Loading...
HomeMy WebLinkAboutCDP 98-12; Forth Residence; Coastal Development Permit (CDP) (10)May 21,1998 Andrew John Forth 2730 Circulo Santiago, # B Carlsbad, CA 92009 SUBJECT: CDP 98- 12 - FORTH RESIDENCE (Rosalena Lot 24) The Planning Department has reviewed your most recent submittal for Coastal Development Permit application no. CDP 9% 12. It appears that many of the items listed in our letter to you dated March 12, 1998 have been resolved on the plans received April 18, 1998. However, some items remain unaddressed or unsatisfactorily addressed. The attached list indicates items remaining to be addressed. Once these items are addressed, we can schedule a Planning Commission hearing date for the project. Please contact your staff planner, Chris DeCerbo, at (760) 43% 116 1, extension 4445, if you have any questions or wish to set up a meeting to discuss the application. Sincerely, Planning Director MJH: CD:LK c: File Copy 2075 Las Palmas Dr. l Carlsbad, CA 92009-l 576 - (760) 438-1161 l FAX (760) 438-0894 @ LIST OF CONCERNS REMAINING TO BE ADDRESSED Application No. CDP 98-12 Planning: 1. No building permits will be issued for Lots 20-24 until a trail easement has been secured to the satisfaction of the City Attorney; or the trail is completely constructed to the satisfaction of the City Engineer and Planning Director. This will be a condition of approval of the project. 2. Be advised that the City will not issue permits for any rear yard improvements until the Coastal Commission provides a letter allowing the proposed improvements to be permitted. The reason for this is that the required bluff top trail has not been constructed. The City and coastal Commission have worked extensively with the Rosalena Homeowners Association (HOA) over the past several years to provide guidance on amending the master plan to formally re-align the trail off of the bluff top. The HOA has not responded to this situation and the lack of a bluff top trail or pending master plan amendment to re-align the trail now prevents the Coastal Commission from sanctioning any rear yard improvements. Therefore, the City will not issue any rear yard structure permits until the trail is constructed; or until the Coastal Commission informs the City in writing that permits may be issued. 3. Thank you for labeling the setbacks. In addition, please label building dimensions on the plot plan. 4. Maximum roofline projections into required yards is two feet. The maximum encroachment for roof eaves into any required yard is two (2) feet. Required yards include the 45 foot bluff-top setback. The roof eave at the entrance projects more than two feet into the setback. Please redesign the entry to comply with the two-foot maximum. 5. Please show location, height, and materials of all walls and fences, including side yard, privacy fencing. 6. The Zoning shown in the Summary Table is incorrect. Please indicate the existing General Plan Land Use as RM (Residential Medium Density) and the Zoning as PC (Planned Community. Please indicate the lot coverage. 7. Please show the spot elevations at the corners of the pad. 8. Please be advised that the applicant must bring one copy of a colored site plan and one copy of a colored elevation to the Planning Department by 12:OO noon, eight (8) days prior to the Planning Commission meeting. Do not mount the exhibits. 9. Please be advised that when the application is tentatively scheduled to be heard by the decision making body, the project planner will contact the applicant and advise you to submit the radius map, two sets of property owners list and labels, as required for Coastal Development Permits.