HomeMy WebLinkAboutCDP 98-89; Carlsbad Pacific Center Phase III; Coastal Development Permit (CDP)DEC.-15-98 TUB 1 1 : OB 1SS it*liU. <OU<i-iOUU40
C»19 *XS 4787 P. O2
CITY OF CARLSBAD
LAND USE REVIEW APPLICATION
1) APPLICATIONS APPLIED ROR: (C
Q Administrative Permit - 2nd
Dwelling Unit
Q Administrative Variance
]52 Coastal Development Permit
O Conditional Use Permit
Q Condominium Permit
Q Environmental Impact
Assessment
Q General Plan Amendment
Q Hillside Development Permit
Q Local Ccmstal Plan Amendment
Q Master Plan
J59 Non-Residential Planned
Development
Q Planned Development Pcunit
:HECK BOXES)
IFOR DEPARTMENT
USE ONLYt
COP IG-FI
9uV 15^07
[~1 Planned Industrial Permit
Planning Commission
Determination
C3 Precise Development Plan
Q Redevelopment Permit
IS Site Development Plan
O Special Use Permit
Q Specific Plan
Obtain from Engrnetring Dtpwnvnt
D 1 entative Tract Mep
d Variance
Q Zone Change
Q 1 1st other applications not
specified
IFOR DEPARTMENT
USE ONLY)
^ #~;?J
21 ASSESSOR PARCEL NO(S).: 'Z-W ' 100
3) PROJECT NAME:flht&e
4) BRIEf DESCRIPTION OF PROJECT:
5LDWNER NAME or 6)APPLICANT NAME (Print or Type)ttfr* 1- P.
MAILING ADDRESS
CITY AND STATE ZIP LEPHONE CITY AND STATE ZIP TELEPHONE
\ CERTtfY THAT 1 AM THE LEGAL OWNER AND THAT AH. THE ABOVt
INFORMATION IS TRIJF AND CORRECT TO tne BEST OF MY
KNOWLEDGE.
1 CERTIFY THAT 1 AM THE LEGAL REPRESENT A TIV6 Of THE
OWNER AND THAT ALL THE ABOVE INFORMATION is TRUC AND
CORRECT TO THE BEST OF MY KNOWLEDGE.
OATE $l(3NAt#DATE
7) BRIEF LEGAL DESCRIPTION
NOTE: A PROPOSED PROJECT REQUIRING MULTIPLE APPLICATIONS BE FILED, MUST BE SUBMITTED TOO* TO 3:30 P.M.
A PROPOSED PROJECT REQUIRING ONLY ONE APPLICATION BE FILED. MUST BE SUBMITTED PRIOR TO 4:00 P.M.
Form 16 PAQE 1 OP 2
DEC-15-98 TUE 11:10 PRENT1SS PROPER!i ES
- O«c-15-98 1X:15A Snryh Cosultincj
NO.
619
r. uo
P.O3
B) LOCATION Of PROJECT;
ON THE
BETWEEN
(NORTH. SOUTH. EAST. WiST)
(NAME OF STREET)
9) LOCAL FACILITIES MANAGEMENT ZONE
10) PBOPOStU NUMfltK OF UU1S
13} TYPE OF SUBDIVISION
16) PERCENTAGE OF PROPOSED
PROJECT IN OPEN SPACE
19) GROSS SITE ACREAGE
22) EXISTING ZONING
11) NUMBER OP EXISTING
RESIDENTIAL UNITS
.14) PROPOSED IND OFFICE/
SQUARE FOOTAGE ,
17) PROPOSED INCREASE IN
ADT
20) EXISTING GENERAL
PLAN
23) PROPOSED ZONING
12) PROPOSED NUMBER OF
RESIDENTIAL UNITS
15) PROPOSED COMM
SQUARE FOOTAGE
18» PROPOSED SEWER
USAUfc IN EOU
71J PROPOSED GENERAL
PLAN DESIGNATION
IN THE PROCESS OF REVIEWING THIS APPLICATION IT MAY BE NECESSARY TOR MEMBERS OF CITY
STAFF, PLANNING COMMISSIONERS, DESIGN REVIEW BOARD MEMtBERS OR CITY COUNCIL MEMBERS
TO INSPECT AND ENTER THE PROPERTY THAT IS THE SUBJECT OF THIS APPLICATION. I/WE CONSENT
TO ENTRY FOR THIS PURPOSE
FOR CITY USE ONLY
FEE COMPUTATION
APPLICATION TYPE FEE REQUIRED
CO?
ft/P
TOTAL FEE REQUIRED f
RECEIVED
DEC 1 5 1998
CITY OF CARLSBAD
RECEIVED BY:
DATE FEE PAID RECEIPT NO.
