Loading...
HomeMy WebLinkAboutCDP 97-11; SDG&E Tower Access Road; Coastal Development Permit (CDP) (4)City of CarlsbadB^ I^BHIHM^m^m^Bm^^m^Hm^^^HIMPlanning Department May 15, 1997 San Diego Gas & Electric Attention: Mark Shoman P.O. Box 1831 San Diego, CA 92112-4150 SUBJECT: CDP 97-11 - SD6&E TOWER ACCESS ROAD Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Coastal Development Permit, application no. CDP 97-11, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, April 15, 1997, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Elaine Blackburn, at (760)438-1161, extension 4471, if you have any questions or wish to set up a meeting to discuss the application. Sincerely 1ICHAEL J. H( Planning Director MJH:EB:kr c: Gary Wayne Chris DeCerbo Clyde Wickham Bobbie Hoder MILLER Data Entry Planning Aide 2O75 Las Palmas Dr. - Carlsbad, CA 92OO9-1576 - (619) 438-1161 • FAX (619) 438-O894 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION No. CDP 97-11 Planning: 1. Please show the width of the proposed surfaced road area on the plans. 2. Per the Supplemental Coastal Development Permit submittal requirements, you will need to submit mapped information including: a) vegetation analysis map showing all of the vegetation in the project area; and b) drainage and wetland mapping. You will also need to provide a Wetlands Delineation Study and a survey for the presence of any sensitive, threatened, or endangered wildlife species (e.g., Least Bells Vireo as noted in the preliminary Biology report submitted). 3. As noted in the biologist's report submitted, there is a possibility that a 404 Permit, Streambed Alteration Agreement, and/or mitigation for impacts may be required for this project. You will need to consult with the relevant federal and state agencies (California Dept. of Fish & Game, Fish & Wildlife, Army Corps of Engineers, etc.) to obtain determinations of what, if any, permits and/or mitigation will be required for the proposed project and submit evidence of the conclusions of such consultations to the Planning Department before the project can be deemed complete. ISSUES OF CONCERN Planning: 1. Issues of concern cannot be fully identified until the necessary items of completeness are submitted.