONCEPT AND INFORMATION GIVEN IN THE CONTRACT DOCUMENTS. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR DIMENSIONS, QUANTITIES, PERFORMANCE, SAFETY, COORDINATION WITH OTHER WORK, AND ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS. REVIEW DOES NOT AUTHORIZE CHANGES TO CONTRACT. 5.02 THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO THE ENGINEER FOR THEIR REVIEW IN ACCORDANCE WITH A SCHEDULE OF SUBMITTALS ACCEPTABLE TO THE ENGINEER. THESE SHOP DRAWINGS SHALL HAVE BEEN CHECKED BY AND STAMPED WITH THE APPROVAL OF THE CONTRACTOR, AND IDENTIFIED AS THE ENGINEER MAY REQUIRE. THE DATA SHOWN ON THE SHOP DRAWINGS HALL BE COMPLETE WITH RESPECT TO DIMENSIONS, DESIGN CRITERIA, AND DULY SIGNED AND SEALED BY A PROFESSIONAL ENGINEER REGISTERED IN THE STATE OF CALIFORNIA. 6.0 FIELD MODIFICATION 6.01 WRITTEN AUTHORIZATION FROM THE STRUCTURAL ENGINEER OF RECORD IS REQUIRED FOR ALL FIELD MODIFICATIONS TO THE STRUCTURAL SYSTEM INCLUDING, BUT NOT LIMITED TO, BEAM AND COLUMN CONNECTIONS, CUTTING OR DRILLING THROUGH ANY STRUCTURAL ELEMENT, ETC. 7.0 SPECIAL INSPECTIONS 7.01 SPECIAL INSPECTIONS WILL BE PROVIDED IN COMPLIANCE WITH THE STATEMENT OF SPECIAL INSPECTIONS 7.02 OWNER WILL ENGAGE A SPECIAL INSPECTOR AND QUALIFIED TESTING AND INSPECTING AGENCY TO PERFORM FIELD TESTS, INSPECTIONS AND PREPARE TEST REPORTS. 7.03 THE GENERAL CONTRACTOR SHALL ASSIST AND COOPERATE WITH AN INDEPENDENT TESTING LABORATORY (TO BE RETAINED BY THE OWNER) WHICH SHALL CONDUCT ALL THE SPECIFIED TESTS REQUIRED FOR THE PROJECT AND REPORT THE RESULTS OF THESE TESTS DIRECTLY AND PROMPTLY TO THE ENGINEER FOR HIS REVIEW. 7.04 CONTRACTOR SHALL NOTIFY SPECIAL INSPECTOR AND TESTING AGENCY 48 HOURS IN ADVANCE OF ITEMS REQUIRED FOR SPECIAL INSPECTION. 7.05 ALL SPECIAL INSPECTION MONTHLY REPORTS SHALL BE SIGNED AND SEALED BY AN ENGINEER LICENSED IN THE STATE OF CALIFORNIA WHO HAS RESPONSIBLE CHARGE OF THE SPECIAL INSPECTIONS PROGRAM. 7.06 A SPECIAL INSPECTIONS MEETING SHALL BE HELD ON SITE WITH ENGINEER OF RECORD, CONSTRUCTION COORDINATOR, INDEPENDENT TESTING AGENCY, AND SPECIAL INSPECTOR TO CLARIFY ALL SPECIAL INSPECTION REQUIREMENTS PRIOR TO BEGINNING WORK. 8.0 FOUNDATIONS 8.01 FOUNDATIONS, SLABS ON GRADE & OTHER ITEMS RELATED TO THE SOILS ARE DESIGNED & SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE RECOMMENDATIONS OF NINYO & MOORE GEOTECHNICAL & ENVIRONMENTAL SCIENCES CONSULTANTS GEOTECHNICAL REPORT PROJECT NO. 109168002 DATED MARCH 26, 2021 AND ADDENDUM TO GEOTECHNICAL EVALUATION - SUPPLEMENTAL CANOPY RECOMMENDATIONS DATED JULY 6, 2021. 8.02 CIDH PILE WORK SHALL BE OBSERVED BY THE GEOTECHNICAL CONSULTANT DURING CONSTRUCTION TO EVALUATE WHETHER THE PILES HAVE BEEN EXTENDED TO THE DESIGN DEPTHS. DRILLED HOLES SHALL BE CLEANED OF LOOSE SOIL AND GRAVEL. IT IS THE CONTRACTOR'S RESPONSIBILITY TO TAKE APPROPRIATE MEASURES FOR MAINTAINING THE INTEGRITY OF THE DRILLED HOLES, SEE THAT THE HOLES ARE CLEANED AND STRAIGHT, AND SEE THAT SLOUGHED LOOSE SOIL IS REMOVED FROM THE BOTTOM OF THE HOLE PRIOR TO THE PLACEMENT OF CONCRETE. 8.03 PLACEMENT OF CONCRETE FOR CIDH PILES SHALL BE PERFORMED BY TREMIE METHOD, OR SIMILAR, SUCH THAT THE AGGREGATE AND CEMENT DO NOT SEGREGATE DURING CONCRETE PLACEMENT. 8.04 DESIGN SOIL BEARING CAPACITIES ARE AS FOLLOWS: CIDH PILES: DOWNWARD AXIAL FRICTIONAL RESISTANCE: 200 PSF UPWARD AXIAL FRICTIONAL RESISTANCE: 150 PSF END BEARING RESISTANCE:NOT INCORPORATED IN DESIGN LATERAL PASSIVE PRESSURE:700 PSF, UP TO 7,000 PSF MAX. 9.0 CONCRETE MATERIAL PROPERTIES 9.01 CONCRETE STRENGTH:F'C PSI A. FOUNDATION PIERS,4000 B. SLAB ON GRADE SEE CIVIL DRAWINGS 11.0 REINFORCING 11.01 MATERIAL PROPERTIES:FY, KSI ASTM A. ALL BARS UNLESS NOTED 60 A615 B. TIES & STIRRUP 60 A615 12.0 CAST IN PLACE CONCRETE 12.01 ALL CONCRETE SHALL BE DESIGNED AND CONSTRUCTED IN ACCORDANCE WITH IBC CHAPTER 19 & ACI-318, LATEST CODE ADOPTED EDITION. 12.02 ALL REINFORCING SHALL BE DETAILED, FABRICATED & PLACED IN ACCORDANCE WITH CRSI "MANUAL OF STANDARD PRACTICE", LATEST EDITION. 12.03 ALL CAST IN PLACE CONCRETE AND POST INSTALLED ANCHORS SHALL BE DESIGNED IN ACCORDANCE WITH CHAPTER 17 OF ACI 318 AS MODIFIED BY THE APPLICABLE BUILDING CODE. 12.04 SLEEVES EMBEDDED IN SLABS AND WALLS SHALL BE LOCATED CLEAR BETWEEN REINFORCING BARS AND SHALL MAINTAIN CLEAR SPACING EQUAL TO THE DIAMETER OF THE LARGEST SLEEVE IN ANY DIRECTION. SLEEVE GROUPS THAT DO NOT COMPLY WITH THE ABOVE REQUIREMENTS SHALL BE CONSIDERED AS AN OPENING AND REINFORCED PER NOTE BELOW. 12.05 DETAILING OF REBAR SHALL BE IN ACCORDANCE WITH THE LATEST REVISION OF THE ACI DETAILING MANUAL, AND CONCRETE REINFORCING INSTITUTE'S LATEST EDITION OF "MANUAL OF STANDARD PRACTICE". ALL SHOP DRAWINGS PERTAINING TO REBAR DETAILS SHALL BE SUBMITTED TO THE ENGINEER FOR HIS REVIEW.CONCRETE MIX DESIGN FOR ALL CONCRETE WORK IS REQUIRED TO BE SUBMITTED TO THE ENGINEER FOR REVIEW. 12.06 CONCRETE SUPPLIER SHALL HAVE A QUALITY CONTROL PROCEDURE FOR THE PRODUCTION OF ALL CONCRETE, WHICH MUST BE ACCEPTABLE TO THE ENGINEER AND MEETS CURRENT ACI STANDARDS. 12.07 LAP SPLICES ARE ALL CLASS B TENSION LAP SPLICES, UNO. 12.08 PROVIDE A 3/4" CHAMFER ON ALL EXPOSED CORNERS OF CONCRETE. 12.09 THE FOLLOWING MINIMUM CONCRETE COVER SHALL BE PROVIDED FOR REINFORCEMENT: A. CONCRETE CAST AGAINST & PERMANENTLY EXPOSED TO EARTH 3" B. CONCRETE EXPOSED TO EARTH OR WEATHER 2" 13.0 STRUCTURAL STEEL 13.01 STEEL MATERIAL PROPERTIES FY, PSI ASTM A. STRUCTURAL WIDE FLANGE SHAPES 50,000 A992 B. RECTANGULAR & SQUARE HSS 50,000 A500 GRADE C C. HIGH STRENGTH BOLTS, UNO 92,000 (1" AND SMALLER)A325 D. WELDING ELECTRODES E70XX AWS D1.3 CHAPTER 5 E. HEADED SHEAR STUDS 51,000 AWS D1.1 TYPE B F. OTHER STRUCT. SHAPES & PLATES 36,000 A36 13.02 STRUCTURAL STEEL DESIGN & CONSTRUCTION SHALL CONFORM TO IBC CHAPTER 22, SECTION 2201, AISC "LOAD & RESISTANCE FACTOR DESIGN SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS" & AISC "CODE OF STANDARD PRACTICE" LATEST CODE ADOPTED EDITION, UNO. 13.03 BOLTED CONNECTIONS SHALL BE BEARING-TYPE WITH THREADS INCLUDED IN THE SHEAR PLANE. UNO, INSTALL BOLTS IN PROPERLY ALIGNED HOLES AND TIGHTEN USING ONE OF THE FOLLOWING METHODS: SNUG-TIGHT CONDITION, TURN-OF-THE-NUT METHOD, A DIRECT TENSION INDICATOR, OR CALIBRATED WRENCH AS DEFINED BY THE LATEST EDITION OF AISC "SPECIFICATION FOR STRUCTURAL JOINTS USING ASTM A325 OR A490 BOLTS". 13.04 STRUCTURAL STEEL SHALL BE SHOP PRIMED AND FIELD FINAL PAINTED WITH AN EXTERIOR RATED PAINT. COLOR TO MATCH ROOF METAL DECK. 14.0 METAL DECKING 14.01 ALL STEEL DECKS SHALL BE DESIGNED & CONSTRUCTED IN ACCORDANCE WITH IBC CHAPTER 22, SECTION 2210.1.1 – COLD-FORMED STEEL AND THE STEEL DECK INSTITUTE SPECIFICATIONS AND RECOMMENDATIONS, LATEST CODE ADOPTED EDITION UNO. 14.02 ROOF METAL DECK SHALL BE 24 GAUGE REVERSED BOX RIB AS MANUFACTURED BY AEP SPAN. OTHER METAL DECK MANUFACTURERS MAY BE APPROVED PROVIDING THAT THE DECK SPECIFICATIONS MEET OR EXCEED THE SPECIFICATIONS OF THE PRE-APPROVED DECK. METAL DECK SHALL BE PAINTED IN OLD TOWN GRAY COLOR BY AEP SPAN. 14.03 ROOF DECK SHALL BE PRIME PAINTED AND LAID OUT CONTINUOUS OVER THREE SPANS MINIMUM. YIELD STRESS SHALL BE 50,000 PSI MINIMUM. DECK SUPPLIER SHALL SUBMIT ICC REPORTS SHOWING ALLOWABLE DIAPHRAGM SHEAR VALUES. ERECT IN ACCORDANCE WITH THE REPORT TO MEET THE REQUIRED SHEAR SPECIFIED ON THE DRAWINGS. CONNECTION TO FRAMING MEMBERS SHALL NOT BE LESS THAN THAT SHOWN HEREIN. 14.04 ROOF DECK FASTENING SHALL BE PROVIDED AT MINIMUM OF 36/3 SPACING AND 24" SIDE SEAM SPACING USING #12 HWH SELF-TAPPING SCREWS. SCREWS SHALL BE INSTALLED WITH NEOPRENE WASHERS TO PROVIDE WATERPROOF CONNECTIONS. a. Where applicable, see Section 1705.12, Special inspections for seismic resistance. b. Specific requirements for special inspection shall be included in the research report for the anchor issued by an approved source in accordance with 17.8.2 in ACI 318, or other qualification procedures. Where specific requirements are not provided, special inspection requirements shall be specified by the registered design professional and shall be approved by the building official prior to the commencement of the work. 9/30/25 8 36 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 W W W W 1 7 25'-1012"20'-0" 1 2 3 4 5 A B C HSS 8X8X1/2 COLUMN, TYP. HOSE VAULT, TYP. FUEL PUMP, TYP. 24" Ø DRILLED PIER, TYP. 1' - 0 " M I N . , T Y P . FUEL PUMP ISLAND (SEE CIVIL) W W W W 1 7 3 8 10'-0"25'-1012"20'-0"10'-0" 1 2 3 4 5 A B C HSS 8X8X1/2 COLUMN, TYP. 12 ' - 0 " 12 ' - 0 " W10X33 CANOPY BEAM, TYP. W8X18 CANOPY PURLIN, TYP. W8X18 CLOSURE BEAM AT EACH END RO O F D E C K S P A N , S E E S H E E T 5 F O R N O T E S RO O F SL O P E 5 % TYP. ≈3'-0" SURFACE MOUNTED LUMINAIRE. TOTAL OF 6. SEE SHEET 7 NORTH FOUNDATION PLAN 1/4" = 1'-0"1 CANOPY FRAMING PLAN 1/4" = 1'-0"2 6 9/30/25 9 36 11 10 10 8 10 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 2 8 1 8 2 7 3 7 CANOPY SECTION 1 FOUNDATION DETAIL 2 FOUNDATION SECTION 3 9/30/25 10 36 11 11 10 10 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 COLUMN TO BEAM CONNECTION 1 BEAM TO PURLIN