Forni 16 PAGE 2 OF 2
CITY OF CARLSBAD^- /
1200 CARLSBAD VILLAGE DRIVE CARLSBAD, CALIFORNIA 92008
434-2867
REC'D FROM rh t *i •/ / v-1rh r/'a ./>t~/ sf DATE.
ACCOUNT NO.
^//Anu-f
•
»
•_
DESCRIPTION
OftP QX--M (*i, WO x. /o) .
SAP 'Qfrd-K
"A/A <%/n
4446 12/15/98
-
RECEIPT^®. 58990 NOT VALID UNLESS VALIDATED BY TOTAL
AMOUNT
v/^j iy
^^4
/^ 1 —
0001 01 02 >
iii
!ii
t
j/f~/~) \
Fiimolaancycled piper.CASH REGISTER
- i iJfca.-L^tfljfr
le City of Carlsbad Planning Department
A REPORT TO THE PLANNING COMMISSION
Item No. I 4
P.C. AGENDA OF: April 21,1999
Application complete date: January 12, 1998
Project Planner: Van Lynch
Project Engineer: Ken Quon
SUBJECT: SDP 98-23/CDP 98-89 - CARLSBAD PACIFIC CENTER - PHASE III -
Request for approval of a site development plan and coastal development permit
for a 41,000 square foot, three-story office building with at-grade parking on 2.05
acres on the east side of Avenida Encinas and south of Palomar Airport Road
within Local Facilities Management Zone 3.
I. RECOMMENDATION
That the Planning Commission ADOPT Planning Commission Resolution No. 4518
APPROVING the Negative Declaration, and Planning Commission Resolutions No. 4519 and
4520, APPROVING SDP 98-23 and CDP 98-89, based on the findings and subject to the
conditions contained therein.
II.INTRODUCTION
These applications propose the development of a 41,000 square foot, three story office building.
This building is the third of a three building development in a campus-like setting. The existing
two buildings were built in 1986 and 1988. The property had been previously subdivided by
minor subdivision 747 into three lots and each building has its own lot. The site has been
previously graded and is currently landscaped with a grass lawn. The project takes access from
Avenida Encinas and through the project site via a shared access and parking agreement that is
currently in place. The site development plan is required because the project falls within the
Palomar Airport Influence area. The project will not have any impacts to the environment and a
Negative Declaration has been issued. The project is in compliance with all City standards and
all issues have been resolved.
III. PROJECT DESCRIPTION AND BACKGROUND
The applicant is requesting the Planning Commission approve a site development plan and a
coastal development permit for a 41,000 square foot, three-story office building on a 2.05 acre
site located on the east side of Avenida Encinas, south of Palomar Airport Road and west of the
southbound on-ramp of Interstate 5. The property is General Plan designated as Planned
Industrial and is zoned Manufacturing. This building is the third building of a three phase
development in a campus-like setting. The first building was built in 1986 and is a 50,765 sq. ft.
three story office building. The second building was completed in 1988 and is a 44,200 sq. ft.
three story office building. These buildings were parked at a ratio of one parking space per 300
square feet of floor area, which was the requirement at the time. The new building will provide
its share of parking at the current parking ratio of one parking space per 250 square feet of gross
floor area, which is 164 spaces. The first two buildings did not require site development plans
o
SDP 98-23/CDP 98-89 - CARLSBAD PACIFIC CENTER, PHASE^III
April 21,1999
Page 2
because at that time the Palomar Airport Influence Area did not extend out as far as the project
site. The Palomar Airport Influence area has since been expanded and now covers the project
site.
