Loading...
HomeMy WebLinkAboutCDP 2018-0011; RECYCLED WATER PHASE III PIPELINE SEGMENT 5; Coastal Development Permit (CDP)(City of LAND USE REVIEW --I Development Services Planning Division Carlsbad APPLICATION 1635 Faraday Avenue P-1 (760) 602-4610 www.carlsbadca.gov APPLICATIONS APPLIED FOR:(CHECK BOXES) Development Permits (FOR DEPT. USE ONLY)Legislative Permits (FOR DEPT. USE ONLY) COPLA)kElCoastal Development Permit 1:1 Minor 00111 General Plan Amendment Conditional Use Permit Local Coastal Program AmendmentDMinor Extension D Day Care (Large)1:1 Master Plan Amendment Environmental Impact Assessment Specific Plan D Amendment Habitat Management Permit Minor Zone Change 1:1 Hillside Development Permit Minor Zone Code Amendment Nonconforming Construction Permit South Carlsbad Coastal Review Area Permits D Planned Development Permit Minor Review Permit D Residential D Non-Residential Administrative Minor D Major Planning Commission Determination 111 Reasonable Accommodation Village Review Area Permits D Site Development Plan D Minor El Review Permit "orSpecial Use Permit 1011 -000 D Administrative Minor Major (11 Tentative Parcel Map (Minor Subdivision) El Tentative Tract Map (Major Subdivision) Variance Minor NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS MUST BE SUBMITTED PRIOR TO 3:30 P.M.A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION MUST BE SUBMITTED PRIOR TO 4:00 P.M. ASSESSOR PARCEL NO(S).:N/A PROJECT NAME:Recycled Water Phase III Pipeline Segment 5 BRIEF DESCRIPTION OF PROJECT:Construct the Recycled Water Pipeline Expansion Segment 5 to provide recycled water to customers along El Camino Real (N. of Chestnut), Kelly, Tamarack, Cannon, etc. PROJECT VALUE (SITE IMPROVEMENTS)$9,000,000 ESTIMATED COMPLETION DATE 02/01/2020 LOCATION OF PROJECT:El Camino Real (N. of Chestnut), Kelly, Tamarack, Cannon, Marron, Haymar, etc. STREET ADDRESS ON THE:within the right-of-way SIDE OF El Camino Real (N. of Chestnut), Kelly, Tamarack, Cannon,Marron, Haymar, etc. (NORTH, SOUTH, EAST, WEST)(NAME OF STREET) BETWEEN AND (NAME OF STREET)(NAME OF STREET) INBMN 0009 1/FAV 01561 - 'CC* 2.0 It—0 at \ P-1 Pane 1 of 6 Revised 09/16 4 COASTAL DEVELOPMENT PERMIT APPLICATION RECYCLED WATER PHASE III PIPELINE SEGMENT 5 Applicant:Lindsay Leahy Associate Engineer Public Works —Utilities (760) 603-7325 Lindsay.Leahy@carlsbadca.gov C'Nos. OWNER NAME (Print):City of Carlsbad APPLICANT NAME (Print):Lindsay Leahy MAILING ADDRESS:1635 Faraday Ave.MAILING ADDRESS: 5950 El Camino Real CITY, STATE, ZIP:Carlsbad, CA 92008 CITY, STATE, ZIP:Carlsbad, CA 92008 TELEPHONE:(760) 602-2719 TELEPHONE:(760) 603-7325 EMAIL ADDRESS:N/A EMAIL ADDRESS:lindsay.leahy@carlsbadca.gov I CERTIFY THAT I AM THE LEGAL OWNER AND THAT ALL THE ABOVE I CERTIFY THAT I AM THE LEGAL REPRESENTATIVE OF THE OWNERINFORMATIONISTRUEANDCORRECTTOTHEBESTOFMYAND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO KNOWLEDGE.I CERTIFY AS LEGAL OWNER THAT THE APPLICANT AS THE BEST OF MY KNOWLEDGE. SET FORTH HEREIN IS MY AUTHORIZED REPRESENTATIVE FORPl>30_$ES OF THI APP AkTION. IS GNAT E D TE SI N TURE DATE APPLICANT'S REPRESENTATIVE (Print):N/A MAILING ADDRESS: CITY, STATE, ZIP: TELEPHONE: EMAIL ADDRESS: I CERTIFY THAT I AM THE REPRESENTATIVE OF THE APPLICANT FOR PURPOSES OF THIS APPLICATION AND THAT ALL THE ABOVE INFORMATION IS TRUE AND CORRECT TO THE BEST OF MY KNOWLEDGE. SIGNATURE DATE IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY FOR MEMBERS OF CITY STAFF,PLANNING COMMISSIONERS OR CITY COUNCIL MEMBERS TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION.I/WE CONSENT TO ENTRY FOR THIS PURPOSE. NOTICE OF RESTRICTION:PROPERTY OWNER ACKNOWLEDGES AND CONSENTS TO A NOTICE OF RESTRICTION BEING RECORDED ON THE TITLE TO HIS PROPERTY IF CONDITIONED FOR THE APPLICANT.NOTICE OF RESTRICTIONS RUN WITH THE LAN21_Ii6ND BIND ANY SU E‘SSORS IN INTERES . 