HomeMy WebLinkAbout1997-12-03; Planning Commission; ; EIR 96-01|GPA 95-06|LCPA 96-03|ZC 95-06|SP 210|LFMP 87-22A - POINSETTIA PROPERTIES SPECIFIC PLANThe City of CARLSBAD Planning Departmeltt zJJ9IJ
A REPORT TO THE PLANNING COMMISSION
P.C. AGENDA OF: December 3, 1997
Item No. G)
Application complete date: May 22, 1996
Project Planner: Adrienne Landers
Project Engineer: Ken Quon
SUBJECT: EIR 96-01/GPA 95-06/LCPA 96-03/ZC 95-06/SP 210/LFMP 87-22(A) -
POINSETTIA PROPERTIES SPECIFIC PLAN -Request for the certification
of a Program Environmental Impact Report, and approval of Candidate Findings
of Fact, Statement of Overriding Considerations, Mitigation Monitoring and
Reporting Program, General Plan Amendment, Local Coastal Program
Amendment, Zone Change, Specific Plan and Local Facilities Management Plan
Amendment. This project has. been designed as a 92-acre Transit-Oriented
Development which includes the following uses: tourist commercial; mixed-use
( commercial-tourist/residential); multiple family residential; and small-lot, single
family residential. The project site is generally located west of A venida Encinas,
east of Carlsbad Boulevard, north of Lakeshore Gardens Mobilehome Park and
the Ponto Road area, and south of the NCTD Poinsettia Transit Station and
Lanikai Lane Mobilehome Park in Local Facilities Management Plan Zone 22.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 4157
RECOMMENDING CERTIFICATION of EIR 96-01, ADOPT Planning Commission
Resolutions No. 4158, 4159, 4161, and 4162, RECOMMENDING APPROVAL of GPA 95-
06, LCPA 96-03, ZC 95-06, SP 210, and LFMP 87-22(A), based on the findings and subject to
the conditions contained therein ..
II. BACKGROUND
The Poinsettia Properties Specific Plan was reviewed by the Planning Commission on November
5 and November 19, 1997. These meetings included a presentation by staff, a presentation by the
applicant, public testimony, submittal of revised documents, response to comments and
discussion by the Commission. Public testimony was closed on November 191\ however the
meeting was continued to December 3rd to allow staff time to revise the approving resolutions to
reflect modified conditions and errata. These changes have been made and are incorporated in
the attached documents. Any required text changes to the specific plan will occur after final
approval by the City Council, should the specific plan be approved.
EIR 96-01/GPA 95-06/LCPA 96-03/ZC 95-06/SP 210/LFMP 87-22(A}-POINSETTIA
PROPERTIES SPECIFIC PLAN
December 3, 1997
Pa e2
ATTACHMENTS:
1. Planning Commission Resolution No. 4157 (EIR)
2. Planning Commission Resolution No. 4158 (GPA)
3·. Planning Commission Resolution No. 4159 (LCP A)
4. Planning Commission Resolution No. 4161 (SP)
5. Planning Commission Resolution No. 4162 (LFMP)
6. Draft Addendum to Final Program EIR
ATTACHMENT 6
POINSETTIA PROPERTIES SPECIFIC PLAN
DRAFT ADDENDUM TO FINAL PROGRAM EIR
NOVEMBER 13, 1997
DRAFT ADDENDUM TO FINAL PROGRAM EIR
A final program environmental impact report (City of Carlsbad EIR 96-01) for th~ Poinsettia
Properties Specific Plan was completed in July 1997. An addendum has been prepared to provide
additional and updated information to EIR. 96-01. Since completion of the EIR, the project applicant
has modified the project to reduce the intensity of development and address other concerns raised
during the public review process. This addendum described the revised project, considers its
environmental effects and mitigation measures, and provides additional information in response to
issues raised at the November 5, 1997 Planning Commission public hearing.
