Loading...
HomeMy WebLinkAboutCP 01-08; Bristol Cove; Condo Permit (CP)^^ ^^ City of Carlsbad Planning Department June 26, 2002 Leo A. Fitzsimon 6860 Shearwaters Drive Carlsbad, Ca 92009 SUBJECT: PRE 02-31 - BRISTOL COVE The Planning Director has completed a review of your application for PRE 02-31 - Bristol Cove (APN: 207-150-13). After careful consideration of the circumstances surrounding this request, the Planning Director has determined that the application qualifies for substantial conformance with the approved permit and therefore, approves the changes to the project based on Planning Director Administrative Policy No. 35. Please submit two (2) blueline copies (24" X 36") of all applicable exhibits for the project file and a reproducible 24" X 36" mylar copy of the amended site plan. The (2) blueline copies must be submitted, stamped "Substantial Conformance", and signed by the Planning Director prior to issuance of any building permits for the project. CITY OF CARLSBAD MICHAEL J. HOLZMILLER Planning Director MJH:GF:cs Principal Planner, Chris DeCerbo Project Engineer, Jeremy Riddle File Copy Data Entry 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us City of Carlsbad Planning Department April 5, 2002 Leo Fitzsimon 6850 Shearwaters Drive Carlsbad, Ca 92009 SUBJECT: CP 01-08 - BRISTOL COVE The City has completed a review of the application for a two-unit condominium development located along the northwest side of Cove Drive within the Bristol Cove development (APN 207-150-13), Carlsbad CA. It is the Planning Director's determination that based on the attached conditions, the project is consistent with the City's condominium regulations (Chapter 21.45) and with all other applicable City Ordinances and Policies accept for the reduced front yard setback (see below for variance discussion). Further, the project has been found to be categorically exempt from environmental review according to Section 15303(b) of the California Environmental Quality Act and a Notice of Exemption was filed on April 1, 2002. The applicant requested an Administrative Variance (AV 01-07) to reduce the required front yard setback from 20 feet to 11.5 feet. Because the amount of the requested front yard setback reduction does not exceed 75 % of the required yard requirement, the request constitutes an Administrative Variance and is acted upon by the Planning Director. The Planning Director approved AV 01-07 on April 1, 2002. This letter, including the listed findings and conditions, constitutes APPROVAL of CP 01-08 - BRISTOL COVE, as shown on Exhibits "A" - "F" dated April 5, 2002, on file in the Planning Department and incorporated herein by reference. Findings: 1. That the granting of this permit will not adversely affect and will be consistent with the Municipal Code, the General Plan, applicable specific plans, master plans, and all adopted plans of the City and other governmental agencies, in that the project density of 14 du/acre is consistent with the Residential High (RH) land use designation, and the project is consistent with the Housing Element and the inclusionary housing ordinance as the developer has been conditioned to pay an inclusionary housing in-lieu fee per unit. 2. That the proposed use at the particular location is necessary and desirable to provide a service or facility which will contribute to the long-term general well-being of the neighborhood and the community, in that the 2-unit condominium is consistent with the surrounding development of multi-family apartment and condominium projects. 3. That such use will not be detrimental to the health, safety, or general welfare of persons residing or working in the vicinity, or injurious to property or improvements in the vicinity, in that the 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (760) 602-4600 • FAX (760) 602-8559 • www.ci.carlsbad.ca.us CP 01-08 - BRISTOL COVE April 5, 2002 Page 2 / project is consistent with the General Plan and Zoning Designations which permits multi- family attached condominiums. 4. That, the proposed Planned Development meets all of the minimum development standards set forth in Chapter 21.45.090, the design criteria set forth in Section 21.45.080, and has been designed in accordance with the concepts contained in the Design Guidelines Manual, in that the project does not exceed the allowed density of 19 dwelling units per acre; setback requirements have been met (with approved variance), two-car garages have been provided for each residence; one required guest parking space has been provided, parking areas have been screened and meet the required setbacks; the required common active recreation open space has been provided in addition to private rear yard patio areas and/or balconies; and storage spaces have been provided in the enclosed garages for each residence. 