October 16, 2000
Mr. Bob Ladwig
Ladwig Design Group
703 Palomar Airport Road, Suite 300
Carlsbad, CA 92009
SUBJECT: FOX-MILLER PROPERTY, CARLSBAD
Dear Mr. Ladwig:
This report provides a summary of traffic factors related to the proposed development of the Fox-
MiUer Property in the City of Carlsbad. The analyses contained in this report are based upon
information provided by you, our past work in the City, previously completed analyses for the study
area, and standard reference materials.
PROJECT DESCRIPTION
The proposed Fox-Miller Property is located on the westerly side of El Camino Real, between
College Boulevard and Faraday Avenue, in the Cit>' of Carlsbad. One access to the proposed project
site is planned via Salk Avenue, westerly off of El Camino Real, which would be right turns in and
out only; another access would be via Salk Avenue, easterly off of College Boulevard. Figure I
illustrates the location of the proposed project in relationship to the surrounding street system. The
net pad area to be developed on the Fox-MiUer Property is 22.4 acres and is planned to consist of
Planned Industrial use.
EXISTING CONDITIONS
Existing traffic conditions in the study area are subject to significant changes as additional arterial
roadway connections and road segments are completed. Some of these in the project study area
15/^/5% OX/107.
2Qy./ioy. TAMARACK AVE
oy./ioy.
No Scale
PROJECT SITE
15%/107.
JOB 112820
1 flK liil 1.
FDX/MILLER PRDPERTY
STUDY ZONE
FIGURE 1
2oy./ioy.
2oy./i5y.
LEGEND
STUDY INTERSECTION
_ EXISTING
PLANNED
PROJECT DISTRIBUTIDN
Z^l YEAR 2005 / YEAR 20E0
-2-
include the extensions of Faraday Avenue, westerly of College Boulevard and easterly of El Camino
Real; the extension of College Boulevard to the north of El Camino Real; and the construction of
segments of Cannon Road. The existing and planned roadways in the study area are illustrated on
Figure I, presented earlier in this study.
Figure I also shows the intersections that were examined as a part of these traffic analyses for the
Fox-MiUer Property project. The eight study intersections and their status (existing or proposed for
the future) are listed below.
# STUDY INTERSECTIONS
1 El Camino Real / Tamarack Avenue (Existing)
2 El Camino Real / College Boulevard (Existing)
3 El Camino Real / Faraday Avenue (Existing)
4 El Camino Real / Palomar Airport Road (Existing)
5 College Boulevard / Faraday Avenue (Existing)
6 College Boulevard / Palomar Airport Road (Existing)
7 El Camino Real / Cannon Road (Future*)
8 College Boulevard / Cannon Road (Future)
* It should be noted that the study intersection of El Camino Real / Cannon Road is
now existing; however, at the time the traffic counts were conducted, this intersection
had not been constructed. Therefore, in these traffic analyses, the intersection was
considered as a 'future" intersection.
The eight study intersections were analyzed using the Intersection Capacity Utilization (ICU)
methodology for existing conditions. The ICU methodology utilizes a comparison of intersection
volumes to available intersection capacity, which results in an ICU value. The ICU value then
relates to various Levels of Service (LOS), which range from "A" (the best) to "F" (the worst). For
the City of Carlsbad, LOS A through D are considered acceptable, while LOS E and F are over
capacity. A more detailed explanation of ICU and its relationship to LOS is provided in Appendix
A.
Willdan - WPA Traffic Engineering
Job #12820
Fox-Miller Property - Traffic Analyses
City of Carlsbad
-3-
Table I presents a summary of the intersection analyses imder existing conditions. Results are
shown for the six study intersections which are currently existing (two of the intersections are
proposed for the future). The existing lane geometries at the study intersections, utilized in the ICU
analyses, are illustrated on Figure 2, while the existing volumes at the study intersections were
obtained from a previous traffic study recently conducted in the study area'. Both the existing
geometries and existing intersection volumes can be referenced on the intersection analyses
worksheets provided in Appendix B. Table 1 shows that all of the existing (six) study intersections
have acceptable operations (LOS A through C) during both the AM and PM peak hours under
existing conditions.
PROJECT CONDITIONS
Trip Generation
Trip generation analyses were performed for the currently proposed Fox-MiUer Property project,
then compared to the trip potential assumed in the Carlsbad Traffic Model for this site. The currently
proposed project consists of 22.4 acres of Planned Industrial use. Table 2 summarizes the results
of the trip generation analyses for the currently proposed project on the Fox-Miller Property. As
shown in Table 2, the proposed project is estimated to generate a total of 1,800 daily trip ends, of
which 195 (175 In, 20 Out) trip ends would occur during the AM peak hour and 215 (45 In, 170 Out)
trip ends would occur during the PM peak hour.
Table 2 also shows that the trip generation rate utilized to calculate the daily trip generation of the
proposed Fox-Miller Property project (Industrial Park land use) is 80.0 trip ends per acre^. The daily
trip generation rate used in these traffic analyses is comparable to the rate applied to the proposed
' "Carlsbad Oaks North Project, Traffic Study"; Willdan - WPA Traffic Engineering; (Draft)
September 25, 2000.
" Referenced from Traffic Generators: San Diego Association of Governments (SANDAG); July,
1998.
Willdan - WPA Traffic Engineering Fox-MiUer Property - Traffic Analyses
Job U12820 City of Carlsbad
TABLE 1
INTERSECTION ANALYSES SUMMARY
Fox-Miller Property, Carlsbad
INTERSECTION
INTERSECTION CAPACITY UTILIZATION (ICU) / LEVEL OF SERVICE (LOS)
INTERSECTION
EXISTING
CONDITIONS
YEAR 2005
CONDITIONS
YEAR 2020
CONDITIONS INTERSECTION
AM PEAK HOUR PM PEAK HOUR AM PEAK HOUR PM PEAK HOUR AMPEAKHOUR PMPEAKHOUR
El Camino Real /
Tamarack Ave. 0.61 /B 0.58/A 0.69 / B 0.68 / B 0.75/C 0.87/D
El Camino Real /
College Blvd. 0.45/A 0.54/A 0.65/B 0.45 / A 0.70/B 0.60/A
El Camino Real /
Faraday Ave. 0.58/A 0.65/B 0.80/C 0.53 / A 0.83 / D 0.72 / C
El Camino Real /
Palomar Airport Rd. 0.57/A 0.74/C 0.80/C 0.76/C 0.78/C 0.80/C
College Blvd. /
Faraday Ave. 0.20 / A 0.25 / A 0.30/A 0.30/A 0.44 / A 0.38/A
College Blvd. /
Palomar Airport Rd. 0.55/A 0.66/B 0.45/A 0.48/A 0.59/A 0.58/A
El Camino Real /
Cannon Rd. (1) (2) (1) (2) 0.46 / A 0.40 / A 0.48/A 0.47 / A
College Blvd. /
Cannon Rd. (1) (1) 0.48/A 0.62/B 0.55/A 0.62 / B
(1) These study intersections currently do not exist for these traffic analyses.
(2) It is noted that the study intersection of El Camino Real / Cannon Road is now existing; however, in these traffic analyses, it is considered as a "future" intersection, since it
had not been constructed at the time the traffic counts were conducted.
I
I
TAMARACK AVE^
1.
JOB •iseso
1 WiC EIGilG, I
FDX/MILLER PRDPERTY
LANE GEDMETRICS
USED IN EXISTING ANALYSIS
FIGURE 2
LEGEND
STUDY INTERSECTION
EXISTING
PLANNED
TABLE 2
TRIP GENERATION - PROPOSED PROJECT
Fox-Miller Property, Carlsbad
-5-
LANDUSE DESCRIPTOR
/SIZE
TRIP ENDS
LANDUSE DESCRIPTOR
/SIZE DAILY
AMPEAKHOUR PMPEAKHOUR LANDUSE DESCRIPTOR
/SIZE DAILY IN OUT IN OUT
TRIP RATES''^:
Industrial Park
(Without Commercial) Per Acre 80.0 7.92 0.88 1.92 7.68
TRIP ENDS:
Fox-Miller Property
(Planned Industrial) 22.4 Acres 1,800 175 20 45 170
(1) Rates referenced from Traffic Generators; San Diego Association of Governments (SANDAG); July, 1998.
-6-
project site for the Model trip generation (81.7 trip ends per acre - Light Industry land usef. It is,
therefore, concluded that the trip generation currently proposed for the Fox-MiUer Property project
is consistent with (or less than) what was previously assumed for this project site in the Carlsbad
Traffic Model.
YEAR 2005 AND YEAR 2020 CONDITIONS
Table I, provided earlier in this study, also presents the results of the intersection analyses for the
eight study intersections under the Year 2005 and Year 2020 conditions. The lane geometries at the
study intersections, utilized in the 2005 / 2020 ICU analyses, are illustrated on Figure 3, while the
2005 and 2020 volumes at the study intersections were obtained from a previous traffic study
recently conducted in the study area''. Both the geometries and intersection volumes utilized in the
2005 and 2020 ICU analyses can be referenced on the intersection analyses worksheets provided in
Appendix B. Review of Table I shows that all of the study intersections are projected to operate at
acceptable Levels of Service A through D during both the AM and PM peak hours under both the
Year 2005 and Year 2020 conditions.
SUMMARY
This study has examined traffic factors related to the proposed Fox-Miller Property development.
The project is located on the westerly side of El Camino Real, between College Boulevard and
Faraday Avenue, in the City of Carlsbad. This study was primarily conducted to determine if the
proposed project is consistent (from a traffic viewpoint) with the land use assumed in the Carlsbad
Traffic Model. Trip generation analyses were performed for the proposed project and compared to
the trip generation utilized in the Model. Buildout traffic conditions were examined at eight
intersections related to the proposed project.
^ Information obtained from San Diego Association of Governments (SANDAG).
" "Carlsbad Oaks North Project, Traffic Study"; op.cit.
Willdan - WPA Traffic Engineering Fox-Miller Property - Traffic Analyses
Job #12820 City of Carlsbad
TAMARACK AVE,
JOB •laeao
1 UK EIGIEIG, iC
FDX/MILLER PRDPERTY
LANE GEDMETRICS
USED IN 2005/2020 ANALYSIS*
FIGURE 3
* SAME AS GEDMETRICS
USED FDR EXISTING
CnNDITIDNS <Nn
IMPROVEMENTS) WITH
THE ADDITION DF THREE
STUDY INTERSECTIONS
LEGEND
STUDY INTERSECTION
EXISTING
PLANNED
-7-
The foUov^dng are the principal findings of the study.
1) Under existing conditions, the six study intersections which are currently existing are shovm
to have acceptable operations (LOS A through C) during both the AM and PM peak hours.
(It is noted that the study intersection of El Camino Real / Cannon Road is now existing;
however, in these fraffic analyses, it is considered as a 'future'" intersection, since it had not
been constructed at the time the traffic coimts were conducted.)
2) The proposed development of the Fox-Miller Property (22.4 acres of Planned Industrial use)
is estimated to generate 1,800 daily trip ends, of which 195 (175 In, 20 Out) trip ends occur
during the AM peak hour and 215 (45 In, 170 Out) trip ends occur during the PM peak hour.
3) When compared with the Carlsbad Traffic Model, the proposed trip generation is consistent
with or less than the previous assumption.
4) The ICU analyses at the eight study intersections show that acceptable Level of Service D
or better operations are projected during both the AM and PM peak hours under both the
Year 2005 and Year 2020 conditions.
Willdan - WPA Traffic Engineering Fox-Miller Property - Traffic Analyses
Job #12820 City of Carlsbad
-8-
We trust that these analyses will be of assistance to you and the City of Carlsbad. If you have any
questions or require additional information, please contact us.
Respectfully submitted,
WPA TRAFFIC ENGINEERING
A DIVISION OF WILLDAN
Weston S. Pringle, P.E.
Registered Professional Engineer
State of Califomia Numbers C16828 & TR565
WSP:CC
#12820
Willdan - WPA Traffic Engineering Fox-MUler Property - Traffic Analyses
Job #12820 City of Carlsbad
APPENDIX A
EXPLANATION OF
INTERSECTION CAPACITY UTILIZATION
AND
LEVEL OF SERVICE
APPENDIX A
EXPLANATION OF INTERSECTION CAPACITY UTILIZATION
The capacity of a street is nearly always greater between intersections and less at
intersections. The reason for this is that the traffic flows continuously between
intersections and only part ofthe time at intersections. To study intersection capacity, a
technique known as Intersection Capacity Utilization (ICU) has been developed. ICU
analysis consists of (a) determining the proportion of signal time needed to sen/e each
conflicting movement; (b) summing the times for the movements; and (c) comparing the
total time required to the time available. For example, if for north-south traffic the
northbound traffic is 1,000 vehicles per hour, the southbound traffic Is 800 vehicles per
hour, and the capacity of either approach Is 2,000 vehicles per hour of green, then
northbound traffic Is critical and requires 1,0000/2,000 or 50 percent ofthe signal time. If
forthe east-west traffic, 40 percent ofthe signal time Is required, then It can be seen that
the ICU Is 50 plus 40, or 90 percent. When left-turn phases exist, they are incorporated
into the analysis. As ICU's approach 100 percent, the quality of traffic service approaches
Level of Service (LOS) E, as defined In the Highway Capacity Manual, Special Report 87,
Highway Research Board, 1965.
Level of Service is used to describe quality of traffic flow. Levels of Service A to C operate
quite well. Level of Service D Is typically the Level of Service for which an urban street is
designed. Level of Service E Is the maximum volume a facility can accommodate and will
result in possible stoppages of momentary duration. Level of Sen/Ice F occurs when a
facility is overloaded and is characterized by stop-and-go traffic with stoppages of long
duration. A description ofthe various Levels of Service appears on the following page.
The ICU calculations assume that an Intersection is signalized and that the signal Is Ideally
timed. It Is possible to have an ICU well below 1.0, yet have severe traffic congestion.
This would occur because one or more movements Is not getting enough time to satisfy
Its demand, with excess time existing on other moves. Although calculating ICU for an
unslgnalized Intersection is not necessarily valid, it can be performed with the presumption
that a signal can be Installed and the calculations show whether the geometries are
capable of accommodating the expected volumes.
Capacity is often defined in terms of roadway width. However, standard lanes have
approximately the same capacity whether they are 11 foot or 14 foot lanes. Our data
indicates that a typical lane, whether a through lane or a left-turn lane, has a capacity as
high as approximately 2200 vehicles per lane per hour of green time. The 1985 Highway
Capacity Manual found capacities of 1800 vehicles per lane per hour of green time. These
studies show that values In the 1600 to 1700 range should result in a conservative
analysis.
APPENDIX A
LEVEL OF SERVICE DESCRIPTIONS
FOR INTERSECTIONS
LEVEL OF
SERVICE DESCRIPTION
NOMINAL RANGE
OFlCif^\
A
Low volumes; high speeds; speed not restricted by other vehicles; all
signal cycles clear with no vehicles; all signal cycles clear with no
vehicles waiting through more than one signal cycle. 0.00-0.60
B
Operating speeds beginning to be affected by other traffic; between
one and ten percent ofthe signal cycles have one or more vehicles
which wait through more than one signal cycle during peak traffic
periods.
0.61-0.70
C
Operating speeds and maneuverability closely controlled by other
traffic; between 11 and 30 percent ofthe signal cycles have one or
more vehicles which wait through more than one signal cycle during
peak traffic periods; recommended ideal design standard.
0.71-0.80
D
Tolerable operating speeds; 31 to 70 percent of the signal cycles
have one or more vehicles which wait through more than one signal
cycle during traffic periods; often used as design standard in urban
areas.
0.81-0.90
E
Capacity; the maximum traffic volumes an intersection can
accommodate; restricted speeds; 71 to 100 percent of the signal
cycles have one or more vehicles which wait through more than one
signal cycle during peak traffic periods.
0.91-1.00
F
Long queues of traffic; unstable flow; stoppages of long duration;
traffic volume and traffic speed can drop to zero; traffic volume will be
less than the volume which occurs at Level of Service E. Not IVIeaningful
(a) ICU (Intersection Capacity Utilization) at various Levels of Service versus Level of Service E for
urban arterial streets.
