HomeMy WebLinkAboutCDP 96-16A; Legoland California; Coastal Development Permit (CDP) (6)City
January 19, 2000
Jim Fend
LEGOLAND California
1 LEG0 Drive
Carlsbad, CA 92008
SUBJECT: SDP 96-l 4(A)/CDP 96-l 6(A) - LEGOLAND CALIFORNIA
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your Site Development Plan Amendment and Coastal
Development Permit Amendment, application no. SDP 96-14(A) and CDP 96-16(A), as to
its completeness for processing.
The application is complete, as submitted. Although the initial processing of your
application may have already begun, the technical acceptance date is acknowledged by
the date of this communication. The City may, in the course of processing the
application, request that you clarify, amplify, correct, or otherwise, supplement the basic
information required for the application. In addition, you should also be aware that various
design issues may exist. These issues must be addressed before this application can be
scheduled for a hearing. Attached is a list of the issues for the project which must be
resolved prior to the preparation of documents to schedule a Planning Commission
Hearing. The Planning Department will begin processing your application as of the date of
this communication.
Please contact your staff planner, Don Neu, at (760) 602-4612, if you have any questions
or wish to set up a meeting to discuss the application.
Sincerely,
Planning Director
MJH:DN:mh
c: Richard Apel
57 1 -B Hygeia Avenue
Leucadia, CA 92024
Gary Wayne File Copy
Adrienne Landers Data Entry
Don Neu Planning Aide
Frank Jimeno
Bobbie Hoder
2075 Las Palmas Dr. - Carlsbad, CA 92009-1576 - (760) 438-l 161 - FAX (760) 438-0894 @
ISSUES OF CONCERN
No. SDP 96-14(A)/CDP 96:16(A) - LEGCLAND CALfPDRNlA
Planning:
1. Please submit a construction materials board and color samples for the proposed
improvements as listed on the application checklist.
2. The note on the lower right hand corner of sheet “WE-102” should be revised to
reference the west expansion area and not the east expansion area.
Engineering:
1. Engineering Department comment will follow in separate correspondence.