5. That the proposed project is designed to be sensitive to and blend in with the natural topography of the site, and maintains and enhances significant natural resources on the site, in that the architectural design of the project conforms with the hillside design guidelines manual and no development encroaches into the uphill perimeter manufactured slope by more than the maximum of six vertical feet. 6. That the proposed project's design and density of the developed portion of the site is compatible with surrounding development and does not create a disharmonious or disruptive element to the neighborhood, in that the proposal is consistent with the surrounding development of two- and three-story apartment and condominiums. 7. That the project's circulation system is designed to be efficient and well integrated with the project and does not dominate the project in that adequate public facilities necessary to serve this project will be provided as required by the City Engineer in conjunction with the approval of parcel map (MS 01-17) required for this project. 8. The project is consistent with the City-Wide Facilities and Improvements Plan, the Local Facilities Management Plan for Zone 1 and all City public facility policies and ordinances. The project includes elements or has been conditioned to construct or provide funding to ensure that all facilities and improvements regarding: sewer collection and treatment; water; drainage; circulation; fire; schools; parks and other recreational facilities; libraries; government administrative facilities; and open space, related to the project will be installed to serve new development prior to or concurrent with need. Specifically, A. The project has been conditioned to provide proof from the Carlsbad Unified School Districts that the project has satisfied its obligation for school facilities. B. Park-in-lieu fees are required by Carlsbad Municipal Code Chapter 20.44, and will be collected prior to issuance of building permit. C. The Public Facility fee is required to be paid by Council Policy No. 17 and will be collected prior to the issuance of building permit. D. The Local Facilities Management fee for Zone 1 is required by Carlsbad Municipal Code Section 21.90.050 and will be collected prior to issuance of building permit. OVECP 01-08 - BRISTOL CO April 5, 2002 Page3 9. That the Planning Director has determined that the project is exempt from the requirements of the California Environmental Quality Act (CEQA) per Section 15303(b) of the state CEQA Guidelines and will not have any adverse significant impact on the environment. Conditions; General; Note: Unless otherwise specified herein, all conditions shall be satisfied prior to issuance of building permits. 1. If any of the following conditions fail to occur; or if they are, by their terms, to be implemented and maintained over time, if any of such conditions fail to be so implemented and maintained according to their terms, the City shall have the right to revoke or modify all approvals herein granted; deny or further condition issuance of all future building permits; deny, revoke or further condition all certificates of occupancy issued under the authority of approvals herein granted; institute and prosecute litigation to compel their compliance with said conditions or seek damages for their violation. No vested rights are gained by Developer or a successor in interest by the City's approval of this Condominium Site Plan. 2. Staff is authorized and directed to make, or require the Developer to make, all corrections and modifications to the Tentative Parcel Map/Condominium Site Plan documents, as necessary to make them internally consistent and in conformity with the final action on the project. Development shall occur substantially as shown on the approved Exhibits. Any proposed development different from this approval, shall require an amendment to this approval. 3. The Developer shall comply with all applicable provisions of federal, state, and local laws and regulations in effect at the time of building permit issuance. 4. If any condition for construction of any public improvements or facilities, or the payment of any fees in-lieu thereof, imposed by this approval or imposed by law on this Project are challenged, this approval shall be suspended as provided in Government Code Section 66020. If any such condition is determined to be invalid this approval shall be invalid unless the City Council determines that the project without the condition complies with all requirements of law. 5. The Developer/Operator shall and does hereby agree to indemnify, protect, defend and hold harmless the City of Carlsbad, its Council members, officers, employees, agents, and representatives, from and against any and all liabilities, losses, damages, demands, claims and costs, including court costs and attorney's fees incurred by the City arising, directly or indirectly, from (a) City's approval and issuance of this Condominium Permit, (b) City's approval or issuance of any permit or action, whether discretionary or non-discretionary, in connection with the use contemplated herein, and (c) Developer/Operator's installation and operation of the facility permitted hereby, including without limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. 