SOURCE: Hiphwav Capacity Manual: Special Report 87; Highway Research Board; 1965.
APPENDIX B
INTERSECTION ANALYSES
WORKSHEETS
Existing
Conditions
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT,
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & TAMARACK 1999 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT EXIST
LANES
PROP
LANES
EXISTING
CAPACITY
NL 111 1 1 ii 0 lllll 1800 II 0 lllll 51 11 11 lllll 0.03 11 *
NT III 1 2 II 0 lllll 4000 II 0 lllll 439 11 II lllll 0.11 11
NR III 1 1 li 0 lllll 1800 II 0 lllll 53 11 11 lllll 0.03 11
SL III i 1 ii 0 lllll 1800 II 0 lllll 27 11 11 lllll 0.02 11
ST III 1 2 II 0 lllll 4000 II 0 lllll 1499 11 11 lllll 0.37 11 *
SR III 1 1 li 0 lllll 1800 li 0 lllll 16 11 11 lllll 0.01 11 EL III 1 1 li 0 lllll 1800 II 0 lllll 38 11 11 lllll 0.02 11
ET III 1 1 li 0 lllll 2000 II 0 lllll 55 11 11 lllll 0.03 11 *
ER III i 1 ii 0 lllll 1800 II 0 lllll 189 11 11 lllll 0.11 11
WL III 1 1 ii 0 lllll 1800 II 0 lllll 227 11 11 lllll 0.13 11 *
WT III 1 2 II 0 lllll 4000 II 0 lllll 206 11 11 lllll 0.06 11 WR III 1 0 II 0 lllll 0 II 0 lllll 26 11 11
lllll 0.06 11
EXISTING
VOLUME
OTHER
VOLUME
2005
PROJECT
VOLUME
ICU SPREADSHEET FILE NAME ECR&TAM 99&99 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS =
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING
V/C
EXISTING
+ OTHER
V/C
0.03
0.11
0.03
0.02
0.37
0.01
0.02
0.03
0.11
0.13
0.06
0.40 0.40
o.ie
0.05
0.61
0.16
0.05
0.61
I B
EX.+OTHER
+PROJECT
V/C
0.03
0.11
0.03
0.02
0.37
0.01
0.02
0.03
0.11
0.13
0.06
0.40
0.16
0.05
0.61
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
CARLSBAD
PM PEAK HOUR
INTERSECTION: ECR & TAMARACK 1999 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT ||1| EXIST 1
11 11 II III 1 II II lllll 11 11 EXISTING 11 11 EX.+OTHER II EX.+OTHER II MOVEMENT ||1| EXIST 1 PROP 11 11 EXISTING il PROPOSED 111 1 EXISTING 11 OTHER 11 PROJECT lllll EXISTING 11 11 + OTHER 11 II +PROJECT 11 +PROJECT II
llll LANES 1 LANES 11 11 CAPACITY ii CAPACITY 111 1 VOLUME 11 VOLUME 11 VOLUME mil V/C li li V/C ii i V/C 11 V/C-W IMP il -= =- lllll ======= 1 ======= II II ========= II = III 1 ========= (j ========= 11 ========= mil ========= li ==- II ========= II ==r ll ========= II === ========= 1 === NL lllll 1 i 11 11 1800 II 0 III 1 180 11 11 lllll 0.10 II II 0.10 11 II 0.10 11 II * NT mil 2 1 II 11 4000 II 0 111 1 1520 11 li lllll 0.38 II * II 0.38 11 * 1' 0.38 11 * II NR llll 1 1 II 11 1800 II 0 111 1 213 11 il lllll 0.12 II II 0.12 11 1 0.12 11 II SL llll; 1 1 II 11 1800 II 0 III 1 30 li ii lllll 0.02 ii * ii 0.02 il * 1, 0.02 li * II ST mil II 11 4000 II 0 111 1 551 11 II lllll 0.14 II II 0.14 II I 0.14 II 11 *
SR lllll 1 1 11 11 1800 II 0 111 1 65 11 li lllll 0.04 II II 0.04 11 |i 0.04 II II EL mil I 1 11 11 1800 II 0 111 1 35 11 il lllll 0.02 II II 0.02 11 1 0.02 11 1 II * ET nil, 1 1 11 11 2000 II 0 111 1 185 11 il lllll 0.09 11 * 11 0.09 II * 1 0.09 11 * 1 II ER lllll 1 1 II II 1800 II 0 HI 1 56 11 11 lllll 0.03 II II 0.03 11 1 0.03 11 II WL mil 1 1 II 11 1800 11 0 HI 1 71 11 li lllll 0.04 II * 11 0.04 II * 1 0.04 II * 1 II WT llll 2 1 11 11 4000 II 0 111 1 101 11 11 lllll 0.03 II II 0.03 11 1 0.03 11 1 II * WR llll 0 1 II II 0 II 0 111 1 28 11 11 lllll II II II 1 I II
ICU SPREADSHEET FILE NAME ECR&TAM 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
' DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.40
0.13
0.05
0.58
0.40
0.13
0.05
0.58
0.40
0.13
0.05
0.58
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
AM PEAK HOUR
ECR & COLLEGE 1999 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT 1 III EXIST 1 PROP 111 1 EXISTING PROPOSED III i EXISTING
1 III LANES 1 lAHES HI 1 CAPACITY CAPACITY 111 1 VOLUME
NL 1 III 1 1 0 111 1 1800 0 111 1 83
NT 1 III 2 1 0 III 1 4000 0 III 1 477
NR 1 III 0 1 0 III 1 0 0 III 1 0
SL 1 :ll 0 1 0 III 1 0 0 III 1 0
ST 1 11 2 1 0 III 1 4000 0 III 1 1358
SR 1 II FREE 1 0 III 1 N.S. 0 III 1 584
EL 1, II 2 1 0 III 1 3600 0 III 1 49
ET !• II 0 1 0 III 1 0 0 111 1 0
ER 1 ii 1 i 0 III 1 1800 1 0 111 1 18
WL II II 0 1 0 III 1 0 1 0 III 1 0
WT i: II 0 1 0 III 1 0 1 0 III 1 0
WR II II 0 1 0 111 1 0 1 0 III 1 0
ICU SPREADSHEET FILE NAME ECR&COL 99&99 |
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
OTHER
VOLUME
2005
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS '
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
mil EXISTING
lllll V/C
lllll 0.05
lllll 0.12
11 11 EXISTING 11
11 11 + OTHER 11
II II V/C 11
II * II 0.05 II *
II II 0.12 II
11 EX.+OTHER II
11 +PROJECT 11
II V/C 11
II 0.05 II *
II 0,12 11
II EX.+OTHER II mil
11 +PROJECT II mil
li V/C-WJMP li mil
lllll 0.34
lllll N.S.
lllll 0.01
II * 11 0.34 II *
II II N.S. 11
II * II 0.01 11 '
II 0.34 11 *
II N.S. 11
II 0.01 11 * :
lllll 0.01 II II 0.01 II II 0.01 II 1 ll
III r 1 r 1 1 * *
lllll 0.39 1 0.39 1 0.39 1 0.00 lllll
lllll 0.01 1 0.01 1 0.01 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.45 1 0.45 1 0.45 1 0.05 mil
lllll A 1 A 1 A 1 A lllll
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
ECR & COLLEGE 1999 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&COL 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT | II EXIST PROP HI 1 EXISTING PROPOSED llll EXISTING
li 11 LANES LANES III i CAPACITY CAPACITY III! VOLUME
NL 11 II 1 ======= Ij 1 1800 1 0 IHI 25
NT II II 2 111 1 4000 1 0 llll 1412
NR i: II 0 III 1 0 0 llll 0
SL 11 II 0 iil 1 0 0 llll 0
ST II II 2 1 III 1 4000 1 0 llll 545
SR II II FREE 1 III 1 N.S. 1 0 llll 105
EL II II 2 III 1 3600 1 0 llll 503
ET \ II 0 III 1 0 1 0 llll 0
ER 1: II 1 III 1 1800 0 llll 39
WL li II 0 i III 1 0 1 0 llll 0
WT II II 0 1 111 1 0 I 0 llll 0
WR II II 0 1 III 1 0 1 0 HH 0
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
lllll 11 11 EXISTING 11 11 EX.+OTHER II 1 EX.+OTHER 11 mil
lllll EXISTING 11 H + OTHER 11 11 +PROJECT li 1 +PROJECT 11 lllll
lllll V/C ii ii V/C II II V/C ii i V/C-WJMP li lllll
lllll ========= II === 11 ========= II ==;= II ========= II === 1 ========= II === lllll
lllll 0.01 II II 0.01 II II 0.01 II 1 II * lllll lllll 0.35 II * II 0.35 II * II 0.35 II m 1 II HHI
lllll II * II II * II II ## 1 II lllll lllll 0.14 II II 0.14 II II #REF! II 1 11 * mil lllll N.S. II II N.S. II II N.S. II 1 II mil lllll 0.14 II * II 0.14 11 * 11 0.14 II * 1 II * inii
lllll 0.02 II II 0.02 II II 0.02 ll 1 llll
lllll ir 1 ir lllll
lllll 0.35 1 0.35 1 #REF! 0.00 lllll
lllll 0.14 1 0.14 1 0.14 0.00 lllll
lllll 0.05 1 0.05 1 0.05 0.05 mil
lllll ========== = == = ========== = == = ========== ==== : =========== == mil
lllll 0.54 1 0.54 1 0.05 lllll
lllll A 1 A 1 A mil
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & FAR 99 GEO & 99 VOL
i/EMENT 11 11 EXIST 1 PROP 111 1 EXISTING 1 PROPOSED
1! 11 LANES 1 LANES HI CAPACITY 1 CAPACITY
NL II 11 2 1 0 111 3600 1 0
NT II II 3 1 0 111 6000 1 0
NR 11 II 0 1 0 111 0 1 0
SL II II 2 1 0 III 3600 1 0
ST II II 3 1 0 III 6000 1 0
SR II II 0 1 0 IIL 0 1 0
EL II II 2 1 0 111, 3600 1 0
ET II II 2 1 '* III 4000 1 0
ER II II 0 1 0 llll 0 1 0
WL II ii 1 i 0 III: 1800 1 0
WT 11 II 2 1 0 llll 4000 1 0
WR II II 0 1 0 llll 0 1 0
EXISTING
VOLUME
928
441
187
179
981
239
43
59
76
66
50
18
OTHER
VOLUME
2005
PROJECT
VOLUME
ICU SPREADSHEET FILE NAME ECR & FAR 99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
' DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS =
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
mil EXISTING
lllll V/C
lllll 0.26
lllll 0.10
II II EXISTING 11
11 11 + OTHER 11
II II V/C II
II * II 0.26 II *
II II 0.10 11
II EX.+OTHER 11
11 +PROJECT 11
II V/C 11
II 0.26 11 *
II 0.12 11
11 EX.+OTHER 11 lllll
11 +PROJECT 11 lllll
II V/C-WJMP 11 mil
lllll 0.05
lllll 0.20
II II 0-05 11
II * II 0.20 11 '
11 0.05 II
li 0.21 il *
lllll 0.01
lllll 0.03
II II 0.01 11
II * II 0.03 11 *
II 0.01 11 ii 0.04 ii * II II* 5
lllll 0.04
lllll 0.02
II * II 0.04 11 *
II II 0.02 11
II 0.04 II •
II 0.03 II •
lllll 0.46 1 0.46 1 0.47 1 0.00 lllll
lllll 0.07 1 0.07 1 0.08 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.58 1 0.58 1 1 0.05 mil
lllll A 1 A 1 1 A lllll
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & FAR 99 GEO & 99 VOL
ICU SPREADSHEET FILE NAME ECR & FAR 99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
' DENOTES CRITICAL MOVEMENTS
MOVEMENT | 111 EXIST PROP III 1 EXISTING 1 PROPOSED HI 1 EXISTING
[: II LANES LANES lii 1 CAPACITY 1 CAPACITY 111 1 VOLUME
NL II II 2 m 1 3600 1 0 111 1 137
NT II II 3 1 III 1 6000 1 0 111 1 1143
NR II II 0 1 III 1 0 1 0 111 1 88
SL II II 2 1 iii 1 3600 1 0 III 1 59
ST 11 II 3 1 III 1 6000 1 0 HI 1 485
SR 11 II 0 1 III 1 0 1 0 III 1 34
EL 11 II 2 1 III 1 3600 1 0 111 1 194
ET 11 II 2 1 ** III 4000 1 0 111 1 62
ER 11 11 0 1 III 0 1 0 HI 1 830
WL II II 1 111 1800 1 0 III 1 263
WT II II 2 III 4000 1 0 111 i 104
WR 11 II 0 1 111 0 1 0 III 1 82
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS :
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
mil EXISTING
lllll V/C
lllll 0.04
lllll 0.21
11 11 EXISTING 11
11 11 + OTHER II
11 II V/C 11
II II 0.04 11
11 ' II 0.21 11 *
11 EX.+OTHER 11
11 +PROJECT 11
II V/C 11
II 0.04 11
II 0.22 11 *
1 EX.+OTHER 11 mil
1 +PROJECT II lllll
i V/C-WJMP li mil
lllll 0.02
lllll 0.09
II * II 0.02 11 *
II II 0.09 11
11 0.02 11 *
II 0.09 11
lllll 0.05
lllll 0.22
II II 0.05 11
II * II 0.22 11 '
II 0.05 11
il 0.23 ii * II II* lllll
lllll 0.15
lllll 0.05
II * II 0.15 11 *
II II 0.05 II
il 0.15 li *
II 0.06 11 il II- lllll
lllll 0.23 1 0.23 1 0.24 1 0.00 lllll
lllll 0.37 1 0.37 1 0.38 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 lllll
lllll 0.65 1 0.65 ============== 1 0.05 mil
lllll B 1 B 1 1 A mil
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & PAR 99 VOLUMES & 99 GEOMETRICS
MOVEMENT lllll EXIST II PROP llll EXISTING 1 PROPOSED llll EXISTING 11 OTHER II
2005 1
PROJECT 1 HI EXISTING
II 11 EXISTING
11 11 + OTHER
11 11 EX.+OTHER
11 11 +PROJECT jj II EX.+OTHER 11 11
11 +PROJECT II 11 lllll LANES 11 LANES llll CAPACITY 1 CAPACITY llll VOLUME 11 VOLUME II VOLUME 1 III V/C 11 II V/C II II V/C 11 ii V/C-W_IMP 11 II
lllll II ~ llll llll ll II III ===——==:—— II ~~~ II =====^=== II === [1 II ~~~ 11 ll X—r 11 NL
NT
lllll 1 II
lllll 3 11
0 llll
0 llll
1800 1
6000 1
0 llll
0 HH
32 11
547 11 II III 0.02
III 0.09
II II 0.02
II * II 0.09
II II 0.02
II * II 0.09 II • II 11* II NR lllll 1 li 0 llll 1800 1 0 llll 400 II II 111 0.22 II II 0.22 II II 0.24 II II 11 II SL lllll 2 11 0 llll 3600 1 0 llll 650 11 II III 0.18 II * II 0.18 11 * 11 0.19 II * II II II ST lllll 3 11 0 llll 6000 1 0 llll 592 11 11 III 0.10 II II 0.10 II II 0.10 II II II * II SR lllll 1 II 0 llll 1800 1 0 llll 341 11 11 III 0.19 II II 0.19 II II 0.19 II II II II EL lllll 2 ii 0 llll 3600 1 0 llll 126 11 il III 0.04 II * II 0.04 II * II 0.04 II II II * II ET lllll 3 II 0 llll 6000 1 0 llll 620 11 II III 0.11 II II 0.11 II II 0.11 II * II II II ER lllll 0 II 0 llll 0 1 0 llll 36 11 II III ii il II li II II II II WL lllll 2 11 0 llll 3600 1 0 llll 458 11 II III 0.13 II II 0.13 11 11 0.16 II * II II II WT lllll 3 11 0 llll 6000 1 0 llll 1260 11 il III 0.21 II * II 0.21 II * 11 0.22 II II II * II WR lllll 1 II 0 llll 1800 1 0 llll 916 II III 0.51 II II 0.51 II II 0.52 11 II II II
NORTH/SOUTH CRITICAL SUMS = 1 III 0.27 1 0.27 1 0.28 1 0.00 11 ICU SPREADSHEET FILE NAME ECR&PAR 99&99 III 1 0.00 11
N = NORTHBOUND. S = SOUTHBOUND
EAST/WEST CRITICAL SUMS = III 0.25 1 0.25 1 0.27 1 0.00 II
