Loading...
HomeMy WebLinkAboutCT 83-40; LA COSTA VILLAS; Engineering ApplicationSUBDIViSION LOG I.SUBDIVISION NO.d7B3-4 DATE RECEIVED_________________________ OWNER - iToP t Je %tt .4A ENGINEER ADDRESS o• totjb VA ADDRESS__________________________________ PHONE _______ PHONE TENTATIVE PARCEL MAP SENT LETTERS DATE PRELIM. DUE PLANNING 0 FIRE 0 0 PRELIM. SENT UTIL/MAINT. 0 CRMWD 0 0 FINAL DUE PARKS 0 LCWD 0 , FINAL' SENT RLQUIRLMLNTS: ' PLANNING REPORT FOR ' ' DATE TO DCC DATE TO P.C. ACTION: 0 APPROVED 0 DENIED DATE TO C.C. "ACTION: 0 APPROVED 0 DENIED O STREET DEDICATION DEED NO. RECORDED______________________ O FUTURE IMPROVEMENT AGREEMENT. TO C.C. 0 APPROVED DOTHER C.C. CONDITIONS: TENATIVE PARCEL MAP PRELIMINARY TITL/ TIVE GRADING PLAN PUBLIC FACILITIE MENT EIGHT COPIES OF ARCEL MAP 300' RADIUS MAP PROPERTY OWNER' J LIST & ENVELOPES ENVIRONMENTAL /IMPACT ASSESSMENT SCHOOL AND 5''WER LETTER TIME EXTEN8'ION AGREEMENT 1ST CHE IN OUT_________ 2ND CCK IN OUT_________ 3R /HECK IN________ OUT________ ED FINAL or MAP 1st Check IN 't/7/1 OUT IJI/41 2nd Check IN ' OUT 3rd Check IN_____ OUT_____ SIGNED BY C.E._____________________________ TO CITY CLERK RECORDED COPIES RECEIVED______________________________ BONDS ENGINEER'S ESTIMATE 'AMOUNT IN FAITHFUL PERFORMANCE MATERIALS & LABOR ' GRADING & EROSION MONUMENTATION IMPROVEMENT AGREEMENT ' 0 BONDING CO. ADDRESS REPORTS REQUIRED , IN TITLE REPORT SUBDIVISION GUARANTEE ' SOILS REPORT ENGINEER'S ESTIMATE 0 TRAVERSE CALC. , 0' 13 IMPROVEMENT PLAN PROJECT N0.6i83-4-O DRAWING NO. Z44 1st Check IN OUT_____ 2nd Check IN OUT_____ 3rd Check IN OUT_____ SIGNED BY C.E._____________________________ SIGNED "AS-BUILT"_____________________________ GRADING PLANS GRADING PERMIT NO. P2,,/ 1st Check IN OUT_____ -44 2nd Check IN_____ OUT_____ 3rd Check IN_____ ' OUT_____ SIGNED BY C.E.____________________________ PERMIT ISSUED______________ DEPOSITS REQUIRED ITEM AMOUNT PAID TENT. EXAM FEE 'PARKS-IN-LIEU FEE GRADING PERMIT FEE FINAL MAP FEE ' /o2,— .IMP. PLAN CHECK FEE INSPECTION FEE WATER CONNECTION DEPOSIT STREET SIGN DEPOSIT STREET TREE DEPOSIT ' 0 'GRADING PLAN CHECK FEE STREET LIGHT ENERGY FEE DUPLICATE TRACING FEE ______ DRAINAGE AREA FEE' , 0 REVISED PLAN CHECK FEE U TOTAL DEPOSI•TSL 'COMMENTS OR PROBLEMS IAJ/LPAti S7' 0 lele /7/