Loading...
HomeMy WebLinkAboutCDP 96-14; Marja Acres PCS Facility; Coastal Development Permit (CDP) (13)HETHERINGTON ENGINEERING, INC. SOIL & FOUNDATION ENGINEERING • ENGINEERING GEOLOGY • HYDROGEOLOGY October 21, 1996 Project No. 1519.1 Log No. 2521 J. M. Consulting Group, Inc. 3530 Camino Del Rio North, Suite 101 San Diego, CA 92108 Attention: Ms. Cheryl M. Hacke Subject: RESPONSE TO PLAN CHECK NO. 96-1376 Proposed Cox California PCS Station SD154 - Marja Acres - 4901 El Camino Real Carlsbad, California References: 1) "Geotechnical Investigation, Proposed Cox California PCS Station, SD154-Marja Acres, Carlsbad, California," by Hetherington Engineering, Inc., dated February 21, 1996. 2) "Supplemental Geotechnical Investigation, Proposed Cox California PCS Station, SD154- Marja Acres, Carlsbad, California," by Hetherington Engineering, Inc. dated May 14, 1996. 3) "Supplemental Retaining Wall Parameters, Proposed Cox California PCS Station, SD154 - Marja Acres, Carlsbad, California," by Hetherington Engineering, Inc., dated July 17, 1996. 4) Plans for Marja Acres, Job #SD154, by KDC Architects, dated July 25, 1996. Dear Ms. Hacke: In accordance with the request of Mr. Barry Lackman of your office, we are providing this response to Plan Check 'No. 96-1376, dated October 11, 1996 by Esgill Corporation. 1) The intent of UBC Section 1806.4.2. is to protect structures from slope drainage, erosion and shallow failures. The concrete V-ditch provided along the rear of the retaining wall (Reference 1, Sheet C-l, Section A-A) addresses drainage. To protect the structure from erosion and shallow failures, it is recommended that the retaining wall extend a minimum of 3 feet above the slope to act as a slough wall. Periodic removal of soil behind the slough wall should be anticipated. If the 5245 Avenida Enemas, Suite G • Carlsbad, CA 92008-4369 • (619) 931-1917 • Fax (619) 931-0545 32242 Paseo Adelanto. Suite C • San Juan Capistrano, CA 92675-3610 • (714) 487-9060 • Fax (714) 487-9116 RESPONSE TO PLAN CHECK NO. 96-1376 Project No. 1519.1 Log No. 2521 October 21, 1996 Page 2 slough wall is constructed as recommended it is our opinion that the setback requirement may be eliminated. 2) As the plan checker has indicated, the slab-on-grade should have a minimum thickness of 6-inches and should be reinforced with at least #4 bars spaced at 12-inches, center to center, in accordance with our recommendations. 3) For design of antenna caissons, lateral loads may be resisted by a passive pressure of 200 pounds per square foot per foot of depth in terrace deposits/bedrock, which may be calculated over two pier diameters. This recommendation has alredy incorporated the 2x factor allowed in UBC Table 18-1-A note 3. This opportunity to be of service is appreciated. If you should have any questions, please contact Danny Cohen at the Carlsbad office. Sincerely, HETHER INC. (expire 3/31/0 MDH;DC/sl cc: KDC Architecture" Ken Miller Fax #683-2349 DANNY COHEN Civil Engineer (expires 3/31 HETHERIIMGTOIM ENGINEERING, INC.