E = EASTBOUND, W = WESTBOUND CLEARANCE = III 0.05 1 0.05 1 0.05 1 0.05 II L = LEFT, T = THROUGH, R
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
= RIGHT III _
1 0.05 1 0.05 II L = LEFT, T = THROUGH, R
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
= RIGHT
ICU VALUE = III 0.57 1 0.57 1 1 0.05 11
* DENOTES CRITICAL MOVEMENTS LOS = III A 1 A 1 1 A II
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
ECR & PAR 99 VOLUMES & 99 GEOMETRICS
ICU SPREADSHEET FILE NAME ECR&PAR 99&99 |
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT | 111 EXIST II PROP III 1 EXISTING 1 PROPOSED llll EXISTING
1 III LANES II LANES 111 1 CAPACITY i CAPACITY llll VOLUME
NL 1 II 1 1 1 1 1800 1 0 llll 72
NT li II 3 II III 1 6000 1 0 llll 523
NR 1 ,11 1 li III 1 1800 1 0 llll 434
SL 1 .11 2 11 HI 1 3600 1 0 llll 918
ST 1 III 3 li III 1 6000 i 0 llll 724
SR 1: .11 1 il III 1 1800 1 0 llll 132
EL 1 III 2 ii III 1 3600 1 0 llll 254
ET 1 III 3 II III 1 6000 1 0 llll 1417
ER 1 III 0 ii iii 1 0 1 0 llll 87
WL 1 III 2 11 III 1 3600 1 0 III 337
WT 1 III 3 II III 1 6000 1 0 IH 717
WR 1 III 1 1^ 1 1 1800 1 0 111, 424
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING
V/C
11 11 EXISTING
II 11 + OTHER
II 11 V/C
11 11 EX.+OTHER 11
11 11 +PROJECT 11
11 II V/C 11
1 EX.-I-OTHER 11
+PROJECT 11
1 V/C-W_IMP 11
0.04
0.09
0.24
0.26
0.12
0.07
0.07
0.25
11 II 0.04
II * II 0.09
II II 0.24
II * II 0.26
ii li 0.12
II II 0.07
II II 0.07
11 * II 0.25
II II 0.04 11
11 * 11 0.09 11 *
ii li 0.26 li
II * II 0.26 11 *
il il 0.12 li
II II 0.07 11
II II 0.07 II
II * II 0.25 11 *
:
0.09
0.12
0.24
II * II 0.09
II II 0.12 ii ii 0.24
II * II 0.13 11 *
II II 0.13 11
II 11 0.29 II 1 1 *
0.35 1 0.35 1 0.35 1 0.00
0.34 1 0.34 1 0.38 1 0.00
0.05 1 0.05 1 0.05 1 0.05
0.74 1 0.74 1 1 0.05
C 1 c 1 1 A
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
CARLSBAD
AM PEAK HOUR
INTERSECTION: COLLEGE & FARADAY 1999 VOLUMES WITH EXISTING CONDITIONS
lllll 11 II II il lllll II II 2005 11 II II 11 EXISTING 11 11 EX.+OTHER 11 11 EX.+OTHER II
MOVEMENT lllll EXIST 11 PROP 11 11 EXISTING II PROPOSED mil EXISTING 11 OTHER 11 PROJECT |1 11 EXISTING II 11 + OTHER 11 11 +PROJECT II 11 +PROJECT II
lllll LANES 11 LANES 11 11 CAPACITY II CAPACITY lllll VOLUME 11 VOLUME 11 VOLUME H 11 V/C 11 II V/C 11 II V/C 11 II V/C-W IMP 11
=—====— 11111======= 1 ======= 11 II = 11 ========= lllll ========= II ========= 11 ========= II II ========= li === II ========= II ==z II ========= II === 11 ========= 11 == NL lllll 2 II 0 II 11 3600 11 0 lllll 180 II ii II 11 0.05 11 ' II 0.05 11 * 11 0.05 11 * II 11 * NT lllll 2 1 0 11 11 4000 11 0 lllll 105 11 li II II 0.03 II II 0.03 11 II 0.03 II II II NR iilii 1 1 0 11 11 1800 II 0 iiHl 315 11 II II II 0.18 II II 0.18 11 11 0.18 11 II II SL lllll 2 1 0 11 11 3600 II 0 Hill 210 ii li II 11 0.06 11 II 0.06 11 11 0.06 11 II 11 ST lllll 3 1 0 II 11 6000 II 0 lllll 315 11 II 11 II 0.05 II * 11 0.05 11 * 11 0.05 II ' II 11 * SR lllll 1 1 0 II 11 1800 II 0 lllll 65 11 ii II II 0.04 II II 0.04 II II 0.04 II II II EL lllll 2 1 0 II 11 3600 II 0 Hill 5 II II II II 0.00 11 * II 0.00 11 * 11 0.00 11 * 11 11 * ET lllll 2 1 0 11 11 4000 II 0 mil 60 11 ii 11 II 0.02 11 II 0.02 11 II 0.02 11 II II ER lllll 1 I 0 11 II 1800 II 0 lllll 40 II II II II 0.02 II 11 0.02 II 11 0.02 11 II II WL lllll 2 '1 0 II II 3600 1! 0 lllll 48 II ii II II 0.01 11 II 0.01 II II 0.01 11 II II WT lllll 2 1 0 II 11 4000 II 0 mil 185 11 II 11 II 0.05 11 * II 0.05 11 * 11 0.05 II * II II * WR lllll 1 1 0 II 11 1800 II 0 lllll 25 11 II II II 0.01 11 II 0.01 11 II 0.01 11 11 11
ICU SPREADSHEET FILE NAME COL&FAR99&99 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.10
0.05
0.05
0.20
0.10
0.05
0.05
0.20
0.10
0.05
0.05
0.20
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL
INTERSECTION
CARLSBAD
PM PEAK HOUR
COLLEGE & FARADAY 1999 VOLUMES WITH EXISTING CONDITIONS
lllll II
lllll MOVEMENT 1| 11 EXIST PROP llll EXISTING PROPOSED 111 EXISTING
lllll 11 II LANES LANES lllll CAPACITY CAPACITY 111 VOLUME
lllll ========= II 11======= j ======= mil ========= ========= III ========= lllll NL II II 2 1 lllll 3600 0 III 65
lllll NT 11 II 2 1 lllll 4000 0 111 255
lllll NR II II 1 lllll 1800 0 111 100
lllll SL II II 2 1 lllll 3600 0 111 25
lllll ST 11 11 3 1 lllll 6000 0 111 135
lllll SR 11 II 1 lllll 1800 1 0 III 10
lllll EL 11 II 2 1 lllll 3600 1 0 III 40
lllll ET 11 11 2 1 lllll 4000 1 0 III 145
lllll ER II II 1 lllll 1800 1 0 HI 155
lllll WL 11 II 2 1 lllll 3600 1 0 111 325
lllll WT 11 11 2 1 lllll 4000 1 0 III 35
lllll WR 11 il 1 i lllll 1800 1 0 III 230
ICU SPREADSHEET FILE NAME COL&FAR 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS ••
EASTAVEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
lllll II 11 EXISTING 11 11 EX.+OTHER II 1 EX.+OTHER 11 mil
lllll EXISTING II 11 + OTHER 11 11 +PROJECT II 1 +PROJECT II lllll
lllll V/C 11 II V/C 11 11 V/C II 1 V/C-WJMP II mil
lllll ========= 11 === II ========= 11 ==: II ========= II === 1 ========= II === mil
lllll 0.02 11 II 0.02 11 11 0.02 11 1 II • mil lllll 0.06 11 * II 0.06 11 * ii 0.06 ii * 1 11 lllll lllll ' 0.06 11 II 0.06 11 li 0.06 II II HH lllll 0.01 11 * II 0.01 11 * 11 0.01 11 * 1 11 nil lllll 0.02 11 II 0.02 11 11 0.02 11 I 11 * llll lllll 0.01 11 II 0.01 11 II 0.01 11 1 II llll Hill 0.01 II II 0.01 11 II 0.01 11 1 II * nil lllll 0.04 II * II 0.04 11 * II 0.04 II • 1 11 llll lllll 0.09 11 II 0.09 11 11 0.09 II 1 11 llll lllll 0.09 11 * 11 0.09 11 * II 0.09 11 * 11 llll Hill 0.01 11 II 0.01 11 II 0.01 II II * llll lllll 0.13 11 11 0.13 11 II 0.13 11 1 II HH
lllll 0.07 1 0.07 1 0.07 0.00 llll
lllll 0.13 1 0.13 1 0.13 0.00 nil'
lllll 0.05 1 0.05 1 0.05 0.05 llll
lllll ========== = == = ========== = == = ========== = == = = ========== = == llll
lllll 0.25 1 0.25 1 0.25 0.05 llll
lllll A 1 A 1 A A mil
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
PAR & COLLEGE 1999 VOLUMES WITH EXISTING CONDITIONS
llll 11 HII II lllll II II 2005 11 II 11 II EXISTING 1 11 EX.+OTHER 11 II EX.-I-OTHER II
MOVEMENT JJJJ EXIST )J PROP jJlil EXISTING )) PROPOSED IIJIJ EXISTING )J OTHER 1) PROJECT )| JI EXISTING j) IJ + OTHER J JJ +PROJECT JJ JJ +PROJECT JJ
llll LANES i| LANES lllll CAPACITY 11 CAPACITY lllll VOLUME 11 VOLUME 11 VOLUME 11 II V/C II II V/C 1 II V/C 11 li V/C-WJMP 11
NL llll 2 1 0 lllll 3600 11 0 HHI 12 11 II Ij 11 0.00 11 * 11 0.00 1 ' II 0.00 11 * 'jj jj=; NT llll 2 11 0 lllll 4000 II 0 HHI 14 11 11 11 II 0.00 11 11 0.00 1 II 0.00 11 II II NR llll 1 II 0 lllll 1800 11 0 HHI 9 11 li II II 0.01 II II 0.01 1 11 0.01 11 11 II SL HH 1 II 0 lllll 1800 11 0 HHI 55 11 ii II II 0.03 II 11 0.03 1 11 0.03 II li ii ST llll 2 II ** lllll 4000 II 0 lllll 8 11 li II 11 0.04 11 * 11 0.04 1 * 11 0.04 II * II II * SR llll 0 II 0 mil 0 II 0 Hill 166 11 ii II II li 11 1 li 11 II 11 EL llll 2 II 0 mil 3600 11 0 lllll 1076 li il II II 0.30 11 * 11 0.30 1 * 11 0.30 11 * 11 II * ET llll 3 II 0 mil 6000 11 0 mil 1393 11 ii II 11 0.23 11 11 0.23 1 11 0.23 II 11 II
ER llll 1 II 0 mil 1800 11 0 mil 66 11 li II II 0.04 II 11 0.04 1 11 0.04 11 ii li WL llll 2 II 0 Hill 3600 II 0 lllll 26 11 li II II 0.01 11 11 0.01 i 11 0.01 11 li li WT llll 3 11 0 mil 6000 i\ 0 mil 930 11 il II II 0.16 11 • II 0.16 1 * 11 0.16 II * il li ' WR llll 1 II 0 mil 1800 11 0 lllll 38 11 II II 11 0.02 11 11 0.02 1 11 0.02 11 II 11
ICU SPREADSHEET FILE NAME PAR&COL 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.04
0.46
0.05
0.55
0.04
0.46
0.05
0.55
0.04
0.46
0.05
0.55
0.00
0.00
0.05
0.05
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
PAR & COLLEGE 1999 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT | 111 EXIST 1 PROP mil EXISTING PROPOSED HI 1 EXISTING
1 III LANES 1 LANES mil CAPACITY CAPACITY HI 1 VOLUME
NL 1 111 2 1 llll 3600 0 III 1 36
NT 1 III 2 1 lllll 4000 0 III 1 1
NR 1 111 1 1 lllll 1800 0 IH i 11
SL 1 III 1 lllll 1800 0 IH 1 36
ST 1 III 2 1 ** lllll 4000 0 III i 7 SR 1 III 0 1 lllll 0 0 111 1 985
EL 1 III 2 1 lllll 3600 0 III 1 228
ET 1 111 3 1 lllll 6000 0 III 1 1211
ER 1 111 1 lllll 1800 0 HI 1 24
WL 1 111 2 1 lllll 3600 0 III 1 11
WT 1 111 3 1 lllll 6000 0 111 i 1731
WR 1 111 1 1 iliil 1800 0 HI 1 99
ICU SPREADSHEET FILE NAME PAR&COL 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
HHI EXISTING
lllll V/C
11 11 EXISTING
11 II + OTHER
11 II V/C
11 11 EX.+OTHER
11 11 +PROJECT
II II V/C
II 11 EX.+OTHER 11 HHI
11 11 +PROJECT 11 Hill
II 11 V/C-WJMP 11 mil
lllll 0.01
lllll 0.00
lllll 0.01
lllll 0.02
lllll 0.25
II * II 0.01
II 11 0.00
11 II 0.01
II 11 0.02
II * II 0.25
II * 11 0.01
II 11 0.00
11 11 0.01
II 11 0.02
II * II 0.25 II * II II * Mill
lllll 0.06
lllll 0.20
lllll 0.01
lllll 0.00
lllll 0.29
lllll 0.06
II * II 0.06
II II 0.20
II II 0.01
II li 0.00
II ' II 0.29
II II 0.06
II * II 0.06
11 II 0.20
11 II 0.01
II 11 0.00
II * 11 0.29
II II 0.06
11 * II II * lltll
II "11 II lllll
lllll 0.26 1 0.26 1 0.26 1 0.00 lllll
lllll 0.35 1 0.35 1 0.35 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.66 1 0.66 1 0.66 1 0.05 mil
lllll B 1 B 1 B 1 A mil
'* REPRESENTS RIGHT & THROUGH/RIGHT
Year 2005
Conditions
INTERSECTION CAPACITY UTILI27\TION ANALYSIS
PROJECT:
INTERVAL:
CARLSBAD
AM PEAK HOUR
INTERSECTION: ECR & TAMARACK 2005 VOLUMES WITH EXISTING CONDITIONS
lllll II II 11 II 11 II 11 II 2005 11 II II 11 EXISTING 11 11 EX.+OTHER 11 11 EX.+OTHER 11
MOVEMENT |1||1 EXIST II PROP 11 11 EXISTING II PROPOSED II 11 EXISTING 11 OTHER 11 PROJECT 1| 11 EXISTING li 11 + OTHER 11 11 +PROJECT 11 11 +PROJECT 11 lllll LANES li LANES II 11 CAPACITY 11 CAPACITY 11 II VOLUME 11 VOLUME 11 VOLUME 1' II V/C 11 11 V/C 11 II V/C II 11 V/C-WJMP 11
lllli II ll II II [I 11 II II 1 II ========= (1 ==-ll == === = === [[ === [| === = ===== II === II ========= Ij —7 NL mil 1 II 0 II II 1800 II 0 11 11 121 II il II 11 0.07 II ' II 0.07 11 * II 0.07 11 * II II * NT mil 2 II 0 II II 4000 II 0 11 II 1032 11 11 11 II 0.26 11 11 0.26 11 II 0.26 11 II 11 NR lllll 1 II 0 11 11 1800 II 0 11 II 74 ii II 1 11 0.04 11 II 0.04 11 II 0.04 11 II II SL mil 1 11 0 II II 1800 II 0 II II 37 II II II II 0.02 II II 0.02 II II 0.02 11 11 II ST mil 2 II 0 11 11 4000 II 0 11 II 1325 11 li II 11 0.33 11 * II 0.33 11 * 11 0.33 11 * II II * SR lllll 1 II 0 II 11 1800 11 0 II II 11 11 II 1 II 0.01 ii II 0.01 11 II 0.01 II II 11 EL lllll 1 11 0 11 H 1800 II 0 II II 88 11 il 1 II 0.05 11 II 0.05 II II 0.05 II II II <
ET lllll 1 II 0 11 11 2000 11 0 II II 50 11 11 II II 0.03 II ' II 0.03 11 * 11 0.03 II * II II ER lllll 1 II 0 II 11 1800 11 0 II II 327 11 II ll II 0.18 11 11 0.18 11 II 0.18 11 II II WL mil 1 11 0 11 11 1800 II 0 II II 370 11 II 1 ill 0.21 II * II 0.21 II * 11 0.21 11 * 11 II WT mil 2 II 0 II II 4000 II 0 II H 135 11 ii 1 III 0.06 11 II 0.06 11 II 0.06 11 11 II * WR mil 0 11 0 11 II 0 11 0 II II 95 11 II 1 II 11 __ II II II II II II
NORTH/SOUTH CRITICAL SUMS = | III 0.40 1 0.40 1 0.40 1 0.00
ICU SPREADSHEET FILE NAME ECR&TAM 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.24
0.05
0.69
0.24
0.05
0.69
0.24
0.05
0.69
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & TAMARACK 2005 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&TAM 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS = lllll 0.48 1 0.48 1 0.48 1 0.00
EAST/WEST CRITICAL SUMS = lllll 0.15 1 0.15 1 0.15 1 0.00
CLEARANCE = lllll 0.05 1 0.05 1 0.05 1 0.05
