Loading...
HomeMy WebLinkAboutCDP 97-49; Flower Fields Retail Sales Building; Coastal Development Permit (CDP) (13)r' CITY OF CARLSBAD ENGINEERING DEPARTMENT LAND DEVELOPMENT SECTION 4eCe;uJ TO: SENIOR PLANNER - DON NEU DATE: February 3, 1998 FROM: Associate Engineer - Michael J. Shirep! PROJECT ID: CDP 97-49 VIA: FLOWER FIELDS SALES FACILITY PROJECT REPORT AND CONDITIONS TRANSMITTAL Principal Civil Engineer - Land Development Engineering Department staff have completed the review of the above-referenced project and are recommending: X - That the project be approved subject to the conditions as listed on the attached sheets. That the project be denied for the following reasons: X The following is a final Land Development Section project report for inclusion in the staff report for this project. 1 I LAND DEVELOPMENT SECTION Proiect Report PROJECT ID: PROJECT NAME: LOCATl ON: PROJECT D ESC R I PTI 0 N : CDP 97-49 Flower Fields Sales Facility PREPARED BY: Michael J. Shirey Ql3 APROVED BY: Northeast corner of the Palomar Airport Road (PAR)/Paseo Del Norte (PDN) intersection. (APN: 21 1-022-21) Coastal Development Permit to add square footage to the existing Flower Fields Sales Facility. I ENGINEERING ISSUES AND DISCUSSION 1 TRAFFIC & CIRCULATION: Projected Average Daily Traffic (ADT): 80 Traffic Study Performed by: N/A Comment: No major traffic and circulation issues are associated with this proposed project. A Traffic Report was prepared for the Carlsbad Ranch Specific Plan and Local Facilities Management Plan (LFMP) Zone 13 (KaKu report dated: August-I 994). This traffic report analyzed all future development within Carlsbad Ranch, and, identified impacts and mitigation measures, as indicated in the tentative map conditions of approval for Carlsbad Ranch (PC Resolution's 3851 & 4083). SEWER: Sewer District: Carlsbad Municipal Water District Sewer Equivalent Dwelling Unit (EDU) Required: 1 edu Comment: No major sewer issues are associated with this proposed project. WATER: Water District: Carlsbad Municipal water District EDU's Required: 1 Gallons per Day (GPD) Required: 220gpdjedu * ledu = 220gpd Comment: No major water issues are associated with this proposed project. SOILS & GRADING: Quantities: Cut: Ocy Fill: Ocy Permit Required: No 2 Off-site Approval required/obtained: No \ N/A Hillside Grading Requirements met: N/A Preliminary Geo-technical Investigation Performed by: N/A Comment: No major soils and grading issues are associated with this proposed project. DRAINAGE & EROSION CONTROL: Drainage Basin: B Preliminary Hydrology Study Performed by: N/A Erosion Potential: Low Comment: proposed project. No drainage and erosion control issues are associated with this LAND TITLE: Conflicts with existing easement: No Easement dedication required: No Site boundary coincides with Land Title: Yes Comment: The curb return right of way at the Palomar Airport Road/Paseo Del Norte northeast corner and Palomar Airport Road/Armada Drive northwest corner was not dedicated on the Carlsbad Ranch final map (CT 94-09). This right of way shall be dedicated as a condition of approval for the project. IMPROVEMENTS: Off-site Improvements: No Standard Variance Required: No Comment: No improvement issues are associated with this proposed project. However, staff has identified that the Palomar Airport Road westbound right turn lane, to northbound Paseo Del Norte should be increased to accommodate more vehicular storage. To provide this increased storage capacity, additional right of way must be obtained from this property. As a condition of approval for this project, additional right of way dedication shall be required. 3 . ENGINEERING CONDITIONS: NOTE: Unless specifically stated in the condition, all of the following conditions, upon the approval of this Coastal Development Permit, must be met prior to issuance of any building permit. General: 46. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, the developer shall submit to and receive approval from the City Engineer for the proposed haul route. The developer shall comply with all conditions and requirements the City Engineer may impose with regards to the hauling operation. Fees/A qreem en ts: 50. The developer shall pay all current fees and deposits required. Dedica tions/lmpro vem en ts: 70. The developer shall comply with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit. The developer shall provide best management practices as referenced in the "California Storm Water Best Management Practices Handbook" to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be approved to the satisfaction of, and by the City Engineer, in accordance with the following: A. Surface runoff shall be directed to a vegetated swale before draining into existing catch basin@). Fossil type filters, if not already installed, shall be installed at storm drain inlets/inverts, as indicated on sheet 2 of 4 of the Coastal Development Permit site plan. 65. Prior to issuance of occupancy, Curb return right of way radii shall be dedicated by the owner at the Palomar Airport RoadlPaseo Del Norte northeast corner and Palomar Airport Road/Armada Drive northwest corner, along the project frontage, based on a right-of-way radius of 25 feet and in conformance with City of Carlsbad Standards. 65. Prior to issuance of occupancy, a 12' dedication shall be irrevocably offered by the owner, along the project frontage, along Palomar Airport Road, from Paseo Del Norte to Armada Drive, in conformance with City of Carlsbad Standards. Code Reminder: The project is subject to all applicable provisions of local ordinances, including but not limited to the following: 35. The developer shall exercise special care during the construction phase of this project to prevent off-site siltation. Planting and erosion control shall be provided in accordance with the Carlsbad Municipal Code and the City Engineer. 4