Loading...
HomeMy WebLinkAbout2325 CAMINO VIDA ROBLE; A; CBC2024-0089; Recycle' f ,r-1 (_ Cicyof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 Development Services Building Division 1635 Faraday Avenue www.carlsbadca.gov This form shall be completed for all demolitions and new construction, additions, and alterations. The California's Green Building Standards Code (CALGreen) requires that at least 65% of construction site debris generated during demolition projects, most new construction, as well as the majority of building additions or alterations be recycled, reused, or otherwise diverted from landfill disposal. STEP 1: The Applicant must submit PART 1 of this form before a building permit application is approved. STEP 2: The permit holder shall utilize a waste management company that can provide verifiable documentation that meets 65% waste diversion. Republic Services is the exclusive franchised waste hauler in the City of Carlsbad. • Option A -Roll-Off Bins: Call Customer Service (760) 332-6464 and ask for a C&D account for waste diversion. Republic Services will provide roll-off bins for construction waste. • Option B -Self Haul to Republic Services or other dump site that can provide verifiable documentation. It must be a Certified Source Separated Recycling Facility. When you enter the site, explain to gate operator that this is C&D material. When you exit the site, request a receipt and certificate from gate operator for waste diversion. STEP 3: Prior to permit close-out (permit final), the permit holder shall complete PART 2 of this form and submit all trash and recycling weight receipts to the building inspector. Waste log, acknowledgement, and tickets must be submitted to release your certificate of occupancy. C&D CERTIFICATION: I certify under penalty of perjury under the laws of the State of California that the information provided in and with this form pertains to construction and demolition debris generated only from the project listed in PART 1, that I have reviewed the accuracy of the information, and that the information is true and correct to the best of my knowledge and belief. I understand the waste diversion requirements of the State of California and submit this Construction Waste Management Plan pursuant to Ca lifornia Green Building Standards Code 4.408.2 or 5.408.1.1. Fa ilure to provide documentation of C&D reporting, reporting of waste diversion less than 65%, and failure to provide adequate weight receipts, may result in enforcement action against me or other responsible parties, including a notice of violation, citations, and any other remedies provided in Chapters 1.08 and 1.10 of the Carlsbad Municipal Code. Projects are required to submit their Waste ~ Log, Acknowledgement Form, and Weight Receipts prior to Certificate of Occupancy (CO) issuance. ~ This project does not involve disposal of universal or hazardous waste OR this project includes disposal of universal or hazardous waste in a responsible, safe and verifiable manner. Disposal of asbestos- containing materials, batteries, electronic waste, fluorescent bulbs, lead based paints, mercury containing equipment and refrigerants, require special processing prior to commencement of Date: S--1 ~) f Signatur Page 1 of 4 rev 4/24 PART 1 Complete and submit this form when applying for a building permit. Permits will not be issued without a completed Construction Waste Management Plan. SECTION A Project Title APN Phone 7{(r 2--q'f ,(/J/>2 SECTION B Complete the following table with estimated waste tonnage to be generated by your project. Material Type Complete this line of the table only if only using WASTE MANAGEMENT roll-off bins. Mixed C&D Debris Asphalt & Concrete Brick/ Masonry/ Tile Mixed Inert Debris Cabinets, Doors, Fixtures, Windows (circle all that apply) Carpet Carpet Padding/ Foam Cardboard Ceiling Tile (acoustic) Drywall (used, new, scrap) Landscape Debris (brush, t rees, stumps, etc.) No dirt. Unpainted Wood & Pallets Roofing M aterials Scrap Metal Stucco Other: TOTAL SECTION C Estimated Waste Quantity (tons) ) A B C Place a ( ✓) check next to items to be reused or salvaged Place a (✓)check next Place a (✓)check next to items to be to items to be recycled disposed at landfill To meet 65% Diversion Requirement (estimate) ~~-------):;~S: ___ x 0.65 =_--+-/ .