The new building is located on the rear lot of the three lot development site. Access is gained
through a single driveway off of Avenida Encinas. A common driveway system and vehicle
parking currently encircles the project site. Additional parking is proposed in the northwestern
and southeastern portions of the site. A campus-like setting is formed between the existing two
buildings and will be expanded with the third building. This area includes concrete hardscape
and walkways, fountain, bench seating, and landscaping. The new building will have two
exterior patio areas, both with an eating area consisting of tables and benches and a seatwall.
The proposed building is 80 feet from the southerly property line and 158 feet from the easterly
property line which is also adjacent to the Interstate 5 southbound onramp. The existing building
to the west will have a building separation of 20 feet and the building to the north will have a
separation of 71 feet from the new building.
The building is similar in design as the initial two buildings and is nearly a mirror image of the
second (southerly) building constructed. An open patio area is formed at the buildings main
entrance by a 25-foot tall triangular open framed structure projecting off the north elevation of
the building. The proposed building materials are similar to the existing, but varies slightly so as
to complement the existing building's colors. The building is predominantly glass with a blue
color. A horizontal silver glass band, or spandrel, is proposed above and below the blue glass
portion of each floor. Two horizontal white spandrels are located between the first and second
and second and third floor levels. All of the glass panels will have a white window frame, or
mullion, which is similar to the existing buildings. The building is 37 feet, 7 inches to the roof
line. A portion of the northern elevation has a four foot parapet which adds vertical relief and
makes the building 41 feet, 7 inches tall on this elevation. The building's finish floor for the site
is 4.6 feet higher than the other two building's finish floor. The building's mechanical heating
and cooling equipment will be located in an expanded mechanical enclosure presently located
along the southerly property line.
The proposed grading for the site requires the export of 2,100 cu. yds. of material to complete the
building pad and expansion of the parking areas. This is required for the finish grading to ensure
adequate site draining and preparation of the building pad. The existing grades are not expected
to change more than one to two feet in elevation.
General Plan, Zoning & Existing Land Use for the Site and surrounding area.
The following table lists the general plan, zoning, and existing land use for the project site and
surrounding properties:
/•"S
SDP 98-23/CDP 98-89 - CARLSBAD PACIFIC CENTER,
April 21,1999
Page 3
PHASE*UI
Site
North
South
East
West
GENERAL PLAN
PI
PI
PI
TC
PI
ZONING
M
M
M
TC
M
EXISTING LAND
USE
Vacant development
pad
Office building
Manufacturing
buildings
1-5 freeway
Office building
PI (Planned Industrial), M (Manufacturing), TC (Transportation Corridor)
Site Description
The existing lot, subdivided in 1988, is 2.05 acres in size and has frontage onto Avenida Encinas,
a public street. The project building site consists of a vacant, graded development pad and has
been maintained as a grass lawn area. The future parking areas are both landscaped and
unimproved lands. There are no sensitive vegetation habitats on the property.
Applicable Regulations
The proposed project is subject to the following plans, ordinances and standards as analyzed
within the following sections of this staff report:
A. Planned Industrial (PI) General Plan Land Use designation;
B. Manufacturing (M) Zone;
C. Comprehensive Land Use Plan for McClellan-Palomar Airport;
D. Mello II Segment of the Local Coastal Program and the Coastal Resource Protection
Overlay Zone - Carlsbad Municipal Code, Chapter 21.203; and
E. Growth Management regulations.
IV. ANALYSIS
The recommendation of approval was developed by analyzing the project's consistency with the
applicable policies and regulations listed above. The following analysis section discusses
compliance with each of these regulations/policies listed above in tables and project specific
discussion.
A. General Plan
The proposed project is consistent with the policies and programs of the General Plan. The table
below indicates how the project complies with the elements of the General Plan which are
particularly relevant to this proposal.
SDP 98-23/CDP 98-89 - CARLSBAD PACIFIC CENTER, PHASED!
April 2 1,1999
Page 4
ELEMENT
Land Use
Circulation
Housing
Public Safety
USE,
CLASSIFICATION,
GOAL, OBJECTIVE,
PROGRAM
Planned Industrial
Provision of adequate
roadways and
intersections and safe
access to the project site
Potential housing linkage
fee pending further study
Pedestrian, fire, structural,
geotechnical, and flood
safety standards
PROPOSED USES &
IMPROVEMENTS
Professional Office Building
All public streets and
intersections in the project area
have been constructed and the
driveway leading to Avenida
Encinas meets separation and
sight distance standards.