6. The Developer shall submit to the Planning Director a reproducible 24" x 36", mylar copy of the Tentative Parcel Map/Condominium Site Plan reflecting the conditions approved by the final decision making body prior to Final Map approval of MS 01-17. :OVECP 01-08 - BRISTOL COVE April 5, 2002 Page 4 7. The Developer shall include, as part of the plans submitted for any permit plan check, a reduced legible version of all approving resolution(s) in a 24" x 36" blueline drawing format. 8. Prior to the issuance of a building permit, the Developer shall provide proof to the Director from the School District that this project has satisfied its obligation to provide school facilities. 9. This project shall comply with all conditions and mitigation measures which are required as part of the Zone 1 Local Facilities Management Plan and any amendments made to that Plan prior to the issuance of building permits. 10. This approval is granted subject to the approval of MS 01-17 and is subject to all conditions contained in MS 01-17 for those other approvals. 11. Prior to approval of the Final Map, the Developer shall apply for and obtain approval of a Coastal Development Permit issued by the California Coastal Commission that substantially conforms to this approval. A signed copy of the Coastal Development Permit must be submitted to the Planning Director. If the approval is substantially different, an amendment to the parcel map/condominium shall be required. 12. This project is being approved as an air space condominium. There will be no individual ownership of land. A note to this effect shall be placed on the final map with the exact wording to the satisfaction of the Planning Director. 13. Building permits will not be issued for this project unless the local agency providing water and sewer services to the project provides written certification to the City that adequate water service and sewer facilities, respectively, are available to the project at the time of the application for the building permit, and that water and sewer capacity and facilities will continue to be available until the time of occupancy. A note to this effect shall be placed on the Final Map. 14. At issuance of building permits, or prior to the approval of a final map and/or issuance of certificate of compliance for the conversion of existing apartments to air-space condominiums, the Developer shall pay to the City an inclusionary housing in-lieu fee as an individual fee on a per market rate dwelling unit basis in the amount in effect at the time, as established by City Council Resolution from time to time. 15. The Developer shall construct and install all landscaping as shown on the approved Plans, and maintain all landscaping in a healthy and thriving condition, free from weeds, trash, and debris. 16. The Developer shall establish a homeowner's association and corresponding covenants, conditions and restrictions. Said CC&Rs shall be submitted to and approved by the Planning Director prior to final map approval. Prior to issuance of a building permit the Developer shall provide the Planning Department with a recorded copy of the official CC&Rs that have been approved by the Department of Real Estate and the Planning Director. At a minimum, the CC&Rs shall contain the following provisions: A. General Enforcement by the City. The City shall have the right, but not the obligation, to enforce those Protective Covenants set forth in this Declaration in favor of, or in which the City has an interest. CP 01-08 - BRISTOL COVE April 5, 2002 PageS B. Notice and Amendment. A copy of any proposed amendment shall be provided to the City in advance. If the proposed amendment affects the City, City shall have the right to disapprove. A copy of the final approved amendment shall be transmitted to City within 30 days for the official record. C. Failure of Association to Maintain Common Area Lots and Easements. In the event that the Association fails to maintain the "Common Area Lots and/or the Association's Easements" as provided in Article , Section the City shall have the right, but not the duty, to perform the necessary maintenance. If the City elects to perform such maintenance, the City shall give written notice to the Association, with a copy thereof to the Owners in the Project, setting forth with particularity the maintenance which the City finds to be required and requesting the same be carried out by the Association within a period of thirty (30) days from the giving of such notice. In the event that the Association fails to carry out such maintenance of the Common Area Lots and/or Association's Easements within the period specified by the City's notice, the City shall be entitled to cause such work to be completed and shall be entitled to reimbursement with respect thereto from the Owners as provided herein. D. Special Assessments Levied by the City. In the event the City has performed the necessary maintenance to either Common Area Lots and/or Association's Easements, the City shall submit a written invoice to the Association for all costs incurred by the City to perform such maintenance of the Common Area Lots and or Association's Easements. The City shall provide a copy of such invoice to each Owner in the Project, together with a statement that if the Association fails to pay such invoice in