__, L__.,_/ ____ tons Total Estimated Waste from above ~----Minimum Required Diversion Applicant Signature _ __,,.,,,,,,..___,,,,.'°------------------Date __ g-:: __ 1,_---~J~_,'f~------- Page 2 of 4 rev 4/24 , t I, PART 2 Complete before final inspection, obtain City Approved hauler receipts and return prior to final building approval. DEBRIS RECYCLING REPORT (ACTUAL): Acknowledgement I certify under penalty of perjury under the laws of the State of Ca lifornia that the information provided in and with this form pertains to construction and demolition debris generated only from t he project listed in PART 1, that I have reviewed the accuracy of the information, and that t he information is true and correct to t he best of my knowledge and belief. Permit No._C.=-'-"""-=-==---'------'------Print Name Address ----'--'=--__ C_o._V'\'\_,"'-_O=-.__\J_l"'_J _c.__,_~-=--'-b-'--( e,::___ti:-----''4'--____ Date Cf "" z.. Use this Final Log below to track loads of materials as they leave the job site. @@SAVE RECEIPTS@@ Indicate FINAL quantities in tons for each material and save receipts and documents from facilities where material is taken. Additional Project Log pages are available if necessa ry. Use City Conversion Table to convert volume to tons. Date Material Type A B C Actual Amt Reused or Salvaged Actual Amt Actual Amt Recycled Disposed in Landfill Destination Facility (Name, Address, Phone) Example: 01/01/2020 Concrete {broken) 5 tons Palomar Transfer Station, 5960 El Camino Real -760 603-0153 Ctv'.) @TOTAL Diversion Rate Achieved 67 % DIVERSION Contractor/Owner Signature_,-~u....u.....c..__..J...;!.'-1-.==----Date 1 ( bl 2,y Attach the following documentation to this Report: Return completed form and documentation to: • Original recycling weight tickets, landfill weight tickets City of Carlsbad • Original donation receipts with photos and/or itemized descriptions Building Division (1st Floor) • Any other relevant information to support Recycling Report 1635 Faraday Avenue Carlsbad, CA 92008 Page 3 of 4 Rev. 04/22 C cityof Carlsbad CONSTRUCTION WASTE MANAGEMENT PLAN B-59 part 2 ., Development Services Building Division 1635 Faraday Avenue 422-339-2719 www.carlsbadca.gov Your project qualifies for the City of Carlsbad Construction Waste Management Plan (CWMP): Section 4.408.1 and Section 5.408.1 of the California Green Building Standards Code requires at least 65% of non-hazardous construction debris is recycled and/ or salvaged for reuse. NEXT STEPS: STEP 1. Before the project - a. Review your CWMP completed prior to permit issuance. (copy is attached to your job card) This plan demonstrates how you will recycle a minimum of 65% of the construction waste generated from your project by choosing: Republic Services or Self Haul. STEP 2 -During the Project a. Save all receipts and/or documents from reuse facilities, recycling centers, processing facilities, and landfills where materials were taken. b. Complete the Debris Recycling Report (ORR) on the next page as your project progresses. Recycling/diversion goals are (at a minimum) 65% of the waste generated by your project STEP 3 -After the Project a. Prior to receiving inspection for final sign off the Building Permit or Certificate of Occupancy, Applicant must submit the fully completed and approved (ORR) of the Construction Waste Management Plan (CWMP) Table. b. Provide the ORR and receipts to your building inspector. FOR MORE INFORMATION: NOTICE: Applicant (contractor and subcontractors) shall comply with the project's CWMP. It is the Applicant's responsibility to collect all receipts from the facilities that recycle their materials AND all project waste/landfill disposal receipts. When working with the City's franchised hauler, Republic Services, one cumulative project receipt is acceptable. However, it is the Applicant's responsibility to confirm that the bins are collected for C&D Recycling. 1. This project shall generate the least amount of waste possible by planning and ordering carefully, following all proper storage and handling procedures to reduce broken and damaged materials, and reusing materials whenever possible. 2. Republic Services can provide 2 roll-off bins, one for commingled construction debris and one for trash. The commingled construction roll-off bin will be taken to a Certified Mixed C&D Processing Facility to sort the material and create receipt(s), to demonstrate the project has met a 65% diversion rate or greater. 