Project has been conditioned to
pay a linkage fee pending fee
adoption.
The lot is graded to engineering
standards and all public
sidewalks, curb, gutters, fire
hydrants, street lights, drainage,
and sewer facilities have been
provided to serve the site. The
building must meet Uniform
Building and Fire codes prior to
building permit issuance.
COMPLIANCE
Yes
Yes
Yes
Yes
B. Zoning
The Zoning designation of the property is Manufacturing (M). The M zone allows industrial
uses as well as uses permitted in the Commercial-Manufacturing (C-M) zone, which allows
heavy commercial and limited industrial uses and other commercial and industrial businesses or
enterprises. The office building would support such uses as commercial and industrial
businesses. The project meets or exceeds all the applicable requirements of the M zone as
demonstrated in the table below:
STANDARD
Front yard setback
Side yard setback
Rear yard setback
Building Height
Employee eating areas
Parking**
Building coverage
REQUIRED
None required
None required
None required
*35 feet / 3 levels. Allowed
protrusions per Section
21.46.020 are allowed to 45 feet
300 sq. ft. per 5000 sq. ft. of
floor area (2,460 sq. ft.).
One space per 250 sq. ft. of floor
area (164 spaces required). 25%
may be compact (41)
No requirement
PROPOSED
Existing front building maintains
151-foot setback. New building
is behind front building
80-setback
158-foot setback
37 feet, 7 inches / 3 levels.
Parapet walls, an allowed
protrusion, extend to 41 feet, 7
inches
2,460 sq. ft. provided outdoors.
167 spaces. (120 standard, 41
compact, and 6 handicap spaces)
15 percent
SDP 98-23/CDP 98-89
April 21,1999
Paee5
-CAM,SBAD PACIFIC CENTER, PHASE
* Building height may be increased with an equal increase in required yards. The two-foot seven inch increase is
provided in the proposed building setbacks.
** Since a portion of the subject site is currently used for parking and circulation for the other two lots, the lot
already is included in the project's reciprocal ingress, egress and parking easement.
Comprehensive Land Use Plan for McClellan - Palomar Airport
The project is located within the Airport Influence Area for McClellan - Palomar airport. The site
is outside the 65 CNEL noise contour for Palomar Airport. The property is approximately 2
miles west of the airport. The airport land use plan identifies the use as being compatible with
the noise levels for the site. The project was sent to San Diego Association of Governments staff
and the Airport Manager for the review and was found to be in conformance with the airport land
use plan.
Mello II Segment of the Local Coastal Program
The project is located in the Coastal Zone and is subject to the policy requirements of the Mello
II Segment. It is not located near a coastal bluff, shoreline, stream, lagoon or the ocean, and will
not impact public access to any coastal resources. The project site is already graded, contains no
native habitat, and the project will not impact agricultural resources or operations in the area.
Even though the site has been rough-graded, the minor proposed cut amount of 2,100 cubic yards
to prepare the site for construction and ensure proper site drainage. The project will require the
issuance of a grading permit. The site is not located in any coastal viewshed area and will not
negatively impact coastal view resources. The project must comply with the City's Storm Water
Management Ordinance and meet all standards of the City's NPDES Permit to reduce urban
pollutant runoff from the site. Therefore, the project is in compliance with the Mello II Segment
policies and will not negatively impact the resources of the Coastal Zone.
