Loading...
HomeMy WebLinkAboutADJ 99-21; BRANDT BOUNDARY ADJUSTMENT; Engineering ApplicationCITY cARLSBAD - ENGINEERING DEP4MENT APPLICATION FOR ENGINEERING PLAN CHECK OR PROCESSING Complete all appropriate information. Write N/A when not applicable. PROJECT NAME: 1rqiicL4 Bc'u'i&u-j Auj4'nei+ DATE: _________ PROJECT DESCRIPTION: oi&rj Adu4-ire4t (eJ(41'l Lu un A.t.eA kY?cr PROJECTADDRESS: 4777 Ar7o-j nle- LOTLOT NO(S).: Zo 4"I MAP NO.: If'31 APN(S).: j07- 4o3-2.o2f NO. OF DWELLING UNITS: I LFMP ZONE: # LOTS: 2..- # ACRES: 2 I/Z. OWNER: bc1 d rc,cH P1NT:- Lcc 1& 1.e( mcir Mailing Address: A Mailing Address: 40/h eCYwn&f'S 144L)!2 QatISjr,crj, C ' 2OCÔ Y1pc H ,c4-L',e Pr- Phone Number: (%o) -0 It -L Phone Number: ( ) I certify that I am the legal owner and that all the above information ne I a2 ~IeE th b f my knowledge SignatuW Signature Date CIVlL-ENGINEER: Lc( Su,€..Jç SOILS ENGINEER: t4/f Firm: rg_L.Su(re..f f.ç Firm: Mailing Address: 1,7'35 (4 f?ci4 Mailing Address: (Pc C,o2ct333L. Phone Number: (O )'72-3161 Phone Number: State Registration Number: 'PL-S 43 State Registration Number: LANDSCAPE ARCHITECT: k(/4- ADDITIONAL COMMENTS: S€e Covey Le-tre Firm: Mailing Address: Phone Number: State Registration Number: IMPROVEMENT VALUATION What water district is the proposed project located in (circle one)? Carlsbad Municipal Water District Olivenhain Vallecitos If in the-Carlsbad Municipal Water District, what is the total cost estimate, including the 15% contingency fee, for water and reclaimed water improvements (if applicable)? $ JI4.... What is the total cost estimate, includingthe 15% contingency fee, for sewer (for Carlsbad Municipal Water District only), street, public (median) landscape and irrigation, and drainage improvements (if applicable)? $ What is the total cost of landscape and irrigation improvements on private property (if $ applicable)? GRADING QUANTITIES cut cy fill JII)r cy remedial cy import/export sc4A— cy DOCS/MISFORMS/APPLICATION ENG PLANCHECK OR PROCESSING REV. 6110197 I APPLICATION FOR: (/ all that apply) FOR CITY USE ONLY Plancheck Number - Type Drawing Number Project i.D. Deposit/Fees Paid dAdjustment Plat ADJP [3 Certificate of Compliance V COC 13 Dedication of Easement Type:. DOE Type: V 13 Encroachment Permit ENCROACH - V 13 Engineering Standards Variance ESV [3 Final Map FM 13 Gading Plancheck V V GRPC 13 Grading GRADING 3 Improvement Plancheck PC V 13 Landscape Plancheck LPC 13 Parcel Map PM 13 Quitclaim of Easement Type: QUITC V Type: . V 13 Reversion to Acreage RTA V• __________ ____________ JJ Street Vacation SW 13 Tentative Parcel Map MS 13 Certificate of Correction CCOR 13 Covenant for Easement COVE Substantial Conformance Exhibit SCE APPLICATION ACCEPTED BY: MASTER PROJECT ID: e 9 o ô / V V RECEIPT NUMBER: PRELIMINARY SIERRA SYSTEM INPUT INITIAL: SIERRA SYSTEM INPUT INITIAL: R:BASE,INPUT INITIAL: MASTER FILE NUMBER: F 13 OTHER:'' ____ i999 V DATE STAMP APPLICATION RECEIVED DOCSJMISFORMSIAPPLICATION ENG PLANCHECIc OR PROCESSING V REV. 6/10197 Signed .,L/OZ Douglas L. Expiration J. I PROJECT REVIEW COMPLETION C1 2 The following project has been reviewed and are recommended for approval: Project Name: Project No Document No.: C- LZ \ - Sheets No.: through DECLARATION OF RESPONSIBLE CHARGE I hereby declare that I have exercised responsible charge over the review of this project as defined in Section 8703 of the Business and Professions Code to determine that the project is found to be in substantial compliance with applicable codes and standards. Review of this project does not relieve the Land Surveyor or Engineer of Work of the responsibilities with state and local ordinances. Helming Engineering Co., Inc. 5962 La Place Court, Suite 245 Carlsbad, CA 92008 (760)431-5999 S. L lit, C23974 c' PROJECT REVIEW COMPLETION.doc S