3. Applicants with a goal of recycling greater than 65% of the project's total waste should work with the City's exclusive franchised waste hauler to develop a more specific CWMP. This plan may include using additional roll-off bins for particular phases of construction (e.g., concrete and wood waste) to ensure the highest waste diversion rate possible. 4. Contractors/subcontractors hauling their own waste as part of their scope of work (e.g., construction clean up companies, etc.) SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. For a current list of Certified Recycling Facilities go to http:ljwww.sandiego.gov/environmental-services/recycling/cd/index.shtml. 5. If contractors/subcontractors furnish their own debris boxes as part of their scope of work, they SHALL NOT be excluded from complying with the CWMP and shall provide weight and waste diversion receipts from a Certified Source Separated Recycling Facility. Rev. 05122 I ' PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 (760)603-0153 000999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract : RESI -GATE Yr. 2 GROSS 44,160 Scale In TARE 29,700 Tare Out NET 14,4 60 Tracking Qty: 0.00 Qty Unit Description 7 . 23 TN MSW Origin: SAN DIEGO 100% Signature: i:i4 Ticket #: 2669949 Weighmaster: macaral In: March 12, 2024 Out: March 12, 2024 Vehicle: a666 Ref: BOL: INBOUND CASH Rate Extension $96.28 $696 .10 Tax $0 .00 Total Paid Change CHECK-SCALE 10 :38 am 10:38 am Total $696.10 $696.10 $696.10 $0 .00 2084 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD , CA 92008 (760) 603-0153 00 0999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract: RESI -GATE Yr. 2 GROSS 37,980 TARE 29,720 NET 8 ,260 Tracking Qty: 0 .00 Qty Unit Description 4 . 13 TN MSW Origin: SAN DIEGO Signature: Scale In Tare Out 100% 54 Ticket #: 2 671308 Weighmaster: macaral In: March 15, 2024 Out : March 15, 2024 Veh icle: a666 Ref: BOL : INBOUN D CASH Rate Extension $96 . 28 $397 . 64 Tax $0 .00 Total Paid Change CHECK-SCALE 9 :49 am 9 : 4 9 am Total $397.64 $397.64 $397.64 $0 .00 2144 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 (760)603-0153 000999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract : RESIDENTIAL-Yr. 2 GROSS 38 ,900 TARE 29 ,620 NET Tracking Qty: 9 ,280 0 .00 Qty 4.64 Unit Descript ion TN MSW Scale In Scale Out 54 Ticket #: 2673189 We i ghmaster: aceveos In: March 20, 2024 Out: March 20, 2024 Vehicle : CD Ref: 38900/BOOck BOL: INBOUND CASH Rate Extension $96 .28 $446 .74 Tax $0 .00 Origin: CARLSBAD 100% Signature : Total Paid Change CHECK-SCALE 8 :37 am 8 :49 am Total $446.74 $446.74 $446 .74 $0.00 2155 PALOMAR TRANS FER 5960 EL CAMINO REAL CARLSBAD , CA 92008 (760)603-0153 000999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract: RESI -GATE Yr . 2 GROSS 39,040 TARE 29,020 NET 10,020 Tracking Qty : 0.00 Qty 5.01 Unit Descrip tion TN MSW Scale In Tare Out 54 Ticket #: 2672381 Weighmaster : macaral In: March 18, 2024 Out : Mar ch 18, 2024 Vehicle: a666 Ref : BOL: I NBOUND CASH Rate Extension $96. 28 $482. 36 Tax $0.00 12:23 pm 12:23 pm Total $482.36 Origin: CARLSBAD 100% Signature : Total Paid Change CHECK-SCALE $482 .36 $482.36 $0 .00 2147 4f!/JI PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD , CA 92008 (760) 603-0153 000999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contr act : RESI -GATE Yr. 2 GROSS 38,140 Scale In TARE 28,260 Tare Out NET 9,880 Tracking Qty: 0 .00 Qty Unit Description 4 .94 TN MSW Origin: CARLSBAD 100% Signature: ~4 Ticke t #: 2676928 We i ghmaster : macaral In: March 29, 2024 Out: March 29, 2024 Vehi cle: a666 Ref: BOL : INBOUND CASH Rate Extension $96.28 $475.62 Tax $0.00 Total Paid Change CHECK-SCALE 10:40 am 10:40 am Total $4 75 .62 $475.62 $475 .62 $0 .00 2165 PALOMAR TRANSFER 5960 EL CAMINO REAL CARLSBAD, CA 92008 (760)603-0153 000999 -CASH AND CHECK CUSTOMER ADDRESS carlsbad, CA 92008 Contract: RESIDENTIAL-Yr. 2 GROSS 30,340 TARE NET 28 ,640 1,700 Tracking Qty: 0.00 Qty 0.85 Unit Description TN MSW Scale In Scale Out 54 Ticket #: 2678846 Weighmaster: diazadl In: April 03, 2024 Out : April 03, 2024 Vehicle : CD Ref : 30340/check 600 BOL : INBOUND CASH Rate Extension $96.28 $81.84 Tax S0.00 Origin: CARLSBAD 100% Signature: Total Paid Change CHECK-SCALE 2:56 pm 3 :09 pm Total $81 .84 $81.84 $81 .84 $0.00 2194