7-.A..t/je g /a PERTY WNER SIGNAT E FOR CITY USE ONLY RECEIVED JAN 3 1,w 201$ CITY OF CARLSBAD PLANNING DIVISION DATE STAMP APPLICATION RECEIVED RECEIVED BY: ___,....k P-1 Page 2 of 6 Revised 09/16 Indemnification and Insurance Requirement for Village Arrea Administrative Permit Certification Statement: I Certify that I am the Legal Business Owner of the subject business and that all of the above information is true and correct to the best of my knowledge.I agree to accept and abide by any conditions placed on the subject project as a result of approval of this application.I agree to indemnify,hold harmless,and defend the City of Carlsbad and its officers and employees from all claims, damage or liability to persons or property arising from or caused directly or indirectly by the installation or placement of the subject property on the public sidewalk and/or the operation of the subject business on the public sidewalk pursuant to this permit unless the damage or liability was caused by the sole active negligence of the City of Carlsbad or its officers or employees.I have submitted a Certificate of Insurance to the City of Carlsbad in the amount of one million dollars issued by a company which has a rating in the latest "Best's Rating Guide" of "A-"or better and a financial size of $50-$100 (currently class VII) or better which lists the City of Carlsbad as "additional insured" and provides primary coverage to the City.I also agree to notify the City of Carlsbad thirty days prior to any cancellation or expiration of the policy.The notice shall be delivered to: City Planner City of Carlsbad 1635 Faraday Avenue Carlsbad The insurance shall remain in effect for as long as the property is placed on the public sidewalk or the business is operated on the public sidewalk.This agreement is a condition of the issuance of this administrative permit for the subject of this permit on the public sidewalk.I understand that an approved administrative permit shall remain in effect for as long as outdoor displays are permitted within the Village Review Area and the permittee remains in compliance with the subject approv d permit.• Signature Date://08 Certification Statement: I Certify that I am the Legal Property Owner for the subject business location and that all of the above information is true and correct to the best of my knowledge.I support the applicant's request for a permit to place the subject property on the public sidewalk.I understand that an approved administrative permit shall remain in effect for as long as outdoor displays are permitted within the Village Review Area and the permittee remains in compliance with the subject approved permit.• Signature t-t7 Date:/2 6/78 P-1 Page 3 of 6 Revised 09/16 • O PROJECT DESCRIPTION Development ServicesCityPlanning Division Carlsbad P-1(B)1635 Faraday Avenue (760) 602-4610 www.carlsbadca.gov PROJECT NAME:Recycled Water Phase Ill Pipeline Segment 5 APPLICANT NAME:Lindsay Leahy Please describe fully the proposed project by application type.Include any details necessary to adequately explain the scope and/or operation of the proposed project.You may also include any background information and supporting statements regarding the reasons for,or appropriateness of, the application.Use an addendum sheet if necessary. Description/Explanation: Pipeline Expansion Segment 5 is part of the Carlsbad Municipal Water District's (CMWD) $37 million Phase III Recycled Water Program and will provide recycled water to customers along El Camino Real (N. of Chestnut), Kelly, Tamarack, Cannon, Marron, Haymar. CMWD started its recycled water program in 1990 with Phase I and by 1995 CMWD served over 1,000 acre-feet per year (afy) of recycled water.In 2000, Phase II was implemented with the construction of the 4-million gallons per day (mgd) Carlsbad Water Recycling Facility (CWRF). Phase II was completed in 2008 and increased service to approximately 4,000 afy. The Phase III Program