full within the time specified, the City will pursue collection against the Owners in the Project pursuant to the provisions of this Section. Said invoice shall be due and payable by the Association within twenty (20) days of receipt by the Association. If the Association shall fail to pay such invoice in full within the period specified, payment shall be deemed delinquent and shall be subject to a late charge in an amount equal to six percent (6%) of the amount of the invoice. Thereafter the City may pursue collection from the Association by means of any remedies available at law or in equity. Without limiting the generality of the foregoing, in addition to all other rights and remedies available to the City, the City may levy a special assessment against the Owners of each Lot in the Project for an equal prorata share of the invoice, plus the late charge. Such special assessment shall constitute a charge on the land and shall be a continuing lien upon each Lot against which the special assessment is levied. Each Owner in the Project hereby vests the City with the right and power to levy such special assessment, to impose a lien upon their respective Lot and to bring all legal actions and/or to pursue lien foreclosure procedures against any Owner and his/her respective Lot for purposes of collecting such special assessment in accordance with the procedures set forth in Article of this Declaration. E. Landscape Maintenance Responsibilities. The HOAs and individual lot or unit owner landscape maintenance responsibilities shall be as set forth in Exhibit . 16. This project is being approved as a condominium permit for residential homeownership purposes. If any of the units in the project are rented, the minimum time increment for such rental shall be not less than 26 days. The CC&Rs for the project shall include this requirement. CP 01-08 - BRISTOL COVE April 5, 2002 Page 6 17. The developer shall submit to the Planning Director a recorded copy of the Condominium Plan which is in conformance with the City approved documents and exhibits. 18. Prior to the issuance of the Building Permit, Developer shall submit to the City a Notice of Restriction to be filed in the office of the County Recorder, subject to the satisfaction of the Planning Director, notifying all interested parties and successors in interest that the City of Carlsbad has issued a Condominium Permit, file No. CP 01-08 on the real property owned by the Developer. Said Notice of Restriction shall note the property description, location of the file containing complete project details and all conditions of approval as well as any conditions or restrictions specified for inclusion in the Notice of Restriction. The Planning Director has the authority to execute and record an amendment to the notice which modifies or terminates said notice upon a showing of good cause by the Developer or successor in interest. STANDARD CODE REMINDERS Fees 19. The Developer shall pay park-in-lieu fees to the City, prior to the approval of the final map as required by Chapter 20.44 of the Carlsbad Municipal Code. 20. Developer shall pay the License Tax on new construction imposed by Carlsbad Municipal Code Section 5.09.030, and CFD #1 special tax (if applicable), and the Citywide Public Facilities Fee imposed by City Council Policy #17, subject to any credits authorized by Carlsbad Municipal Code Section 5.09.040. Developer shall also pay any applicable Local Facilities Management Plan fee for Zone 1, pursuant to Chapter 21.90. All such taxes/fees shall be paid at issuance of building permit. If the taxes/fees and not paid, this approval will not be consistent with the General Plan and shall become void. Final Map Notes 21. A note shall be placed on the Final Map stating that building permits will not be issued for this project unless the local agency providing water and sewer services to the project provides written certification to the City that adequate water service and sewer facilities, respectively, are available to the project at the time of the application for the building permit, and that water and sewer capacity and facilities will continue to be available until the time of occupancy. General 22. Approval of this request shall not excuse compliance with all applicable sections of the Zoning Ordinance and all other applicable City ordinances in effect at time of building permit issuance, except as otherwise specifically provided herein. 23. All roof appurtenances, including air conditioners, shall be architecturally integrated and concealed from view and the sound buffered from adjacent properties and streets, in substance as provided in Building Department Policy No. 80-6, to the satisfaction of the Directors of Community Development and Planning. 24. Prior to occupancy of the first dwelling unit the Developer shall provide all required passive and active recreational areas per the approved plans, including landscaping and recreational facilities. 