Growth Management
The proposed project is located within Local Facilities Management Zone 3 in the southwest
quadrant of the City. The impacts on public facilities created by the project, and its compliance
with the adopted performance standards, are summarized in the table below:
GROWTH MANAGEMENT COMPLIANCE
STANDARD
City Administration
Library
Waste Water Treatment
Parks
Drainage
Circulation
Fire
IMPACTS
N/A
N/A
Encinas
N/A
Basin C
820 ADT
Station No. 4
COMPLIANCE
N/A
N/A
Yes
Yes
Yes
Yes
Yes
cSDP 98-23/CDP 98-89 - CARLSBAD PACIFIC CENTER, PHASE*1lI
April 21, 1999
Page 6
GROWTH MANAGEMENT COMPLIANCE
STANDARD
Open Space
Schools
Sewer Collection System
Water
IMPACTS
N/A
N/A
23EDU
5,011GPD
COMPLIANCE
N/A
N/A
Yes
Yes
V. ENVIRONMENTAL REVIEW
The initial study (EIA-Part II) prepared in conjunction with this project determined that the
project would not have a significant impact on the environment. The project is considered an in-
fill type of development that is consistent with the General Plan and zoning. The project falls
within the scope of the City's MEIR for the City of Carlsbad General Plan update (EIR 93-01)
certified in September, 1994, in which a Statement of Overriding Considerations was adopted for
cumulative impacts to air quality and traffic. An Average Daily Trip (ADT) of 820 would be
generated by the proposed project. This ADT is consistent with the generation rate analyzed for
the site in the MEIR. All feasible mitigation measures identified by the MEIR which are
appropriate to this project have been incorporated into the site design.
The City has received its annual Growth Management Traffic Monitoring Report. The Report
has recorded an unanticipated intersection "level of service" (LOS) failure at Palomar Airport
Road (PAR) and El Camino Real (ECR) during both the a.m. and p.m. peak hours. This
potentially creates a changed circumstance negating reliance on previous environmental
documentation. Pursuant to §15162 of the CEQA Guidelines a lead agency must prepare a
"Subsequent" environmental documentation if substantial evidence (i.e., the recorded
intersection failure) determines that a changed circumstance exists. However, case law has
interpreted this section of the CEQA Guidelines to not require the preparation of a "Subsequent
EIR" if mitigation measures are adopted which reduce the identified impacts to a level of
insignificance.
A mitigation measure has been identified which, if implemented, will bring the peak hours LOS
into the acceptable range. The mitigation measure involves construction of two dual right turn
lanes-northbound to eastbound and westbound to northbound. This project has been conditioned
to pay its fair share of the intersection "short-term improvements" thereby, guaranteeing
mitigation to a level of insignificance.
The project site has also been disturbed by authorized grading. The surrounding properties are
developed with industrial and commercial land uses and all the support utilities and service
infrastructure have been constructed. See the Environmental Assessment Form-Part II for a
detailed description of the justification to recommend approval of the Negative Declaration. In
consideration of the foregoing, on January 25, 1999, the Planning Director issued a Negative
Declaration for the proposed project. The environmental document was noticed in the newspaper
and no public comments were received during the 30 day public review and comment period.
SDP 98-23/CDP 98-89 - CARLSBAD PACIFIC CENTER, PHASEm
April 21, 1999
Page?
ATTACHMENTS:
1. Planning Commission Resolution No. 4518 (Negative Declaration)
2. Planning Commission Resolution No. 4520 (SDP)
3. Planning Commission Resolution No. 4519 (CDP)
4. Location Map
5. Background Data Sheet
6. Local Facilities Impact Assessment Form
7. Disclosure Statement
8. Reduced Exhibits
9. Full Size Exhibits "A" - "G" dated April 21,1999
VL:mh:eh
PALOMAR AIRPORT RD
CARLSBAD PACIFIC CENTER
PHASE II
SDP 98-23/CDP 98-89
BACKGROUND DATA SHEET
CASE NO: SDP 98-23/CDP 98-89
CASE NAME: Carlsbad Pacific Center Phase III
APPLICANT: Prentice Properties
REQUEST AND LOCATION: 41.000 sa. ft. office building located on the east side of
Avenida Encinas and south of Palomar Airport Rd.
