Loading...
HomeMy WebLinkAboutCDP 97-16; Poinsettia Properties Master Tentative Map; Coastal Development Permit (CDP) (2)City of Carlsbad Planning Department June 12, 1997 HSL/BP/MICHAN L.P. C/O Benchmark Pacific 2892 Jefferson Street Carlsbad, CA 92008 SUBJECT: POINSETTIA PROPERTIES MASTER TENTATIVE MAP - CT 97-10/CDP 97-16 Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Tentative Map, Planned Development Permit and Coastal Development Permit, application nos. CT 97-10/CDP 97-16, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed. May 13, 1997, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Teresa Woods, at (760) 438-1161, extension 4447, if you have any questions or wish to set up a meeting to discuss the application. Sincer MTCHAELA HOLZ Planning'Director MJH:TW:kr Gary Wayne Dee Landers Ken Quon Bobbie Hoder File Copy Data Entry Planning Aide 2O75 Las Palmas Dr. - Carlsbad, CA 92OO9-1576 - (619) 438-1161 • FAX (G19) 438-O894 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION Project No. CT 97-10/CDP 97-16 Planning: Please revise the existing Zoning and General Plan designations on the tentative map summary sheet to indicate SP 210 General Plan and Zoning Designations. This project cannot be processed to hearing unless the Zoning and General Plan designations proposed as part of SP 210 are approved. Please submit grading plans for the project area. 3. Please submit a fully-completed original notarized PFF agreement and one copy of the PFF agreement. Please note that a separate PFF agreement is required for each project submitted. 4. Please submit a completed disclosure statement (form attached). 5. Please submit three copies of the Preliminary Title Report (current within the last six months). 6. Please note that this project will remain incomplete until the Specific Plan, EIR and all associated discretionary applications have been approved, including LCPA approval by the California Coastal Commission. Engineering: Engineering Department incomplete items will be sent under separate cover. ISSUES OF CONCERN Planning: The plans show an existing storm drain running through the middle of the project. The studies prepared for the EIR do not reflect this storm drain. Please submit documentation describing this drainage facility and note whether it will be removed, relocated, etc. Please show the meandering sidewalk on Avenida Encinas on the tentative map exhibit. Submit a detailed soils testing and analysis report, prepared by a soils engineer. This report must be submitted to the County Health Department for review and approval. This report is to be prepared pursuant to the Poinsettia Properties EIR. Please submit a program of Best Management Practices (BMP) including structural controls and detention basins for the storm drain system drainage area for consideration and approval by the City Engineer. The BMP report is to be prepared pursuant to the Poinsettia Properties Specific Plan EIR. Engineering: Engineering issues of concern will be sent under separate cover.