Loading...
HomeMy WebLinkAboutCDP 14-07; Pryor Residence; Coastal Development Permit (CDP) (2)Plotted: Oct 20, 2014 - 10:41amFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-012 OF 131"=20'Site planA-1 Peirameter of the basement is 198 Ft. and vertical distance from exterior grade to the adjacent interior floor below is greater than the vertical distance from exterior grade to the adjacent interior ceiling above for 149 linear feet of the perimeter which is seventy-five percent of the perimeter of the basement. APPROVEDTHIS IS THE APPROVED SITE PLANFOR PROJECT NO.________ PER CONDITION NO.________________________________ ______________________ ______PLANNING DIVISION DATE ENGINEERING DIVISION DATE 3 OF131"=10'Large ScaleSitePlanA-2 APPROVEDTHIS IS THE APPROVED SITE PLANFOR PROJECT NO.________ PER CONDITION NO.________________________________ ______________________ ______PLANNING DIVISION DATE ENGINEERING DIVISION DATEPlotted: Oct 20, 2014 - 10:43amFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 Plotted: Oct 20, 2014 - 10:47amFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-014 OF 131/4"=1'-0"Proposed BasementPlanA-3 Peirameter of the basement is 198 Ft. and vertical distance from exterior grade to the adjacent interior floor below is greater than the vertical distance from exterior grade to the adjacent interior ceiling above for 149 linear feet of the perimeter which is seventy-five percent of the perimeter of the basement. 5 OF 131/4"=1'-0"Proposed Ground FloorPlanA-4 Plotted: Oct 20, 2014 - 10:55amFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 Plotted: Oct 20, 2014 - 11:13amFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-016 OF 131/4"=1'-0"Proposed UpperUpper FloorPlanA-5 7 OF131/4"=1'-0"ProposedRoofPlanA-6 Plotted: Oct 20, 2014 - 11:16amFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 8 OF 131/4"=1'-0"ElevationsFrontand SouthA-7 Plotted: Oct 20, 2014 - 12:39pmFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 9 OF 131/4"=1'-0"Rear & NorthElevationA-8 Plotted: Oct 20, 2014 - 12:47pmFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 Plotted: Oct 20, 2014 - 1:52pmFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-0110 OF 131/4"=1'-0"Sections "G", "F"TransverseBldg. SectionsA-9 11 OF 131/4"=1'-0"Sections "C", "E"LongitudinalBldg. SectionsA-10 Plotted: Oct 20, 2014 - 2:21pmFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 12 OF 131/8"=1'-0"ExistingBasement & groundFloor PlanA-11 Plotted: Oct 20, 2014 - 2:55pmFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01 13 OF133/16"=1'-0"LandscapingConceptPlanPP-1 Plotted: Oct 20, 2014 - 2:55pmFile: \\File01\Data\Projects\Current\Pryor\DWGS\PR-XPLAN-24.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign Phase-COASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01SLOPES 6:1 OR STEEPER requiring erosion control measures as specified here in shall be treated with one or more of the following g planting standards:a. Standard #1 - Cover Crop/Reinforced Straw MattingCover crop shall be a seed mix typically made up of quick germinating and fast covering grasses, clovers, and/ or wild flowers. Submit the specific seed mix for City approval prior to application. The cover crop shall be applied at a rate and manner sufficient to provide 90% coverage within thirty (30) days.Type of reinforced straw matting shall be as approved by the city and staked to theSlope as recommended by the manufacturer.Reinforced straw matting shall be required when planting occurs between August 15 and April 15. The cover crop and/or reinforced straw mat shall be used the remainder of the year.b. Standard # 2 - Ground CoverOne hundred ( 100%) percent of the areas hall be planted with a ground cover known tohave excellent soil binding characteristics (planted from a minimum size of flattedmaterial and spaced to provide full coverage within one year).c. Standard# 3 - Low Shrubs Low spreading woody shrubs (planted from a minimum of 2-3/4 inch liners) shall cover a minimum of seventy( 7O%) percent of the slope face( at mature size).d. Standard# 4-Trees and/or Large Shrubs Trees and/or large shrubs shall be (planted from a minimum of 1 gallon containers) at a minimum rate of one (1) per two hundred (200) square feet.Slopes- 6:1o r steeper and a. 3' or less in vertical height and are adjacent to public walks or streets require at minimum Standard # 1.SLOPES 6:1 OR STEEPER and:a. 3' or less in vertical height and are adjacent to public walks or streets require at minimumStandard # 1.b. 3' to 8' in vertical height require Standards# 1 (erosion control matting shall be installedin lieu of a cover crop), # 2 and # 3.c. In excess o f 8' in vertical h eight require Standards #1 (erosion control matting shall be installed in lieu of a cover crop), # 2, #3, and #4.Areas graded flatter than 6:1 require Standard #1 (cover crop) with temporary irrigation when they have one or more of the following conditions:a. Sheet graded pads not scheduled or improvements within 6 months of completion ofrough grading.b. A potential erosion problem as determined by the City.c. Identified by the City as highly visible areas to the public or have special conditions that warrant immediate treatment. NOTE: 50% of the shrubs ( except on slopes 3 :1 or steeper) shall be a minimum 5 gallon sizeGeneral Notes:1) The Total Landscape area for this project is 1,238 square feet2) 50% of the shrubs ( except on slopes 3 :1 or steeper) shall be a minimum 5 gallon size3) Areas to be irrigated with drip system ( Grasscrete) l am familiar with the requirements for landscape and irrigation plans contained in the city of Carlsbad landscape manual and water efficient landscape regulations. I have prepared this plan in compliance with those regulations and the landscape Manual and agree to comply with all requirements when submitting construction documents. I certify that the plan implements those regulations so provide efficient use of water."Farshid Mohseni Architect 1"=10'Site PlanPR Plotted: Nov 17, 2014 - 1:15pmFile: \\File01\data\Projects\Current\Pryor\DWGS\PR-XPLAN-23.dwgOctober 22, 201407/2011Revisions DateSheet orderProject No. Date Scale SHEET NUMBERSHEET TITLENot For ConstructionDesign PhaseCOASTALDEVELOPMENTSUBMITTALCDP 14-07CONSTRUCTION INC.DEVELOPMENTDESIGNCDP 14-07 AV 14-01