LEGAL DESCRIPTION:
APN: 210-100-16-00 Acres: 2.05 Proposed No. of Lots/Units: N/A
GENERAL PLAN AND ZONING
Land Use Designation: Planned Industrial TPD
Density Allowed: N/A Density Proposed: N/A
Existing Zone: Manufacturing (M) Proposed Zone: Manufacturing CM)
Surrounding Zoning, General Plan, and Land Use:
Zoning General Plan Land Use
Site Manufacturing Planned Industrial (PI) Vacant/parking lot
(M)
M
M
PI
PI
Office building
Industrial building
East Transportation 1C Freeway
Corridor (TC)
West M PI Office building
PUBLIC FACILITIES
School District: Carlsbad Water District: Carlsbad Sewer District: Carlsbad
Equivalent Dwelling Units (EDU) (Sewer Capacity): 23 EDUs
Public Facilities Fee Agreement, dated: December 10.1998
ENVIRONMENTAL IMPACT ASSESSMENT
/\ Negative Declaration, issued January 25. 1998
Certified Environmental Impact Report, dated
Other,
CITY OF CARLSBAD
GROWTH MANAGEMENT PROGRAM
LOCAL FACILITIES IMPACTS ASSESSMENT FORM
PROJECT IDENTITY AND IMPACT ASSESSMENT:
FILE NAME AND NO: Carlsbad Pacific Center. Phase III - SDP 98-23/CDP 98-89
LOCAL FACILITY MANAGEMENT ZONE: 3 GENERAL PLAN: Planned Industrial TPD
ZONING: Manufacturing flVf)
DEVELOPER'S NAME: Prentice Properties
ADDRESS: 703 Palomar Airport Rd. suite 250. Carlsbad Ca 92009
PHONE NO.: (760^931-7634 ASSESSOR'S PARCEL NO.: 210-100-16-00
QUANTITY OF LAND USE/DEVELOPMENT (AC., SQ. FT., DU): 41.000 sq. ft.
ESTIMATED COMPLETION DATE: unknown
A. City Administrative Facilities: Demand in Square Footage = N/A
B. Library: Demand in Square Footage = N/A
C. Wastewater Treatment Capacity (Calculate with J. Sewer) N/A
D. Park: Demand in Acreage - N/A
E. Drainage: Demand in CFS = N/A
Identify Drainage Basin = C
(Identify master plan facilities on site plan)
F. Circulation: Demand in ADT= 820
(Identify Trip Distribution on site plan)
G. Fire: Served by Fire Station No. = 4
H. Open Space: Acreage Provided = .5 ac
I. Schools: N/A
(Demands to be determined by staff)
J. Sewer: Demands in EDU 23
Identify Sub Basin = C
(Identify trunk line(s) impacted on site plan)
K. Water: Demand in GPD= 5.011
City of Garlsbad
^* T^BPl^<^UMB^BBi^B^"i^lMl^a^l^aM^B^M^J^Planning Department
DISCLOSURE STATEMENT
Applicant's statement or disclosure of certain ownership interests on all applications which will require
discretionary action on the part of the City Council or any appointed Board. Commission or Committee.
The following information MUST be disclosed at the time of application submittal. Your project cannot
be reviewed until this information is completed. Please print.
Note:
Person is defined as "Any individual, firm, co-partnership, joint venture, association, social club, fraternal
organization, corporation, estate, trust, receiver, syndicate, in this and any other county, city and county, city
municipality, district or other political subdivision or any other group or combination acting as a unit."
Agents may sign this document; however, the legal name and entity of the applicant and property owner must be
provided below.
1. APPLICANT (Not the applicant's agent)
Provide the COMPLETE, LEGAL names and addresses of ALL persons having a financial
interest in the application. If the applicant includes a corporation or partnership, include the
names, title, addresses of all individuals owning more than 10% of the shares. IF NO
INDIVIDUALS OWN MORE THAN 10% OF THE SHARES. PLEASE INDICATE NON-
APPLICABLE (N/A) IN THE SPACE BELOW. If a publiclv-owned corporation, include the
names, titles, and addresses of the corporate officers. (A separate page may be attached if
necessarv.)
' A///?Person
Title
SEE ATTACHED EXHIBIT "A".
Corp/Part
Title
Address Address
OWNER (Not the owner's agent)
Provide the COMPLETE. LEGAL names and addresses of ALL persons having any ownership
interest in the property involved. Also, provide the nature of the legal ownership (i.e.
partnership, tenants in common, non-profit, corporation, etc.). If the ownership includes a
corporation or partnership, include the names, title, addresses of all individuals owning more
than 10% of the shares. IF NO INDIVIDUALS OWN MORE THAN 10% OF THE SHARES,
PLEASE INDICATE NON-APPLICABLE (N/A) IN THE SPACE BELOW. If a publiclv-
owned corporation, include the names, titles, and addresses of the corporate officers. (A separate
page may be attached if necessary.)
Person,
Title
/I'/A SEE ATTACHED EXHIBIT "B".
