HomeMy WebLinkAboutCT 03-08; Carlsbad Office Park; Tentative Map (CT) (5)July 29, 2003
Jim Schreder
Danjon Engineering
895 E. Yorba Linda Blvd. # 202
Placentia, CA 92870
SUBJECT: PUD 03-05 - CARLSBAD OFFICE PARK
Thank you for applying for Land Use Permits in the City of Carlsbad. The Planning Department
has reviewed your request to subdivide an industrial parcel into six lots, application no. PUD 03-
05, as to its completeness for processing.
The items requested from you earlier to make your application complete have been received
and reviewed by the Planning Department. It has been determined that the application is now
complete for processing. Although the initial processing of your application may have already
begun, the technical acceptance date is acknowledged by the date of this communication.
Please note that although the application is now considered complete, there may be issues that
could be discovered during project review and/or environmental review. Any issues should be
resolved prior to scheduling the project for public hearing. In addition, the City may request, in
the course of processing the application, that you clarify, amplify, correct, or otherwise,
supplement the basic information required for the application.
At this time, the City asks that you provide two complete sets of the revised development plans
so that the project can continue to be reviewed.
Please contact your staff planner, Saima Qureshy, at (760) 602-4619, if you have any questions
or wish to set up a meeting to discuss the application.
Sincerely,
MICHAELYHOLZ~IILLER
Planning Director
MJH:SQ:bd
c: Gary Barberio, Team Leader
John Maashoff, Project Engineer
File Copy
Data Entry
Planning Aide
Attachment
@ 1635 Faraday Avenue Carlsbad, CA 92008-7314 (760) 602-4600 FAX (760) 602-8559 www.ci.carlsbad.ca.us
NO. PUD 03-05 - CARLSBAD OFFICE PARK
ISSUES OF CONCERN
Engineering:
The Engineering Department has completed its review of the above project for application
completeness. The application and plans submitted for this project are considered complete.
Prior to scheduling this project for hearing, the following items should be corrected/addressed:
1.
2.
3.
4.
5.
6.
7.
8.
9.
IO.
Please revise the TM so the text (and drawings) are aligned parallel with the long side of
the “D” sheet. In other words, please rotate all blocks of textldrawings 90 degrees
clockwise in relation to the paper.
Please add the easement recording information for all easements that are shown a$
proposed, but the easements have already been recorded.
Please revise the earthwork quantities on the TM if necessary. Wasn’t the grading
currently shown proposed with the PIP and this application proposed no grading?
Please add a note to the TM and reference as necessary the existing approved grading
and improvement drawing numbers as the site is currently under construction.
Please have the EngineedLand Surveyor-of-work and the property owner sign the TM.
Please revise the title of the map to read Tentative Map rather than Tentative Parcel Map.
The TM should show all easements listed in the title report dated June 6th unless an
updated one has been prepared, in which case, please provide a copy with the next
submittal.
Please add a notehndicate on the TM, how each of the lots will obtain access to public
roads and utilities. Will Parcel 6 be owned in common .with each of the other 5 lots
having an equal interest?
Please revise the TM so that each of the proposed lots is labeled as a lot rather than a
parcel. The TM should show Lots 1-6.
Please show line-of-sight areas for stopping sight distances at the intersection of Corte
Del Nogal and Camino Vida Roble in accordance with City standards. The TM should
show any necessary easements to ensure the lines-of-sight are maintained.
Please note, this is not a complete review of all applicable information related to the subject
application. Additional information may be required/issues of concern may arise from review of
the responses to the above items.
Should you have any questions regarding any of the comments above, please contact John
Maashoff at 760-602-2747.