HomeMy WebLinkAboutCDP 99-39; Chapparone Auto Body; Coastal Development Permit (CDP) (3)City of Carlsbad
Planning Department
September 17, 1999
Mr. James Chinn
21 20 Jimmy Durante Blvd., Suite 117
Del Mar, CA 92104
SUBJECT: CP 99-39 - CHAPPARONE AUTO BODY
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning
Department has reviewed your Minor Coastal Development Permit, application no. CDP
99-39, as to its completeness for processing.
The application is complete, as submitted. Although the initial processing of your
application may have already begun, the technical acceptance date is acknowledged by
the date of this communication. The City may, in the course of processing the
application, request that you clarify, amplify, correct, or otherwise, supplement the basic
information required for the application. In addition, you should also be aware that various
design issues may exist. These issues must be addressed before this application can be
scheduled for a hearing. The Planning Department will begin processing your application
as of the date of this communication.
Please contact your staff planner, Paul Godwin, at (760) 438-1161, extension 4329, if
you have any questions or wish to set up a meeting to discuss the application.
Sincej^ly,
MICHAEL J. HOL
Planning Director
ILLER
MJH:PG:eh
Gary Wayne
Chris DeCerbo
Kathy Farmer
Bobbie Hoder
File Copy
Data Entry
Planning Aide
2075 Las Palmas Dr. • Carlsbad, CA 92009-1576 • (760) 438-1161 • FAX (760) 438-0894
LIST OF ITEMS NEEDED
TO COMPLETE THE APPLICATION
No. CDP 99-39, Chapparone Auto Body
Planning:
None.
Engineering:
None.
ISSUES OF CONCERN
Planning:
None.
Engineering:
1. Show surface drainage on property.
2. Indicate how National Pollutant Discharge Elimination System (NPDES) criteria will be
met.
MEMORANDUM
TO: Paul Godwin, Planning Technician
FROM: Kathy Farmer, Engineering Technician
DATE: September 15, 1999
SUBJECT: MINOR CDP 99-39; CHAPPARONE AUTO BODY
COMPLETENESS & ISSUES REVIEW
Engineering Department staff has completed a review of the above-referenced project for
application completeness. The application and plans submitted for this proposed project are
considered complete. Additionally, staff has conducted a review of the project for engineering
issues of concern. Engineering issues which need to be resolved or adequately addressed
prior to staff making a determination on the proposed project are as follows:
1. Show surface drainage on property.
2. Indicate how National Pollutant Discharge Elimination System (NPDES) criteria will be
met.
If you or the applicant have any questions, please either see or contact me at extension 4374.
cc: Principal Civil Engineer
! Chris DeCerbo - CP 99:59 Body'
From: Mike Smith
To: Chris DeCerbo
Date: 9/3/99 4:47PM
Subject: CP 99-59 Chapparone Auto Body
'"Page 1'|
Issues:
1. Existing automatic fire sprinkler system must be certified as conforming to the design density required
for the proposed building use, or sprinkler system must be redesigned to comply.
2. Plans for spray booths or other finishing equipment must be submitted to the Fire Department, and
approved prior to installation. The Fire Department will neither inspect nor test equipment for which plans
have not been approved.
3. Provide information regarding the method of paint product storage, i.e. quantity, type etc.
4. Secure permits from the Department of Environmental Health for storage of flammable liquids.
5. Indicate locations of closest two fire hydrants.