began in 2012 with the preparation of a feasibility study and includes the expansion of the CWRF,18 miles of new pipeline, and the construction of a 1.5 million gallon storage tank. Only the storage tank and 8 miles of pipeline remain to be constructed. Pipeline Expansion Segment 5 is located along El Camino Real (N. of Chestnut), Kelly, Tamarack, Cannon,.This project includes the construction of approximately 11,077 linear feet of 8 -inch diameter and 32,661 linear feet of 6-in diameter polyvinyl chloride (PVC) pipeline and recycled water services. Recycled water in these pipeline segments will be used for landscape irrigation. intr:.nr7.11t-Tn JAN 311 2013 CITY CF CARLSBAD :\C.S.. P-1(8)Page 1 of 1 Revised 07/10 C 0 HAZARDOUS WASTE C City of AND SUBSTANCES Development Services Planning Division Carlsbad STATEMENT 1635 Faraday Avenue (760) 602-4610P-1(C)www.carlsbadca.gov RECT.-r`--i Consultation of Lists of Sites Related to Hazardous Wastes JAN 3 4 2018 (Certification of Compliance with Government Code Section 65962.5.1ulTY OF CARL'".n Pursuant to State of California Government Code Section 65962.5,I hkeAaltPtAU16:13ifre Hazardous Waste and Substances Sites List compiled by the California Environmental Protection Agency and hereby certify that (check one): Ill The development project and any alternatives proposed in this application are not contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. 111 The development project and any alternatives proposed in this application are contained on the lists compiled pursuant to Section 65962.5 of the State Government Code. APPLICANT PROPERTY OWNER Name:Lindsay Leahy Name:City of Carlsbad Address:5950 El Camino Real Address:1635 Faraday Ave Carlsbad, CA 92008 Carlsbad, CA 92008 Phone Number:(760) 603 -7325 Phone Number (760) 602-2719 Address of Site: El Camino Real (N. of Chestnut), Kelly, Tamarack, Cannon, Marron, Haymar, etc. Local Agency (City and County):Carlsbad, San Diego Assessor's book, page, and parcel number: Specify list(s): Regulatory Identification Number: Date of List: A (k/io gicant Si n !y.e/Date.kl 762 I vcr ----./.. -..k_..„„,I.7--"a .e4c //08ProperyiliwnerSgnature/Date The Hazardous Waste and Substances Sites List (Cortese List)is used by the State,local agencies and developers to comply with the California Environmental Quality Act requirements in providing information about the location of hazardous materials release sites. P-1(C)Page 1 of 2 Revised 02/13 Per the California Environmental Protection Agency's website,"While Government Code Section 65962.5 [referred to as the Cortese List]makes reference to the preparation of a "fist," many changes have occurred related to web -based information access since [the amended statute's effective date in]1992 and this information is now largely available on the Internet sites of the responsible organizations. Those requesting a copy of the Cortese "list" are now referred directly to the appropriate information resources contained on the Internet web sites of the boards or departments that are referenced in the statute." Below is a list of agencies that maintain information regarding hazardous waste and substances sites. Department of Toxic Substances Control www.calepa.ca.qov/sitecleanup/CorteseList/default.htm www.calepa.ca.qov/database/calsites www.envirostor.dtsc.ca.qov/public EnviroStor Help Desk (916) 323-3400 State Water Resources Control Board http://qeotracker.waterboards.ca.qov/ County of San Diego Department of Environmental Health Services www.co.san -dieqo.ca.us/deh Hazardous Materials Division www.sdcounty.ca.eovideh/hazmat/hazmat permits.html Mailing Address: County of San Diego Department of Environmental Health P.O. Box 129261 San Diego, CA 92112-9261 Call Duty Specialist for technical questions at (858) 505-6880, fax (858) 505-6868 (fax) Environmental Protection Agency National Priorities Sites ("Superfund" or "CERCLIS") www.epa.qov/superfund/sites/cursites (800) 424-9346 or (702) 284-8214 National Priorities List Sites in the United States www.epa.qov/superfund/sites/npl/npl.htm P-1(C)Page 2 of 2 Revised 02/13 DEQMINATION OF PROJECT'S•S Development Services SWPPP TIER LEVEL AND Land Development Engineering Car CONSTRUCTION THREAT .LEVEU-.).