HomeMy WebLinkAboutCDP 98-14; Sammis-Rosalena Lot 23; Coastal Development Permit (CDP) (11)CITY OF CARLSBAD
ENGINEERING DEPARTMENT
LAND USE REVIEW
TO: Senior Planner - Chris Decerbo May 18, 1998
FROM: Associate Engineer - Clyde Wickham
RE: CDP98-14, SAMMIS - Rosalena Lot #23
VIA: /^^" Principal Civil Engineer - Land Use Review
The Engineering Department has completed its review of the above referenced project and is
recommending:
X That the project be approved subject to the conditions as listed on the attached sheet.
That the project be denied for the following reasons:
Grading:
Quantities: Grading quantities were not identified on plans. Because of the pre-
graded pads, It appears that a permit will be not be required.
Grading plans will be part of the building permit process.
Permit Required: No
Offsite Approval required/obtained: Possible / NO
Hillside Grading Requirements met: No
Preliminary Geotechnical Investigation Performed by: If required, will be part of building permit
process
Comment: No major grading issues are associated with this proposed project except that limits
of grading and lot drainage to the street are critical. Again, no grading concept was shown.
Drainage and Erosion Control:
Drainage Basin: DA
Preliminary Hydrology Study Performed by: N/A
Erosion Potential: Low if pad drains to street and open space is not graded.
Land Title:
Conflicts with existing easement: No
Easement dedication required: No
\JM
nO
6
E
D
Plan Check No. CB_
Planner
APN:
PLANNING DEPARTMEr
PLAN CHECK REVIEW CHECKLIST
> Address /
Phone (619) 438-1161, extension
Type of Project and Use:^-f
PC-Zoning:.
CFD lin/mitl
Circle One
General Plan:
Project Density:
Facilities Management Zone:
.Date of participation:Remaining net dev acres: C)
Legend:
(For non-residential development: Type of land used created by
this- permit: )
X Item Complete fl F Item Incomplete - Needs your action
TYPEEnvironmental Review Required: YES X NO _
DATE OF COMPLETION: 9- ?~ ^t
Compliance with conditions of approval? If not, state conditions which require action..
Conditions of Approval: -^ ^ 1 rQ< f Tft^t^^jf feJ<- <^?.K— f^ (( ' "^
Discretionary Action Required:
APPROVAL/RESO. NO.
PROJECT NO.
YES )( NO
DATE
TYPE
c/
OTHER RELATED CASES:
Compliance with conditions or approval? If not, state conditions which require action.
Conditions of Approval:
I I I I Coastal Zone Assessment/Compliance
Project site located in Coastal Zone? YES K NO_ _
CA Coastal Commission Authority? YES _ NO (/
If California Coastal Commission Authority: Contact them at - 3111 Camino Del Rio North, Suite
200, San Diego CA 92108-1725; (619) 521-8036
Determine status (Coastal Permit Required or Exempt):
NOCoastal Permit Determination Form already completed? YES
If NO, complete Coastal Permit Determination Form now.
Coastal Permit Determination Log #: _
Follow-Up Actions:
1) Stamp Building Plans as "Exempt" or "Coastal Permit Required" (at minimum
Floor Plans).
2) Complete Coastal Permit Determination Log as needed.
|~~] Inclusionary Hr ing Fee requsre$: YES NC '
(Effective date of InclusTGhary Housing Ordinsnut -May 21, 1993.)
Data Entry Completed? YES _ NO
(Enter CB #; UACT; NEXT 12; Construct housing Y/N; Enter Fee Amount (See fee schedule tor amount): Return)
Site Plan:
j ] | | 1. Provide a fully dimensional $ite plan drawn to scale. Show: North arrow,
property lines, easements, existing and proposed structures, streets, existing
street improvements, right-of-way width, dimensional setbacks and existing
topographical lines.
| I | ] 2. Provide legal description of property and assessor's parcel number.
CU
Zoning:
1 . Setbacks:
Front:
Interior Side:
Street Side:
Rear:
2. Accessory structure
Front:
Interior Side:
Street Side:
Rear:
Structure separation
3. Lot Coverage:
Required
Required
Required
Required
setbacks:
Required
Required
Required
Required
: Required
Required
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
Shown
D 4. Height:Required Shown
J I I I I 5. Parking: Spaces Required
Guest Spaces Required
I I I I I I Additional Comments
Shown
Shown
OK TO ISSUE AND ENTERED APPROVAL INTO COMPUTER DATE