Loading...
HomeMy WebLinkAboutCDP 97-52; Kelly Ranch Corporate Center; Coastal Development Permit (CDP) (22)_ . Citof . e . l -., February 22, 2000 Kevin A. Noel1 Kelly Ranch Corporate Center I, LLC 2141 Palomar Airport Road, Ste. 300 Carlsbad, CA 92008 SUBJECT: SDP 97-25/CDP97-52 - KELLY CORPORATE CENTER REVISIONS TO TRAFFIC MITIGATION MEASURE Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department has reviewed your Environmental Impact Assessment Form and revised Traffic Study sections, application no. SDP 97-25/CDP 97-52, as to its completeness for processing. The application is incomplete, as submitted. Attached are two lists. The first list is information which must be submitted to complete your application. This list of items must be submitted directly to your staff planner by appointment. All list items must be submitted simultaneously and a copy of this list must be included with your submittals. No processing of your application can occur until the application is determined to be complete. The second list is issues of concern to staff. When all required materials are submitted the City has 30 days to make a determination of completeness. If the application is determined to be complete, processing for a decision on the application will be initiated. In addition, please note that you have six months from the date the application was initially filed, January 25, 2000, to either resubmit the application or submit the required information. Failure to resubmit the application or to submit the materials necessary to determine your application complete shall be deemed to constitute withdrawal of the application. If an application is withdrawn or deemed withdrawn, a new application must be submitted. Please contact your staff planner, Don Neu, at (760) 602-4612, if you have any questions or wish to set up a meeting to discuss the application. MJH:DN:mh c: Adrienne Landers Frank Jimeno John Kim File Copy Data Entry Planning Aide Stuart Fisk Hofman Planning Associates 5900 Pasteur Court, Suite 150 Carlsbad, CA 92008 Harve Filuk P.O. Box 912 Del Mar, CA 92014 LIST OF ITEMS NEEDED TO COMPLETE THE APPLICATION No. SDP 97-25/CDP 97-52 - KELLY CORPORATE CENTER PROPOSED RIVISION TO THE TRAFFIC MITIGATION MEASURE Engineering & Planning: 1. The application cannot be accepted as complete until a completely updated revised report which is based on the latest traffic counts is submitted, reviewed and accepted by the Engineering Department staff. The traffic study shall include in accumulative analysis other projects proposed in the area such as the Costco Store Expansion, Costco Gasoline Station Expansion, and Oscar’s Restaurant planned for the existing pad adjacent to the main access point to the Costco site. ISSUES OF CONCERN Engineering and Planning: 1. The required traffic study must demonstrate that the circulation system functions within the Growth Management Program Circulation Performance Standard in order for city staff to recommend revising the traffic mitigation measure requiring the construction of Cannon Road prior to the issuance of building permits. 2. Environmental documents cannot be prepared and a finding noticed until a traffic study is submitted and approved by the Engineering Department staff. 3. Planning Commission approval is required to revise the traffic mitigation measure.