ICU VALUE = lllll 0.68 1 0.68 1 0.68 1 0.05
LOS = lllll B 1 B 1 B 1 A
1 II llll lllll 11 II II 11 1 11 EXISTING 1 11 EX.+OTHER 1 11 EX.+OTHER 11
MOVEMENT 1 11 EXIST PROP llll EXISTING PROPOSED iiill EXISTING II OTHER 11 PROJECT |1 11 EXISTING 1 11 + OTHER 1 11 -i-PROJECT 1 11 +PROJECT 11 1 ,11 LANES LANES llll CAPACITY CAPACITY Hill VOLUME II VOLUME 11 VOLUME |1 II V/C 1 II V/C 1 II V/C 1 11 V/C-W IMP 11
========= 1 ill ======= 1 ======= nil ========= ========= mil ========= II ========= il ========= il II ========= I === II ===-1 === 11 ========= === 1 ========= ==
NL 1 III 1 liiil 1800 0 lllll 319 11 ii ii 11 0.18 1 * II 0.18 1 * 11 0.18 1 * II II *
NT 1 III 2 lllll 4000 0 iiill 1197 11 li II 11 0.30 1 11 0.30 1 11 0.30 1 II II NR 1 III 1 lllll 1800 0 lllll 433 11 li II 11 0.24 1 II 0.24 1 11 0.24 1 II II SL 1 III 1 lllll 1800 0 Hill 228 11 ii II II 0.13 1 II 0.13 1 11 0.13 1 II II ST 1 III 2 lllll 4000 0 Hill 1214 11 ii II 11 0.30 1 * 11 0.30 1 * 11 0.30 1 * II II * SR 1 III 1 lllll 1800 0 lllll 144 il li II 11 0.08 1 II 0.08 1 11 0.08 1 II II EL 1 III 1 lllll 1800 0 Hill 21 il li II 11 0.01 1 II 0.01 1 11 0.01 1 II II * ET 1 III 1 lllll 2000 0 lllll 172 II 11 II 11 0.09 1 * 11 0.09 1 * 11 0.09
ER 1 III 1 llll 1800 0 lllll 131 11 il II II 0.07 1 11 0.07 1 11 0.07 1 11 II WL 1 III 1 llll 1800 0 lllll 113 II li II 11 0.06 1 * 11 0.06 1 ' 11 0.06 1 ' 11 II WT 1 III 2 llll 4000 0 Hill 76 11 II 11 li 0.03 1 11 0.03 1 11 0.03 1 II II • WR 1 III 0 llll 0 0 lllll 48 II II II 11 1 II 1 II 1 11 11
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & COLLEGE 2005 VOLUMES WITH EXISTING CONDITIONS
11 11 lllll llll 11 2005 II II 11 11 EXISTING 11 11 EX.+OTHER 11 II EX.+OTHER II MOVEMENT || II EXIST PROP mil EXISTING 1 PROPOSED llll EXISTING 11 OTHER 1 PROJECT 11 11 EXISTING 11 11 + OTHER 11 li +PROJECT 11 11 +PROJECT 11
li II LANES LANES lllll CAPACITY CAPACITY Hi VOLUME 11 VOLUME 1 VOLUME II 11 V/C 11 ii V/C li II V/C 11 ii V/C-WJMP il
J, II " i lllll — . 1 === === = = = |||l . II 1 II II ========= II === II ==== ===== jj === II ========= II ==r II ========= 11 =: NL II 11 1 1 0 lllll 1800 1 0 llll 208 11 II II 0.12 il * 11 0.12 11 * II 0.12 il • 11 II * NT II 11 2 1 0 lllll 4000 I 0 llll 622 II II II 0.16 11 II 0.16 11 II 0.16 11 11 II NR II II 0 0 lllll 0 i 0 llll s 11 1 II II II II II II II II II SL 1 II 0 0 lllll 0 0 Ili 12 11 1 11 II 11 11 II 11 II 11 II ST 11 II 2 1 0 lllll 4000 1 0 llll 1676 11 ii II 0.42 11 * II 0.42 11 * li 0.42 II * 11 II * SR II II FREE 1 0 lllll N.S. 1 0 llll 817 11 II II N.S. 11 II N.S. 11 II N.S. II II II EL II II 2 1 0 lllll 3600 1 0 llll 208 11 1 II 11 0.06 11 * II 0.06 11 * II 0.06 11 * II 11 ' ET r II 0 1 0 Hill 0 0 Hi 5 II 1 11 II il II II II 11 11 II ER II II 1 1 0 HHI 1800 1 0 llll 135 11 1 il II 0.08 II II 0.08 II II 0.08 11 II II WL II II 0 1 0 lllll 0 1 0 llll 65 11 1 II II II II II 11 11 II 11 WT |! II 0 1 0 lllll 0 0 III 45 11 1 11 li ii * ii li * II 11 • II II * WR II II 0 1 0 mil 0 0 HI 34 11 1 II II II II II II II 11 II
ICU SPREADSHEET FILE NAME ECR&COL 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS •
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.54
0.06
0.05
0.65
0.54
0.06
0.05
0.65
0.54
0.06
0.05
0.65
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & COLLEGE 2005 VOLUMES WITH EXISTING CONDITIONS
1 III 1 III III 1 li II 11 11 1 11 EXISTING 1 11 EX.+OTHER EX.+OTHER 11
MOVEMENT | III EXIST 1 PROP 111 1 EXISTING PROPOSED HI 1 EXISTING 11 OTHER 11 PROJECT i| 11 EXISTING 1 11 -I- OTHER 1 - 11 -i-PROJECT +PROJECT 11
1 III LANES 1 LANES 111 1 CAPACITY CAPACITY HI 1 VOLUME 11 VOLUME 11 VOLUME || II V/C i II V/C 1 ii V/C V/C-WJMP ii
========= 1 111======= 1 ======= 111 1 ========= ====-==-= HI 1 ========= II —=== II ===== II 11 ========= 1 === II ========= 1 ==: II ========= 1 === 1 ========= II == NL 1 III 1 1 HI 1 1800 0 HI 1 104 11 li II 11 0.06 1 11 0.06 1 II 0.06 1 ## 1 11 * NT 1 III 2 1 HI 1 4000 0 HI 1 1534 11 li II 11 0.40 1 * 11 0.40 1 * ii 0.40 1 1 II NR 1 III 0 1 111 1 0 0 111 1 73 11 li II 11 1 li 1 II II SL 1 111 0 1 iii 1 0 0 HI 1 50 li li il 11 1 * II 1 * II 1 1 II ST 1 III 2 1 ili 1 4000 0 HI 1 624 11 ii il II 0.17 1 II 0.17 1 11 #REF! 1 ## 1 II * SR 1 III FREE 1 III 1 N.S. 0 HI 1 260 11 ii II II N.S. 1 li N.S. 1 II N.S. II EL 1 111 2 1 III 1 3600 0 HI 1 15 11 ii II II 0.00 1 * 11 0.00 1 * 11 0.00 1 * 1 II * ET 1 III 0 1 III 1 0 0 HI 1 53 11 II II 11 1 li I II II ER 1 111 1 III 1 1800 0 HI i 201 ii ii il II 0.11 1 II 0.11 1 II 0.11 |]
WL 1 111 0 1 III 1 0 0 HI 1 15 11 ii II III I II 1 II II WT 1 III 0 1 III 1 0 0 III 1 11 II ii 1 lii t * II t * |i 1 ' 1 II * WR 1 111 0 1 III 1 0 0 HI 1 17 ii II 1 III 1 II 1 II 11
ICU SPREADSHEET FILE NAME ECR&COL 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.40
0.00
0.05
0.45
0.40
0.00
0.05
0.45
#REF!
0.00
0.05
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & FAR 99&05
ICU SPREADSHEET FILE NAME ECR & FAR 99&05
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT H II EXIST 1 PROP mil EXISTING [ =ROPOSE[ 11 1 EXISTING
II II LANES 1 LANES mil CAPACITY 1 CAPACITY 11 II VOLUME
NL II II 2 1 0 lllll 3600 I 0 11 II 1160
NT II 11 3 1 0 lllll 6000 1 0 II II 1007
NR II 11 0 1 0 lllll 0 1 0 11 II 0
SL II II 2 1 0 mil 3600 1 0 II II 19
ST II II 3 1 0 lllll 6000 1 0 11 11 1600
SR II II 0 j 0 lllll 0 1 0 11 II 171
EL 11 li 2 1 0 lllll 3600 1 0 II 1 65
ET II II 2 1 ** lllll 4000 0 11 1 6
ER II II 0 1 0 lllll 0 0 11 1 400
WL II II 1 i 0 lllll 1800 0 11 1 61
WT II II 2 1 0 lllll 4000 1 0 11 1 27
WR II II 0 1 0 lllll 0 0 11 1 4
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING
V/C
0.32
0.17
11 11 EXISTING II
11 11 + OTHER 11
11 II V/C 11
11 * II 0.32 11 '
11 II 0.17 11
11 EX.+OTHER
11 +PROJECT
11 V/C
11 0.32
II 0.17
II II EX.+OTHER il
II 11 +PROJECT II
11 ii V/C-W_IMP li
0.01
0.30
II II 0.01 11
II * II 0.30 11 '
II 0.01
11 0.30 II * II It *
0.02
0.10
11 li 0.02 II
11 * 11 0.10 11 '
II 0.02
11 0.10
II II II t
II * II II
0.03
0.01
II * 11 0.03 II '
II II 0.01 H
11 0.03
11 0.01
0.62 1 0.62 1 0.62 1 0.00
0.13 1 0.13 1 0.13 1 0.00
0.05 1 0.05 1 0.05 1 0.05
0.80 1 0.80 1 0.80 1 0.05
C 1 c 1 c 1 A
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & FAR 99&05
llll lllll 11 lllll II II 1 HI I 11 EXISTING 11 11 EX.+OTHER II II EX.+OTHER 11
MOVEMENT |||| EXIST 1 PROP lllll EXISTING II =ROPOSE[ lllll EXISTING 11 OTHER 11 PROJECT 1 111 EXISTING 1 11 + OTHER 11 11 +PROJECT 11 11 +PROJECT 11
llll LANES 1 LANES Hill CAPACITY II CAPACITY mil VOLUME 11 VOLUME 11 VOLUME 1 111 V/C 1 11 V/C 11 II V/C 11 11 V/C-WJMP 11
========= llll ======= lllll ========= 1 ========= mil ========= II ========= il III ========= II ========= 11 === 11 ========= 11 ===
NL llll 2 1 lllll 3600 11 0 mil 316 11 li 1 ill 0.09 1 11 0.09 11 11 0.09 II II II *
NT llll 3 1 lllll 6000 W 0 lllll 1481 li il 1 III 0.27 1 * II 0.27 11 * II 0.27 II * H II
NR llll 0 1 lllll 0 11 0 lllll 115 11 11 1 IH 1 II II II 11 11 11
SL HH 2 1 lllll 3600 II 0 mil 5 11 li 1 III 0.00 1 • 11 0.00 II * 11 0.00 II * 11 y
ST llll 3 1 iiiii 6000 II 0 mil 959 11 li 1 IH 0.17 1 H 0.17 H H 0.17 11 H 11 *
SR llll 0 1 lllll 0 11 0 lllll 67 11 11 1 III 1 II II II II 11 II
EL llll 2 1 lllll 3600 H 0 mil 69 11 II 1 III 0.02 1 11 0.02 11 II 0.02 II 11 II'
ET llll 2 1 '* lllll 4000 11 0 mil 42 11 11 1 III 0.21 1 * 11 0.21 11 -H 0.21 11 ' H 11
ER llll 0 1 lllll 0 II 0 HH 803 11 ii 1 HI 1 W II II 11 II 11
WL llll 1 1 mil 1800 11 0 HH 0 11 il 1 HI 0.00 1 * II 0.00 11 * II 0.00 11 * W II
WT llll 2 1 lllll 4000 11 0 llll 7 II ii HII 0.01 1 H 0.01 II 11 0.01 II 11 II'
WR llll 0 1 lllll 0 11 0 llll 16 11 II .,. llll
MM
1 H II II 11 11 H
ICU SPREADSHEET FILE NAME ECR & FAR 99&05
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ^
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.27 1 0.27 1 0.27
0.21 1 0.21 1 0.21
0.05 1 0.05 1 0.05
0.53 1 0.53 1 0.53
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & PAR 2005 VOLUMES & 99 GEOMETRICS
ii II 1 lllll llll II 1 2005 11 II II 1 MOVEMENT i| 11 EXIST 1 PROP mil EXISTING PROPOSED llll EXISTING II OTHER 1 PROJECT 11 II EXISTING 11 1
i II LANES 1 LANES lllll CAPACITY CAPACITY llll VOLUME 11 VOLUME 1 VOLUME 11 11 V/C 11 1
========= 11 11======= 1 ======= mil ========= ========= nil ========= II ========= 1 ========= II II ========= 11 === 1 NL 11 11 1 1 0 lllll 1800 0 llll 74 11 1 II 11 0.04 11 1 NT II II 3 1 0 IHH 6000 0 llll 1106 11 1 11 11 0.18 11 * 1
NR 11 il 1 i 0 IHH 1800 0 llll 856 11 1 II II 0.48 11 1
SL 11 11 2 1 0 lllll 3600 0 llll 1128 11 1 II 11 0.31 11 * 1
ST 11 11 3 1 0 lllll 6000 0 llll 609 II 1 II II 0.10 11 1 SR 11 ii 1 i 0 lllll 1800 0 llll 350 II 1 II II 0.19 11 1 EL II 11 2 1 0 Hill 3600 0 llll 147 II 1 11 II 0.04 11 1
ET 11 11 3 1 0 lllll 6000 0 llll 510 11 1 II II 0.10 11 * 1
ER 11 II 0 1 0 lllll 0 0 llll 60 II 1 II II II 1 WL 11 II 2 1 0 lllll 3600 1 0 llll 566 11 1 11 II 0.16 11 * 1 WT 11 II 3 1 0 lllll 6000 0 llll 762 il 1 II 11 0.13 11 1
WR II II 1 i 0 lllll 1800 1 0 llll 983 11 1 II II 0.55 11 1
ICU SPREADSHEET FILE NAME ECR&PAR 99&05 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.49
0.26
0.05
0.80
EXISTING
+ OTHER
V/C
0.04
0.18
0.48
0.31
0.10
0.19
0.04
0.10
0.16
0.13
0.55
0.49
0.26
0.05
0.80
EX.+OTHER
+PROJECT
V/C
0.04
0.18
0.48
0.31
0.10
0.19
0.04
0.10
0.16
0.13
0.55
0.49
0.26
0.05
0.80
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & PAR 2005 VOLUMES & 99 GEOMETRICS
ii II 1 lllll III 1 11 II II II 1 11 EXISTING 11 11 EX.+OTHER 11 11 EX.+OTHER 11 MOVEMENT i| 11 EXIST 1 PROP HHI EXISTING PROPOSED 111 1 EXISTING 11 OTHER 11 PROJECT i| II EXISTING 1 11 + OTHER 11 11 +PROJECT 11 11 +PROJECT 11
II 11 LANES 1 LANES HHI CAPACITY CAPACITY 111 1 VOLUME 11 VOLUME 11 VOLUME H II V/C 1 11 V/C 11 II V/C II 11 V/C-W_IMP II
========= II 11======= 1 ======= llll ========= == = III 1 II ========= II ========= II 11 ========= 1 === II ========= II === 11 ========= 11 === II ========= II =: NL II II 1 Iiill 1800 0 III 1 102 11 11 II 11 0.06 1 II 0.06 11 II 0.06 II NT II II 3 1 lllll 6000 0 HI 1 629 11 II II II 0.10 1 * II 0.10 11 * II 0.10 11 * II II NR II II 1 1 llll. 1800 0 111 1 291 11 ii II II 0.16 1 H 0.16 H H 0.16 11 11 11 SL II II 2 1 lllll 3600 1 0 111 1064 11 II II II 0.30 1 * 11 0.30 11 * II 0.30 ii * II II ST 11 II 3 1 lllll 6000 1 0 111 661 11 II II II 0.11 1 11 0.11 li II 0.11 11 II 11 * SR 11 ii 1 lllll 1800 0 111 1 102 11 li II II 0.06 1 II 0.06 11 il 0.06 ii II II EL 11 II 2 1 iiir 3600 0 HI 1 319 11 il II 11 0.09 1 11 0.09 11 II 0.09 II II II * ET II II 3 1 llll 6000 0 111 1 901 11 ii II 11 0.18 1 * H 0.18 11 * II 0.18 11 ' II II ER II II 0 1 llll 0 0 111 1 162 11 il 11 11 1 II ii II I II II WL II II 2 iiil 3600 0 III 1 483 ii ii ii H 0.13 1 * H 0.13 \\ ' H 0.13 II * II II WT II II 3 1 lllll 6000 1 0 111 1 497 ii II II 11 0.08 1 II 0.08 11 II 0.08 11 II II * WR 11 II 1 lllll 1800 0 111 I 997 11 II H 11 0.55 1 11 0.55 11 II 0.55 11 II II
ICU SPREADSHEET FILE NAME ECR&PAR 99&05 |
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS =
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.40
0.31
0.05
0.76
0.40
0.31
0.05
0.76
0.40
0.31
0.05
0.76
0.00
0.00
0.05
0.05
SO'O
SO'O
OO'O
OO'O
cJlAII /V\-0/A
i03rO!dd+
a3H10+'X3
oeo
SO'O
60'0
91.0
0/A
io3royd+
y3HiO+'X3
OE'O
90'0
eo'o
oro
0/A
y3HX0 ^
9NI1SIX3
oe'o
SO'O
60-0
H-O
11 11 11 eo'o 11 11 eo^o II II eoo lllll II II 1.9 lllll 0 II 0081.