Corp/Part
Title
Address Address
2075 Las Palmas Dr. - Carlsbad, CA 92009-1576 • (76O) 438-1161 • FAX (760) 438-O894
oNON-PROFIT ORGANIZATION OR TRUST
If any person identified pursuant to (1) or (2) above is a nonprofit organization or a trust. list the
names and addresses of ANY person serving as an officer or director of the non-profit
organization or as trustee or beneficiary of the.
Non Profit/Trust N/A Non Profit/Trust N/A
Title
Non Profit/Trust.
Title
Address Address
Have you had more than $250 worth of business transacted with any member of City staff.
Boards, Commissions, Committees and/or Council within the past twelve (12) months?
Yes FxlNo If yes, please indicate person(s): N/A
NOTE: Attach additional sheets if necessary.
1 certify that all the above information is true and correct to the best of my knowledge.
Owner:
PRENTISS PROPERTIES ACQUISITION
PARTNERS, L.P.,
a Delaware limited partnership
By: PRENTISS PROPERTIES I, INC.,
a Delaware Corporation,
its sole general nartner
Nforie: J.KEVAN DILBECK
Vice President
Title:
By,
Applicant/Developer:
PRENTISS PROPERTIES LIBdTED, INC.,
aDelaw
.e,
By:.
Name:
Title:
By:.
Date:
J. KEVAN DILBfcC
Vice President
to
"^^^N JXftl
,1998
Date:/O ,1998
H:ADMIN\COUNTER\DISCLOSURE STATEMENT 5/98 Page 2 of 2
c
Thomas F. August
David C. Robertson
Mark R. Doran
Michael A. Ernst
Gregory S. Imhoff
J. Kevan Dilbeck
EXHmiTA
Officers of Prentiss Properties I, Inc.
President
Senior Vice President
Executive Vice President & Chief Financial Officer
Senior Vice President & Treasurer
Vice President & Secretary
Vice President & Assistant Secretary
Thomas F. August
David C. Robertson
Mark R. Doran
Michael A. Ernst
Gregory S. Imhoff
J. Kevan Dilbeck
EXHmiTB
Officers of Prentiss Properties I, Inc.
President
Senior Vice President
Executive Vice President & Chief Financial Officer
Senior Vice President & Treasurer
Vice President & Secretary
Vice President & Assistant Secretary
U&-11U. (619)
OtIU \OtfcKJ-S
HI |WUBd jkji fiiijiiiiii
EU (419)cu Un)o
SJ091JLJOJV"
SSLLN35)d
III
J9UI8O 3U|08d i Itiill
s. a. a
iiiliii
T-V-TI InH
ss
M
s! a a.
Pi
«s< 3& £
^ fe|»8 g
»P i2*8? «5
-Ui fell)-fti ton)S3UX3dO>ld SSLLN3SJ
O '•mvodWIII |0ai»d tt
tl
--
§
Q-
T3 ;
«J UiV-tti (619)
OCItt YD1**]**?OR*nsmcmiQQ onti o S3iix3do>id ssiiNaxd mtm
V3'P«mn3 '•putndj|v.iBuio|Bd9(U
HI |60JBd I fthi
5 3' S; ¥ 8:'
lilllijit1!
jfl
•ij
—a-
8!
LLi
m Material / Color Board Key
MJLLW* DUJi LOCK - (
i mint
South Elevation
mmmmmm
Wact Elevation Eact Elevation
m m ^ ^ SJS ^ ^ ^
North Elevation
s!<P So
o<
IO
CO
3 a
1 &-S "J
Dear DMtaprrwt
PhnOwh
BUStt
PvrHtSet
Can*uctenS«
A5
PAKOS 1J. MC 3Cf MKfL Mf WHncarrcF CMUWA cowrr er sw «Em
SniF OF OtLmMH jKOCHQMB TO Of **fMHEF w urn. ntDMrne amc or *fCOUITY MEcanet v sw one canrr,
EASEMENT NOTE:cusnw pxanc mi ouacitr wt ooaKCCHDCD j-fj-fi «tjt m n-oiioTM^ anIS A OOCWi EUEUENT «IH W i.OC*«W SET FOMTH
HO-IOO-J9tio-m-a&t>~too-<?PARCEL ,MAP 1310
MHCHMAHK
ac oan TOP i/r m N oawcvr M10 fUT NOflMEST WM9t me HO <I55Ma* Mf Mtm or a HHJOCCTKH v
a OUWD KM ** ^«OKWF MFORT MUD££t* 2H.9M (MMtlACi * 0.5.
