HomeMy WebLinkAboutCT 03-09A; Ocean Bluff; Tentative Map (CT) (14)22 -98 10:23 FR CflTELLUS RESIDENTS 714 251 1933 TO 17604380894 p.03/04
w"
CATELLUS
May 22, 1998
David Hauser
Assistant City Engineer
City of Carlsbad
2075 Las Palmas Drive
Carlsbad, CA 92009
SUBJECT: TM 93-09 (A) CONDITIONS OF APPROVAL
Dear David:
Thank you for your assistance in processing the Poinsettia Lane Reimbursement
Agreement.
I have enclosed modified language for the Condition regarding the Poinsettia Lane
requirements for the Planning Department's report to the Planning Commission,
scheduled for June 17, 1998.
The proposed Condition relates the roadway improvements for Poinsettia Lane to the
approved Reimbursement Agreement.
I would appreciate your review of this language and acknowledgment to Anne Hysong in
the Planning Department that the language is acceptable. Please let me know if you have
any questions or comments.
Again, thank you for your assistance as we continue to move the Poinsettia Lane process
forward.
Sincerely,
CATELLUS RESIDENTIAL GROUP, INC.
Brian J. Milidi
Vice President
Enc.
cc: Anne Hysong (withenc.)
CATELLUS RESIDENTIAL GROUP
5 IJARK PI.AZA, SUITE 400, IRVINE, CALIFORNIA 92714 (949) 251-6100 FAX (949) 251-8837
251 1933 TO 176W3B0894 P.04/04
Roadway Condition:
"City acknowledges that the off-site roadway improvements described below
are not the responsibility of the developer. Nevertheless, as an accommodation to the City,
and for the benefit of city-wide planning, the developer has agreed to construct the off-site
roadway improvements for that portion of Poinsettia Lane between Aviara Parkway and
Black Rail Road (the "Aviara/Black Rail Segment"), and, in consideration therefore, the
City has agreed to reimburse the developer for the actual cost of constructing the
Aviara/Black Rail Segment (all as more fully described in that certain Agreement for
Reimbursement of Costs for Construction of Improvements for Poinsettia Lane from Aviara
Parfcway to Black Rail Road, dated , 1998 (the "Road Work Agreement");
provided, however, the developer shall not be obligated to construct the Aviara/Black Rail
Segment unless (i) the City acquires all necessary right-of-way and easements related to the
construction and use of the Aviara/Black Rail Segment (as more fully described in the Road
Work Agreement), and (ii) at the time the map is otherwise scheduled to receive final
approval, the City is not in default under the Road Work Agreement."
SIWEISSM 3(Ci6 403425 2
MOV -y\ '98 17:08 310 27? 7B89 PflGE-03