Loading...
HomeMy WebLinkAboutCDP 97-52; Kelly Ranch Corporate Center; Coastal Development Permit (CDP) (4)City of Carlsbad February 19,1999 Bill Hofinan Hofkuur Planning Associates 5900 Pasteur Court, Suite 150 Carlsbad, CA 92008-73 17 SUBJECT: SDP 97-2WDP 97-52 - KELLY CORPORATE CENTER Dear Bill: Enclosed is a copy of the “Transportation Analysis for the Kelly Corporate Center” prepared by Urban Systems Associates with a revision date of February 1, 1999. Contained in the analysis are comments from John Kim of the Traffic Division of the Engineering Department. All issues with the traffic study need to be resolved with John Kim in order for the project to be processed any further. The project applications were originally submitted on November 17, 1997 and were deemed complete on November 10, 1998. To comply with the permit streamlining act a decision must be made on the applications by May 10, 1999. This means that the latest the Planning Commission Hearing could be is May 5, 1999. For this to occur all required information and plans including a traffic analysis approved by the Engineering Department must be received by March 1,1999. The remaining time is needed to review the revised project plans and environmental studies, prepare the environmental document, staff report and resolutions, provide the required public and agency review period on the environmental document, notice the public hearing, and finally management review of the documents. This assumes’that a Mitigated Negative Declaration can be prepared for the project which has not been confirmed. The environmental determination as stated in the November 10, 1998 complete application letter is that a Focused EIR is required. Should the traffic analysis continue to conclude that the growth management performance standard fails to be met the project could not be considered for approval without the preparation of an EIR and a Statement of Overriding Considerations. Please submit all outstanding plans and studies by March 1, 1999. A traffic study which has already been approved by the Engineering Department showing that the growth management performance standard for circulation is met is due no latter than March 1, 1999. Should this deadline not be observed the applicant will have the option of withdrawing and resubmitting the 2075 La Palmas Dr. l Carlsbad, CA 92009-l 576 l (760) 438-l 161 l FAX (760) 438-0894 @ applications at a latter date or it will be necessary for me to schedule the project for hearing with a recommendation of denial. Should you have any questions please contact me at 438-l 161, extension 4446. Sincerely, @IlLJ%x DON NEU Senior Planner DN:mb Enclosure c: Randy Jackson Kihoy Realty 4365 Executive Drive, Suite 850 San Diego, CA 92121-2130 Sam Kab Urban Systems Associates 4540 Keamy Villa Road, Suite 106 San Diego, CA 92123-1573 Adrienne Landers Frank Jimeno John Kim