CONNECTION 2 CLOSURE BEAM TO PURLIN CONNECTION 3 9/30/25 11 36 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 ABBREVIATIONS SUFFIX DESCRIPTION 4" SQUARE BY 2 1/8" DEEP BOX.4S AMERICAN WITH DISABILITIES ACT.ADA ABOVE FINISH FLOOR.AFF ABOVE FINISH GRADE.AFG AMERICAN WIRE GAUGE.AWG AMP, A AMPERE. AMPERES INTERRUPTING CAPACITY (SYMMETRICAL).A.I.C. AMP FRAME, AMP TRIP.AF/AT AMP SWITCH, AMP FUSE.AS/AF AUTOMATIC TRANSFER SWITCH.ATS AUXILIARY CONTACTS.AUX BR BRANCH. BLDG BUILDING. CIRC., CKT. CIRCUIT. CIRCUIT BREAKER.CB COMBINATION SMOKE FIRE DAMPER.SFD C CONDUIT. CONDUIT ONLY, COMPLETE WITH PULLSTRING.C.O. CONN CONNECTED. CURRENT TRANSFORMER.CT CONTROL POWER TRANSFORMER.CPT DIA DIAMETER. DISC DISCONNECT. DISTRIBUTION.DIST ELECTRICAL CONTRACTOR.E.C. ENERGY MANAGEMENT CONTROL SYSTEM.EMS ELECTRICAL METALLIC TUBING.EMT ELECTRIC WATER COOLER.EWC EXHAUST FAN.EF FT or 'FEET. FA FIRE ALARM. FULL LOAD AMPS.FLA GROUND.GND & G GROUND FAULT CIRCUIT INTERRUPTER.GFCI HEATING AIR CONDITIONING REFRIGERATION.HACR HEATING, VENTILATING AND AIR CONDITIONING.HVAC HEIGHT, WIDTH, DEPTH, LENGTH.H.,W.,D.,L. HORSEPOWER.HP IN. or '' INCHES. ISOLATED GROUND.IG JUNCTION BOX.JBOX DEGREE KELVIN.K KILOVOLT AMPERES.KVA KW KILOWATT. KILOWATT HOUR.KWH L.F. LINEAR FEET. LTG, LTS LIGHTING. MAX. MAXIMUM. MAXIMUM OVERCURRENT PROTECTION.MOCP MAIN CIRCUIT BREAKER.MCB MAIN LUGS ONLY.MLO M METER. M/M METER MAIN. MIN. MINIMUM. MINIMUM CIRCUIT AMPS.MCA THOUSAND CIRCULAR MILS.MCM MANUFACTURER.MFR. MTD MOUNTED. MOTOR CIRCUIT PROTECTOR.MCP MW MICROWAVE. NATIONAL ELECTRICAL CODE.NEC NATIONAL ELECTRICAL MANUFACTURER'S ASSOCIATION.NEMA NF NON-FUSED. NOT IN CONTRACT.NIC NOT TO SCALE.N.T.S. NL NIGHT LIGHT. NO. or # NUMBER. OWNER FURNISHED, CONTRACTOR INSTALLED.OFCI PERCENT IMPEDANCE.%Z PH. or Ø PHASE. PC P POLE. POLY VINYL CHLORIDE.PVC POWER DISTRIBUTION UNIT.PDU OVER 600 VOLTS.PRIMARY FURNISH, INSTALL AND CONNECT.PROVIDE POTENTIAL TRANSFORMER.PT PA PUBLIC ADDRESS. RECEPTACLE.REC, RECEPT REFRIGERATOR.REF RIGID GALVANIZED STEEL.RGS SHORT CIRCUIT CURRENT.SCC SMOKE FIRE DAMPER.SFD SQ. SQUARE. TC TIMECLOCK. TELEPHONE AND DATA.TEL/DATA TV TELEVISION. SURGE PROTECTION DEVICESPD TYP TYPICAL. UNDERGROUND PULL SECTION.U.G.P.S. PHOTOCELL POWER SYMBOL LIST SYMBOL DESCRIPTION FLUSH MOUNTED BRANCH CIRCUIT PANELBOARD. SURFACE MOUNTED BRANCH CIRCUIT PANELBOARD. DISTRIBUTION BOARD. J CEILING MOUNTED JUNCTION BOX. J JUNCTION BOX, FLUSH MOUNTED AT +18" AFF UNLESS NOTED OTHERWISE. J JUNCTION BOX, SURFACE MOUNTED AT +18" AFF UNLESS NOTED OTHERWISE. BRANCH CIRCUIT CONDUIT, CONCEALED IN WALL OR CEILING. BRANCH CIRCUIT CONDUIT, CONCEALED IN FLOOR OR UNDERGROUND. BRANCH CIRCUIT CONDUIT, RUN EXPOSED. CONDUIT RUN TURNED UP. CONDUIT RUN TURNED DOWN. CONDUIT RUN STUBBED OUT. BRANCH CIRCUIT HOMERUN WITH PANEL AND CIRCUIT DESIGNATED.A-1 WIRING / EQUIP CONNECT SYMB LIST SYMBOL DESCRIPTION GENERAL NOTES 1. INSTALLATION OF ELECTRICAL MATERIAL SHALL COMPLY WITH CALIFORNIA ELECTRICAL CODE (CEC) 2022 EDITION AND ALL LOCAL AMENDMENTS, AND ALL OTHER GOVERNING CODES AND ORDINANCES. 2. FIELD VERIFICATION: VERIFY ALL DEVICES AND CONDITIONS BEFORE PROCEEDING WITH THE WORK. 3. REFER TO MECHANICAL PLANS FOR EXACT LOCATION OF MECHANICAL EQUIPMENT. 4. IT SHALL BE THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY TO OBTAIN A COMPLETE SET OF DRAWINGS AND SPECIFICATIONS. HE/SHE SHALL CHECK THE DRAWINGS OF THE OTHER TRADES AND SHALL CAREFULLY READ THE SPECIFICATIONS AND DETERMINE HIS RESPONSIBILITIES. FAILURE TO DO SO SHALL NOT RELEASE THE CONTRACTOR FROM DOING THE WORK IN COMPLETE ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS. 5. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH OTHER TRADES AT THE SITE. ANY COST TO ROUTE CONDUIT OTHER THAN AS SHOWN ON THE PLANS SHALL BE INCURRED BY THE CONTRACTOR. 6. WHEREVER A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE, EQUIPMENT DEVICES, CIRCUIT BREAKERS, TRANSFORMERS, GROUND FAULT PROTECTION SYSTEM, ECT. (ALL MATERIALS ARISES ON THE DRAWINGS AND/OR SPECIFICATIONS), THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL MATERIAL AND SERVICE REQUIRED BY THE STRICTEST CONDITIONS NOTED ON DRAWINGS AND/OR IN THE SPECIFICATIONS TO ENSURE COMPLETE AND OPERABLE SYSTEMS AS REQUIRED BY THE OWNER OR ENGINEER. 7. ALL CONDUIT SIZES ARE BASED ON COPPER CONDUCTORS WITH THHN-2/THWN -2 INSULATION UNLESS OTHERWISE NOTED. ALL CONDUCTORS SHALL BE COPPER. CONDUCTOR INSULATION SHALL BE THHN/TWHN UNLESS OTHERWISE NOTED. MINIMUM CONDUIT SIZE SHALL BE 3/4", UNLESS OTHERWISE NOTED. 8. INSTALL ALL EQUIPMENT, LIGHTING FIXTURE, DEVICES, CONDUIT AND CONDUIT SUPPORTS TO MEET SEISMIC DESIGN CATEGORY D. 9. CONDUIT RUNS SHOWN ARE DIAGRAMMATIC ONLY. INSTALL ALL CONDUITS TO SUIT FIELD CONDITIONS. 10. PROVIDE PROPERLY SIZED LUGS AT ALL CIRCUIT BREAKER PANELS, FOR THE CONDUCTORS SHOWN TO CONNECT THESE LUGS. 11. INSTALL ALL EXTERIOR MOUNTED ELECTRICAL EQUIPMENT IN WEATHERPROOF, NEMA-3R ENCLOSURES, UNLESS OTHERWISE NOTED. 12. SEPARATE INSULATED EQUIPMENT GROUNDING CONDUCTOR, SIZED PER CEC 250-122, SHALL BE PROVIDED, INSTALLED IN THE SAME CONDUIT AS THE CIRCUIT CONDUCTORS FOR ALL FEEDERS AND BRANCH CIRCUITS. 13. CONNECTIONS TO ALL EQUIPMENT FURNISHED BY OTHERS SHALL BE COORDINATED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING MANUFACTURER'S SHOP DRAWINGS PRIOR TO ROUGHING IN ALL CONDUIT TO THIS EQUIPMENT. 14. EXACT METHOD AND LOCATION OF CONDUIT PENETRATIONS AND/OR OPENINGS IN CONCRETE WALLS OR FLOORS SHALL BE AS DIRECTED BY THE STRUCTURAL ENGINEER OF RECORD. 15. NOT ALL SYMBOLS AND ABBREVIATIONS ON THIS SHEET ARE USED. 1. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CODES AND ORDINANCES INCLUDING: 2022 CALIFORNIA ELECTRICAL CODE, CALIFORNIA CODE OF REGULATIONS TITLE 24 - PART 3. 2020 NATIONAL ELECTRICAL CODE, CHAPTER 5 - ARTICLE 514 2021 NFPA 30 & 30A FLAMMABLE AND COMBUSTIBLE LIQUIDS CODE APPLICABLE CODES ABBREVIATIONS SUFFIX DESCRIPTION UNDERGROUND PULL SECTION.U.G.P.S. UNLESS OTHERWISE NOTED.U.O.N. UNINTERRUPTABLE POWER SYSTEM.U.P.S. VARIABLE AIR VOLUME.VAV V VOLTS. VOLT AMPERES.VA VOLTAGE DROP.VD WEATHERPROOF.WP W WIRE. TRANSFORMER.XFMR INDICATES EXISTING TO REMAIN.(X) INDICATES EXISTING TO BE REMOVED.(XR) INDICATES EXISTING TO BE RELOCATED.(XL) INDICATES NEW LOCATION OF RELOCATED EQUIPMENT.(XN) FUEL LEAK DETECTION, MONITORING, AND MANAGEMENT SYSTEMS ARE TO BE FURNISHED AS COMPLETE, TURN KEY, INTEGRATED SYSTEMS BY QUALIFIED FUEL SYSTEMS VENDORS. ALL FUEL SYSTEM CONTROLS, WIRING DIAGRAMS, INTERCONNECTION REQUIREMENTS, CABLES, MATERIAL AND INSTALLATION SHALL BE PROVIDED BY FUEL SYSTEM VENDORS. ALL FUEL LEAK DETECTION, MONITORING AND MANAGEMENT MATERIALS AND INSTALLATION SHALL COMPLY WITH NATIONAL ELECTRICAL CODE SECTION 514 FOR CLASS 1, DIVISION 1 AND 2, GROUP D LOCATIONS. ALL CONDUITS SHOWN ON THESE DRAWINGS FOR FUEL LEAK DETECTION, MONITORING AND MANAGEMENT SYSTEMS HAVE BEEN DETERMINED BY INFORMATION AVAILABLE AT THE TIME OF THE PROJECT DESIGN PHASE. CONTRACTOR SHALL VERIFY FINAL INTEGRATED FUEL LEAK DETECTION MONITORING AND MANAGEMENT SYSTEMS CONDUITS AND MODIFY NUMBER, SIZE, AND LOCATION TO COMPLY WITH THOSE REQUIREMENTS. FUEL LEAK DETECTION, MONITORING, AND MANAGEMENT NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 LEGEND,ABBREVIATIONS AND GENERAL NOTES 9 9/30/25 12 36 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 FG:(365.87) FG:(365.79) FG:(365.84) F G : ( 3 6 5 . 9 5 ) F G : ( 3 6 5 . 9 4 ) FG : ( 3 6 5 . 8 9 ) FG:(365.95) F G : ( 3 6 5 . 9 1 ) FG:(365.93) FG:(365.86) FG:(365.86) FG:(365.83) FG: ( 3 6 5 . 8 6 ) FG: ( 3 6 5 . 9 9 ) FG:(366.00) FG:(365.94) FG:(365.85) FG:(365.84 ) FG:(365.80) FG:(365.57) FG:(365.10) 36 5 . 9 6 C E N T E R O F D O O R 365.99 CENTER OF DOOR VARIOUS SIZED MANHOLES (TYPICAL) HOSE VAULT FUEL PUMP FUEL PUMP FUEL PUMP HOSE VAULT PUMP CONTROL CABINETGP GP WATER PIPELINES WATER SPIGOT WATER METER E WATER METER GAS METER SEWER MANHOLE SEWER CLEANOUT UNKNOWN HANDHOLE DI DI DI AD E E E TRAP AD DI STRIP DRAIN STRIP DRAIN STRIP DRAIN STRIP DRAIN C/L FENCE CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC C U R B CONC SWAL E CONC CU R B & GUTTE R CURB INLET CURB INLET AC AC AC CONC CONC CONC CONC CONC 1004 UST TO BE REMOVED AND REPLACED (APPROX.) FIBERGLASS 12,000 GALLON (UNDERGROUND; UNLEADED) UST TO BE REMOVED AND REPLACED (APPROX.) FIBERGLASS 20,000 GALLON (UNDERGROUND; UNLEADED) UST TO BE REMOVED AND REPLACED (APPROX.) FIBERGLASS 20,000 GALLON (UNDERGROUND; DIESEL) APPROX. EXCAVATION LIMITS PROPOSED FUEL ISLAND CANOPY. SEE SHEET 5 FOR DETAILS (XR) 1 1 2 3 (XN) (XR) (XR) (XR) (XR) 3 3 2 10 4 KEYNOTES 1 EXISTING POLE MOUNTED AREA LIGHT INCLUDING LUMINAIRES, POLES, COMPLETE POLE BASES, AND ASSOCIATED ELECTRICAL TO BE REMOVED, DISCONNECT, AND REMOVE BRANCH CIRCUIT WIRING. ALL CONDUCTORS SHALL BE REMOVED FROM DEVICE BACK TO PANEL BOARD. EXISTING ASSET MANAGEMENT CONSOLE TO BE REMOVED AND ASSOCIATED ELECTRICAL TO BE REMOVED. SAFE OFF, DISCONNECT, AND REMOVE BRANCH CIRCUIT WIRING. ALL CONDUCTORS SHALL BE REMOVED FROM DEVICE BACK TO PANEL BOARD. EXISTING FUEL DISPENSERS, SUMP AND ASSOCIATED ELECTRICAL TO BE REMOVED. SAFE OFF, DISCONNECT, AND REMOVE BRANCH CIRCUIT WIRING. ALL CONDUCTORS SHALL BE REMOVED FROM DEVICE BACK TO PANEL BOARD. EXISTING FUEL TANK PUMP AND ASSOCIATED ELECTRICAL TO BE REMOVED. SAFE OFF, DISCONNECT, AND REMOVE BRANCH CIRCUIT WIRING. ALL CONDUCTORS SHALL BE REMOVED FROM DEVICE BACK TO PANEL BOARD. 