Loading...
HomeMy WebLinkAboutAV 90-07; Foster Deck Addition; Administrative Variance (AV) (18)ENVIRONMENTAL IMPACT ASSESSMENT FORM - PART I (To be Completed by APPLICANT) Applicant: GEORGE & ANITA FOSTER CARLSBAD, CA. 92008 Name, address and phone number of person to be contacted (if other than Appl icant) : GENERAL INFORMATION: (Please be specific) Project Description: SIDE SUN DECK 48" X 240" Lfl 20 1 Project Location/Address: SAMF Assessor Parcel Number: 204 - 234 - 09-05 General P1 an/Zone of Subject Property: / Local Facilities Management.Zone: Is the site within Carlsbad's Coastal Zone? Please describe the area surrounding the site to the North: RESIDENTIAL East: RESIDENTIAL List all other applicable permits & approvals related to this project: JOSEPH & KATHLEEN ONDER PARCE 204-234-09-01 2 - - (please be Soeci. L. Attach Additional Paqes or Leihibits. if necessary1 1. please describe the project site, including distinguishing natural and manmade-characteristics. Also provide precise slope analysis when a slope of 15' or higher and 15% grade or greater is present on the site. SUN DECK ON 2ND STORY CONDO 4' X 20' 2. P1 ease describe energy conservation measures incorporated into the design and/or operation of the project. N/A 3. PLEASE AllACH A PROJECT SWRY SHEET WHICH SWS THE FOLLWING: a. If a residential project identify the number of units, type of units, schedule of unit sizes, range of sale prices or rents, and type of household size expected, average daily traffic generation (latest SANOAG rates). b. If a commercial project, indicate 'the exact type, activity(ies), square footage of sales area, average daily traffic generation (latest SANDAG rates), parking provided, and loading facilities. c. If an industrial project, indicate the exact type or industry(ies), average daily traffic generation (latest SANDAG rates), estimated employment per shift, time of shifts, and loading facilities. d. If an institutional project, indicate the major project/site function, estimated employment per shift, estimated occupancy, loading facilities, and community benefits to be derived from the project. I 3 I. ENVIRONMENTAL IMPACT ANALYSIS Please Answer each of the following questions by placing a check in the appropriate space. Then, fully discuss and explain why each item was checked yes or no. Provide supporting data if applicable. Attach additional sheets as necessary. 1) Could the project significantly impact or change present or future land uses in the vicinity of the act i vi ty? EXPLANATION: X 2) Could the activity affect the use of a recreational area, or area of aesthetic value? EXPLANATION: A$& X . 3) Could the activity affect the functioning of an establ ished community or neighborhood? EXPLANATION: </A X 4) Could the activity result in the displacement of community residents? EXPLANATION: X t 4 - -. Could the activity increase the number of low and moderate cest housing units in the city? EXPLANATION: MLLk Could the activity significantly affect existing housing or create a demand for additional housing? EXPLANATION: -</A Are any of the natural or man-made features in the activity area unique, that is, not found in other parts of the county, state or nation? EXPLANATION: N/! / Could the activity significantly affect an historical or archaeological site or its settings? EXPLANATION: 449 Could the activity significantly affect the potential use, extraction, or conservation of a scarce natural resource? EXPLANATION: A$// w lrls - NO X X X X X 5 -. Could the .activity significantly affect fish, wild1 ife or plant resources? EXPLANATION: k Are there any rare or endangered plant or animal species in the activity area? EXPLANATION: Could the activity change existing features of any of the city’s stream, lagoons, bays, tidelands or beaches? EXPLANATION: Iy/A - Could the activity result in the erosion or elimin- ation of agricultural lands? EXPLANATION: fl/M Could the actfvi ty serve to encourage development of presently undeveloped areas or intensify develop- ment of already developed areas? EXPLANATION: &/A W X X X X X 6 -. vES - NO 15) Will the. activity require a variance from estab- lished environmental standards (air, water, noise, etc. )? EXPLANATION: 16) Is the activity carried out as part of a larger project or series of projects? X - x 17) Will the activity require certification, authoriza- tion or issuance of a pemi t by any local, state or federal environmental control aghcy?" EXPLANATION: 18) Will the activity require issuance of a variance or conditional use permit by the City? EXPLANATION: \ X 19) Will the activity involve the application, use, or di sposal of potent i a1 1 y hazardous materi a1 s? X 7 c -. Ei NO Will the-activity involve construction of facilities in a flood plain? X - - Will the activity involve construction of facilities in the area of an active fault? X EXPLANATION: - Could the activity result in the generation of significant amounts of dust? EXPLANATION: N/! c X Will the activity involve the burning of brush, trees, or other materials? EXPLANATION: &A Could the activity result in a significant change in the quality of any portion of the region's air or water resources? (Should note surface, ground water, off-shore.) X EXPUNATION: H/!h 8 - YES Will the project substantially increase fuel consumption (electric1 ty, oil, natural gas, etc. )? EXPLANATION: #// - NO X Will the activity involve construction of facilities on a slope of 25 percent or greater? EXPLANAT ION : d/h X Will there be a significant change to existing land form? (a) Indicate estimated grading to be done in (b) Percentage of alteration to the present cubic yards: . land form: 0 (c) Maximum height of cut or fill slopes: n EXPLANATION: ,- x Will the activity result in substantial increases in the use of utilities, sewers, drains or streets? EXPLANATION: M/4 9 X "_ G 29) Will the project significantly water erosion of soi 1 s? increase wind or - NO X EXPLANATION: 30) Could the project significantly affect existing fish or wildlife habitat? EXPLANATION: r//r 31) Will the project significantly produce new light or glare? EXPLANATION: Af!! X X 10 11. STATEMENT OF 1 4-SIGNIFICANT ENVIRONMENTAL EFFt. IS If you have answered yes to any Of the questions in Section I but think the activity will have no significant environmental effects, indicate your reasons- bel ow: . 111. COMMENTS OR ELABORATIONS TO ANY OF THE OUESTIONS IN SECTION I (If additional space is needed for answering any questions, attach additional sheets as needed.) Signature (Perseompl et i ng Report) Date Signed 5 7-98 t Instruct. ei a LBS: 1 h 11