. 11 11 11 90-0 11 11 90-0 11 11 90'0 lllll 11 II zzz lllll 0 II coot'
II II . II wo II . II wo II . 11 PO'O Hill II II IZl lllll 0 II 0098
11 H II fO'O II II wo II II fO'O lllll 11 II 8Z IHH 0 II 0081
11 11 , II 90'0 11 . 11 90'0 II . II 90'0 lllll II II 1.61. Hill 0 II ooot'
. 11 11 11 SO'O II II 30-0 II II ZO'O lllll II 11 12 . lllll 0 11 0098
11 11 II QZO II II oz o II 11 OZ'O lllll II II Z9£ lllll 0 II 0081
, 11 II II 90'0 II II SO'O II II 90'0 lllll II II IZZ lllll 0 II 0009
II 11 . 11 oro II . 11 oro II . II oro lllll 11 II 89£ lllll 0 li 0098
II 11 11 IVO II H IVO II II IVO lllll 11 II lit lllll 0 II 0081
11 II . 11 90-0 II . II 90'0 II . II 90'0 lllll II II 5ZZ lllll 0 il ooot'
. 11 II 11 900 II II SO'O II II 50'0 lllll II 11 681. lllll 0 11 0098
0/A
0NIiSIX3
•• son
= 3mvA noi
= 30NVyV310
: si'jns ivoiiiao is3/wisv3
= swns nvoiiiao Hinos/HiyoN
3l^\imOA
i03royd
9003
aiftimoA
y3HiO
awmoA
0NIiSIX3
SiN31M3AOtN IVOIliyO S310N3a .
30IAy3S dO 13A31 = SOT
a3ZnVN9ISX0N = S'N
iHoiy = y "HonoyHi = i 'idan = i
aNnoaiS3AA = N\ 'aNnoaisvg = 3
QNnoaHinos = s 'aNnosHiyoN = N
66'?90 yVd'SlOO
AilOVdVO
assodoad
AilOVdVO
0NIiSIX3
SNOUIONOO 9NIiSlX3 HIIAA S3lAim0A 9002 AVCVyVd 'S 3031100
ynoH >iv3d m
avasnyvo
3WVN 31ld 133HSaV3ydS HOI
lllll 0 1 I. II il y/v\
lllll 0 1 z II II l/W
lllll 0 1 Z II II T/W
HHI 0 1 I II II ya
lllll 0 1 z II II 13
lllll 0 1 z II 11 13
lllll 0 1 I II II ys
lllll 0 1 e II II IS
lllll 0 1 z II 11 IS
lllll 0 1 1. II II yN
lllll 0 1 z II II IN
lllll 0 1 z II II IN
lllll S3NV1 1 S3NV1 II II
lllll doyd 1 1SIX3 II 11 1N31AI3AOIM
NOI103Sy3iNI
nvAy3iNi
ioaroyd
siSAivNV Noiivzniin Aiiovdvo NOiioasyaiNi
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
COLLEGE & FARADAY 2005 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT EXIST
LANES
PROP
LANES
EXISTING
CAPACITY
PROPOSED
CAPACITY
EXISTING
VOLUME
OTHER
VOLUME
======== = 11111======= 11 ======= lllll ========= II === ====== mil == ======== 11 ========= li ======= === lim ========= 11 === 1 __=______ ========= === ~
NL lllll 2 II lllll 3600 II 0 Hlli 99 II il lllll 0.03 11 11 0.03 li 1 0.03 11 1 1 ' NT lllll 2 11 lllll 4000 11 0 IHH 450 11 il lllll 0.11 11 * 11 0.11 II * 1 0.11 il * II NR iilii 1 ii Iiill 1800 11 0 lllll 105 11 ii lllll 0.06 11 11 0.06 11 1 0.06 11 II SL lllll 2 11 IHII 3600 II 0 lllll 77 II il lllll 0.02 11 * 11 0.02 11 * 1 0.02 11 ' II ST lllll 3 11 HHI 6000 II 0 lllll 231 II li lllll 0.04 11 11 0.04 11 0.04 II II * SR iilii 1 li iilii 1800 11 0 lllll 86 11 ii lllll 0.05 11 11 0.05 11 0.05 II II EL lllll 211 mil 3600 11 0 lllll 305 11 11 IIIH 0.08 11 * 11 0.08 11 * 0.08 II * II * ET lllll 211 mil 4000 11 0 IHH 194 11 ii iiill 0.05 11 11 0.05 11 0.05 11 II ER HHI 1 li M\ 1800 ii 0 lllll 122 H II lllll 0.07 II II 0.07 II 0.07 li II WL lllll 2 II lllll 3600 11 0 lllll 242 11 ii lllll 0.07 11 11 0.07 11 0.07 11 II WT lllll 2 II lllll 4000 11 0 lllll 154 ii ii HHI 0.04 II ' 11 0.04 11 * 0.04 11 * II * WR iilii 1 ii lllll 1800 II 0 lllll 336 il II lllll 0.19 11 11 0.19 11 0.19 11 II
PROJECT
VOLUME
ICU SPREADSHEET FILE NAME COL&FAR 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
' DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS '
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING
V/C
0.13
0.12
0.05
0.30
EXISTING
- OTHER
V/C
0.13
0.12
0.05
0.30
EX.+OTHER
+PROJECT
V/C
0.13
0.12
0.05
0.30
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
PAR & COLLEGE 2005 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME PAR&COL 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT jiii EXIST PROP mil EXISTING 11 PROPOSED III EXISTING
llll LANES LANES mil CAPACITY 11 CAPACITY llll VOLUME
NL Hli 2 0 lllll 3600 11 0 llll 192
NT Hli 2 0 lllll 4000 II 0 llll 356
NR llll 1 0 lllll 1800 11 0 HII 318
SL mil 1 0 lllll 1800 11 0 HI! 112
ST mil 2 ** lllll 4000 11 0 llll 69
SR Hill 0 0 lllll 0 11 0 HII 320
EL iiii: 2 : 0 IHH 3600 ii 0 HII 649
ET mil 3 1 0 lllll 6000 11 0 nil 812
ER mil 1 1 0 lllll 1800 11 0 nil 55
WL llll: 2 0 lllll 3600 11 0 llll 50
WT lllll 3 1 0 HHI 6000 11 0 HII 436
WR lllll 1 ! 0 lllll 1800 li 0 nil 66
OTHER
VOLUME
2005
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
lllll EXISTING
iilii V/C
11 11 EXISTING
11 11 + OTHER
II II V/C
II 11 EX.+OTHER 11
11 11 +PROJECT 11 il ii V/C ii
11 EX.+OTHER II mil
11 +PROJECT li mil
II V/C-WJMP 11 mil
HHI 0.05
lllll 0.09
lllll 0.18
lllll 0.06
lllll 0.10
II ' II 0.05
II II 0.09
11 ii 0.18
II li 0.06
ii * il 0.10
II * 11 0.05 II '
11 II 0.09 11
II II 0.18 11
11 11 0.06 II
H * II 0.10 11 *
lllll 0.18
lllll 0.14
lllll 0.03
lllll 0.01
IIIH 0.07
lllll 0.04
11 * 11 0.18
il II 0.14
H 11 0.03
II 11 0.01
II * II 0.07
il il 0.04
II * II 0.18 11 *
li ii 0.14 II
11 II 0.03 11
II 11 0.01 II
II * 11 0.07 11 *
II 11 0.04 11
i r ii
IIIH 0.15 1 0.15 1 0.15 1 0.00 lllll
lllll 0.25 1 0.25 1 0.25 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 HHI
lllll 0.45 1 0.45 1 0.45 1 0.05 mil
lllll A 1 A 1 A 1 A mil
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
PAR & COLLEGE 2005 VOLUMES WITH EXISTING CONDITIONS
OTHER
VOLUME
MOVEMENT || 11 EXIST 1 PROP HH EXISTING 1 PROPOSED llll EXISTING
II 11 LANES i LANES HII CAPACITY CAPACITY llll VOLUME
NL II II 2 1 lllll 3600 0 llll 90
NT 11 11 2 1 lllll 4000 1 0 llll 102
NR 11 il 1 i lllll 1800 0 HII 53
SL II II 1 1 llll 1800 0 llll 78
ST 11 11 2 1 ** nil 4000 0 IHI 433
SR II 11 0 1 llll 0 0 llll 417
EL JI II 2 1 111!, 3600 : 0 nil 287
ET 11 II 3 1 lllll 6000 1 0 llll 382
ER 11 ii 1 i iiiil 1800 1 0 llll 275
WL II II 2 1 lllll 3600 0 llll 410
WT II II 3 1 llll: 6000 1 0 llll 678
WR 11 il 1 1 lllll 1800 0 llll 108
ICU SPREADSHEET FILE NAME PAR&COL 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING
V/C
11 11 EXISTING 11
11 11 + OTHER 11
II 11 V/C 11
II EX.+OTHER 11
II +PROJECT 11
II V/C 11
11 EX.+OTHER 11
li +PROJECT II
11 V/C-WJMP 11
0.03
0.03
0.03
0.04
0.21
II * 11 0.03 II •
II 11 0.03 11
11 11 0.03 11
11 11 0.04 11
11 * 11 0.21 11 *
H 0.03 II •
II 0.03 II
11 0.03 11
11 0.04 11
II 0.21 II * II II *
0.08
0.06
0.15
0.11
0.11
0.06
II * II 0.08 II *
II 11 0.06 11
11 11 0.15 11
II H 0.11 11
11 * 11 0.11 11 *
H 11 0.06 11
II 0.08 II *
11 0.06 11
II 0.15 11
II 0.11 11
II 0.11 11 *
II 0.06 11
1 ir
0.24 1 0.24 1 0.24 1 0.00
0.19 1 0.19 1 0.19 1 0.00
0.05
0.48
1 0.05
1 0.48
1 0.05
1 0.48
1 0.05
1 0.05
A i A 1 A 1 A
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & CANNON 2005 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&CAN 05&99 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT || 11 EXIST 1 PROP Hill EXISTING PROPOSED Ili EXISTING
11 11 LANES 1 LANES HHI CAPACITY CAPACITY llll VOLUME
NL II II 2 1 0 lllll 3600 0 llll 41
NT 11 II 3 1 0 lllll 6000 0 llll 906
NR 11 11 0 1 0 lllll 0 0 llll 0
SL 11 II 0 1 0 lllll 0 0 HII 0
ST 11 II 3 1 0 lllll 6000 0 IHI 2102
SR 11 ii 1 i 0 lllll 1800 0 llll 54
EL 11 II 2 1 0 lllll 3600 0 llll 162
ET 11 11 0 1 0 lllll 0 0 liil 0
ER 11 11 1 1 0 lllll 1800 1 0 llll 234
WL 11 II 0 1 0 lllll 0 1 0 llll 0
WT 11 11 0 1 0 lllll 0 1 0 llll 0
WR 11 11 0 1 0 lllll 0 1 0 llll 0
OTHER
VOLUME
2005
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
Hill EXISTING
lllll V/C
lllll 0.01
lllli 0.15
II 11
II II
II 11
II === 11
II * II
II 11
H 11
EXISTING 11
+ OTHER 11
V/C 11
0.01 H *
0.15 11
11 EX.+OTHER
11 +PROJECT
11 V/C
ii 0.01
11 0.15
11 11 EX.+OTHER 11 llll
II 11 +PROJECT II llll
II 11 V/C-WJMP II llll
Hill 0.35
lllll 0.03
lllll 0.05
11 II
11 * H
11 H
11 * H
II II
0.35 11 *
0.03 11
0.05 11 '
11 0.35
11 0.03
11 0.05
• " • HHI 0.13 II II
11 II 11 H II * II
0.13 11
II *
II 0.13 . ii
HHI 0.36
II II
11 II
1 0.36 1 0.36 1 0.00 llll
lllll 0.05 1 0.05 1 0.05 1 0.00 nil
lllll 0.05
lllll 0.46
1
1
0.05
0.46
1 0.05
1 0.46
1 0.05 llll
1 0.05 llll
lllll A 1 A 1 A 1 A mil
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
ECR & CANNON 2005 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&CAN 05&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT | 111 EXIST 1 PROP mil EXISTING PROPOSED llll EXISTING
1 II LANES LANES lllll CAPACITY CAPACITY llll VOLUME
NL 1 II 2 1 ======= mi 3600 j 0 llll 226
NT 1, 11 3 1 lllll 6000 1 0 llll 1955
NR 1 II 0 1 lllll 0 1 0 llll 0
SL 1 II 0 1 iiiii 0 1 0 HH 0
ST 1 II 3 1 lllll 6000 1 0 llll 999
SR 1 II 1 lllll 1800 1 0 illl 240
EL 1 II 2 1 lllll 3600 1 0 HII 82
ET 1 11 0 1 lllll 0 1 0 llll 0
ER 1 II 1 1 lllll 1800 1 0 HH 59
WL 1 II 0 1 lllll 0 1 0 llll 0
WT 1 II 0 1 lllll 0 1 0 llll 0
WR 1 II 0 1 lllll 0 1 0 llll 0
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS -•
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
Hill EXISTING 11
Hlli V/C 11
lllli 0.06 11
iiiii 0.33 11 *
11 EXISTING 11
11 + OTHER 11 ii V/C li
II 0.06 II