2 3 GENERAL NOTES 1.THE EXISTING CONDITIONS AND LOCATIONS OF ABOVE GRADE STRUCTURES SUCH AS BUILDINGS, CONCRETE PAVEMENT AND SLABS, EQUIPMENT SUPPORT PADS, PARKING LOTS, AND ASPHALT PAVING, AS INDICATED ON THESE DRAWINGS, HAVE BEEN COMPILED FROM CIVIL SURVEY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE ANY AND ALL ABOVE GRADE STRUCTURES THAT MAY INTERFERE WITH THE INSTALLATION OF THE DOCUMENTED SCOPE OF WORK. ANY DAMAGES TO EXISTING STRUCTURES, RESULTING FROM THE DOCUMENTED SCOPE OF WORK, SHALL IMMEDIATELY BE REPORTED TO THE OWNER AND REPAIRED TO MATCH EXISTING BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE OWNER. 2.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION AND DEPTH OF BELOW GRADE PIPING AND UTILITIES IN THE IMMEDIATE VICINITY OF CONSTRUCTION ACTIVITIES, WHETHER SHOWN ON THESE DRAWINGS OR NOT. CONTRACTOR SHALL MARK ALL EXISTING PIPING AND UTILITIES AFFECTED BY CONSTRUCTION ACTIVITIES BY USING AN UNDERGROUND PIPE LOCATOR TO LOCATE THE POSITION OF PIPES AND CONDUITS. ANY DAMAGES TO EXISTING UNDERGROUND PIPING AND UTILITIES, WHICH MIGHT HAVE RESULTED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND PIPING AND UTILITIES, SHALL IMMEDIATELY BE REPORTED TO THE OWNER AND REPAIRED TO MATCH EXISTING BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE OWNER. 3.REFER TO CIVIL DRAWINGS FOR HORIZONTAL AND VERTICAL PLACEMENT/CONTROL OF ALL EXISTING AND NEW SITE UTILITIES. 4.WHERE HANDHOLE OR MANHOLE OCCURS IN VEHICULAR ACCESS PATH OF FIRE TRUCK ACCESS ROUTE, THE LID AND VAULT SHALL BE DESIGNED FOR H-20 (MINIMUM) TRUCK LOADING 5.REUSE OF EXISTING UNDERGROUND CONDUITS WILL BE ALLOWED WHERE THEY ENTER THE WASHROOM BUILDING ELECTRICAL ROOM AND THE MAINTENANCE BUILDING. 4 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 3010 SITE DEMO PLAN - ELECTRICAL EXISTING ELECTRICAL ROOM - CAR WASH BAY TS-LLD PUMP CONTROL BOX EXIST. FUEL DISPENSER ESO RELAY TS-LLD PUMP CONTROL BOX EXIST. JUNTION BOX TS-LLD PUMP CONTROL BOX EXIST. SHUT-OFF RELAY EXIST. JUNTION BOX REMOVE EXISTING FUEL PUMP CONTROLLER AND LEAK DETECTION EQUIPMENT AND ASSOCIATED WIRING SCALE: 1”=10'-0" SITE DEMO PLAN - ELECTRICAL1 NORTH010'20' NOT TO SCALE FUEL TANK PUMP CONTROLLER DETAIL - DEMO2 EXISTING EXISTING EXISTING EXISTING EXISTING EXISTING 3613 9/30/25 8 13 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 F G : ( 3 6 5 . 9 4 ) FG : ( 3 6 5 . 8 9 ) FG:(365.95) FG:(365.83) FG:(364.97) FG:(368.83) FG: ( 3 6 5 . 8 6 ) FG: ( 3 6 5 . 9 9 ) T 2 T 3 (UNLEADED) (DIESEL) 1 12 EPA S1 S1 S1 S1 S1 S1 T 1 (UNLEADED) DLIP DLIP DLIP TO TURBINE CONTROLLERS DISP#1&2 DISP#3&4 DISP#5&6 NEW FUEL MANAGEMENT P.O.S TLS 450 PLUS DIGITAL LEAK & INVENTORY PROBE (TYP.3) 3 1 1 1 2 3 4 5 2 11 EXTENT OF HAZARDOUS LOCATION 6 EXISTING MAINTENANCE BUILDING 7 7 7 8 -EPA EPA-2,4 EPA-6,8 EPA-10,12 EPA-1,3 EPA-11 EPA-17 EPA-9 EPA-7 2#10,1#12 GND, 3/4"C. CONTROL CONDUITS TO EVO FUEL MANAGMENT SYSTEM TO MAINTENANCE BUILDING, SEE DETAIL 3 ON SHEET 13 2 13 KEYNOTES GENERAL NOTES TURBINE PUMP CIRCUIT TO PANEL "EPA" IS VIA PUMP CONTROLLER IN WASH AREA ELECTRICAL ROOM. ALL CONTROL CONDUITS SHALL BE MINIMUM 3/4" CONDUIT, UNLESS LARGER SIZE IS REQUIRED BY PUMP VENDOR. ALL AVAILABLE EXISTING UNDERGROUND CONDUITS ENTERING WASH BUILDING MAY BE RE-USED. ALL NEW CONDUITS ENTERING WASH BUILDING AND FACILITIES MAINTENANCE BUILDING ORIGINATING FROM THE DESIGNATED HAZARDOUS AREA SHALL UTILIZE EXPLOSION PROOF CONDUIT SEALING FITTINGS. REPLACE EXISTING EXPLOSION PROOF CONDUIT SEAL FITTING WHERE REQUIRED. SEE DETAIL 4 ON SHEET 13. ALL CONDUITS TO NEW EVO FUEL MANAGEMENT SYSTEM SHALL BE ROUTED FROM BUILDING CONDUIT ENTRANCE TO NEW EVO PANEL. ROUTE CONDUITS OVERHEAD SIMILAR TO EXISTING CONTROL CONDUITS. SEE DETAIL 3 ON SHEET 13 FOR CONTINUATION. RUN NEW LIGHTING CONDUIT UP FUEL CANOPY COLUMN. MOUNT LIGHT FIXTURE ON CANOPY PURLINS AS SHOWN ON ELECTRICAL SITE PLAN. COMPLY WITH ALL APPLICABLE SECTIONS OF NEC ARTICLE 514. SEE STRUCTURAL DRAWINGS FOR CANOPY DETAIL. ALL ELECTRICAL WORK WITHIN THE DESIGNATED HAZARDOUS AREA AND CONDUITS ORIGINATING FROM THE DESIGNATED HAZARDOUS AREA SHALL COMPLY WITH THE NEC ARTICLE 514, CLASS 1, DIVISION 1 & 2, GROUP D. SEE DETAIL 4 ON SHEET 13. ALL NEW POWER CONDUCTORS FROM NEW DISPENSERS WILL BE ROUTED TO PANEL 'EPA' VIA EXISTING FUEL DISPENSERS ESO RELAY ROUTE LIGHTING CIRCUITS TO PANEL 'EPA' VIA EXISTING TIME CLOCK ADJACENT TO PANEL 'EPA' 1 1.THE EXISTING CONDITIONS AND LOCATIONS OF ABOVE GRADE STRUCTURES SUCH AS BUILDINGS, CONCRETE PAVEMENT AND SLABS, EQUIPMENT SUPPORT PADS, PARKING LOTS, AND ASPHALT PAVING, AS INDICATED ON THESE DRAWINGS, HAVE BEEN COMPILED FROM CIVIL SURVEY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ACCURATELY LOCATE ANY AND ALL ABOVE GRADE STRUCTURES THAT MAY INTERFERE WITH THE INSTALLATION OF THE DOCUMENTED SCOPE OF WORK. ANY DAMAGES TO EXISTING STRUCTURES, RESULTING FROM THE DOCUMENTED SCOPE OF WORK, SHALL IMMEDIATELY BE REPORTED TO THE OWNER AND REPAIRED TO MATCH EXISTING BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE OWNER. 2.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY THE EXACT LOCATION AND DEPTH OF BELOW GRADE PIPING AND UTILITIES IN THE IMMEDIATE VICINITY OF CONSTRUCTION ACTIVITIES, WHETHER SHOWN ON THESE DRAWINGS OR NOT. CONTRACTOR SHALL MARK ALL EXISTING PIPING AND UTILITIES AFFECTED BY CONSTRUCTION ACTIVITIES BY USING AN UNDERGROUND PIPE LOCATOR TO LOCATE THE POSITION OF PIPES AND CONDUITS. ANY DAMAGES TO EXISTING UNDERGROUND PIPING AND UTILITIES, WHICH MIGHT HAVE RESULTED BY THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND PIPING AND UTILITIES, SHALL IMMEDIATELY BE REPORTED TO THE OWNER AND REPAIRED TO MATCH EXISTING BY THE CONTRACTOR, AT NO ADDITIONAL COST TO THE OWNER. 3.REFER TO CIVIL DRAWINGS FOR HORIZONTAL AND VERTICAL PLACEMENT/CONTROL OF ALL EXISTING AND NEW SITE UTILITIES. 4.WHERE HANDHOLE OR MANHOLE OCCURS IN VEHICULAR ACCESS PATH OF FIRE TRUCK ACCESS ROUTE, THE LID AND VAULT SHALL BE DESIGNED FOR H-20 (MINIMUM) TRUCK LOADING 5.ALL NEW ELECTRICAL AND COMMUNICATION UNDERGROUND CONDUITS TO BE SCHEDULE 40 PVC, UNLESS OTHERWISE NOTED. SEE DETAIL DETAIL 2 ON SHEET 13. 2 3 4 5 6 7 8 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 SCALE: 1”=10'-0" SITE PLAN - ELECTRICAL1 NORTH010'20' EXISTING ELECTRICAL ROOM - CAR WASH BAY EXIST. FUEL DISPENSER ESO RELAY EXIST. JUNTION BOX EXIST. SHUT-OFF RELAY EXIST. JUNTION BOX NEW TURBINE PUMP CONTROLLER NEW TURBINE PUMP CONTROLLER NEW TURBINE PUMP CONTROLLER NOT TO SCALE FUEL TANK PUMP CONTROLLER DETAIL - NEW2 11 NEW 3#10,1#12, 1/2"C. EXISTING EXISTING EXISTING EXISTING EXISTING CONTROLLER, LEAK DETECTION MONITORING AND MANAGEMENT SYSTEM TO BE PROVIDED BY SYSTEM VENDOR. SITE PLAN - ELECTRICAL REINSTALL FUEL MANAGEMENT CONSOLE P.O.S. 14 36 9/30/25 16 16 16 16 16 16 15 14 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 SDGE#652156 M TO POWER UTILITY SERVICE POINT OF CONNECTION. EXISTING SDGE METER 200A 3P EXISTING ENCLOSED SWITCH EXISTING DIST. PANEL LB EXISTING XFMR - TB, 30kVA 480-208Y/120V EXISTING XFMR - ETA 30kVA 480-208Y/120V EXISTING PANEL PB EXISTING PANEL EPA TO EXISTING 300kW 480/277V, 3PH 4W GENERATOR 300kW EXISTING TS - 80A 480V,3P EXISTING EXISTING EXISTING PANEL EPA NEW TURBINE PHASE CONTROLLER #1 P.B. EM SHUT OFF NEW TURBINE PHASE CONTROLLER #2 NEW TURBINE PHASE CONTROLLER #3 NEW TURBINE PUMP #1 NEW DLIP NEW TURBINE PUMP #2 NEW TURBINE PUMP #3 EXISTING ELECTRICAL ROOM - CAR WASH BAY EXISTING MAINTENANCE BUILDING NEW FUEL MANAGEMENT SYSTEM TLS 450 PLUS NEW ASSET MANAGEMENT P.O.S. TLS 450 PLUS UNDERGROUND STORAGE TANKS NEW DISPENSER #1&2 NEW DISPENSER #3&4 NEW DISPENSER #5&6 GAS DISPENSER ISLAND EXISTING DISPENSER RELAY ESO CONTROLS CABLING CONTROLS CABLING TO EVO FUEL MANAGEMENT SYSTEM CONTROLS CABLING CONTROLS CABLING CONTROLS CABLING EXIST. ISOLATION XFMR J EXISTING ESO RESET BUTTON EXIST. EXIST. PROJECT AREA PANELBOARD SCHEDULE NOTE: NEUTRAL: BUS AMPS: VOLTS:AIC: MAIN BKR: LUGS:FED FROM: MOUNTING: ROOM: CKT #BKR CKT kVA LOAD CIRCUIT DESCRIPTION CKT #BKR CKT kVA LOAD CIRCUIT DESCRIPTION STANDARD MLO 22,000 225 480Y/277V 3P 4W SURFACE LB UTILITY 100% a60/3 0 20/3 012 b 43 | | c | |5 6 a125/3 0 30/3 078 b 109 | | c | |11 12 a20/1 0 20/1 01314 b 161520/1 20/10 0 c 0020/120/117 18 a50/3 8.84 50/3 01920 b 2221 | | c | |23 24 FEEDER/SERVICE LOAD CALCULATION TOTAL kVA (100%)OTHER MTRS LARGEST MTR CONTINUOUS NONCOIN/DIVERSE KITCHEN EQUIP (125%) NONCONTINUOUS (100%) CALC. kVACONN. kVA CONN. kVA CALC. kVA (50%>10) (125%) RECEPTACLES LIGHTING BALANCED 3-PHASE AMPERES (125%)METERED DMND 9.048.84 10.9 (N/A)(N/A) 0.360.36 (N/A)0 0 0 0 0 0 0 7.14 0 7.14 0.8 0.54 1 0.54 0 0 RECLAIMED WATER WASHER CONTROL SWITCHED LTG T.C. LIGHTING SPARE XFMR -EPA