Loading...
HomeMy WebLinkAboutCT 02-28; La Costa Condominiums; Tentative Map (CT) (17)Hofman Planning Associates Planning Fiscal Services Environmental gp. RECEIVED October 14,2003 Saima Qureshy City of Carlsbad, Planning Department 1635 Faraday Avenue Carlsbad, Ca. 92008 P BC3 1 t4 e:,S CITY OF CARLSBAD PLANNING DEPT. RE: LA COSTA CONDOMINIUMS (CT 02-28/CP 02-13/HDP 02-14) Dear Saima: This letter accompanies the resubmittal of the abovementioned project. Attached to this letter is a copy of your letter of July 2, 2003 and Frank Jimeno’s letter dated July 31, 2003. The following is a response to all of the issues contained in both letters. ISSUES OF CONCERN Planning 1. Corrections have been made per the redlined plans. 2. A lighting plan will be submitted prior to the Planning Commission hearing. Fire Department 3. 4. 5. 6. 7. A note has been added to the plans. See Driveway Grade Exhibit. Done. Please see the Turning Radius exhibit as part of this package A loop system will not be provided. Prior to final engineering we will provide you with a water study that demonstrates that a single connection system will be adequate to handle the anticipated flows. Engineering 1. This information was delivered to you and Frank Jimeno on September 12,2003 and a copy of that letter has been included as part of this package. 5900 Pasteur Court Suite 150 Carlsbad CA 92008 (760) 438-1465 Fax: (760) 438-2443 2. A copy of this deed for SDG&E easement (document 74-07071 5) has been included as part of this package. 3. Shown on plans. 4. A note has been added to the plans. 5. See Sheet 6 of the Tentative Map. 6. Please see the Sight Distance exhibit included in this package. 7. All of the trees in the La Costa Avenue right-of-way that are to be removed are indicated as such. 8. Please see the Driveway Grade exhibit. 9. This information was provided to you on August 27,2003 and a copy has been included in this package. In addition two copies of the revised Hydrology, Hydraulics, and Detention Study (dated 9/26/03) have been included. 10. Two sets of a revised SWPPP plan (dated 9/26/03) have been included. 1 1. A loop system will not be provided. Prior to final engineering we will provide you with a water study that demonstrates that a single connection system will be adequate to handle the anticipated flows. Wastewater District), dated October 8,2003 concerning the sewer design of the project. 12. Please see the attached letter from Steve Deering, (District Engineer, Leucadia 13. Corrections have been made per the redlined plans. If you have any questions or need additional information, please call me at 438-1465. Sincerely, Roy Publico Cc FrankJimeno Fire Department Kwan So