HomeMy WebLinkAboutCD 16-12; Poinsettia Park Pickleball Court; Administrative Permits (ADMIN)CITY OF CARLSBAD APPLICATION FORM FOR CONSISTENCY DETERMINATION APPLICATION
CITYUSEONLY COP 05-J'2..
C>riginalProjectNumber: GblP '12•6'1-S-1-1O4>~•~'1'Consistency Determination Number: ,,.-d
PROJECTNAME: r>c)·\l\\e.it-1 ..... ~e-.rlc. ':f',c..Lc:.le.beJ.t Covf-t-5
Assessor's Parcel Number(s): _2~l _t.l-~-_l_4D __ -_l 3_-_0_b __________________ _
Description of proposal (add attachment if necessary): De-te-<~ J\c:X. cfb ""11,.--.A-u, re"b~-
~i 2e~ t\~lt-bal.t c.&.r±s, &J-.~ -:1CMc,;"~_(J2' IJ-). ~~~ fl&\~ ~ckec~ "&:L___
s. d-c.. \Wl-pl1\le.W\e d::r ~~ Cm. \is:t::&t: v,,A-'ih -+b.c, -e ~ud·. "ka. s:\-tc ..P \..~" ,
Yes D NoX Would you like to orally present your proposal to your assigned staff planner/engineer? D
Please list the staff members you have previously spoken to regarding this project. If none, please so state.
__:lli·O) ])('(.(J
OWNER NAME (Print):
MAILING ADDRESS:
CITY, STATE, ZIP:
TELEPHONE:
EMAIL ADDRESS:
*Owner's signature indicates permission to conduct a preliminary
review for a development proposal.
IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE
NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND
ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS
APPLICATION. IM/E CONSENT TO ENTRY FOR THIS PURPOSE. I
CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE
INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY
KNOWLEDGE.
: SIGNATURE DATE
i APPLICANT'S REPRESENTATIVE (Print):
MAILING ADDRESS:
CITY, STATE, ZIP:
TELEPHONE:
EMAIL ADDRESS:
FEE REQUIRED/DATE FEE P,f':p:
RECEIVED BY: V'
APPLICANT NAME (Print): :Ea,r~r~ 1/e.vt:<t-e.dj
MAILING ADDRESS: __ ~_,....,IM.=e__::;;._ ______ _
CITY, STATE, ZIP:
TELEPHONE: J {o O -\,t ~ 'f -2-7 7 t/-
EMAIL ADDRESS; !x,.l'~rj(.• \o4C,t,]'\&h€
~(' {S e:..d C,t; . ' .
I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE
OWNER AND THAT ALL THE ABOVE INFORMATION fS TRUE
AND CORRECT TO THE BEST OF MY KNOWLEDGE.
__ __,__-11--6'1<--4'--l'--O,.__.._=------------------------
P-16 Page 2 of 2 Revised 08/16
Ccityor
Carlsbad
CONSISTENCY DETERMINATION
SUBMITTAL PROCEDURES
AND APPLICATION
P-16
What you need to give us:
Development Services
Planning Division
1635 Faraday Avenue
(760) 602-4610
www.carlsbadca.gov
• Application form (signed by the owner{s) of the property unless applicant has sufficient
legal interest in the property.)
• Fee (See current fee schedule for cost)
• Detailed written description of the proposed revision(s)
• Two (2) sets of your site plan folded to 8 ½ x 11
• Revised site plans and/or elevations and floor plans
• Exhibits/plans/tables, which provide a comparable analysis of the existing project and
proposed revised project
WHEN and WHERE to submit:
Your application may be submitted at the Planning Division counter at 1635 Faraday Avenue,
from 7:30 a.m. to 4:30 p.m. Monday through Thursday or 8:00 a.m. to 4:00 p.m. on Friday.
HOW your application is processed:
After a submittal is made, the project planner and project engineer will be assigned the project.
Written responses to your submittal will be mailed following the Planning and Land Development
Engineering review (and other divisions/departments as applicable) and should be received by
you within thirty days after the review date. Please keep in mind that additional information may
be requested in order to make a consistency determination and project issues of concern.
Upon approval of a Consistency Determination, the City Planner will request the project applicant
to submit two (2) blueline copies (24"x36") of all Consistency Determination exhibits to be
stamped "Consistency Determination." Also, you may need to provide the City with a reproducible
24"x36" mylar copy of an amended Site Plan which must be stamped "Consistency Determination"
to obtain the City Planner's signature.
Please review Policy 35 (attached) to determine if your project qualifies for a Consistency
Determination.
P-16 Page 1 of 2 Revised 08/16