Loading...
HomeMy WebLinkAboutCD 2017-0020; UPTOWN BRESSI RETAIL CENTER; Consistency Determination (CD)CITY OF CARLSBAD APPLICATION FORM FOR CONSISTENCY DETERMINATION APPLICATION CITY USE ONLY Original Project Numbep09Ho- O(o tv lO\'\ - DOO Consistency Determination Number: PROJECT NAME: ^he Square at Bressi Ranch Retail Center^ figfcitl Assessor's Parcel Number(s): 213262209 Description of proposal (add attachment If necessary):Building facade changes, festoon lighting ^acLe^A. tt*yt~ addition, and addtional parking added Would you like to orally present your proposal to your assigned staff planner/engineer? Please list the staff members you have previously spoken to regarding this project. If none, please so state. Greg Fisher OWNER NAME (Print): MAILING ADDRESS: CITY, STATE. ZIP; TELEPHONE: EMAIL ADDRESS: Min Kang, Shea Properties 949-389-7147 130 Vantis, Suite 200 Aliso Viejo, CA 92656 Min.Kangtgsheaproperties.com 'Owner's signature Indicates permission to conduct a preliminary review for a development proposal. IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT TO ENTRY FOR THIS PURPOSE. I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE CITY. STATE. ZIP: APPLICANT NAME ( Norman Barrett, SCA MAILING ADDRESS: Architecture13280 Evening Creek Drive South, No. 125 San Diego, CA TELEPHONE: 858.793.4777 EMAIL ADDRESS: normanb@sca-sd.eom I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNER AND THAT ALK THE ABOVE INFORMATION IS TRUE ANDiCORRECT TO THE BESfr OF MY KNOWLEDGE. SIGNATURE DATE APPLICANTS REPRESENTATIVE (Print): Norman Barrett, SCA MAILING ADDRESS: CITY. STATE. ZIP: TELEPHONE: email ADDRESS: iRTIFYTHATI AM lEB •TURE Architecture! 3280 Evening Creek Drive South, No. 125 San Diego, CA 858.793.4777 normanb@sca-sd.com RF:rr:iVED JUL 1 ^ 20^7 CITY OF CAULbBAU PLANNING DIVISION AL REPRESENTATIVE OF THE APPLICANT AND THAT ALL THE ABOVE INFORMATION IS TRUE AND KNOWLEDGE. DATE FEE REQUIRED/DATE FEE PAID: ^ ^ ["J RECEIVED BY: P P-18 Page 2 of 2 Revised 03/17 SmithConsultingArchitects July 17. 2017 August 8, 2017 August 15, 2017 Greg Fisher City of Carlsbad Planning Division 1635 Faraday Ave. Carlsbad. CA 92008 Mr. Greg Fisher, Consistency Determination, SDR 16-06 Below is the list of Improvements to the Uptovm Bressi Retail (The Square at Bressi Ranch) project. Sheet AS1; 1. Added parking stalls behind BIdgs. A and B. 2. Added parking stall in front of BIdg. C 3. Revised parking layout between BIdgs. C and H. 4. Add decorative festoon lighting between BIdgs. E and D. 5. Noted that festoon light shall be a minimum of 14'-0" above the street surface. Sheet AS2; 1. Revised roof plan layout to reflect the building changes at BIdgs. 0 and G. Sheet ASS: 1. Revised site section BIdg. 0 to reflect the BIdg. D tower change. Sheet A2: 1. Floor plan E: added additional storefront on the west facing elevation. 2. Floor plan F: revised the location of the mechanical and fire riser rooms in order to add additional west facing storefront. Sheet A4: 1. Elevation a: BIdg. E: noted the height of the string lighting at>ove finish floor 2. Elevation b and d: BIdg. D: revised northwest tower height to 35' aff. 3. Elevation b: BIdg. D: noted the height of the string lighting above finish floor 4. Elevation d: BIdg. D: revised southwest tower height to 30' aff. 5. Elevation d: BIdg. D: noted the height of the string lighting above finish floor 6. Elevation e: BIdg. E: noted the height of the string lighting above finish floor 7. Elevation g: BIdg. E: added storefront at the northwest elevation. 8. Elevation g: BIdg. E: noted the height of the string lighting above finish floor 9. Elevation h: BIdg. F: added storefront at the northwest elevation. 10. Elevation h: BIdg. F: added storefront at the southwest elevation. 11. Elevations g and h: BIdgs. E and F: minor fagade changes to accommodate the addition of the additional storefront. Sheet A5: 1. Elevation b: BIdg. G: Added tower element to northwest elevation. 35' aff. 2. Elevation f: BIdg. G: Added tower element to northwest elevation. 35' aff. Please contact me should you have any question. Thank you. Norman Barrett 13280 Evening Creek Drive South ¨ Suite 125 ¨ San Diego. CA 92128 ¨ Phone; 858-793-4777 ¨ Fax: 858-793-4787 ts RECEIVED JUL 1 7 20)7 CITY OF CARLSBAD PLANNING DIVISION July 17. 2017 Greg Fisher City of Carlsbad Planning Division 1635 Faraday Ave. Carlsbad. CA 92008 Mr. Greg Fisher, Consistency Determination, SDP 16-06 Below Is the list of improvements to the Uptown Bressi Retail (The Square at Bressi Ranch) project. Sheet AS1: 1. Added parking stalls behind BIdgs. A and B. 2. Added parking stall in front of BIdg. C 3. Revised parking layout between Bidgs. C and H. 4. Add decorative festoon lighting between BIdgs. E and D. Sheet AS2: 1. Revised roof plan layout to reflect the building changes at BIdgs. C and G. Sheet ASS: 1. Revised site section BIdg. D to reflect the BIdg. D tower change. Sheet A2: 1. Floor plan E: added additional storefront on the west facing elevation. 2. Floor plan F: revised the location of the mechanical and fire riser rooms in order to add additional west facing storefront. Sheet A4: 1. BIdg. C: revised northwest tower height to 35' aff. 2. BIdg. C: revised southwest tower height to 30' aff. 3. BIdg. E: added storefront at the northwest elevation. 4. BIdg. F: added storefront at the northwest elevation. 5. BIdg. F: added storefront at the southwest elevation. 6. BIdgs. E and F: minor elevation changes to accommodate the addition of the additional storefront. Sheet A5: 1. BIdg. G: Added tower element to northwest elevation. 35' aff. Please contact me should you have any question. Thank you, Norman Barrett 13280 Evening Creek Drive South ¨ Suite 125 ¨ San Diego, CA 92128 ¨ Phone: 858-793-4777 ¨ Fax: 858-793-4787