Introduction
Under the California Environmental Quality Act (CEQA) and the CEQA Guidelines (California
Administrative Code section 15164), an addendum to an EIR may be prepared when:
(A) The EIR requires minor technical changes or additions; and
(B) None of the following conditions described in CEQA Guidelines section 15162 calling
preparation of a subsequent EIR have occurred:
(1) Substantial changes are proposed in the project which require major revisions of the EIR
due to the involvement of new significant environmental effects or substantial increase in the
severity of previously identified significant effects;
(2) Substantial changes occur with respect to the circumstances under which the project is
undertaken which will require major revisions of the previous EIR due to involvement of new
significant environmental effects or a substantial increase in the severity of previously
identified significant effects; and
(3) New information of substantial importance, which was not known and could not have
been known with the exercise of reasonable diligence at the time the previous EIR was
completed· shows any of the following:
• The revised project will have one or more significant effects not discussed in the
previous EIR;
• Significant effects previously examined will be substantially more severe than shown
in the previous EIR;
• Mitigation measures or alternatives previously found not to be feasible would in fact
be feasible and would substantially reduce o~e or more significant effects of the
project, but the project proponents decline to adopt the mitigation measure or
alternative; or
• Mitigation measures or alternatives which are considerably different from those
analyzed in the previous EIR would substantially reduce one or more significant
effects on the environment, but the project proponents decline to adopt the mitigation
measure or alternative.
Poinsettia Properties Specific Plan
Draft Addendum to Final Program ~R 1
City of Carlsbad
November 13, 1997
--
CEQA Guidelines section 15164 (b) and ( c) also indicate that an addendum need not be circulated
for public review, but can be included in or attached to the final EIR, and that the decision making
body shall consider the addendum with the final EIR prior to making a decision on the project.
An addendum to Final EIR 96-01 is appropriate because the proposed revision to the project
analyzed in the EIR requires only minor technical changes or additions to the document and none
of the conditions described in CEQA Guidelines section 15162 calling for preparation of a
subsequent EIR have occurred. This conclusion is supported by substantial evidence identified
within the Final EIR and this addendum.
Revised Project Description
The applicant has revised the project description to reduce the intensity of development and address
other concerns raised during the public review process. The project addressed in final EIR 96-01
and the revised project associated with this addendum are described below in Tables A-1 and A-2:
Table A-I
Comparison of Poinsettia Properties EIR Pro_iect and Revised Project by Planning Area
Planning Area(a) Em Project Develol!ment Revised Project Develol!ment
Non-Residential ( acres or bldg sq. ft.) • Non-Residential (bldg sq. feet)
Residential (dwelling units) Residential (dwelling units)
Planning Area I Travel Recreation -40,000 sq ft of Travel Recreation -21, 780 sq ft of
building floor area building floor area
Planning Area 2 Residential Medium Density -114 du Residential Medium Density -180 du;
building height limit -30 ft/2 stories
Planning Area 3 Open Space -1.4 acres Open Space -1.4 acres
Planning Area 4 Residential Medium High Density -186 Residential Medium High Density -178
du du; building height limit -30 ft/2 stories
Planning Area 5 Residential High Density -142 du Residential High Density -139 du
Planning Area 6 Travel Recreation/Commercial/Mixed-Travel Recreation/Commercial/Mixed-
Use/Multi-Family Residential -61 du & Use/Multi-Family Residential -61 du &
80,000 sq ft of commercial building floor 80,000 sq ft of commercial building floor
area area
Planning Area 7 Residential High Density -356 du -Residential Medium High Density -215
building height limit -35 ft du; building height limit -30 ft/2 stories
Planning Area 8 Residential Medium High Density -150 Residential Medium High Density -150
du du; building height -30 ft/2 stories
Total Specific Plan 91.9 acres/120,000 sq ft of building 91.9 acres/101,780 sq ft of building
Development floor area/1,009 du/1.4 acres open floor area/923 du/1.4 acres open space
space
Notes: (a) For the EIR Project, Planning Areas 1 -6 are located on Parcel A, Planning Area 7 on Parcel B, and
Planning Area 8 on Parcel C. For the Revised Project, Planning Areas 2 -6 are located on Parcel A, Planning
Area 7 on Parcel B, and Planning Areas l and 8 on Parcel C.