'OVECP 01-08 - BRISTOL COVE April 5, 2002 Page? 25. Addresses, approved by the Building Official, shall be placed on all new and existing buildings so as to be plainly visible from the street or access road; color of identification and/or addresses shaJl contrast to their background color, as required by Carlsbad Municipal Code Section 18.04.320. NOTICE Please take NOTICE that approval of your project includes the "imposition" of fees, dedications, reservations, or other exactions hereafter collectively referred to for convenience as "fees/exactions." You have 90 days from date of final approval to protest imposition of these fees/exactions. If you protest them, you must follow the protest procedure set forth in Government Code Section 66020(a), and file the protest and any other required information with the City Manager for processing in accordance with Carlsbad Municipal Code Section 3.32.030. Failure to timely follow that procedure will bar any subsequent legal action to attack, review, set aside, void, or annul their imposition. You are hereby FURTHER NOTIFIED that your right to protest the specified fees/exactions DOES NOT APPLY to water and sewer connection fees and capacity charges, nor planning, zoning, grading or other similar application processing or service fees in connection with this project; NOR DOES IT APPLY to any fees/exactions of which you have previously been given a NOTICE similar to this, or as to which the statute of limitations has previously otherwise expired. If you have any further questions, please call Greg Fisher in the Planning Department at (760) 602-4629. Sincerely, MICHAEL J. HOLZMILLER Planning Director MJH:GF:cs Attachment Jeremy Riddle Chris DeCerbo Bobbie Hoder File Copy Data Entry City of Carlsbad Public Works — Engineering April 3, 2002 Leo A. Fitzsimon 6860 Shearwaters Drive Carlsbad, CA 92009 SUBJECT: BRISTOL COVE MINOR SUBDIVISION (MS 01-17) The City Engineer has made a preliminary decision pursuant to Section 20.24.120 of the City of Carlsbad Municipal Code, to approve this tentative parcel map of the proposed minor subdivision, subject to the conditions listed below. The preliminary conditions are: Unless specifically stated in the condition, all of the following conditions, upon the approval of this tentative parcel map, must be met prior to approval of a final parcel map, building permit, or grading permit, whichever is first. General 1. This approval is granted subject to the approval of CP 01-08 and AV 01-07 and is subject to all conditions set forth in those other approvals. 2. Prior to issuance of any building permit, Developer shall comply with the requirements of the City's anti-graffiti program for wall treatments if and when such a program is formally established by the City. 3. Developer shall submit to the City Engineer, a reproducible 24" x 36", photo mylar and a digital file copy of the tentative parcel map reflecting the conditions approved by the final decision making body (including any applicable Coastal Commission approvals). The reproducible shall be submitted to the City Engineer, reviewed and, if acceptable, signed by the City's project engineer and project planner prior to submittal of the building plans, final map, improvement or grading plans, whichever occurs first. The digital file copy shall be submitted in accordance with the established City format to the satisfaction of the City Engineer. 4. Unless a standards variance has been issued, no variance from City Standards is authorized by virtue of approval of this tentative parcel map. 5. Developer shall comply with all applicable provisions of federal, state, and local laws and regulations in effect at the time building permits are issued. 1635 Faraday Avenue • Carlsbad, CA 92008-7314 • (76O) 602-2720 • FAX (760) 602-8562 Bristol Cove Preliminary Conditions April 3, 2002 Page 2 of 7 6. If any condition for construction of any public facilities, or payment of any fees in- lieu thereof, imposed by this approval or imposed by law on this Project are challenged, this approval shall be suspended as provided in Government Code Section 66020. If any such condition is determined to be invalid, this approval shall be invalid unless the City Engineer determines that this Project without this condition complies with the requirements of the law. 7. Developer shall and does hereby agree to indemnify, protect, defend and hold harmless the City of Carlsbad, its Council members, agents, officers, and representatives, from and against any and all liabilities, losses, damages, demands, claim and costs, including court costs and attorney's fees incurred by the City arising, directly or indirectly, from (a) City's approval and issuance of this tentative parcel map, (b) City's approval or issuance of any permit or action, whether discretionary or non-discretionary, in connection with the use contemplated herein, including an action filed within the time period specified in Government Code Section 66499.37 and (c) Developer's installation and operation of the facility permitted hereby, including without limitation, any and all liabilities arising from the emission by the facility of electromagnetic fields or other energy waves or emissions. 8. There shall be one final parcel map recorded for this project. 