II 0.33 11 *
II EX.+OTHER 11
11 +PROJECT II
11 V/C II
II 0.06 II
11 0.33 II '
11 EX.+OTHER 11 mil
11 +PROJECT II mil
11 V/C-WJMP 11 lllll
IHH 0.17 11
lllll 0.13 11
lllll 0.02 11 *
11 0.17 11 ii 0.13 il
II 0.02 11 *
II 0.17 II
II 0.13 II
11 0.02 II *
II Ir mil
HHI 0.03 11 11 0.03 11 II 0.03 II 1 1 11
*
lllll 0.33 1 0.33 1 0.33 1 0.00 lllll
lllll 0.02 1 0,02 1 0.02 1 0.00 lllll
lllll 0.05
lllll 0.40
1 0.05
1 0.40
1 0.05
1 0.40
1 0.05 lllll
1 0.05 mil
lllll A 1 A 1 A 1 A mil
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
CARLSBAD
AM PEAK HOUR
INTERSECTION: CANNON & COLLEGE 2005 VOLUMES WITH EXISTING CONDITIONS
11 HI II llll 11 lllll 11 11 2005 11 II 11 1 EXISTING 11 11 EX.+OTHER II 11 EX.+OTHER II
MOVEMENT || 111 EXIST 11 PROP llll EXISTING 11 PROPOSED lllli EXISTING 11 OTHER 11 PROJECT H II EXISTING II + OTHER 11 11 +PROJECT 11 11 +PROJECT 11 1' III LANES 11 LANES llll CAPACITY 11 CAPACITY mil VOLUME 11 VOLUME 11 VOLUME H II V/C 11 V/C 11 II V/C 11 11 V/C-WJMP II
========= ij i|j======= 11 ======= llll ========= II —= ==_ lllll == =—= II II === ==_ II II ========= II === I ========= II === II ========= II === II ========= II == NL H II 1 H 0 llll 1800 11 0 HHI 109 11 II II II 0.06 11 * 1 0.06 11 * 11 0.06 11 * II II * NT 11 ill 2 11 0 llll 4000 11 0 lllll 758 11 ii 11 II 0.19 11 0.19 11 II 0.19 11 II 11 NR 1 III 1 H 0 IHI 1800 11 0 HHI 363 11 ii II II 0.20 11 0.20 11 II 0.20 11 II II SL ll 11 1 ii 0 llll 1800 II 0 mil 53 II II II II 0.03 II 0.03 li II 0.03 II II II ST 11 11 2 11 0 llll 4000 11 0 Hill 640 II II II H 0.16 11 * 0.16 H * 11 0.16 11 * 11 11 * SR 11 lii 1 ii 0 HII 1800 11 0 IHII 516 ii il li II 0.29 11 0.29 11 11 0.29 11 II II EL 11 ill 2 H 0 llll 3600 ii 0 HHI 205 li ii 11 II 0.06 11 0.06 11 11 0.06 11 II II * ET ll 11 2 II 0 llll 4000 II 0 lllll 389 II li II H 0.10 II * 0.10 II * 11 0.10 II * II II ER II 11 1 11 0 HII 1800 11 0 lllll 48 11 ii 11 11 0.03 11 0.03 11 11 0.03 11 II II WL II II 2 11 0 nil 3600 II 0 IHH 397 11 li ii II 0.11 11 ' 0.11 11 • H 0.11 11 * II 11 WT II ii 2 II 0 llll 4000 II 0 mil 48 11 II 11 II 0.01 11 0.01 H II 0.01 11 II 11 • WR II II 1 II 0 llll 1800 II 0 mil 46 II II II II 0.03 II 0.03 II II 0.03 II II II
ICU SPREADSHEET FILE NAME CAN&COL 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ^
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.22
0.21
0.05
0.48
0.22
0.21
0.05
0.48
0.22
0.21
0.05
0.48
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
CANNON & COLLEGE 2005 VOLUMES WITH EXISTING CONDITIONS
II II 1 lllll llll II 11 il H li 11 EXISTING 11 11 EX.+OTHER 11 II EX.+OTHER 11 MOVEMENT 1| 11 EXIST PROP Hill EXISTING 1 PROPOSED llll EXISTING 11 OTHER 11 PROJECT || 11 EXISTING 11 11 + OTHER 11 11 +PROJECT 11 i +PROJECT ii 11 II LANES LANES Hill CAPACITY CAPACITY llll VOLUME 11 VOLUME 11 VOLUME || II V/C II ii V/C ii II V/C 11 li V/C-W IMP il
========= 11 11======= ======= lllll = 1 ==—==_ nil ==—= 11 ========= II ========= II II ========= II === II ========= II === II ========= II === II ========= 11 =1 NL 11 II 1 lllll 1800 0 nil 119 ii ii li 11 0.07 11 * 11 0.07 11 * 11 0.07 11 * II 11 * NT 11 11 2 lllll 4000 0 llll 815 11 ii II II 0.20 11 II 0.20 11 II 0.20 11 11 II NR 11 li 1 lllll 1800 0 nil 547 11 li II II 0.30 11 11 0.30 11 II 0.30 11 11 II SL 11 II 1 lllll 1800 0 nil 56 11 11 ii II 0.03 11 II 0.03 11 II 0.03 11 11 II ST 11 11 2 lllll 4000 0 nil 744 11 II 11 II 0.19 11 • 11 0.19 11 * II 0.19 11 * 11 II * SR 11 li 1 lllll 1800 0 llll 198 11 11 11 II 0.11 II II 0.11 11 II 0.11 II II II EL II II 2 lllli 3600 0 llll 349 II il li H 0.10 11 II 0.10 11 II 0.10 II II II * ET II II 2 lllll 4000 0 llll 839 11 ii II II 0.21 11 * II 0.21 11 * ii 0.21 ii * II II ER 11 II 1 llll. 1800 0 llll 114 li li II 11 0.06 11 II 0.06 II II 0.06 11 II II WL II II 2 lllll 3600 0 llll 363 11 ii 11 II 0.10 11 * II 0.10 11 * 11 0.10 11 ' II 11 WT II II 2 lllll 4000 0 llll 474 11 11 11 11 0.12 li II 0.12 11 li 0.12 II II II * WR II II 1 lllll 1800 0 llll 59 11 11 II 11 0.03 II II 0.03 11 11 0.03 11 II 11
ICU SPREADSHEET FILE NAME CAN&COL 99&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.26
0.31
0.05
0.62
0.26
0.31
0.05
0.62
0.26
0.31
0.05
0.62
0.00
0.00
0.05
0.05
Year 2020
Conditions
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
INTERSECTION:
CARLSBAD
AM PEAK HOUR
ECR & TAMARACK 2020 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT EXIST
LANES
PROP
LANES
EXISTING
CAPACITY
PROPOSED
CAPACITY
EXISTING
VOLUME
OTHER
VOLUME
2005
PROJECT
VOLUME
NL ill 1 1 II 0 lllll 1800 li 0 mil 209 11 11 lllll 0.12 11 * 11 0.12 ii * 11 0.12 11 * 11
NT HI 1 2 11 0 lllll 4000 II 0 Hill 1169 11 11 lllll 0.29 11 11 0.29 11 11 0.29 ii ii 11 NR HI 1 1 ii 0 lllli 1800 11 0 lllll 80 II 11 lllll 0.04 11 11 0.04 II 11 0.04 ii ii II SL III 1 1 11 0 lllll 1800 11 0 Hill 45 ii ii lllll 0.03 11 11 0.03 II II 0.03 li ii II ST 111 1 2 11 0 lllll 4000 11 0 lllll 1472 11 11 lllll 0.37 11 • 11 0.37 li * il 0.37 II * 11 II * SR HI 1 1 ii 0 lllll 1800 11 0 Hill 10 11 11 lllll 0.01 11 11 0.01 II 11 0.01 ii ii II EL III 1 1 li 0 lllll 1800 11 0 lllll 61 11 11 iilii 0.03 ii il 0.03 II 11 0.03 11 11 II * ET ill 1 1 11 0 lllll 2000 11 0 Hill 160 11 11 lllli 0.08 11 ' 11 0.08 11 * 11 0.08 ii * li II ER HI 1 1 II 0 lllll 1800 11 0 lllll 466 11 II lllll 0.26 11 11 0.26 11 11 0.26 11 11 11 WL 111 1 1 II 0 lllll 1800 11 0 lllll 233 11 li lllll 0.13 11 * 11 0.13 11 * 11 0.13 11 * 11 II WT HI 1 2 il 0 lllll 4000 11 0 lllll 138 II II lllll 0.04 11 11 0.04 11 11 0.04 11 II II * WR Hi 1 0 11 0 lllll 0 11 0 lllll 23 11 11 iiiii ii ii ii
0.04 11 II
II
ICU SPREADSHEET FILE NAME ECR&TAM 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING
V/C
0.49
0.21
0.05
0.75
EXISTING
yOTHER
V/C
0.49
0.21
0.05
0.75
EX.+OTHER
+PROJECT
V/C
0.49
0.21
0.05
0.75
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
ECR & TAMARACK 2020 VOLUMES WITH EXISTING CONDITIONS
11 II 1 lllli III II II II II 11 11 EXISTING 11 11 EX.+OTHER 11
MOVEMENT || 11 EXIST 1 PROP Hli; EXISTING PROPOSED Hi EXISTING 11 OTHER 11 PROJECT || 11 EXISTING 11 11 + OTHER II 11 +PROJECT 11
ii 11 LANES 1 LANES Hli CAPACITY CAPACITY Hi VOLUME 11 VOLUME 11 VOLUME || 11 V/C 11 II V/C 11 ii V/C il ========= 11 11======= 1 ======= Hli ========= ========= III 1 ========= II ========= II ========= II II ========= II === il ========= II === ii ========= II === NL II II 1 1 Iliil 1800 1 0 ill 525 11 ii II II 0.29 11 * II 0.29 11 • 11 0.29 11 *
NT 11 II 2 1 lllll 4000 1 0 HI 1212 ii II II 11 0.30 11 II 0.30 11 11 0.30 11 NR 11 11 1 i lllll 1800 1 0 HI 263 11 li II 11 0.15 ii ii 0.15 li II 0.15 II
SL 11 II 1 1 Hli: 1800 1 0 111 134 11 li II 11 0.07 11 II 0.07 11 II 0.07 11
ST 11 11 2 1 illl 4000 1 0 111 1389 11 II II 11 0.35 11 * II 0.35 11 * II 0.35 11 *
SR II II 1 1 llll. 1800 1 0 HI 88 II II II II 0.05 11 II 0.05 11 II 0.05 11
EL 11 II 1 i lllll 1800 1 0 IH 19 11 II II II 0.01 11 11 0.01 11 11 0.01 II
ET 11 II 1 i lllll 2000 1 0 HI 212 II li 11 II 0.11 11 * II 0.11 11 * II 0.11 II *
ER 11 11 1 1 lllll 1800 i 0 111 201 11 II 11 11 0.11 H 11 0.11 11 11 0.11 11
WL 11 11 1 i Hill 1800 1 0 111 117 11 li II II 0.07 11 * 11 0.07 11 • II 0.07 11 *
WT 11 II 2 1 HII: 4000 0 111 1 293 11 il II 11 0.09 11 11 0.09 11 II 0.09 II
WR II II 0 1 lllll 0 1 0 III 1 75 II II II II 11 II 11 II II
ICU SPREADSHEET FILE NAME ECR&TAM 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
• DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS -•
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.64
0.18
0.05
0.87
0.64
0.18
0.05
0.87
0.64
0.1£
0.05
0.87
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & COLLEGE 2020 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&COL 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT | 11 EXIST PROP Hill EXISTING 11 PROPOSED llll EXISTING
1 11 LANES LANES HHI CAPACITY 11 CAPACITY HII VOLUME
NL 1 ii 1 0 lllll 1800 11 0 llll 147
NT 1, II 2 1 0 lllll 4000 II 0 Hli 996
NR 11 II 0 1 0 lllll 0 II 0 llll 0
SL II II 0 1 0 lllll 0 11 0 llll 0
ST II II 2 1 0 lllll 4000 11 0 llll 2029
SR II II FREE 1 0 lllll N.S. i 0 nil 725
EL II 11 2 1 0 lllll 3600 11 0 HH 212
ET li II 0 1 0 lllll 0 II 0 llll 0
ER II II 1 1 0 lllll 1800 11 0 IHI 170
WL 1! 11 0 I 0 lllll 0 11 0 llll 0
WT II II 0 i 0 lllll 0 II 0 llll 0
WR 11 II 0 j 0 lllll 0 II 0 llll 0
OTHER
VOLUME
2005
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
Hill EXISTING ii
lllll V/C 11
11 EXISTING
11 + OTHER
II V/C
II 11 EX.+OTHER 11
11 11 +PROJECT 11
li 11 V/C II
11 EX.+OTHER II mil
11 +PROJECT 11 mil
ii V/C-WJMP ii mil
lllll 0.08 11 *
lllll 0.25 II
11 0.08
II 0.25
11 * II 0.08 11 *
II 11 0.25 II
lllll 0.51 11 *
lllll N.S. 11
lllll 0.06 11 *
ii 0.51
II N.S.