AIR COMP. WASHER SPARE SPARE SPARE XFMR - PB EXISTING EXISTING EXISTING EXISTING BREAKER TO REMAIN1 1 1 1 1 1 1 1 1 1 1 1 1 PANELBOARD SCHEDULE NOTE: NEUTRAL: BUS AMPS: VOLTS:AIC: MAIN BKR: LUGS:FED FROM: MOUNTING: ROOM: CKT #BKR CKT kVA LOAD CIRCUIT DESCRIPTION CKT #BKR CKT kVA LOAD CIRCUIT DESCRIPTION STANDARD 100 22,000 100 208Y/120V 3P 4W FLUSH EPA -EPA 100% a20/2 0.8 20/2 1.3712 b 43 | | c 1.370.18 20/220/15 6 a20/1 1.01 |7 8 b 10920/1 20/21.01 1.37 c1.01 |20/111 12 a20/1 0.18 -/1 01314 b 161520/1 -/10.18 0 c 00.36 -/120/117 18 a-/1 0 -/1 01920 b 2221-/1 -/10 0 c 00-/1-/123 24 FEEDER/SERVICE LOAD CALCULATION TOTAL kVA (100%)OTHER MTRS LARGEST MTR CONTINUOUS NONCOIN/DIVERSE KITCHEN EQUIP (125%) NONCONTINUOUS (100%) CALC. kVACONN. kVA CONN. kVA CALC. kVA (50%>10) (125%) RECEPTACLES LIGHTING BALANCED 3-PHASE AMPERES (125%)METERED DMND 9.048.84 25.1 (N/A)(N/A) 0.360.36 (N/A)0 0 0 0 0 0 0 7.14 0 7.14 0.8 0.54 1 0.54 0 0 SITE LIGHTING ASSET MANAGMENT CONSOLE FUEL DISPENSER (PUMPS 1&2) DISPENSER FUEL DISPENSER (PUMPS 3&4) DISPENSER FUEL DISPENSER (PUMPS 5&6) DISPENSER PUSH BUTTON ASSET MANAGEMENT ANTENNA OUTLET RECEPTACLE SPACE SPACE SPACE GAS PUMP T-1 GAS PUMP T-2 GAS PUMP T-3 SPACE SPACE SPACE SPACE SPACE SPACE 1 EXISTING BREAKER TO REMAIN1 MAX/MINMIN PHOTOMETRIC CALCULATIONS AVERAGEDESCRIPTION MAX AVG/MIN UNDERCANOPY 13.7 FC 16.8 FC 9.3 FC 1.8:1 15.1:1 IES RECOMMENDED FOOTCANDLE (FC) = AVERAGE 10-15 FC Calculations Utilize a LLF of 0.85 N E LUMINAIRE SCHEDULE CALLOUT SYMBOL LAMP DESCRIPTION VOLTS INPUT VA BALLAST/DRIVER NOTES S1 LED/4000K/14,098LM GARDCO SIGNIFY SLENDORFORM MODEL:SFC--MR-5W-48L-900-NW-G2-208-MGY OR APPROVED EQUAL 208 133 ELECTRONIC PROVIDE MOTION SENSOR TO POWER UTILITY SERVICE POINT OF CONNECTION. 480/277V, 3PH 4W VOLTAGE DROP SCHEDULE DEVICE FEEDER VOLTAGE DROP CONDUCTOR SIZE ESTIMATED LENGTH BRANCH CIRCUIT MAX VOLTAGE DROP CONDUCTOR SIZE ESTIMATED LENGTH TOTAL VOLTAGE DROP EPA 0.03%#1 5'-3"2.57% (CKT 11)#10 184'2.6% EPA-1,3: 0.48%#10 134' EPA-5: 0.42%#10 169' EPA-7: 1.92%#10 140' EPA-9: 2.24%#10 162' EPA-11: 2.57%#10 184' EPA-17: 0.84%#10 169' EPA-2,4: 0.48%#10 82' EPA-6,8: 0.69%#12 72' EPA-10,12: 0.47%#10 80' EXISTING GUTTER/S EXISTING ESO RESET NEW DLIP NEW DLIP LB EPA NEW STORAGE TANK TURBINE CONTROLLERS (TYP. 3) EXISTING PANEL "LB" EXISTING TRANSFER SWITCH EXISTING PANEL "PB" EXISTING PANEL "EPA" EXISTING ENCLOSED SWITCH EXISTING SDG&E SERVICE METER EXISTING CONTACTOR RELAY BOX EXISTING P.B. EMERGENCY SHUT OFF SWITCH EXISTING P.B. EMERGENCY SHUT OFF RESET SWITCH NOT TO SCALE PARTIAL SINGLE LINE DIAGRAM2 BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 SCALE: 1/2”=1'-0” EXISTING ELECTRICAL ROOM - WASH AREA1 12 SCHEDULES, DIAGRAM & PARTIAL FLOOR PLAN NOT TO SCALE UNDERGROUND STORAGE TANK AND FUEL MANAGMENT INTERCONNECT DIAGRAM3 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L REINSTALL ASSET MANAGEMENT P.O.S. CONSOLE 15 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 24" MIN COVER EXISTING BUILDING WALL EXISTING CONCRETE SLAB EXPLOSION PROOF CONDUIT SEALING FITTING, THE DESIGNATED HAZARDOUS AREA SHALL COMPLY WITH THE NEC ARTICLE 514, CLASS 1, DIVISION 1, GROUP D. PVC COATED GRC GRC CONCRETE ENCASED NONMETALLIC RIDGED CONDUIT ELECTRICAL DETAILS 13 2-1/2" 3" 3" 4" 3"3"3"3" 3"3" 12" BACKFILL TO MATCH EXISTING GRADE ASPHALT OR CONCRETE PAVING PAVING BASE SELECTED BACKFILL FREE OF LARGE DEBRIS AND COMPACTED TO 90% RELATIVE DENSITY CONCRETE SLURRY MIX (1 SACK) MEETING SDG&E STANDARDS DATA/COMM. POWER CONCRETE ENCASEMENT CONTINUOUS WARNING TAPE X" MIN. 24" MIN. SELECT SCALE MOTOR FUEL DISPENSING FACILITIES - ARTICLE 5144 SELECT SCALE PARTIAL ELEVATION IN EXISTING MAINTENANCE BUILDING 3NOT TO SCALE SHARED TRENCH DETAIL (TYPICAL)2 SEE CONTINUATION ON SHEET 11 8-3/4"C. CONTROL CONDUITS 8-3/4"C. CONTROL CONDUITS MOUNTED ON BLOCK WALL. NEW FUEL MANAGEMENT SYSTEM TLS 450 PLUS NOT TO SCALE UNDERGROUND HAZARDOUS CONDUIT CONNECTION (TYPICAL FOR ALL HAZARDOUS AREA CONNECTION TYPES)1 FUEL MANAGEMENT SYSTEM 16 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 3014 TITLE 24 DOCUMENTATION 17 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 TITLE 24 DOCUMENTATION 15 9/30/25 18 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 3016 SPECIFICATION SHEET 19 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 NO: 7846 REE N G I N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T I ROBE R T E . RA N D A L L ELECT R I C A L BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 3017 SPECIFICATION SHEET 20 36 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 ABBREV PLUMBING SYMBOL LIST BELOW BELOW GRADE BOTTOM OF PIPE BEL BOP B/G CONCRETE CLEAR DOWN CONNECTION CONTRACTOR CONTINUATION EXISTING EACH DRAWINGS CLR CONT CONN CONC DN CONT'R EA EXIST DWGS (E) POC FOS FOV POINT OF CONNECTION DENOTES EXISTING DESCRIPTION FOV SYMBOL REMOVE EXISTING EQUIP./PIPING FUEL OIL SUPPLY PIPE BELOW GRADE FUEL OIL VENT INVERT MANHOLE INV MH MINIMUM MOUNTED NUMBER NOT IN CONTRACT NOT TO SCALE QUANTITY SHEET OPERATING NIC MTD MIN NTS NO. SHT QTY OPER MANUFACTURERMFR TYPICAL SPECIFICATION STRUCTURAL WEIGHT VOLTS/PHASE/HERTZ VENT THRU ROOF STRUCT SPEC UNO TYP V/PH/HZ WGT VTR UNLESS NOTED OTHERWISE FOS PLUMBING SITE PLAN PLUMBING LEGEND, SHEET LIST AND SPECIFICATIONS18 SHEET NUMBER PLUMBING SHEET INDEX SHEET NAME 191.SUPPORT PIPING IN ACCORDANCE WITH THE CMC 2019 EDITION AND THE CPC 2019 EDITION. 2.FOR CLARITY, NOT ALL PIPING AT FIXTURE IS SHOWN. PROVIDE PER SCHEDULES AND DETAILS. 3.BELOW GRADE PIPING AT FOOTINGS AND GRADE BEAMS SHALL BE IN ACCORDANCE WITH THE FOLLOWING CRITERIA: A. PENETRATION OF GRADE BEAMS IS PROHIBITED. ROUTE PIPING BELOW GRADE BEAMS. B. ARRANGE HORIZONTAL PIPING TO AVOID SPREAD FOOTINGS. C. WHERE VERTICAL RISERS ARE UNAVOIDABLE WITHIN SPREAD/CONTINUOUS FOOTINGS, CONTINUE PIPE THRU AND EXTEND PIPING OUT BELOW BOTTOM OF FOOTING. EXTEND PIPING TO BEYOND EDGE OF FOOTING IN MINIMUM DISTANCE. D. PENETRATION OF CONTINUOUS FOOTINGS WITH HORIZONTAL PIPING IS PROHIBITED. ROUTE PIPING BELOW CONTINUOUS FOOTINGS. 4.PIPING AND EQUIPMENT ARE DIAGRAMMATICALLY LOCATED ON FLOOR PLANS. FOR DIMENSIONED PLANS AND EQUIPMENT LOCATIONS, SEE "KIMLEY HORN" DRAWINGS. 5.BEFORE START OF WORK, CONTRACTOR TO VERIFY THE SIZE, TYPE AND LOCATION OF ALL EXISTING UTILITIES, AND ALL POINTS OF CONNECTION LOCATIONS, DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 6.VENT PIPE OUTLETS FOR TANKS STORING CLASS I, II OR IIIA LIQUIDS SHALL BE LOCATED SUCH THAT THE VAPORS ARE RELEASED AT A SAFE POINT OUTSIDE OF BUILDINGS AND NOT LESS THAN 12 FEET (3658 MM) ABOVE THE FINISHED GROUND LEVEL. VAPORS SHALL BE DISCHARGED UPWARD OR HORIZONTALLY AWAY FROM ADJACENT WALLS TO ASSIST IN VAPOR DISPERSION. VENT OUTLETS SHALL BE LOCATED SUCH THAT FLAMMABLE VAPORS WILL NOT BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHALL BE AT LEAST 5 FEET FROM BUILDING OPENINGS OR LOT LINES OF PROPERTIES THAT CAN BE BUILT UPON. GENERAL NOTES NOTES: 1.PIPE TO BE ENCASED IN A MINIMUM OF 6 INCHES OF SAND. 2.TOP OF PIPE SHALL BE MINIMUM OF 30 INCHES BELOW GRADE. 3.TRACER WIRE MUST BE ELECTRICALLY CONTINUOUS AND MUST EXTEND 12" ABOVE GRADE ADJACENT TO EVERY RISER / VALVE BOX TRENCH WIDTH PIPE INSULATED #10 COPPER TRACER WIRE TAPED TO ALL NON METALLIC UTILITY PIPE NATIVE BACKFILL 90% COMPACTION WARNING TAPE 8"-12" BELOW FINISHED GRADE 80% CBR BASE COARSE COMPACTED TO 95% DENSITY. 8" THICK FOR VEHICLE TRAFFIC, 4" THICK FOR WALKWAYS SAND EXISTING AC PAVEMENT EXISTING CONCRETE PAVEMENT NEW A.C. PAVEMENT SAME THICKNESS AS EXISTING ASPHALT EMULSION AND SAND SEAL COAT (TRAFFIC LANES ONLY) TACK COAT 30 " MI N I M U M 6" O. D . O F PI P E 6" 12" MATCH EXISTING CONCRETE PAVEMENT NOT TO SCALE PIPE TRENCH DETAIL1 BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 NO: 31531 REE N GI N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T IANHCE M I C LA AARO N P A RKIN G T O N 18 LEGEND & SHEDULE 21 36 9/30/25 21 22 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 FG:(365.87) FG:(365.79) FG:(365.84) F G : ( 3 6 5 . 9 5 ) F G : ( 3 6 5 . 9 4 ) FG : ( 3 6 5 . 8 9 ) FG:(365.95) F G : ( 3 6 5 . 9 1 ) FG:(365.93) FG:(365.86) FG:(365.86) FG:(365.83) FG: ( 3 6 5 . 8 6 ) FG: ( 3 6 5 . 9 9 ) FG:(366.00) FG:(365.94) FG:(365.85) FG:(365.84 ) FG:(365.80) FG:(365.57) FG:(365.10) 36 5 . 