9. The project is approved with the express condition that building permits will not be issued for the development of the subject property unless the City Engineer determines that sewer facilities are available at the time of application for such sewer permits and will continue to be available until time of occupancy. This note shall be placed on the non-title sheet of the final parcel map. Fees/Agreements 10. Developer is required to pay all required fees and deposits prior to approval of the final parcel map. 11. Developer shall pay the Local Drainage Area Fee prior to approval of the final parcel map. 12. Developer shall pay park-in-lieu fees to the City prior to approval of the final parcel map as required by Chapter 20.44 of the Carlsbad Municipal Code. 13. Developer shall cause property owner to execute and submit to the City Engineer for recordation the City's standard form Geologic Failure Hold Harmless PrelimCONDITIONS.doc REV. 4/3/02 Page: 2 Bristol Cove Preliminary Conditions April 3, 2002 Page 3 of 7 Agreement 14. Prior to approval of any grading or building permits for this project, Developer shall cause Owner to give written consent to the City Engineer to the annexation of the area shown within the boundaries of the subdivision into the existing City of Carlsbad Street Lighting and Landscaping District No. 1, on a form provided by the City Engineer. Grading 15. Prior to hauling dirt or construction materials to or from any proposed construction site within this project, Developer shall apply for and obtain approval from, the City Engineer for the proposed haul route. 16. Based upon a review of the proposed grading and the grading quantities shown on the tentative parcel map, a grading permit for this project is required. Developer shall apply for and obtain a grading permit from the City Engineer. A Grading Permit cannot be issued until the final parcel map has been recorded for this project. Coastal Conditions 17. If a Grading Permit is required, all grading activities shall cease by October 1st. Grading activities shall be limited to the "dry season", April 1st to October 1st of each year. /mprove/nente/Ded/cafa'cms 18. Additional drainage easements may be required. Developer shall dedicate and provide or install drainage structures, as may be required by the City Engineer, prior to or concurrent with any grading or building permit. 19. Developer shall execute and record a City standard Development Improvement Agreement to install and secure with appropriate security as provided by law, public improvements shown on the Tentative Parcel Map and the following improvements including, but not limited to: paving, base, sidewalks, curbs and gutters, grading, clearing and grubbing, under grounding or relocation of utilities, sewer, water, fire hydrants, signing, striping, street lights, retaining walls and reclaimed water), all constructed to City Standards and to the satisfaction of the City Engineer. The improvements consist of: a. Improve Adams Avenue along the project frontage including any PrelimCONDITlONS.doc REV. 4/3/02 Page: 3 Bristol Cove Preliminary Conditions April 3, 2002 Page 4 of 7 transitions to existing pavement to include half-with improvements measured 25-feet from street centerline to the right-of-way, b. Improvement shall include the extension of guardrail along the project frontage of Adams Avenue. A list of the above shall be placed on an additional map sheet on the Final Parcel Map per the provisions of Sections 66434.2 of the Subdivision Map Act. Improvements listed above shall be constructed within 18 months of approval of the subdivision or development improvement agreement or such other time as provided in said agreement. 20. Developer shall comply with the City's requirements of the National Pollutant Discharge Elimination System (NPDES) permit, latest version. Developer shall provide improvements constructed pursuant to best management practices as referenced in the "California Storm Water Best Management Practices Handbook" to reduce surface pollutants to an acceptable level prior to discharge to sensitive areas. Plans for such improvements shall be submitted to and subject to the approval of the City Engineer. Said plans shall include, but not be limited to notifying prospective owners and tenants of the following: A. All owners and tenants shall coordinate efforts to establish or work with established disposal programs to remove and properly dispose of toxic and hazardous waste products. B. Toxic chemicals or hydrocarbon compounds such as gasoline, motor oil, antifreeze, solvents, paints, paint thinners, wood preservatives, and other such fluids shall not be discharged into any street, public or private, or into storm drain or storm water conveyance systems. Use and disposal of pesticides, fungicides, herbicides, insecticides, fertilizers and other such chemical treatments shall meet Federal, State, County and City requirements as prescribed in their respective containers. C. Best Management Practices shall be used to eliminate or reduce surface pollutants when planning any changes to the landscaping and surface improvements. 