HomeMy WebLinkAboutCD 13-18; Floral Trade Center; Administrative Permits (ADMIN) (2)Project Description MAKE Office Building (Floral Trade Center) 5600 Avenida Encinas Carlsbad, CA 11/25/13 The objective of the MAKE project is to use the existing 156,092 SF Floral Trade Center Building and renovate it into a cutting edge office building for today. This involves removing a 15,705 SF section of the interior roof to create a Breezeway to allow light into the center of the structure. This new Breezeway will be 40 feet wide and create a space for the tenants to be able to open up their interior space to the outside. The project could have up to 30,783 SF of future mezzanine space bringing the total building area to 171,170 SF (not exceeding the 10% increase 156,092 SF X 1.10% =171,701 SF for Substantial Conformance) The Breezeway will be a space to have meetings or just go outside and create on your own. It will act as a circulation space, a gathering space, a space for nourishment and a space to gather light. There will be a cafe in the corner a gallery at the north end and beautiful views to the west and north. You will see from the plans it is a balance of decorative hardscape and landscape. The interior uses will be primarily office (140,387 SF) with approximately 30,783 SF of Studio space, where the tenants can move from their office area to work creatively on team projects. This space will be better defined as the project acquires tenants and their needs are defined. For water quality purposes, the majority of the existing paving will remain and a new asphalt overlay will be provided to bring the quality of the finished paving to current standards. All new flat work and landscaping will be provided in the parking lots and around the building. The existing concrete drainage ditch at the west side of the property will be abandon ahd three 36" pipes will be installed below grade. Two of the pipes will take the drainage from the adjacent property and one will handle the drainage on site. Other amenities include a bike shop where tenants can store their surfboards, grab a beach bike and pedal to the nearby beach. There will be an outdoor amphitheater for tenants use and for community uses alike. The amphitheater will have AV facilities as well as a large outdoor projection screen to enhance the use of the space. An area on the west side will be provided for gourmet food trucks to provide quality food to the tenants and support public use of the amphitheater. As part of our submittal package we have included RAPT Architecture's design brief that shows the progression in the development of the concept and provides a variety of images that sparked the creative design process. This brief also shows some of the finishes considered for the exterior. ( ( ., City of Carlsbad 1635 Faraday Avenue Carlsbad CA 92008 11111111111111111111111111111111111111111111111111111111111111 Applicant: MONROE CRUZAN Description Amount CD130018 696.00 5600 AVENIDA ENCINAS CBAD Receipt Number: R0098460 Transaction ID: R0098460 Transaction Date: 11/26/2013 Pay Type Method Description Amount Payment Check 696.00 Transaction Amount: 696.00 ,. City of Carlsbad Faraday Center Fa1·aday Cashiering 001 1333001-1 11/26/2013 32 Tue, Nov 26, 2013 02:04 PH Receipt Ref Nbr: R1333001-1/0018 PERmS -PERimS Tran Ref Nbr: 133300101 0018 0023 Trans/Rcpt#: R0098460 SET #: CD130018 Amount: Item Subtotal : Item Tot a 1: IWI(S) TOTAL: Check (Chk# 006105) Total Received: Have a nice day! 1 & $696.00 $696.00 $696.00 $696.00 $696.00 $695.00 ( (~A_ CITY OF -~VCARLSBAD Community & Economic Development www.carlsbadca.gov May 8, 2014 Cruzan Monroe 215 151h Street Del Mar, CA 92014 SUBJECT: CD 13-18-FLORAL TRADE CENTER The City Planner has completed a review of your application for a consistency determination, which is a modification to approved PIP 89-08(A), (APN: 210-090-50) located at 5600 Avenida Encinas. The proposed modification includes: • Renovate the existing one-story 156,092 SF Floral Trade Center into a 140,735 SF shell building (future office), removing 15,357 SF of roofed area to create an approximate 38-foot wide breezeway through the building. The project could have up to 30,966 SF of future mezzanine space bringing the total building area to 171,701 SF (not exceeding a 10% increase 156,092 SF X 1.10%"' 171,701 SF). • Create new window openings