9 6 C E N T E R O F D O O R 365.99 CENTER OF DOOR VARIOUS SIZED MANHOLES (TYPICAL) HOSE VAULT FUEL PUMP FUEL PUMP FUEL PUMP HOSE VAULT PUMP CONTROL CABINETGP GP WATER PIPELINES WATER SPIGOT WATER METER E WATER METER GAS METER SEWER MANHOLE SEWER CLEANOUT UNKNOWN HANDHOLE DI DI DI AD E E E TRAP AD DI STRIP DRAIN STRIP DRAIN STRIP DRAIN STRIP DRAIN C/L FENCE CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC W A L L CONC C U R B CONC SWAL E CONC CU R B & GUTTE R CURB INLET CURB INLET AC AC AC CONC CONC CONC CONC CONC 1004 T 3 T 2 T 1 D 1 D 2 D 3 (UNLEADED) (UNLEADED) (DIESEL) (UNLEADED) (UNLEADED) (DIESEL) 2"FOS(DIE S E L ) 2"FOV 2 1 1 6 5 5 6 2"FOS(GAS ) 2"FOV 4 7 8 7 5 6 7 3 9 2"FOV 2"FOV 2"FOV 2"FOV 2"FOS(GAS ) 2"FOS(GAS ) 2"FOS(GAS ) 1 2"FOS(DIE S E L ) 2"VAPOR 3"VAPOR 2"VAPOR 2"VAPOR 1 18 (TYP) KEYNOTES GENERAL NOTES FUEL OIL SUPPLY BELOW FINISHED GRADE. FUEL OIL VENT BELOW FINISHED GRADE. FUEL OIL VENT PIPE POINT OF CONNECTION TO BELOW GRADE TRANSITION SUMP (TYP.). REMOVE EXISTING FUEL MANAGEMENT CONSOLE AND INSTALL VEEDER-ROOT TLS 450 PLUS POS CONSOLE BELOW GRADE TURBINE PUMP IN UST SUMP HOUSING. PRODUCT FILL PORT AND MULTI-PORT SPILL CONTAINMENT. CONNECT FUEL OIL PIPING TO THE UNDER-DISPENSER CONTAINMENT (UDC) AT BOTTOM OF EACH DISPENSER. FINAL CONNECTION BETWEEN DISPENSERS AND UDC SUMP BY G.C. REMOVE EXISTING FUEL OIL VENT PIPE BELOW GRADE, INSIDE BUILDING AND UP THROUGH ROOF OF EXISTING WASH BUILDING, TERMINATE AT MIN 12"-0" ABOVE FINISHED GRADE AND 5'-0" AWAY FROM BUILDING OPENINGS AND ADJACENT LOT LINES. PATCH WALL AND ROOF TO MATCH EXISTING. PROVIDE TRANSITION BOX BELOW GRADE FOR DOUBLE WALL FUEL OIL VENT PIPE TRANSITION TO SINGLE WALL PIPE ABOVE GRADE. ROUTE PIPE UP ON EXTERIOR WALL OF BUILDING AND TERMINATE ABOVE PARAPET WALL. 1.FIELD VERIFY ALL EXISTING CONDITIONS - ARCHTECTURAL, STRUCTURAL, ELECTRICAL, MECHANICAL, PLUMBING, ETC. PRIOR TO START OF WORK. IF THERE ARE ANY DISCREPANCIES NOTIFY GENERAL CONTRACTOR IMMEDIATELY. 2.G.C. TO COORDINATE ALL CONNECTION POINTS TO AND FROM ALL UST SYSTEM COMPONENTS. 1 2 3 4 5 6 7 8 9 BMLLADANALR Integrated Services - MEP Engineering | Technical Services | Building Sciences | Building Commissioning | Clean Energy Solutions | Energy Services | SAN DIEGO - SAN FRANCISCO 3131 Camino del Rio N, Suite 800, San Diego, CA 92108. (619) 713-5700 Fax (619) 713-5701 401 B Street, Suite 600, San Diego, California 92101 Phone: 619.234.9411 | www.kimley-horn.com 30 SCALE: 1”=10'-0" SITE PLAN - PLUMBING1 NORTH010'20' 19 SITE PLAN - PLUMBING NO: 31531 REE N GI N E L ANOISSEFORPDERE ST GI E R ANROFILAFOE A T S C T IANHCE M I C LA AARO N P A RKIN G T O N EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE TO BE STORED DURING CONSTRUCTION AND RECONNECTED. 3622 9/30/25 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 3623 9/30/25 NEW ELECTRICAL CONDUIT TO RUN ON OUTSIDE OF DISPENSER UDC'S GAS &/OR DIESEL PRODUCT LINES VAPOR RETURN LINE VAPOR RETURN LINE SIZE INCREASE SECONDARY CLAMSHELL DETAIL VAPOR RETURN LINE SIZE INCREASE PRIMARY FITTINGS DETAIL ALL UDC ENTRY FITTING TO HAVE TEST PORTLOCATED AT 12 O'CLOCK WITH A PLUGGED BALL VALVE CONNECTED TO IT FOR TESTING 5 6 1 3 9 71110 DOUBLE WALL UDC SUMP DETAILS (TOP VIEW) DOUBLE WALL SUMP DETAILS (SIDE VIEW) 1/8" MIN. SLOPE TO UST's 4" OVER 2" VAPOR RETURN LINE 3" OVER 2" VAPOR RETURN LINE 3" OVER 2" VAPOR RETURN LINE 4" OVER 3" VAPOR RETURN LINE T O U D C 29 26 29 23 1112 1011 1012 1011 1/8" MIN. SLOPE TO UST's 2" PRIMARY VAPOR RETURN LINE 2" PRIMARY VAPOR RETURN LINE 2" PRIMARY VAPOR RETURN LINE 3" PRIMARY VAPOR RETURN LINE T O U D C 18 8 1 15 1 81 10 10 10 11 011030-310-4 012020-410-4 011030-410-4 012020-101-8 012030-101-8 012030-360-3 012040-360-3 012030-310-3 012040-310-3 012030-410-3 012040-410-3 SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST 3" 45 DEGREE FIBERGLASS PRIMARY ELBOW 2" FIBERGLASS PRIMARY TEE 3" FIBERGLASS PRIMARY TEE 2" FIBERGLASS SLEEVE PRIMARY COUPLING 3" FIBERGLASS SLEEVE PRIMARY COUPLING 3" 90 DEGREE SECONDARY FIBERGLASS ELBOW (2 PIECES) 4" 90 DEGREE SECONDARY FIBERGLASS ELBOW ( 2 PIECES) 3" 45 DEGREE SECONDARY FIBERGLASS ELBOW ( 2 PIECES) 4" 45 DEGREE SECONDARY FIBERGLASS ELBOW ( 2 PIECES) 3" SECONDARY FIBERGLASS TEE (2 PIECE) 4" SECONDARY FIBERGLASS TEE (2 PIECE) DISPENSER CONTAINMENT BOX (UDC) SHEAR VALVE STABILIZER BARS 1 1/2" X 24" FLEX CONNECTOR 2" X 1 -1/2" NPT FIBERGLASS REDUCER BUSHING GAS & DIESEL PRODUCT SHEAR VALVE VAPOR SHEAR VALVE 3" X 2" SUMP ENTRY FITTING 3" X 2" FIBERGLASS REDUCER BUSHING SUMP SENSOR (NON DISCRIMINATING) 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE 4" FIBERGLASS PIPE 2" 90 DEGREE FIBERGLASS PRIMARY ELBOW 3" 90 DEGREE FIBERGLASS PRIMARY ELBOW 2" 45 DEGREE FIBERGLASS PRIMARY ELBOW BRAVO BRAVO FLEXING SMITH FIBERCAST OPW OPW SMITH FIBERCAST SMITH FIBERCAST VEEDER-ROOT SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST SMITHFIBERCAST B1670-D30 BRKT-B2 FF15X24HMXEZFG9 012020-231-4 OPW-10BHMP-5830 OP60-VSP-100 012030-626-0 012030-231-7 VR-794380-208 011020-069-2 011030-069-2 011040-069-2 012020-360-4 012030-360-4 012020-310-4 NO.PART NUMBERMANUFACTUREREQUIPMENT DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 012030-101-3 012040-101-3 012040-238-3 VR-794380-304 SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST VEEDER-ROOT 3" SECONDARY FIBERGLASS SLEEVE COUPLING (2 PIECES) 4" SECONDARY FIBERGLASS SLEEVE COUPLING (2 PIECES) 4" X 3" FIBERGLASS CONCENTRIC REDUCER (2 PIECES) MINI HYDROSTATIC SENSOR 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 30 1 2 4 7 3" OVER 2" DIESEL PRODUCT LINE 1321 11 10 1/8" MIN. SLOPE (ALL LINES) 1 4 7 2 4 7 3" OVER 2" DIESEL PRODUCT LINE 1/8" MIN. SLOPE (ALL LINES) 10" MIN. 3" OVER 2" 87 PRODUCT LINE 10" MIN. TO UST's 13 21 11 10 3" OVER 2" VAPOR RETURN LINE 1321 1826 29 3" OVER 2" 87 PRODUCT LINE 4" OVER 3" VAPOR RETURN LINE TO UST's 29 8 1725 15 23 11 10 11 10 10" MIN. 15 23 1 4 7 2 4 7 10" MIN.11 12 3" OVER 2" DIESEL PRODUCT LINE 1/8" MIN. SLOPE (ALL LINES) 11 10 PIPING & UDC DETAILS 20 33 NEW ELECTRICAL CONDUIT TO RUN ON OUTSIDE OFDISPENSER UDC'S GAS &/OR DIESEL PRODUCT LINES VAPOR RETURN LINE VAPOR RETURN LINE SIZE INCREASE SECONDARY CLAMSHELL DETAIL VAPOR RETURN LINE SIZE INCREASE PRIMARY FITTINGS DETAIL ALL UDC ENTRY FITTING TO HAVE TEST PORT LOCATED AT 12 O'CLOCKWITH A PLUGGED BALL VALVECONNECTED TO IT FOR TESTING 5 6 1 3 9 71110 DOUBLE WALL UDC SUMP DETAILS (TOP VIEW) DOUBLE WALL SUMP DETAILS (SIDE VIEW) 1/8" MIN. SLOPE TO UST's 4" OVER 2" VAPOR RETURN LINE 3" OVER 2" VAPOR RETURN LINE 3" OVER 2" VAPOR RETURN LINE 4" OVER 3" VAPOR RETURN LINE T O U D C 29 26 29 23 1112 1011 1012 1011 011030-310-4 012020-410-4 011030-410-4 012020-101-8 012030-101-8 012030-360-3 012040-360-3 012030-310-3 012040-310-3 012030-410-3 012040-410-3 SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST 3" 45 DEGREE FIBERGLASS PRIMARY ELBOW 2" FIBERGLASS PRIMARY TEE 3" FIBERGLASS PRIMARY TEE 2" FIBERGLASS SLEEVE PRIMARY COUPLING 3" FIBERGLASS SLEEVE PRIMARY COUPLING 3" 90 DEGREE SECONDARY FIBERGLASS ELBOW (2 PIECES) 4" 90 DEGREE SECONDARY FIBERGLASS ELBOW ( 2 PIECES) 3" 45 DEGREE SECONDARY FIBERGLASS ELBOW ( 2 PIECES) 4" 45 DEGREE SECONDARY FIBERGLASS ELBOW ( 2 PIECES) 3" SECONDARY FIBERGLASS TEE (2 PIECE) 4" SECONDARY FIBERGLASS TEE (2 PIECE) DISPENSER CONTAINMENT BOX (UDC) SHEAR VALVE STABILIZER BARS 1 1/2" X 24" FLEX CONNECTOR 2" X 1 -1/2" NPT FIBERGLASS REDUCER BUSHING GAS & DIESEL PRODUCT SHEAR VALVE VAPOR SHEAR VALVE 3" X 2" SUMP ENTRY FITTING 3" X 2" FIBERGLASS REDUCER BUSHING SUMP SENSOR (NON DISCRIMINATING) 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE 4" FIBERGLASS PIPE 2" 90 DEGREE FIBERGLASS PRIMARY ELBOW 3" 90 DEGREE FIBERGLASS PRIMARY ELBOW 2" 45 DEGREE FIBERGLASS PRIMARY ELBOW BRAVO BRAVO FLEXING SMITH FIBERCAST OPW OPW SMITH FIBERCAST SMITH FIBERCAST VEEDER-ROOT SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST SMITHFIBERCAST B1670-D30 BRKT-B2 FF15X24HMXEZFG9 012020-231-4 OPW-10BHMP-5830 OP60-VSP-100 012030-626-0 012030-231-7 VR-794380-208 011020-069-2 011030-069-2 011040-069-2 012020-360-4 012030-360-4 012020-310-4 NO.PART NUMBERMANUFACTUREREQUIPMENT DESCRIPTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 012030-101-3 012040-101-3 012040-238-3 VR-794380-304 SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST VEEDER-ROOT 3" SECONDARY FIBERGLASS SLEEVE COUPLING (2 PIECES) 4" SECONDARY FIBERGLASS SLEEVE COUPLING (2 PIECES) 4" X 3" FIBERGLASS CONCENTRIC REDUCER (2 PIECES) MINI HYDROSTATIC SENSOR 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 30 1 2 4 7 3" OVER 2" DIESEL PRODUCT LINE 13 21 11 10 1/8" MIN. SLOPE (ALL LINES) 1 4 7 2 4 7 3" OVER 2" DIESEL PRODUCT LINE 1/8" MIN. SLOPE (ALL LINES) 10" MIN. 3" OVER 2" 87 PRODUCT LINE 10" MIN. TO UST's 1321 11 10 3" OVER 2" VAPOR RETURN LINE 13 21 1826 29 3" OVER 2" 87 PRODUCT LINE 4" OVER 3" VAPOR RETURN LINE TO UST's 29 8 1725 1523 11 10 11 10 10" MIN. 15 23 1 4 7 2 4 7 10" MIN.11 12 3" OVER 2" DIESEL PRODUCT LINE 1/8" MIN. SLOPE (ALL LINES) 11 10 1/8" MIN. SLOPE TO UST's 2" PRIMARY VAPOR RETURN LINE 2" PRIMARY VAPOR RETURN LINE 2" PRIMARY VAPOR RETURN LINE 3" PRIMARY VAPOR RETURN LINE T O U D C 18 8 15 8 10 10 10 11 NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 24 36 9/30/25 ! U L 9 7 1 U L 9 7 1 U L 9 7 1 1 3 0 NEW vent pipes and vent rack Centerline of lowest U-bolt on Vapor Polisher's mounting bracket CRITICALDIMENSION: 9' - 2"MINIMUMabovegrade 1 P 12' - 0"min.abovegrade Diesel vent c 2 Veeder-RootCarbon CanisterVapor Polisher NEW 3 NOTE: Rack fabrication and installation as shown will meet or exceed Veeder-Root's standards for support of the Carbon Canister Vapor Polisher. 1 3 0 on of . PolisherVaporCanisterCarbon Top of reducing tee Centerline of lowest U-bolt on Vapor Polisher's mounting bracket Cord grip Vapor sensor 2-pin cable connector from vapor valve assembly to TLS field wiring Vapor valve assembly 15 . 