Loading...
HomeMy WebLinkAboutPS 2021-0054; OAKMONT OF CARLSBAD; Sign Permits/Programs (PS)EXISTING SIGNS: TYPE NUMBER SIGN AREA SIGN HEIGHT Pole Monument Wall Suspended/Projecting Directional Canopy Freestanding (Project Identity) PERMITS ISSUED FOR EXISTING SIGNS: Yes O No O Date ______ _ PROPOSED PERMANENT SIGNS: MAXIMUM NUMBER MAXIMUM PROPOSED MAXIMUM PROPOSED TYPE NUMBER SIGN SIGN SIGN ALLOWED PROPOSED AREA SIGN AREA HEIGHT HEIGHT Pole- Monument*• 1 1 t::n c:::n FT ,;1 C:::f'\ i=T I'-'-()" 5'-"'" Wall Suspended/Projecting Directional Canopy Freestanding..., (Project Identity) Digital Display PROPOSED TEMPORARY SIGNS: MAXIMUM NUMBER MAXIMUM PROPOSED MAXIMUM PROPOSED TYPE NUMBER SIGN SIGN SIGN ALLOWED PROPOSED AREA SIGN AREA HEIGHT HEIGHT Construction•• For Sale** Banner Interim -Prior to approval, all proposed pole, monument, and freestanding signs must be reviewed for potential sight distance and visibility issues. Additional information must supplement this application showing how the proposed signage will not encroach into the public right-of- way or present a traffic hazard. Page 3 of 4 illustrates an example for what would be required for such proposed signs. P-11 Page 2 of 4 Rev 02/28/18 PROPERTY OWNER APPLICANT NAME (PRINT OR TYPE) NAME (PRINT OR TYPE) Oakmont of Carlsbad LLC OSL Construction MAILING ADDRESS MAILING ADDRESS 9240 Old Redwood Hwy, Suite 200 9240 Old Redwood Hwy, Suite 200 Windsor, CA 95492 Windsor, CA 95492 CITY STATE ZIP TELEPHONE CITY STATE ZIP TELEPHONE 707-535-3200 707-535-3200 I CERTIFY THAT I AM THE LEGAL OWNER I CERTIFY THAT I AM THE REPRESENTATIVE AND THAT ALL THE ABOVE INFORMATION OF THE LEGAL OWNER AND THAT ALL THE IS TRUE AND CORRECT TO THE BEST OF ABOVE INFORMATION IS TRUE AND CORRECT MY KNOLGE. T;zBEST OF MY KNOWLEDGE. J. rJJ 6,2,2021 0 6/2/2021 SIGNATURE DATE L.,, ✓slGNATURE DATE PLANNER CHECK LIST: 1. Field check by planner. 2. Within maximum length, area. 3. Style consistent with Sign Program and/or Specific Plan criteria, if applicable. 4. Location: ❖ In right-of-way ❖ In visibility triangle at comer 5. Pole and monument signs to be checked by Transportation Engineering, for visibility issues. 6. When approved ro~ APPROVED: Planner: -~ Date:2/V2JD2,J.. P-11 Page 4 of 4 Rev. 02/28/18