HomeMy WebLinkAboutCDP 97-02; Sambi Seaside Heights; Coastal Development Permit (CDP)Memorandum
TO: Senior Planner, Chris Decerbo
FROM: Associate Engineer, Clyde Wickham
VIA: Principle Civil Engineer, Bob Wojcik
DATE: Aprils, 1997
RE: SDP 92 - 06 (B), SAMBI SEASIDE HEIGHTS
We have completed our review of the Site Development Plan and Coastal
Development Permit identified above. We can support this permit based upon
the attached conditions. Please include these comments in your staff report.
CONDITIONS:
• The typical drainage system shown on sheet 1 of the plot plans has been
reviewed by the City Engineer and is approved subject to the following
conditions:
1. Existing typical lot grading standard GS-15 shall be incorporated for all
lots except as shown on alternate section D/D on sheet 1 of the plot plans for
this project.
2. The 15 lots identified in the above mentioned alternative drainage design
shall have: Deepened Footings, PVC yard drains, retaining wall drainage
systems, and shall comply with specific recommendations from the project's
Soils Engineer.
3. Any changes to the alternative drainage design shall be approved by the
City Engineer prior to individual unit construction or prior to pad certification
by the project Engineer.
• The fence plan and grading plan shall include the required sight corridor
easements and shall provide for a clear area to remain visible in perpetuity.
• All conditions of CT 92 - 02 are incorporated by reference to this approval.
Please number the conditions as necessary to fit into the appropriate format. If
you have any questions or would like to discuss this project further, please give
me a call at ext. 4353.
CLYDE WICKHAM
Associate Engineer
Land Development Division