7 " MI N I M U M Vapor Polisher Inlet Locking 3 Way Ball Valve (Shown in open position)P/V Vent Stack Upper J-box, installed per codes (epoxy-enclosed connections in junction box) Vapor valve filter housing 1 2 3 PART NUMBERNO. EQUIPMENT DESCRIPTION MANUFACTURER NG FOR QUIDS 1 3 0 723V-2203 23-0033 332761-002 OPW OPW Veeder-Root Pressure Vacuum Vent Diesel Vent Cap Carbon Canister NOTE: Canister/enclosure must be labelledNO SMOKINGWITHIN 25 FEET CARBON CANISTER DETAILS 21 33 1 2 3 NO. ! NOTE: ALL ABOVE GROUND PIPING FOR FLAMABLE OR COMBUSTIBLE LIQUIDS SHALL BE METAL U L 9 7 1 U L 9 7 1 U L 9 7 1 NOTE: Rack fabrication and ins as shown will meet or exc Veeder-Root's standards for su the Carbon Canister Vapor P 1 3 0 NEW vent pipes and vent rack Seal-off Centerline of lowest U-bolt on Vapor Polisher's mounting bracket Top of reducing tee 15 . 7 " MI N I M U M CRITICALDIMENSION: 9' - 2"MINIMUMabovegrade 1 Pressure vacuum vent Grade Lower J-box, installed per codes (epoxy-enclosed connections in junction box) Centerline of lowest U-bolt on Vapor Polisher's mounting bracket Upper J-box, installed per codes (epoxy-enclosed connections in junction box) Diesel vent cap2 Veeder-RootCarbon CanisterVapor Polisher NEW 3 12' - 0"min.abovegrade IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 25 36 9/30/25 6" MIN. NEW ELECTRICAL CONDUIT TO RUN ON OUTSIDE OF VENT BOX 11 10 9 8 12 7 5 6 213 11 10*NOTE: 87 VENT LINES SECONDARY MONITORING TO BE TIED TOGETHER IN VENT BOX AS SHOWN AND MONITORED UNDER ONLY 1 VACUUM SENSOR IN THE 87 MAIN STP SUMP 1 2 3 4 5 6 7 8 9 10 11 12 13 723V-2203 ASTM-A53 RS-500-JP-4S-CT 23-0033 794380-208 B500-F4S-DW-AB FFEZ20X24 FR-3X2-T F-30-F 011020-069-2 011030-069-2 012020-194-4 794390-304 OPW STEEL BRAVO OPW VEEDER ROOT BRAVO FLEXING BRAVO BRAVO SMITHFIBERCAST SMITHFIBERCAST SMITHFIBERCAST VEEDER ROOT PRESSURE VACUUM VENT VALVE 2" GALVANIZED PIPE, NIPPLES & FITTINGS VENT RACK DIESEL VENT CAP SUMP SENSOR (NON DISCRIMINATING) VENT RISER CONTAINMENT SUMP 2" X 24" FLEX CONNECTOR 3" X 2" RETROFIT-S FIBERGLASS TEST BOOT FF SERIES 3" PENETRATION FITTING 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE 2" FIBERGLASS BELL X FEMALE NPT MINI HYDROSTATIC SENSOR EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO.VENT RACK DETAIL VENT LINES VENT BOX DETAIL (TOP VIEW) VENT BOX DETAIL (SIDE VIEW) SECOND ANNULAR ACCESS PORT 5 7 6 12 9 87 R E G U L A R 87 R E G U L A R DI E S E L 6 3 1 12' FT. MIN. 4 87 R E G U L A R DI E S E L 87 R E G U L A R VENT BOX DETAIL 22 33 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 3626 9/30/25 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 16 17 18 19 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. VEEDER-ROOT TANK LEVEL MAG PROBE 1911 11 10 11 10 89 19 87 REGULAR TURBINE SUMP SIDE VIEW Sump and Penetration Fitting Details 48" DW CONTAINMENT SUMP 848480-001 FF15X24HMXEZFG9 A0716-042C FL100GRAY-SK12 VR-794390-208 STP200-VL2 F-17-RR-D 012030-626-0 011020-069-2 011030-069-2 846390-109 XERXES VEEDER-ROOT FLEXING FIBRELITE OPW VEEDER-ROOT F. E. PETRO BRAVO SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST VEEDER-ROOT 48" DOUBLE WALL TURBINE SUMP ELECTRONIC LINE LEAK DETECTOR 1 1/2" X 24" FLEX CONNECTOR 42" Dia. WATERTIGHT FLAT SEALED COVER EXTRACTOR VALVE SUMP SENSOR (NON DISCRIMINATING) SUBMERSIBLE TURBINE PUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" 3" X 2" FIBERGLASS SUMP PENETRATION FITTING 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE TANK LEVEL MAGNETOSTRICTIVE PROBE TANK LEVEL FLOAT KIT INTERSTITIAL LIQUID SENSOR 18" MANHOLE VEEDER-ROOT VEEDER-ROOT OPW 846400-001 VR-794390-303 104A-1800WT 87 REGULAR TURBINE SUMP TOP VIEW Sump and Penetration Fitting Details 87 & DSL ANNULAR SIDE VIEW Sump and Penetration Fitting Details VR-794380-304 VR-330020-485 100-501 011040-069-2 VEEDER-ROOT VEEDER-ROOT JOMAR SMITH FIBERCAST MINI HYDROSTATIC SENSOR VACUUM SENSOR KIT 1/4" STAINLESS STEEL BALL VALVE 4" FIBERGLASS PIPE 11 16 1 6 8 15 14MONITORING WELL SECOND ANNULAR ACCESS PORT 1 4 7 2 19 ELECTRICAL CONDUIT9 1110 PRODUCT LINE VAPOR LINE VENT LINE 911 10 17 12 2 7 8 ALL SUMP ENTRY FITTING TO HAVE TEST PORT LOCATED AT 6 O'CLOCK WITH A BALL VALVE CONNECTED TO IT FOR TESTING 18 7 F.E. PETRO SUBMERSIBLE TURBINE PUMP VEEDER-ROOT MAG PROBE SET OVERFILL ALARM AT 90%, HIGH PRODUCT AT 95% 6 12 VEEDER-ROOT MAG PROBE FLOAT KIT 13 SECOND ANNULAR ACCESS PORT 9PRODUCT LINE VAPOR LINEVENT LINE 9 ELECTRICAL CONDUIT8 17 3 16 87 REGULAR STP DETAIL 23 33 16 17 18 19 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. VR-794380-304 VR-330020-485 100-501 011040-069-2 VEEDER-ROOT VEEDER-ROOT JOMAR SMITH FIBERCAST MINI HYDROSTATIC SENSOR VACUUM SENSOR KIT 1/4" STAINLESS STEEL BALL VALVE 4" FIBERGLASS PIPE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 48" DW CONTAINMENT SUMP 848480-001 FF15X24HMXEZFG9 FL100GRAY-SK12 233-4432 VR-794390-208 STP200-VL2 F-17-RR-D 012030-626-0 011020-069-2 011030-069-2 846390-109 XERXES VEEDER-ROOT FLEXING FIBRELITE OPW VEEDER-ROOT F. E. PETRO BRAVO SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST VEEDER-ROOT 48" DOUBLE WALL TURBINE SUMP ELECTRONIC LINE LEAK DETECTOR 1 1/2" X 24" FLEX CONNECTOR 42" Dia. WATERTIGHT FLAT SEALED COVER EXTRACTOR VALVE SUMP SENSOR (NON DISCRIMINATING) SUBMERSIBLE TURBINE PUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" 3" X 2" FIBERGLASS SUMP PENETRATION FITTING 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE TANK LEVEL MAGNETOSTRICTIVE PROBE TANK LEVEL FLOAT KIT INTERSTITIAL LIQUID SENSOR 18" MANHOLE VEEDER-ROOT VEEDER-ROOT OPW 846400-001 VR-794390-303 104A-1800WT VEEDER-ROOT TANK LEVEL MAG PROBE 19 11 11 10 11 10 89 19 87 REGULAR TURBINE SUMP SIDE VIEW Sump and Penetration Fitting Details 87 REGULAR TURBINE SUMP TOP VIEW Sump and Penetration Fitting Details 87 & DSL ANNULAR SIDE VIEW Sump and Penetration Fitting Details 11 16 1 6 8 15 14MONITORING WELL SECOND ANNULAR ACCESS PORT 1 4 7 2 19 ELECTRICAL CONDUIT9 1110 PRODUCT LINE VAPOR LINE VENT LINE 911 10 17 12 2 7 8 ALL SUMP ENTRY FITTING TO HAVE TEST PORT LOCATED AT 6 O'CLOCK WITH A BALL VALVE CONNECTED TO IT FOR TESTING 18 7 F.E. PETRO SUBMERSIBLE TURBINE PUMP VEEDER-ROOT MAG PROBE SET OVERFILL ALARM AT 90%, HIGH PRODUCT AT 95% 6 12 VEEDER-ROOT MAG PROBE FLOAT KIT 13 SECOND ANNULAR ACCESS PORT 9PRODUCT LINE VAPOR LINEVENT LINE 9 ELECTRICAL CONDUIT8 17 3 16 5 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 27 36 9/30/25 MA X6" 2"MIN 45% FLAPPER REQUIRED SET AT 95% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 2 87 REGULAR FILL SUMP PLAN VIEW Sump and Penetration Fitting Details 87 REGULAR FILL SUMP SIDE VIEW Sump and Penetration Fitting Details OPW Bucket and Fitting Details SECOND ANNULAR ACCESS PORT SECOND ANNULAR ACCESS PORT NOTE: SPILL BUCKETS TO BE TESTED TO HOLD 5 GALLONS BELOW THE CAP 4 1 3 10 9 2 11 3 1 4 8 6 14 13 5 7 1512 9 SUMP SENSOR (NON DISCRIMINATING) MINI HYDROSTATIC SENSOR 42" DOUBLE WALL FILL SUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" VEEDER-ROOT VEEDER-ROOT XERXES BRAVO VR-794390-208 VR-794380-304 42" DW CONTAINMENT SUMP F-17-RR-D 5 GALLON PRODUCT CONTAINMENT BUCKET 5 GALLON VAPOR CONTAINMENT BUCKET PRODUCT SWIVEL ADAPTOR VAPOR SWIVEL ADAPTOR DROP TUBE DROP TUBE FLAPPER 42" Dia. WATERTIGHT FLAT SEALED MULTI PORT COVER FACE SEAL ADAPTER PRODUCT DUST CAP VAPOR DUST CAP JACK SCREW KIT P761C-FLDV P761C-FLPL 61SALP-1020-EVR 61VSA-1020-EVR 61T-SS 71SO PK2-42RTMP FSA-400-S 634TT-EVR 1711T-EVR 61JSK-4410 OPW OPW OPW OPW OPW OPW OPW OPW OPW OPW OPW 87 REGULAR FILL SUMP DETAIL 24 33 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 28 36 9/30/25 DIESEL STP SUMP DETAIL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 16 17 18 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 19 20 21 VEEDER-ROOT TANK LEVEL MAG PROBE DIESEL TURBINE SUMP SIDE VIEW Sump and Penetration Fitting Details DIESEL TURBINE SUMP TOP VIEW Sump and Penetration Fitting Details 48" DW CONTAINMENT SUMP 848480-001 FF15X24HMXEZFG9 FL100GRAY-SK12 233-4432 VR-794390-208 STP200-VL2 F-17-RR-D 012030-626-0 011020-069-2 011030-069-2 846390-109 XERXES VEEDER-ROOT FLEXING FIBRELITE OPW VEEDER-ROOT F. E. PETRO BRAVO SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST VEEDER-ROOT 48" DOUBLE WALL TURBINE SUMP ELECTRONIC LINE LEAK DETECTOR 1 1/2" X 24" FLEX CONNECTOR 42" Dia. WATERTIGHT FLAT SEALED COVER EXTRACTOR VALVE SUMP SENSOR (NON DISCRIMINATING) SUBMERSIBLE TURBINE PUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" 3" X 2" FIBERGLASS SUMP PENETRATION FITTING 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE TANK LEVEL MAGNETOSTRICTIVE PROBE TANK LEVEL FLOAT KIT INTERSTITIAL LIQUID SENSOR 18" MANHOLE VEEDER-ROOT VEEDER-ROOT OPW 846400-001 VR-794390-303 104A-1800WT VR-794380-304 VR-330020-480 100-501 VR-794390-303 A0716-018C 011040-069-2 VEEDER-ROOT VEEDER-ROOT JOMAR VEEDER-ROOT EMCO WHEATON SMITH FIBERCAST MINI HYDROSTATIC SENSOR VACUUM SENSOR KIT 