Loading...
HomeMy WebLinkAboutCDP 97-02; Sambi Seaside Heights; Coastal Development Permit (CDP) (7)PACIFIC SOILS ENGINEERING, INC. 7715 CONVOY COURT. SAN DIEGO, CALIFORNIA 92111 TELEPHONE: (619) 560-1713, FAX: (619) 560-0380 KAUFMAN & BROAD OF SAN DIEGO, INC. 12626 High Bluff Drive - Suite 400 San Diego, CA. 92130 March 11, 1997 Work Order 400224KB Attention: Ms. Lisa Gordon Subject: Plot Plan Review for Lots 37 thru 111, incl., and Lots 120 thru 137, incl., CT 92-02, Sambi Seaside Heights, in the City of Carlsbad, CA. References: See Appendix Gentleperson: Pursuant to your request, Pacific Soils Engineering, Inc.'s (PSE's) has reviewed the undated plot plans (sheets 1 through 9 of 9) prepared by Burkett and Wong for lots 37 through 111, inclusive, and lots 120 through 137, inclusive, Sambi Seaside Heights, CT 92-02, in the City of Carlsbad, California. From a geotechnical viewpoint, the plot plans have incorporated the recommendations in the referenced reports and adequately address: 1) the need for deepened footings adjacent to side yard swales; and 2) the need for P.V.C. storm drains on lots with nar- row side yards. CORPORATE HEADQUARTERS LOS ANGELES COUNTY RIVERSIDE COUNTY SOUTH ORANGE COUNTY TEL: (714) 220-0770 TEL: (213) 325-7272 or 775-6771 TEL: (909) 676-8195 TEL: (714) 730-2122 FAX: (714) 220-9589 FAX: (714) 220-9589 FAX: (909) 676-1879 FAX: (714) 730-5191 Work Order 400224KB March 11, 1997 Page 2 Should you have any questions concerning this letter, please contact the undersigned. Respectfully submitted, PACIFIC SOILS ENGINEERING, INC. By:. JOHNA. HANSON, CEG 990 VicePresident Dist (8) Addressee (2) Burkett and Wong, Attn: Mr. Tat Wai D D/ J AC/D AM/J AH :kr/KB003 PACIFIC SOIUS ENGINEERING, INC. Work Order 400224KB APPENDIX March 11, 1997 REFERENCES Pacific Soils Engineering, Inc., 1997, Revised Foundation Plan Review for Lots 37 thru 111, incl., and Lots 120 thru 137, incl., Area"C", Sambi Seaside Heights, CT 92-02, City Carlsbad, CA., dated March 10, 1997 (Work Order 400224KB). Pacific Soils Engineering, Inc., 1997, Revised Foundation Recommendations for Lots 37 thru 111, incl., Lots 120 thru 137, incl., Area "C", Sambi Seaside Heights, CT 92-02, City of Carlsbad, CA., dated March 10, 1997 (Work Order 400224KB). Pacific Soils Engineering, Inc., 1997, Project Grading Report for Area 'A' and Alga Road (Approximate Sta. 30+40 to 56+20), Sambi Seaside Heights Project, City of Carlsbad, CA., dated January 13, 1997 (Work Order 400224GA). Pacific Soils Engineering, Inc., 1996a, Project Grading Report for Lots 1 thru 138, incl., Sambi Seaside Heights Project, City of Carlsbad, CA., for Sambi Seaside Heights, c/o CDC, dated May 9, 1996 (Work Order 400224GR). Pacific Soils Engineering, Inc., 1996b, Review and Comments on Construction Notes for Placement of Tensar Geogrids and Backfill Soils for Sierra Slope Retention System, Sambi Seaside Heights Project, City of Carlsbad, CA., for Sambi Sea- side Heights, c/o CDC, dated April 3, 1996 (Work Order 400224GR). Pacific Soils Engineering, Inc., 1995, Grading Plan Review, Sambi Seaside Heights, CT-92-02, Portion of Alga Road and a Portion of Hidden Valley Road, City of Carlsbad, CA., for Sambi Seaside Heights, c/o CDC, dated May 17, 1995 (Work Order 400224GP). Pacific Soils Engineering, Inc., 1989, Preliminary Geotechnical Investigation, Sambi, a Portion of the Southeast 1/4 of Section 21, Township 12 South, Range 4 West, City of Carlsbad, CA., for Sunbelt Development Company, dated February 6, 1989 (Work Order 400224). PACIFIC SOILS ENGINEERING, INC.