oasme wo ftuo) w AS-MTno/) tanaiixwr (Wv ittt)
CUT (TO m» sarus) • uoc cr«i fro mm IMTM^ - *oo criMORun - onerararr - zroo cr
tTOBM DRAM NOT«8
OffSWC STOW OUN S)STCWro REMAM MD sr t/nmiD nw
ffC KHUHHG MfAS TO Bf
ORADINQ AND DRAMAat
ARTNERS
and Engineering
CO 1 §
-0
I,
0)
Oo
fO
CO
< °°11 E> j -is? £to
10p
]
g
MS«
PlmttStt
CnndknU
°~*|t»» ^,.»
C1
WATER CONSERVATION NOTES
POLLOWWO WA-BH CONSBJVATION TEOMOUES WA_L BE EMPLOYE) K -MB
JTUZCD TO fcpoove «ATBI HOLONO CAPAOTY or sou
AREAS or n« LANDSCAPE BASBD
DEOON Eoemve -o SLOPE FACTORS.
CONJJCTION MTU ive AUTOMATC BOWATION STBTBA
vON FOR AWJAL BRBATON aCMEDLLE.
LANDSCAPE WATR UBB CERmCATUN MTU 8LPW3JTN3 DATA t> CO^UANCE VVTUSTATE OF CAUFOOMA WATBT EFFKENCY ORDNANCE FOR APPROVAL OMAU. BE SLBMTTH3WTH LAWeCAPE COBTOUCTCN DOOJK04T BUBMTTAL TQ TMB CITY,
AM AUTOMATIC BBBATON STSTW WU flE PBOVOED WTV- AU- BOL**»^r aLTABLa FOBe use OF aeoLAM*D WATR AND MEALTM CWWTXW^T BEOLREKCNTS RBLATTVC TO* E VAL APPLY TO Tl«
LANDSCAPE CONCEPT STATEMENT
TV* LAMMCAPE CONCST MTBCRATES A ^ew J-STQHY BLLONC NTO TV«
Of H* DCBTN8 OfmjCFUCtf V*4fi a»POOCMO TH- AHCMTECTLBAl.N Tve -WOSCAPE THS « Aa-evm TUKXJO-I TME esTMUQMwmr o»*
ur OF LAN36CAPE ZONE& UTUZfJO TI9EE5 AND 9-OlflS FROM n<906TNO FUU4T PALETTB. TVB PADKNQ AREAS FEATLBE EVBN8EEN CANCPTTIKE9. UWOaPLANTH) V«TV- FLOVWDNO SMUBS AND OROLWCOvaiS. TVC
BUU3NO FACADES A« ACCmTED WTX4 VBTTCAL OeCOuOUS TBBCS.PROVDE FALL COLOR, Ate A FLOWBBMO KOOC ACOLFO TK PB»TTBLJL3N8 CEM^DCES TVE COVTNJTT WTTV' TbE ADJAC04T BULOMB (PARCELrLOwnxe CANOPY TRKS AND LM»?STC»T ^VANTNQS VBUALLT re TICEM8TN8 CajTRAL COJTTA8O AND FOLNTAM TO ThC NEW BLLDNQ, WAEscaevns races PTOVDC A BLWBJ BgrwgSN tve NEW pA&n« AHEASAXACBVBTES.
PRELMNACY PLANT PALETTE PCELJMMARY PLANT PALETTE (CONT.'D)
APPROX
SZE On, COMMENTS
POHEOBOUMJ
AND PA0OM LOT
*™*«««Ll»/
^EBA
ANNUAL COLOB
gBCALLglA
-JACKBVAWT
PLANTING ZONE PERCENTAGES
ZOK AREA 1 OF BTTE LAF06CAPE
LANDSCAPE TABULATIONS
MANTB^ANCE BESPO>SBUTeS TOTAL rtM. LANOOCApe APSAJ LANDSCAPE CONCEPT/
WATER CONSERVATION PLAN "
•z.u
L-1