Loading...
HomeMy WebLinkAboutCDP 98-12A; Forth Residence; Coastal Development Permit (CDP) (2)RosaJena Owners' Association Carlsbad, CA 92009 September 15. 2000 Mr Andy J. Forth 1476 Sapphire Drive Carlsbad, CA 92009 Subject Architectural Committee Approval Lot 24 Plans Ref. Design Haus Lot 24 Architectural Drawings Dear Mr Forth. This is to confirm the approval of the Rosatena Owners Association Board of Directors, acting as the Architectural Committee, of the reference plans The plans are approved subject to the following change requirements: 1 California Coastal Commission and City of Carlsbad approval is required to extend side yard fences beyond the rear of the house 2 The round precast concrete pillars shown at the entry to the house are not acceptable. Ail pillars or columns must be square or rectangular in cross- section and stuccoed, consistent with Rosatena designs 3 Clay roofing tile must match the tiles already in the project All exterior colors must be approved by the AC prior to their application to the house 4 Chimney caps must be similar to those in the current units in the project. 5 The overhead garage doors must be wooden with no windows The garage door trim must be the same as one of the designs on existing Rosatena garage doors 6 Rain gutters and downspouts must be painted the same color as the house exterior color 7. Gates and fencing shall be painted steel matching the style, color and dimensions of the fencing currently in the project. 8 The address numbers shall be mounted in recessed lighted niches to match the treatment on the other units in the project 9 The mailboxes and posts must match the units currently installed in the project. 10 Sheet A 4 Awning windows above or below casement windows must be deleted 11 Sheet A3: Lattice window on 2na floor must be changed to delete lattice work, matching the other windows in the house Your formal application form for AC approval must be submitted wrth the final house plans incorporating the changes listed above. If you revise your plans subsequent to the AC final approval, you must submit the changes for AC review prior to incorporating them tn actual construction of the house Please contact us if you have questions Thank you for your cooperation Sincerely The Board of Directors Rick Chambers */*«//* President and Chief Financial Officer Paul Corarito Vice President Drew Swonetz Secretary Clayton Walters Member