1/4" STAINLESS STEEL BALL VALVE INTERSTITIAL LIQUID SENSOR 18" MANHOLE 4" FIBERGLASS PIPE 10 11 9 16 1 6 8 17 12 SECOND ANNULAR ACCESS PORT PRODUCT LINE 7 ALL SUMP ENTRY FITTING TO HAVE TEST PORT LOCATED AT 6 O'CLOCK WITH A BALL VALVE CONNECTED TO IT FOR TESTING F.E. PETRO SUBMERSIBLE TURBINE PUMP VEEDER-ROOT MAG PROBE FLOAT KIT 1110 9 8 1 4 816 7 2 13 3 PRODUCT LINE 18 9 11 10 VENT LINE 2 7 VEEDER-ROOT MAG PROBE SET OVERFILL ALARM AT 90%, HIGH PRODUCT AT 95% SECOND ANNULAR ACCESS PORT 11 10 5 12 6 VENT LINE 921 17 25 33 48 " 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 48" DW CONTAINMENT SUMP 848480-001 FF15X24HMXEZFG9 FL100GRAY-SK12 233-4432 VR-794390-208 STP200-VL2 F-17-RR-D 012030-626-0 011020-069-2 011030-069-2 846390-109 XERXES VEEDER-ROOT FLEXING FIBRELITE OPW VEEDER-ROOT F. E. PETRO BRAVO SMITH FIBERCAST SMITH FIBERCAST SMITH FIBERCAST VEEDER-ROOT 48" DOUBLE WALL TURBINE SUMP ELECTRONIC LINE LEAK DETECTOR 1 1/2" X 24" FLEX CONNECTOR 42" Dia. WATERTIGHT FLAT SEALED COVER EXTRACTOR VALVE SUMP SENSOR (NON DISCRIMINATING) SUBMERSIBLE TURBINE PUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" 3" X 2" FIBERGLASS SUMP PENETRATION FITTING 2" FIBERGLASS PIPE 3" FIBERGLASS PIPE TANK LEVEL MAGNETOSTRICTIVE PROBE TANK LEVEL FLOAT KIT 1/4" STAINLESS STEEL BALL VALVE VACUUM SENSOR KIT VEEDER-ROOT JOMAR VEEDER-ROOT 846400-001 100-501 VR-330020-480 16 17 18 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 19 20 21 VR-794380-304VEEDER-ROOTMINI HYDROSTATIC SENSOR VEEDER-ROOT TANK LEVEL MAG PROBE 11 10 DIESEL TURBINE SUMP SIDE VIEW Sump and Penetration Fitting Details DIESEL TURBINE SUMP TOP VIEW Sump and Penetration Fitting Details 10 11 9 16 1 6 8 15 12 SECOND ANNULAR ACCESS PORT PRODUCT LINE 7 ALL SUMP ENTRY FITTING TO HAVE TEST PORT LOCATED AT 6 O'CLOCK WITH A BALL VALVE CONNECTED TO IT FOR TESTING F.E. PETRO SUBMERSIBLE TURBINE PUMP VEEDER-ROOT MAG PROBE FLOAT KIT 1110 9 8 1 4 816 7 2 13 3 PRODUCT LINE 14 9 11 10 VENT LINE 2 7 VEEDER-ROOT MAG PROBE SET OVERFILL ALARM AT 90%, HIGH PRODUCT AT 95% SECOND ANNULAR ACCESS PORT5 12 6 VENT LINE 921 15 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 29 36 9/30/25 DIESEL FILL SUMP DETAIL MA X6" 2"MIN 45% FLAPPER REQUIRED SET AT 95% 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 16 17 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 3" FIBERGLASS PIPE MINI HYDROSTATIC SENSOR 2 DIESEL FILL SUMP PLAN VIEW Sump and Penetration Fitting Details DIESEL FILL SUMP SIDE VIEW Sump and Penetration Fitting Details OPW Bucket and Fitting Details 42" DOUBLE WALL FILL SUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" SUMP SENSOR (NON DISCRIMINATING) 2" X 24" FLEX CONNECTOR XERXES BRAVO VEEDER-ROOT FLEXING VR-794390-208 FF20X12SSHMXSSHM 42" DW CONTAINMENT SUMP F-17-SS-D 5 GALLON PRODUCT CONTAINMENT BUCKET PRODUCT SWIVEL ADAPTOR DROP TUBE DROP TUBE FLAPPER 42" Dia. WATERTIGHT FLAT SEALED MULTI PORT COVER FACE SEAL ADAPTER PRODUCT DUST CAP JACK SCREW KIT EXTRACTOR VALVE 3" X 2" FIBERGLASS SUMP PENETRATION FITTING 2" FIBERGLASS PIPE P761C-FLDV 61SALP-1020-EVR 61T-SS 71SO DMP42-2-SW-YEL FSA-400-S 634TT-EVR 61JSK-4410 233-4432 012030-626-0 011020-069-2 OPW OPW OPW OPW OPW OPW OPW OPW OPW A.O. SMITH A.O. SMITH A.O. SMITH VEEDER-ROOT 011030-069-2 VR-794380-304 SECOND ANNULAR ACCESS PORT SECOND ANNULAR ACCESS PORT NOTE: SPILL BUCKETS TO BE TESTED TO HOLD 5 GALLONS BELOW THE CAP 17 1 13 3 8 7 2 9 3 1 17 11 5 6 1210 7 26 33 42 " NORTH CALE IN FEET 5 10 1 2 3 4 5 6 7 8 9 10 11 12 13 14 EQUIPMENT DESCRIPTION MANUFACTURER PART NUMBERNO. 42" DOUBLE WALL FILL SUMP ELEC. CONDUIT PENETRATION FITTING FOR 3/4" SUMP SENSOR (NON DISCRIMINATING) 2" X 24" FLEX CONNECTOR XERXES BRAVO VEEDER-ROOT FLEXING VR-794390-208 FF20X12SSHMXSSHM 42" DW CONTAINMENT SUMP F-17-SS-D 5 GALLON PRODUCT CONTAINMENT BUCKET PRODUCT SWIVEL ADAPTOR DROP TUBE DROP TUBE FLAPPER 42" Dia. WATERTIGHT FLAT SEALED MULTI PORT COVER FACE SEAL ADAPTER PRODUCT DUST CAP JACK SCREW KIT EXTRACTOR VALVE MINI HYDROSTATIC SENSOR P761C-FLDV 61SALP-1020-EVR 61T-SS 71SO DMP42-2-SW-YEL FSA-400-S 634TT-EVR 61JSK-4410 233-4432 VR-794380-304 OPW OPW OPW OPW OPW OPW OPW OPW OPW VEEDER-ROOT MA X6" 2"MIN 45% FLAPPER REQUIRED SET AT 95% 2 DIESEL FILL SUMP PLAN VIEW Sump and Penetration Fitting Details DIESEL FILL SUMP SIDE VIEW Sump and Penetration Fitting Details OPW Bucket and Fitting Details SECOND ANNULAR ACCESS PORT SECOND ANNULAR ACCESS PORT NOTE: SPILL BUCKETS TO BE TESTED TO HOLD 5 GALLONS BELOW THE CAP 14 1 13 3 8 7 2 9 3 1 14 11 5 6 1210 7 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 333036 9/30/25 20,000 GALLON TANK DETAIL 27 33 F. E. PETRO TURBINE 4" MIN. 6" MAX. VEEDER-ROOT MAG PROBE SET AT 90% CL CL DROP TUBE BRINE RESERVOIR AND INTERSTITIAL MONITOR 20,000 GALLON XERXES DOUBLE WALLED FIBERGLASS TANK 20,000 GALLON XERXES DOUBLE WALLED FIBERGLASS TANK 20,000 GALLONS 20,000 GALLONS 20,000 GALLON UNDERGROUND FIBERGLASS STORAGE TANK XERXES 10' DIA. DOUBLE-WALL CAP. 20,000 GALLONS TANK DESCRIPTION MANUFACTURER PART NUMBERNO. 1 ITEM A B E D C QTY 1 2 1 1 1 DESCRIPTION 18" DIA HYDROSTATIC MONITORING RESERVOIR WITH 4" NPT FITTING 4" NPT SERVICE FITTINGS 22" DIA MANWAY WITH 5 - 4" NPT FITTINGS IN COVER 48" DIA DW CONTAINMENT & 72" HIGH DOUBLE WALL BRINE MONITORED CONTAINMENT SUMP WITH 36" DIA WATERTIGHT TOP COVER 42" DIA DW CONTAINMENT & 72" HIGH DOUBLE WALL BRINE MONITORED CONTAINMENT SUMP WITH 32" DIA WATERTIGHT TOP COVER 37' 8.75" 12' 6"12' 6" 10' 4" O.D. 10' 0" I.D. EA B C D FLAPPER REQUIRED SET AT 95% IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 31 36 9/30/25 12,000 GALLON TANK DETAIL 28 33 F. E. PETRO TURBINE 4" MIN. 6" MAX. VEEDER-ROOT MAG PROBE SET AT 90% CL CL DROP TUBE BRINE RESERVOIR AND INTERSTITIAL MONITOR 12,000 GALLON XERXES DOUBLE WALLED FIBERGLASS TANK 12,000 GALLON XERXES DOUBLE WALLED FIBERGLASS TANK 12,000 GALLONS 12,000 GALLONS 12,000 GALLON UNDERGROUND FIBERGLASS STORAGE TANK XERXES 10' DIA. DOUBLE-WALL CAP. 12,000 GALLONS TANK DESCRIPTION MANUFACTURER PART NUMBERNO. 1 ITEM A B E D C QTY 1 2 1 1 1 DESCRIPTION 18" DIA HYDROSTATIC MONITORING RESERVOIR WITH 4" NPT FITTING 4" NPT SERVICE FITTINGS 22" DIA MANWAY WITH 5 - 4" NPT FITTINGS IN COVER 48" DIA DW CONTAINMENT & 72" HIGH DOUBLE WALL BRINE MONITORED CONTAINMENT SUMP WITH 36" DIA WATERTIGHT TOP COVER 42" DIA DW CONTAINMENT & 72" HIGH DOUBLE WALL BRINE MONITORED CONTAINMENT SUMP WITH 32" DIA WATERTIGHT TOP COVER 23' 8.50" 7' 6"7' 6" 10' 4" O.D. 10' 0" I.D. EA B C D FLAPPER REQUIRED SET AT 95% IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 32 36 9/30/25 DISPENSER DETAILS 29 33 1011 1 8 7 6 DSL 9 1 5 3 2 87 4 ISD Flow Meter(installed anywhere in vapor line above shear valve) Pressure sensing port ISD Pressure sensor (in 1 dispenser only) Vapor return linefrom dispenser Vapor return lineshear valve Flow Meter and Pressure Sensor wiring may sharethe same conduit Pitch to drain 1/4"per 12" horizontal 1/4" O.D. rigidtubing as required OUTLET Flow meter end view INLET Cable Cable Junction box Seal off Conduit to TLS Console A test port is required forintroducing liquid duringTP-201.4 dynamic backpressure test. Top of island DISPENSER SUMP DISPENSER HYDRAULICS CABINET FROMHEALY PUMP Arrow must point down *NOTE: ISD VAPOR PRESSURE SENSOR TO BE INSTALLED IN DISPENSER CLOSEST TO UST'S (DISPENSER #1/2) GASBOY ATLAS (1+0) DIESEL ONLY DISPENSER NO.PART NUMBERMANUFACTUREREQUIPMENT DESCRIPTION GASBOY ATLAS 1+0 VST-EVR-NBBK-2 VSTA-EVR-SBKA 532366640-00100 532366641-08031 532331724-00174 3360 532331724-00974 159503-03 VR-330020-585 VR-330020-515 VR-794380-208 336.02 106 GASBOY VST VST CONTINENTAL CONTINENTAL CONTINENTAL HUSKY CONTINENTAL HUSKY VEEDER-ROOT VEEDER-ROOT VEEDER-ROOT VEEDER-ROOT VEEDER-ROOT GASBOY ATLAS DISPENSER 1 + 0 EVR NOZZLE BREAKAWAY 12" COAXIAL HOSE 8' COAXIAL HOSE DIESEL 12" WHIP HOSE DIESEL BREAKAWAY DIESEL 8' HOSE DIESEL NOZZLE VAPOR FLOW METER (ISD) VAPOR PRESSURE SENSOR (ISD) SUMP SENSOR (NON DISCRIMINATING) TLS-350 SOFTWARE UPGRADE ISD SOFTWARE UPGRADE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ISD ABOVE SHEAR VALVE DETAIL NOTE: All Required warning and notice sign-age to be installed on dispenser prior to final inspection In any event that product should be released from inside the dispenser it will fall into and be contained in the dispenser UDC In any event that product should be released from inside the dispenser it will fall into and be contained in the dispenser UDC NOTE: All Required warning and notice sign-age to be installed on dispenser prior to final inspection GASBOY ATLAS (1+0) GASOLINE ONLY DISPENSER 3' MAX SEPARATION BUMPER POST DETAIL 6"diameter,concrete- filled 3' - 0 " 4' - 0 " 6" CONCRETE BELOW POSTAND AT SIDES MIN. 18" NOTE: BUMPER POSTS TO HAVE A MAXINUM SEPARATION OF 4' BETWEEN POSTS 1011 1 8 7 6 DSL 9 1 5 3 2 87 4 12 12 ISD Flow Meter(installed anywherein vapor line above shear valve) Pressure sensing port ISD Pressure sensor (in 1 dispenser only) Vapor return linefrom dispenser Vapor return lineshear valve Flow Meter and Pressure Sensor