HomeMy WebLinkAboutCT 83-33; SEAPORT CONDOMINIUMS; Engineering Application-
SUBDIVISION LOG
SUJI.VISION NO. C783"-S3
OWNER
ADDRESS
PHONE
DATE RE
ENGINEER
ADDRESS
PHONE
- 743- 223A
.1ENTAT1VE PARCEL MAP SLNI
DATE__________
PLANNING 0
UTIL/MAINT. 0
PARKS 0
FIRE 0 0
CRMWD 0 0
LCWD 0
PRELIM. DUE
PRELIM. SENT
FINAL DUE
FINAL SENT
REQUIREMENTS:
PLANNING REPORT FOR DATE TO DCC
DATE TO P.C. ACTION:. 0 APPROVED 0 DENIED
DATE TO C.C. ACTION: 0 APPROVED 0 DENIED o STREET DEDICATION DEED NO. RECORDED_____________________ El FUTURE IMPROVEMENT AGREEMENT. TO C.C. . 0 APPROVED
[I OTHER
C .C. CONDITIONS:
IMPROVEMENT PLANS
TENATIVE PARCEL MAP
PROJECT NO.C783-3 DRAWING NO.Zf -1
PRELIMINARY TITLE REPORT 1st Check IN . OUT_____
GRADING PLAN 2nd Check . IN OUT_____
PUBLIC FACILITIES FEE AGREEMENT 3rd Check IN OUT_____
EIGHT COPIES OF TENTATIVE PARCEL MAP SIGNED BY C.
'
E.
300' RADIUS MAP . . SIGNED "AS-BUILT" -
PROPERTY OWNER'S LIST & ENVELOPES
ENVIRONMENTAL IMPACT ASSESSMENT . . . GRADING PLANS
SCHOOL AND SEWER LETTER GRADING PERMIT NO. Fz.84(.I
TIME EXTENSION AGREEMENT 1st Check, IN n, OUT_____
1$T CHECK IN OUT 2nd Check IN-' . OUT_____
2ND CHECK IN OUT 3rd Check IN__ OUT_____
3RD CHECK IN _. OUT__________ SIGNED BY C.E.__________________________
APPROVED .
.PE.IMJT iSSUED
DEPOSITS REQUIRED
ITEM AMOUNT PAID FINAL OR PARCEL MAP . .
1st Check IN/g/1( OUT /-?/V TENT. EXAM FEE
PARKS-IN-LIEU FEE
D,Z
2nd Check IN,/2o/ OUT_____ ..
3rd Check IN- OUT GRADING PERMIT FEE _________ 0
FINAL MAP F EE
SIGNED BY C.E. . . . -lMP. PLAN CHECK FEE 375.
TO CITY CLERK
_______________________________
INSPECTION FEE 0
RECORDED _.. WATER CONNECTION DEPOSIT
COPIES RECEIVED . STREET SIGN DEPOSIT
STREET TREE DEPOSIT
s-GRADING PLAN CHECK FEE . BONDS STREET LIGHT ENERGY FEE
ENGINEER'S ESTIMATE $. DUPLICATE TRACING FEE
AMOUNT IN
FAITHFUL PER . . DRAINAGE AREA FEE
MATERIALS & LABOR
•IJ REVISED PLAN CHECK FEE
GRADING & EROSION _________ 0 . _-
MONUMENTATION 0
IMPROVEMENT AGREEMENT 0 TOTAL DEPOSITS
- BON DI NG CO - COMMENTSOR •PROBLEMS
.
ADDRESS
•
REPORTS .
ç_('ç,e'/c'c,c
IN REQUIRED
_____________________________________ TITLE REPORT • .0 0
SUBDIVISION GUARANTEE 0 • . U
SOILS REPORT • 0 0 -- •
ENGINEER'S ESTIMATE 0 . 0 •
TRAVERSE cALç. 0 • Q
-, • .0 0 .
CITYlF'CARLSBAD
0
ENGINEERING DEPARTMENT
FEES AND DEPOSITS WORKSHE,
PROJECT NAME: 'T 6333 , PREPARED BY:
• DATE: -09
TENTATIVE MAP FEE .' .•'
FINAL MAP FEE (. / LOTS)'. .
.G../ ......
______________________
IMPROVEMENT PLAN CHECK FEE:
•-LL.' VALUE
TOTAL:' ' X e, 0w5 i27O
- Percentage
' IMPROVEMENT INSPECTION FEE:
' I ITEM ' VALUE
TOTAL:
' ., Percentage - S
PARKS-IN-LIEU FEE (CIRCLE ONE):
DWELLING TYPE - SF MF •MH
AREA ' I 24
' ' NUMBER OF UNITS: ' x tf3L1 ', 00
Area Fee/Unit
'
, STREET LIGHT ENERGr'zrNG: ' . ' • ' •'
,
: 5,800 Lumen ' ' ' @ 8T.00
9,500 Lumen '@' 111.06 =
16.000 Lumen @ 152.10
20,000 Lumen / @ 169.38 'Jt,c?,&3
TOTAL: - • ___________
GRADING PLAN CHECK FEE ( CUBIC YARDS) ...............' DUPLICATE TRACING DEPOSIT .................................*..szi.o -- GRADING CASH DEPOSIT . . . ., .' .......... #3000.00 ............'., 00-0 STREET SIGN DEPOSIT
5-
TOTAL:
'_ -
STREET STRIPING DEPOSIT .'
FRONT LINE OR AREA FEES (TYPE . ................ __________)
DRAINAGE AREA FEE ' (AREA O. ,j/A_ ) ................' ' -
TOTAL ACRES: , X
Area Fee
LESS VALUE OF MASTER DRAINAGE IMPROVEMENTS AS NOTED IN MASTER DRAINAGE PLAN DOCUMENTS ' MULTIPLIED BY CURRENT INFLATION. FACTOR. •'
LINE ' VALUE- X FACTOR AMOUNT
- - x - -
x • - - -'
X .5-
S.
TOTAL:
DRAINAGE FEE DUE,:
ADDITIONAL 'FEES: - • ' -' -
' - - • • - --
' • • -
-' - TYPE: -• _____________________
- ' TYPE: -'• _-
•• , : -_-_-
'• : • •.
,
. -
-
TOTAL FEES 'AND DEPOSITS: — -
(IN ADDITION, A GRADING PERMIT FEE OF — IS DUE UPON
ISSUANCE OF THE GRADING PERMIT).
-------,---
' • ' • S • - •
'' -
.--