in existing walls to allow more light into the interior and provide an updated look to the building architecture. Remove existing metal building fascia and install new smooth finished EFIS System plus wooden screen elements to update the building architecture. • Proposed breezeway through the building will provide outdoor meeting spaces for future building tenants. • All 62,860 SF of existing landscaping will be removed and replaced with 123,768 SF of new landscaping and irrigation installed throughout the site. • Large landscaped areas will be created around the building to provide a buffer from parking and driveways. Private tenant patios will be created to provide outdoor spaces for tenants to meet. • For water quality purposes, the majority of the existing paving will remain and a new asphalt overlay will be provided to bring the quality of the finished paving to current standards. Design will comply with current water quality standards. • The existing concrete drainage ditch at the west side of the property will be abandoned and three 36"-diameter pipes will be installed below grade. Two of the pipes will take the drainage from the adjacent property and one will handle the drainage on-site. • Amenities include a bike shop where tenants can store their surfboards and other equipment. Outdoor rinse-off areas will be provided for the tenant's use after their visit to the beach. • There will be a horseshoe pit for recreation and an outdoor amphitheater for tenants use. The amphitheater will have AV facilities as well as a large outdoor projection screen to enhance the use of the space. • An area on the west side will be provided for gourmet food trucks to provide quality food to the tenants. • There will be a cafe kiosk within the breezeway with beautiful views to the west and north. Planning Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T 760-602-4600 F 760-602-8559 ® ~ ~CARLSBAD Community & Economic Development July 15, 2014 Mr. Peter Spencer The Mart-Carlsbad, LLC 22115'h Street Del Mar, CA 92014 www.carlsbadca.gov COMPLETION OF GRADING PLAN CHECK PROJECT ID: CD 13-18/PIP 89-08(A) DWG NO.: :;c48"'0'--"'9A'-'----------- GR NO.: GR 14-21 PROJECT NAME: FLORAL TRADE CENTER The grading plancheck process has been completed for the project noted above. The following information will assist you in completing the next steps in obtaining the required grading permit. Our records indicate your project is clear for grading permit issuance provided the following items are completed to the satisfaction of the city engineer. If you have not already done so, please submit these items to the engineering development services counter at 1635 Faraday Avenue. 1. Grading permit application (enclosed) submitted within 12 months of the date of mylar signing (see www.carlsbadca.gov/engineering for current version of forms). If application is submitted later than 12 months, an additional plancheck and fee may be required. 2. Four copies (two full size and two 11" x 17") of the approved grading plans. 3. Two copies (one full size and one 11" x 17") of the approved single sheet post-construction BMP exhibit. 4. A copy of this letter. Since permit fees are subject to change, you may wish to verify the permit fee amount prior to applying for your permit. After complying with the requirements listed above, you will be provided with contact information for scheduling the preconstruction meeting with a public works inspector. The inspector will give you your copy of the grading permit at the preconstruction meeting. The Inspection Division will coordinate the release of your securities at the completion of the project. Please do not begin construction until you have received your permit (rom the public works inspector. Additionally, the following items may be required during the construction of your project. Please coordinate the timing of these items with your inspector. 1. An approved haul route permit prior to hauling any construction equipment or materials onsite or offsite. 2. An approved traffic control plan and a valid right-of-way permit prior to performing any work in Land Development Engineering Division 1635 Faraday Avenue, Carlsbad, CA 92008-7314 T760-602-2740 F 760-602-1052 Doc ER.02-04 11/15/2011 CD 13-18/PIP 89-08{A)-FLORAL TRADE CENTER July 24, 2014 Page 2 the public right of way (allow two weeks for approval). 