wiring may share the same conduit Pitch to drain 1/4"per 12" horizontal 1/4" O.D. rigidtubing as required OUTLET Flow meter end view INLET Cable Cable Junction box Seal off Conduit to TLS Console A test port is required for introducing liquid duringTP-201.4 dynamicbackpressure test. Top of island DISPENSER SUMP DISPENSER HYDRAULICS CABINET FROM HEALY PUMP Arrow must point down *NOTE: ISD VAPOR PRESSURE SENSOR TO BE INSTALLED IN DISPENSER CLOSEST TO UST'S (DISPENSER #1/2) GASBOY ATLAS (1+0) DIESEL ONLY DISPENSER NO.PART NUMBERMANUFACTUREREQUIPMENT DESCRIPTION GASBOY ATLAS 1+0 VST-EVR-NBBK-2 VSTA-EVR-SBKA 532366640-00100 532366641-08031 532331724-00174 3360 532331724-00974 159503-03 VR-330020-585 VR-330020-515 VR-794380-208 336.02 106 GASBOY VST VST CONTINENTAL CONTINENTAL CONTINENTAL HUSKY CONTINENTAL HUSKY VEEDER-ROOT VEEDER-ROOT VEEDER-ROOT VEEDER-ROOT VEEDER-ROOT GASBOY ATLAS DISPENSER 1 + 0 EVR NOZZLE BREAKAWAY 12" COAXIAL HOSE 8' COAXIAL HOSE DIESEL 12" WHIP HOSE DIESEL BREAKAWAY DIESEL 8' HOSE DIESEL NOZZLE VAPOR FLOW METER (ISD) VAPOR PRESSURE SENSOR (ISD) SUMP SENSOR (NON DISCRIMINATING) TLS-350 SOFTWARE UPGRADE ISD SOFTWARE UPGRADE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ISD ABOVE SHEAR VALVE DETAIL NOTE: All Required warning and notice sign-age to be installed on dispenser prior to final inspection In any event that product should be released from inside the dispenser it will fall into and be contained in the dispenser UDC In any event that product should be released from inside the dispenser it will fall into and be contained in the dispenser UDC NOTE: All Required warning and notice sign-age to be installed on dispenser prior to final inspection GASBOY ATLAS (1+0) GASOLINE ONLY DISPENSER 3' MAX SEPARATION BUMPER POST DETAIL 6"diameter, concrete-filled 3' - 0 " 4' - 0 " 6" CONCRETE BELOW POSTAND AT SIDES MIN. 18" NOTE: BUMPER POSTS TO HAVE A MAXINUM SEPARATION OF 4' BETWEEN POSTS BOLLARDS BOLLARD IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 33 36 9/30/25 ADA COMPLIANCE DETAILS 46 " M A X OP E R A T I O N A L P A R T S 10" MAX OBSTRUCTION DISPENSER ISLAND DRIVE SLAB No smoking. Shut off motor.Discharge your static electricity before fuelingby touching a metal surface away from the nozzle. To prevent static charge, do not reenter your vehicle while gasoline is pumping. If a fire starts, do not remove nozzleand back away immediately.It is unlawful and dangerous to dispense gasoline into unapproved containers. No filling of portable containers in or on a motor vehicle.Place container on ground before filling nozzle instructions WARNING SIGNS SHALL BE PROVIDED ON ALL DISPENSERS IN CONFORMANCE WITH SECTION 2305.6 CFC NOZZLE OPERATION INSTRUCTIONS SHALL BE PROVIDED ON ALL DISPENSERS IN CONFORMANCE WITH SECTION 2304.4.2 CFC KEY PAD, DISPLAY KEYS AND All OPPERATIONAL PARTS SHALL BE IN COMPLIANCE WITH THE 2016 CBC SERIES 11B-707.2, 11B-707.3, 11B-707.7.2 AND 11B-707.9 30 33 IN CASE OF FIRE, SPILL OR RELEASE 1. USE EMERGENCY PUMP SHUTOFF 2. REPORT THE ACCIDENT! FIRE DEPARTMENT TELEPHONE NO._______ FACILITY ADDRESS: 2480 IMPALA DRIVE, CARLSBAD, CA 92010 EMERGENCY SIGN SHALL BE PROVIDED ON ALL DISPENSERS IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 34 36 9/30/25 TANK HOLE DETAIL 1' 0" MINIMUM 2' 0" MINIMUM 1' 0" MINIMUM GRAVEL BACKFILL 2' 0" MINIMUM 2' 0" MINIMUM 3' 0" MINIMUM SIDE VIEW FINISHED GRADE END VIEWFINISHED GRADE 3' 0" MINIMUM 31 33 IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR I C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 333635 22 9/30/25 VACUUM ZONES & SENSOR LAYOUT 32 33 AREA OF WORKAREA OF WORK AREA OF WORKAREA OF WORK AR E A O F W O R K AR E A O F W O R K A R E A O F W O R K AR E A O F W O R K IMPALA DR. OR I O N S T . BUILDING 1+0 1+01+0 87— REGULAR MAIN TS TS 20,000 GALLONS F VF S F VF S DIESEL TS FF S 12,000 GALLONS 20,000 GALLONS 87— REGULAR SECONDARY VENT PIPES &CARBON CANISTER N TLS 1 24 3 6 5 COMPLIANCEWORKBOOKS MSDSs T STSTSTSTSTSTSTSTS1TS- T STSTSTSTSTSTSTSTS3TS- T STSTSTSTSTSTSTSTS2TS- FS-1 FS-2 FS-3 AAAAAAAAA AAAAAAAAA AAAAAAAAA UDC-3 UDC-2 UDC-1 VACUU VAC SENSO 3 DISP (UDC-1 VEEDER VEEDER 1 VEN VEEDER VEEDER 3 FILL VEEDE VEEDE ES O ESO OA VS - 1 FE PRODUCT LINES 3" OVER 2" 87 UNLEADED 3" OVER 2" DIESEL 3" OVER 2" VAPOR LINE 4" OVER 3" VAPOR LINE PIPING LEGEND VENT LINES 3" OVER 2" 87 UNLEADED 3" OVER 2" DIESEL A — Annular T S — Turbine Sump F — Fill bucketV — Vapor recovery bucket F S — Fill Sump 1+0 — Single product dispenser (SPD) with a single nozzle (per side) to dispense either gasoline or Diesel. LEGEND — Emergency Shutoff SwitchESO — Veeder Root TLS-350TLS — Overfill AlarmOA VACUUM SENSOR KIT #2 - DIESEL TURBINE SUMPZONE #4 - DIESEL PRODUCT LINEZONE #5 - DIESEL VENT LINE VACUUM SENSOR KIT #1 - 87 TURBINE SUMP PIPE LENGTH SECONDARY VOLUME QUANTITYZONE #1 - 87 PRODUCT LINEZONE #2 - 87 VENT LINE 25 feetZONE #3 - VAPOR RETURN LINE & 55 feet VACUUM ZONE LEGEND & CALCULATIONS 0.19 cubic feet55 feet 40 feet 0.71 cubic feet 0.43 cubic feet 0.30 cubic feet0.41 cubic feet 30 feet VEEDER–ROOT TLS-350 SENSORS, PROBES, & Line Leak Detectors 3 TURBINE SUMPs — (TS-1 - TS-3) SENSORS3 DISPENSER UDCs — (UDC-1 - UDC-3) VEEDER-ROOT 794380-208 Sump Sensors VEEDER-ROOT 794380-304 Sump Sensors LINE LEAK DETECTORS3 PLLDs — (TS-1, TS-2, TS-3) VEEDER-ROOT 848480-001 PLLD Sensors VEEDER-ROOT 794380-208 Sump Sensor VEEDER-ROOT 794380-304 Sump Sensor 1 VENT SUMP — (VS-1) VEEDER-ROOT 794380-208 Sump Sensor VEEDER-ROOT 794380-304 Sump Sensor PROBES3 MAG PROBES — (TS-1 - TS-3) VEEDER-ROOT 847390-109 MAG PLUS 3 FILL SUMPs — (FS-1 - FS-3) VEEDER-ROOT 794380-208 Sump Sensor VEEDER-ROOT 794380-304 Sump Sensor 3 ANNULAR — (A-1 - A-3) VEEDER-ROOT 794380-303 Sensors TLS-450PLUS NOTE: PIPING SHOWN HEREON IS SCHEMATIC. SEE SHEET 22 FOR DETAILS IS S U E D F O R C O N S T R U C T I O N 05/30/2024 32 3 48 5 6 10 7 10 5 6 4 8 5 6 7 7 3 2 1 9 9 2.4' 4. 5 ' 1. 9 ' 3. 0 ' 4. 0 ' FUEL PUMP DETAIL N.T.S NORTH 0 GRAPHIC SCALE IN FEET 5 2.5 5 10 1 2 3 4 5 6 7 8 9 10 REMOVE EXISTING FUEL FOCUS ASSET MANAGEMENT CONSOLE. STORE FOR FUTURE RECONNECTION BY CITY FORCES. REMOVE EXISTING LIGHT POLE REMOVE EXISTING HOSE VAULT REMOVE EXISTING PCC CURB ISLAND REMOVE EXISTING FUEL DISPENSER INSTALL GASBOY ATLAS FUEL DISPENSER: MODEL 9852KTW-1 (ISLAND-ORIENTED), AND RECONNECT ALL PIPING; SEE DETAIL THIS SHEET CONSTRUCT FUEL CANOPY COLUMNS; SEE SHEET 6 CONSTRUCT 6" PCC CURB ISLAND PATCH OR REPLACE CONCRETE SURFACE WITHIN LIMITS OF WORK; CONCRETE SHALL BE 8" THICK 560-C-3500 REINFORCED WITH NO. 4 BARS, 18" O.C., OVER 4" AGGREGATE BASE. CONSTRUCT FUEL CANOPY; SEE SHEET 6 CONSTRUCTION NOTES LEGEND EXISTING FINISHED GRADE SPOT ELEVATION EXISTING 0.5' CONTOUR* EXISTING 2.5' CONTOUR CONCRETE CHAIN LINK ELECTRICAL EQUIPMENT *NOTE: CONTOUR INTERVAL IS 1' C/L E LIGHT STANDARD BACKFLOW PREVENTER RISER CONC AREA DRAIN DRAIN INLET ASPHALT AD DI AC GP WATER VALVE GUARD POST STORM DRAIN MANHOLE (UNLESS OTHERWISE NOTED) SET CONTROL POINT FIRE DEPARTMENT CONNECTION FG:(365.73) 1003 1.INSTALL GASBOY ATLAS MODEL 9852KTW1 STD-FLOW TWIN 1 PUMP 2.REFERENCE MANUFACTURER FOR DETAILS NOTES: 3 APPROX. EXCAVATION LIMITS FUEL ISLAND CANOPY 333636 9/30/25 BUOYANCY CALCULATIONS 33 33 12,000 GALLON UST 20,000 GALLON UST IS S U E D F O R C O N S T R U C T I O N 05/30/2024 Appendix A FLEET COMPLIANCE CERTIFICATION Bidder hereby acknowledges that they have reviewed the California Air Resources Board’s policies, rules and regulations and are familiar with the requirements of Title 13, California Code of Regulations, Division 3, Chapter 9, effective on January 1, 2024 (the “Regulation”). Bidder hereby certifies, subject to penalty for perjury, that the option checked below relating to the Bidder’s fleet, and/or that of their subcontractor(s) (“Fleet”) is true and correct: □The Fleet is subject to the requirements of the Regulation, and the appropriate Certificate(s) of Reported Compliance have been attached hereto. □The Fleet is exempt from the Regulation under section 2449.1(f)(2), and a signed description of the subject vehicles, and reasoning for exemption has been attached hereto. □Bidder and/or their subcontractor is unable to procure R99 or R100 renewable diesel fuel as defined in the Regulation pursuant to section 2449.1(f)(3). Bidder shall keep detailed records describing the normal refueling methods, their attempts to procure renewable diesel fuel and proof that shows they were not able to procure renewable diesel (i.e. third party correspondence or vendor bids). □The Fleet is exempt from the requirements of the Regulation pursuant to section 2449(i)(4) because this Project has been deemed an Emergency, as defined under section 2449(c)(18). Bidder shall only operate the exempted vehicles in the emergency situation and records of the exempted vehicles must be maintained, pursuant to section 2449(i)(4). □The Fleet does not fall under the Regulation or is otherwise exempted, and a detailed reasoning is attached hereto. Name of Bidder: Signature: Name: Title: Date: PWS24-2282FAC