21. Prior to issuance of building permits, Developer shall install separate sewer services to each unit proposed by this tentative parcel map. Sewer services shall be provided to the Satisfaction of the City Engineer. 22. Developer shall cause Owner to waive direct access rights on the final map and provide proof of recordation to the city engineer prior to the issuance of a PrclimCONDITIONS.doc REV. 4/3/02 Page: 4 Bristol Cove Preliminary Conditions April 3, 2002 Page 5 of 7 building permit for all lots abutting Adams Street. Final Parcel Map Notes 23. Developer shall show the gross and net acres for each parcel on final parcel map. 24. Note(s) to the following effect(s) shall be placed on the final parcel map as non- mapping data: A. Building permits will not be issued for development of the subject property unless the appropriate agency determines that sewer and water facilities are available. B. All the improvements within the subject property are privately owned and maintained with the exception of the following: 1) Half-street improvements to the frontage of Adams Street measured 25-feet from the centerline of the street to the right-of-way line. D. Geotechnical Caution: 1. The owner of this property on behalf of itself and all of its successors in interest has agreed to hold harmless and indemnify the City of Carlsbad from any action that may arise through any geological failure, ground water seepage or land subsidence and subsequent damage that may occur on, or adjacent to, this subdivision due to its construction, operation or maintenance. Carlsbad Municipal Water District Conditions 25. Prior to approval of improvement plans or final parcel map, Developer shall meet with the Fire Marshal to determine if fire protection measures (fire flows, fire hydrant locations, building sprinklers) are required to serve the project. Fire hydrants, if proposed, shall be considered public improvements and shall be served by public water mains to the satisfaction of the Deputy City Engineer. 26. The Developer shall design and construct public facilities within public right-of- way or within minimum 20-feet wide easements granted to the District or the City of Carlsbad. At the discretion of the Deputy City Engineer, wider easements may be required for adequate maintenance, access and/or joint utility purposes. PrelimCONDITIONS.doc REV. 4/3/02 Page: 5 Bristol Cove Preliminary Conditions April 3, 2002 Page 6 of 7 27. Prior to issuance of building permits, Developer shall pay all fees, deposits, and charges for connection to public facilities. Developer shall pay the San Diego County Water Authority capacity charge(s) prior to issuance of Building Permits. 28. The Developer shall install potable water meters at a location approved by the Deputy City Engineer. The locations of said services shall be reflected on public improvement plans. 29. The Developer shall install sewer laterals and clean-outs at a location approved by the Deputy City Engineer. The locations of sewer laterals shall be reflected on public improvement plans. 30. The Developer shall provide separate potable water meters for each separately owned unit. 31. This project is approved upon the express condition that building permits will not be issued for the development of the subject property, unless the Deputy City Engineer - Utilities has determined that adequate water facilities are available at the time of occupancy. A note to this effect shall be placed on the Final Map, as non-mapping data. Code Reminder The project is subject to all applicable provisions of local ordinances, including but not limited to the following: 32. The tentative parcel map shall expire twenty-four (24) months from the date of the letter containing the final decision for tentative parcel map approval. 33. Developer shall exercise special care during the construction phase of this project to prevent offsite siltation. Planting and erosion control shall be provided in accordance with Carlsbad Municipal Code Chapter 15.16 (the Grading Ordinance) to the satisfaction of the City Engineer. The applicant may request a review of these preliminary conditions within ten (10) days of the date of this preliminary approval. The request must be submitted in writing to the City Engineer in accordance with Section 20.24.120 through 140 of the Carlsbad Municipal Code. The City Engineer has reviewed each of the exactions imposed on the Developer contained in the conditions of approval and hereby finds that the exactions are imposed to mitigate impacts caused or reasonably related to this project, and the extent and degree of the exactions is in rough proportionality to the impact caused by the project. Prelim CONDITIONS.doc REV. 4/3/02 Page: 6 Bristol Cove Preliminary Conditions April 3, 2002 Page 7 of 7 If you have any questions regarding the above, please contact the Project Engineer, Jeremy Riddle at 760-602-2737. If you have any planning related questions, please contact Greg Fisher at 760-602-4629. Sincerely, Robert J. Wojcik Deputy City Engineer c: Management Analyst, Development Services Skip Hammann, Senior Civil Engineer Jeremy Riddle, Project Engineer Greg Fisher, Project Planner Prelim CONDITIONS.doc REV. 4/3/02 Page: 7