Loading...
HomeMy WebLinkAboutCDP 98-55; SCULPTURE PARK DEMOLITION; Redevelopment Permits (RP) (3)CITY OF CARLSBAD PLANS FOR THE DEMOLITION OF OCEAN STREET SCULPTURE PARK PROJECT NO 3615 SITE SITE VICINITY MAP NOT TO SCALE LOCATION MAP NOT TO SCALE SHEET 1 CITY OF CARLSBAD l^T^ PUBLIC WDRKS BEPAPTMEKT j 4 SCULPTURE PARK APPROVED LLOYD HUBBS £y.iy^L..i^95!-S.DIRECTOR PE DATE j IMT;AL [NCiNtER Of WORK REVISION DFSCRlPTiON BATE i :NIT1AI OTHFR APPROVAL D'AN BY: CHKO Br RVWO B'T !OJEcr rgo 36/5 : DRAWING ti'. \ 371-4 A/o TES- © DEMOLISH WALLS AND COLUMNS AND DISPOSE DEBRIS OFFSITE (D EXISTING NORTH WALL TO REMAIN (SEE THE LIMITS) Q) REMOVE EXISTING SPRINKLERS. ELECTRICAL CONDUITS WIRING PULL BOXES Sc PLANTING. REMOVE AND CAP ALL EXISTING DRAINAGE (7) REMOVE ALL CONCRETE BENCHES (5) REMOVE EXISTING STEEL PIPE FENCE (D INSTALL ANODIZED ALUMINUM RAILING Q) REMOVE EXISTING PCC WALKWAY d) ALL SALVAGED ELECTRICAL EQUIPMENT SHALL BE DELIVERED TO PARKS (D EXISTING RETAINING WALL TO REMAIN @ CONSTRUCT 4" P.C.C. WALKWAY (n) CONSTRUCT 12' WIDE CURB © EXISTING CONCRETE CURB ALONG THE ENTIRE PIPE RAIUNG TO REMAIN EXISTING RESTAURANT PARKINC TO REMAIN OPEN EXISTING SLOT DRAIN TO REMAIN CONSTRUCT 43 L.F. OF MOWING STRIP PER SDRSD L-J. SEE DETAIL ON SHEET 4 SAW CUT. REMOVE SOUTH WALL. FINISH SAWCUT AREA OF NORTH WALL REMOVE POOLS FILL AND COMPACT TO 90Z EXISTING CONDUIT, WIRING Se PULL BOXES TO REMAIN EXISTING WATER SERVICE TO REMAIN REMOVE EXISTING VALVES Sc CAP LIMITS OF DEMOLITION SCALE I = 10 DATE ENeNEtR OF WORK 'ISION DESCRIPTION 3THF.S APPRnV4i. 2 CITY OF CARLSBAD PUBLIC wnPKS DEPARTMENT SHEEtsl 4 SCULPTURE PARK DEMOLITION PLAN APPROVEO UOYD HUBBS nwN RY- SFF CHKD ev PC PROJECI NO 3615 DRAWINO NO. 371-4 NOTES: ® CRAOf SITE AND SLOPE SOLS AT 4:1 FROU SURROUNDING AREA (NO COMPACTION IS NECESSARY) Q) NORTH HALL SLOPES SHALL BE CONSTRUCTED ONE (I) FOOT FROU THE TOP OF THE WALL AT 4:1 TOWARDS THE CENTER OF THE PARK Q) FILL AND COUP ACT TO SOX SHEET 3 CITY OF CARLSBAD PUBLIC WORKS DEPARTMENT SHEETS 4 SHEET 3 CITY OF CARLSBAD PUBLIC WORKS DEPARTMENT SHEETS 4 SCULPTURE PARK GRADING SCULPTURE PARK GRADING SCULPTURE PARK GRADING SCULPTURE PARK GRADING SCULPTURE PARK GRADING APPROVED UOYD HUBBS APPROVED UOYD HUBBS PUBLIC WORKS DIRECTOR PE25889 EXPIRES/2/JI/0)DATE DATE INITIAL REVISION OESCRIPTION DATE INITIAL OATt INITIAL DWN BY: CHKD 8> RVWD B~i Pf PROJECT IMO. 36/5 DRAWING NO 37/-4 ENGINEER OF WORK REVISION OESCRIPTION OTHER APPROVAL CITY APPROVAL DWN BY: CHKD 8> RVWD B~i r PROJECT IMO. 36/5 DRAWING NO 37/-4 NOTE- • CHANGES OF DIRECTION SHALL BE DOUBLE POSTED. • CHANGES OF PITCH SHALL BE MITRED AT POST --/'•'i^i'h TQp i)iil • POSrS ^WD PICKETS SHALL ALWAYS BE VERTICAL. 