Loading...
HomeMy WebLinkAboutADJ 01-17; ALTIVA PLACE; Engineering ApplicationCITY OF CARLSBAD - ENGINEERING DEPARTMENT APPLICATION FOR ENGINEERING PLAN CHECK OR PROCESSING Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: L7/07 JC DATE: 9-i - UT PROJECT DESCRIPTION: /-07"- Z 1A10- PROJECT ADDRESS: 3')156;D 73J1? /~~77 L119 PL1qCc,C4RL$/2,qD LOT NO(S).: MAP NO APN(S).: NO. OF DWELLING UNITS: LFMP ZONE: # LOTS: # ACRES: OWNER: 7/Wg6 h'. S6-022' i'tJC APPLICANT: Zq ''e H - 5607T Mailing Address: %2 6( //1/3 Mailing Address: PO Phone Number: (5 752 7067 Phone Number: I certify that I am the legal owner and that all the above information i rue nd corr t to t e best f my knowledge signature X ('1Vate ,o/'& (o, Signature9.<. iq'v"6te ,J14'/oj CIVIL ENGINEER: C/a. v 5 /fly,e'f SOILS ENGINEER: Je-,rej ,4 cJc2t7ey Firm: 7tfV'RifV& Firm: Mailing Address: / 39 Avew i da /i/e/g-rrO Mailing Address: 77/5 Ccwoy oev-/— '/l72- S Diejfo C/ 92-/// Phone Number: (.9/) qq Phone Number: (Y5) S-& o - State Registration Number: /?S/ State Registration Number: 6E2..3 ADDITIONAL COMMENTS: IMPROVEMENT VALUATION What water districLis the proposed project located in? (circle one) Carlsbad Mun~ici~pal~a~ierDis~~(ic Olivenhain Vallecitos If in the Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements (if applicable)? $ What is the total cost estimate, including the 15% contingency fee, for sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? . $ /)j 4 What is the total cost of landscape and irrigation improvements on private property (if applicable)? GRADING QUANTITIES cut cy fill cy remedial . cy import/export cy H:WORD/DOCS/MISFORMSiAPPLICATIQN ENG PLANCIIECK OR PROCESSING REV. 10106/99 APPLICATION FOR: (/all that apply) FOR CITY USE ONLY Plancheck Number f Type .., Drawing Number Project.LD. Deposit/Fees Paid Adjustment Plat fYi6(t7 ADJP c! - 6. L Certificate of Compliance COC Q Dedication of Easement DOE Type: Type: U Encroachment Permit ENCROACH U Engineering Standards Variance ESV U Final Map . . FM.. U Grading Plancheck GRPC . U Grading GRADING U Improvement Plancheck IPC U Parcel Map PM. U QUitclaim of Easement QUITC Type: Type: U Reversion to Acreage RTA U Street Vacation STV U Tentative Parcel Map MS U Certificate of Correction. CCOR Q Covenant for Easement covE U Substantial Conformance Exhibit SCE APPLICATIONACCEPTED BY: MASTER PROJECT ID: RECEIPT NUMBER: PRELIMINARY SIERRA SYSTEM INPUT INITIAL: SIERRA SYSTEM INPUT INITIAL: . R:BASE INPUT INITIAL: MASTER FILE NUMBER: F U OTHER: CEIVED 1 2Uo . DEPARTMENT DATE STAMP APPLICATION RECEIVED DOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV. 10/06/99 . .. PROJECT REVIEW COMPLETION - CERTIFICATE OF COMPLIANCE The following project has been reviewed and are recommended for approval: Project Name: 4e 7t VA L14 - Project No.: A1J //7 Document No.: CE 0 2 Sheets No.: / through (lure I 13 DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the review of this project as defined in Section 8703 of the Business and Professions Code to determine that the project is found to be in substantial compliance with applicable codes and tandards. Review of this project does not relieve the Land Surveyor or Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 200 E. Washington Ave., Suite 221 Escondido, CA 92025 (760) 233-4900 Signed ICILI Date2I'iC. 2,I ,2CIJ.2_ Douglas L. Iming, RCE 23874. Expiration Date12/31/05 NO 23 OF Cp, PROJECT REVIEW COMPLETION - Cert of Compliance