3. A retaining wall permit from the Building Department. As part of the grading plancheck process, the city engineer signed the grading plans for the project noted above. These plans are now the property of the City of Carlsbad and have been filed for permanent record with this office. You may obtain copies and other reproductions at your cost through one of several bonded reprographic firms in the area. Approval of these plans by the City of Carlsbad does not authorize the applicant to violate any federal, state, or city laws, ordinances, regulations, or policies. · Also, issuance of your grading permit is subject to the limitations and requirements of city ordinances, policies, and regulations; your conditions of approval, if any; and all required state and federal agency permits and approvals including, but not limited to, the California Department of Fish and, Game, United States Fish and Wildlife Service, California Coastal Commission, and San Diego Regional Water Quality Control Board. Thank you for your cooperation and assistance. It has been a pleasure working with you through the plancheck process. If you have any questions, please contact me at 760-602-2781 or via email at David.Rick@carlsbadca.gov. Respectfully, ~;'\ {A'-DAVID~ V Associate Engineer Enclosures: Grading Permit Application Right of Way Permit Application Package cc: K&S Engineering, Inc., Attn: Kamal Sweis, 7801 Mission Center Court, Suite 100, San Diego, CA 92108-1314 Greg Fisher, Project Planner Inspection: Senior Office Specialist Parks-Trees & Medians Parks & Recreation -Trails Engineering Counter File Doc ER-02-04 11/15/2011 April!, 2015 TO: FROM: RE: Greg Fisher, Assistant Planner Van Lynch, Senior Planner Chris DeCerbo, Principal Planner Bridget Desmarais, Administrative Secretary Sabrina Michelson, Senior Office Specialist Cecelia F emandez, Office Specialist Michael Elliott, City of Carlsbad's Contract Landscape Architect Landscape Architectural Review-Construction Drawings -gth Review Floral Trade Center, PIP 89-08(A), CD 13-18, DWG 480-9L A venida Encinas MELA file: 513 ~Floral Trade Center-CD8 Landscape Architect: James Burnett-Phone: (858) 793-6970 Approved, signed plans are retumed for City processing and files. Photo #I Photo #2 Photo# 3 Photo #4 Photo# 5 Photo# 6 Photo# 7 Photo# 8 Photo# 9 Photo# IO Photo# I I Photo# I2 Photo# 13 Photo# 14 Photo #15 Photo# 16 Photo# 17 Photo# 18 Photo# 19 MA)(E Pr=ntotoon Objective To design and build a redefinition of what a creative space looks and feels like- one that's authentic and meaningful and that attracts clients who want a better experience at work. RAPT STUDIO CONFIDENTIAL ©2013 10/09/2013 MAKE Pre::entat>on Companies of Interest: Values Fair Honest Positive Creative Sustainable Peace Environmentally Conscious Socially Responsible Humanitarian Charitable Exploration RAPT STUDIO CONFIDENTIAL ©2013 10109/2013 Self Expression Style Life Well Lived Authority Artistic Legacy Sustainable Responsible Innovative Pioneering Visionary MAKE Presenta\!oo Connections RAPT STUDIO CONFIDENTIAL 02013 10/09/2013 MAKE Pre:;:entmoon Connections Tenants Visitors of Tenants Amenities Providers Community RAPT STUOlO CONFIDENTIAL ©2013 10/0912013 MAKE Presentation Characteristics RAPT STUOIO CONFIDENTIAL ©2013 10/0912013 MAI<E PlcwntlllK>n Characteristics Expressive/Unique Iconic Creative/Innovative Lifestyle Old/New Inspired Destination Timeless Confident Genuine Collaborative Casual Accessible Mobile Energized Raw/Refined Synergistic Passionate Inviting Active Driven Quiet/Bold RAPT STUDIO CONFIDENTIAL ©2013 1010912013 RAPT STUDIO CONFIDENTIAL @2013 10/0912013 " MAKE Preoonta!ion RAPT STUDIO CONFIDENTIAL ©2013 10/09not3 " MAKE Pr!r'.,onlnliOO RAPT STUDIO CONFIDENTIAL ©20<3 10/0912013 RAPT STUDIO CONFIDENTIAL ©2013 10/09nD13 15 MAI<E Prro.mtatiOfl Comprehensive Branding Examples RAPT STUOIO CONFIDENTIAL ©2013 1010912013 " MAKE Presentation RAPT STUDIO CONFIDENTIAL ©:?013 10/0912003 " MAKE Presml~lloo Case Studies RAPT STUDlO CONFIDENTIAL ©2013 10/0912013 " MAKE Prownt6tion Amenities RAPT STUDIO CONFIDENTIAL @2013 10/09/2013 " MAKE Prcxntmio!l Experience Maps RAPT STUDIO CONFIDENTIIIL ©2013 1010912013 " MAKE Pre:;entalioll Architectural Concept RAPT STUOto CONFIDENTIAL ©2013 10/0912013 MAKE Prewn1a1ion Potential Mural Locations RAPT STUDIO CONFIDENTIAL ©20>3 10/0912013