1/2-5 RAIL © 5" O.C. TYPICAL y-0~ TYP ELEVATION 1/2' = I'-O' RETAINING WALL -TORCH Sc REMOVE EXISTING PIPE FENCE T'iP. # EACH PICKET (SEE 5Pf.CS; SEE NOIL (J) EXISTING CURB DETAIL SECTION C-C r = r-o" Nf IV ANODIZED ALUMINUM RAILING FILL WITH SET 45 4~ O.D. SCH 40 GALV STEEL PIPE EXISTING NORTH/SOUTH RETAINING WALL 1-1/2' = r-0' NOTE: • ALL ALUMINUM CONNECTORS TO BE 6063 T-6 FINISHED IN CLEAR ANODIZE. • NEW RAILING TO BE 4" MAX. AWAY FROM EXISTING NORTH GUARD RAIL. • 1/2" EXPANSION JONTS ARE REOUIRED AT 50' SPACING • DO NOT USE CALCIUM CHLORIDE OR EQUIV ADDITIVE IN CONCRETE 1' 1 I / : NEW MOWING STRIP SEE NOTE 16 SHEET 1 PICKET 5 OPEN SP.^.Ct 2~a °Dsr je" Q.t BO r rev RAH :J X x /t TRIM PLA !E SLOT DRAIN DETAIL 1/2" = T-O' ^-1/4" RAOn 6" SECTigN 3" lyiQ" EXISTING SLOT DR I I I I I'l I I I 11 I I I I I / J//6" ZW MOWING STRIP- ANODIZED ALUMINUM FENCE DETAIL SLOT DRAIN SECTION D-D 1-1/2' = I'-O" WEAKENED PLANE JOINT MAX.. 20 FT O.C. 3" = T-n" .FXiSTiNG RETAINING WALL TO HtMAiN NOTES- (2) CORE NEW 4' HOLES (3) EXISTING PIPE HOLES TO BE FILLED WITH CONCRETE (SEE SPECS) 4" O.D SLEE^/E NOTES: © CONSTRUCT 12" x 14' CURB. TOP OF CURB ELEV. TO MA TCH EXISTING CURB Sc RETAINING WALL INSTALL 4' O.D. STEEL SLEEVES IN FRESH CONCRETE NEW CURB DETAIL SECTION B-B 1" = I'-G" i SHEET 4 CITY OF CARLSBAD PUBLIC WORKS DEPAPTMENT : SHEETS: I.A..J SHEET 4 CITY OF CARLSBAD PUBLIC WORKS DEPAPTMENT : SHEETS: I.A..J i SCULPTURE PARK FENCE DETAILS i ! SCULPTURE PARK FENCE DETAILS ! f SCULPTURE PARK FENCE DETAILS ! f SCULPTURE PARK FENCE DETAILS SCULPTURE PARK FENCE DETAILS I APPSGVLC' LLOYD HUBBS APPSGVLC' LLOYD HUBBS . i— pueiiC WORKS DIRECTOR PE2Jaa9 EXPIPESI^/JI/O/OATE OATE 1 IMTIAL REVISION DE5CRIFT:0N DATE ; INITIAL OTHFR ApFROVAL DATE •NiTIAL O'AN BY: CHKD B> Rvm 3' Sff Pf PROJECT NO. 36/5 ;DSAMNG NO.: ! 371-4 i tNC.iNE£K Of WORK REVISION DE5CRIFT:0N DATE ; INITIAL OTHFR ApFROVAL CITY APPROVAL O'AN BY: CHKD B> Rvm 3' PROJECT NO. 36/5 ;DSAMNG NO.: ! 371-4 i tNC.iNE£K Of WORK REVISION DE5CRIFT:0N DATE ; INITIAL OTHFR ApFROVAL CITY APPROVAL