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EIR 2
City of Carlsbad
November 13, 1997
Comparison of Poinsettia Properties EIR Pro_iect and Revised Proiect bv Parcel
Parcel EIR Project Develo(!ment Revised Project Develo(!ment
Non-Residential ( acres or bldg sq. ft.) Non-Residential (bldg sq. feet)
Residential (dwelling units) Residential (dwelling units)
Parcel A Travel Recreation -40,000 sq ft of Residential Medium Densi!l'. -180 du
building floor area Open SEace -1.4 acres
Residential Medium Densi!X -114 du Residential Medium High Density -178
OEen S2ace -1.4 acres du
Residential Medium High Density -186 Residential High Densi:!X -139 du
du Travel Recreation/Commercial/Mixed-
Residential High Densi!l'. -142 du Use/Multi-Family Residential -61 du &
Travel Recereation/Commercial/Mixed-80,000 sq ft of commercial building floor
Use/Multi-Family Residential -61 du & area
80,000 sq ft of commercial building floor Building height limit in PA 2 and 4
area limited to 30 ft/2 stories
Subtotal -Parcel A 55.7 acres/120,000 sq ft of building 55.7 acres/80,000 sq ft of building floor
floor area/503 du/1.4 acres open space area/558 du/1.4 acres open space
Parcel B Residential High Density -356 du -Residential Medium High Density -215
building height limit-35 ft du; building height limit -30 ft/2 stories
Subtotal -Parcel B 18. 7 acres/3S6du 18. 7 acres/215 du
Parcel C Residential Medium High Density -150 Travel Recreation -21,780 sq ft of
du building floor area
Residential Medium High Density -150
du
Building height limit -30 ft/2 stories
Subtotal -Parcel C 17.5 acres/150 du 17.5 acres/21,780 sq ft of building floor
area/ISO du
Total Specific Plan 91.9 acres/120,000 sq ft of building 91.9 acres/101,780 sq ft of building
Development floor area/1,009 du/1.4 acres open floor area/923 du/1.4 acres open space
space
Proposed General Plan and zoning designations for the revised project are shown in Figures A-1 and
A-2 at the end of this addendum.
Environmental Impact and Mitigation Measures
The revised project decreases the amount of non-residential building square footage proposed by
18,220 square feet (a reduction of approximately 15 percent) and the number of residential dwelling
units by 86 (a reduction of approximately 8.5 percent). The amount of proposed open space (1.4
acres) remains the same. Although implementation of the revised project reduces certain
environmental impacts identified for the earlier project analyzed in the EIR, the conclusions of the
EIR regarding overall impact and mitigation remain unchanged for the revised project.
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EIR 3
City of Carlsbad
November /3, /997
For traffic/circulation, air quality, noise, visual aesthetics/grading, and public services and utilities,
the revised project will have less impacts than the EIR project, while other impacts of the revised
project are similar to the EIR project. Even though the revised project will create less traffic and air
quality impacts at the project level, cumulative impacts remain significant and unavoidable. EIR
project alternatives compare similarly to the revised project and long-term effects are comparable for
the EIR project and revised project. A summarized comparison of environmental impact for the EIR
project and the revised project are provided in Table A-3 below:
TableA-3
Comparison of Em Conclusions for Poinsettia Properties Em Pro_iect and Revised Pro.iect
Environmental Impacts EIRProject
and Mitigation, 91.9 acres/120,000 sq ft of building floor
Alternatives and Long-area/1,009 du/1.4 acres open space
Term Effects
Land Use Compatibility Less than significant impact
Population/Housing Less than significant impact
Traffic/Circulation Less than significant impact
Air Quality Significant, but mitigable impact
Noise Significant, but mitigable impact
Biological Resources Significant, but mitigable impact
Archaeological and Significant, but mitigable impact
Paleontological Resources
Agricultural Resources Significant, but mitigable impact
Visual Aesthetics/Grading Significant, but mitigable impact
Public Services and Less than significant impact
Utilities
Water Quality/Hydrology Significant, but mitigable impact
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EJR 4
Revised Project
91.9 acres/101,780 sq ft of building floor
area/923 du/1.4 acres open space
Impact similar to EIR project -less
than significant impact
Impact similar to EIR project -less
than significant impact
Impact less than EIR project (fewer
vehicular trips generated) -less than
significant impact
Impact less than EIR project (fewer
mobile and stationary source emissions
generated) -significant, but mitigable
impact
Impact less than EIR project (fewer
vehicular trips generating less noise
along roadways) -significant, but
mitigable impact
Impact similar to EIR project -
significant, but mitigable impact
Impact similar to EIR project -
significant, but mitigable impact
