Loading...
HomeMy WebLinkAboutCDP 99-10; Mijuskovic Residence; Coastal Development Permit (CDP) (12)JRN-19-2000 19=05 FROM PRJ MGMT NORTHERN TO 19497520597 P.01 D Son Diego Gas & Electric 1623 WEST MISSION ROAD • ESCONOIDO. CA 93029-1109 1/19/2000 To: Ben and Ruth Mijuskovic 1161-AS. MelroseDr. Vista, Ca 92083 SUBJECT: Response to letter dated 1/11/2000. Please allow me to define what I saw as the results of our site meeting 12/1/99. The SDG&E Handhole is a vehicle bearing traffic lid and is within the public street. If you place a permanent asphalt driveway around the handhole I agree that SDG&E will remove the retaining wall and housekeeping pad at SDG&E's expense. We also discussed acceptable angles of the handhole's surface. Although my first preference was to allow the handhole to remain at the current level position our crews would adjust it to an acceptable driveway grade angle once at SDG&E's expense. If the grade is modified after SDG&E adjusts the handhole (to the grade provided by your contractor) you will be billed for any further adjustments greater than %". However 1 will need to review your final grade plans prior to my commitment to be certain all aspects of the project is acceptable with SDG&E standards. Mr. Taylor (Sr. Designer) and I have agreed with these very workable solutions pertaining the handhole and retaining wall that I believe all can agree with. 1.) Developer to maintain two feet level ground west of the existing SDG&E handhole Or an acceptable grade per the SDG&E standards pages 3483.1,2,3 and 4 . The north and south ends of the handhole will match the existing grade Or acceptable grade per SDG&E standards. These standards pages have been given to Mr. Soto. 2.) SDG&E will demolish and haul away all the block retaining wall, footings and concrete house-keeping pad. Plus one adjustment of the handhole to final grade will be made by SDG&E at our expense. Should any work associated with your home's construction result in damage to any permanent SDG&E facility the repair or replacement will be billable to the property owner. Any time the City of Carlsbad modifies Carlsbad Blvd in the future SDG&E will adjust to eliminate a conflict with the handhole per our current Franchise Agreement. If you have any questions or comments please call, mail or E-mail me at the number address below. Dennis E. Buss Project Management Northern Governmental Liaison Planner Phone (760) 480-7642 E-mail Dbuss@sdge.com .cc Robert Taylor Post-It" brand fax transmitlal memo 76711» «* p»g»« » / T6 i y y irrom rv rO . J co.Vll/O* D»pl. co- JAN 19 '00 17=52 6197460651 TOTPL P.01 PRGE.01