Loading...
HomeMy WebLinkAbout1418 TURQUOISE DR; ; CB992512; PermitCity of Carlsbad 07/19/1999 Residential Permit Permit No:CB992512 Building Inspection Request Line (760) 438-3101 Job Address: 1418 TURQUOISE DR CBAD Permit Type: RESDNTL Sub Type: SFD Status: Parcel No: 2121903000 Lot #: 53 Applied: Valuation: $205,237.00 Construction Type: VN Entered By: Occupancy Group: 6 Reference #: CT94-32 07/19/1999 # Dwelling Units: 1 Structure Type: SFD Issued: Bedrooms: 4 Bathrooms: 2.5 Inspect Area: Project Title: MARBRISA(COBBLESTONE) PHASE 12 Orig PC#: PLAN 6, SFD 2336 SF, GAR 595 SF Applicant: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92008 760-804-7700 Plan Check#: Owner: GREYSTONE HOMES 101 5973 AVENIDA ENCINAS CARLSBAD CA 92008 760-804-7700 ISSUED 07/08/1999 RMA Plan Approved: 07/19/1999 PY CB971300 990079 Total Fees: $17,722.15 Total Payments To Date: Balance Due: $17,722.15 Building Permit Add'I Building Permit Fee Plan Check Add'I Plan Check Fee Plan Check Discount Strong Motion Fee Park in Lieu Fee Park Fee LFM Fee Bridge Fee Other Bridge Fee BTD #2 Fee BTD #3 Fee Renewal Fee Add'I Renewal Fee Other Building Fee Pot. Water Con. Fee Meter Size Add'I Pot. Water Con. Fee lnspecto,,1 ... -___ ...,_ __ $992.08 $0.00 $644.85 $0.00 ($51 .59) $20.52 $1,575.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,400.00 05/8 $0.00 Reel. Water Con. Fee Meter Size Add'I Reel. Water Con. Fee CFO Payoff Fee PFF PFF (CFO Fund} License Tax License Tax (CFO Fund} Traffic Impact Fee Traffic Impact (CFO Fund) LFMZ Transportation Fee PLUMBING TOTAL ELECTRICAL TOT AL MECHANICAL TOTAL Housing Impact Fee Housing lnlieu Fee Master Drainage Fee: Sewer Fee: TOTAL PERMIT FEES $0.00 $0.00 $2,685.23 $3,735.31 $0.00 $0.00 $0.00 $550.00 $0.00 $100.00 $189.00 $41 .25 $61 .50 $2,925.00 $0.00 $0.00 $1,854.00 $17,722.15 FINAL APPROVAL Date: 7 j;3)o CJ I I Clearance: , .. 1:,.-()D NOTICE: Please take TICE that approval of your project includes the 'Imposition· of fees, dedications, reservations, or other exactions hereafter collectively referred to as "fees/exactions." You have 90 days from the date this permtt was issued to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedures set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capactiy changes, nor planning, zoning, grading or other similar application processing or service fees in connection with this project NOR DOES IT APPLY to any fees/exactions of which ou have reviousl been iven a NOTICE similar to this or as to which the statute of limitations has reviousl otherwise ex ired. 2075 Las Palmas Dr., Carlsbad, CA 92009 (760) 438-1161 City of Carlsbad Bldg Inspection Request For: 7/6/2000 Permit# CB992512 Title: MARBRISA(COBBLESTONE) PHASE 12 Descri ption: PLAN 6, SFD 2336 SF, GAR 595 SF Type: RESDNTL Sub Type: SFD Job Address: Suite: Location: 1418 TURQUOISE DR Lot APPLICANT GREYSTONE HOMES Owner: GREYSTONE HOMES INC Remarks: Total Time: 53 CD Description ~omments 19 Final Structural 29 Final Plumbing 39 Final Electrical 49 Final Mechanical Associated PCRs lnsgection Histo[Y Date Description Act lnsp Comments 6/28/2000 39 Final Electrical PA PY EMR 6/21/2000 89 Final Combo NR PY 5/23/2000 82 Drywall/Ext Lath/Gas Test AP PY 5/9/2000 23 Gas/TesURepairs AP RB 515/2000 17 Interior Lath/Drywall AP PS 5/5/2000 18 Exterior Lath/Drywall AP PS 5/5/2000 23 Gas/TesURepairs NR PS 5/1/2000 84 Rough Combo AP PD 4/25/2000 13 Shear Panels/HD's AP PY ON 4/24 4/24/2000 13 Shear Panels/HD's AP PY 4/21/2000 13 Shear Panels/HD's NS PY 4/13/2000 13 Shear Panels/HD's WC PY 4/13/2000 15 Roof/Reroof AP PY Inspector Assignment: PY --- Phone: 7606030056 Inspector: Requested By: DAVE WATSON Entered By: CHRISTINE 3/9/2000 11 Fig/Foundation/Piers PA PY OK TO POUR NEED SET BACK@ RETAINING WALL 3/8/2000 11 Fig/Foundation/Piers NS PY RAIN 3/7/2000 11 Fig/Foundation/Piers co PY SET BACKS? (. . . . .-. . ... • :_-. ·,. APNOvtOTOCOVet ,. 8U11.D1Ne .-·~-... :~•" .. --~ .... --..: .. _ ,:.-',•~-.-."f'tti".7""J:.~.,,;·•·, -~ ~ fOUNOATlON : : .2 /,,,,,/.,,,_.. • e,,;_y,•• I=~ ... L ••t,CM,,;,I,J<.,_1:-.t:r~/ ~ IWNFORGD STEEL • ·-.sQHltY . ' .s•our 0 WALL DRAINS TllTPAHflS f'OURSTRIPS COLUMN FOOTINGS □all.INC ROOF SHEATHING EXT. SHEAR PANELS fltAME INSUlATIOH £XT£1UOR LATH \.•. ' ..... _·.... . ..:.• if· INTERIOR LATH & DRYWALL PLUMB/NC ~SEWER ANO 81/CO gw'IJCO UNOEACROUNO -p.w:,.sn O WATER TOP OUT O WASTE O WAllR. TUB AND ~OWER PAN :· ,:;AS.,ffl'T □~PIP.ING -□ WATER HEATER O SOLAll WATER· flfCTIUCAl □ ElfCTRJC UNOEltCROUNO □ UFER ., ROUGH ELECTRIC WALLS . U I · ROt.J(jH EU~IC CEILING .J • • l I I , • a ElfCRJC SEJtVICE a ~v. □ BONDING . 0 l'OOl FINAL MECHANICM UNOEllOROUNO DUCTS & PIPING ... /I • 0 DUCT & PLEM.0 REF. PIPING .... • /· I HEAT • AIR CONO. SYSTEMS ✓ . t ll)II ' I (. 'f. '\ VENTILATING SYSTEMS FINAL CAU FOR FINAL INSP£<..1IDN WHEN l<LlAPl'l!.O/'fW. TE ITEMS It•< II'. HAVE BEEN Al'l'Jt ntH l'tNAl Sien When Apprvprlata , / •• , JldinSOept.llrlspectlon~-43&-3101 71~/m Jt.,;'f,I..,,, 931-2121 , l • _ Plannlns o.p.,tmenl • ~ ... Dept. Onspectioos) B'uikf'"II lns_pectl)B (7.lffi-4pm) . 43_8-35~ . .✓-J I ' CMWO • oS:2122 E,ct.7153 1.::'\«0V I M REV"8 . rrn· 'OIi' . ...... ,, _., SEC BACJC~ ~ NOTtS r,. •,•