11 0.06
II * 11 0.51 11 *
11 II N.S. II
II * 11 0.06 11 * 1 * 111
lllll 0.09 11 II 0.09 11 11 0.09 11 ll ! lllll
llll II * j 11 * 11 11 '
lllll 0.59 1 0.59 1 0.59 1 0.00 lllll
lllll 0.06 1 0.06 1 0.06 1 0.00 mil
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.70 1 0.70 1 0.70 1 0.05 mil
lllll B 1 B 1 B 1 A lllll
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & COLLEGE 2020 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT || II EXIST 1 PROP Hi 1 EXISTING 1 PROPOSED 111 EXISTING
H II LANES 1 LANES HI 1 CAPACITY 1 CAPACITY 111 VOLUME
NL II II 1 1 III 1 1800 i 0 111 91
NT II II 2 1 III 1 4000 1 0 111 1543
NR II II 0 1 Ili 1 0 0 111 0
SL 1 II 0 1 111 1 0 0 111 1 0
ST II II 2 1 III 1 4000 1 0 HI 1 971
SR II 11 FREE 1 111 1 N.S. 1 0 111 310
EL II II 2 1 Ili 1 3600 0 111 1 585
ET 11 11 0 1 III 1 0 0 HI 1 0
ER ll li 1 i iii i 1800 0 III 1 173
WL II 11 0 1 ill 1 0 0 III 0
WT II 11 0 1 III 1 0 0 111 0
WR 1, II 0 1 HI 1 0 0 111 1 0
ICU SPREADSHEET FILE NAME ECR&COL 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
' DENOTES CRITICAL MOVEMENTS
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
11 11 EXISTING 11 11 EX.+OTHER 11 II EX.+OTHER II
EXISTING 11 11 + OTHER 11 11 +PROJECT II 11 +PROJECT II
V/C 11 11 V/C II H V/C li li V/C-W_IMP 11
========= II == : 11 ========= II === II ========= 11 === 11 == = ==== = = 11 ==5
0.05 11 11 0.05 II 11 0.05 II *W II II *
0.39 11 * 11 0.39 II ' II 0.39 II #*t 11 11
11 * 11 11 ' ll II II [j 0.24 II II 0.24 li II #REF! II \l II * N.S. II 11 N.S. 11 II N.S. li li II
0.16 H * II 0.16 II * 11 0.16 11 ' 11 11 *
0.10 \\ 11 0.10 II II 0.10 1 II 11
II * ir 11 11'
0.39 1 0.39 1 #REF! 1 0.00
0.16 1 0.16 1 0.16 ' 1 0.00
0.05 1 0.05 1 0.05 .._ _ 0.05
========== = == = ========== = == = ========== ==== ========== - == 0.60 1 0.60 1 1 0.05
A 1 A 1 ..... A
========== = == = ========== = == = ========== ==== _ —
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & FAR 99&20
HHI II lllll li IHII 11 II lllll II 11 EXISTING II II EX.+OTHER II
MOVEMENT lllli EXIST II PROP Hill EXISTING 11 ='ROPOSE[ mil EXISTING 11 OTHER 11 PROJECT mil EXISTING II 11 + OTHER 11 11 +PROJECT 11
lllll LANES II LANES mil CAPACITY 11 CAPACITY mil VOLUME 11 VOLUME II VOLUME mil V/C 11 11 V/C 11 II V/C 11
11111======= II ======= mil ========= II ========= mil ========= II ========= II ========= mil ========= II === II ========= 11 == • 1 ========= 1 == NL lllll 2 11 0 Hill 3600 11 0 HHI 851 11 ii iilii 0.24 11 II 0.24 11 II 0.24 11 NT lllll 3 11 0 lllll 6000 11 0 IHII 1473 11 11 HHI 0.26 11 ' II 0.26 11 * II 0.26 11 *
NR lllll 0 11 0 mil 0 11 0 HHI 80 11 11 mil II ii li i 11 SL lllli 2 11 0 Hill 3600 11 0 mil 1012 11 li iiiii 0.28 II ' 11 0.28 11 * II 0.28 11 *
ST lllll 3 11 0 mil 6000 II 0 Hill 1535 11 il Hill 0.29 II II 0.29 11 11 0.29 II SR lllll 0 II 0 mil 0 II 0 lllll 188 11 li HHI II 11 1 1 EL lllll 2 II 0 mil 3600 11 0 HHI 58 11 ii Hill 0.02 II * 11 0.02 11 * II 0.02 11 *
ET lllll 2 11 ** IHH 4000 11 0 lllli 89 11 li Hill 0.11 11 li 0.11 II 11 0.11 II
ER lllll 0 11 0 lllll 0 11 0 HHI 360 11 il lllli II II 11 11 II WL IHII 1 II 0 IHII 1800 II 0 HHI 86 II ii liiii 0.05 II 11 0.05 H II 0.05 II WT lllll 2 11 0 mil 4000 11 0 lllll 532 11 ii lllli 0.22 11 * II 0.22 11 * II 0.22 11 *
WR lllll 0 11 0 mil 0 11 0 mil 355 ii 11 Hill II 11 II II 11
ICU SPREADSHEET FILE NAME ECR&FAR99&20 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.54
0.24
0.05
0.83
0.54
0.24
0.05
0.83
0.54
0.24
0.05
0.83
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
ECR & FAR 99&20
MOVEMENT 1 III EXIST PROP lllll EXISTING |=ROPOSE[|il 1 EXISTING
1 111 LANES LANES mil CAPACITY 1 CAPACITY 111 1 VOLUME
NL 1 II 2 1 lllll 3600 1 0 HI 1 280
NT 1 11 3 lllll 6000 1 0 ill 1 1742
NR 1 111 0 lllll 0 1 0 ill 1 71
SL 1 III 2 lllll 3600 1 0 ill 1 368
ST 1 'II 3 1 lllll 6000 1 0 III 1 1381
SR 1 II 0 1 lllll 0 1 0 HI 1 89
EL 1 11 2 1 lllll 3600 0 111 1 159
ET 1 III 2 1 ** lllll 4000 1 0 HI 1 399
ER 1 111 0 1 lllll 0 1 0 ill 1 589
WL 1 III 1 lllll 1800 1 0 ill 1 0
WT 1 'il 2 lllll 4000 1 0 III 1 175
WR 1 II 0 1 lllll 0 0 HI 1 763
ICU SPREADSHEET FILE NAME ECR & FAR 99&20
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS :
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
lllll EXISTING 11
lllll V/C 11
lllll 0.08 11
lllll 0.30 II *
11 EXISTING 11
11 + OTHER 11
11 V/C 11
II 0.08 11
li 0.30 11 •
11 EX.+OTHER 11
11 +PROJECT 11 ii V/C ii
11 0.08 11
11 0.30 11 *
11 EX.+OTHER
11 +PROJECT
11 V/C-WJMP
lllll 0.10 11 *
lllll 0.25 II
11 0.10 II *
11 0.25 11
11 0.10 11 *
11 0.25 II 11- lllll
lllll 0.04 11 *
iiill 0.25 11
il 0.04 II *
II 0.25 11
II 0.04 II *
II 0.25 11 11* lllll
lllli 0.00 11
lllll 0.23 II *
11 0.00 11
II 0.23 II '
II 0.00 11
11 0.23 II * •
lllli 0.40 1 0.40 1 0.40 1 0.00 " lllll
lllll 0.27 1 0.27 1 0.27 1 0.00 " ~ lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.72 1 0.72 1 0.72 1 0.05 ' lllll
lllll c 1 c 1 c 1 A III
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
ECR & PAR 2020 VOLUMES & 99 GEOMETRICS
1 II lllll II 11 11 11 11 2005 11 11 1 11 EXISTING 1 11 EX.+OTHER 1 11 EX.+OTHER 11 mil
MOVEMENT| 11 EXIST PROP mil EXISTING 1 PROPOSED 11 11 EXISTING 11 OTHER 11 PROJECT 1| 11 EXISTING 1 11 + OTHER 1 11 +PROJECT j 11 +PROJECT 11 HHI
1 11 LANES LANES mil CAPACITY 1 CAPACITY 11 11 VOLUME 11 VOLUME 11 VOLUME 11 II V/C 1 11 V/C 1 11 V/C 1 11 V/C-WJMP II mil
NL 1 il 1 0 iiiil 1800 1 0 11 II 280 11 Ij H 0.16 1 11 0.16 1 11 0.16 1 11 ir lllll NT II II 3 0 Hill 6000 11 0 11 II 1378 11 li i 11 0.23 1 * 11 0.23 1 ' 11 0.23 1 * il 11 IHH NR 1 II 1 0 Hill 1800 11 0 11 11 705 11 11 1 11 0.39 1 11 0.39 1 11 0.39 1 11 II lllll
SL 1 II 2 0 lllll 3600 11 0 11 II 780 li il 1 11 0.22 i * ii 0.22 1 * 11 0.22 1 ' 11 11 lllll ST 1 11 3 0 HHI 6000 II 0 11 il 779 11 ii 1 11 0.13 1 H 0.13 1 II 0.13 1 II ir lllll SR 1 11 1 0 mil 1800 li 0 11 II 415 11 li 1 11 0.23 1 11 0.23 1 11 0.23 1 II 11 HHI
EL 1 ill 2 0 mil 3600 11 0 11 11 187 11 II 1 111 0.05 1 11 0.05 1 11 0.05 1 11 11* mil
ET 1 ill 3 0 liiil 6000 II 0 11 11 689 11 il 1 111 0.12 1 * ii 0.12 1 * 11 0.12 1 * 11 11 mil
ER 1 111 0 0 llll 0 11 0 11 II 7 11 il 1 111 i ii i li 1 11 H mil WL 1 III 2 0 llll: 3600 11 0 11 11 589 11 ii 1 111 0.16 1 * 11 0.16 1 * 11 0.16 r li 11 Hill WT 1 111 3 0 llll 6000 11 0 11 11 892 11 ii 1 III 0.15 1 11 0.15 1 II 0.15 1 H 11 ' HHI
WR i III 1 0 llll 1800 H 0 11 11 969 11 11 1 111 0.54 1 11 0.54 1 11 0.54 1 11 II mil
NORTH/SOUTH CRITICAL SUMS = i III 0.45 1 0.45 1 0.45 1 0.00 mil
ICU SPREADSHEET FILE NAME ECR&PAR 99&20 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.28
0.05
0.78
0.28
0.05
0.78
0.28
0.05
0.78
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
ECR & PAR 2020 VOLUMES & 99 GEOMETRICS
MOVEMENT | III EXIST 11 PROP HHI EXISTING 11 PROPOSED mil EXISTING
1 111 LANES 11 LANES HHI CAPACITY 11 CAPACITY mil VOLUME
NL 1 111 1 11 llll 1800 II 0 mil 21
NT 1 111 3 II llll 6000 II 0 mil 665
NR 1 Ili 1 ii llll 1800 11 0 HHI 296
SL 1 III 2 II iliil 3600 11 0 lllll 746
ST 1 111 3 ii lllll 6000 II 0 HHI 1337
SR 1 III 1 11 lllll 1800 II 0 Hill 118
EL 1 HI 2 li llll 3600 11 0 IHH 327
ET 1 HI 3 il llll 6000 11 0 lllll 968
ER 1 HI 0 II HII 0 11 0 lllll 197
WL 1, III 2 li llll. 3600 11 0 HHI 857
WT II III 3 li lllll 6000 II 0 Hill 618
WR II III 1 li iiiil 1800 II 0 Hill 915
ICU SPREADSHEET FILE NAME ECR&PAR 99&20
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS ^
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
mil EXISTING
lllll V/C
IHH 0.01
lllll 0.11
HHI 0.16
IIIH 0.21
Hill 0.22
iiill 0.07
lllll 0.09
lllll 0.19
11 II EXISTING
11 II + OTHER
II II V/C
II II 0.01
11 * 11 0.11
11 11 0.16
11 * II 0.21
11 11 0.22
II 11 0.07
II II 0.09
11 * II 0.19
II II EX.+OTHER
II 11 +PROJECT
II II V/C
II II 0.01
II * II 0.11 ii ii 0.16
11 * 11 0.21
II 11 0.22
II II 0.07
II II 0.09
II * 11 0.19
11 11 EX.+OTHER 11 mil
11 II +PROJECT 11 mil
il il V/C-WJMP li mil
II * II II lltll
11 * II li lllll
lllll 0.24
lllll 0.10
lllll 0.51
II * II 0.24
II 11 0.10
11 11 0.51
II ' 11 0.24
II 11 0.10
II 11 0.51
HHI 0.32 1 0.32 1 0.32 1 0.00 lllll
lllll 0.43 1 0.43 1 0.43 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.80 1 0.80 1 0.80 1 0.05 mil
lllll c 1 c 1 c 1 A Hill
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
INTERSECTION
CARLSBAD
AM PEAK HOUR
COLLEGE & FARADAY 2020 VOLUMES WITH EXISTING CONDITIONS
MOVEMENT || 11 EXIST 1 PROP lllll EXISTING
/ Jill
PROPOSED liil EXISTING
11 11 LANES i LANES lllll CAPACITY CAPACITY llll VOLUME
NL 11 11 2 1 0 lllll 3600 0 llll 254
NT II II 2 1 0 lllll 4000 0 llll 448
NR 11 II 1 1 0 lllll 1800 0 llll 390
SL li II 2 1 0 lllll 3600 0 Hi 607
ST II II 3 1 0 lllll 6000 0 111, 428
SR II 11 1 0 lllll 1800 0 HI 392
EL II 11 2 1 0 Hill 3600 0 111 148
ET \: III 2 0 lllll 4000 0 111 212
ER 1 'li 1 0 lllll 1800 0 111 100
WL ll II 2 i 0 lllll 3600 0 III; 176
WT 11 11 2 1 0 Hill 4000 0 liil 287
WR II II 1 i 0 lllli 1800 0 liil 137
ICU SPREADSHEET FILE NAME COL&FAR 20&99 1
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
OTHER
VOLUME
2005
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
(11(1 (1 (( EXISTING (( [( EX.+OTHER (( (( EX.-I-OTHER (( (((((
lllli EXISTING 11 11 + OTHER 11 11 +PROJECT II 11 +PROJECT 11 mil
lllll V/C 11 11 V/C 11 11 V/C 11 11 V/C-WJMP II mil
lllll 0.07 11 li 0.07 11 11 0.07 11 II ll~ lllll lllll 0.11 11 * II 0.11 11 * li 0.11 ii * il 11 lllll
lllll 0.22 II 11 0.22 11 II 0.22 11 ii ii lllll lllll 0.17 II * II 0.17 11 * ii 0.17 li * 11 li lllll lllll 0.07 II II 0.07 11 II 0.07 11 li II * lllll
lllll 0.22 II 11 0.22 11 11 0.22 11 II 11 lllll
lllll 0.04 11 * 11 0.04 11 * 11 0.04 11 * il ii * lllll lllll 0.05 II 11 0.05 11 II 0.05 11 il ii lllll lllll 0.06 II 11 0.06 11 11 0.06 11 il li lllll lllll 0.05 II 11 0.05 II li 0.05 II ii li lllll lllll 0.07 H * II 0.07 11 * II 0.07 11 * ii li * illll lllll 0.08 II 11 0.08 11 11 0.08 11 II II lllll
lllll 0.28 1 0.28 1 0.28 1 0.00 lllll
lllll 0.11 1 0.11 1 0.11 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.05 mil
lllll 0.44 1 0.44 1 0.44 1 0.05 mil
lllll A 1 A 1 A 1 A Hill
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
PM PEAK HOUR
COLLEGE & FARADAY 2020 VOLUMES WITH EXISTING CONDITIONS
1 111 j iiill III II II 11 11 1 11 EXISTING 1 li EX.+OTHER 11 11
MOVEMENT| 111 EXIST 1 PROP mil EXISTING 1 PROPOSED HI EXISTING 11 OTHER 11 PROJECT H 11 EXISTING 1 11 + OTHER 1 II +PROJECT 11 11
1 111 LANES 1 LANES mil CAPACITY 1 CAPACITY 111 VOLUME 11 VOLUME 11 VOLUME H 11 V/C 1 11 V/C i ii V/C II il
NL 1 III 2 1 llll 3600 1 0 HI 123 11 II ji 11 0.03 1 11 0.03 1 II 0.03 II II
NT 1 Ili 2 j lllll 4000 0 IH 1 665 11 II II 11 0.17 1 * II 0.17 1 * 11 0.17 11 ' 11
NR 1 111 1 1 lllll 1800 0 111 127 11 ii II II 0.07 1 II 0.07 1 II 0.07 11 11
SL 1 III 2 lllll 3600 0 111 1 158 11 II II 11 0.04 1 * 11 0.04 1 * II 0.04 11 * 11
ST 1 III 3 lllll 6000 0 111 428 ii il II 11 0.07 1 II 0.07 i ii 0.07 ii li
SR 1 III 1 Hli 1800 0 111 I 143 11 II II 11 0.08 1 11 0.08 1 11 0.08 11 11
EL 1 III 2 llll 3600 0 111 I 288 11 il II 11 0.08 1 ' II 0.08 1 * 11 0.08 11 * II
ET 1 Ili 2 llll 4000 0 111 1 200 11 ii II 11 0.05 1 11 0.05 1 11 0.05 II II
ER 1 Ili 1 llll 1800 0 111 1 159 11 il 11 11 0.09 1 11 0.09 1 11 0.09 11 11
WL 1 111 2 Hli 3600 0 HI 1 249 II ii 11 11 0.07 1 II 0.07 1 11 0.07 11 II
WT 1 HI 2 llll 4000 0 111 1 160 II li II 11 0.04 1 * 11 0.04 i * ii 0.04 ii * ii
WR 1 HI 1 Hli 1800 0 HI 1 422 II II 11 11 0.23 1 11 0.23 1 II 0.23 11 11