-- .244„.7.--5 Faraday Avenue E-32 E-32 enue _12 __LJ 60- www.carlsbadca.gov JAN 3 n 2018 ciTt cAisisPADI'm applying for:0 Grading Permit 0 Building Permit Right -of-way.permitff -0 Other Project Name: Recycled Water Phase Ill Pipeline Segment 5 Project ID:DWG #/CB# Address:El Camino Real (N. Chestnut), Kelly, Tamarack, Etc APN N/A Disturbed Area:2.02 Ac Section 1:Determination of Project's SWPPP Tier Level SWPPP (Check applicable criteria and check the corresponding SWPPP Tier Level, then go to section 2)Tier Level Exempt —No Threat Project Assessment Criteria My project is in a category of permit types exempt from City Construction SWPPP requirements. Provided no significant grading proposed, pursuant to Tablet, section 3.2.2 of Storm Water Standards, the following permits are exempt from SWPPP requirements:0 Exempt O Electrical 0 Patio 0 Mobile Home ID Plumbing 0 Spa (Factory-Made) O Fire Sprinkler 0 Mechanical 0 Re-Roofing Sign 0 Roof-Mounted Solar Array Tier 3 —Significant Threat Assessment Criteria —(See Construction General Permit (CGP) Section LB)* 0 My project includes construction or demolition activity that results in a land disturbance of equal to or greater than one acre including but not limited to clearing, grading, grubbing or excavation; or, O My project includes construction activity that results in land disturbance of less than one acre but the construction activity is part of a larger common plan of development or the sale of one or more acres of disturbed land surface; or, O My Project is associated with construction activity related to residential,commercial,or industrial WI Tier 3 development on lands currently used for agriculture; or O My project is associated with construction activity associated with Linear Underground/Overhead Projects (LUP)including but not limited to those activities necessary for installation of underground and overhead linear facilities (e.g.conduits,substructures,pipelines,towers,poles,cables,wire,towers,poles,cables, wires, connectors, switching, regulating and transforming equipment and associated ancillary facilities) and include but not limited to underground utility mark out, potholing, concrete and asphalt cutting and removal, trenching,excavation,boring and drilling,access road,tower footings/foundation,pavement repair or replacement, stockpile/borrow locations. O Other per CGP Tier 2 —Moderate Threat Assessment Criteria:My project does not meet any of the Significant Threat Assessment Criteria described above and meets one or more of the following criteria: O Project requires a grading plan pursuant to the Carlsbad Grading Ordinance (Chapter 15.16 of the Carlsbad Municipal Code); or, O Project will result in 2,500 sq. ft. or more of soils disturbance including any associated construction staging, stockpiling, pavement removal, equipment storage, refueling and maintenance areas and project meets one or more of the additional following criteria:0 Tier 2 •located within 200 ft. of an environmentally sensitive area or the Pacific Ocean; and/or, •disturbed area is located on a slope with a grade at or exceeding 5 horizontal to 1 vertical; and/or •disturbed area is located along or within 30 ft.of a storm drain inlet,an open drainage channel or watercourse; and/or •construction will be initiated during the rainy season or will extend into the rainy season (Oct.1 —Apr. 30) Tier 1 —Low Threat Assessment Criteria O My project does not meet any of the Significant or Moderate Threat criteria above,is not an exempt permit type per above and the project meets one or more of the following