Impact similar to EIR project -
significant, but mitigable impact
Impact less than EIR project (fewer
structures on Parcel B) -significant,
but mitigable impact
Impact less than EIR project (less
demand for services/facilities) -less
than significant impact
Impact similar to EIR project -
significant, but mitigable impact
City of Carlsbad
November 13, 1997
TableA-3
Comparison of EIR Conclusions for Poinsettia Properties EIR Project and Revised Project
( continued)
Environmental Impacts EIRProject
and Mitigation, 91.9 acres/120,000 sq ft of building floor
Alternatives and Long-area/1,009 du/1.4 acres open space
Term Effects
No Project/No Environmentally superior to EIR
Development Alternative project, but does not meet basic
objective of establishing TOD
Existing GP/LCP Not environmentally superior to EIR
Alternative project and does not meet most
objectives of establishing TOD
Increased Density Not environmentally superior to EIR
Alternative project, but does meet most
objectives of establishing TOD
Alternative Location Environmentally superior to EIR
project and does meet basic
objective of establishing TOD, but
outside City jurisdiction
Cumulative Impacts Significant cumulative air quality
and traffic/circulation impact
Growth Inducement Not growth inducing
Significant Irreversible Consumption of nonrenewable
Environmental Change resources
Areas of No Significant Land use compatibility
Impact Population/housing
Traffic/circulation (project-level)
Public services and utilities
Geology/soils
Energy and mineral resources
Recreation
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EJR 5
Revised Project
91.9 acres/101,780 sq ft of building floor
area/923 du/1.4 acres open space
Similar to EIR project -
. environmentally superior to revised
project, but does not meet basic
objective of establishing TOD
Similar to EIR project -not
environmentally superior to revised
project and does not meet most
objectives of establishing TOD
Similar to EIR project -not
environmentally superior to revised
project, but does meet most
objectives of establishing TOD
Similar to EIR project -
environmentally superior to EIR
project and does meet basic
objective of establishing TOD, but
outside City jurisdiction
Similar to EIR project -significant
cumulative air quality and
traffic/circulation impact
Similar to EIR project -not growth
inducing
Similar to EIR -consumption of
non-renewable resources
Similar to EIR project -
Land use compatibility
Population/housing
Traffic/circulation (project-level)
Public services and utilities
Geology/soils
Energy and mineral resources
Recreation
City of Carlsbad
November 13, 1997
Justification for Addendum
The EIR requires only minor technical changes or additions to incorporate the revised project in place
of the EIR project. In total, the revised project is less intensive than the EIR project, because it
proposes 18,220 square feet less of non-residential building floor area and 86 fewer residential
dwelling units than the EIR project, while maintaining the same I. 4 acres of open space. As shown
in Table A-3, environmental impacts associated with the revised project are less than or similar to
those attributable to the EIR project. As a result, no substantial changes are proposed for the project
requiring major revisions of the EIR due to the involvement of new significant environmental effects
or increases in the severity of previously identified significant effects.
Since the final EIR was completed recently (July 1997), no substantial changes have occurred with
respect to the circumstances under which the project is undertaken which will require major revisions
of the previous EIR due to involvement of new significant environmental effects or a substantial
increase in the severity of previously identified significant effects.
No information of substantial importance has been identified indicating that the revised project will
have significant effects not already discussed in the EIR or that the significant effects previously
examined in the report will be substantially more severe. In addition, no information of substantial
importance has been identified indicating that mitigation measures or alternatives which are
considerably different or were previously found infeasible, are now feasible and would substantially
reduce significant impacts.
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EIR 6
City of Carlsbad
November 13, 1997
RESIDENTIAL-~ MEDIUM DEN.SITY ~ OPEN SPACE
RESIDENTIAL-TRAVEURECREA TION ~ MEDIUM-HIGH DENSITY ~ COMMERCIAL
~ RESIDENTIAL-
HIGH DENSITY
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EIR
FigureA-1
Proposed General Plan Designations
7
City of Carlsbad
November 13, /997
RESIDENTIAL DENSITY-
MULTIPLE ZONE
COMMERCIAL-
TOURIST ZONE
OPEN SPACE
FigureA-2
Proposed Zoning Designations
Poinsettia Properties Specific Plan
Draft Addendum to Final Program EIR 8
City of Carlsbad
November 13, 1997