ICU SPREADSHEET FILE NAME COL&FAR 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
• DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.21
0.12
0.05
0.38
0.21
0.12
0.05
0.38
0.21
0.12
0.05
0.38
EX.+OTHER
+PROJECT
V/C-W IMP
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
AM PEAK HOUR
PAR & COLLEGE 2020 VOLUMES WITH EXISTING CONDITIONS
Hli II lllll 11 II II II 11 2005 11 II II ii EXISTING 11 11 EX.+OTHER 11 II EX.+OTHER II
MOVEMENT HH EXIST II PROP mil EXISTING 11 PROPOSED 11 11 EXISTING 11 OTHER 11 PROJECT H 11 EXISTING 11 11 + OTHER 11 II +PROJECT 11 11 +PROJECT II
llll LANES 11 LANES mil CAPACITY 11 CAPACITY 11 11 VOLUME 11 VOLUME 11 VOLUME 1| II V/C 11 11 V/C 11 II V/C 11 II V/C-WJMP II
nil ======= 11 ======= lllll II === = = ==== II II II —. II II II ==== ===== II === II == ======= II = = II ==== === = = II === II ========= 11 === NL llll 2 11 0 lllll 3600 II 0 11 II 367 11 II II 11 0.10 11 * 11 0.10 11 * II 0.10 11 * II II
NT IHI 2 11 0 IIIH 4000 li 0 11 H 511 II II 11 II 0.13 H II 0.13 H II 0.13 11 II II NR llll 1 II 0 IHH 1800 II 0 II 11 312 H ii il II 0.17 11 11 0.17 II II 0.17 11 II II SL llll 1 II 0 lllli 1800 11 0 11 II 149 11 li 11 II 0.08 11 II 0.08 11 II 0.08 11 II II ST llll 2 II lllll 4000 11 0 11 11 189 11 11 II 11 0.12 11 * il 0.12 ii * 11 0.12 II * II II * SR llll 0 II 0 lllll 0 11 0 11 11 307 11 II II 11 11 II II 11 II II 11 EL IHI 2 11 0 Hill 3600 II 0 11 II 759 II li 11 II 0.21 11 * 11 0.21 11 * II 0.21 11 ' II II * ET llll 3 II 0 HHI 6000 H 0 II II 1082 II ii II H 0.18 H ii 0.18 ii H 0.18 II II II ER llll 1 II 0 mil 1800 11 0 11 II 111 II II II 11 0.06 11 11 0.06 11 II 0.06 11 11 11
WL llll 2 11 0 mil 3600 H 0 II II 102 il ii il 11 0.03 11 11 0.03 II 11 0.03 11 II II WT llll 3 11 0 lllll 6000 II 0 11 II 637 ii 11 11 11 0.11 H * II 0.11 11 * 11 0.11 11 * II II • WR HII 1 II 0 lllll 1800 II 0 11 II 61 II II 1, 11 0.03 11 II 0.03 11 II 0.03 11 11 11
NORTH/SOUTH CRITICAL SUMS = 1, 11 0.22 1 0.22 1 0.22 1 0.00
ICU SPREADSHEET FILE NAME PAR&COL 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
EAST/WEST CRITICAL SUMS =
CLEARANCE -•
ICU VALUE =
LOS =
0.32
0.05
0.59
0.32
0.05
0.59
0.00
0.05
0.05
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
PAR & COLLEGE 2020 VOLUMES WITH EXISTING CONDITIONS
1 III lllll 111 II 11 11 II li 11 EXISTING 11 II EX.+OTHER 11 11 EX.+OTHER 11
MOVEMENT | 111 EXIST PROP HHI EXISTING 1 PROPOSED Hi EXISTING 11 OTHER 11 PROJECT H II EXISTING 11 11 + OTHER 11 11 +PROJECT 11 11 +PROJECT 11
i 111 LANES LANES mil CAPACITY CAPACITY 111 VOLUME 11 VOLUME 11 VOLUME H II V/C 11 II V/C 11 1 V/C 11 V/C-W_IMP 11
========= 1 111======= j ======= mil ========= nil ========= II ========= II ========= II II ========= II === II ========= 11 === II II II II 11 [I ========= 11 =: NL 1 III 2 mil 3600 1 0 HII 185 11 ii ii II 0.05 11 * II 0.05 11 • H 0.05 II * 11 II * NT 1 Ili 2 lllll 4000 0 Hi' 211 ii II II II 0.05 11 11 0.05 11 11 0.05 11 II II NR 1 Iii 1 mil 1800 0 ill 88 11 il II II 0.05 11 II 0.05 11 II 0.05 11 II II SL 1 III 1 1 lllll 1800 i 0 III, 63 II li II 11 0.04 II II 0.04 11 II 0.04 II 11 II ST 1 III 2 1 ** mil 4000 1 0 llll 579 11 li II II 0.26 11 * 11 0.26 11 * II 0.26 11 * II II * SR 1 III 0 mil 0 0 llll 480 11 II II 11 il 11 11 II II II II EL 1 III 2 HHI 3600 0 III 277 ii li II 11 0.08 11 * 11 0.08 11 ' II 0.08 11 • II II * ET 1 III 3 lllll 6000 0 HI 560 II li 11 11 0.09 11 11 0.09 11 II 0.09 11 II II ER 1 III 1 1 lllll 1800 0 Hli 452 II II II II 0.25 II II 0.25 II ii 0.25 ii II II WL 1 Ili 2 Hill 3600 0 llll 340 11 ii 11 II 0.09 11 II 0.09 11 II 0.09 II II II WT 1 III 3 Hill 6000 0 111 857 11 II II il 0.14 ii ' 11 0.14 11 • li 0.14 il • II II * WR 1 111 1 mil 1800 0 HI 188 11 11 11 II 0.10 11 II 0.10 li II 0.10 11 II 11
ICU SPREADSHEET FILE NAME PAR&COL 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ••
EAST/WEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.31
0.22
0.05
0.58
0.31
0.22
0.05
0.58
0.31
0.22
0.05
0.58
0.00
0.00
0.05
0.05
REPRESENTS RIGHT & THROUGH/RIGHT
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION:
CARLSBAD
AM PEAK HOUR
ECR & CANNON 2020 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&CAN 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
MOVEMENT |! 11 EXIST 1 PROP mil EXISTING PROPOSED llll EXISTING
il 11 LANES 1 LANES Hill CAPACITY CAPACITY llll VOLUME
NL 1! H 2 1 0 illll 3600 0 llll 143
NT II II 3 1 0 HII! 6000 0 llll 1064
NR 11 11 0 1 0 lllll 0 1 0 IHI 163
SL 11 11 0 1 0 mil 0 1 0 llll 114
ST 11 11 3 1 0 lllll 6000 0 llll 1950
SR 11 II 1 1 0 lllll 1800 0 llll 388
EL 11 11 2 i 0 iiii: 3600 0 llll 187
ET II II 0 1 0 Hill 0 0 llll 339
ER 11 II 1 i 0 lllll 1800 0 illl 180
WL II II 0 1 0 mil 0 0 llll 487
WT 11 II 0 1 0 lllll 0 0 llll 818
WR 11 II 0 1 0 lllll 0 0 Hli 173
OTHER
VOLUME
2005
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS =
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
HHI EXISTING
lllll V/C
lllll 0.04
lllll 0.20
II *
II EXISTING 11
11 + OTHER 11
ii V/C 11
11 0.04 11 *
11 0.20 11
11 EX.+OTHER 11
11 +PROJECT 11
11 V/C II
II 0.04 11 *
II 0.20 II
11 EX.+OTHER 11 mil
11 +PROJECT 11 mil
11 V/C-W_IMP 11 mil
IHH 0.34
lllll 0.22
lllll 0.05
II *
II *
11 0.34 11 *
11 0.22 11
11 0.05 11 *
II 0.34 11 -
II 0.22 II
II 0.05 11 ' ii;
IHH 0.10 11 II 0.10 II II 0.10 11 11 11 lllll
lllll II * r II II* lllll
lllll 0.38 1 0,38 1 0.38 1 0.00 lllll
lllll 0.05 1 0.05 1 0.05 1 0.00 lllll
lllll 0.05
lllll 0.48
1 0.05
1 0.48
1 0.05
1 0.48
1 0.05 mil
1 0.05 mil
lllll A 1 A 1 A 1 A mil
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL,
INTERSECTION:
CARLSBAD
PM PEAK HOUR
ECR & CANNON 2020 VOLUMES WITH EXISTING CONDITIONS
ICU SPREADSHEET FILE NAME ECR&CAN 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
Ul
MOVEMENT |||
11 )i
1 EXIST 11
1 LANES II
PROP HI'H EXISTING PROPOSED |1||
LANES mil CAPACITY H CAPACITY |i{|
EXISTING
VOLUME
NL 111 1 2 11 III 3600 11 0 llll 163
NT 111 1 3 11 mil 6000 11 0 llll 1566
NR III 1 0 11 lllll 0 11 0 llll 264
SL ill 1 0 11 lllll 0 11 0 llll 264
ST III i 3 ii iiiii 6000 11 0 llll 1098
SR Hi 1 1 li Hlli 1800 11 0 111, 255
EL III 1 2 11 mil 3600 11 0 111 384
ET III 1 0 11 lllll 0 11 0 HI 869
ER 111 1 1 II lllli 1800 11 0 111 123
WL 111 1 0 11 lllll 0 11 0 HI 84
WT HI 1 0 11 lllll 0 II 0 111 385
WR HI 1 0 11 liiii 0 11 0 111 166
OTHER
VOLUME
PROJECT
VOLUME
NORTH/SOUTH CRITICAL SUMS ••
EASTAWEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
EXISTING II
V/C II
1 EXISTING
1 + OTHER
1 V/C
11 li EX.+OTHER II
11 11 +PROJECT II
ii 11 V/C II
11 EX.+OTHER 11
11 +PROJECT 11
11 V/C-WJMP 11
0.05 11
0.31 11 *
1 0.05
1 0.31
11 11 0.05 11
II * II 0.31 11 *
11 * 11 * II ll ' II 11 0.23 11
0.14 11
0.11 il *
1 0.23
1 0.14
1 0.11
II 11 0.23 11
11 11 0.14 11
II * 11 0.11 II • ii ii-
0.07 11 1 0.07 II II 0.07 11 11 11
II * *
0.31 1 0.31 1 0.31 1 0.00
0.11 1 0.11 1 0.11 1 0.00
0.05 1 0.05 1 0.05 1 0.05
0.47 1 0.47 1 0.47 1 0.05
A 1 A 1 A 1 A
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT
INTERVAL:
CARLSBAD
AM PEAK HOUR
INTERSECTION: CANNON & COLLEGE 2020 VOLUMES WITH EXISTING CONDITIONS
llll H 11 11 11 llll 11 II 2005 11 II 11 11 EXISTING 11 11 EX.+OTHER II 11 EX.+OTHER 11
MOVEMENT HH EXIST II PROP II 11 EXISTING 11 PROPOSED HII EXISTING li OTHER 11 PROJECT || II EXISTING 11 11 + OTHER 11 11 +PROJECT 11 II +PROJECT 11
llll LANES 11 LANES II 11 CAPACITY II CAPACITY illl VOLUME II VOLUME 11 VOLUME H 11 V/C 11 li V/C II 11 V/C 11 11 V/C-WJMP II
nil = = = = = 11 = = = = 11 II 1 llll II 11 .— 11 II ===== = = = = II == II ==== === = = II === II = = = = = ==== 11 == = 1 ========= II == NL llll 1 II 0 II 11 1800 H 0 HH 109 11 ii ii 11 0.06 11 • li 0.06 11 * II 0.06 11 * II II ' NT HH 2 11 0 11 11 4000 II 0 HII 758 11 11 II 11 0.19 11 11 0.19 11 II 0.19 11 II II NR llll 1 11 0 II 11 1800 11 0 HII 363 11 ii II II 0.20 11 II 0.20 11 11 0.20 11 II 11 SL llll 1 II 0 11 11 1800 II 0 nil 53 11 II II 11 0.03 11 11 0.03 11 H 0.03 11 II 11 ST llll 2 II 0 11 11 4000 II 0 nil 640 11 II 11 II 0.16 11 * II 0.16 ii * II 0.16 11 * II 11 * SR llll 1 II 0 II 11 1800 11 0 llll 516 y li 11 11 0.29 11 11 0.29 11 11 0.29 11 II 11 EL llll 2 11 0 11 11 3600 11 0 nil 205 11 II II 11 0.06 11 11 0.06 11 11 0.06 11 II 11 «
ET llll 2 II 0 II 11 4000 il 0 HII 389 ii II II 11 0.10 li * ii 0.10 ii * II 0.10 11 • 11 II ER llll 1 II 0 II 11 1800 II 0 illl 48 11 II 11 11 0.03 11 II 0.03 11 11 0.03 11 II II WL llll 2 II 0 11 11 3600 11 0 nil 640 11 II II H 0.18 11 * II 0.18 11 * 11 0.18 li * II II WT llll 2 11 0 II 11 4000 II 0 HH 814 li li II II 0,20 11 11 0.20 11 11 0.20 II II 11 * WR llll 1 11 0 II 11 1800 II 0 llll 46 11 11 II II 0.03 11 11 0.03 11 II 0.03 11 II 11
ICU SPREADSHEET FILE NAME CAN&COL 20&99
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
L = LEFT, T = THROUGH, R = RIGHT
N.S. = NOT SIGNALIZED
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
NORTH/SOUTH CRITICAL SUMS ^
EASTA/VEST CRITICAL SUMS =
CLEARANCE =
ICU VALUE =
LOS =
0.22
0.28
0.05
0.55
0.22
0.28
0.05
0.55
0.22
0.28
0.05
0.55
0.00
0.00
0.05
0.05
INTERSECTION CAPACITY UTILIZATION ANALYSIS
PROJECT:
INTERVAL:
INTERSECTION
CARLSBAD
PM PEAK HOUR
CANNON & COLLEGE 2020 VOLUMES WITH EXISTING CONDITIONS
lllll II lllll l| II II II II 1 III 11 11 EXISTING 11 11 EX.+OTHER 11 11 EX.+OTHER 11
MOVEMENT ||1|1 EXIST || PROP |11|| EXISTING I PROPOSED 11 11 EXISTING 11 OTHER 11 PROJECT | 111 EXISTING 11 11 + OTHER 11 11 +PROJECT 11 11 +PROJECT II
mil LANES 11 LANES HIH CAPACITY 1 CAPACITY II 11 VOLUME 11 VOLUME 11 VOLUME | 111 V/C II 11 V/C ii li V/C ii 11 V/C-WJMP 11
NL Hill 1 11 lllli 1800 II 0 11 II 119 11 1 1 III 0.07 11 * II 0.07 II ' II 0.07 11 * 1 ========= |==
NT mil 2 II lllll 4000 11 0 11 II 815 11 il 1 III 0.20 11 11 0.20 11 II 0.20 11 11 11 NR lllll 1 II lllll 1800 11 0 11 II 547 ii ii i 111 0.30 11 11 0.30 11 11 0.30 11 il II SL mil 1 11 mil 1800 11 0 II II 56 11 II 1 111 0.03 11 II 0.03 II II 0.03 11 ii 11 ST Hill 2 11 mil 4000 II 0 11 11 744 11 II 1 III 0.19 II * li 0.19 II * 11 0.19 11 * II 11 ' SR lllll 1 il mil 1800 II 0 11 11 198 li 11 1 III 0.11 11 II 0.11 II 11 0.11 II 11 li EL mil 2 11 mil 3600 11 0 11 11 349 11 il 1 III 0.10 11 11 0.10 li 11 0.10 11 II 11 * ET illll 2 11 HHI 4000 II 0 11 11 839 11 ii 1 III 0.21 II * II 0.21 ii * ii 0.21 li * II II
ER mil 1 11 IHII 1800 II 0 11 II 114 11 ii 1 III 0.06 II 11 0.06 11 11 0.06 11 11 11
WL lllll 2 11 mil 3600 il 0 II II 363 II II 1 111 0.10 II * II 0.10 II * 11 0.10 11 * II II WT lllll 2 11 Hill 4000 li 0 11 11 474 11 ii 1 III 0.12 11 11 0.12 II H 0.12 11 II II •
WR mil 1 11 HHI 1800 II 0 11 II 54 11 II 1 111 0.03 11 11 0.03 11 11 0.03 11 H 11
NORTH/SOUTH CRITICAL SUMS = 1 III 0.26 1 0.26 1 0.26 1 0.00 NORTH/SOUTH CRITICAL SUMS = 1 III 0.26 1 0.26 1 0.26 1 0.00
ICU SPREADSHEET FILE NAME CAN&COL 20&99 III ICU SPREADSHEET FILE NAME CAN&COL 20&99
EASTAWEST CRITICAL SUMS = 1 III 0.31 1 0.31 1 0.31 1 0.00 EASTAWEST CRITICAL SUMS = 1 III 0.31 1 0.31 1 0.31 1 0.00
N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND
IM N = NORTHBOUND, S = SOUTHBOUND
E = EASTBOUND, W = WESTBOUND CLEARANCE = 111 0.05 1 0.05 1 0.05 1 0.05
L = LEFT, T = THROUGH, R = RIGHT 111 ========== = == = ========== = == = ========== = == = ========== = =
N.S. = NOT SIGNALIZED ICU VALUE = III 0.62 1 0.62 1 0.62 1 0.05
LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS
III LOS = LEVEL OF SERVICE
* DENOTES CRITICAL MOVEMENTS LOS = 111 B 1 B 1 B 1 A