criteria: Tier 1•results in some soil disturbance; and/or •includes outdoor construction activities (such as roof framing,saw cutting,equipment washing,material stockpiling, vehicle fueling, waste stockpiling) *Items listed are excerpt from CGP. CGP governs criteria for triggers for Tier 3 SWPPP.Developer/owner shall confirm coverage under the current CGP and any amendments, revisions and reissuance thereof. E-32 Pane 1 of 2 REV. 02/16 , Section 2:Determination of Project's Construction Threat LevelSWPPP Construction(Check applicable criteria under the Tier Level as determined in section 1,check theTier Threatcorresponding Construction Threat Level, then complete the emergency contact andLevel Levelsignature block below) Exempt -Not Applicable -Exempt Tier 3 —High Construction Threat Assessment Criteria:My Project meets one or more of the following: Project site is 50 acres or more and grading will occur during the rainy season El Project site is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA 0 High0Soil at site is moderately to highly erosive (defined as having a predominance of soils with Tier 3 USDA-NRCS Erosion factors kr greater than or equal to 0.4) O Site slope is 5 to 1 or steeper El Construction is initiated during the rainy season or will extend into the rainy season (Oct.1 —April 30) El Owner/contractor received a Storm Water Notice of Violation within past two years Tier 3 —Medium Construction Threat Assessment Criteria El All projects not meeting Tier 3 High Construction Threat Assessment Criteria 0 Medium Tier 2 —High Construction Threat Assessment Criteria: My Project meets one or more of the following: Project is located within the Buena Vista or Agua Hedionda Lagoon watershed, inside or within 200 feet of an environmentally sensitive area (ESA) or discharges directly to an ESA Soil at site is moderately to highly erosive (defined as having a predominance of soils with 0 HighUSDA-NRCS Erosion factors kr greater than or equal to 0.4) Tier 2 0 Site slope is 5 to 1 or steeper O Construction is initiated during the rainy season or will extend into the rainy season (Oct.1 —Apr. 30) I:Owner/contractor received a Storm Water Notice of Violation within past two years O Site results in 10,000 sq. ft. or more of soil disturbance Tier 2 —Medium Construction Threat Assessment Criteria 0 My project does not meet Tier 2 High Threat Assessment Criteria listed above 0 Medium Tier 1 —Medium Construction Threat Assessment Criteria: My Project meets one or more of the following: O Owner/contractor received a Storm Water Notice of Violation within past two years 0 Medium0Site results in 500 sq. ft. or more of soil disturbanceTier1El Construction will be initiated during the rainy season or will extend into the rainy season (Oct.1 —April 30) Tier 1 —Low Construction Threat Assessment Criteria 0 Low0My project does not meet Tier 1 Medium Threat Assessment Criteria listed above I certify to the best of my knowledge that the above statements are true and correct.I will prepare and submit an appropriate tier level SWPPP as determined above prepared in accordance with the City SWPPP Manual.I understand and acknowledge that I must adhere to and comply with the storm water best management practices pursuant to Title 15 of the Carisbad Municipal Code and to City Standards at all times during construction activities for the permit type(s) checked above. The City Engineer/Building Official may authorize minor variances from the Construction Threat Assessment Criteria in special circumstances where it can be shown that a lesser or higher SWPPP Tier Level is warranted. Emergency Contact Name:Telephone No: Lindsay Leahy (760) 603-7325 Owner/Owner's Authorized Agent Name:/Title: try ._f;Pri/e ...t rfr is 7 detty .4 -re.— Owner/ap/a0a Authorized Age Signature:Date: /17--of /72 /7•0 FOR CITY USE ONLY Yes No City Concurrence:- By: Date: E-32 Page 2 of 2 REV. 02/16